How to Plan & Build a Timber Deck

Total Page:16

File Type:pdf, Size:1020Kb

How to Plan & Build a Timber Deck The Wickes Project Guide How to plan & build a timber deck A timber deck can be built on level or sloping ground and on one or more levels to create an attractive, solid base for garden dining and relaxation – and you can add a pergola and deck rails or deck panels to complete the picture. Buying the right Kit decking components Tool List > Wood chisels To help you get everything you need a project shopping list is on > Handsaw > Spade the back page of this leaflet, you’ll find advice on calculating material quantities throughout, too. > Circular saw or > Screwdrivers jigsaw > Plumb line Buy the timber components about a week before you build the deck to give it a chance to adjust to the temperature outside. > Drill and drill > Clamps bits Store it close to where it will be used, stacked on level ground on timber bearers, and cover to keep dry. > Cordless drill/ Safety driver Equipment Plan the deck need to work on the board widths at > Tape measure > Dust mask The key to a successful deck is in the 140mm plus 5mm gaps in between. 1 The table below will help you calculate > String line > RCD adaptor planning. First decide on the location: do you your deck’s proportions: > Spirit level > Goggles want a sunny or shaded location and is privacy a requirement? How big does the 10 boards and 9 gaps = 1445mm deck width > Hammer > Gloves deck need to be? Do you want to add 12 boards and 11 gaps = 1735mm deck width interest to the deck with pergola components 14 boards and 13 gaps = 2025mm deck width or combine decking components with As you would if Always use an paving? Is the site level or will part of the 16 boards and 15 gaps = 2315mm deck width* working with any RCD device deck have to be supported on timbers set 18 boards and 17 gaps = 2605mm deck width timber product, when employing into concrete (see page 5 for instructions). wear gloves to any power tools 20 boards and 19 gaps = 2895mm deck width See Fig. 1 (see page 2) to get an idea of avoid splinters, outside. *This is the key deck square, which has been sized to just some of the components we sell – and goggles allow the other modules to interlink, creating and how they can be used together. numerous deck designs. when using circular saws, Work out the deck’s proportions Skill level required drills or sanders. It is essential to plan your deck to scale on Basic carpentry skills are enough for Avoid breathing paper. Be as accurate as possible with building a basic deck; raised decks need in dust when measurements and bear in mind that it is careful planning and more experience. cutting wood by the deck boarding that basically governs wearing a nose the size of the deck. Designing a deck and mouth mask. carefully will limit cutting, and board or bearer wastage. For any deck, you will Planning pitfalls Fig. 1 Timber decking component parts > Decks built in permanent shade can be affected by damp and algae growth, Handrail Deck bearer so be prepared to clean and treat these Pergola upright once a year to preserve the timber. Elevated decks. Built as a Avoid very wet areas completely. series of platforms connected by the deck stair riser > Very large decks and raised decks may require planning permission, so check with the local council before you start work. > Raised decks should not be built with Deck board the deck level more than 600mm above Handrail ground level without specialist advice. > When installing posts or levelling the ground, take special care not to damage Stress underground cabling, pipes or drainage, graded joist Newel Post and do not permanently obstruct post manhole covers or other services. Square Deck stair spindle riser Deck board Deck bearer Stress graded joists are recommended for use when constructing a raised deck Build a basic Fig. 2 Basic deck support bearer layout deck frame 3040 2880 2Construct the simple, rectangular deck frame shown in Fig. 2 Our basic deck support bearer layout in Fig. 2 has an overall size of 3040 x 2400mm. 2400 The width of this basic deck is based on the use of 21 uncut 2.4m long and 140mm wide deck boards with 20 gaps of 5mm between them (the calculation is: (21 x 140mm 500 = 2940mm) + (20 x 5mm = 100mm) = 3040mm total width). The base is designed to provide a complete perimeter with intermediate bearers at no more than 500mm spacings. The bearers are cut to length to suit the