EXECUTIVE SUMMARY

1.1 PROJECT TITLE

The title of the Project is “Cadangan Projek Pengeluaran Hasil Hutan Seluas +199 Hektar Di Komparimen 70 dan Komparimen 71 Hutan Simpan , Mukim Hulu Chukai & Kemasik, Daerah Kemaman,

Terengganu” (hereinafter referred to as “the Project”).

1.2 PROJECT DESCRIPTION

The Project site covers a total of of +199 hectares (491.74 acres) located in Compartment 70 and Compartment 71 Hutan Simpan Rasau Kerteh, District of Kemaman. The conventional method will be applied in this project. The nearest major town is which is approximately 6.8 km southwest from the Project site while the other major town are Kerteh located 37.3 km and Paka which located about 58.8 km northeast from the Project site. The nearest settlement areas around the site is

located about 3.5 km southeast of the boundary project site which are Kampong Air Jernih, Taman

Jernih & Kg Cina.

The description of the climate in the project site and its surroundings is based on data obtained from the nearest meteorological stations i.e. at (rainfall, temperature, relative humidity, wind speed and wind rose). The mean total annual rainfall for 10 years (Year 2008 to 2017) is 2996.6 mm. Month of May recorded the highest annual temperature (28.6°C) while month of January and November recorded as the lowest annual temperature (26.7 °C). The highest mean relative humidity for

year 2008 to 2017 occurred in November which was about 87.7% while the lowest mean relative humidity occurred in February at 79.7%.

8 water samples were collected within and outside the project site to obtain the existing conditions of

water quality before the development take place. Based on the calculation of the Water Quality Index (WQI) the value is ranged from 77.13 to 80.93 (Status: Slightly polluted). For air quality and noise level,

three (3) stations was monitored.

EXECUTIVE SUMMARY ES - CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS +199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN, TERENGGANU

1.3 CONTACT DETAILS OF PROJECT PROPONENT AND EIA CONSULTANT

The details of the project proponent and environmental consultant for the proposed project are as

follow:

LOGGING LICENSED OWNER ZEE UTUH ENTERPRISE

2388 Kg. Simpang Kubang Bujuk,

Beladau Selat,

20500 Kuala Terengganu,

Terengganu Darul Iman.

LOGGING CONTRACTOR KUNCI JAYASAMA SDN. BHD.

Lot 118, Tingkat 1, Jalan Air Putih, 25300 ,

Pahang Darul Makmur. Contact Person: Mr Sheikh Abdullah bin Sheikh Hassan Phone num: +60199650116

EIA CONSULTANT ENVIROCONSULT SERVICES

No. 24, Lorong Bandar Putra 1/8,

Bandar Putra,

26060 Kuantan,

Pahang. ENVIROCONSULT SERVICES Tel. No.: 017-663 0255 Fax. No.: 03-8948 5912

Email: [email protected]

Contact Person: Mr.Mohd Zikri Azmi

Designation: Director / ELA Team Leader

EXECUTIVE SUMMARY CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS +199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN, TERENGGANU

1.4 LOCATION OF PROJECT

The project site is located in Compartment 70 and Compartment 71 Hutan Simpan Rasau Kerteh, District of Kemaman in which Table 1.4.1 shows the coordinates of the Project. Meanwhile, Figure 1.4.1

shows the location plan and access road of the project.

Table 1.4.1 Coordinates of Project

Point Latitude Longitude

] 4° 25' 10.9" N 103° 21' 43.761" E

2 4° 25'7.212'N 103° 22' 18.696" E

3 A° 26' 26.873" N 103° 21' 39.609" E

4 4° 25' 54.636" N 103° 21' 10.736" E

EXECUTIVE SUMMARY ES - CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS +199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN, TERENGGANU

103°18'0"E ea 1 ote REECE OEE nai benda 103°25'0"E See we

t 4°29°0"N 4°29°0"N

Hutan Simpan Rasau Kerteh Mukim Hulu Chukai & Kemasik District of Kemaman Terenggenu Darul Naim

4°28'0"N 4°28'0"N Ay Far nn. i TN (orn) a In es 4°27°0"N as Ode a Dre TA N 2 103° 21" 39.609" ES ” x 3). 4° 26! 26.873" N/ a p ; A AE a

| A

4°26'0"N Va \ 4°26°0"N np ew bmw | Project Site ! f | J: 1 f

&\) Be NG , ADB a E | SS : 103° a 21° 43.761" pL E — * 2) 0 425" T:212"N ANS | fe. | . .. Kg. Te poyak 4 ey eS ap AG 25" Ce iis (Le D 1 a X

4°25'0"N ce ’ ‘ argh LEGEND Cc) Project Site Contour at} Paved Road | Access Road |. T AN r a Unpaved Road === Access Road 4°24'0"N ee ELD 4°24°0"N x ——— 7 Main River —— River * Oil Palm Plantation Secondary Forest, Belukar, lerami dan Riung 4 Rubber Plantation | GZ Sundry Tree Cultivation 4°23'0"N 4°23'0"N : Sundry Non Tree Caltivation Grass Forest “=> Swamp “A & Settlement Area

© Coordinate Point

Source :'Jabatan Ukur dan' Pemetaan (JUPEM | oh ADANG 2 £ fifo ee +s hae me

4°22'0"N q q Il q q q q q 422°0"N -309 Spot Height 103°18'0"E 103°19'0"E 103°20'0"E 103°21'0"E 103°22'0"E 103°23'0"E 103°24'0"E 103°25'0"E ‘+—— Transmissicn Line

Figure 1.1.1: Location and Access Road of the Project Site

EXECUTIVE SUMMARY ES -4

CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS £199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN , TERENGGANU

1.5 SUMMARY OF POTENTIAL IMPACTS, THEIR MAGNITUDE & PROPOSED P2M2

A tabulation of potential impacts, their magnitude and proposed pollution prevention and mitigation measures (P2M2) as shown in Table 1.5.1 below.

