Deck Requirements (PDF)

Total Page:16

File Type:pdf, Size:1020Kb

Deck Requirements (PDF) OFFICE OF BUILDING INSPECTION INFORMATION REQUIRED TO BUILD A DECK 1. A recent survey showing the exact location of the proposed deck. 2. A set of plans showing how the deck will be constructed. You may be able to get a set of plans from your lumber provider. (SEE SPAN TABLE) 3. A completed Village of Richfield building permit application. 4. Washington County Land Use office approval required! (SEE ATTACHED) 5. See Fee Schedule for current fee plus plan review fee. VILLAGE REQUIREMENTS: • Decks must comply with building setback requirements. • Any deck attached to the home must be provided with 48" of frost protection. • All wood used in deck construction must be pressure treated against decay or species that is naturally decay resistant. • Decks shall be designed for 50 P.S.F. (40# Live Load + 10# Dead Load). • Decks 6' or more above grade must use 6"x6" support posts. • All joists must have 1-1/2" bearing or be attached to beams with approved mechanical fasteners. • All hangers and hardware must be compatible for use with pressure treated wood and installed per manufacturer's specifications. • No deck may cantilever over a beam more than 24". • The maximum step to or from a deck is 8". • The maximum rise for deck stairs is 8" and minimum tread is 9". Steps may not vary more than 3/16". • Handrails must be provided 30"-38" above the tread nosing on all open sides for all stairs more than 3 risers. • Guardrails are required around any deck more than 24" above grade level. Minimum height of guardrail is 36" and must have intermediate rails or balusters (horizontal or vertical) not capable of passing a 4" object. The opening between the intermediate rails or balusters should be less than 4". • If the deck serves as an exit, the area shall be lighted. • Deck stairs to a pool must be equipped with a lockable, self-closing, self latching gate. There shall be a distance of at least 5' from the well head and 5' from septic tanks. Over => Revised 5/2016 Joel Jaster, Inspector [email protected] Greg Darga, Inspector [email protected] Richfield Village Hall 4128 Hubertus Road Hubertus, Wisconsin 53033 www.richfieldwi.gov Phone (262) 628-2260 Ext. 117 Fax (262) 628-2984 Table 2 (Treated Lumber) JOIST LENGTH S' 7' e' 9' 10" 11' 12' 73• lie 15' 16' .101eit ZS 16'0C 26 W OC 28 16-0C 23:8 IF OC 238 16' CO 24 ITOC 22418 10-00 2110 12' CC C Fee 20 24'OC 2$ 24" OC 248 24'OC 2x10 24" OC 210 24'00 210 24'OC 2:00 16'0C 2x12 24'OC 2x10 sr OC 2x12 16" OC 2412 16'00 Beam 1-24 1-26 1-243 1-23 1-218 1-2x8 1-2x10 1 - aio Size 1-26 1-24 1-248 1-210 1 -ZOO 1-210 1 -2x10 I-212 1-2x10 1-212 1-,2x12 Ixst 2 616'00 24 18.00. 24 16-0C 2x8 to-CO 2$ 16' CC 2x8 1,22 0C 210 16"00 2(10 IZOC ' 5 Size . 