dimensions. Prepare the ground 2. Fix the deck frame Clamp then join the Ensuring the ground is level and dry will Trade Tip frame at each corner using two 150mm (6") Plan the deck so that it help prolong the deck’s life. timber drive screws. As you proceed, use a slopes very slightly (a 1:80 fall is sufficient), spirit level to make sure the frame remains 1. Measure out the deck Following your and use fluted deck boards that run in the flat. Its corners should be square, too, and direction of the slope; this will aid rainwater plan drawing, measure and mark out the you can check this by measuring the frame’s deck area, using pegs and a string line. run-off, meaning the deck is less slippery and less prone to algae build-up diagonals; they should be equal. If you are constructing a deck on level ground, further marking out should not be 3. Fit intermediate bearers Now mark, needed, as the bearers can be laid out in cut and fit the intermediate bearers, Construct a basic deck the positions where they will be used. remembering the maximum 500mm bearer frame spacing limit, and checking they are flat 2. Level the ground If the ground is The basic deck support bearer layout with a spirit level. If longer bearers are slightly uneven, level it off, working in will change with the varying deck board needed, these can be clamped then joined a 1:80 fall for drainage, and make sure patterns – see Fig. 3 (see page 3). together by screwing together off cuts with that it is firm. If laying the deck over lawn 150mm (6") timber drive screws. or weeds, remove them, and cover the 1. Lay out the outer deck frame Mark, cut and lay out the outer frame first ground with Wickes Landscaping Fabric Trade Tip to prevent future growth under the deck. using 80 x 80mm bearers. Ensure the When fixing your frame rests flat and is totally supported. deckboard to the frame, use decking screws 3. Add pea shingle If the ground is soggy If you find hollows under the frame or as they can easily be removed without or likely to become so in wet periods, areas where it is held off the ground, damaging the wood. Clamping timbers together spread pea shingle over the landscape adjust the ground level to prevent the deck before screwing stops them moving out of fabric to a depth of about 25mm. Your being springy. As you work, treat every alignment during the fixing operation. bearer frame will bed down on to the cut end with Wickes Decking Preserver. Don’t just use preserver on cut ends shingle and will, to a large extent, be kept – use it in drill holes to help prolong off almost permanently wet ground the deck’s life, too. 2 Trade Tip Fixing deck boards If you are joining two cut deck boards together in a long run, screw them down at an angle 10mm from the end to the frame of each board to securely fix them to the joist beneath. With the basic deck support bearer frame complete, you can begin to lay deck boards. The different deck board layouts shown 2. Secure the deck boards Once you are Locate the screws about 15mm in from 3in Fig. 3 from chevron to diagonal, are happy with the layout and spacing of the the edge of each board and in a hollow, created using 140mm wide boards and deck boards, fit and secure them to the see Fig. 5 over-sized and trimmed later, 80 x 80mm bearers. Plan your layout bearers with 65mm (no.8 x 2½") decking see Fig. 6. before assembling your bearers, as the screws, using two screws per board to 3. Cut curved edges If you want to pattern will affect the spacing and number each and every bearer to avoid cupping. create a curved edge, bear in mind that of bearers. For example, double bearers the unsupported decking cannot be more will be needed for some chevron styles than 150mm away from a bearer. Mark out see Fig. 4. Trade Tip curves using a string line in an arc or with Gaps between decking 1. Check the deck board layout a piece of timber fixed to create an arc boards should be at least 5mm to allow for Loose-lay boards initially to determine expansion and for rainwater to drain through see Fig. 7. what the gaps will actually need to be – freely – cut a piece of timber to 5mm and use 4. Edge the deck Add deck boards the variations in timber mean you should between boards for a consistent gap (Wickes around the edges to frame the deck not stick rigidly to fixing the first board, flooring spacers do the same job). and finish it neatly seeFig. 8 measuring or using a 5mm spacer, (see page 4). then fixing the next board and so on.
