General Presentation
Total Page:16
File Type:pdf, Size:1020Kb
GENERAL PERFORM. PRESENTATION TRANSFORM WE DO ITALL Building Highway / Expressway Railway Infrastructure Water Supply Electrification Timeline Renamed as DEE VEE Projects Limited 1989 2012 Started Operations as M/s Patel Enterprises Leadership Team • Mr. Dinesh Kumar Patel (Promoter and Whole Time Director) • Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director) • Mr. Navin Patel (Promoter and Whole Time Director) • Mr. Vivek Ranjan Mahto (Whole Time Director) • Mr. Ashok Patel (Director) • Mr. Deepak Patel (Director) • Mr. Dheeraj Dubey (Director) • Mr. Ritesh Bhawnani (Director) • Mr. Gaurav Gupta (Independent Director) • Mr. Amit Sharma (Independent Director) • Mr. Anup Agarwal (President & COO ) • Mr. Sumit R Das (Vice President) • Mr. Avinash Bansal (Vice President) • Mr. Deep Patel (Vice President) • Mr. Prashant Singh (Vice President) • Mr. Hitesh Luna (Vice President) • Mr. Satish Kumar Sarawgi (CFO) • Mr. N V Subrahmanyam (CGM) Organization Structure Operating Work Divisions Roads and Highways Division Directors Building Division Railway Division Water Supply Division Electrification Division Business Management & Administration Units Core Management Group Marketing Division Procurement Division Financing & Accounting Division Auditing Group Human Resource Division R&D Human Resources 1% 32% 62% 4% 1% Recruitment Taxation Salary Administration Audit Statutory Compliance Financial Highlights Rs. 81.83 CRORE NETWORTH : 2016‐17 Rs. 109.36 CRORE NETWORTH : 2017‐18 Financial Highlights Average Annual Turnover (2016~2018) Rs. 542 CRORE 800 700 INR Cr 600 500 400 300 200 100 0 2016 2017 2018 Financial Highlights No Loss Certificate Plant & Equipment Plant & Equipment Equipment Description Qty Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 30Cum / 08 Nos (30 Cum / hr) hr. capacity Cement Silos for 2 (two) days capacity with direct feeding Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 02 Nos (60 & 70 Cum / hr) 70Cum hr capacity with direct feeding Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 112 02 Nos (112 Cum / hr) Cum / hr capacity with direct feeding Concrete Pump Concrete Pump with MS concrete Piping system for pumping 23 Set Transit Mixer Capacity – 6 Cum 35 Nos 01 No. Crusher MESTO 250 TPH Plant & Equipment Equipment Description Qty Wet Mix Macadam WMM Plant ( 100 – 120 TPH) 01 Nos. Plant Weigh Bridge 100 MT Capacity 08 Nos. JCB 4DX (JCB HYDRAULIC - EXCAVATOR) 02 Nos. JCB 3DX (JCB HYDRAULIC – EXCAVATOR\ 06 Nos. Earthmovers and EXCAVATOR (KOMATSU), Tata Hitachi, Hyundai, JCB) 10 Nos. Excavators HYUNDAI POKLAIN (CHAIN MOUNTED) 215 01 Nos. BACKHOE LOADER (JCB) 30 Nos. Plant & Equipment Equipment Description Qty L&T CASE 770 SS LOADER BACKHOE 14 Nos. TATA HITACHI 110EX 03 Nos. BOBCAT 12 Nos. HYWA 45 Nos. Earthmovers and Excavators HYWA WITH WATER TANK 10 Nos. ROLLER 1407 L&T (WIBRO) 12 Nos. GRADER (CAT / CASE 120 H) 06 Nos. CASE 1107 ROLLER 01 No. Plant & Equipment Equipment Description Qty CASE 752 ROLLER 01 Nos. CASE 50 DX MINI ROLLER 01 Nos. Earthmovers and BABY ROLLER 01 Nos. Excavators SENSOR PAVER (GOMACO) 02 Nos. MANUAL PAVER (UNISTEEL) 03 Nos. TOWER CRANE (POTAIN ) 06 Nos. Crane and Hydra MOBILE TOWER CRANE ACE 04 Nos. HYDRA CRANE (MODEL 14 XW) 06 Nos. Plant & Equipment Equipment