General Presentation

Total Page:16

File Type:pdf, Size:1020Kb

General Presentation GENERAL PERFORM. PRESENTATION TRANSFORM WE DO ITALL Building Highway / Expressway Railway Infrastructure Water Supply Electrification Timeline Renamed as DEE VEE Projects Limited 1989 2012 Started Operations as M/s Patel Enterprises Leadership Team • Mr. Dinesh Kumar Patel (Promoter and Whole Time Director) • Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director) • Mr. Navin Patel (Promoter and Whole Time Director) • Mr. Vivek Ranjan Mahto (Whole Time Director) • Mr. Ashok Patel (Director) • Mr. Deepak Patel (Director) • Mr. Dheeraj Dubey (Director) • Mr. Ritesh Bhawnani (Director) • Mr. Gaurav Gupta (Independent Director) • Mr. Amit Sharma (Independent Director) • Mr. Anup Agarwal (President & COO ) • Mr. Sumit R Das (Vice President) • Mr. Avinash Bansal (Vice President) • Mr. Deep Patel (Vice President) • Mr. Prashant Singh (Vice President) • Mr. Hitesh Luna (Vice President) • Mr. Satish Kumar Sarawgi (CFO) • Mr. N V Subrahmanyam (CGM) Organization Structure Operating Work Divisions Roads and Highways Division Directors Building Division Railway Division Water Supply Division Electrification Division Business Management & Administration Units Core Management Group Marketing Division Procurement Division Financing & Accounting Division Auditing Group Human Resource Division R&D Human Resources 1% 32% 62% 4% 1% Recruitment Taxation Salary Administration Audit Statutory Compliance Financial Highlights Rs. 81.83 CRORE NETWORTH : 2016‐17 Rs. 109.36 CRORE NETWORTH : 2017‐18 Financial Highlights Average Annual Turnover (2016~2018) Rs. 542 CRORE 800 700 INR Cr 600 500 400 300 200 100 0 2016 2017 2018 Financial Highlights No Loss Certificate Plant & Equipment Plant & Equipment Equipment Description Qty Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 30Cum / 08 Nos (30 Cum / hr) hr. capacity Cement Silos for 2 (two) days capacity with direct feeding Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 02 Nos (60 & 70 Cum / hr) 70Cum hr capacity with direct feeding Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 112 02 Nos (112 Cum / hr) Cum / hr capacity with direct feeding Concrete Pump Concrete Pump with MS concrete Piping system for pumping 23 Set Transit Mixer Capacity – 6 Cum 35 Nos 01 No. Crusher MESTO 250 TPH Plant & Equipment Equipment Description Qty Wet Mix Macadam WMM Plant ( 100 – 120 TPH) 01 Nos. Plant Weigh Bridge 100 MT Capacity 08 Nos. JCB 4DX (JCB HYDRAULIC - EXCAVATOR) 02 Nos. JCB 3DX (JCB HYDRAULIC – EXCAVATOR\ 06 Nos. Earthmovers and EXCAVATOR (KOMATSU), Tata Hitachi, Hyundai, JCB) 10 Nos. Excavators HYUNDAI POKLAIN (CHAIN MOUNTED) 215 01 Nos. BACKHOE LOADER (JCB) 30 Nos. Plant & Equipment Equipment Description Qty L&T CASE 770 SS LOADER BACKHOE 14 Nos. TATA HITACHI 110EX 03 Nos. BOBCAT 12 Nos. HYWA 45 Nos. Earthmovers and Excavators HYWA WITH WATER TANK 10 Nos. ROLLER 1407 L&T (WIBRO) 12 Nos. GRADER (CAT / CASE 120 H) 06 Nos. CASE 1107 ROLLER 01 No. Plant & Equipment Equipment Description Qty CASE 752 ROLLER 01 Nos. CASE 50 DX MINI ROLLER 01 Nos. Earthmovers and BABY ROLLER 01 Nos. Excavators SENSOR PAVER (GOMACO) 02 Nos. MANUAL PAVER (UNISTEEL) 03 Nos. TOWER CRANE (POTAIN ) 06 Nos. Crane and Hydra MOBILE TOWER CRANE ACE 04 Nos. HYDRA CRANE (MODEL 14 XW) 06 Nos. Plant & Equipment Equipment Description Qty Concrete Sensor SENSOR PAVER – CONCRETE - WIEIGHTEN 01 Nos. Paver Bituminous Sensor SENSOR PAVER - BITUMINOUS 03 Nos. Paver Hydra Hydra 10 Nos. Boom Placer Boom Placer – Putzmeister 01 Nos. DG Set Diesel Generator 50 Nos Plant & Equipment Equipment Description Qty BUILDING HOIST 8 Nos. Hoist MONKEY HOIST SAFARI 45 Nos. Tractor TRACTOR 11 Nos. Site Vehicles SUV, MUV, Sedan, Pick-up 30 Nos. Shuttering material along with steel props, pipes, Shuttering Materials 100,000 sqm scaffolding cup lock system for all heights