Recommended publications
  • 120' Raised Pilothouse Motor Yacht
    THIS DOCUMENT IS THE INTELLECTUAL PROPERTY OF BURGER BOAT COMPANY AND GREGORY C. MARSHALL N.A. LTD. AND CONTAINS PROPRIETARY INFORMATION. IT SHALL NOT BE USED OR REPRODUCED IN WHOLE OR IN PART NOR SHALL IT BE DISCLOSED TO PARTICIPANTS OF THE YACHTING INDUSTRY WITHOUT THE EXPRESS WRITTEN CONSENT OF BURGER BOAT COMPANY. R 2 x 20 PERSON LIFE RAFTS 20' NOVURANIA STEP STEP HOT TUB LOOSE FURNITURE CATAMARAN SETTEE TENDER STEP SEA-DOO GTX-LTD STEP FULL BEAM SEAT/ STEP LOUNGE STEP WITH POP UP DAVIT SLIDING HATCH TO UNDER LIFT UP HATCH TO BRIDGE TWEEN-DECK STORAGE DAY HEAD WET W/FROSTED BAR FLYBRIDGE HELM OPTIONAL SKYLIGHT FRIDGE SETTEE BBQ 2 x 20 PERSON LIFE RAFTS 2'-8" 45 40 35 30 25 20 15 10 5 0 2 x 20 PERSON LIFE RAFTS BRIDGE & SUN DECK WING BRIDGE DOWN TO STEP MAIN DECK TECHNICAL SPACE STEP STEP SLIDING DOOR STEP SHOWN OPEN LOCKER STEP SETTEE STEP STEP STEP TABLE STEP SETTEE STEP FULL BEAM STEP SUNPAD SEAT/ SETTEE TABLE STEP ANCHOR LOUNGE HANDLING STEP WITH POP UP TO FLYBRIDGE UP DAVIT UNDER STEP WATER TOY STORAGE BRIDGE DOWN TO MAIN DECK DOWN TO DAY AFT DECK STEP HEAD STEP OPEN TO PASSAGEWAY BELOW LOCKER SLIDING DOOR STEP SHOWN CLOSED STEP STEP TECHNICAL SPACE DOWN TO STEP MAIN DECK WING BRIDGE 2 x 20 PERSON LIFE RAFTS 2'-8" 45 40 35 30 25 20 15 10 5 0 SIDE GATE WEATHER ENCLOSURE MAIN DECK TV UP TO BRIDGE DECK GARBAGE Trash Trash BAR/BUFFET STORAGE UNDER Bin Bin UP TO DOWN TO DRESSER SWIM DECK AFT DECK MACHINERY Above Cabinets DRESSER DRESSER TC DRESSER SPACE TC AIR Oven DW WALK-IN END TABLE END TABLE WARDROBE SOFA Cooktop Exhaust Hood Above CHAIR 40 K.W.
    [Show full text]
  • RESIDENTIAL PATIO / PATIO COVER / DECK REGULATIONS and PLANS REQUIREMENTS Residential Patios Patio Covers PLAN REQUIREMENTS
    RESIDENTIAL PATIO / PATIO COVER / DECK REGULATIONS AND PLANS REQUIREMENTS Residential Patios This permit applies only to concrete poured patios. A permit is required when the patio is proposed to be connected to the house and/or 30 inches or more above grade. PLAN REQUIREMENTS: Plans are required to be in sufficient detail and size to properly determine code compliance. Additional information may be required. A typical grouping of plans is: 1. Plot plan or survey. A plan that shows: a. The Property lines b. Any currently existing buildings, fences, houses, etc. c. Setbacks, easements, rights of way, etc. d. The location of the proposed construction. 2. Structural plan. A plan that shows: a. The structural component of the patio (i.e. rebar or wire mesh) b. Perimeter beams if applicable c. Attachment to the house. (Regardless of the requirement for a permit, patios must not be located in Public Utility Easements or Drainage Easements. Refer to the survey of your lot for the location of easements.) PERMIT FEE: Without Utilities: $48.00 Patio Covers Any patio cover requires a permit. SET BACK REQUIREMENTS: 25 Feet from the Front yard property line to the edge of the patio cover foundation. 5 Feet from the Interior side yard property line to the edge of the patio cover foundation. 15 Feet from the Exterior side yard property line on a corner lot to the edge of the patio cover foundation. Public Utility Easements (PUEs) may be larger than the above setbacks, in which case the PUE must be used as the setback. PLAN REQUIREMENTS Plans are required to be in sufficient detail and size to properly determine code compliance.
