Shieldhall 420 Shieldhall Road, Glasgow G51 4HY

Total Page:16

File Type:pdf, Size:1020Kb

Shieldhall 420 Shieldhall Road, Glasgow G51 4HY Shieldhall 420 Shieldhall Road, Glasgow G51 4HY End Terraced Villa Shieldhall Offers Over £130,000 Seldom available, larger END TERRACE VILLA occupying an enviable position within this sought after and established residential district just a few minutes from the recently opened Southern General Hospital Campus and nearby access to the Clyde Tunnel and Expressway, in addition to being only minutes from both Braehead and Silverburn shopping centres, Asda Govan (24 hour), Morrison’s at Cardonald and access to the motorway and onward to Glasgow Airport and City Centre. The property has been extensively improved by its existing owners and is beautifully presented throughout offering first class family accommodation and benefiting from gas central heating, double glazing, good quality modern kitchen and bathroom fittings, in addition the building has been re-rendered externally. Decorative opaque double glazed and PVC front door onto broad reception hall with access to all ground floor apartments off and stairs to first floor (built-in storage below stairs), immaculate 15’4 south facing lounge to front enjoying pleasant open aspects, separate dining room to front again enjoying open aspects and this apartment could easily comprise bedroom four, 16’3 fully fitted kitchen with integrated oven, hob and hood and comprising extensive floor and wall mounted beech wood veneer fronted units with complimentary work tops. The kitchen enjoys aspects over a large fully enclosed garden with access door to garden. On the first floor: broad landing with deep storage cupboard, three double bedrooms and modern fitted bathroom comprising three piece white suite with electric instant shower above bath, fully height water resistant panelling around walls, heated towel rail. There is a mono block paved hard parking area to front providing excellent off street parking and one of the largest fully enclosed gardens within the district to the rear also providing the opportunity to extend the existing accommodation if required and subject to obtaining the relevant Local Authority consents. Comprising one of the largest family homes within the district with a flexible layout, the agents recommend internal inspection in order to not only appreciate the existing standard of accommodation, however convenience of location. Measurements Features LOUNGE 15’4 (4.67m) x 12’3 (3.74m) • Larger End Terrace Villa DINING/BEDROOM FOUR 10’5 (3.18m) x 9’5 (2.87m) • South facing 15’4 lounge KITCHEN 16’3 (4.95m) x 8’3 (2.53m) • 16’3 fitted kitchen FIRST FLOOR • Three double bedrooms BEDROOM ONE 13’1 (3.99m) x 11’11 (3.63m) • Refitted bathroom BEDROOM TWO 11’11 (3.63m) x 9’0 (2.74m) • Large enclosed rear garden BEDROOM THREE 11’11 (3.63m) x 9’9 (2.98m) • Mono block parking area BATHROOM 8’4 (2.54m) x 6’11 (2.10m) EPC D Travel Directions Travelling west along Shieldhall Road from the junction with Drumoyne Road continue straight ahead at the roundabout (sign post for Clyde Tunnel and Southern General) onto the continuation of Shieldhall Road turning next right running parallel with Shieldhall Road and number 420 is on your right overlooking the main road. Disclaimer Whilst we endeavour to make these particulars as accurate as possible, they do not form part of any contract on offer, nor are they guaranteed. Measurements are approximate and in most cases are taken with a digital/sonic measuring device and are taken to the widest point. We have not tested the electricity, gas or water services or any appliances. Photographs are reproduced for general information and it must not be inferred that any item is included for sale with the property. If there is any part of this that you find misleading or simply wish clarification on any point, please contact our office immediately when we will endeavour to assist you in any way possible. GSPC Reference 227707 Viewing Office Details Through solicitors on 0141 639 2277 138 Ayr Road, Newton Mearns, Glasgow, G77 6EG Evenings and weekends 0141 572 7668 T. 0141 639 2277 F. 0141 616 2412.
