Scaffolding Rental and Supply for Year 2020/2021 at Mukah Power Generation Sdn Bhd

Total Page:16

File Type:pdf, Size:1020Kb

Scaffolding Rental and Supply for Year 2020/2021 at Mukah Power Generation Sdn Bhd SCAFFOLDING RENTAL AND SUPPLY FOR YEAR 2020/2021 AT MUKAH POWER GENERATION SDN BHD (TENDER REF. NO.: MPG(M)5/101/ASM/ZS (2223)) TENDER NOTICE Suitably qualified tenderers are invited For Scaffolding Rental And Supply For Year 2020/2021 At Mukah Power Generation Sdn Bhd stated as follows: Tender Reference No. Title Eligibility MPG(M)5/101/ASM/ZS (2223) SCAFFOLDING RENTAL AND SUPPLY FOR YEAR • UPKJ – At least Class C or above, Register under 2020/2021 AT MUKAH POWER Services & Supplies with Head I – Civil Engineering & GENERATION SDN BHD Building Materials [Sub-Head 2(a) • Bumiputera Registered Company Instruction to Tenderers: Mandatory Requirement Tenderers shall possess adequate financial capability and experience as follows: 1. Provide past project experience on the related works (feedback and report from past client) *Interested tenderers are required to produce evidence of fulfilling above-mentioned mandatory requirement. Failing which, your intention will be rejected. General Instructions 1. This tender exercise will be conducted on an online Ariba platform. The entire event will be managed by SEPRO (Sarawak Energy e-Procurement) Team. Tender details are available for viewing at http://www2.sesco.com.my 2. Please note that all Tenderers are required to register in SEPRO to participate in this tender. If your company is not registered in SEPRO, please allow ample time to complete registration. Vendors can self-register to SEPRO via the URL provided: http://bit.ly/register2SEPRO. The registration is free of charge. 3. Interested Tenderer that meets the eligibility is required to do the following steps: A) Email your interest to participate for this tender exercise to [email protected]. Please include the following details: • Tender Reference: • Tender Title: • Company Contact Person: • Company Name: • Phone Number: • Email Address: • (Attach all softcopy of evidence for mandatory requirement) 4. Tenderers shall attend the briefing and site visit held as follows. Tenderers who failed to attend the briefing and site visit may be disqualified by Sarawak Energy. **(Please delete item 4. if no tender briefing or site visit required) Tender Briefing Site Visit Date and Time 08th December 2020 @ 2pm Venue Meeting Room, Level 2, Admin Building, Mukah Power Generation Sdn Bhd (Preferable with Virtual during Covid-19 Pandemic, kindly contact the representative for arrangement) ONLY shareholders, directors or Company's authorized personnel (thru company's authorization letter) shall be allowed to attend the Tender briefing and Site Visit (if necessary). All tenderers must bring along Original Copies (for verification) of Company Registration (Form 24 and Form 49) or Form I (The Businesses, Professions and Trading Licensing Ordinance) and Company Official Stamp during the Tender Briefing. 5. Tender documents can only be accessible to the Tenderer after registration. A) SEPRO team will acknowledge receipt upon receiving your email on interest to participate. If you have any inquiries on SEPRO please contact us at the following channel: • Email: [email protected] • Phone: 082-330127 Monday to Thursday : 9.00am – 1.00pm and 2.00pm – 4.00pm Friday : 9.00am – 11.30am and 2.30pm – 4.00pm Note: Sarawak Energy Berhad is not liable for any cost incurred by the Tenderer in preparing the tenders. Tender submission shall be submitted online through SEPRO system no later than 3:00 p.m. (Malaysia Local Time) on the date specified below. Tender Reference Number Closing Date Closing Time MPG(M)5/101/ASM/ZS (2223) Wednesday,16th December 2020 3:00 PM All enquiries regarding the Tender should be addressed to: Mukah Power Generation Sdn Bhd KM32, Jalan Mukah-Balingian, 96400, Mukah. Sarawak. Attention: Maintenance Manager Tel. No.: +6016-8892101 Fax No.: .: +6 084 – 875067 Email : [email protected] INTRODUCTION Sarawak Energy Berhad is an energy development company and vertically integrated power utility with a vision to achieve sustainable growth and prosperity for Sarawak by meeting the region’s need for reliable and renewable energy – providing electricity to 2.7 million Sarawakians in urban and rural areas. Built on a foundation of almost 100 years of experience, our role is to provide reliable, safe, and competitively – priced power. Our energy predominantly comes from Sarawak’s rich hydropower resources, making our energy supply environmentally friendly and sustainable. We are the primary electricity provider in Sarawak, with an expanding consumer base on more than 650,000 account holders throughout the state and growing multidisciplinary workforce of 5,000. Sarawak energy is the largest employer of professional Sarawak talent. We are now taking bold steps to support Sarawak’s goal of becoming a developed state by 2030. in advancing the agenda of sustainable and continuous growth, a strategy roadmap is designed to consolidate, protect and optimise the value created from the