    [Show full text]
  • Building Deck Stairs P1
    How To Build a Deck: Part 5 – BUILDING DECK STAIRS Skill Level: ADVANCED Try these projects after you have a collection of DIY successes under your belt, and make sure you’re ready for a challenge. You’ll need experience with a wide variety of specialized tools, and it may take several hours to finish. If you’ve built a deck or installed an irrigation system, these projects probably match your abilities. MATERIALS Paper In this set of instructions for our deck building series, you'll learn how to calculate stairway dimensions and build a solid set of steps. If you Pencil haven’t installed your decking, you’ll need to take care of that first. View Level the previous video and instructions in this series, Framing and Decking, at Lowes.com/Videos. Framing Square Tape Measure Stair Gauges PREPARATION 2x12 Planks 01 Be sure that you understand and follow local building codes. You may need 5/4 Decking plan approval, a building permit, and one or more inspections during the Sawhorses construction process. Circular Saw 02 A deck stairway is comprised of one Handsaw or more pair of diagonal stringers or Dust Mask supports and numerous horizontal Work Gloves treads or steps. Like decks, stairways Safety Glasses can also have vertical balusters and horizontal rails. A simple deck plan will Brackets have one stairway section or multiple Drill with Bits sections with landings, flat areas that Socket Wrench and Sockets connect runs. Landings are often used to change the direction of the stairway. Carriage Bolts, Washers and Nuts 3 lb.
    [Show full text]
  • Second Story Deck
    SECOND STORY DECK (ATTACHED TO A RESIDENTIAL DWELLING) B UI L D I N G & S A F E T Y 8353 SIERRA AVE, FONTANA, CA 92335 (909) 350­7640 + FAX: (909) 350­7676 WALL­SWITCH CONTROLLED EXTERIOR LIGHT (12’­ 0” MAX SPAN) (10’­ 0” MAX SPAN) TABLE “A” TABLE “B” NOTES: 1. ALL METAL HARDWARE & SCREWS TO BE DECK JOIST SPANS HEADER SIZING & SPANS GALVANIZED OR OF OTHERWISE APPROVED (DOUGLAS FIR #2 OR BETTER) (DOUGLAS FIR #2 OR BETTER) CORROSION RESISTANCE. HEADER 2. DECK CANNOT BE ATTACHED TO SIZE SPACING SPAN DECK JOIST ND CANTILEVERED 2 FLOOR UNLESS SPAN 2 x 8 12” O.C. 12’­ 0” SIZE SPAN STRUCTURAL CALCULATIONS ARE SUBMITTED 2 x 10 16” O.C. 12’­ 0” 4 x 8 8’­ 0” AND APPROVED BY THE BUILDING 2 x 12 16” O.C. 12’­ 0” DEPARTMENT UP TO 8’­ 0” 4 x 10 10’­ 0” . 4 x 12 10’­ 0” 3. SHEAR WALLS MAY NOT BE MODIFIED UNLESS STRUCTURAL CALCULATIONS ARE SUBMITTED DISCLAIMER: 4 x 8 7’­ 6” AND APPROVED BY THE BUILDING ALTERNATE DECK DESIGNS ARE 8’­ 1” TO 10’­ 0” 4 x 10 9’­ 6” DEPARTMENT. POSSIBLE WHEN DESIGNED BY A 4 x 12 10’­ 0” LICENSED ENGINEER. USE OF THIS 4 x 8 7’­ 0” CONVENTIONAL STANDARD DESIGN IS 10’­ 0” TO 12’­ 0” 4 x 10 9’­ 0” AT THE USER’S RISK AND CARRIES NO 4 x 12 10’­ 0” IMPLIED OR INFERRED GUARANTEE AGAINST FAILURE OR DEFECTS. www.fontana.org Page 1 of 5 REV. 11­21­12 SECOND STORY DECK 4X4 POST (MIN) 1 ½ “ MAX 1 ½ “ MAX LEDGER BOLTS SHALL BE: 3/8” DIA.