Certificate ISO 9001:2015 Building, Roads, Highways, Mechenical, Electrical, Structural, & Civil Engineering Works. Certificate ISO 14001:2015 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Certificate OHSAS 18001:2017 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Our Esteemed Clientele and the list is growing.. Project Locations Dhanbad Bhopal, Shahdol,, Singrauli Raipur,, Korba, Bilaspur, Ambikapur Sundergarh Nagpur, GondiaAmravati, Bhandara Office Locations Offices : Head Office and Corporate Office Registered Office 1st Floor Vikas Complex, P.H Road, Korba ‐ 495677 (C.G.), Phone : +91 771 2972 580 Corporate Office Dee Vee Building , Maulshree Vihar, Raipur ‐ 492006 (C.G.), Phone : +91 7759 245 168 Project Details Building Works Roads and Railway Water Supply Electrification Highways Works Infrastructure Synopsis of EXISTING PROJECTS Synopsis of Existing Projects (1/6) Construction Value Project Location Client Period (INR Cr) Medical College Building at Ambikapur, CG Ambikapur, CG CGPWD Mar'2019 ~ Mar'2021 336.42 Face Lifting and Renovation of 'F' Type Buildings (87 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 37.32 in Colony at CSTPS, Chandrapur, MH Face Lifting and Renovation of 'F' Type Buildings (116 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 34.46 in Colony at CSTPS, Chandrapur, MH Execution of Casting of Precast RCC Boxes and making them available near the Bridges at nominated places in connection Raipur, CG DGM, Raipur, CG Dec'2018 ~ Mar'2020 16.82 with rebuilding of Stone Slab Bridges in KBJ‐LAE Section Of E.CO. Railway in Chhattisgarh and Odisha State, India Synopsis of Existing Projects (2/6) Construction Value Project Location Client Period (INR Cr) Balance Civil Renovation Work for Mining Engineering, Central Library, Metallurgical & Chemical Engineering, Civil Engineering, Electronics & Communication Engineering, Mechanical Engineering, Admin Block, Deshpande Auditorium, Electrical Dhanbad, JH Oct'2018 ~ May'2019 23.04 Engineering Projects (I) LTD Substation, (Hostel 1‐6), Rain Water Harvesting System, Horticulture & Landscaping, Road, (Package‐I) at B.I.T. Sindri, Dhanbad, Jharkhand Civil & associated Works of Road Works for 4 Lane with paved shoulder configuration of Bilaspur to Pathrapali (Km 00+000 To Km Bilaspur, CG ADANI Infra Feb'2019 ~ Jul'2020 304.48 53+300) Section Of NH 111 (New NH‐130) in the State Of Chhattisgarh, India Beautification of Ranisagar and Bhuthsagar Lake at Rajnandgaon, Rajnandgaon, CG Municipal Corporation, Rajnandgaon, Sept'2018 ~ Mar'2020 17.04 CG CG Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54 Nos. Jr. HIG (Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr. Raipur, CG CGHB Aug'2018 ~ Feb'2021 149.82 MIG (Duplex) at Sector‐12, Naya Raipur i/c External Development Works at Sector‐12, Naya Raipur (Phase‐I), CG Construction of House and Development of Infrastructure for Identified Slum Localities in Indore, M.P. under PMAY at Rau Near Indore, MP Municipal Corporation, MP Jul'2018~ Jul'2020 388.30 Silicon City, MP Synopsis of Existing Projects (3/6) Construction Value Project Location Client Period (INR Cr) Construction of Dipka‐Jawali‐Chakabuda Road in KM 1/2 To KM Korba, CG CGPWD Jul'2018 ~ Jan'2020 33.31 15/2 (100) = 14.10 KM i/c Hume Pipe Culverts Construction of Head Quarter Building, Western Region‐II, NTPC Naya Raipur, CG NRDA, CG Jun'2018 ~ Jun'2019 70.07 Ltd. at Sector‐24, Naya Raipur, CG Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIG Duplex, 52 LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F, E/F & all related Infrastructure Development Work & External Korba, CG CGHB May'2018 ~ May'2020 40.95 Development Work under Atal Vihar Yojna at Jhagarha, Korba District, CG Proposed Construction of Head Office Building of Chhattisgarh Naya Raipur, CG CGRB Apr'2018 ~ May'2019 4.74 Rajya Gramin Bank at Naya Raipur, CG Demolition, Land