Description Qty Concrete Sensor SENSOR PAVER – CONCRETE - WIEIGHTEN 01 Nos. Paver Bituminous Sensor SENSOR PAVER - BITUMINOUS 03 Nos. Paver Hydra Hydra 10 Nos. Boom Placer Boom Placer – Putzmeister 01 Nos. DG Set Diesel Generator 50 Nos Plant & Equipment Equipment Description Qty BUILDING HOIST 8 Nos. Hoist MONKEY HOIST SAFARI 45 Nos. Tractor TRACTOR 11 Nos. Site Vehicles SUV, MUV, Sedan, Pick-up 30 Nos. Shuttering material along with steel props, pipes, Shuttering Materials 100,000 sqm scaffolding cup lock system for all heights Certificate ISO 9001:2015 Building, Roads, Highways, Mechenical, Electrical, Structural, & Civil Engineering Works. Certificate ISO 14001:2015 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Certificate OHSAS 18001:2017 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Our Esteemed Clientele and the list is growing.. Project Locations Dhanbad Bhopal, Shahdol,, Singrauli Raipur,, Korba, Bilaspur, Ambikapur Sundergarh Nagpur, GondiaAmravati, Bhandara Office Locations Offices : Head Office and Corporate Office Registered Office 1st Floor Vikas Complex, P.H Road, Korba ‐ 495677 (C.G.), Phone : +91 771 2972 580 Corporate Office Dee Vee Building , Maulshree Vihar, Raipur ‐ 492006 (C.G.), Phone : +91 7759 245 168 Project Details Building Works Roads and Railway Water Supply Electrification Highways Works Infrastructure Synopsis of EXISTING PROJECTS Synopsis of Existing Projects (1/6) Construction Value Project Location Client Period (INR Cr) Medical College Building at Ambikapur, CG Ambikapur, CG CGPWD Mar'2019 ~ Mar'2021 336.42 Face Lifting and Renovation of 'F' Type Buildings (87 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 37.32 in Colony at CSTPS, Chandrapur, MH Face Lifting and Renovation of 'F' Type Buildings (116 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 34.46 in Colony at CSTPS, Chandrapur, MH Execution of Casting of Precast RCC Boxes and making them available near the Bridges at nominated places in connection Raipur, CG DGM, Raipur, CG Dec'2018 ~ Mar'2020 16.82 with rebuilding of Stone Slab Bridges in KBJ‐LAE Section Of E.CO. Railway in Chhattisgarh and Odisha State, India Synopsis of Existing Projects (2/6) Construction Value Project Location Client Period (INR Cr) Balance Civil Renovation Work for Mining Engineering, Central Library, Metallurgical & Chemical Engineering, Civil Engineering, Electronics & Communication Engineering, Mechanical Engineering, Admin Block, Deshpande Auditorium, Electrical Dhanbad, JH Oct'2018 ~ May'2019 23.04 Engineering Projects (I) LTD Substation, (Hostel 1‐6), Rain Water Harvesting System, Horticulture & Landscaping, Road, (Package‐I) at B.I.T. Sindri, Dhanbad, Jharkhand Civil & associated Works of Road Works for 4 Lane with paved shoulder configuration of Bilaspur to Pathrapali (Km 00+000 To Km Bilaspur, CG ADANI Infra Feb'2019 ~ Jul'2020 304.48 53+300) Section Of NH 111 (New NH‐130) in the State Of Chhattisgarh, India Beautification of Ranisagar and Bhuthsagar Lake at Rajnandgaon, Rajnandgaon, CG Municipal Corporation, Rajnandgaon, Sept'2018 ~ Mar'2020 17.04 CG CG Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54 Nos. Jr. HIG (Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr. Raipur, CG CGHB Aug'2018 ~ Feb'2021 149.82 MIG (Duplex) at Sector‐12, Naya Raipur i/c External Development