26 240C 24 24-00 2x8 24" OC 210 24- 0C NW 24° CC 2x10 240O alii 18'0C 242 DVOC 2x10 16'0C 2412 IF cc an 1e 0C Bean 2-25 2-24 1-24 1-28 1-24 1-248 1-2330 1-2;410 See 1-26 1-24 1-2x8 1-ar0 1 - an 1-2410 1--2x70 1-212 1-21D 1-212 1-212 Jaist 26 16. CC 24 16' 00 24 16' OC 2$ se cc as sew as 12.0C 210 16'0C 212 1Z 0G 6' Sae as aroc • 23 24-0C 28 240C 210 24-0C 210 24'0C 210 240C 2410 16'0C 212 24' CC WO 16'0C 212 WOC 2412 le oc Beam 2-24 2-24 2-2x8 2-24 2-246 2-26 2-210 2-x410 2-2d 0 2-2410 1 Sire 2-26 1-23 2-24 1 -210 1-210 1-210 1-2310 1-2x12 1-2412 1-2x12 1-2x72 Met 26 1610C 24 16" OC 24 16.02 27.13 16' Cc 2:r8 16.00 as IZOC zeta 10-01 We 12'0C T Ste 24 24'OC 22 24" OC 248 24'OC 2310 24' CC 2430 24-00 2310 24'0C 2x10 150C 212 2400 210 16'02 2xI2 IFCC 212 16"00 Beam 3-24 3-24 2-26 2-24e 2-24 3-248 2-210 2-2x10 2-2410 2-2310 Tr: 2-26 2-248 2-2x8 2-2x-D0 2-20 2-210 2-210 1-2212 2-2x12 2-212 2-212 kist - 24 W OC 226 16' oc as 16`oc as 16' CC 24 16'OC 28 12" OC 210 16.00, am 12-06 r Sze 24 24 Oc 24 24- CO 24824'0C 210 24r OC 210 24'0C am 24'0C 2x1016-00 212 24* CC 210 W OC 212 1F OC 2x12 16'0C Beam 3-2a 3 - 2,S 3-24 3-24 3-24 3-24 3-28 2-210 3-2x10 3-2x10 3 - a10 Sae 2-22e 2-24 2-28 2-210 2-2x10 2-210 2-210 2-212 2-212 2-2312 2-212 ..14.g. 24 IF CC 24 WOO 24 15- CC 2x818-0C 2c8 ?FOC 28 12'0C ale IF OC 2101700 9' Sze 26 240C as 24' CC 243 24'0C alo 24'0C 210 24'00 WO 24"00 ass 15 00 212 2V0C 2/0 16' OC 2312 16" CC 212 16'OC Beam 3-238 4-2x5 4-26 3-7xs 3-24 3-248 4-24 3-210 3- 7x10 3-2,10 3- 2X10 Sze 2-2(11 3-24 3-2%8 2-2x10 2-2110 2-2x10 3-210 2-2412 2-212 2-2412 2-212 Jzisi 2:6 16'0 246 16.00 24 IT OC 24 15" CC 2810'0C 2x8 1700 2x101502 aso 12' oc 10' Sae . 246 24-0C 245 24' OC 28 24'0C ale 24" OC 210 24-0C 210 24'0C 210 16'0C an 24'0C 210 16' OC 242 w CC 212 10-02 Beam 4-24 3-23 3-as 3-2xS 4-26 4-26 4-24 3-2e10 3 - 2x10 4-a10 4 - zdo Sze 3-228 2-2210 2-210 2-2.10 3-2x10 3-210 3-240 2-212 3-242 3-2x12 3-2x12 .tom 24 1r OC 2416- 00 28 IFOC 25 IF OC 26 1F OC 24 12'0C 2410 IFOC 201012'0C 11' size 24 24'0C 24 24' CC 28 24'0C 2410 24.0C 210 24.00 210 244 0C 210 10OC 212 24'0C 210 16-00 2312 16'00 an 10-CC Beam 3-28 3-23 4-2x8 4-228 3-2x10 3-1E10 3 - al0 4-210 4-210 4-2410 4-210 Size 2-210 2-213 3-210 3-216 2-202 3-212 3-2412 3-2(12 3 - 2e12 3-2002 3-2412 ..t.)./ as 16" 02 2:46 ir cc as 16' OC as 16' OC 24 16- cc 24 12'0C ale .16'OC 2x101200 12' Size 26 24'0C 24 24'0C 26 24- 0C WO 24'00 210 24-00 240 24.02 210 WOC 212 240C 2410- WOO 2312 15'00 2(12 WOO Beam 3-2.0 4-24 4-24 3-210 3 -2x10 4-210 4-210 4-210 Sim 2-210 3-210 3-2410 2-212 3-212 3-212 3-212 3-2x12 3-212 3-212 3-212 .6±0 as se oc 2x6 16' Cc 2,1 16' CC 2x8 WOC 2c8 16-0C al3 12 00 am 16-0C NW 12'0C 13' Size 24 24" cc 2x8 24'00 24 24`00 2r18 24-02 210 24'0C 210 240C 210 15. OC 212 24'0C 210 WOO 2x1216'06 212 WOC Beam 3-x48 4-24 