GENERAL PERFORM. PRESENTATION TRANSFORM WE DO ITALL

Building Highway / Expressway Railway Infrastructure Water Supply Electrification Timeline

Renamed as DEE VEE Projects Limited

1989 2012

Started Operations as M/s Patel Enterprises Leadership Team

• Mr. Dinesh Kumar Patel (Promoter and Whole Time Director) • Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director) • Mr. Navin Patel (Promoter and Whole Time Director) • Mr. Vivek Ranjan Mahto (Whole Time Director) • Mr. Ashok Patel (Director) • Mr. Deepak Patel (Director) • Mr. Dheeraj Dubey (Director) • Mr. Ritesh Bhawnani (Director) • Mr. Gaurav Gupta (Independent Director) • Mr. Amit Sharma (Independent Director) • Mr. Anup Agarwal (President & COO ) • Mr. Sumit R Das (Vice President) • Mr. Avinash Bansal (Vice President) • Mr. Deep Patel (Vice President) • Mr. Prashant Singh (Vice President) • Mr. Hitesh Luna (Vice President) • Mr. Satish Kumar Sarawgi (CFO) • Mr. N V Subrahmanyam (CGM)

Organization Structure

Operating Work Divisions

Roads and Highways Division

Directors Building Division

Railway Division

Water Supply Division

Electrification Division

Business Management & Administration Units

Core Management Group Marketing Division

Procurement Division

Financing & Accounting Division Auditing Group Human Resource Division

R&D Human Resources

1%

32%

62%

4% 1%

 Recruitment  Taxation  Salary Administration  Audit  Statutory Compliance

Financial Highlights

Rs. 81.83 CRORE NETWORTH : 2016‐17 Rs. 109.36 CRORE NETWORTH : 2017‐18 Financial Highlights

Average Annual Turnover (2016~2018) Rs. 542 CRORE 800 700 INR Cr 600

500

400

300

200

100

0 2016 2017 2018 Financial Highlights

No Loss Certificate Plant & Equipment Plant & Equipment

Equipment Description Qty

Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 30Cum / 08 Nos (30 Cum / hr) hr. capacity Cement Silos for 2 (two) days capacity with direct feeding

Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 02 Nos (60 & 70 Cum / hr) 70Cum hr capacity with direct feeding

Batching Plant Computerized and Fully Automatic Concrete Batching plant of minimum 112 02 Nos (112 Cum / hr) Cum / hr capacity with direct feeding

Concrete Pump Concrete Pump with MS concrete Piping system for pumping 23 Set

Transit Mixer Capacity – 6 Cum 35 Nos

01 No. Crusher MESTO 250 TPH

Plant & Equipment

Equipment Description Qty

Wet Mix Macadam WMM Plant ( 100 – 120 TPH) 01 Nos. Plant

Weigh Bridge 100 MT Capacity 08 Nos.

JCB 4DX (JCB HYDRAULIC - EXCAVATOR) 02 Nos.

JCB 3DX (JCB HYDRAULIC – EXCAVATOR\ 06 Nos.

Earthmovers and EXCAVATOR (KOMATSU), Tata Hitachi, Hyundai, JCB) 10 Nos. Excavators

HYUNDAI POKLAIN (CHAIN MOUNTED) 215 01 Nos.

BACKHOE LOADER (JCB) 30 Nos. Plant & Equipment

Equipment Description Qty

L&T CASE 770 SS LOADER BACKHOE 14 Nos.

TATA HITACHI 110EX 03 Nos.

BOBCAT 12 Nos.

HYWA 45 Nos. Earthmovers and Excavators HYWA WITH WATER TANK 10 Nos.

ROLLER 1407 L&T (WIBRO) 12 Nos.

GRADER (CAT / CASE 120 H) 06 Nos.

CASE 1107 ROLLER 01 No. Plant & Equipment

Equipment Description Qty

CASE 752 ROLLER 01 Nos.

CASE 50 DX MINI ROLLER 01 Nos.

Earthmovers and BABY ROLLER 01 Nos. Excavators

SENSOR PAVER (GOMACO) 02 Nos.

MANUAL PAVER (UNISTEEL) 03 Nos.

TOWER CRANE (POTAIN ) 06 Nos.