transformation of a traditional utility into a corporate power house and digital utility of the future by focusing on excellence in operation and health safety and environment (HSE), project delivery and talent management enabled by a high performance organisational culture. Introduction of Scaffolding Rental and Supply for Year 2020/2021 at Mukah Power Generation Sdn Bhd (MPG) The Services to be provided by the Service Provider include the following: 1. This tender specification is intended to describe and quantify, as far as possible, the works which are required to be done by the contractor who has intention to do Scaffolding Rental and Supply for Year 2020/2021 at Mukah Power Generation Sdn Bhd. 2. Each Tenderer will be required to submit its Tender Offer in the Tender price and to provide with all information which is either requested or is otherwise required to be provided in accordance with the Tender Documents. Tenderers shall note that MPG may, in its sole discretion, elect to: A. appoint more than one tenderer to perform the works; B. not appoint any tenderer to perform the works, or C. cancel this invitation to tender process at any time. 3. MPG consists of Unit 1 & Unit 2, with each Unit can deliver 135MW. Scaffolding rental and supply will cover all area within Mukah Power Generation Sdn Bhd as per listed work scopes. SCOPE OF SERVICES / SPECIFICATIONS The work scope shall include, but not limited, to the following: 1. Scaffolding Requirements All scaffolding shall be constructed in accordance with BS 5973 Code of Practice for Access and Working Scaffolds and Special Scaffold structures in steel or its equivalent. 2. Scaffolding Materials & Component a) Scaffold tubes: i. All tubes must be galvanized steel 48.3mm OD and wall thickness 4mm comply to BS 1139 Part 1, 1982 and free from crack, splits or excessive corrosion and straight. b) Coupling and Fittings i. They must be of sound construction, comply with BS 1139 Part 2. Do not mix tubular and fittings of different standards. ii. 3 basic most comment couplers types: a. Right angle couplers b. Putlog couplers c. Swivel couples iii. Right angle and swivel couplers can be used to fix tube in a load bearing connection iv. To joint tubes end to end joint pins (also called spigots) or sleeve coupler are used. c) Board and Decking i. All timber scaffold boards shall meet the recommended BS 2842:1981 or regulation 87 of factory and machinery act 1967, Regulation 1986. ii. Ended are protected by metal plates called hoop irons. iii. Comes in 3 thickness 38mm (usual), 50mm & 63mm are standard width (225mm) d) Ladders i. Shall meets BS 1129:1982 e) Frame or tubular scaffolds i. Only propriety steel frame or tubular scaffold of sound design and construction are allowed as per manufacturer specification f) Inspection i. A qualified scaffold supervisor should inspect all material and inspect the relevant erected scaffolding with the report signed and forwarded to the safety officer for record keeping. ii. Any scaffolding that has passed inspection shall be tagged to indicate that it is safe for usage. iii. A qualified scaffold supervisor shall be at site full time to supervise any scaffold works. iv. A qualified scaffold supervisor shall apply permit to remove any scaffolding material and shall tagged relevant scaffolding that removal work in progress. v. Any scaffolding above 40 meters height must be designed and endorsed by professional structural engineer and forwarded to DOSH. g) Erection i. Scaffold must only be erected, altered or dismantle by competent scaffolder under supervision of charge hand scaffolder. All inspection of any scaffolding shall be done by a scaffold inspector. ii. The maximum duration for scaffolding volume installs at one area is one month (30 days). iii. For hanging scaffolding, the volume calculated based on how much volume of scaffold erected. h) Scaffolder: i. The contractor must provide 1 Certified License Scaffolding installer to each team that consists of 4 members. Minimum four (4) teams must be provided by the contractor to Mukah Power Genaration Sdn Bhd. ii. All the resume and certificate for the team leader that have Certified License for Scaffolding Installer from DOSH must be attached inside the tender. Mukah Power Generation Sdn Bhd will conduct an interview to each of them. iii. List of staff as a scaffolding erector must be attached also in the tender. i) Scaffolding Inspector: i. Contractor must provide one (1) scaffolding supervisor to do inspection for the scaffolding that erect by the scaffolding erector. ii. Scaffolding supervisor must prepare monthly checklist and finding report to Mukah Power Generation Engineer in charge. iii. Resume and valid certificate must be attached inside the tender. j) Material: i. Contractor must provide material lists that will be used for scaffolding work in Mukah Power Generation Sdn Bhd. The material list must consist of material data sheet and quantity of every part or material that will be used for this contract. k) Company: i. Company must be registered with CIDB (Construction Industry Development Board) registered as Scaffolding Installer.