Development & Boundary Wall Repair Works Sindri, JH PDIL Feb'2018 ~ May'2019 55.19 (Package‐I) at Sindri, Jharkhand Construction of Education Hub Phase‐II i/c Development Work at Korba, CG CGHB Jan'2018 ~ Jan'2020 63.53 Block Katghora, CG Construction & Commisioning of balance Canal Work i/c Cross Drainage structures and design of Gosikhurd National Project in Bhandara, MH NBCC Sept''2017 ~ Jul'2019 332.97 Bhandara, Narela (MH), Package‐I, NBCC Synopsis of Existing Projects (4/6) Construction Value Project Location Client Period (INR Cr) Re‐habilitation and up‐gradation of Korchi‐Chichgad‐Deori‐ Amgaon‐Gondia from existing Km 180+330 of SH‐276 (on 413+540 NH‐53, Deori) to KM 213+330 of SH‐249 (Amgaon) Deori, MH NH‐PWD, MH Aug'2017 ~ Aug'2019 288.5 (Design KM 0.000 to KM 38.000) Section of National Highway to Two lane with paved shoulders on EPC Mode in the State of Maharashtra Construction of GAD Houses i/c Development Work for Govt. Officers and Employees at various 5 Block level offices For Korba, CG CGHB Aug'2017 ~ May'2019 23.93 District Korba, CG Construction Of GAD Houses i/c Development Work for Govt. Officers and Employees at All Block Head Quarters of District Koriya, CG CGHB Jul'2017 ~ Jun'2019 24.18 Koriya, CG Rehabilitation and Up‐gradation Of NH‐111 (New NH‐130) from National Highway Zone KM 163.400 to KM 215.800 (Shivnagar to Ambikapur) to 2‐Lane Shivnagar‐Ambikapur, CG PWD, Raipur, CG Jun'2017 ~ Jun'2019 109.70 with Paved Shoulder (Value 223.89 Cr, DEE VEE 49% = 109.70 Cr & GAWAR 51% = 114.18 Cr) Construction of 674 EWS, 436 MIG and 108 HIG Residential Tenements on land bearing survey No. 47, 57 and 58 at Mauja Amravati, MH AHAADB, Amravati, MH Jun'2017 ~ Dec'2019 139.83 Akoli, Dist.‐Amravati, MH Construction & External Development of Inter State Bus Raipur, CG UADD, CG Mar'2017 ~ May'2019 43.21 Terminal at Raipur, CG Synopsis of Existing Projects (5/6) Construction Value Project Location Client Period (INR Cr) Two Laning with hard shoulder of Tara‐Premnagar‐ Ramanujnagar road section from existing chainage KM 0.000 To Tara‐Premnagar‐ KM 50.312 (Design Chainage From Km 0.000 To Km 50.242) in CGRDC Feb'2017 ~ Jun'2019 50.29 Ramanujnagar, CG the State of Chhattisgarh on EPC Mode.
Recommended publications
  • Financial Feasibility Report for Development of Amusement Park
    NAYA RAIPUR DEVELOPMENT AUTHORITY **Images are used only for illustrative purpose 2010 Financial Feasibility Report for Development of Amusement Park and Recreational Park at Naya Raipur (Chhattisgarh) on PPP Basis Development of Amusement Park and Recreational Park at Naya Raipur on PPP Basis CONTENTS DISCLAIMER ....................................................................................................................................................... 2 LIST OF ABBREVIATIONS ............................................................................................................................... 3 CHAPTER 1 ASSIGNMENT CONTEXT ....................................................................................................... 4 1.1 Our Brief ....................................................................................................................................... 4 CHAPTER 2 MARKET DEMAND STUDY .................................................................................................... 5 2.1 Factors Governing Demand of a Recreational Destination ....................................................... 5 2.2 Catchment Area Delineation and Analysis ................................................................................. 6 2.3 Estimation of Demand for Proposed Recreation Hub .............................................................. 8 2.3.1 Demographic Profile: .........................................................................................................................................