Recommended publications
  • Open Space Strategy Consultative Draft
    GLASGOW OPEN SPACE STRATEGY CONSULTATIVE DRAFT Prepared For: GLASGOW CITY COUNCIL Issue No 49365601 /05 49365601 /05 49365601 /05 Contents 1. Executive Summary 1 2. Glasgu: The Dear Green Place 11 3. What should open space be used for? 13 4. What is the current open space resource? 23 5. Place Setting for improved economic and community vitality 35 6. Health and wellbeing 59 7. Creating connections 73 8. Ecological Quality 83 9. Enhancing natural processes and generating resources 93 10. Micro‐Climate Control 119 11. Moving towards delivery 123 Strategic Environmental Assessment Interim Environment Report 131 Appendix 144 49365601 /05 49365601 /05 1. Executive Summary The City of Glasgow has a long tradition in the pursuit of a high quality built environment and public realm, continuing to the present day. This strategy represents the next steps in this tradition by setting out how open space should be planned, created, enhanced and managed in order to meet the priorities for Glasgow for the 21st century. This is not just an open space strategy. It is a cross‐cutting vision for delivering a high quality environment that supports economic vitality, improves the health of Glasgow’s residents, provides opportunities for low carbon movement, builds resilience to climate change, supports ecological networks and encourages community cohesion. This is because, when planned well, open space can provide multiple functions that deliver numerous social, economic and environmental benefits. Realising these benefits should be undertaken in a way that is tailored to the needs of the City. As such, this strategy examines the priorities Glasgow has set out and identifies six cross‐cutting strategic priority themes for how open space can contribute to meeting them.
    [Show full text]
  • Shieldhall Tunnel Construction of the First Shaft, Service Chamber, Cut and Cover and the Tunnel Boring Machine Launch Chamber at Craigton
    www.WaterProjectsOnline.com Wastewater Treatment & Sewerage Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton onstruction of the Shieldhall Tunnel, the biggest investment in the Glasgow wastewater network since Victorian times, is well underway. Once complete, it will improve river water quality and the natural environment of the CRiver Clyde and its tributaries, enable the Greater Glasgow area to grow and develop, alleviate sewer flooding key locations and deal with the effects of increased rainfall and climate change in the area served by the Shieldhall WwTW. The Shieldhall Tunnel will be 3.1 miles long (more than five times as long as the Clyde Tunnel that takes a dual carriageway beneath the river) and 4.70m in diameter, big enough to fit a double-decker bus inside. It will be the biggest wastewater tunnel in Scotland, with a storage capacity equivalent to 36 Olympic-sized swimming pools. ‘Daisy’, the Shieldhall Tunnel TBM - Courtesy of Herrenknecht Section of TBM lowered into Shaft 1 - Courtesy of SNS Section of TBM lowered into Shaft 1 - Courtesy of SNS Planning CVJV have been carrying out preparatory work, including mine The investment follows years of collaboration and studies by the working consolidation, utility diversion work, constructing the Metropolitan Glasgow Strategic Drainage Partnership (MGSDP), first shaft, service chamber, cut and cover and the tunnel boring whose members include Scottish Water, the Scottish Environment machine (TBM) launch chamber at Craigton in advance of Protection Agency (SEPA), Glasgow City Council and Scottish Canals. tunnelling beginning. The improvements are required to meet European directives and Tunnel route SEPA recommendations and will contribute towards the Scottish The tunnel is being launched from a former tram depot site in the Government’s objective to comply with the Urban Waste Water Craigton area of Glasgow, in the south-west of the city.