Works at Sector‐12, Naya Raipur (Phase‐I), CG Construction of House and Development of Infrastructure for Identified Slum Localities in Indore, M.P. under PMAY at Rau Near Indore, MP Municipal Corporation, MP Jul'2018~ Jul'2020 388.30 Silicon City, MP Synopsis of Existing Projects (3/6) Construction Value Project Location Client Period (INR Cr) Construction of Dipka‐Jawali‐Chakabuda Road in KM 1/2 To KM Korba, CG CGPWD Jul'2018 ~ Jan'2020 33.31 15/2 (100) = 14.10 KM i/c Hume Pipe Culverts Construction of Head Quarter Building, Western Region‐II, NTPC Naya Raipur, CG NRDA, CG Jun'2018 ~ Jun'2019 70.07 Ltd. at Sector‐24, Naya Raipur, CG Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIG Duplex, 52 LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F, E/F & all related Infrastructure Development Work & External Korba, CG CGHB May'2018 ~ May'2020 40.95 Development Work under Atal Vihar Yojna at Jhagarha, Korba District, CG Proposed Construction of Head Office Building of Chhattisgarh Naya Raipur, CG CGRB Apr'2018 ~ May'2019 4.74 Rajya Gramin Bank at Naya Raipur, CG Demolition, Land Development & Boundary Wall Repair Works Sindri, JH PDIL Feb'2018 ~ May'2019 55.19 (Package‐I) at Sindri, Jharkhand Construction of Education Hub Phase‐II i/c Development Work at Korba, CG CGHB Jan'2018 ~ Jan'2020 63.53 Block Katghora, CG Construction & Commisioning of balance Canal Work i/c Cross Drainage structures and design of Gosikhurd National Project in Bhandara, MH NBCC Sept''2017 ~ Jul'2019 332.97 Bhandara, Narela (MH), Package‐I, NBCC Synopsis of Existing Projects (4/6) Construction Value Project Location Client Period (INR Cr) Re‐habilitation and up‐gradation of Korchi‐Chichgad‐Deori‐ Amgaon‐Gondia from existing Km 180+330 of SH‐276 (on 413+540 NH‐53, Deori) to KM 213+330 of SH‐249 (Amgaon) Deori, MH NH‐PWD, MH Aug'2017 ~ Aug'2019 288.5 (Design KM 0.000 to KM 38.000) Section of National Highway to Two lane with paved shoulders on EPC Mode in the State of Maharashtra Construction of GAD Houses i/c Development Work for Govt. Officers and Employees at various 5 Block level offices For Korba, CG CGHB Aug'2017 ~ May'2019 23.93 District Korba, CG Construction Of GAD Houses i/c Development Work for Govt. Officers and Employees at All Block Head Quarters of District Koriya, CG CGHB Jul'2017 ~ Jun'2019 24.18 Koriya, CG Rehabilitation and Up‐gradation Of NH‐111 (New NH‐130) from National Highway Zone KM 163.400 to KM 215.800 (Shivnagar to Ambikapur) to 2‐Lane Shivnagar‐Ambikapur, CG PWD, Raipur, CG Jun'2017 ~ Jun'2019 109.70 with Paved Shoulder (Value 223.89 Cr, DEE VEE 49% = 109.70 Cr & GAWAR 51% = 114.18 Cr) Construction of 674 EWS, 436 MIG and 108 HIG Residential Tenements on land bearing survey No. 47, 57 and 58 at Mauja Amravati, MH AHAADB, Amravati, MH Jun'2017 ~ Dec'2019 139.83 Akoli, Dist.‐Amravati, MH Construction & External Development of Inter State Bus Raipur, CG UADD, CG Mar'2017 ~ May'2019 43.21 Terminal at Raipur, CG Synopsis of Existing Projects (5/6) Construction Value Project Location Client Period (INR Cr) Two Laning with hard shoulder of Tara‐Premnagar‐ Ramanujnagar road section from existing chainage KM 0.000 To Tara‐Premnagar‐ KM 50.312 (Design Chainage From Km 0.000 To Km 50.242) in CGRDC Feb'2017 ~ Jun'2019 50.29 Ramanujnagar, CG the State of Chhattisgarh on EPC Mode.