3- Z40 4-210 4-2o0 4-2d0 Sae 3-210 3-22 3-212 3-212 3 -2x12 3-212 3-210 3-212 4-212 4-212 4-212 Joist 2x6 WOG 2x6 18' CC 2x8 16' OC 248 16-0C 248 16'02 at 1210C 210 16"00 2410 12'0C 14' Size 2V3 24' OC 7x8 24" OC al 24- pc " ass 24- 0C WO 24 oc alp 24-0C 210 IFOC an zroc aro sroc 2412 16' OC 212 16"OC Beam 4-248 3-2410 4-210 4-210 4-2x10 ENG. BF_Ati 1310.6151,M Size 3-2410 3-212 3-2412 3-242 3-212 3-3412 _ 4-212 4-2(12 4- zo 2 FrrcesRED 69:11.11REO Washington County Planning and Parks Department WASHINGTON COUNTY WISCONSTN REMINDER TO PROPERTY OWNERS IN ALL UNINCORPORATED TOWNS Please note that the Washington County Planning and Parks Department Land Use Division administers and enforces the following ordinances within your municipality: CONTACT FOR THE FOLLOWING TOWNSHIPS: ■ Subdivision Ordinance ■ Sanitary Ordinance Phillip Gantlet-Land Resources Manager/Manager of Land Use Division ■ Shoreland/Wetland/Floodplain Wayne, Kewaskum, Addison, Hartford, Barton Zoning Ordinance Dave Sells-Inspector in Charge Polk, Erin, Richfield, Germantown Dave Lindner-Land Use Inspector Farmington, West Bend, Trenton, Jackson Best time to call is from 8:00 to 9:00 A.M.
Recommended publications
  • 120' Raised Pilothouse Motor Yacht
    THIS DOCUMENT IS THE INTELLECTUAL PROPERTY OF BURGER BOAT COMPANY AND GREGORY C. MARSHALL N.A. LTD. AND CONTAINS PROPRIETARY INFORMATION. IT SHALL NOT BE USED OR REPRODUCED IN WHOLE OR IN PART NOR SHALL IT BE DISCLOSED TO PARTICIPANTS OF THE YACHTING INDUSTRY WITHOUT THE EXPRESS WRITTEN CONSENT OF BURGER BOAT COMPANY. R 2 x 20 PERSON LIFE RAFTS 20' NOVURANIA STEP STEP HOT TUB LOOSE FURNITURE CATAMARAN SETTEE TENDER STEP SEA-DOO GTX-LTD STEP FULL BEAM SEAT/ STEP LOUNGE STEP WITH POP UP DAVIT SLIDING HATCH TO UNDER LIFT UP HATCH TO BRIDGE TWEEN-DECK STORAGE DAY HEAD WET W/FROSTED BAR FLYBRIDGE HELM OPTIONAL SKYLIGHT FRIDGE SETTEE BBQ 2 x 20 PERSON LIFE RAFTS 2'-8" 45 40 35 30 25 20 15 10 5 0 2 x 20 PERSON LIFE RAFTS BRIDGE & SUN DECK WING BRIDGE DOWN TO STEP MAIN DECK TECHNICAL SPACE STEP STEP SLIDING DOOR STEP SHOWN OPEN LOCKER STEP SETTEE STEP STEP STEP TABLE STEP SETTEE STEP FULL BEAM STEP SUNPAD SEAT/ SETTEE TABLE STEP ANCHOR LOUNGE HANDLING STEP WITH POP UP TO FLYBRIDGE UP DAVIT UNDER STEP WATER TOY STORAGE BRIDGE DOWN TO MAIN DECK DOWN TO DAY AFT DECK STEP HEAD STEP OPEN TO PASSAGEWAY BELOW LOCKER SLIDING DOOR STEP SHOWN CLOSED STEP STEP TECHNICAL SPACE DOWN TO STEP MAIN DECK WING BRIDGE 2 x 20 PERSON LIFE RAFTS 2'-8" 45 40 35 30 25 20 15 10 5 0 SIDE GATE WEATHER ENCLOSURE MAIN DECK TV UP TO BRIDGE DECK GARBAGE Trash Trash BAR/BUFFET STORAGE UNDER Bin Bin UP TO DOWN TO DRESSER SWIM DECK AFT DECK MACHINERY Above Cabinets DRESSER DRESSER TC DRESSER SPACE TC AIR Oven DW WALK-IN END TABLE END TABLE WARDROBE SOFA Cooktop Exhaust Hood Above CHAIR 40 K.W.
