10/31/2018 District Irrigation Profiles

IRRIGATION PROFILE OF DISTRICT

*Click here for Ayacut Map

INTRODUCTION

Srikakulam District is the extreme Northeastern District of situated within the geographic Co-ordinates of 18° -20' and 19° -10' of Northern latitude and 83° -50' and 84° -50' of Eastern longitude. The District is skirted to a distance by Kandivalasagedda, Vamsadhara and Bahuda at certain stretches of their courses while a line of heights of the great Eastern Ghasts run from North East. District flanks in the south and west while Orissa bounds it on the north and on the East. The total area of the District is 5,837 Sq. Kms. It has a population of 27,03,114 persons according to the 2011 census. The District derived its name from Srikakulam its headquarters . was carved out in 1950 by bifurcating it from District, it remained unaffected in its territorial jurisdiction for quite some time. But in November, 1969 the District lost 63 from Saluru Taluk and 44 villages from Taluk on account of their transfer to the then newly constituted Gajapathinagaram Taluk of . Again in May, 1979, the District had undergone major territorial changes on account of the formation of new District with head quarters at Vizianagaram which involved transfer of , Bobbili, Parvathipuram and Taluks to the new District.

The Nagavali, Vamsadhara, Survarnamukhi, Vegavathi, Mahendratanaya Gomukhi, Champavathi, Bahuda and Kumbikota gedda are the important rivers of the District. The rises in the of Orissa State and enters Srikakulam District in Mandal and finally falls in to the Bay of Bengal near Calingapatnam. The Nagavali and Survarnamukhi rivers also originate in the Eastern Ghats while Nagavali in Vangara Mandal and the confluence joins the Bay of Bengal at near Srikakulam rising in hills the Vegavathi river flows from west to east, ultimately joining the river Suvarnamukhi, Gomukhi joins Suvarnamukhi at Sirlam of , Mahendratanya, which is Atributory of Vamsadhara joins the later at Komanapalli village in Hiramandalam Mandal. Another river of the same eastern Ghats flows through and Mandalas and falls into Bay of Bengal at . The Bhuda river also rises in the eastern Ghats and enters Srikakulam District at Boddabada village of Ichapuram Mandal and flows through Ichapauram and , Mandasa and enters into Bay of Bengal at Donkuru. The District has a seacoast of 193 Kms.

Classification Of Geographical Area Of Srikakulam District

Classification of geographical area Area in Acres Percentage of geographical area Total geographical area 14,42,322.70 100 Forest area 1,69,611.91 11.76 http://irrigationap.cgg.gov.in/wrd/getDistricts 1/28 10/31/2018 District Irrigation Profiles Cultivable area 9,00,375.57 62.43 Barren and Un-cultivable area 1,19,616.17 8.29 Land put to Non-Agricultural use and other 2,52,719.05 17.52 Sown Area 7,50,922.07 52.06 Irrigated area 6,47,656.52 44.90 Normal Average Rainfall 1162mm --- Cultivable waste 1,487.54 0.10 Permanent pastures and other grazing land 2,327.68 0.16 Miscellaneous 18,411.42 1.28 Other fallow land 36,345.94 2.52 Current fallows 89,857.92 6.23 Others 1,022.99 0.07 Irrigation area % with reference to cultivable area 71.93

Details Of Irrigation Projects

S.No Name of the Projects Total IP created in Acres A Completed Projects I Major Irrigation Projects 1 Vamsadhara Project Stage-I 1,48,230 2 Narayanapuram Anicut 39,436 3 Thotapalli Regulator 55,285 II Medium Irrigation Projects 1 Gorle Sriramulu Naidu Reservoir Project (Phase-I) 24,700 III Minor Irrigation Projects 1 Minor Irrigation schemes--6Nos 11,958 2 Minor Irrigation Tanks(Above 1000Ac)--375Nos 69,183 3 Open Head Channels, Gedda Systems, Anicuts & Other sources (Above 100 Ac.)--80Nos 40,339 4 Minor Irrigation Tanks ( Below 100 Ac.)--478Nos 18,380 5 Open Head Channels, Gedda Systems, Anicuts & Other sources (Below 100 Ac.)--21Nos 1,069 6 Small Minor Irrigation Tanks (P.R.Tanks)--6937Nos 1,51,531 7 Minor Irrigation tanks - SMI Divn.,--546Nos 16,716 8 Check Dams SMI Divn--503Nos 14,228 IV Lift Irrigation Schemes under APSIDC 1 Lift Irrigation Schemes--45Nos 23,655 B Ongoing Projects I Major Irrigation Projects 1 B.R.R. Vamsadhara Project Phase- I of Stage-II 62,280 2 B.R.R. Vamsadhara Project Phase- II of Stage-II 45,000 3 63,933 II Medium Irrigation Projects 1 Gorle Sriramulu Naidu Madduvalasa Reservoir Project (Phase-I) 12,500 2 Off shore Resevoir on River Mahendra tanaya 24,600 III Minor Irrigation Projects 1 Minor Irrigation schemes --4Nos 3,273 IV Lift Irrigation Schemes under APSIDC 1 Lift Irrigation Schemes--4Nos 5,910

COMPLETED MAJOR IRRIGATION PROJECTS

1. B.R.R. Vamsadhara Project Stage-I http://irrigationap.cgg.gov.in/wrd/getDistricts 2/28 10/31/2018 District Irrigation Profiles

Preamble

B.R.R. Vamsadhara Project Stage-I envisages construction of Barrage across the River Vamsadhara at Gotta (V) in Hiramandalam (M) of Srikakulam District to irrigate an ayacut of 1,48,230 acres in 398 villages of 12 Mandals with Left Main Canal for a length of 104.24 Km. and 68 Nos. of distributaries. The project was taken up in 1970 and water was first let out for irrigation in 1977. The updated estimated cost of the project is Rs.109.00 Crores with S.S.R. 1997-98.

Salient Features

Location : Gotta (V), Hiramandalam (M),Srikakulam Dist Longitude : 83° 58' 0'' E Latitude : 18° 12' 0'' N Ayacut : 1,48,230 Acres 12 Nos i.e,Hiramandalam,Saravakota, , Polaki , Kotabommali, Mandals benefited : Santabommali, , Nandigam, , Vajrapukoturu & . Gross Storage : 17329 Cum FRL : 38.100 M MDDL : 34.44 M (Sill Level of Left Head Sluice) Dependable net : 57.50 TMC (AP Share at Gotta barrage) Yield Maximum Flood : 2, 90,000 Cusecs Discharge Canals Left Main Canal Length : 104.24 Km. Section : 29.26 X 2.90m Water allocation : 17.841 TMC (Irrigation) Water allocation : ---- (Drinking) Water : Nil allocation(Industries) Cropping Pattern : 1,48,230 Acres for Paddy Present Stage : Completed and under O&M Funding Details : Normal State Plan Project Starting Year : 1971 http://irrigationap.cgg.gov.in/wrd/getDistricts 3/28 10/31/2018 District Irrigation Profiles Project Completion : 1977 Year Budget for the Year : Plan - 18.0000 Crs. Non-Plan - 0.6000 Crs. 2015-16

Mandal-Wise Ayacut Under Right Main Canal, High Level Canal & Flood Flow Canal In Vamsadhara Project

S.No Mandal No. of Villages under Command Ayacut in Acres 1 Bhamini 9 7082 2 Kothuru 14 10697 3 HLM 7 3117 4 Sarubujjili 49 8493 5 LN Peta 39 15769 6 Burja 28 6184 7 Amadalavalasa 30 8559 8 Srikakulam 22 17800 9 Gara 27 29579 Total 225 107280

B.R.R. Vamsadhara project - stage-I left main canal Mandal-wise ayacut utilized under Khariff 2014-15

S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres 1 Hiramandalam 12 2008 2 Saravakota 13 2782 3 Jalumuru 57 16347 4 Narasannapeta 44 21463 5 Polaki 49 22708 6 Kotabommali 29 8884 7 Santhabommali 40 26383 8 Tekkali 35 14947 9 Nandigam 51 12492 10 Palasa 36 8362 11 Vajrapukotturu 31 11796 12 Meliaputti 1 58 Total 398 148230

* Though Mandal comes to the Left side of the River, there is no command under it under Vamsadhara Project

B.R.R. Vamsadhara project - stage-I left main canal Assembly Constituency-wise registered ayacut details

S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres 1 Pathapatnam 13 2067 2 Narasannapeta 128 49412 3 Tekkali 245 94224 4 Palasa 12 2527 Total 398 148230

B.R.R. Vamsadhara project - phase-I of stage-II right main canal Assembly constituency-wise - Mandal-wise ayacut details

Sl. Name of Assembly Name of No. of Ayacut in Acres Constituency-wise Total ayacut in Acres No. Constituency Mandal Villages 1 Pathapatnam Hiramandalam 4 896.51 896.51 http://irrigationap.cgg.gov.in/wrd/getDistricts 4/28 10/31/2018 District Irrigation Profiles 2 Amadalavalasa Sarubujjili 43 13726.21 34004.16 LN Peta 26 8492.66 Burja 13 3227.1 Amadalavalasa 30 8558.19 Sub-Total 112 34004.16 3 Srikakulam Srikakulam 22 17800.52 47379.33 Gara 27 29578.81 Sub-Total 49 47379.33 Total 82280

2. Narayanapuram Anicut Scheme

Preamble

The Narayanapuram Anicut across was constructed during the year 1959-1963 in Narayanapuram village of Burja Mandal to Irrigate an ayacut of 39,179 Acres, through left and right main canals in Burja, Amdalavalasa, Srikakulam , Gara Santhakaviti, and Mandals of Srikakulam District.