Crane and Hydra MOBILE TOWER CRANE ACE 04 Nos.

HYDRA CRANE (MODEL 14 XW) 06 Nos. Plant & Equipment

Equipment Description Qty

Concrete Sensor SENSOR PAVER – CONCRETE - WIEIGHTEN 01 Nos. Paver

Bituminous Sensor SENSOR PAVER - BITUMINOUS 03 Nos. Paver

Hydra Hydra 10 Nos.

Boom Placer Boom Placer – Putzmeister 01 Nos.

DG Set Diesel Generator 50 Nos Plant & Equipment

Equipment Description Qty

BUILDING HOIST 8 Nos. Hoist MONKEY HOIST SAFARI 45 Nos.

Tractor TRACTOR 11 Nos.

Site Vehicles SUV, MUV, Sedan, Pick-up 30 Nos.

Shuttering material along with steel props, pipes, Shuttering Materials 100,000 sqm scaffolding cup lock system for all heights Certificate

ISO 9001:2015

Building, Roads, Highways, Mechenical, Electrical, Structural, & Civil Engineering Works. Certificate

ISO 14001:2015

Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Certificate

OHSAS 18001:2017

Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works. Our Esteemed Clientele

and the list is growing.. Project Locations

Dhanbad , Shahdol,, Singrauli

Raipur,, Korba, Bilaspur, Ambikapur

Sundergarh

Nagpur, GondiaAmravati, Bhandara Office Locations

Offices : Head Office and Corporate Office Registered Office 1st Floor Vikas Complex, P.H Road, Korba ‐ 495677 (C.G.), Phone : +91 771 2972 580 Corporate Office Dee Vee Building , Maulshree Vihar, ‐ 492006 (C.G.), Phone : +91 7759 245 168 Project Details

Building Works Roads and Railway Water Supply Electrification Highways Works Infrastructure Synopsis of EXISTING PROJECTS Synopsis of Existing Projects (1/6)

Construction Value Project Location Client Period (INR Cr)

Medical College Building at Ambikapur, CG Ambikapur, CG CGPWD Mar'2019 ~ Mar'2021 336.42

Face Lifting and Renovation of 'F' Type Buildings (87 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 37.32 in Colony at CSTPS, Chandrapur, MH

Face Lifting and Renovation of 'F' Type Buildings (116 Buildings) Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 34.46 in Colony at CSTPS, Chandrapur, MH

Execution of Casting of Precast RCC Boxes and making them available near the Bridges at nominated places in connection Raipur, CG DGM, Raipur, CG Dec'2018 ~ Mar'2020 16.82 with rebuilding of Stone Slab Bridges in KBJ‐LAE Section Of E.CO. Railway in and Odisha State, Synopsis of Existing Projects (2/6)

Construction Value Project Location Client Period (INR Cr) Balance Civil Renovation Work for Mining Engineering, Central Library, Metallurgical & Chemical Engineering, Civil Engineering, Electronics & Communication Engineering, Mechanical

Engineering, Admin Block, Deshpande Auditorium, Electrical Dhanbad, JH Oct'2018 ~ May'2019 23.04 Engineering Projects (I) LTD Substation, (Hostel 1‐6), Rain Water Harvesting System, Horticulture & Landscaping, Road, (Package‐I) at B.I.T. Sindri, Dhanbad, Jharkhand Civil & associated Works of Road Works for 4 Lane with paved shoulder configuration of Bilaspur to Pathrapali (Km 00+000 To Km Bilaspur, CG ADANI Infra Feb'2019 ~ Jul'2020 304.48 53+300) Section Of NH 111 (New NH‐130) in the State Of Chhattisgarh, India

Beautification of Ranisagar and Bhuthsagar Lake at , Rajnandgaon, CG Municipal Corporation, Rajnandgaon, Sept'2018 ~ Mar'2020 17.04 CG CG

Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54 Nos. Jr. HIG (Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr. Raipur, CG CGHB Aug'2018 ~ Feb'2021 149.82 MIG (Duplex) at Sector‐12, Naya Raipur i/c External Development Works at Sector‐12, Naya Raipur (Phase‐I), CG