Recommended publications
  • The BIMP-EAGA Port Booklet
    The BIMP-EAGA Port Booklet Published with support from the Asian Development Bank (ADB) Regional Policy Advocay technical Assistance (R-PATA) on support for Trade Facilitation in BIMP-EAGA The BIMP-EAGA Port Booklet Published with support from the Asian Development Bank (ADB) Regional Policy Advocay technical Assistance (R-PATA) on support for Trade Facilitation in BIMP-EAGA Contents BRUNEI DARUSSALAM Port of Muara 6 INDONESIA Port of Balikpapan 10 Port of Bitung 12 Port of Nunukan 14 Port of Pontianak 16 Port of Tarakan 18 MALAYSIA Port of Kuchin 22 Port of Kudat 24 Port of Labuan 26 Port of Miri 28 Port of Sandakan 30 Port of Tawau 32 2 PHILIPPINES Port of Bongao 36 Port of Brooke’s Point 38 Port of Dapitan 40 Port of Glan 42 Port of Pagadian 42 3 Brunei Darussalam Brunei Darussalam Brunei Darussalam Brunei Darussalam Port of Muara 1. Location Muara Port is the main international gateway for Brunei Darussalam. It is located on the and Layout island of Borneo and at located Lat 5 0’ 52” N Long 115 4’ 1”E. Muara Port was opened for commercial operations in February 1973, and commissioned as the Ports Department on 1st. May 1974. The Ports Department of Brunei (established in January 1986) is tasked with the management and operations of the Port. Muara port is served by numerous shipping lines connecting it to the regional hub ports including Kota Kinabalu, Kuching, Penang, Port Klang, Tanjung Pelepas and Singapore. 2. City Hinterland Brunei Darussalam and both Sabah and Sarawak 3. Main Cargo Both Containerized and conventional cargoes are handled at the port.
    [Show full text]
  • Indigenous Knowledge Among Iban Kua' in Samarahan District, Sarawak
    International Journal of Academic Research in Business and Social Sciences Vol. 8 , No. 14, Special Issue: Transforming Community Towards a Sustainable and Globalized Society, 2018, E-ISSN: 2222-6990 © 2018 HRMARS Indigenous Knowledge among Iban Kua’ in Samarahan District, Sarawak: Some Observations Elvin Jawol, Neilson Ilan Mersat, Mohamad Suhaidi Salleh, Spencer Empading Sanggin, Ahi Sarok, Wong Swee Kiong, Mohd. Azizul Hafiz B. Jamain To Link this Article: http://dx.doi.org/10.6007/IJARBSS/v8-i14/5033 DOI: 10.6007/IJARBSS/v8-i14/5033 Received: 28 Aug 2018, Revised: 11 Oct 2018, Accepted: 05 Dec 2018 Published Online: 23 Dec 2018 In-Text Citation: (Jawol et al., 2018) To Cite this Article: Jawol, E., Mersat, N. I., Salleh, M. S., Sanggin, S. E., Sarok, A., Kiong, W. S., & Jamain, M. A. H. B. (2018). Indigenous Knowledge among Iban Kua’ in Samarahan District, Sarawak: Some Observations. International Journal of Academic Research in Business and Social Sciences, 8(14), 117–126. Copyright: © 2018 The Author(s) Published by Human Resource Management Academic Research Society (www.hrmars.com) This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode Special Issue: Transforming Community Towards a Sustainable and Globalized Society, 2018, Pg. 117 - 126 http://hrmars.com/index.php/pages/detail/IJARBSS JOURNAL HOMEPAGE Full Terms & Conditions of access and use can be found at http://hrmars.com/index.php/pages/detail/publication-ethics 117 International Journal of Academic Research in Business and Social Sciences Vol.