    [Show full text]
  • RESIDENTIAL PATIO / PATIO COVER / DECK REGULATIONS and PLANS REQUIREMENTS Residential Patios Patio Covers PLAN REQUIREMENTS
    RESIDENTIAL PATIO / PATIO COVER / DECK REGULATIONS AND PLANS REQUIREMENTS Residential Patios This permit applies only to concrete poured patios. A permit is required when the patio is proposed to be connected to the house and/or 30 inches or more above grade. PLAN REQUIREMENTS: Plans are required to be in sufficient detail and size to properly determine code compliance. Additional information may be required. A typical grouping of plans is: 1. Plot plan or survey. A plan that shows: a. The Property lines b. Any currently existing buildings, fences, houses, etc. c. Setbacks, easements, rights of way, etc. d. The location of the proposed construction. 2. Structural plan. A plan that shows: a. The structural component of the patio (i.e. rebar or wire mesh) b. Perimeter beams if applicable c. Attachment to the house. (Regardless of the requirement for a permit, patios must not be located in Public Utility Easements or Drainage Easements. Refer to the survey of your lot for the location of easements.) PERMIT FEE: Without Utilities: $48.00 Patio Covers Any patio cover requires a permit. SET BACK REQUIREMENTS: 25 Feet from the Front yard property line to the edge of the patio cover foundation. 5 Feet from the Interior side yard property line to the edge of the patio cover foundation. 15 Feet from the Exterior side yard property line on a corner lot to the edge of the patio cover foundation. Public Utility Easements (PUEs) may be larger than the above setbacks, in which case the PUE must be used as the setback. PLAN REQUIREMENTS Plans are required to be in sufficient detail and size to properly determine code compliance.
    [Show full text]
  • Building Deck Stairs P1
    How To Build a Deck: Part 5 – BUILDING DECK STAIRS Skill Level: ADVANCED Try these projects after you have a collection of DIY successes under your belt, and make sure you’re ready for a challenge. You’ll need experience with a wide variety of specialized tools, and it may take several hours to finish. If you’ve built a deck or installed an irrigation system, these projects probably match your abilities. MATERIALS Paper In this set of instructions for our deck building series, you'll learn how to calculate stairway dimensions and build a solid set of steps. If you Pencil haven’t installed your decking, you’ll need to take care of that first. View Level the previous video and instructions in this series, Framing and Decking, at Lowes.com/Videos. Framing Square Tape Measure Stair Gauges PREPARATION 2x12 Planks 01 Be sure that you understand and follow local building codes. You may need 5/4 Decking plan approval, a building permit, and one or more inspections during the Sawhorses construction process. Circular Saw 02 A deck stairway is comprised of one Handsaw or more pair of diagonal stringers or Dust Mask supports and numerous horizontal Work Gloves treads or steps. Like decks, stairways Safety Glasses can also have vertical balusters and horizontal rails. A simple deck plan will Brackets have one stairway section or multiple Drill with Bits sections with landings, flat areas that Socket Wrench and Sockets connect runs. Landings are often used to change the direction of the stairway. Carriage Bolts, Washers and Nuts 3 lb.