The Right Canal is running for a length of 50.6Km and distributaries running for a length of 162.00 Km to Irrigate an ayacut of 18,362 Acres in Santakaviti, Ponduru, Etcherela, Amdalavalasa and Srikakulam Mandal.

The left canal is running for a length of 39.00 Km to irrigate an ayacut of 18691 Acres .

Sailent Features

Longitude : 83° 48' 0'' E Latitude : 18° 23' 0'' N Ayacut : 37053 Acres Catchment Area : 5079.62 KM2 Yield from catchment : 1,117.57 mm3 Average Mansoon Rainfall : 1024 mm Designed Flood Discharge : 4,876.7 M3/Sec Maximum Flood Discharge (5/90) : 6,910.08 M3/Sec Anicut Anicut Length of Anicut : 357 Met. Crest level of Anicut : + 28.04 M Shutters 118 Nos Size : 3.025M x 1M Top of falling shutter : +28.95 M Top of Flood bank Level : +32.77 M http://irrigationap.cgg.gov.in/wrd/getDistricts 5/28 10/31/2018 District Irrigation Profiles Head Sluice 2 Nos : 8 Vents Size : 2.28 M x 1.05 M Sill Level : + 27.13 Scovering Sluices 2 Nos : 8 Vents Size : 1.80 M x 2.10 M Sill Level : + 26.82 M Down Stream Solid Apron Length : 360 Mts Top Level : 27.14 M Canals Left Canal : 39.00 KM Left high level Canal : 14.70 KM Discharge : 13.28 M3/Sec Ayacut : 21045 Acres Bed Level at Start : + 27.13 M Bed Fall : 1 in 4000 Depth of Flow : 1.20 M Right side canal Length of Canal : 50.60 KM Discharge : 13.28 M3/Sec Ayacut : 18362 Acres Bed Level at Start : + 27.13 M Bed Fall : 1 in 4000 Depth of Flow : 1.20 M Budget for the Year 2015-16 : Plan - 1.70000 Crs

Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut

Ayacut localised Ayaccut Irrigated during Khariff S.No Name of the Mandal Srikakulam Vizianagaram Total 2014 District District a Narayanapuram left side channel Amadalavalasa 7215.00 --- 7215.00 6421.00 Srikakulam 5894.00 -- 5894.00 5776.00 Gara 3867.00 -- 3867.00 3790.00 Burja 1715.00 -- 1715.00 1681.00 Total 18691.00 -- 18691.00 17668.00 Narayanapuram Right side b channel Santhakaviti 4221.00 --- 4221.00 4052.00 Ponduru 6966.54 -- 6966.54 6827.00 Etcherla 7174.41 -- 7174.41 6313.00 18361.95 -- 18361.95 17192.00 Total 37052.95 -- 37052.95 34860.00

Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut

Ayacut localised S.No Name of the Mandal Ayacut Irrigated during Khariff 2014 Srikakulam District Vizianagaram District Total a Nagavali Left side channel Veeraghattam 14330.00 --- 14330.00 13757.00 13080.00 -- 13080.00 12688.00 Garugubilli -- 2341.99 2341.99 2248.00 Ziyyamavalasa -- 1850.00 1850.00 1776.00 http://irrigationap.cgg.gov.in/wrd/getDistricts 6/28 10/31/2018 District Irrigation Profiles 27410.00 4191.99 31601.99 30469.00 b Nagavali Right side channel Vangara 4298.00 --- 4298.00 4126.00 Baligipeta -- 550.00 550.00 534.00 Garugubilli -- 3093.5 3093.5 3000.00 4298.00 3643.50 7941.50 7660.00 Total 31708.00 7835.49 39543.49 38129.00

3. Thotapalli Regulator

Preamble

The existing Thotapalli regulator is the first diversion work on river Nagavali, which was constructed with RR masonry during the year 1907-1908. The Thotapalli old regulator consisting of mainly the following components:

1. Nagvali Left Main canal of length 37.626 Km with 8 nos of branch canals and distributory system was executed during the year 1908-1934 including construction of CM & CD works with RR masonry in Surki mortar to feed an ayacut of 31200 acres.

2. Nagavali Right main canal of length 20.016 Km with 11 nos of branch canals and distributory system was executed during the year 1934-1958 including construction of CM & CD works with RR masonry in surki mortar to feed an ayacut of 9000 acres.

3. 9 Nos of open head channels on left side of river to feed an ayacut of 10606 acres and 5 nos open head channels on right side river to feed an ayacut of 13194 Acres.

As such the total ayacut being irrigated under the above regulatory system is 64000 Acres. It became old and showing signs of deterioration. It is proposed to construct a barrage near Thotapalli village across Nagavali River at about 500 mts U/S of existing Thotapalli regulator in order to save the existing ayacut of 64000 Acres and to irrigate additional ayacut of 120000 Ac in Vizianagaram and Srikakulam districts including drinking water supply in 24 villages en-route the proposed Right Main canal.

Sailent Features

Location : Thotapalli (Village) Garugubelli (Mandal) Longitude : 80° 36' 15'' E Latitude : 18° 46' 52'' N Ayacut (Stabilized) : 55,285 Acres Mandals Benefitted : (1) Veeraghattam (2) Palakonda (3) Vongara Dependable Net Yield : 6700 Mcft. Water Allocation : 5.780 TMC. Maximum Flood Discharge : 1,13,200 C/s Canals http://irrigationap.cgg.gov.in/wrd/getDistricts 7/28 10/31/2018 District Irrigation Profiles Length : Left Main Canal : 37.40 KM Right side Canal : 19.80 KM Discharge : Left Main Canal : 414 C/s Right side Canal : 106 C/s Ayacut : Left Main Canal : 38,708 Acres Right side Canal : 16,577 Acres Cropping Pattern : Khariff (Paddy) Villages Benefited : 32 Nos Rehabilitation : - NIL -

ONGOING MAJOR IRRIGATION PROJECTS

1. B.R.R.Vamsadhara Project Phase-I of Stage-II

Preamble

The Phase-I of Stage-II of Vamsadhara Project is intended to create an Irrigation potential of 62,280 Acres under Right Main Canal. The project components are (1) Construction of head regulator on Right Bank of Vamsadhara River @ 750m U/s of Gotta Barrage (2) Excavation of Right Main Canal for a length of 52.973 Km with distributory net work from1R to 37TE to command the ayacut.

Salient Features

F.S.L of Canal of head reach : + 38.484M Bed level of canal at Head : + 36.074M reach Starting section of canal : 20.25 x 2.41M Length of Canal : 52.973Km Designed discharge : 1867 Cusecs up to 2.67 Km & 865 Cusecs in D/S Estimated Cost : Rs. 123.936 crores Revised Estimated Cost : Rs. 209.00 Crores Mandals benefited : Sarubujjili, Amadalavalasa, Gara,Srikakulam and Burja, L.N.Peta,Hiramandalam Village benefited : 165 Nos Cropping pattern: : Paddy: 32,280 Acres Chillies:30,000 Acres Total:62,280 Acres

http://irrigationap.cgg.gov.in/wrd/getDistricts 8/28 10/31/2018 District Irrigation Profiles Irrigation Potential

The project is intended to create irrigation potential to an extent of about 62,280 Acres in 7 mandals of about 165 villages in Pathapatnam, Amadalavalasa & Srikakulam Constituencies of Srikakulam District utilizing 7.353 TMC of water.

Components

The project comprised of construction Head Regulator, etc., construction Right Main Canal for a length of 52.973Km with 1R, 37TE distributories and field channels.

Status

The Right Main Canal was completed upto 15.466 duly linking, Yeragam, Purushothapuram and Bhyri Open Head Channels through 11L Distributory restoring lower riparian rights for 20,000 Acres under NABARD RIDF-II .The works from Km 15.466 to 52.973 including all distributories were taken up under A.I.B.P and Normal State Plan Funds. An expenditure of Rs. 145.906 Cores was incurred under the Project. An irrigation potential of 62,280 acres was created by Khariff 2012.