Construction of House and Development of Infrastructure for Identified Slum Localities in Indore, M.P. under PMAY at Rau Near Indore, MP Municipal Corporation, MP Jul'2018~ Jul'2020 388.30 Silicon City, MP Synopsis of Existing Projects (3/6)

Construction Value Project Location Client Period (INR Cr)

Construction of Dipka‐Jawali‐Chakabuda Road in KM 1/2 To KM Korba, CG CGPWD Jul'2018 ~ Jan'2020 33.31 15/2 (100) = 14.10 KM i/c Hume Pipe Culverts

Construction of Head Quarter Building, Western Region‐II, NTPC Naya Raipur, CG NRDA, CG Jun'2018 ~ Jun'2019 70.07 Ltd. at Sector‐24, Naya Raipur, CG

Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIG Duplex, 52 LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F, E/F & all related Infrastructure Development Work & External Korba, CG CGHB May'2018 ~ May'2020 40.95 Development Work under Atal Vihar Yojna at Jhagarha, , CG

Proposed Construction of Head Office Building of Chhattisgarh Naya Raipur, CG CGRB Apr'2018 ~ May'2019 4.74 Rajya Gramin Bank at Naya Raipur, CG

Demolition, Land Development & Boundary Wall Repair Works Sindri, JH PDIL Feb'2018 ~ May'2019 55.19 (Package‐I) at Sindri, Jharkhand

Construction of Education Hub Phase‐II i/c Development Work at Korba, CG CGHB Jan'2018 ~ Jan'2020 63.53 Block Katghora, CG

Construction & Commisioning of balance Canal Work i/c Cross Drainage structures and design of Gosikhurd National Project in Bhandara, MH NBCC Sept''2017 ~ Jul'2019 332.97 Bhandara, Narela (MH), Package‐I, NBCC Synopsis of Existing Projects (4/6)

Construction Value Project Location Client Period (INR Cr)

Re‐habilitation and up‐gradation of Korchi‐Chichgad‐Deori‐ Amgaon‐Gondia from existing Km 180+330 of SH‐276 (on 413+540 NH‐53, Deori) to KM 213+330 of SH‐249 (Amgaon) Deori, MH NH‐PWD, MH Aug'2017 ~ Aug'2019 288.5 (Design KM 0.000 to KM 38.000) Section of National Highway to Two lane with paved shoulders on EPC Mode in the State of Maharashtra

Construction of GAD Houses i/c Development Work for Govt. Officers and Employees at various 5 Block level offices For Korba, CG CGHB Aug'2017 ~ May'2019 23.93 District Korba, CG Construction Of GAD Houses i/c Development Work for Govt. Officers and Employees at All Block Head Quarters of District Koriya, CG CGHB Jul'2017 ~ Jun'2019 24.18 Koriya, CG Rehabilitation and Up‐gradation Of NH‐111 (New NH‐130) from National Highway Zone KM 163.400 to KM 215.800 (Shivnagar to Ambikapur) to 2‐Lane Shivnagar‐Ambikapur, CG PWD, Raipur, CG Jun'2017 ~ Jun'2019 109.70 with Paved Shoulder (Value 223.89 Cr, DEE VEE 49% = 109.70 Cr

& GAWAR 51% = 114.18 Cr) Construction of 674 EWS, 436 MIG and 108 HIG Residential Tenements on land bearing survey No. 47, 57 and 58 at Mauja Amravati, MH AHAADB, Amravati, MH Jun'2017 ~ Dec'2019 139.83 Akoli, Dist.‐Amravati, MH Construction & External Development of Inter State Bus Raipur, CG UADD, CG Mar'2017 ~ May'2019 43.21 Terminal at Raipur, CG Synopsis of Existing Projects (5/6)

Construction Value Project Location Client Period (INR Cr)

Two Laning with hard shoulder of Tara‐Premnagar‐ Ramanujnagar road section from existing chainage KM 0.000 To Tara‐Premnagar‐ KM 50.312 (Design Chainage From Km 0.000 To Km 50.242) in CGRDC Feb'2017 ~ Jun'2019 50.29 Ramanujnagar, CG the State of Chhattisgarh on EPC Mode. (GAWAR ‐ Rs. 54.18 Cr & DEE VEE ‐ Rs. 50.29 Cr)