    [Show full text]
  • Naya Raipur Development Plan 20312031
    Naya Raipur Development Plan 20312031 Naya Raipur Development Authority NAYA RAIPUR DEVELOPMENT PLAN-2031 PLANNING TEAM NAYA RAIPUR DEVELOPMENT AUTHORITY Shri P. Joy Oommen (I.A.S.) Chairman Shri S.S. Bajaj (I.F.S.) Chief Executive Officer & Director T & CP Shri A.K. Dubey , General Manager (Finance) Shri P.C. Jain, Manager (Finance) Shri S.K. Shrivastava , General Manager (PWD) Shri. S.K.Nag, Manager (PWD) Shri K.P. Bajpai , Building Officer & Town Planner Shri. G.C.Nahata, Deputy Manager ( Land) Shri J.C. Singhal , Dy. G.M. (Public Relation) Shri.V.R. Meshram, Asst. Manager (Land) Shri J.P. Sharma ,Manager (Env) & Dy.M.(R) OFFICERS ASSOCIATED WITH NRDA (EARLIER CADA) AND DIRECTORATE TOWN AND COUNTRY PLANNING ,RAIPUR, IN EARLY STAGES OF PLAN Shri.Vivek Dhand, I.A.S, Chairman Shri.M.K.Gupta, Dy.G.M.(Planning) Shri. Sanjay Shukla, I.F.S, Chief Executive Officer Shri.P.Nihalani, Nazul Officer & D.M (Land) Shri. B.K.Sinha, I.F.S. Chief Executive Officer & Director T & CP Shri. Alok Tiwari, Manager (Environnent) Shri. K.C.Yadav, I.F.S. Chief Executive Officer Shri. Akhilesh Shukla, Data Entry Operator Shri. Anil Tuteja, Chief Executive Officer Shri. Vineet Nair, T & CP OTHER OFFICIAL ASSOCIATED WITH NRDA Shri Rajkumar Mudaliar Shri G.P.Sharma. Shri. B.L.Nishad Shri R.S. Tiwari Shri.Manoj Joshi Shri. K.K.Singaur Shri.Pradeep Thambi Shri S.L. Dhruwanshi Shri.P.D.Yoshen Shri.Mani Ram Dhruw Shri. N.L.Sahu Shri.Navneet Kotwaliwale CITY AND INDUSTRIAL DEVELOPMENT CORPORATION (CIDCO), NAVI MUMBAI Shri N.
    [Show full text]
  • (S) No.869 of 2015 Dwarika Prasad Patel, S/O Girdhari Lal Patel, Aged
    W.P.(S)Nos.869/2015, 870/2015, 871/2015 & 1477/2015 Page 1 of 25 AFR HIGH COURT OF CHHATTISGARH, BILASPUR Writ Petition (S) No.869 of 2015 Dwarika Prasad Patel, S/o Girdhari Lal Patel, aged about 31 years, Rural Medical Assistant (R.M.A.), Primary Health Centre Bhithidih, Block Pithora, District Mahasamund, R/o Village Turidih, PO Jhalap, PS Patewa, District Mahasamund (C.G.) ---- Petitioner Versus 1. State of Chhattisgarh, through the Secretary, Department of Health & Family Welfare, Mantralaya, Mahanadi Bhawan, Naya Raipur, District Raipur (C.G.) 2. The Director, The Directorate of Health Services, Chhattisgarh, Raipur, Block-1, IIIrd Floor, Indrawati Bhawan, Naya Raipur, District Raipur (C.G.) 3. The Joint Director (Establishment), Directorate of Health Services, Block-1, IIIrd Floor, Indrawati Bhawan, Naya Raipur, District Raipur (C.G.) 4. R. Prasanna, Presently posted as Director, The Directorate of Health Services Chhattisgarh, Raipur, Block-1, 3rd Floor, Indrawati Bhawan, Naya Raipur, District Raipur (C.G.) 5. Smt. Triveni Patil, W/o Dr. Yuvraj Patil, aged about 35 years, presently posted as Rural Medical Assistant, at Primary Health Centre Chhiraha, District Bemetara, R/o Village Sankari, PP Pairi, PS & Tahsil Gunderdehi, District Balod (C.G.) 6. Smt. Kiran Patel, W/o P.K. Patel, aged about 28 years, presently posted as Rural Medical Assistant, at Primary Health Centre Bonda, District Raigarh, R/o Village Bahaya, PO, PS & Tashil Lailunga, District Raigarh (C.G.) 7. Smt. Sunita Verma, W/o Dr. Salik Ram Verma, aged about 27 years, presently posted as Rural Medical Assistant, at Primary Health Centre Mardapal, District Kondagaon, R/o Qtr.