    [Show full text]
  • Glasgow City Health and Social Care Partnership Health Contacts
    Glasgow City Health and Social Care Partnership Health Contacts January 2017 Contents Glasgow City Community Health and Care Centre page 1 North East Locality 2 North West Locality 3 South Locality 4 Adult Protection 5 Child Protection 5 Emergency and Out-of-Hours care 5 Addictions 6 Asylum Seekers 9 Breast Screening 9 Breastfeeding 9 Carers 10 Children and Families 12 Continence Services 15 Dental and Oral Health 16 Dementia 18 Diabetes 19 Dietetics 20 Domestic Abuse 21 Employability 22 Equality 23 Health Improvement 23 Health Centres 25 Hospitals 29 Housing and Homelessness 33 Learning Disabilities 36 Maternity - Family Nurse Partnership 38 Mental Health 39 Psychotherapy 47 NHS Greater Glasgow and Clyde Psychological Trauma Service 47 Money Advice 49 Nursing 50 Older People 52 Occupational Therapy 52 Physiotherapy 53 Podiatry 54 Rehabilitation Services 54 Respiratory Team 55 Sexual Health 56 Rape and Sexual Assault 56 Stop Smoking 57 Volunteering 57 Young People 58 Public Partnership Forum 60 Comments and Complaints 61 Glasgow City Community Health & Care Partnership Glasgow Health and Social Care Partnership (GCHSCP), Commonwealth House, 32 Albion St, Glasgow G1 1LH. Tel: 0141 287 0499 The Management Team Chief Officer David Williams Chief Officer Finances and Resources Sharon Wearing Chief Officer Planning & Strategy & Chief Social Work Officer Susanne Miller Chief Officer Operations Alex MacKenzie Clincial Director Dr Richard Groden Nurse Director Mari Brannigan Lead Associate Medical Director (Mental Health Services) Dr Michael Smith
    [Show full text]
  • 18 Mybster Place | Govan | G51 4NX
    18 Mybster Place | Govan | G51 4NX www.pjglasgow.co.uk 18 Mybster Place | Govan A lovely two bedroom semi-detached villa set within good over bath. sized level gardens in an extremely popular and convenient Key Features South Side location. Externally, the gardens to the front and rear are mainly enclosed and laid in lawn. There is a good sized patio area at • Beautiful two bedroom The property benefits from a refurbished exterior that includes the rear and storage area located at the side of the house. semi detached villa replaced downpipes, cavity wall insulation and a re-rendered • Prime cul-de-sac location finish. There has also been many upgrades internally by the N.B. There is full planning permission in place for the erection present owner who has replaced all floor coverings, installed a of a single storey rear extension. • Upgraded exterior and contemporary high gloss kitchen, a stylish bathroom, replaced interior the central heating system and installed a combination boiler, The property sits in a small cul-de-sac close to a variety of • Kitchen and bathroom added fitted wardrobes to the master bedroom and French local shops, Braehead shopping centre, the recently opened (2014) doors in the lounge that give direct access to the sunny Queen Elizabeth Hospital and the Glasgow Media Village. garden at the rear. The specification also includes loft Glasgow City Centre is only a short distance away and offers a • Gas central heating insulation and double glazing throughout. Early inspection is wider range of amenities including theatres, cinemas, retail (2011) strongly advised to avoid disappointment.
    [Show full text]
  • Pharmaceutical List - Pharmacies April 2014 POSTCODE AREA: G1
    Pharmaceutical List - Pharmacies April 2014 POSTCODE AREA: G1 HIGH STREET PHARMACY PHARMACEUTICAL SERVICES: 128 High Street, Advice to Care Homes: Healthy Start Vitamins: Palliative Care: GLASGOW, G1 1PQ EHC: Injecting Equipment Provider: Stoma Supplier: Telephone No: 0141 552 5929 Free Condom Service: MMyM: Supervised Disulfiram: Fax No: 0141 553 0655 e-Mail Address: [email protected] Gluten Free Service: Opiate Substitution Therapy: Contractor Code: 1620 HOURS OF OPENING: GPhC No: 1092760 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Lunch CH(C)P: Glasgow City CHP - North East 09:00 - 18:00 09:00 - 18:00 09:00 - 18:00 09:00 - 18:00 09:00 - 18:00 09:00 - 17:30 - - BOOTS UK PHARMACEUTICAL SERVICES: Queen Street Station, Dundas Street Advice to Care Homes: Healthy Start Vitamins: Palliative Care: GLASGOW, G1 2AF EHC: Injecting Equipment Provider: Stoma Supplier: Telephone No: 0141 332 5870 Free Condom Service: MMyM: Supervised Disulfiram: Fax No: 0141 353 0783 e-Mail Address: Gluten Free Service: Opiate Substitution Therapy: Contractor Code: 1555 HOURS OF OPENING: GPhC No: 1042470 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Lunch CH(C)P: Glasgow City CHP - North East 07:00 - 19:00 07:00 - 19:00 07:00 - 19:00 07:00 - 19:00 07:00 - 19:00 08:30 - 18:00 - - BOOTS UK PHARMACEUTICAL SERVICES: Unit 3 Level 3 Buchanan Galleries, Advice to Care Homes: Healthy Start Vitamins: Palliative Care: GLASGOW, G1 2GF EHC: Injecting Equipment Provider: Stoma Supplier: Telephone No: 0141 333 9306 Free Condom Service: MMyM: Supervised
    [Show full text]
  • Campus Travel Guide Final 08092016 PRINT READY
    Lochfauld V Farm ersion 1.1 27 Forth and 44 Switchback Road Maryhill F C Road 6 Clyde Canal Road Balmore 1 0 GLASGOW TRANSPORT NETWORK 5 , 6 F 61 Acre0 A d Old Blairdardie oa R Drumchapel Summerston ch lo 20 til 23 High Knightswood B irkin e K F 6 a /6A r s de F 15 n R F 8 o Netherton a High d 39 43 Dawsholm 31 Possil Forth and Clyde Canal Milton Cadder Temple Gilshochill a 38 Maryhill 4 / 4 n F e d a s d /4 r a 4 a o F e River Lambhill R B d Kelvin F a Anniesland o 18 F 9 0 R 6 n /6A 1 40 r 6 u F M 30 a b g Springburn ry n h 20 i ill r R Ruchill p Kelvindale S Scotstounhill o a Balornock 41 d Possil G Jordanhill re Park C at 19 15 W es 14 te rn R 17 37 oa Old Balornock 2 d Forth and D um Kelvinside 16 Clyde b North art 11 Canal on Kelvin t Ro Firhill ad 36 ee 5 tr 1 42 Scotstoun Hamiltonhill S Cowlairs Hyndland 0 F F n e 9 Broomhill 6 F ac 0 r Maryhill Road V , a ic 6 S Pa tor Dowanhill d r ia a k D 0 F o S riv A 8 21 Petershill o e R uth 8 F 6 n F /6 G r A a u C 15 rs b R g c o u n Whiteinch a i b r 7 d e Partickhill F 4 p /4 S F a River Kelvin F 9 7 Hillhead 9 0 7 River 18 Craighall Road Port Sighthill Clyde Partick Woodside Forth and F 15 Dundas Clyde 7 Germiston 7 Woodlands Renfrew Road 10 Dob Canal F bie' 1 14 s Loa 16 n 5 River Kelvin 17 1 5 F H il 7 Pointhouse Road li 18 5 R n 1 o g 25A a t o Shieldhall F 77 Garnethill d M 15 n 1 14 M 21, 23 10 M 17 9 6 F 90 15 13 Alexandra Parade 12 0 26 Townhead 9 8 Linthouse 6 3 F Govan 33 16 29 Blyt3hswood New Town F 34, 34a Anderston © The University of Glasgo North Stobcross Street Cardonald
    [Show full text]
  • Hillington Industrial Estate Glasgow
    FLEXSPACE HILLINGTON Hillington Industrial Estate Glasgow BUSINESS UNITS ON FLEXIBLE TERMS SAT NAV: G52 4BJ Office & Workshop Facilities v Oces Workshop Security Furnished Visitor Parking Meeting Rooms Flexspace is one of the UK’s leading providers 68-74 Queen Elizabeth Avenue of workshops, offices, warehouses and self Hillington Industrial Estate storage units for small businesses. Glasgow G52 4BJ Make Flexspace your first port of call to rent adaptable, convenient business units on flexible terms. FLEXIBLE ADAPTABLE • CONVENIENT Flexspace Hillington Workshop & Office SAT NAV: G52 4BJ Overview River C lyd J4 Flexspace Hillington is a flexible business centre, e BISHOPSBRIGG located within Scotland’s largest industrial estate, M8 A82 M80 A80 GLASGOW providing a range of furnished offices, workshops AIRPORT M73 A739 and studios that are available on flexible terms. J13 M8 J29 GLASGOW J21 J22 J19 The centre is fully telecoms & IT enabled and PAISLEY A761 A74 A8 provides free car parking and CCTV security. M77 M74 The 30 offices range from 80 to 550 ft2 (7.5 to 51 A77 m2) and are located over two floors and feature M74 carpeting and all utilities. A meeting room is also available. RENFREW RD KINGS INCH DR 2 The workshops range from 120 to 1,734 ft (11 to J26 J26 2 M8 161 m ) and are suitable for light industrial and D R KELVIN AVE AND warehouse purposes. Small storage units are also MOSSL MONTROSE AVE H IL M8 available. L PENILEE RD IN G T O N R Hillington Industrial Estate provides a good D SHIELDHALL RD QUEEN ELIZABETH AVE WATT RD D R S selection of amenities for its tenants, including a A736 E H C T I NEWARK P Harvester, several takeaway outlets, a Post Office Y NORTH CARNEGIE RD T F I and a variety of stores.