    [Show full text]
  • THE KEY to SUCCESS with READY SEAL: ABOUT READY SEAL
    Thank you for considering Ready Seal for your exterior wood projects. We want you to get the best results possible, so if you still have questions or need additional information after reading the contents of this document, please visit our website or contact us @ 888-782-4648 for additional product support. THE KEY TO SUCCESS with READY SEAL: This document contains multiple sections that address a variety of topics. Proper wood preparation and measuring the moisture content of the wood prior to application are the two most critical steps to getting the best results. *See the WOOD PREP and MOISTURE CONTENT sections of this document. ABOUT READY SEAL Ready Seal has been the product of choice for professionals since 1992. What used to be available to contractors only is now available to all. Ready Seal is a genuine semi-transparent stain and seal that penetrates into the wood rather than sitting on the surface. It is a proprietary blend of natural resins, trans-oxide pigments (which provide UV protection), and some of the finest oils in the industry. There is no linseed oil, which has been known to promote algae and mildew growth. It is ideal for fences, decks, cedar siding, log homes, wooden garage doors, children’s play-sets, equestrian centers, boat docks, pergolas, gazebos, cabanas, pavilions, and other outdoor wood structures. It is also safe to use indoors and frequently used for interior projects including cabinets, floors & furniture. Ready Seal can be used on most wood types, such as pine (regular and pressure-treated), cedar, tiger, cypress, redwood, walnut, cherry, hickory and oak, and even some exotics such as teak, ipê, massaranduba, cumara, and garapa, although there are some nuances with these exotic woods, so please contact our office at 888-782-4648 if you want additional information on these.
    [Show full text]
  • Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor System Applicability
    Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor System September 18, 2007 Applicability: The purpose of this Technical Note is to suggest construction details for residential deck ledger attachment to metal plate connected wood truss (MPCWT) floor systems. Issue: Numerous field observations of existing decks revealed that a major source of failures are attributable to inadequate connection between the deck ledger and house rim joist, related wood decay and/or corrosion of fasteners, and a failure of single and/or various elements of the guardrail system. Residential decks are usually supported on one side by a ledger attached to the house. This ledger attachment is critical for ensuring that the deck is safely and securely supported at this location. Deck ledger connection problems are often aggravated by lack of structural redundancy, namely, when the ledger to rim board connection fails, the deck typically collapses catastrophically. Recommendations: When the floor system for the house uses MPCWT, the deck ledger shall not be connected to the house by nails alone. In the absence of a lateral bracing system installed on the deck, lag screws or bolts and/or other mechanical connectors must be used, i.e., the deck ledger must be lagged or bolted to the rim joist and/or other structural components of the house which in turn must be securely attached to the framing of the structure and supported on the foundation and/or wall below. A MPCWT is an engineered, prefabricated structural component designed for each specific application. MPCWT used in residential floors are often installed with a 2x4 lumber “ribbon” at the ends of the trusses (see Figure 1), the purpose of which is to tie the ends of the trusses together.