    [Show full text]
  • (Naya Raipur),Chhattisgarh, India
    Journal of University of Shanghai for Science and Technology ISSN: 1007-6735 Geophysical Analysis for Deeper Groundwater Assets by using Resistivity Survey of Atal Nagar (Naya Raipur),Chhattisgarh, India 1K. Panigrahi , 2Dr. Bhumika Das* a1Research Scholar of Mats University Raipur Chhattisgarh ,India 2Associate Professor Mats University Raipur Chhattisgarh, India Abstract: : Surface electrical resistivity surveys are focused on the theory that electrical resistivity and distribution of the surrounding soils and rocks depend on the distribution of electrical potential in the ground around a current-carrying electrode. Gradient Resistivity Profiling (GRP- 1 No.s) and Vertical Electrical Sounding (VES – 9 No.s) decipher the sub surface condition at the Nava Raipur District in formation of the time resistivity survey. For the survey, the Aqua Meter CRM-50 resistivity metre was used. Both profiling and sounding mode have been performed for the present analysis. The gradient approach for profiling has been carried out. Both the Schlumberger configuration and half the Schlumberger configuration were used for audio. 200 m (AB) for profiling and 240 m (AB) for sounding were the full spreads. By artificially energizing the subsurface and bringing measurements on the ground surface, electrical resistivity of sub-surface geological formation is calculated using Ohm's law. The contrast with the surrounding or effective presence (depending on its relative resistivity and thickness) of the resistivity value of an individual layer makes it observable. Raipur district is situated in the centre of the state of Chhattisgarh and is bounded by 81 ° 32'05 '& 82 ° 59'05" east longitudes and 19 ° 46 '35' & 21 ° 53'00' north latitudes (fig.
    [Show full text]
  • Pharmaceutical & Biotechnology-1
    Pharmaceutical & Biotechnology Sector Profile - 2015 Chhattisgarh: Pharmaceutical & Biotechnology Sector Profile - 2015 02 State Profile:Chhattisgarh Chhattisgarh: KeyStrengths Institutional FrameworkforInvestmentFacilitation Policy Support Key InvestmentEnablers Naya Raipur: Key Contacts Investment OpportunitiesinBiotech &Pharma Incentives Biotechnology Sector Indian PharmaceuticalsIndustry A vailable toBiotech&PharmaUnits The newSMAR C O N T T cityofChhattisgarh E N T S 23 24 22 15 10 7 3 4 5 6 9 State Profile: Chhattisgarh State Snapshot ? Geographical area: 1.35 Lakh square km. ?State27 disSnapshottricts with Raipur as the Capital city ? Major cities: Bhilai, Bilaspur, Raigarh, Durg, Korba ? Ranks 17th in terms of population and 10th in terms of area in the Country ? GSDP growth consistently higher than National average. The State has clocked on an average, more than 8% growth rate over last 5 years ? GDP Per Capita: INR 69,000 (FY2013-14) ? Established exports profile with exports aggregating INR 30 billion Rich in Mineral Resources Power Surplus State 8Of total production in India, Chhattisgarh 8Uninterrupted Quality power supply produces: 81/3rd of national target of 90,000 MW in 430% Aluminum 12th Five Year Plan to be commissioned in 430% Steel/ Sponge Iron 417% Coal the State. 415% Cement 8Total installed capacity of 23,000 MW 411% Dolomite 8Planned installed capacity of 41,384 MW 8 High reserves of Bauxite, Limestone , th Quartzite by the end of the 12 plan 8Only Tin producing State of the Country Rich Water Resources 8Rich water
    [Show full text]