    [Show full text]
  • Making Contact
    Information on: Making contact Get in touch Office closure If you wish to report a repair during office hours, please call Our office is currently closed 0141 445 4418 and press option 1 due to the Scottish Government If your call is regarding another matter, please call 0141 445 restrictions imposed as a result 4418 and press option 2 of Covid19 and all telephone lines have been diverted to staff If you wish to contact us by email, please send it to who are working from home. [email protected] If you have an emergency repair out-with office hours, please contact our contractor as follows: For gas heating repairs contact Gas sure on 01294 - 468113 For all other types of emergency repairs contact Select Facilities on 0344 8718018 Making direct contact You can also make direct contact with your Customer Services Officer/Assistant. Their contact details are on the next page. 1. Find out which patch your house is in; 2. Get the patch contact details from the sheet; 3. Get in touch. Linthouse Housing Association, 1 Cressy St, Glasgow G51 4RB. Telephone: 0141 445 4418, Email: [email protected]. Linthouse Housing Association is registered with the Financial Conduct Authority, registration number 1800RS, the Scottish Housing Regulatory, registration number 149, and is a charity registered in Scotland, registration number SC028161. A copy of our Data Protection Policy is available through our website at www.linthouseha.com. Contact Patches Team member Email addresses number Patch 1 Balbeg Street Lisa Lindsay 0141 445 8402 [email protected]
    [Show full text]
  • Govan Ward Spaces for People Commonplace Report
    Govan Ward Spaces for People Commonplace Report About this report The Glasgow Spaces for People Commonplace Mapping Tool allows members of the public to highlight areas across the city centre and local neighbourhoods where emergency temporary measures such as pavement widening and new cycle lanes could be introduced to help people maintain physical distancing and suppress a resurgence of COVID-19. This report summarizes the suggestions made by members of the public in the five weeks between 5 June 2020 and 10 July 2020. The total number of contributions in Govan Ward is 936 The ward with the most contributions is Anderston/Yorkhill/City with 3279 contributions. The total number of contributions across the city is 16,922. Most Popular Ideas So Far in Govan Ward Location Suggestions Further Comments 1 Mavisbank Gardens South Clyde Remove gates & While the north bank of the Clyde Path fencing to allow has a cycle/walking path along its access to path length, the southern side has no such single direct path into the city centre (from Govan/Ibrox/Kinning Park. There used to be an open path between the Arc bridge, past Mavisbank Gardens and the Quay, and into Tradeston - however the Mavisbank Gardens section has been closed to the public for a few years (I have seen that this is because it is a "private space" for the landowners. This is hugely frustrating, as connecting to the north side cycle route is not easy from the south - it involves joining traffic across the Clyde Arc bridge, or haphazardly cycling across the pavement of this bridge, which should be avoided at the best of times.