Table 1.5.1 Summary of Potential Impacts, Their Magnitudes and Proposed Pollution Prevention and Mitigation Measures (P2M2)

MAGNITUDE OF SIGNIFICANT POTENTIAL SIGNIFICANT P2M2 REFERENCE IMPACTS POTENTIAL PAGE IMPACTS

1) Soil erosion and e Scheduling of the development. 8-1 sedimentation High e =Plant cover crop. 2) Reduce river e =6Prepare silt trap, and sediment basin. depth/drain capacity e Retain buffer zone. 3) Declining water quality level

Waste Generation High e No open burning. 8-17 a) Biomass waste e = Apply air curtain burner. b) Solid waste e = Provide garbage bins. c) Scheduled waste e Composting waste approach. e Proper storage area.

1) Habitat- Fragmentation. High e = Phasing/Directional clearing. 8-20 2) Human-wildlife Conflict e = Wildlife-Human conflict management strategies. e §=©Report incident. e = Prohibition of wildlife poaching e Signage on prohibition of wildlife hunting or trapping.

Declining Air Quality Level Medium e Spraying water on road (water 8-24, 8-28 bowser) Provide wash through Apply crusher run for unsealed road

Noise Pollution Low e Use quieter and/or silence 8-26, 8-29 machineries. e Use proper personal protection equipment (PPE) on site with ear plug. Regularly servicing and maintaining vehicles and machineries.

Nuisance During = Project Medium e Preparing Project Abandonment Plan. 8-30 Abandonment e Warning signage to be installed. Removes vehicles involved in the project development. e Initiate environmental control measures. e Regular inspections on site.

EXECUTIVE SUMMARY | ES - CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS £199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN , TERENGGANU

1.6 PERFORMANCE MONITORING (PM) & COMPLIANCE MONITORING (CM)

This project site will apply pollution prevention and mitigation measures (P2M2) in order to reduce

disturbance on environment at the project area. A performance monitoring (PM) is applied to monitor the effectiveness of the P2M2 while Compliance Monitoring (CM) program is used to monitor the effluent discharge and air emissions. Table 1.6.1 and Table 1.6.2 below summarized the description on

PM and CM parameters.

Table 1.6.1: The Performance Monitoring Components LD-P2M2 TOOLS PERFORMANCE RECOMMENDED MONITORING FREQUENCIES MONITORING (PM) LIMITS LOCATIONS PARAMETERS/ STATUS Sediment Trap TSS *50 mg/L The locations Monthly Turbidity *50 NTU referred to the Sediment level LD-P2M2 attachment Drone - = - Project Site Quarterly - River within Project site Note: *Refer to Letter of Approval by Department of Environment Malaysia (DOE). However, the recommended normal! values are as stated in this table.

Table 1.6.1: The Performance Monitoring Components LD-P2M2 TOOLS PERFORMANCE RECOMMENDED MONITORING FREQUENCIES MONITORING (PM) LIMITS LOCATIONS PARAMETERS/ STATUS Sediment Trap TSS *50 mg/L The locations Monthly Turbidity *50 NTU referred to the Sediment level LD-P2M2 attachment Drone - - - Project Site Quarterly - River within Project site Note: *Refer to Letter of Approval by Department of Environment Malaysia (DOE). However, the recommended norma! values are as stated in this table.

EXECUTIVE SUMMARY ES - CADANGAN PROJEK PENGELUARAN HASIL HUTAN SELUAS +199 HEKTAR DI KOMPARTMEN 70 DAN KOMPARTMEN 71 HUTAN SIMPAN RASAU KERTEH, MUKIM HULU CHUKAI & KEMASIK, DAERAH KEMAMAN , TERENGGANU

1.7 IMPACT MONITORING (IM)

The logging activities may result in some impacts on the condition of the area. The description on the

monitoring parameters is shown in Table 1.7.1.

Table 1.7.1: The Impact Monitoring Component (IM) Note: IMPACTS MONITORING MONITORING LOCATIONS FREQUENCY PARAMETERS

“Air Pollution | PMio Three (3) point refer to Quarterly Figure 6.8.1 “Noise Laeq Three (3) point refer to Quarterly Pollution Figure 6.9.1

“Water Total Suspended Solids (TSS) Monthly

Pollution Biochemical Oxygen Demand (BOD)

Chemical Oxygen Demand (COD Eight (8) points refer to Figure

Turbidity 6.10.1

Ammoniacal Nitrogen (NHs-N)

Dissolved Oxygen (DO)

pH

Oil & Grease E-Coli

Temperature

* New Malaysia Ambient Air Quality Standard, Department of Environment, Malaysia (DOE). ** ~The Planning Guidelines for Environmental Noise Limits and Control, Schedule 1, Department of Environment, Malaysia (DOE). *** National Water Quality Standards for Malaysia (NWQS), Department of Environment, Malaysia (DOE).

EXECUTIVE SUMMARY ES -