Administrative approval was accorded to Project revised estimate by the Government of an amount Rs. 209.00 Crores vide G.O. Rt. No. 734, dated 27.12.2011 and the new / additional imperative works like CC lining of Canal at vulnerable reaches, protection walls etc. are under progress.

The ayacut under the Right Main Canal of 62,280 acres is being irrigated every year. Further the 20,000 acres proposed under Sugarcane in Vamsadhara Project Phase-II of Stage-II is developed for Paddy crop supplemented with the waters diverted from Gotta Barrage.

B.R.R. Vamsadhara Project - phase-I of stage-II Right Main Canal (Excluding The Open Head Channels Registered Ayacut) Assembly Constituency-Wise - Mandal-Wise Ayacut Utilized Under Khariff 2014-15

S.No Name of Assembly Constituency Name of Mandal No. of Villages Ayacut in Acres Constituency-wise Total ayacut in Acres Hiramandalam 4 746.51 1 Pathapatnam 6325.6 LN Peta 26 5579.09 Sarubujjili 43 8452.51 2 Amadalavalasa Burja 13 2073.96 16637.07 Amadalavalasa 30 6110.6 Srikakulam 22 12104.89 3 Srikakulam 27716.33 Gara 27 15611.44 Total 165 50679

The Reconcilation of above irrigation potential created and localization of the above ayacut under Right Main Canal is under progress by the Project authorities in co-ordination with Revenue & Agricultural Departments.

Mandal-Wise Ayacut Particulars Under R/S Open Head Channels (linked by right main canal of B.R.R. Vamsadhara Project phase-I of stage-II)

S.No Name of Assembly Constituency Name of Mandal No. of Villages Open Head Channel Registered Ayacut in Acres 1 Pathapatnam LN Peta 2 415.27 Sarubujjili 16 5053.70 2 Amadalavalasa Amadalavalasa 3 394.94 Srikakulam 7 3495.63 3 Srikakulam Gara 20 10640.00 Total 48 19999.54

Water Uses Associations were already formed for the above ayacut in the year 2000

2. B.R.R. Vamsdhara Project Phase-II of Stage-II

http://irrigationap.cgg.gov.in/wrd/getDistricts 9/28 10/31/2018 District Irrigation Profiles

Preamble

The Phase-II of Stage-II of Vamsadhara Project is intended to create an Irrigation Potential of 45,000 Acres and stabilizing the existing ayacut of 2,10,510 Acres under Left & Right Main Canals. The cost of the project is Rs. 933.90 Crores and administratively approved vide G.O.Ms. No. 33, dated 25.02.2005.

The Project Components are:

1) Construction of a side weir on Right bank of Vamsadhara River at Katragada (Village) Bhamini Mandal for diverting the flood waters into flood flow canal. A regulator for regulatory flows into flood flow canal and silt excluder for diverting excess water into the river.

2) A Flood Flow Canal about 34 Km length with two balancing reservoirs at Singidi and Parapuram Villages en-route irrigating 20,000 Acres.

3) Hiramandalam Reservoir with 19.05 Tmc capacity with head sluices for High Level Canal, Link Canal and Spillway regulator.

4) A High Level Canal to irrigate 5,000 Acres.

5) A Link Canal to connect the Right Main Canal @ Ch. 2.670 km from Hiramandalam Reservoir to supplement the deficit requirement under Left & Right Main Canals.

Salient Features

Location Latitude : 18° 59' 34'' N Longitude : 83° 48' 12'' E Srikakulam (Andhra District : Pradesh) Mandal : Bhamini Near Katragada Village on Village : Alikam - Bathili Road Hydrology Catchment Area at Katragaa : 7895 Sq.Km (3050 Sq.m) Mean Annual Rainfall : 1194 mm (47'') http://irrigationap.cgg.gov.in/wrd/getDistricts 10/28 10/31/2018 District Irrigation Profiles Average Monsoon Rainfall : 1067 mm (42'') 6.00 Lakh cusecs (16,900 Maximum Flood Discharge during September 1980 at Neradi site. : cumecs) 75% dependable yield at Gotta (115 TMC) agreed by Orissa and Andhra Pradesh : 3256.46 M.Cum Component Features Details As per Approved Description Hydraulic Particulars Side Weir Length : 300 m Crest Level : +70.400 m D/s F.S.L : +70.240 m Discharge : 6400 Cusecs Average Bed Level of River : +69.500 m Head Regulator Crest Level : +69.500 m Flood Flow Canal (from km 0.000 to km 5.214 i.e., up to Infall Regulator of Singidi Balancing Reservoir) Discharge : 8000 Cusecs Canal Section : 36.50 m x 5.084 m Bed Fall : 1 in 12,000 Canal Bed Level @ km 0.000 : +66.370 m Full Supply Level @ km 0.000 : +71.454 m Canal Bed Level @ km 5.214 : +65.936 m Full Supply Level @ km 5.214 : +71.020 m Singidi Balancing Reservoir T.B.L. : +73.870 m F.R.L. : +70.870 m M.W.L. : +72.370 m Storage Capacity : 0.0686 tmc Length of Earth Bund : 2.10 km Self Catchment Area : 12.608 Sq. km Water Spread Area @ F.R.L. : 0.799 Sq. km Flood Flow Canal (from km 6.834 i.e., Outfall Regulator of Singidi Balancing Reservoir to km 26.217 i.e., Infall Regulator of Parapuram Balancing Reservoir) Discharge : 8000 Cusecs Canal Section : 36.50 m x 4.45 m Canal Bed Level @ km 6.834 : +65.555 m Full Supply Level @ km 6.834 : +70.005 m Canal Bed Level @ km 26.217 : +63.940 m Full Supply Level @ km 26.217 : +68.390 m Parapuram Balancing Reservoir T.B.L. : +72.200 m F.R.L. : +68.240 m M.W.L. : +69.750 m Storage Capacity : 0.404 tmc Length of Earth Bund : 2.500 km Self Catchment Area : 13.19 Sq. km Water Spread Area @ F.R.L. : 2.565 Sq. km Flood Flow Canal (from km 29.127 i.e., Outfall Regulator of Parapuram Balancing Reservoir to km 33.107 i.e., Infall Regulator of Hiramandalam Reservoir) Discharge : 8000 Cusecs Canal Section : 36.50 m x 4.45 m Canal Bed Level @ km 29.127 : +63.082 m Full Supply Level @ km 29.127 : +67.532 m Canal Bed Level @ km 33.107 : +62.750 m Full Supply Level @ km 33.107 : +67.200 m / 67.050 m http://irrigationap.cgg.gov.in/wrd/getDistricts 11/28 10/31/2018 District Irrigation Profiles Hiramandalam Reservoir T.B.L. : +73.600 m F.R.L. : +67.056 m M.D.D.L. : +45.110 m Gross Storage Capacity : 19.359 tmc Live Storage Capacity : 16.685 tmc Length of Earth Bund : 7.20 km Self Catchment Area : 79.00 Sq. km Water Spread Area @ F.R.L. : 31.67 Sq. km

Irrigation Potential

The project is intended to create irrigation potential to an extent of 45,000 Acres and stabilization of existing ayacut under Left & Right Main Canals as follows.

1) Under Flood Flow Canal : 20,000 Acres.

2) High Level Canal : 5,000 Acres.

3) Right Main Canal (Sugarcane Crop) : 20,000 Acres

4) Stabilization Under existing Left & Right Main Canals : 2,10,510 Acres

The new & stabilizing ayacut exists in Palakonda, Pathapatnam, Amadalavalasa, Palasa, Tekkali, Narasannapeta, Srikakulam Assembly constituencies of Srikakulam District.

Land Acquisition and R & R

Total Land Acquisition involved is 11,542 Acres. 4 Nos of L.A Units have been establishment for L.A & R.R. 34 villages are affected under the proposed reservoirs. Socio Economic Survey is completed. 11,238 Acres of Land has been handed over to the Department. An amount of Rs. 233.01 Crores has been incurred towards Land Acquisition and Rs. 95.93 Crores under R&R. Land acquisition for important components has been completed.

3. Thotapalli Barrage Project http://irrigationap.cgg.gov.in/wrd/getDistricts 12/28 10/31/2018 District Irrigation Profiles

Preamble

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh have accorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012 for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including 15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13 Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres in Vizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli regulator and providing drinking water supply to 24 Villages en route of the canal by feeding 42 Nos. of tanks.