    [Show full text]
  • (18 MAC 2021) 1. LAPORAN HARIAN A. Status Kes COVID-19 Di Dalam W
    Kenyataan Media JPBN Bil 77/2021 JAWATANKUASA PENGURUSAN BENCANA NEGERI SARAWAK KENYATAAN MEDIA (18 MAC 2021) 1. LAPORAN HARIAN A. Status Kes COVID-19 Di Dalam Wad Hospital Dan Masih Di Bawah Pengawasan Perubatan (Kes Aktif) Hari ini terdapat 206 kes baharu yang telah pulih dan dibenarkan discaj pada hari ini iaitu dari Hospital Sibu (51), Hospital Miri (35), Hospital Umum Sarawak (28), PKRC di bawah Hospital Kapit (24), Hospital Bintulu (21), Hospital Sarikei (19), PKRC Betong (15), PKRC Sri Aman (8), PKRC Serian (4) dan PKRC Mukah (1). Ini menjadikan jumlah keseluruhan kes positif COVID-19 yang telah pulih atau dibenarkan discaj setakat hari ini adalah seramai 10,838 orang atau 80.80% dari jumlah keseluruhan kes COVID-19 di Sarawak. Jumlah kes aktif yang masih mendapat rawatan dan diasingkan di PKRC dan wad hospital mengikut hospital adalah seramai 2,433 orang dimana: • 701 kes di Hospital Sibu dan PKRC di Sibu; • 449 kes di Hospital Miri dan PKRC di Miri; • 340 kes di Hospital Bintulu dan PKRC di Bintulu; • 264 kes di Hospital Umum Sarawak dan PKRC di Kuching; 1 Kenyataan Media JPBN Bil 77/2021 • 201 kes di Hospital Kapit dan PKRC di Kapit; • 161 kes di Hospital Sarikei dan PKRC di Sarikei • 127 kes di Hospital Betong dan PKRC di Betong; • 99 kes di PKRC Depo Imigresen Semuja, Serian • 34 kes di PKRC Serian; • 30 kes di Hospital Sri Aman dan PKRC di Sri Aman; • 22 kes di PKRC Mukah; • 3 kes di Hospital Limbang; dan • 2 kes di PKRC Lawas. Hari ini, 304 PUI baru telah dilaporkan dan dua (2) PUI yang masih menunggu keputusan ujian makmal.
    [Show full text]
  • Laporan Keputusan Akhir Dewan Undangan Negeri Bagi Negeri Sarawak Tahun 2016
    LAPORAN KEPUTUSAN AKHIR DEWAN UNDANGAN NEGERI BAGI NEGERI SARAWAK TAHUN 2016 BAHAGIAN PILIHAN RAYA NAMA CALON PARTI BILANGAN UNDI STATUS P.192-MAS GADING N.01 - OPAR RANUM ANAK MINA BN 3,665 MNG NIPONI ANAK UNDEK BEBAS 1,583 PATRICK ANEK UREN PBDSB 524 HD FRANCIS TERON KADAP ANAK NOYET PKR 1,549 JUMLAH PEMILIH : 9,714 KERTAS UNDI DITOLAK : 57 KERTAS UNDI DIKELUARKAN : 7,419 KERTAS UNDI TIDAK DIKEMBALIKAN : 41 PERATUSAN PENGUNDIAN : 76.40% MAJORITI : 2,082 BAHAGIAN PILIHAN RAYA NAMA CALON PARTI BILANGAN UNDI STATUS P.192-MAS GADING N.02 - TASIK BIRU MORDI ANAK BIMOL DAP 5,634 HENRY @ HARRY ANAK JINEP BN 6,922 MNG JUMLAH PEMILIH : 17,041 KERTAS UNDI DITOLAK : 197 KERTAS UNDI DIKELUARKAN : 12,797 KERTAS UNDI TIDAK DIKEMBALIKAN : 44 PERATUSAN PENGUNDIAN : 75.10% MAJORITI : 1,288 BAHAGIAN PILIHAN RAYA NAMA CALON PARTI BILANGAN UNDI STATUS P.193-SANTUBONG N.03 - TANJONG DATU ADENAN BIN SATEM BN 6,360 MNG JAZOLKIPLI BIN NUMAN PKR 468 HD JUMLAH PEMILIH : 9,899 KERTAS UNDI DITOLAK : 77 KERTAS UNDI DIKELUARKAN : 6,936 KERTAS UNDI TIDAK DIKEMBALIKAN : 31 PERATUSAN PENGUNDIAN : 70.10% MAJORITI : 5,892 PRU DUN Sarawak Ke-11 1 BAHAGIAN PILIHAN RAYA NAMA CALON PARTI BILANGAN UNDI STATUS P.193-SANTUBONG N.04 - PANTAI DAMAI ABDUL RAHMAN BIN JUNAIDI BN 10,918 MNG ZAINAL ABIDIN BIN YET PAS 1,658 JUMLAH PEMILIH : 18,409 KERTAS UNDI DITOLAK : 221 KERTAS UNDI DIKELUARKAN : 12,851 KERTAS UNDI TIDAK DIKEMBALIKAN : 54 PERATUSAN PENGUNDIAN : 69.80% MAJORITI : 9,260 BAHAGIAN PILIHAN RAYA NAMA CALON PARTI BILANGAN UNDI STATUS P.193-SANTUBONG N.05 - DEMAK LAUT HAZLAND