  • Transit Oriented Development Promoting Integrated Land Use and Transit Planning
    TRANSIT ORIENTED DEVELOPMENT PROMOTING INTEGRATED LAND USE AND TRANSIT PLANNING Presented by: Trevor McIntyre, Director, IBI Group Bankim Kalra, Team Leader- Urban Planning and Design, IBI Group India IBI GROUP INTRODUCTIONIBI GROUP IBI GROUP IBI Group is a multi-disciplinary organization offering services in four areas of practice: URBAN LAND • FACILITIES • TRANSPORTATION • SYSTEMS TECHNOLOGY “IBI Group is the fourth largest firm ranked by the number of creative staff and the world’s fifth largest architecture practice.” – BD 2011 World Architecture 100, January 2011 IBI Group 3 Offices & Staff CANADA USA EUROPE ASIA Calgary AB Boston MA Athens GR Dubai Edmonton AB Denver CO Bristol UK Hong Kong Kingston ON Detroit MI Glasgow UK Beijing London ON Irvine CA Jerusalem IS Shanghai Montreal QC Orlando FL London UK New Delhi Ottawa ON Pompano Beach FL Paris FR Bangalore Richmond Hill ON Portland OR Toronto ON Salt Lake City UT Vancouver BC San Diego CA Waterloo ON San Francisco CA 80+ Offices Seattle WA Washington DC Workforce of 3000+ IBI Group 4 INTRODUCTION TO IBI GROUP Areas STUDYof Service ON TRANSIT ORIENTED DEVELOPMENT (TOD) FOR NAYA RAIPUR Comprehensive Planning, Urban Design, Economic Development Planning, Land Development Planning, Environmental Planning, Engineering, Surveying and Mapping, and Geographic Information Urban Land Systems (GIS) Transportation Planning, Public Transit, Traffic Operations, Parking Fare Collection, Intelligent Transportation Systems Transportation Architecture, Landscape Architecture, Parks Planning,
    [Show full text]
  • IBEF Presentataion
    BHORAMDEO TEMPLE, CHHATTISGARH CHHATTISGARH THE MINERAL BASKET For information, please visit www.ibef.org September 2018 Table of Content Executive Summary .…………….…….…....3 Introduction ……..………………………...….4 Economic Snapshot ……………….….…….9 Physical Infrastructure ………..……...........15 Social Infrastructure ..................................22 Industrial Infrastructure ……..……….........25 Key Sectors ………….………………....…...28 Key Procedures & Policies…………….…...36 Annexure.………….……..…........................45 EXECUTIVE SUMMARY . Chhattisgarh ranked second in terms of value of major mineral production (excluding atomic, fuel and minor minerals) in India, with a 17.2 per cent share in February 2018. It is a leading producer of minerals such as coal, iron ore and dolomite. Strong mineral production . Coal production & iron ore production in the state accounted for about 21 per cent and 17 per cent of the base overall coal & iron ore production in India, respectively, during 2017-18 (up to February 2018). Iron ore from Bailadila mines in the state is considered to be among the best in the world, in terms of quality. It is the only state in India that produces tin concentrates and accounts for 35.4 per cent of tin ore reserves of India. During 2017-18 (up to February 2018), tin concentrate production in the state stood at 15,650 kgs. Korba – Power capital of . Korba district in Chhattisgarh is known as the power capital of India. All villages are in the state have been India electrified under Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY). E-commerce & other sectors which are in the start up stage have begun to grow in Raipur, converting the Start up hub states into a start up hub. By setting up a start up in the state, the player can enjoy first mover advantage and capture a larger market.