Salient features:

Source : River Nagavali (Langulya) Location : Thotapalli(v), Garugubilli (M),Vizianagaram District Catchment area : 4455 sqkm. Latitude : 18° 47' 30'' N Longitude : 83° 25' 24'' E Total available yield from catchment area : 44.000 TMC. Yield allocated for Andhra Pradesh as per Inter state Agreement : 16.000 TMC Proposed yield to be utilised in this Thotapalli Barrage Scheme : 15.895 TMC Storage capacity of Barrage at FRL/MWL (+105.00 Mts) : 2.509 TMC (71.05 M.Cum) C.C.A. Under this Project : 1,84,000 Acers Existing Ayacut (Khariff Paddy) : 64,000 Acres Proposed additional Ayacut (Ground nut in Khariff) : 1,20,000 Acres Spillway Type of spillway : Ogee Total length : 117 Mts No.of Radial Gates : 8 No.s Size of vent : 12.00Mts x 7.00Mts Crest level : +98.00Mts Designed Discharge : 3234Cumecs Foundation level : +87.50Mts Earth Dam Total Length : 8.20Km (Both sides) Top width : 6.00Mts Maximum height : 20.20Mts (R/S Earth Dam) F.R.L/M.W.L : +105.00Mts T.B.L : +109.00Mts M.D.D.L. : +100.00Mts Left Head Sluice http://irrigationap.cgg.gov.in/wrd/getDistricts 13/28 10/31/2018 District Irrigation Profiles Sill level : +97.00 Mts No.of vents : 2 No.s (Size 2.00Mx2.25M) Right Head Sluice Sill level : +97.40 Mts No.of vents : 2 No.s (Size 4.30Mx2.50M) Discharge : 34.23 Cumecs Length of Right Main Canal : 107.00 Kms

BRIEF NOTE ON THOTAPALLI BARRAGE PROJECT

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh have accorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012 for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including 15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13 Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres in Vizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli Regulator and providing drinking water supply to 24 Villages en route of the canal by feeding 42 Nos. of tanks.

New ayacut proposed 63,933 Acres

Existing ayacut stabilization 55,285 acres.

The total Mandals benefited are : Benefited Mandals : Regidi Amadalavalasa, Vangara, Rajam, Santhakaviti, G.Sigadam, Laveru and . Benefited villages : 132 Nos in Srikakulam District. Total Ayacut in Vizianagaram District (80973 Acres) Stabilized : 8715 Acres Proposed New Ayacut : 72258 Acres Total Ayacut in Srikakulam District (119218 Acres) Stabilized : 55285 Acres Proposed New Ayacut : 63933 Acres

The total yield available from catchment area at site is 32 TMC and the yield proportionally allocated to Andhra Pradesh state as per Inter State agreement dated: 15.12.1978 is 16.00TMC.

The Utilization is 15.890TMC

Description As per allocation of CWC As G.O.Ms. No .83 I&CAD PW Dt 15.11.2012 Irrigation 13.985TMC 15.485TMC Drinking water 0.320TMC 0.320TMC Industrial Demand 0.640TMC Notional Evaporation 0.945TMC 0.985TMC Total 15.890 TMC 16.790 TMC

Surplus water of Nagavali from the run of the river to be drawn during the flood season above FRL of Thotapalli Barrage (Phase 1 - M/S Alfa infraprop) 1.25TMC

Package-2

The Right Main Canal and distributory system from Km 52.45 to km 117.89 is awarded to M/s Maytas - NCC (JV) Hyd vide Agmt no. 5/2004-2005 for Rs. 170.02 Crores.

(A)Works Revised Estimate Amount : Rs. 179.56 Crores Agreement Value (PA&SE/TTPRC/5/2004-05 : Rs.170.02 Crores http://irrigationap.cgg.gov.in/wrd/getDistricts 14/28 10/31/2018 District Irrigation Profiles Dated 25.10.2004) Original Estimate Amount : Rs.178.56 Crores Rs.132.344 Crores (Including escalation, Seignorage Re-imbursement, Cumulative Expenditure up to 31.05.2013 : NAC, Labour cess) Value of work done up to 10.06.2013 : Rs. 132.928 Crores (Including escalation) Value of work done up to 10.06.2013 : Rs 120.716 Crores (Excluding escalation) Expenditure incurred during this year : Rs 0.865 Crores Further funds required : Rs 49.304 Crores (Excluding escalation) Bills pending at PAO : RS. 1.81 Crores As per Revised EPC Package 2 works : 179.56 Crores. Additional items POL s, Cement, Steel : Rs 9.98 Crores Labour Cess : Rs 1.76 Crores NAC/CMRF : Rs 0.1578 Crores Seignorage Re imbursement : Rs 0.8749 Crores Total excluding LA : Rs 192.333 Crore (B)Land Acquisition: SKLM VZM TOTAL Required : 1921Ac. 2529Ac. 4450 Ac. Requisitioned : 1819 Ac 2436 Ac 4255 Ac Requisition to be Submitted by the agency : 100 Ac 92 Ac 192 Ac Acquired : 1449 Ac 2019 Ac 3468 Ac Network (tentative) : 81511

COMPLETED MEDIUM IRRIGATION PROJECT

1. Sri Gorle Sriramulu Naidu Madduvalasa Reservoir Project

Preamble

Madduvalasa Reservoir Project is a Medium Irrigation Project for which envisages formation of Reservoir across Suvarnamukhi river a tributary of Nagavali River. The project is intended to serve an ayacut of 24,700 acres in 6 Mandals in Srikakulam District under Stage ( which was completed in the year 2002 and water is being supplied to the contemplated ayacut.

Salient Features

Name of the Project : Sri Gorle Sriramulu Naidu MadduvalasaReservoir Project Location : Near Madduvalasa Village,Vangara Mandal,Srikakulam District Longitude : 83° 37' 20'' E Latitude : 18° 35' 30'' N http://irrigationap.cgg.gov.in/wrd/getDistricts 15/28 10/31/2018 District Irrigation Profiles River : Suvarnamukhi Basin : Nagavali Catchment Area : 2536 sq.km Maximum Flood Discharge : 5590 cumec Max Designed discharge of spillway : NA Mean Annual Rain fall : 950 mm Yield available : 123.34 M.cum (4.356 TMC) Capacity of the Reservoir : 95.51 M.cum (3.372 TMC) Water spread area : 26.73 Msq.m ( 6600 Acers) Total Length of Dam : 2325.00 Meters Top width of Earth Dam : 5.00 Meters Full Reservoir Level : + 65.00 Meters Crest Level of Spillway Ogee : + 57.37 Meters Lowest Bed Level : + 52.30 Meters Gross Storage : 95.51 M.cum (3.372 TMC) Dead Storage up to MDDL : 1.83 M.cum ( 68M.cft) Live Storage : 93.58 M.cum ( 3305 M.cft) Gates : 11 Nos of Radial Gates of size 12.00Mt X 7.63 Mt Sill Level of Gate : + 57.16 Meters Top Level of Gates : + 65.096 Meters Length of Spillway : 159.50 mt Bucket invert Level : +46.00 Meters Lip wall Level : +47.60 Meters Surplus course Level : +52.31 Meters Width of Road way : 4.25 mt Iteam LMC RMC R.M.C.Extn Canal Length : 1.672 km 50.704 km 5.000 km Ayacut : 385 Ha(950 Ac) 9615Ha(23750Ac) 5058Ha.(12500Ac) Discharge at Head : 0.712 cumec 16.80 cumec 3.89 cumec Sluice No & Size of Vents : 1(0.60mt X1.00mt) 2(1.50mt X2.20 mt) ------Sill Level : +58.050 mt +56.850 mt +48.145 mt Bed Width : 1.50mt 12.20 mt 4.00 mt F.S.Depth : 0.63mt 2.15 mt 1.30 mt Bed Fall at Head : 1 in 4000 1 in 9000 1 in 4500 F.S.L.at Head : +58.780 mt + 59.000 mt +49.445 mt Velocity at Head : 0.376 m/sec 0.6406 m/sec 0.544 m/sec Budget for the Year 2015-16 : Plan - 5.0000 Crs. Total I.P created in Acres : 24,700

1.Madduvalasa Reservoir Project Stage-II:-

Preamble

Additional water requirement to Irrigate 12,500 Acres in stage II was calculated as per modified Penman method is 0.862 TMC and the total requirement is arrived as 4.730 TMC for entire ayacut will be within the limits of yield allocated by C.W.C. to Madduvalasa Project i.e. 4.960 T.M.C. It is proposed to create an additional ayacut of 12,500 acres duly extension of Right Main Canal for 5.00 KM distance and excavation of 2 distributories, benefiting 4 Mandals i.e. G.Sigadam(1395 Acres), Ponduru (4,933 Acres), Laveru(5010 Acres) and Etcherla(1075 Acres) total 12,500 Acres.