    [Show full text]
  • Accessibility and Development in Rural Sarawak. a Case Study of the Baleh River Basin, Kapit District, Sarawak, Malaysia
    Accessibility and development in rural Sarawak. A case study of the Baleh river basin, Kapit District, Sarawak, Malaysia. Regina Garai Abdullah A thesis submitted to Victoria University of Wellington in fulfilment of the requirements for the degree of Doctor of Philosophy 2016 School of Geography, Environment and Earth Sciences, Victoria University of Wellington, New Zealand i Abstract To what degree does accessibility to markets correlate with levels of development? This is an important question for those living in remote, underdeveloped parts of Southeast Asia during the final phases of de-agrarianisation. My study recounts the experience of rural-based Iban households living in the Baleh river basin of the Kapit District (population of 54,200) within a day or less travel by river to the small market town of Kapit (with a population of 18,000). With no connecting roads to the rest of Sarawak and reliant almost entirely on river transport, the local economy remains underdeveloped and is losing population. My field work among 20 villages in three accessibility zones of the Baleh river basin was undertaken over the three month period of May-July 2014. Structured interviews were conducted with 20 village headmen (tuai rumah), 82 heads of household, and 82 individuals within the households. Data was also systematically collected on 153 other individuals, including both residents and non-resident members of these bilik-families. My conceptual framework draws on von Thünen’s model of agricultural land use in order to generate expectations about the possible effects of market accessibility. While the sale of vegetables and other commodities accords with expected patterns, most rural households are in fact dependent on other, largely non-agricultural sources of income.
    [Show full text]
  • Kenyataan Media JPBN Bil 219/2021 1 JAWATANKUASA
    Kenyataan Media JPBN Bil 219/2021 JAWATANKUASA PENGURUSAN BENCANA NEGERI SARAWAK KENYATAAN MEDIA (07 OGOS 2021) 1. LAPORAN HARIAN A. JUMLAH KES COVID-19 JUMLAH KES BAHARU COVID-19 573 JUMLAH KUMULATIF KES COVID-19 80,747 B. PECAHAN KES COVID-19 BAHARU MENGIKUT DAERAH BILANGAN BILANGAN BIL. DAERAH BIL. DAERAH KES KES 1 Kuching 261 21 Kanowit 1 2 Serian 79 22 Song 1 3 Simunjan 41 23 Marudi 1 4 Samarahan 29 24 Tatau 1 5 Sibu 28 25 Kabong 1 6 Bau 21 26 Pakan 1 7 Mukah 14 27 Sarikei 0 8 Sri Aman 12 28 Bukit Mabong 0 9 Lundu 12 29 Telang Usan 0 10 Selangau 12 30 Beluru 0 11 Miri 11 31 Betong 0 12 Meradong 9 32 Sebauh 0 13 Subis 7 33 Tanjung Manis 0 14 Dalat 7 34 Julau 0 15 Bintulu 6 35 Pusa 0 16 Kapit 6 36 Daro 0 17 Asajaya 4 37 Belaga 0 18 Tebedu 4 38 Limbang 0 19 Saratok 2 39 Lubok Antu 0 20 Lawas 2 40 Matu 0 1 Kenyataan Media JPBN Bil 219/2021 C. RINGKASAN KES COVID-19 BAHARU TIDAK BILANGAN BIL. RINGKASAN SARINGAN BERGEJALA BERGEJALA KES Individu yang mempunyai kontak kepada kes 1 32 291 323 positif COVID-19. 2 Individu dalam kluster aktif sedia ada. 4 56 60 3 Saringan Individu bergejala di fasiliti kesihatan. 58 0 58 4 Lain-lain saringan di fasiliti kesihatan. 4 126 130 Saringan individu yang baru pulang atau masuk 5 dari negeri-negeri lain di Malaysia (Import B). 2 0 2 Sabah (2) JUMLAH 100 473 573 D.