    [Show full text]
  • Of 14 Dr. DC Jhariya Academic Profile
    Dr. D.C. Jhariya FGSI, FISRS, FIAH, FAEG Assistant Professor Department of Applied Geology National Institute of Technology Raipur G. E. Road, Raipur (Chhattisgarh) INDIA Contact No. 09754244867; 09406548947 Email Id: [email protected] Academic Profile: 1. Completed 6 (Six) Credit Course “Characterization and Engineering of Karst Aquifers” of Accredited Academic Master Programme in Hydrogeology from Belgrdae University, Serbia in June, 2019. 2. Ph.D. completed in Applied Geology (Faculty of Engineering) from Dr. Harisingh Gour Vishwavidyalaya, Sagar, Madhya Pradesh in March, 2013. 2. M.Tech. (Applied Geology) from Department of Applied Geology, Dr. Hari Singh Gour Vishwavidylaya, Sagar (Madhya Pradesh) Completed in May, 2007. 3. B.Sc. (Geology) From Govt. Autonomous P.G. Collage Chhindwara Madhya Pradesh Affiliated to Dr. Harisingh Gour Vishwavidylaya, Sagar, Madhya Pradesh Completed in May, 2004. 4. Higher Secondary from Mathura Prasad Higher Secondary School Chhindwara (Madhya Pradesh) Board –M P Board BHOPAL (Class XII) Completed in May, 2001. 5. High School from Jaggannath Higher Secondary School Chhindwara (Madhya Pradesh) (Class X) Completed in May, 1998. Teaching Experience: Assistant Professor in the Department of Applied Geology, National Institute of Technology, Raipur (Chhattisgarh) since 09.10.2009 (till date). Page 1 of 14 Research Paper Published in National/International Journals: [1] Jaiswal T. and Jhariya D.C. (2020). Impacts of Land Use Land Cover Change on Surface Temperature and Groundwater Fluctuation in Raipur District. Journal of the Geological Society of India, 95(4), 393- 402. https://doi.org/10.1007/s12594-020-1448-6. [2] Agnihotri, D., Kumar, T. & Jhariya, D. (2020). Intelligent vulnerability prediction of soil erosion hazard in semi-arid and humid region.
    [Show full text]
  • To Download Order
    WWW.LIVELAW.IN 1 NAFR HIGH COURT OF CHHATTISGARH, BILASPUR WPS No. 5286 of 2020 Prafull Kumar Tiwari S/o Shri Shiv Shankar Tiwari, Aged About 30 Years, R/o Bazar Mohalla, Marwahi, Post and Block Marwahi, District Gaurela Pendra Marwahi, Chhattisgarh. … Petitioner Versus 1. State Of Chhattisgarh, Through The Secretary, Department Of Law And Legislative Department, Atal Nagar, Nava Raipur, District Raipur (CG) 2. High Court Of Chhattisgarh, Through The Registrar General, High Court Campus, Bodri, District Bilaspur (CG) 3. Chhattisgarh State Public Service Commission, Through The Secretary, Shankar Nagar Road, Bhagat Singh Square, Raipur, District Raipur (CG) 4. The Examination Controller, Chhattisgarh Public Service Commission, Shankar Nagar Road, Bhagat Singh Square, Raipur, District Raipur (CG) ... Respondents WPS No. 231 of 2021 • Amita Shrivastava W/o Praveen Chand Shrivastava Aged About 37 Years R/o Hig 503, 5th Floor, Kanchan Ashva Apartment, D.D. Nagar, District- Raipur (Chhattisgarh) ... Petitioner Versus 1. State Of Chhattisgarh Through The Secretary Department Of Law And Legislative Affair, Mahanadi Bhawan Mantralaya, Post Rakhi, Atal Nagar, Naya Raipur District Raipur Chhattisgarh. 2. High Court Of Chhattisgarh Through Registrar General Chhattisgarh High Court, Bodri, District Bilaspur, Chhattisgarh. 3. Secretary, Public Service Commission Shankar Nagar Raipur, District Raipur, Chhattisgarh. 4. Controller Of Examination, Public Service Commission Shankar Nagar Raipur, District Raipur, Chhattisgarh. ... Respondents WPS No. 253 of 2021 • Shivani Goyal D/o Nandlal Goyal, Aged About 24 Years, R/o F-102, Maruti Lifestyle, Kota Road, Mahoba Bazar, Police Station Saraswati Nagar, District Raipur (CG) ... Petitioner Versus 1. State Of Chhattisgarh, Through The Secretary, Department Of Law and Legislative Affair, Mahanadi Bhawan Mantralaya, Post Rakhi, Atal Nagar, Naya Raipuir, District Raipur (CG) 2.