2. Offshore Reservoir Scheme on River Mahendratanaya:-

Mahendratanaya River is a tributary to the Vamsadhara River. The takes its origin near Tuparasingi (V) in Orissa State. The river Mahendratanaya travels 27 km in the state of Andhra Pradesh and joins Vamsadhara River at about 4 km above the Gotta Barrage at Gulumuru village. Out of 27 km, the river flows 19 km in Andhra Pradesh and about 8 km as common boundary between Andhra Pradesh & Orissa. http://irrigationap.cgg.gov.in/wrd/getDistricts 16/28 10/31/2018 District Irrigation Profiles The basin has a total drainage area of 1233 Sq.km till its confluence with Vamsadhara River. The Catchment Area is mostly hilly. The basin receives abundant supply under the influence of both the South-West and North-East monsoons with an average annual rainfall being 1126 mm (47'). Rainfall in this Catchment is erratic and high peaks of discharge occur for a few days in the monsoon period accounting for substantial part of the yield during the sub peaks. For effective utilization of the water, it is proposed to divert the flows in to a diversion channel, taking off from the River near Chapara Village of Meliaputti Mandal in Srikakulam District.

The Mahendratanaya River flows through a very backward region in Orissa and Andhra Pradesh states. The development of irrigation under this river is very meager till its confluence with Vamsadhara River.

There are no Inter State Agreements on utilization of water in Mahendratanaya River and there are no restrictions to utilize the share of water in the Vamsadhara basin.

However, for beneficially utilizing the waters in Vamsadhara Basin, the States of Orissa and Andhra Pradesh have agreed in 1962 that the yield of the river at Gotta will be about 115 TMC and that these waters shall be shared on half and half basis (vide D.O. Lr. No. Nil, dated 03.10.1962 from Sri B. Patnaik, Honorable Chief Minister of Orissa addressed to Sri N. Sanjeeva Reddy, Honorable Chief Minister of Andhra Pradesh).

Salient Features

Excavation of Flood Flow Canal taking off from Mahendratanaya River near Chapara Village of Meliyaputti Mandal in Srikakulam Dist. Formation of off-Shore Reservoir Name of Work : near Regulapadu Village and Formation of Canal net work from reservoir including Distributory network. Administrative Approval : G.O.Ms No.1, Dt. 04.01.2007 for Rs. 127.00 Crores Name of the Executing agency : M/s SVEC-INDU(JV), Agreement No / Value : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 Crores Ayacut contemplated : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 Crores 1) Excavation of Flood Flow Canal to develop an ayacut of 24600 Ac including construction of CM & CD works distributory System. 2) Construction of Head Components of the Scheme : Regulator 3) Formation of Reservoir with Spillway etc. at Regulapadu and canal distributory system. Length of the Flood Flow Canal : 13.60 km Design Discharge of the F.F.C : 1200 Cusecs No. of villages benefited : 108 villages in Nandigam, Meliaputti, Palasa & Tekkali Mandals Regulapadu Reservoir Length of the Earthen Bund : 2.485 Km F.R.L. of the Reservoir : + 52.500 M T.B.L. of the Reservoir : + 55.600 M Capacity of the Reservoir : 1.860 TMC Self Catchment of the Reservoir : 0.465 TMC Water Utilization Irrigation Requirements : 1.890 tmc Drinking Water Supply : 0.108 tmc Total : 2.000 tmc Total Water Availability 75% Divertible Yield from : 1.631 tmc Mahendratanaya River Self Catchment Yield of : 0.465 tmc Regulapadu Reservoir Total : 2.096 tmc Land Acquisition Total Land required : 2500 Ac Cumulative Expenditure up to : 53.93 Crs 5/2015 Budget for the Year 2015-16 : Plan - 6.0000 Crs.

Mandal-Wise Ayacut Particulars Of Offshore Reservoir Scheme On River Mahendratanaya

http://irrigationap.cgg.gov.in/wrd/getDistricts 17/28 10/31/2018 District Irrigation Profiles S.No Name of the District Name of the Mandal Contemplated Ayacut in Acres 1 Meliaputti 3890 Acres 2 Nandigama 12090 Acres Srikakulam District 3 Tekkali 1820 Acres 4 Palasa 6800 Acres Total 24600 Acres

Water User Associations (WUAs)

ABSTRACT S.No Name of the Project Name of the District Number of DC's Number of WUA's Ayacut in Acres I Major Irrigation a BRR Vamsadhara Project Srikakulam 08 54 145244 b Narayanapuram Anicut Srikakulam 05 25 37053 c Thotapalli Old Regulator Srikakulam & Vizianagaram 05 25 39544 total 18 104 221841 II Medium Irrigation a Pydigam Project Srikakulam -- 5 4986 III Minor Irrigation a M.I.Tanks/ Sources Srikakulam -- 398 135944 Grand Total 18 507 362771

Capacity Table of Gotta Barrage

http://irrigationap.cgg.gov.in/wrd/getDistricts 18/28 10/31/2018 District Irrigation Profiles S.No Elevation Area Mean Contour Capacity in between Cumulative Capacity Cumulative Capacity (m) (Sq.m) Area Interval Contours (Cubic (Million Cubic Capacity (Million (TMC) (Sq.m) (m) meters) meters) Cubic Feet) 1 34.00 1,28,000 10,88,000 1.00 10,88,000 2 35.00 20,48,000 1.088 38.42 0.038 24,83,200 1.00 24,83,200 3 36.00 29,18,400 3.571 126.11 0.126 49,89,600 1.00 49,89,600 4 37.00 60,60,800 8.560 302.29 0.302 87,68,000 1.00 87,68,000 5 38.00 1,14,75,200 17.329 611.97 0.612 1,41,34,400 1.00 1,41,34,400 6 39.00 1,67,93,600 31.463 1111.11 1.111 1,90,97,600 1.00 1,90,97,600 7 40.00 2,14,01,600 50.560 1785.51 1.790 2,35,87,200 1.00 2,35,87,200 8 41.00 2,57,72,800 74.147 2618.48 2.620 2,79,48,800 1.00 2,79,48,800 9 42.00 3,01,24,800 102.095 3605.45 3.605

Mahendratanaya Reservoir Project Offshore Reservoir At Regulapadu Contour Capacities

Interval Area Cumulative area Mean area Quantity Capacity in Capacity in Cumulative Contour REMARKS (m) (sqm) (sqm) (sqm) (cum) mcft tmc in tmc 1 2 3 4 5 6 7 8 9 10 32.000 33.000 1 40925.537 40925.537 0.000 0.000 0.000 0.0000 0.0000 34.000 1 89449.949 130375.486 85650.512 85650.512 3.025 0.0030 0.0030 35.000 1 206757.612 337133.098 233754.292 233754.292 8.255 0.0083 0.0113 36.000 1 276524.708 613657.806 475395.452 475395.452 16.789 0.0168 0.0281 37.000 1 315167.347 928825.153 771241.480 771241.480 27.236 0.0272 0.0553 38.000 1 270069.462 1198894.615 1063859.884 1063859.884 37.570 0.0376 0.0929 39.000 1 262243.935 1461138.550 1330016.583 1330016.583 46.970 0.0470 0.1398 40.000 1 252429.475 1713568.025 1587353.288 1587353.288 56.057 0.0561 0.1959 41.000 1 253600.239 1967168.264 1840368.145 1840368.145 64.993 0.0650 0.2609 42.000 1 264831.396 2231999.660 2099583.962 2099583.962 74.147 0.0741 0.3350 43.000 1 276360.225 2508359.885 2370179.773 2370179.773 83.703 0.0837 0.4187 44.000 1 305193.823 2813553.708 2660956.797 2660956.797 93.972 0.0940 0.5127 45.000 1 321171.896 3134725.604 2974139.656 2974139.656 105.032 0.1050 0.6177 46.000 1 396596.499 3531322.103 3333023.854 3333023.854 117.706 0.1177 0.7355 47.000 1 380678.208 3912000.311 3721661.207 3721661.207 131.430 0.1314 0.8669 48.000 1 377759.688 4289759.999 4100880.155 4100880.155 144.823 0.1448 1.0117 49.000 1 417459.505 4707219.504 4498489.752 4498489.752 158.864 0.1589 1.1706 50.000 1 482926.447 5190145.951 4948682.728 4948682.728 174.763 0.1748 1.3453 51.000 1 483584.500 5673730.451 5431938.201 5431938.201 191.829 0.1918 1.5372 52.000 1 504178.440 6177908.891 5925819.671 5925819.671 209.270 0.2093 1.7464 52.500 1 282911.674 6460820.565 6319364.728 3159682.364 111.584 0.1116 1.8580 Gross Capacity at +52.500 FRL is 1.858 TMC