Construction of Art & Cultural Centre and Conventional Hall at Korba, CG CGHB Feb'2017 ~ May'2019 14.97 Korba, CG

Construction of Houses and Development of Infrastructure under Singrauli, MP Municipal Corporation Singrauli, MP Dec'2016 ~ May'2019 197.16 PMAY, Singrauli Municipal Corporation, MP

Integrated Infrastructure Development work for Sector‐24 (Part‐ Naya Raipur, CG NRDA, CG Dec'2016 ~ Jun'2019 71.37 A Phase‐II) Naya Raipur, CG

Renovation work for various building (Pkg‐III) at B.I.T. Sindri, Dhanbad, JH Engineering Projects (I) LTD Nov'2016 ~ May'2019 19.93 Dhanbad, Jharkhand Synopsis of Existing Projects (6/6)

Construction Value Project Location Client Period (INR Cr)

Construction of Degree Collage Shahdol to University Shahdol, Distt Shahdol, MP i/c Water Supply, Sanitary Fitting and Shahdol, MP MPPWD Sept'2016 ~ May'2019 38.56 Electrification,

Township Package for Darlipali Super Thermal Power Project, Darlipali, OR NTPC LTD Aug'2016 ~ Jun'2019 167.90 Stage‐ I (2X800 MW) near Jharsuguda, Odisha

Construction of Engineering College at Chatwai, Distt‐Shahdol, Shahdol, MP MPPWD Sept'2016 ~ Jun'2019 30.37 MP i/c Water Supply, Sanitary Fitting and Electrification

Construction of New Medical College and up‐gradation of Hospital at Shahdol, MP Shahdol, MP MPRDC Jan'2016 ~ May'2019 201.47

Synopsis of COMPLETED PROJECTS Synopsis of Completed Projects (1/6)

Construction Value Project Location Client Period (INR Cr)

Airport Highway (V.I.P. Road) Widening Contract, Raipur, Raipur, CG UADD, CG May'2016 ~ Sept'2018 67.87 CG

Construction of Girls Hostel for IIIT at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2017 ~ Aug'2018 7.00

Construction of Commercial Retail (Formal & Informal) i/c Buildings and Services on Plot No. E04, E05, E09 & E10 of Naya Raipur, CG NRDA, CG Dec'2014 ~ Jul'2018 121.59 Phase-1, CBD Complex, Sector 21 at Naya Raipur, CG

Supply and Stacking of balance quantity of Ballast between Titlagarh-Lakhna Section of Sambalpur Division of E.Co.R in Titlagarh-Lakhna Sec. of RVNL Oct'2016 ~ Jun'2018 18.45 Odisha, India, in connection with Raipur-Titlagarh Doubling. Sambalpur Div., OR

Synopsis of Completed Projects (2/6)

Construction Value Project Location Client Period (INR Cr) Construction of Civil Works i/c Earthwork in formation for Embankment and Cutting, Blanketing, Culverts, Major & Minor Bridges and other Ancillary Works from KM 98.860 to KM 134.660 and Flyover Line from KM 128.000 to KM 135.200 (Pkg-I) in connection with the construction of New Gevra Road-Pendra Road, BG Electrified Double Line in the State of Chhattisgarh over IRCON Jul'2016 ~ Jun'2018 80.97 CG SECR East-West Corridor–Gevra Road-Pendra Road via Dipka, Kathghora, Sendurgarh and Pasan. (DEE VEE- GAWAR (JV)) (Value 197.54 Cr, DEE VEE: 70%=138.28 Cr & GAWAR: 30%=59.26 Cr)

Execution of all P.Way works (Excluding PF shelter & FOB), Supply of Ballast and misc. Civil works i/c supply and transporting of P.Way material in ARN (Ex)-BLSN (in) section and ANMD yard of Sambalpur division of E.Co.R. in the State Raipur, CG RVNL Nov'2016 ~ May'2018 24.73 of Chhattisgarh, India, in connection with Raipur-Titlagarh Doubling Project.