    [Show full text]
  • Glasgow City Council Housing Development Committee Report By
    Glasgow City Council Housing Development Committee Report by Director of Development and Regeneration Services Contact: Jennifer Sheddan Ext: 78449 Operation of the Homestake Scheme in Glasgow Purpose of Report: The purpose of this report is to seek approval for priority groups for housing developments through the new Homestake scheme, and for other aspects of operation of the scheme. Recommendations: Committee is requested to: - (a) approve the priority groups for housing developments through the new Homestake scheme; (b) approve that in general, the Council’s attitude to whether the RSL should take a ‘golden share’ in Homestake properties is flexible, with the exception of Homestake development in ‘hotspot’ areas where the Housing Association, in most circumstances, will retain a ‘golden share’; (c) approve that applications for Homestake properties should normally be open to all eligible households, with preference given to existing RSL tenants to free up other existing affordable housing options; (d) approve that net capital receipts to RSLs through the sale of Homestake properties will be returned to the Council as grant provider to be recycled in further affordable housing developments. Ward No(s): Citywide: Local member(s) advised: Yes No Consulted: Yes No PLEASE NOTE THE FOLLOWING: Any Ordnance Survey mapping included within this Report is provided by Glasgow City Council under licence from the Ordnance Survey in order to fulfil its public function to make available Council-held public domain information. Persons viewing this mapping should contact Ordnance Survey Copyright for advice where they wish to licence Ordnance Survey mapping/map data for their own use. The OS web site can be found at <http://www.ordnancesurvey.co.uk> .
    [Show full text]
  • Communitynews Former Drumoyne Primary School, Govan
    ISSUE 1: NOV 2020 COMMUNITYNEWS FORMER DRUMOYNE PRIMARY SCHOOL, GOVAN This newsletter is available to download at: @CCG_SCOTLAND www.c-c-g.co.uk/csr/site-information @CCGSCOTLAND ABOUT CCG CCG is one of Scotland’s largest privately owned construction and manufacturing companies, with a turnover of £168 million in the last financial year. The Group employs 700 staff which is spread across eight divisions. We also have a year- on-year commitment to youth training, currently employing over 50 trade apprentices and over 30 trainees. CCG has deployed our Construction division to manage SCOPE OF WORKS this contract who have extensive experience in the area of new CCG (Scotland) Ltd is the main contractor for a new affordable housing development build affordable housing and located upon the site of the former Drumoyne Primary School in Govan. Consisting working with communities. of 49 units, the project is being delivered on behalf of Linthouse Association and will be undertaken over a 76-week programme. Works commence 02/11/2020. COMMUNITY SITE ACTIVITY As part of our work on this project CCG will be providing a CCG will begin preparing the site for construction by installing perimeter fencing and range of community benefit welfare facilities for staff. This will then be followed by the removal of any excess initiatives during the construction materials before commencing grouting, a term given to improvement works to the period. ground that will sit within the site. This phase of activity will be completed in early December with the site team then preparing to demolish the existing school building.
    [Show full text]
  • Bellahouston Project Care Home Service Adults Flat 1/2 11 Orkney Street Govan Glasgow G51 2BZ Telephone: 0141 445 2319
    Bellahouston Project Care Home Service Adults Flat 1/2 11 Orkney Street Govan Glasgow G51 2BZ Telephone: 0141 445 2319 Type of inspection: Unannounced Inspection completed on: 10 October 2014 Inspection report continued Contents Page No Summary 3 1 About the service we inspected 5 2 How we inspected this service 7 3 The inspection 10 4 Other information 22 5 Summary of grades 23 6 Inspection and grading history 23 Service provided by: Scottish Association For Mental Health Service provider number: SP2003000180 Care service number: CS2003014314 If you wish to contact the Care Inspectorate about this inspection report, please call us on 0345 600 9527 or email us at [email protected] Bellahouston Project, page 2 of 25 Inspection report continued Summary This report and grades represent our assessment of the quality of the areas of performance which were examined during this inspection. Grades for this care service may change after this inspection following other regulatory activity. For example, if we have to take enforcement action to make the service improve, or if we investigate and agree with a complaint someone makes about the service. We gave the service these grades Quality of Care and Support 5 Very Good Quality of Environment 5 Very Good Quality of Staffing 5 Very Good Quality of Management and Leadership 5 Very Good What the service does well We found that the manager and staff were familiar with resident's support needs, likes and dislikes. We decided this after reading support files and talking to the manager, staff and residents. When we talked to residents they said that they were very happy living in the Bellahouston Project.
    [Show full text]