Capacity Table Of Hiramandalam Reservoir (Dead Storage Level=45.110M, FRL= 67.056M) http://irrigationap.cgg.gov.in/wrd/getDistricts 19/28 10/31/2018 District Irrigation Profiles S.No Reservoir Elevation (m) Water spread Area (sqm) Water spread Area (Acres) Cumulative capacity in TMC 1 33 827585 204.50 2 34 2019569 499.05 0.049 3 35 2936614 725.65 0.136 4 36 3765774 930.54 0.254 5 37 4447698 1099.05 0.399 6 38 5216516 1289.03 0.569 7 39 5979256 1477.51 0.767 8 40 6873361 1698.44 0.993 9 41 7821375 1932.70 1.253 10 42 8730762 2157.42 1.545 11 43 9669704 2389.44 1.870 12 44 10770463 2661.44 2.230 13 45.11 11863322 2931.49 2.674 14 46 12573032 3106.86 3.058 15 47 13654961 3374.21 3.521 16 48 14734485 3640.97 4.022 17 49 15559254 3844.78 4.557 18 50 16454251 4065.93 5.122 19 51 17437685 4308.95 5.720 20 52 18316723 4526.16 6.352 21 53 19136852 4728.82 7.013 22 54 19832107 4900.62 7.701 23 55 20421987 5046.38 8.412 24 56 21297237 5262.66 9.148 25 57 22364529 5526.40 9.919 26 58 23138747 5717.71 10.723 27 59 23841223 5891.30 11.552 28 60 24615835 6082.71 12.408 29 61 25470321 6293.85 13.292 30 62 26288314 6495.98 14.206 31 63 27264989 6737.33 15.152 32 64 28241031 6978.51 16.132 33 65 29254888 7229.04 17.147 34 66 30439914 7521.87 18.201 35 67.056 31673177 7826.61 19.359

MINOR IRRIGATION

Minor Irrigation Statement Showing The Mandal Wise Ayacut Irrigated During Khariff- 2014 In respect of M.I.tanks/ sources and small M.I (P.R) tanks

M.I. Tanks/ Sources Small M.I. (P.R) Tanks Name of the S.No Mandal No. of Regd. Ayacut Irrigated Ayacut in acres No. of Regd. Ayacut Irrigated Ayacut in acres Sources in Acres during Khariff 2014 Tanks in Acres during Khariff 2014 1 Itchapuram 20 7462.76 7015.00 129 2585.78 1778.00 2 Kaviti 5 758.00 705.00 103 2195.46 1537.00 3 Kanchili 40 4531.24 4259.00 204 5312.35 3718.00 4 Sompeta 22 10250.26 9840.85 39 1045.38 1004.00 5 Mandasa 22 11930.62 11214.15 117 2786.65 2557.00 6 Palasa 14 2161.69 2075.00 90 2104.67 1999.00 7 Vajrapukotturu 3 254.23 244.00 169 3688.04 3523.00 http://irrigationap.cgg.gov.in/wrd/getDistricts 20/28 10/31/2018 District Irrigation Profiles 8 Santhabommali 3 397.50 374.00 179 4772.85 4486.00 9 Kotabommali 25 2833.12 2606.00 309 9471.00 8619.00 10 Nandigam 15 2024.90 1660.00 386 9460.52 7663.00 11 Tekkali 8 1441.87 1240.00 214 4873.95 4192.00 12 Meliaputti 22 6554.33 5374.06 196 3850.20 3119.00 13 Pathapatnam 27 5357.70 4393.00 233 5235.90 4293.00 14 Saravakota 24 5324.09 4685.00 325 7431.18 6435.00 15 Hiramandalam 19 1862.02 1527.00 143 2822.30 2286.00 16 Kotturu 82 8247.79 7341.00 304 6738.42 4852.00 17 Bhamini 74 6652.46 5721.00 182 4506.71 858.00 18 Seethampeta 5 891.67 731.41 175 2667.11 2160.00 19 Palakonda 4 2932.59 2874.00 34 679.89 659.00 20 Burja 123 8632.82 8546.22 169 3278.83 3213.00 21 Santhakavity 23 5649.72 5593.00 249 6061.33 5940.00 22 Rajam 54 5403.57 5187.00 277 5865.88 5631.00 23 Regidi 29 8655.67 8309.00 451 6787.35 6448.00 24 Vangara 6 1727.22 1178.00 218 3826.72 3635.00 25 Veeraghattam 1 309.46 300.00 89 1439.89 1382.00 26 L.N.Peta 20 3385.59 2945.00 148 5048.20 4392.00 27 G.Sigadam 93 7281.04 5534.00 227 3672.35 2754.00 28 Etcherla 5 728.59 306.00 105 1935.65 794.00 29 Laveru 65 5447.62 2258.00 218 4215.03 1728.00 30 Ranasthalam 46 2936.24 1263.00 314 5457.58 2339.00 31 Ponduru 13 1092.33 393.00 121 2420.20 861.00 32 Polaki ------132 2988.03 2928.00 33 Narasannapeta ------85 2451.03 2402.00 34 Gara 4 481.39 472.00 71 1214.95 1191.00 35 Srikakulam 9 1179.67 1144.00 139 3436.72 3368.00 36 Amadalavalasa 4 1096.46 877.00 228 4412.58 3530.00 37 Sarubujjili 23 3964.96 3410.00 67 2162.23 1860.00 38 Jalumuru 8 1088.34 1067.00 98 2628.88 2576.00 TOTAL 960 140930 122662 6937 151531 122710

Statement Showing The Particulars Under Minor Irrigation (M.I. Tanks/ Sources & Schemes)

M.I. Sources/ Schemes P.R.Tanks TOTAL S.No Constituency Name of the Mandal Nos Ayacut in Acres Nos Ayacut in Acres Nos Ayacut in Acres 1 Itchapuram 20 7462.76 129 2585.78 149 10002.76 2 Kaviti 5 758.00 103 2195.46 108 2953.46 Ichapuram 3 Kanchili 40 4531.24 204 5312.35 244 9843.59 4 Sompeta 22 10250.26 39 1045.38 61 11295.64 87 23002.26 475 11138.97 562 34095.45 5 Mandasa 22 11930.62 117 2786.65 139 14717.27 6 Palasa Palasa 14 2161.69 90 2104.67 104 4266.36 7 Vajrapukotturu 3 254.23 169 3688.04 172 3942.27 39 14346.54 376 8579.36 415 22925.90 8 Santhabommali 3 397.50 179 4772.85 182 5170.35 9 Kotabommali 25 2833.12 309 9471.00 334 12304.12 Tekkali 10 Nandigam 15 2024.90 386 9460.52 401 11485.42 11 Tekkali 8 1441.87 214 4873.95 222 6315.82 http://irrigationap.cgg.gov.in/wrd/getDistricts 21/28 10/31/2018 District Irrigation Profiles 51 6697.39 1088 28578.32 1139 35275.71 12 Meliaputti 22 6554.33 196 3850.20 218 10404.53 13 Pathapatnam 27 5357.70 233 5235.90 260 10593.60 14 Pathapatnam Hiramandalam 19 1862.02 143 2822.30 162 4684.32 15 Kotturu 82 8247.79 304 6738.42 386 14986.21 16 L.N.Peta 20 3385.59 148 5048.20 168 8433.79 170 25407.43 1024 23695.02 1194 49102.45 17 Bhamini 74 6652.46 182 4506.71 256 11159.17 18 Seethampeta 5 891.67 175 2667.11 180 3558.78 Palakonda 19 Palakonda 4 2932.59 34 679.89 38 3612.48 20 Veeraghattam 1 309.46 89 1439.89 90 1749.35 84 10786.18 480 9293.60 564 20079.78 21 Santhakavity 23 5649.72 249 6061.33 272 11711.05 22 Rajam 54 5403.57 277 5865.88 331 11269.45 Rajam 23 Regidi 29 8655.67 451 6787.35 480 15443.02 24 Vangara 6 1727.22 218 3826.72 224 5553.94 112 21436.18 1195 22541.28 1307 43977.46 25 G.Sigadam 93 7281.04 227 3672.35 320 10953.39 26 Etcherla 5 728.59 105 1935.65 110 2664.24 Etcherla 27 Laveru 65 5447.62 218 4215.03 283 9662.65 28 Ranasthalam 46 2936.24 314 5457.58 360 8393.82 209 16393.49 864 15280.61 1073 31674.10 29 Saravakota 24 5324.09 325 7431.18 349 12755.27 30 Polaki 0 0 132 2988.03 132 2988.03 Narasanna peta 31 Narasannapeta 0 0 85 2451.03 85 2451.03 32 Jalumuru 8 1088.34 98 2628.88 106 3717.22 32 6412.43 640 15499.12 672 21911.55 33 Burja 123 8632.82 169 3278.83 292 11911.65 34 Ponduru 13 1092.33 121 2420.20 134 3512.53 Amadala valasa 35 Amadalavalasa 4 1096.46 228 4412.58 232 5509.04 36 Sarubujjili 23 3964.96 67 2162.23 90 6127.19 163 14786.57 585 12273.84 748 27060.41 37 Gara 4 481.39 71 1214.95 75 1696.34 Srikakulam 38 Srikakulam 9 1179.67 139 3436.72 148 4616.39 13 1661.06 10 4651.67 223 6312.73 TOTAL 960 140930 6937 151531 7897 292461.00

NOTE ON SPECIAL INVESTIGATION DIVISION, SRIKAKULAM

The Government have sanctioned an amount of Rs.310.00 Crs G.O.Ms.No.01, I&CAD, Date.03-01-2007 for formation of Nagavali & Vamsadhara flood banks and entrusted the Vamsadhara flood banks packages- I, II, III & IV to this division for execution.