    [Show full text]
  • Second Story Deck
    SECOND STORY DECK (ATTACHED TO A RESIDENTIAL DWELLING) B UI L D I N G & S A F E T Y 8353 SIERRA AVE, FONTANA, CA 92335 (909) 350­7640 + FAX: (909) 350­7676 WALL­SWITCH CONTROLLED EXTERIOR LIGHT (12’­ 0” MAX SPAN) (10’­ 0” MAX SPAN) TABLE “A” TABLE “B” NOTES: 1. ALL METAL HARDWARE & SCREWS TO BE DECK JOIST SPANS HEADER SIZING & SPANS GALVANIZED OR OF OTHERWISE APPROVED (DOUGLAS FIR #2 OR BETTER) (DOUGLAS FIR #2 OR BETTER) CORROSION RESISTANCE. HEADER 2. DECK CANNOT BE ATTACHED TO SIZE SPACING SPAN DECK JOIST ND CANTILEVERED 2 FLOOR UNLESS SPAN 2 x 8 12” O.C. 12’­ 0” SIZE SPAN STRUCTURAL CALCULATIONS ARE SUBMITTED 2 x 10 16” O.C. 12’­ 0” 4 x 8 8’­ 0” AND APPROVED BY THE BUILDING 2 x 12 16” O.C. 12’­ 0” DEPARTMENT UP TO 8’­ 0” 4 x 10 10’­ 0” . 4 x 12 10’­ 0” 3. SHEAR WALLS MAY NOT BE MODIFIED UNLESS STRUCTURAL CALCULATIONS ARE SUBMITTED DISCLAIMER: 4 x 8 7’­ 6” AND APPROVED BY THE BUILDING ALTERNATE DECK DESIGNS ARE 8’­ 1” TO 10’­ 0” 4 x 10 9’­ 6” DEPARTMENT. POSSIBLE WHEN DESIGNED BY A 4 x 12 10’­ 0” LICENSED ENGINEER. USE OF THIS 4 x 8 7’­ 0” CONVENTIONAL STANDARD DESIGN IS 10’­ 0” TO 12’­ 0” 4 x 10 9’­ 0” AT THE USER’S RISK AND CARRIES NO 4 x 12 10’­ 0” IMPLIED OR INFERRED GUARANTEE AGAINST FAILURE OR DEFECTS. www.fontana.org Page 1 of 5 REV. 11­21­12 SECOND STORY DECK 4X4 POST (MIN) 1 ½ “ MAX 1 ½ “ MAX LEDGER BOLTS SHALL BE: 3/8” DIA.
    [Show full text]
  • THE KEY to SUCCESS with READY SEAL: ABOUT READY SEAL
    Thank you for considering Ready Seal for your exterior wood projects. We want you to get the best results possible, so if you still have questions or need additional information after reading the contents of this document, please visit our website or contact us @ 888-782-4648 for additional product support. THE KEY TO SUCCESS with READY SEAL: This document contains multiple sections that address a variety of topics. Proper wood preparation and measuring the moisture content of the wood prior to application are the two most critical steps to getting the best results. *See the WOOD PREP and MOISTURE CONTENT sections of this document. ABOUT READY SEAL Ready Seal has been the product of choice for professionals since 1992. What used to be available to contractors only is now available to all. Ready Seal is a genuine semi-transparent stain and seal that penetrates into the wood rather than sitting on the surface. It is a proprietary blend of natural resins, trans-oxide pigments (which provide UV protection), and some of the finest oils in the industry. There is no linseed oil, which has been known to promote algae and mildew growth. It is ideal for fences, decks, cedar siding, log homes, wooden garage doors, children’s play-sets, equestrian centers, boat docks, pergolas, gazebos, cabanas, pavilions, and other outdoor wood structures. It is also safe to use indoors and frequently used for interior projects including cabinets, floors & furniture. Ready Seal can be used on most wood types, such as pine (regular and pressure-treated), cedar, tiger, cypress, redwood, walnut, cherry, hickory and oak, and even some exotics such as teak, ipê, massaranduba, cumara, and garapa, although there are some nuances with these exotic woods, so please contact our office at 888-782-4648 if you want additional information on these.
    [Show full text]
  • Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor System Applicability
    Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor System September 18, 2007 Applicability: The purpose of this Technical Note is to suggest construction details for residential deck ledger attachment to metal plate connected wood truss (MPCWT) floor systems. Issue: Numerous field observations of existing decks revealed that a major source of failures are attributable to inadequate connection between the deck ledger and house rim joist, related wood decay and/or corrosion of fasteners, and a failure of single and/or various elements of the guardrail system. Residential decks are usually supported on one side by a ledger attached to the house. This ledger attachment is critical for ensuring that the deck is safely and securely supported at this location. Deck ledger connection problems are often aggravated by lack of structural redundancy, namely, when the ledger to rim board connection fails, the deck typically collapses catastrophically. Recommendations: When the floor system for the house uses MPCWT, the deck ledger shall not be connected to the house by nails alone. In the absence of a lateral bracing system installed on the deck, lag screws or bolts and/or other mechanical connectors must be used, i.e., the deck ledger must be lagged or bolted to the rim joist and/or other structural components of the house which in turn must be securely attached to the framing of the structure and supported on the foundation and/or wall below. A MPCWT is an engineered, prefabricated structural component designed for each specific application. MPCWT used in residential floors are often installed with a 2x4 lumber “ribbon” at the ends of the trusses (see Figure 1), the purpose of which is to tie the ends of the trusses together.