Rehabilitation and up-gradation of NH-43 from KM 241.00 to KM 298.00 (Dahikonda to ) in the State of Chhattisgarh to Two-lanes with Paved Shoulders under NHDP- IV on EPC Basis. Dahikonda to Jagdalpur, CG NHDP Mar'2015 ~ May'2018 176.55 (Barbric-DEE VEE (JV) TotalAmount 175.99 Cr. DEE VEE- 60%=105.5 Cr & Barbric-40%=70.39 Cr)

Synopsis of Completed Projects (3/6)

Construction Value Project Location Client Period (INR Cr) Construction of Commercial Office Campus i/c buildings and services on Plot No. C03 of Phase-1, CBD Complex, Sector Naya Raipur, CG NRDA, CG Dec'2014 ~ Apr'2018 153.26 21 at Naya Raipur, CG

Construction of Chhattisgarh State Judicial Academy Bhawan Bilaspur, CG PWD, Bilaspur, CG Aug'2014 ~ Mar'2018 171.41 at High Court, Bodri, Bilaspur, CG

Construction of New Civil at Visveswaraya National Institute , MH NBCC Sept'2015 ~ Feb'2018 189.86 of Technology, Nagpur, MH

Construction of 1 no. ROB and 5 no. RUB (full height and limited height) and allied work in connection with Mandirhasaud-Nayaraipur- SECR-Bilaspur Apr'2016 ~ Oct'2017 18.21 construction of New Rail Line between Mandirhasaud- Kendri, CG Nayaraipur-Kendri, CG

Rehabilitation and up-gradation of NH-43 from KM 81.50 to KM 130.00 ( to Kanker) in the State of Chhattisgarh to Two-lanes with Paved Shoulders under NHDP-IV on EPC. Dhamtari to Kanker, CG NHDP Mar'2015 ~ Jun'2017 54.39 (Barbric-DEE VEE (JV)) (Value 135.99 Cr, DEE VEE: 40%=54.40 Cr & Barbric: 60%=81.59 Cr)

Synopsis of Completed Projects (4/6)

Construction Value Project Location Client Period (INR Cr) Construction of 12 HIG Type-II, 47 Sr. MIG Type-II, 57 Jr. MIG Type-II, 150 LIG Type-II, & 272 EWS Type-I for Atal Chilhati, CG CGHB Jul'2014 ~ Mar'2017 30.80 Vihar Yojna at Chilhati, Bilaspur, CG Construction of Forest Department building at North block, Raipur, CG NRDA, CG Feb' 2015 ~ Feb'2017 38.92 Sector-19 of Naya Raipur, CG

C.G.H.B. 30 Acre Land Development Work at Urga, Dist- Korba, CG CGHB Sept'2013 ~ Apr'2016 12.31 Korba, CG Construction of Paryavas Bhawan (Composite Building) of Naya Raipur, CG NRDA, CG Mar'2013 ~ Apr'2016 61.59 Sector-19 at Naya Raipur, CG Construction of 24 No. HIG -II, 131 No. Sr. MIG-II, 131 No. Jr. MIG-II, 90 No. LIG-II & 432 No. EWS (G+3), Total 808 No. Korba, CG CGHB Sept'2013 ~ Mar'2016 39.98 Houses i/c W/S, S/F, Electrification Works at Atal Vihar Urga, Korba, CG

Construction of Cement Concrete road in KM 1 to 23/4 = 22.40 Dipka to Pali, CG PWD, Korba, CG Aug'2013 ~ Dec'2015 61.89 KM of Dipka to Pali Road i/c Bridge and Culverts, CG

Constrution of 688 EWS and 510 LIG houses dwelling unit with RCC Framed Structure under Atal Vihar Yojana at Parsada , CG CGHB Sept'2013 ~ Oct'2015 33.39 Kumhari, Disst. Durg, CG Synopsis of Completed Projects (5/6)

Construction Value Project Location Client Period (INR Cr) Construction of 34 No. HIG (Premium), 144 No. HIG (Duplex), 176 No. Sr. MIG, 176 No. Jr. MIG, 320 No. EWS (G+3), 432 No. LIG (S+6), 144 No. HIG (S+6), Commercial Naya Raipur, CG CGHB Feb' 2012 ~ Apr'2015 209.19 Complex (G+4) & Club House, Water Supply i/c Electrification Work at Sector-29, Naya Raipur, CG (Group- A) Construction of Cement Concrete Road in KM 9/2 to 13/10 = Korba, CG PWD, Korba, CG Sept'2013 ~ Jan'2015 9.09 5.00 KM on Ring Road Korba (Godhi To Risdhi), Korba, CG