    [Show full text]
  • Scanned Document
    Malayan Nature Journal 2006, 59(2), 165 - 187 Small Mammal Survey at Two Sites in Planted Forest Zone, Bintulu, Sarawak DON E. WILSON1, KRISTOFER M.HELGEN1, CHIN SING YUN2 and BELDEN GIMAN2 Abstract: A survey for small mammals was done at two sites within the Forest Department of Sarawak's Planted Forests Project in the Bintulu Division. Sampling was carried out in Bukit Sarang, a flooded swamp forest, and in Samarakan forest, an area of mixed 6-7 year old Acacia mangium blocks interspersed with remnants of disturbed logged forest. A total of twenty-two chiropteran species was recorded from these sites, including the first confirmed Sarawak records of Hipposideros bicolor and Myotis montivagus, and two bat species possibly new to science. In addition, sixteen species of small mammals were recorded at both sites. A short taxonomic discussion including the regional significance is given for each species collected. The annotated checklist from these two areas revealed that certain mammal species do survive within Acacia plantings, while mammal species richness was high in designated conservation zones such as Bukit Sarang. Keywords. Bats, Small Mammals, Bukit Sarang, Acacia mangium. Planted Forest Zone Bintulu, Sarawak. INTRODUCTION During the late 1990s, the Sarawak State government began a major initiative to enhance the supply of industrial wood in its Planted Forests (Pulp and Paper) Project, and employed Grand Perfect Sdn Bhd as its principal contractor. The Planted Forest Zone (PFZ), located in the Bintulu Division, covers approximately 490,000 ha. Of this total, approximately 45% will be planted with the fast growing tree, Acacia mangium, while 30-35% has been set aside as conservation areas, either as large blocks (20,000-25,000 ha) or smaller forested riverine buffers or forest remnants within the acacia blocks.
    [Show full text]
  • Lions Clubs International Club Membership Register Summary the Clubs and Membership Figures Reflect Changes As of March 2005
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF MARCH 2005 CLUB CLUB LAST MMR FCL YR MEMBERSHI P CHANGES TOTAL DIST IDENT NBR CLUB NAME STATUS RPT DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 5234 025619 KOTA KINABALU HOST 308 A2 4 03-2005 60 1 0 0 0 1 61 5234 025629 KUCHING HOST 308 A2 4 03-2005 34 1 0 0 0 1 35 5234 025631 MIRI HOST 308 A2 4 03-2005 67 3 0 0 -1 2 69 5234 025639 SIBU 308 A2 4 03-2005 62 2 0 0 -4 -2 60 5234 030905 BINTULU 308 A2 4 03-2005 29 1 0 0 0 1 30 5234 034584 SANDAKAN 308 A2 4 03-2005 25 2 0 0 0 2 27 5234 035238 SARIKEI 308 A2 4 03-2005 19 3 0 0 0 3 22 5234 035239 TAWAU HOST 308 A2 4 03-2005 24 3 0 0 0 3 27 5234 035843 KENINGAU 308 A2 4 03-2005 23 1 0 0 0 1 24 5234 036835 LABUAN 308 A2 4 03-2005 25 1 0 0 0 1 26 5234 040271 KOTA KINABALU METRO 308 A2 4 03-2005 19 0 2 0 -4 -2 17 5234 040329 TENOM 308 A2 4 03-2005 25 1 0 0 0 1 26 5234 041223 KOTA BELUD 308 A2 4 03-2005 14 1 0 0 0 1 15 5234 044478 SERIAN 308 A2 4 02-2005 22 2 0 0 0 2 24 5234 045021 KOTA KINABALU MANDARIN 308 A2 4 03-2005 35 2 0 0 0 2 37 5234 045022 KOTA KINABALU PENAMPANG 308 A2 4 03-2005 21 0 0 0 0 0 21 5234 045942 KUCHING METRO 308 A2 4 03-2005 30 5 0 0 0 5 35 5234 046879 KOTA KINABALU DOWNTOWN 308 A2 4 03-2005 14 0 0 0 0 0 14 5234 047924 LIMBANG 308 A2 4 03-2005 30 0 0 0 -1 -1 29 5234 048220 KOTA KINABALU CENTRAL 308 A2 4 03-2005 17 3 1 0 -2 2 19 5234 048561 KUDAT 308 A2 4 01-2005 17 0 0 0 0 0 17 5234 048740 LAWAS 308 A2 4 03-2005 19 0 0 0 0 0 19 5234 048946 KUCHING CITY 308 A2 4 03-2005
    [Show full text]
  • Technical Assistance to Malaysia for the Daro-Mukah Coastal Zone