    [Show full text]
  • Roof Deck Roof Over
    72056_1-91 11/7/12 4:26 PM Page 32 CertainTeed Shingle Applicator’s Manual The Roof Deck and Tearing Off or Roofing Over4 THE SHINGLE MANUFACTURER’S WARRANTY YOUR OBJECTIVE: If you apply a shingle roof over a deck surface that is unacceptable to To understand (1) how building design, deck the shingle manufacturer and damage results, the warranty might not construction and deck materials affect the entire be honored. The manufacturer will not take the responsibility for: roofing system and the warranties on the roofing N Poor deck design that contributes to damage to the roofing system products, and (2) to be able to recognize or other parts of the house. and predict deck-related problems. N Defects or damage caused by materials used as a roofing base, over which the roofing shingles are applied. N Roof deck performance can have a strong affect on shingle perfor- Damage to the shingles caused by settlement, distortion, failure, mance. A bad deck can be a real headache. The causes for many of or cracking of the roof deck. the complications that a problem deck creates can usually be traced N Defects, damage or failure of shingles caused by applications back to the design of the building, the materials used to make the that are not in strict adherence with the written instructions of deck, or the way the deck was installed. the manufacturer. CertainTeed suggests that you make it your business to learn how N Application over wood that is not dry or which has hard to properly install shingles over all the various types of decks projections, such as partially driven nails, which can cause discussed in this chapter.
    [Show full text]
  • Applying Modular Construction to Multifamily Residential Projects in Washington, DC
    Fabulous Pre-fab Applying Modular Construction to Multifamily Residential Projects in Washington, DC Abigail R. Brown, AIA Hello! 1 1 Welcome to iLab iLab exists to promote innovation and progressive architecture and design through internal research sponsored by Hickok Cole Architects. The program creates a gap in day to day work life to foster innovation. The firm crowd sources the most compelling proposals, every employee votes, and the winners are awarded uninterrupted project- free time to develop an idea or project. Through this exploration the firm aims to stretch conventional notions about architecture, fabrication, work styles, and entrepreneurship. 2 What You’ll See Here This document is the result of Abigail Brown’s iLab project “Fabulous Pre-fab: Tour of modular construction factory; DeLuxe Building Systems Applying Modular Construction to Multifamily Residential Projects in Washington, DC.” Modular construction is a pre-fabrication system in which modules of a building are 2 2 constructed in a factory then shipped to the site and assembled on a foundation. This system has not yet been widely used in Washington, DC, despite the cost, schedule, and environmental benefits it offers and the successful use of the system in other major cities. This document records answers to the three major research questions that drove the investigation: what’s modular?, why and why not use modular?, and what can modular be? This research was tested with a speculative design for a real site in Washington, DC, with the intention of introducing
    [Show full text]
  • Custom Deck Design Planner We’Ll Design Your Deck Idea from a Sketch Or Detailed Plan
    Custom Deck Design Planner We’ll design your deck idea from a sketch or detailed plan. Complete this deck planner and we’ll give you a materials list and quote. Submit your worksheet to a Parr Deck Tools professional at your nearest location. Name: Address: Phone: Email: Give a brief description of what kind of deck you would like. (big, small, high, low, rail, no rail, stairs, no stairs, etc.) My deck project is: On somewhat level terrain On sloping terrain On irregular terrain A new deck. There is no deck structure currently in this area. An addition to a current deck structure. A deck replacement. A replacement deck of the same size and shape. I plan to build the deck myself. I plan to hire a contractor to build the deck. I need room for: A small table and 2 chairs A table and 4 to 6 chairs A table plus chaise lounge(s) or other deck furniture Potted plants / planters Hot tub - size: Other Please check those that apply: Multi-level deck Rail system: Wood Metal Glass panel Cable Bench seating Built-in planter boxes Special decking patterns (angled, mitered border) Deck lights Decorative post caps I prefer (choose one): Natural wood surface: Cedar Treated Redwood IPE Other Manufactured decking: TimberTech Trex Azek Other Other decking: This is a sample of the information we will need to complete your deck design. Sketch your deck on page 4 of this guide using similar detail or attach your deck plan here. Sketch the back of your house as accurately as possible noting features like window and door locations, hose bibs, air conditioners, etc.