Construction of Police Head Quarter at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2012 ~ Dec'2014 49.63

Construction of Cement Concrete Road in KM 1 to KM 8 = 8.00 KM on Barbaspur to Godhi Road (Ring Road Korba) i/c Korba, CG PWD, Korba, CG Mar'2013 ~ Dec'2014 19.31 Hume Pipe Culverts, CG Construction of 35 HIG-I Delux Duplex, 20 HIG-II Delux Duplex, 64 HIG- II Std., 38 MIG Duplex, 7 MIG, 65 LIG (Total 229) House at Hasdev Vihar Janjgir i/c Water Supply, Korba, CG CGHB Sept'2012 ~ Aug'2014 26.61 Internal Electrification& Balance Development Work, Korba, CG Construction of 32 HIG (Duplex), 63 Sr. MIG (Duplex), 576 MIG (S+6), 144 HIG (S+6) & Commercial Complex under Naya Raipur, CG CGHB Dec'2011 ~ Jun'2014 125.22 Composite Housing Scheme at Sector-29 Naya Raipur,CG (Group-B) Synopsis of Completed Projects (6/6)

Construction Value Project Location Client Period (INR Cr)

Construction of Naya Raipur Capital Complex-Lake (Rakhi) front development under Conservation & Development of Naya Raipur, CG NRDA, CG Apr'2012 ~ Mar'2014 26.02 Water Bodies under the Head of 13th Finance Commission

Construction of 52 No. HIG (Duplex), 152 No. Sr. MIG, 72 No. HIG (S+6), 256 No. HIG (S+8) and Commercial Complex (G+2) and Community Hall i/c Water Supply and Naya Raipur, CG CGHB Dec'2011 ~ Feb'2014 124.8 Internal Electrification at Sector-29 Naya Raipur, CG (Group- C)

Construction of New Composite Building at Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG Jun'2012 ~ Dec'2013 14.82

Construction of 168 (G+2) Deendayal Awas House and 84 Korba, CG CGHB Apr'2012 ~ Sept'2013 7.89 EWS (G+2) at Kharmora, Korba, CG

Constrution of Institute of Tecnology Building at Korba i/c Water Supply, Sanitary fitting, Electrification with Approach Korba, CG PWD, Korba, CG Jan'2011 ~Sept'2012 26.94 Road, Korba, CG Quality Policy

VISION To be the preferred source of quality construction services while building a most favorable and successful organization.

MISSION • To specialize in all segments of construction activities. • To provide quality project supervision and workmanship through recruitment, training and systems support. • To foster a corporate culture where our employees have a safe, respectful and rewarding work environment. • To deliver projects on schedule and on budget • To maximize the utilization of resources • To seek business opportunities that optimize our multi-disciplinary capabilities.

QUALITY STATEMENT We are committed to providing quality work to our customers that meets the project standards and specifications for materials, workmanship, schedules while maintaining Profitability and competitiveness. We seek to achieve quality by instilling the principle of “Trust to Last” in the efforts of all levels of staff. We ensure continual improvement through quality processes which are directed by a strong management team. HSE Policy

STATEMENT OF POLICY

It is the policy of our company to perform work in the safest possible manner consistent with the Health & Safety Act and Regulations for Construction Projects.

It is our belief that every employee in the construction industry is entitled to work in a safe and healthy construction environment. Every reasonable precaution shall be taken to provide such an environment.

Our goal is to eliminate or minimize the hazards that cause accidents and injuries. Any accident in this company shall be viewed as a serious matter and shall be thoroughly investigated.

POLICY COMMITMENT Copies of this policy must be posted, distributed and explained to all workers. Compliance with this policy will be reviewed regularly at all employee levels. Violations will be recorded. Repeated disregard or willful violations of this policy by any subcontractor or employee at any level may be considered cause for discipline in accordance with the Company Rules and existing laws.

PROJECTS GLIMPSES

If one needs to succeed in the construction industry, one needs to be committed & pay attention to detail. There is also a need to be resolute in one's work ethic.

Constructing Success Committed to Superior Quality, Safety and Timely Completion. Hope you liked what you saw..