    [Show full text]
  • 7 Economic Base, Employment and Work Areas
    Naya Raipur Development Plan -2031 7 7 Economic Base, Employment and Work Areas 7.1 Economic Base The main activity base of Naya Raipur would be the Government / State Capital functions. However, a diversification of economic activities is desirable which would be attained through the following activities: i. Software Technology Park ii. Gems and Jewellery and other similar industries iii. Business Offices iv. Health, Education and Research services v. Regional recreational activities 7.1.1 Workforce Participation Rate The workforce participation rate as per 2001 census for Raipur city is 32.48% the same for Chandigarh is 37.8% and it is constantly increasing (Refer table 7.1). Table 7.1: Work Participation Ratio of Chandigarh and Raipur Year Percentage of workers to total population Chandigarh Raipur 1971 33.10 - 1981 34.83 - 1991 34.17 29.93 2001 37.8 32.48 Source: Compiled from census data It is generally observed that work participation ratio for new towns is higher as compared to existing old towns. With this in view for the Naya Raipur capital city a work participation ratio adopted for 2031 is 40 percent. With this work participation rate the total employment of the Naya Raipur works out to 222,950. 7.2 Occupational Pattern Before projecting the occupational pattern for Naya Raipur, the trends for Raipur, Chandigarh and the proposals given in Delhi Master Plan 2001 have been studied (Refer fig 7.1). 26 Naya Raipur Development Plan -2031 Fig 7.1 Comparative Analysis of Occupational Pattern: Raipur and Chandigarh COMPARATIVE ANALYSIS
    [Show full text]
  • Naya Raipur, India
    International Urban Planning Workshop Naya Raipur, 17th-30th November 2012 NAYA RAIPUR, INDIA Call for applications to select the 21 participants for the professional workshop SHAPING A NEW CAPITAL CITY TO FIT INDIAN LIFE Exploring the thresholds, limits and in-between zones Explore, test and propose ways that the new, emerging city of Naya Raipur can provide for Indian Life: Inhabiting the thresholds and spaces between buildings and streets; city and landscape; neighbourhoods and districts; providing for the needs of city- dwellers to become more equal and prosperous in the future. Engage with the design of a new city, as it comes into being. Preamble Naya Raipur Development Authority (NRDA) is the development authority for a new capital city in the central Indian state of Chhattisgarh. As a partner in the European-Union funded Euro-Asian Sustainable Towns Programme (EAST), the NRDA has invited Les Ateliers to hold a professional workshop on the topic of the development of the new city in November 2012. The workshop will fulfil the aims of the EAST programme to promote exchange of knowledge and learning about new towns between Europe and Asia. Websites: Naya Raipur Development Authority: http://www.nayaraipur.com Euro-Asian Sustainable Towns Programme: http://www.east-project.org Members of EAST and Les Ateliers made preparatory visits to Naya Raipur in September 2010 and November 2011 to agree with the NRDA the objectives, topics and arrangements for the workshop, which are outlined in this document. As part of the visits, meetings were also held with other stakeholders in the adjacent city of Raipur, including the Raipur Development Authority, Universities, Developers and others.
    [Show full text]
  • Chhattisgarh in Figures
    CHHATTISGARH December 2020 For updated information, please visit www.ibef.org Table of Contents Executive Summary 3 Introduction 4 Economic Snapshot 9 Physical Infrastructure 15 Social Infrastructure 22 Industrial Infrastructure 25 Key Sectors 28 Key Procedures & Policies 36 Appendix 45 2 Executive summary Strong mineral production base . It is the only state in India that produces tin concentrates and accounts for 35.4% of tin ore reserves of India. 1 During 2018-19, tin concentrate production in the state stood at 21,211 kgs. Korba - Power capital of India . Korba district in Chhattisgarh is known as the power capital of India. All villages in the state have been electrified 2 under Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY). Start up hub . E- commerce and other sectors which are in the start up stage have begun to grow in Raipur, converting the states into a start up hub. By setting up a start up in the state, the player can enjoy first mover advantage and capture a 3 larger market. Strong growth in agriculture . Between 2011-2012 and 2018-19, Gross Value Added (GVA) from the agriculture, forestry and fishing sectors in 4 the state grew at a CAGR of 12.53%. Source: Economic Survey of Chhattisgarh, Indian Bureau of Mines 3 INTRODUCTION 4 Chhattisgarh fact file Raipur Capital 189 persons per sq km 25.5 million Population density total population 1,35,194 sq.km. geographical area 12.7 million 12.8 million female population male population 991 Sex ratio 71.04% 27 administrative (females per 1,000 males) Key Insights literacy rate districts • Chhattisgarh is located in central India.
    [Show full text]