    [Show full text]
  • Roof Deck Roof Over
    72056_1-91 11/7/12 4:26 PM Page 32 CertainTeed Shingle Applicator’s Manual The Roof Deck and Tearing Off or Roofing Over4 THE SHINGLE MANUFACTURER’S WARRANTY YOUR OBJECTIVE: If you apply a shingle roof over a deck surface that is unacceptable to To understand (1) how building design, deck the shingle manufacturer and damage results, the warranty might not construction and deck materials affect the entire be honored. The manufacturer will not take the responsibility for: roofing system and the warranties on the roofing N Poor deck design that contributes to damage to the roofing system products, and (2) to be able to recognize or other parts of the house. and predict deck-related problems. N Defects or damage caused by materials used as a roofing base, over which the roofing shingles are applied. N Roof deck performance can have a strong affect on shingle perfor- Damage to the shingles caused by settlement, distortion, failure, mance. A bad deck can be a real headache. The causes for many of or cracking of the roof deck. the complications that a problem deck creates can usually be traced N Defects, damage or failure of shingles caused by applications back to the design of the building, the materials used to make the that are not in strict adherence with the written instructions of deck, or the way the deck was installed. the manufacturer. CertainTeed suggests that you make it your business to learn how N Application over wood that is not dry or which has hard to properly install shingles over all the various types of decks projections, such as partially driven nails, which can cause discussed in this chapter.
    [Show full text]
  • Applying Modular Construction to Multifamily Residential Projects in Washington, DC
    Fabulous Pre-fab Applying Modular Construction to Multifamily Residential Projects in Washington, DC Abigail R. Brown, AIA Hello! 1 1 Welcome to iLab iLab exists to promote innovation and progressive architecture and design through internal research sponsored by Hickok Cole Architects. The program creates a gap in day to day work life to foster innovation. The firm crowd sources the most compelling proposals, every employee votes, and the winners are awarded uninterrupted project- free time to develop an idea or project. Through this exploration the firm aims to stretch conventional notions about architecture, fabrication, work styles, and entrepreneurship. 2 What You’ll See Here This document is the result of Abigail Brown’s iLab project “Fabulous Pre-fab: Tour of modular construction factory; DeLuxe Building Systems Applying Modular Construction to Multifamily Residential Projects in Washington, DC.” Modular construction is a pre-fabrication system in which modules of a building are 2 2 constructed in a factory then shipped to the site and assembled on a foundation. This system has not yet been widely used in Washington, DC, despite the cost, schedule, and environmental benefits it offers and the successful use of the system in other major cities. This document records answers to the three major research questions that drove the investigation: what’s modular?, why and why not use modular?, and what can modular be? This research was tested with a speculative design for a real site in Washington, DC, with the intention of introducing
    [Show full text]
  • Custom Deck Design Planner We’Ll Design Your Deck Idea from a Sketch Or Detailed Plan
    Custom Deck Design Planner We’ll design your deck idea from a sketch or detailed plan. Complete this deck planner and we’ll give you a materials list and quote. Submit your worksheet to a Parr Deck Tools professional at your nearest location. Name: Address: Phone: Email: Give a brief description of what kind of deck you would like. (big, small, high, low, rail, no rail, stairs, no stairs, etc.) My deck project is: On somewhat level terrain On sloping terrain On irregular terrain A new deck. There is no deck structure currently in this area. An addition to a current deck structure. A deck replacement. A replacement deck of the same size and shape. I plan to build the deck myself. I plan to hire a contractor to build the deck. I need room for: A small table and 2 chairs A table and 4 to 6 chairs A table plus chaise lounge(s) or other deck furniture Potted plants / planters Hot tub - size: Other Please check those that apply: Multi-level deck Rail system: Wood Metal Glass panel Cable Bench seating Built-in planter boxes Special decking patterns (angled, mitered border) Deck lights Decorative post caps I prefer (choose one): Natural wood surface: Cedar Treated Redwood IPE Other Manufactured decking: TimberTech Trex Azek Other Other decking: This is a sample of the information we will need to complete your deck design. Sketch your deck on page 4 of this guide using similar detail or attach your deck plan here. Sketch the back of your house as accurately as possible noting features like window and door locations, hose bibs, air conditioners, etc.