    TAR:MAL 26309 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO MALAYSIA FOR THE DARO-MUKAH COASTAL ZONE DEVELOPMENT PROJECT December 1995 CURRENCY EQUIVALENTS (as of 30 November 1995) Currency Unit - Ringgit (RM) RM1.00 = $0.40 $1.00 = RM2.50 (i) The ringgit is linked to a weighted basket of currencies of the country's major trading partners. (ii) An exchange rate of RM2.50 to $1.00 has been used in this Report. ABBREVIATIONS DID - Department of Irrigation and Drainage EIA - Environmental Impact Assessment FELCRA - Federal Land Consolidation and Rehabilitation Authority FMP - Framework Master Plan GIS - Geographic Information System GTZ - German Technical Cooperation Agency IADP - Integrated Agricultural Development Project IEE - Initial Environmental Examination NGO - Non Governmental Organization SEIA - Summary Environmental Impact Assessment SPU - State Planning Unit, Sarawak TA - Technical Assistance TOR - Terms of Reference NOTES (i) The fiscal year (FY) of the Government ends on 31 December. (ii) In this Report, °$' refers to US dollars. 116'E 118"E 11 '30'E 6'N - MALAYSIA S01138h MALAYSIA Pro1W Area DARO-MUKAH COASTAL ZONE DEVELOPMENT PROJECT Project Area E::4* •0! 011 110°E 11 8'E SOUTH C H SF,-1. 3000'N 3*.O(rN— BBali Iigin ian Mukah fl Sg. TqWs Selangau .................. A OWN— !'30'N . %8lapang le31YE x^ .................. Provincial Capital SIBU U Town Proposed New Road Existing Road q Framework Master Plan Area lava J, River Kuala Belawai Divisional Boundary ......................... .......... District Boundary Bintangor Sub-district Boundary International Boundary Kuala IKEV (Boundaries not necessarily authoritative) Rajang 11'3(YE 1. INTRODUCTION 1. The Government of Malaysia requested Bank technical assistance (TA) to prepare the Daro-Mukah Coastal Zone Development Project in the State of Sarawak.
    [Show full text]
  • For Customer Copy
    Volume 2, Issue 3 Page 2 Volume 2, Issue 3 C H Williams Talhar Wong & Yeo Sdn. Bhd. (24706-T) July-September, 2004 FEDERAL BUDGET 2005 HIGHLIGHTS OF THE 4-PRONGED BUDGET STRATEGIES “Work Together With You” PPK 344/6/2004 1ST STRATEGY :ENHANCING THE EFFECTIVENESS OF GOVERNMENT FINANCIAL MANAGEMENT, EFFICIENCY OF THE DELIVERY SYSTEM AND COMPETITIVENESS SIBU-THE CENTRE OF THE RAJANG BASIN 1. Review the taxation system • Set up a Taxation System Review Panel comprising public and private sector representatives. • Replace existing sales and services taxes with goods and services tax (GST) w.e.f. January, 2007. Goods and services deemed to be basic needs and small businesses will be exempted. • GST will provide the government with opportunity to reduce the corporate and individual income tax rates. 2. Income tax refunds Expedite income tax refunds to companies that make excess payments. Area of Sibu Division 8,278.3 sq km Population of Sibu Division 240,000 (est) 3. Streamline/improve the delivery system Divisional Town Sibu •Introduce the disclosure-based regulation (DBR), which requires the authorities to clearly set out the criteria District Town Kanowit & Selangau to be fulfilled in order for approval to be granted. Approvals are automatic upon confirmation by companies Export based Industries Timber-based industries, Ship building that have complied with the requirements. Natural Feature Batang Rajang, the longest river in Malaysia Landmark Wisma Sanyan, the tallest building in Sarawak • Expand the use of information and communications technology (ICT) to expedite payments and ensure accuracy of financial information, through eTreasury. Aerial view of Sibu town Notwithstanding the reduction in size from 12,639.7 sq km to 8,278.3 sq km in March 2002 (following the creation 4.