    [Show full text]
  • Seattle SDCI Tip #312—Decks, Fences and Arbors for Single
    Seattle Department of Construction sdciand Inspections Tip 312 Seattle Permits — part of a multi-departmental City of Seattle series on getting a permit What information will I need to apply for a deck Decks, Fences, and permit? Arbors for Single-Family For most decks, you will need: A site plan Homes in Seattle A scaled site plan that shows all structures on your Updated January 3, 2019 site, including the proposed deck. Your site plan dimensions must show that your deck meets our land use requirements for location and lot area cover- This Tip addresses the questions most commonly asked age. (See Tip 103, Site Plan Requirements) by homeowners wishing to construct decks, fences and An elevation drawing arbors. This information applies to single-family homes A scaled elevation drawing that shows the height on single-family and lowrise multifamily zoned properties. of the proposed deck (height above existing or final grade, whichever is lower), including any guardrails Decks vary widely in the scope of their construction; and stairs. Your elevation drawings must offer side you will need to get a permit for some. You generally views of structures, from the ground to the top of the do not need a permit to build a fence, but you need to structure. (See Tip 303, Applicant Responsibilities follow our regulations. You generally need a permit to and Plan Requirements for Single Family and Two- build arbors. Unit Dwellings) Construction notes Decks Your notes on your drawings should call out the size What type of permit do I need to build deck? and type of posts proposed (e.g., pressure treated wood), the method of support for the posts (e.g., Most decks on single-family zoned properties only require poured concrete footings), joist size, span and spac- a subject-to-field-inspection (STFI) permit.
    [Show full text]
  • Design Guidance: Office Space
    Design Guidance: Office Space Division of the University Architect September 2003 Table of Contents INTRODUCTION .........................................................................................................3 HISTORY....................................................................................................................3 Integration with Master Plan Initiatives and Strategies................................................4 Integration of Quality of Life Standards for All Students, Faculty, and Staff ................4 Integration with Industry .........................................................................................5 Integration of Responsible Use of Funds and Resources..............................................5 OBJECTIVES ...............................................................................................................6 SPACE PLANNING......................................................................................................7 GOVERNING PHILOSOPHY FOR OFFICE SPACE PLANNING..................................................7 OTHER OFFICE SPACES ................................................................................................8 ORGANIZING PRINCIPLES .............................................................................................8 Planning Principles .................................................................................................8 Other Considerations...............................................................................................8
    [Show full text]
  • Deck Guidelines (Residential)
    City of Meriden Building Department 142 East Main Street Meriden, CT 06450 (203) 630-4091 DECK GUIDELINES All information in this handout pertains to 1 and 2 family residential decks. The City of Meriden CT is offering this informational handout as representative of typical issues/questions that may arise on a typical deck construction project. The City of Meriden CT assumes no responsibility for any errors or omissions the installer is required to follow applicable codes. This handout does not cover all situations, nor is it intended to. If a issue arises please feel free to contact this office. 1. IMPORTANT NOTES: A. If you plan to install a hot tub, spa, pool, screen room, sunroom or future addition on proposed deck, this handout may be used as a guide. Please contact this department for correct foundation and frame details. B. If proposed deck is in area of electric or gas service, oil fill/vent or other utilities a clear working/service area should be maintained. Any heating, drying or exhaust outlets shall maintain the correct distance to floor/grade below. In some instances a combustible service may not be allowed and exhaust may need to be relocated. 2. PERMIT APPLICATION: A. Plot Plan or GIS survey with proposed deck location required for Zoning Department approvals. B. Deck plan drawn to scale with the following items; 1. deck size 2. Size and spacing of floor joist and beams 3. Size and type of decking materials 4. Size, type, location and spacing of support post C. Deck Elevation 1. Height of deck 2.
    [Show full text]