    [Show full text]
  • Seattle SDCI Tip #312—Decks, Fences and Arbors for Single
    Seattle Department of Construction sdciand Inspections Tip 312 Seattle Permits — part of a multi-departmental City of Seattle series on getting a permit What information will I need to apply for a deck Decks, Fences, and permit? Arbors for Single-Family For most decks, you will need: A site plan Homes in Seattle A scaled site plan that shows all structures on your Updated January 3, 2019 site, including the proposed deck. Your site plan dimensions must show that your deck meets our land use requirements for location and lot area cover- This Tip addresses the questions most commonly asked age. (See Tip 103, Site Plan Requirements) by homeowners wishing to construct decks, fences and An elevation drawing arbors. This information applies to single-family homes A scaled elevation drawing that shows the height on single-family and lowrise multifamily zoned properties. of the proposed deck (height above existing or final grade, whichever is lower), including any guardrails Decks vary widely in the scope of their construction; and stairs. Your elevation drawings must offer side you will need to get a permit for some. You generally views of structures, from the ground to the top of the do not need a permit to build a fence, but you need to structure. (See Tip 303, Applicant Responsibilities follow our regulations. You generally need a permit to and Plan Requirements for Single Family and Two- build arbors. Unit Dwellings) Construction notes Decks Your notes on your drawings should call out the size What type of permit do I need to build deck? and type of posts proposed (e.g., pressure treated wood), the method of support for the posts (e.g., Most decks on single-family zoned properties only require poured concrete footings), joist size, span and spac- a subject-to-field-inspection (STFI) permit.
    [Show full text]
  • How to Plan & Build a Timber Deck
    The Wickes Project Guide How to plan & build a timber deck A timber deck can be built on level or sloping ground and on one or more levels to create an attractive, solid base for garden dining and relaxation – and you can add a pergola and deck rails or deck panels to complete the picture. Buying the right Kit decking components Tool List > Wood chisels To help you get everything you need a project shopping list is on > Handsaw > Spade the back page of this leaflet, you’ll find advice on calculating material quantities throughout, too. > Circular saw or > Screwdrivers jigsaw > Plumb line Buy the timber components about a week before you build the deck to give it a chance to adjust to the temperature outside. > Drill and drill > Clamps bits Store it close to where it will be used, stacked on level ground on timber bearers, and cover to keep dry. > Cordless drill/ Safety driver Equipment Plan the deck need to work on the board widths at > Tape measure > Dust mask The key to a successful deck is in the 140mm plus 5mm gaps in between. 1 The table below will help you calculate > String line > RCD adaptor planning. First decide on the location: do you your deck’s proportions: > Spirit level > Goggles want a sunny or shaded location and is privacy a requirement? How big does the 10 boards and 9 gaps = 1445mm deck width > Hammer > Gloves deck need to be? Do you want to add 12 boards and 11 gaps = 1735mm deck width interest to the deck with pergola components 14 boards and 13 gaps = 2025mm deck width or combine decking components with As you would if Always use an paving? Is the site level or will part of the 16 boards and 15 gaps = 2315mm deck width* working with any RCD device deck have to be supported on timbers set 18 boards and 17 gaps = 2605mm deck width timber product, when employing into concrete (see page 5 for instructions).
    [Show full text]
  • Design Guidance: Office Space
    Design Guidance: Office Space Division of the University Architect September 2003 Table of Contents INTRODUCTION .........................................................................................................3 HISTORY....................................................................................................................3 Integration with Master Plan Initiatives and Strategies................................................4 Integration of Quality of Life Standards for All Students, Faculty, and Staff ................4 Integration with Industry .........................................................................................5 Integration of Responsible Use of Funds and Resources..............................................5 OBJECTIVES ...............................................................................................................6 SPACE PLANNING......................................................................................................7 GOVERNING PHILOSOPHY FOR OFFICE SPACE PLANNING..................................................7 OTHER OFFICE SPACES ................................................................................................8 ORGANIZING PRINCIPLES .............................................................................................8 Planning Principles .................................................................................................8 Other Considerations...............................................................................................8
    [Show full text]