    [Show full text]
  • KCH-13Ncvc-17/8-2016 BETWEEN BUDI
    KCH-13NCvC-17/8-2016 MALAYSIA IN THE HIGH COURT IN SABAH AND SARAWAK AT KUCHING APPLICATION FOR JUDICIAL REVIEW NO: KCH-13NCvC-17/8-2016 5 In the matter of the application for leave for an Order of Certiorari under Order 53 Rule 3 of the Rules of Court, 2012. AND In the matter of Paragraph 1 of the Schedule to the 10 Courts of Judicature Act. AND In the matter of Paragraph 1A, 4 & 9 (cc) of Schedule 7A of the Income Tax Act, 1967. 15 BETWEEN BUDI NASIB SDN. BHD (Co. No. 628064-W) 8th Floor, Crown Towers 88 Jalan Pending 20 93450 Kuching, Sarawak. … … … … … … Applicant AND KETUA PENGARAH HASIL DALAM NEGERI Ibu Pejabat Lembaga Hasil Dalam Negeri Malaysia Jalan Resolusi Pertikaian 25 Jabatan Pejabat Ketua Pegawai Eksekutif Menara Hasil, Aras 11 Persiaran Rimba Permai, Cyber 8 63000 Cyberjaya, Selangor. … … … … … …Respondent 30 1 KCH-13NCvC-17/8-2016 BEFORE THE HONOURABLE JUSTICE DATO RHODZARIAH BT. BUJANG IN CHAMBER JUDGMENT 5 The applicant is a Bintulu-based company in the business of oil palm cultivation and has filed this action against the respondent following its dissatisfaction with his decision not to allow their claim for reinvestment allowance (‘the allowance’) made under paragraph 1A of Schedule 7A of the Income Tax Act 1967 (“the Act”). The said provision allows the respondent to 10 give a company resident in Malaysia and which has been in operation for a minimum of three years such an allowance at the rate of 60% of its capital expenditure in relation to an agricultural project.
    [Show full text]
  • Impressive Results Await BN in Sarawak State Elections
    ISSUE: 2016 NO. 20 ISSN 2335-6677 RESEARCHERS AT ISEAS – YUSOF ISHAK INSTITUTE SHARE THEIR UNDERSTANDING OF CURRENT EVENTS Singapore | 3 May 2016 Impressive Results Await BN in Sarawak State Elections By Lee Hock Guan* EXECUTIVE SUMMARY The Sarawak state elections will be won by the Barisan Nasional. The question is really, by how much. Taib Mahmud’s successor as chief minister, Adenan Satem, has through various measures taken over the last two years, increased his personal popularity and the popularity of his party tremendously. While there have been disagreements within both the coalitions – Barisan Nasional (BN) and Pakatan Harapan (PH) – those within PH are most serious, and damage the credibility of its component parties even at the federal level. This may affect voter support in the general elections to be held within two years. As the situation now stands, the opposition parties have lost the initiative that they had in 2011, and are basically carrying out damage control measures. Retaining the same number of seats they won in 2011 will be their most realistic strategy. * Lee Hock Guan is ISEAS Senior Fellow and co-coordinator of the Institute’s Malaysia Studies Programme 1 ISSUE: 2016 NO. 20 ISSN 2335-6677 ETHNIC POLITICS WITHOUT UMNO Much of what lies behind Sarawak’s political conditioning is in the fact that the United Malays National Organisation (UMNO), Malaysia’s federally dominant party, has never established itself in this East Malaysian state where Malay voters constitute a minority. Instead, UMNO, through the Barisan Nasional (BN) coalition model in which it is the decisive voice, has strategically formed political pacts with parties representing Sarawak’s Muslim bumiputras, Christian bumiputra minorities and Chinese.
    [Show full text]