Name of the Agency :-

Vamsadhara Pkg -I, II & III : M/s Ramky Infrastructure Ltd, Hyd

Vamsadhara Pkg -IV : M/s. A.P.R. Construction, Hyderabad.

The details of works and its present status as follows:-

Major Irrigation Sector:-

1) Vamsadhara Package-I:- Formation of Flood Bank on Vamsadhara River on right margin from Bathili (V) to Keesari (V) of Bhamini (M) and Sirusuvada to Akulatampara (V) of Kotturu (M) in Srikakulam Dist. SE's Agt. No.5SE/2007-08, Dt.20.06.2007 for http://irrigationap.cgg.gov.in/wrd/getDistricts 22/28 10/31/2018 District Irrigation Profiles Rs.4477.00 Lakhs @ 15.30% Less than ECV. 9.42% of work completed and stopped since 06/2010. The Expenditure incurred sofar is Rs. 385.29 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 460.68 Acres, Land Acquired 82.40 Acres, Land to be acquired 378.08 Acres.

2) Vamsadhara Package-II:- Formation of Flood Bank on Vamsadhara River Left margin from Rugada to Karakavalasa (V) and Right margin from Gulumuru (V) to Scotpeta (V) of L.N.Peta (M) of Srikakulam Dist. SE's Agt. No.06SE/2007-08, Dt.20.06.2007 for Rs. 2729.00 Lakhs @ 15.311% Less than ECV. 3.76% of work completed and stopped since 03/2011. The Expenditure incurred sofar is Rs. 93.71 Lakhs as on 08/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 229 Acres, Land Acquired 32.12 Acres, Land to be acquired 196.88 Acres.

3) Vamsadhara Package-III:- Formation of Flood Bank on Vamsadhara river right margin from Scotpeta in L.N. Peta (M) to Sevakulapeta (V) of (M) and Navanambadu (V) in Srikakulam (M) to (V) in Gara (M) of Srikakulam Dist. SE's Agt. No.07SE/ 2007-08, Dt.20.06.2007 for Rs.4916.00 Lakhs @ 20.09% Less than ECV. 2.45% of work completed and stopped since 07/2010. The Expenditure incurred sofar is Rs.104.88 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 353 Acres, Land Acquired 167.94 Acres, Land to be acquired 185.06 Acres.

Present status:-

Vamsadhara packages-I,II & III:-

M/s Ramky Infrastructure Ltd, Hyderabad have represented to the government to pre-closure of EPC Agreements and proposals submitted to government Vide Chief Engineer, North Coast, Visakhapatnam letter No.CE/ NC/ VSP/ DEE1/ AEE5/ NCFB/Vol.12/ Dt.10.04.2013. (Package-I) & CE/ NC/ VSP/ DEE1/ AEE5/ NCFB/ Vol.13/1/ Dt.24.12.2013 & (Package-II & III)for taking further necessary action.

Final notice issued to the agencies to resume the balance works vide letter Nos.183-M, 184-M & 185-M/Dt.19.04.2015, 263- M, 264-M & 265-M/Dt.27.05.2015 and 280-M, 281-M &282-M/ Dt.02.06.2015for resuming the balance works in accordance with the G.O.Ms.No.22/ Dt.23.02.2015 and as per instructions of the Principal Secretary to Government, Water Resources (Reforms) Dept., Hyderabad vide Memo No.3810/Reforms/ A1/ 2015-2/ Dt.04.04.2015. But, agencies were not resumed the balance works till to day and report submitted to the higher authorities for taking further necessary action. Action will be initiated to re-call the tenders as per instructions of the higher authorities. The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide this office Lr.No.306-SE, 307-SE & 308-SE/Dt.19.06.2015 for approval.

4) Vamsadhara Package-IV:- Formation of Flood Bank on Vamsadhara river left margin from Karakavalasa (V) of Jalumuru (M) to Pallipeta (V) of Polaki (M) in Srikakulam Dist. SE's Agt. No.38SE/2009-10 for Rs.5660.01@ 4.5691% Excess over ECV. 14.2% of work completed. At present the work is in progress. 6th EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide letter No.305-SE/Dt.19.06.2015 for accorded approval from the Government. The Expenditure incurred sofar is Rs.789.27 Lakhs.

The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide this office Lr.No.305-SE/Dt.19.06.2015 for approval.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 381.88 Acres, Land Acquired 90.15 Acres, Land to be acquired 291.73 Acres.

Linking of Nagavali left main canal from Korukonda Distributory to voni gedda canal & improvements to Voni gedda canal for supplementation to the 7000 Acres ayacut under existing Vonigedda canal system

Administrative approval: Administrative approval was accorded by the Government vide G.O.Rt.No.286/ I&CAD/PW-M&MI A1(2) Department/ Dt.09.05.2013 for Rs.699.90 Lakhs.

Technical Sanction: Technical sanction was accorded by the Chief Engineer, North coast, Visakhapatnam for Rs.699.90 Lakhs vide CE(I) No.06/2013-14/ Dt.23.05.2013.

Agreement: The work was entrusted to M/s Harsha Constructions, Hyderabad vide Superintending Engineer, Irrigation Circle, Bobbili Agmt. No.06SE/2013-14/ Dt.12.02.2014 for Rs.538.11 Lakhs @ 12.34% Less than the ECV of Rs.6,13,86,760/- with an agreement period of 12 months. EOT granted upto 29.02.2016. http://irrigationap.cgg.gov.in/wrd/getDistricts 23/28 10/31/2018 District Irrigation Profiles Land Acquisition: The LP Schedules for an extent of 4.849 Acres of land were submitted to the Joint Collector, Srikakulam vide letter No.5R/Dt.06.02.2015.

Expenditure Incurred sofar: Rs.297.22 Lakhs.

Present Stage: At present the work is in progress.

HUD-HUD Cyclone - Major & Minor Irrigation October-2014: (G.O.Rt.No.727/Dt.10.11.2014.)

Administrative approval was accorded by the District Collector, Srikakulam vide proceedings No.2495/2014/D.3/Dt.10.01.2015 to take up 5 Nos. of Permanent Restoration for Rs.29.70 Lakhs. 3 works completed and balance 2 works are in progress.

Neeru-Chettu Programe:

Administrative approval was accorded by the District Collector, Srikakulam to take up 417 Nos. of De-silting & Improvements works to the MI.Tanks, Open head channels, Gedda systems, and Removal of Encroachments in foreshore areas to the MI.Tanks, De-silting & Improvement works to the Main & Branch channels of NLS system under Major Irrigation Sector having an ayacut of more than 100 Acres and less than 100 Acres (PR tanks) for Rs.2927.10 Lakhs. 100 works completed and balance works are in progress out of 164 works takenup. The Expenditure incurred under these works is Rs.503.10 Lakhs.

Minor Irrigation Schemes:

Estimate Agrt.No/Value Exp. Name of the S.No Value/ Sanction No. & Name of Incurred Present stage work Ayacut the agency sofar Formation of O.E - New M.I. tank Rs.214.84 14-SE/2003-04 Head works completed. The Revised Estimate across Lakhs G.O.Ms.No.60/ I&CAD Rs.156.51 proposals for the balance works with SSR 2014- Raikhillogedda Rs. R.E - Dept./ Dt.31.03.2003 Lakhs M/s. 15 were submitted to the CE/MI/HYD vide 1 near Devupuram 325.59 Rs.436.86 vide CE(I) No.256/ Venkata SE/IC/Bobbili Lr.No.667CE/ Dt.21.11.2014 for (V) Mandasa Lakhs Lakhs 2003-04/ Dt.01.08.2003. Ponduranga Rs.436.86 Lakhs for obtaining Revised (M) of Palasa 860 Const., VSP administrative approval from the Govt. Assembly Acres constituency Formation of O.E- Head works completed. The balance works i.e., Reservoir across Rs.195.16 02SE/2005-06/ Surplus course, Canals, CM&CD works etc., Kadagandi G.O.Ms.No.100/ Lakhs Dt.19.04.2005 were stopped by the contractor due to Land gedda near I&CAD Dept. Rs. R.E. Rs.105.56 acqusition problem. The Revised Estimate 2 Jambada (V) /Dt.20.09.2004 CE(I) 175.72 Rs.406.00 Lakhs M/s Proposals for the balance works with SSR 2014- L.N.Peta (M) of No.316/ 2004-05/ Lakhs Lakhs B.Prabhakara 15 submitted to the Government by the CE,MI, Pathapatnam Dt.29.12.2004 580 Reddy, Hyd. A.P., Hyderabad for Rs.406.00 Lakhs for Assembly Acres according Revised administrative approval. constituency 40% of work completed and stopped by the Formation of agency since 09/2012 and not submitted the Reservoir across O.E. 36SE/2006-07/ further EOT proposals for completion of the work Kondaloya Rs.377.00 Dt.29.03.2007 G.O.Rt.I&CAD(MI) even after issuing several notices. The Revised gedda near Lakhs Rs.307.45 Rs. No.17/ Dt.28.01.2006. Estimate proposals for the leftover quantites were 3 Bhamini (V) & R.E. Lakhs M/s 162.55 CE(I) No.18/ 2006-07/ submitted with SSR 2014-15 to the CE/MI/HYD (M) of Rs.890.00 Ratna Lakhs Dt.04.05.2006. vide SE's Lr.No.152-CE/ Dt.20.03.2015 for Palakonda Lakhs Constructions, Rs.890.00 Lakhs for obtaining Revised Assembly 988Acres Hyderabad administrative approval from the Govt. and for constituency. issuing instructions to determine the contract. 4 Conversion of O.E- G.O.Rt.No.1084/I&CAD 13SE/2010-11/ Rs. Contractor has completed 46.72% as on 05/2011 Gangasagaram Rs.611.00 (MI-1)/ Dt.26.06.09 Dt.01.06.2010. 180.78 and stopped due to non-handing over of the tank into Mini Lakhs CE(I) No.131&132/ Rs.418.82 Lakhs required land and other bottlenecks such as Reservoir near R.E- 2009-10 /Dt.19.01.2010 Lakhs M/s shifting of eletrical lines etc. Report submitted to Jalantrakota (V) Rs.766.40 (578.60 (W) + 32.40 R.Subba Raju, CE,MI,HYD vide SE's Lr. No.203-CE/ Kanchili (M) of Lakhs (L.A.) Contractor, Dt.16.04.2015. Revised Estimate proposals Itchapuram 845 Tilak Nagar, submitted to the SE/IC/Bobbili vide this office Assembly Acres letter No.293-SE/ Dt.04.06.2015 and returned the constituency same by the SE.,I.C., BBL vide Memo.No.129- SI/Dt.25.06.2015. The contract for the above http://irrigationap.cgg.gov.in/wrd/getDistricts 24/28 10/31/2018 District Irrigation Profiles work was closed by the Govt. vide Memo.No.9618/Dt.01.07.2015.

Mandal wise abstract of M.I. Tanks - Ayacut Irrigated during khariff 2014 in respect of SMI division, Seethampeta

S.No Mandal No. of M.I. tanks Ayacut ( in Acres) Ayacut irrigated 2014 1 Seethampeta 107 3395 2988 2 Palakonda 4 101 89 3 Veeraghattam 29 885 788 4 Bhamini 22 869 791 5 Burja 12 435 413 6 Sarubujjili 7 295 274 7 Kotturu 30 792 729 8 L.N.Peta 5 201 191 9 Hiramandalam 32 1065 990 10 Pathapatnam 31 893 839 11 Meliaputti 93 2677 2329 12 Saravakota 36 970 825 13 Jalumuru 3 85 68 14 Tekkali 20 608 517 15 Nandigam 22 727 582 16 Palasa 23 552 497 17 Mandasa 53 1590 1415 18 Sompeta 7 185 163 19 Kanchili 10 391 332 546 16716 14819

Mandal Wise Abstract Of Ayacut Partiulars of SMI Division, Seethampeta

No. of M.I. Ayacut ( in No. of Check Ayacut (in Total(MI Tanks & Check Total(Ayacut in S.No Mandal tanks Acres) dams Acres) dams) Acres) 1 Seethampeta 107 3395 273 7897 380 11292 2 Palakonda 4 101 4 155 8 256 3 Veeraghattam 29 885 11 295 40 1180 4 Bhamini 22 869 15 571 37 1440 5 Burja 12 435 7 185 19 620 6 Sarubujjili 7 295 8 197 15 492 7 Kotturu 30 792 12 316 42 1108 8 L.N.Peta 5 201 7 208 12 409 9 Hiramandalam 32 1065 32 864 64 1929 10 Pathapatnam 31 893 27 677 58 1570 11 Meliaputti 93 2677 46 1161 139 3838 12 Saravakota 36 970 12 317 48 1287 13 Jalumuru 3 85 1 22 4 107 14 Tekkali 20 608 8 207 28 815 15 Nandigam 22 727 6 165 28 892 16 Palasa 23 552 11 228 34 780 17 Mandasa 53 1590 16 581 69 2171 18 Sompeta 7 185 4 91 11 276 19 Kanchili 10 391 3 91 13 482 546 16716 503 14228 1049 30944 http://irrigationap.cgg.gov.in/wrd/getDistricts 25/28 10/31/2018 District Irrigation Profiles A.P.S.I.D.C.- Srikakulam District Details Of Commissioned Lift Irrigation Schemes - Assembly Constituency wise.

Envisaged Est. cost Sl. Name of the Date of Proposed Source Mandal Ayacut in (Rs.in Present stage No Scheme Commissioning under Acres lakhs) 1 2 3 4 5 6 7 8 9 A) TEKKALI Constituency: 1 Sripuram VLMC Kotabommali 600 93.47 Nov.2006 Working - 2 Kurudu VLMC - do - 1650 225.12 Sep.07 - do - - 3 Pedabammidi BC of VLMC - do - 1000 429.15 Sep.2012 - do - - 4 local pond - do - 50 3.50 July.03 - do - - 5 Podugupadu VLMC - do - 1000 840.39 July, 2013 - do - - Revival Works 6 Narayanavalasa VLMC - do - 1500 175.51 Sep.02 Partially working under progress 7 Kothapeta VLMC - do - 800 838.29 Oct.14 Working - Sub-total:- 6600 2605.43 B) NARASANNAPETA Constituency: 1 Lingalavalasa VLMC Jalumuru 1500 376.48 July.10 Working - 2 Jalumuru VLMC - do - 500 140.05 July.10 - do - - 3 Ramachandrapuram VLMC - do - 1300 330.05 July.10 - do - - N'peta B.C. of 4 Tekkalipadu Jalumuru 1250 766.53 Oct.14 - do - - VLMC 5 Bhadri VLMC Saravakota 600 149.88 July.10 - do - - 6 Thogiri VLMC - do - 1000 637.50 Sep.11 - do - - Revival Works 7 Cheedipudi VLMC - do - 450 20.35 Jun-94 - do - under progress 8 Odipadu BC.of VLMC Polaki 50 11.00 Oct.07 - do - - 9 Geddayyapeta BC.of VLMC Narasannapeta 90 49.04 July.11 - do - - Revival Works 10 Bydalapuram VLMC - do - 400 12.31 Oct-91 Partially working under progress Sub-total:- 7140 2493.19 C) ITCHAPURAM Constituency: 1 Pothangi Mahendratanaya Sompeta 200 68.89 Aug.2011 Working - 2 Kuthuma Beela (swamp) Kanchili 250 63.70 Sep.11 Working - Revival Not working. Fit for Works 3 Benkili - do - - do - 200 11.32 Sep-95 Revival under progress 4 Rushikudda - do - - do - 300 11.01 Nov-93 - do - - do - 5 Edupuram Bahuda Itchapuram 1200 127.37 Nov.03 - do - - do - Sub-total:- 2150 282.29 D) PALAKONDA Constituency: 1 Mukundapuram Peddagedda Seethampeta 190 62.12 Aug.2011 Working TSP Revival Works 2 Addakulaguda Isukagedda - do - 120 4.11 Apr-85 Partially working under progress 5 Kuddapali - do - - do - 75 11.91 Jul-00 - do - - do - http://irrigationap.cgg.gov.in/wrd/getDistricts 26/28 10/31/2018 District Irrigation Profiles 3 Manda Kambagedda - do - 200 5.92 Nov-87 - do - - do - 4 Engupeta Cheepurugedda - do - 100 6.29 Jun-92 - do - - do - Not working. Fit for 6 Neradi Vamsadhara Bhamini 500 13.85 Dec-92 - do - Revival 7 Chinamangalapuram Nagavali Palakonda 200 3.28 Sep-88 - do - - do - Abandoned. Ayacut 8 Manapuram Rellagedda - do - 100 6.58 Apr-92 covered under - Check Dam. 9 Kothakota - do - - do - 100 6.70 Jun-92 - Abandoned. Total 10 Liviri Vamsadhara - do - 100 5.00 June.02 schemes washed - away in floods. 11 Pasukudi - do - - do - 100 9.00 Sep.02 - Sub-total:- 1785 134.76 - - E) RAJAM Constituency: 1 Geethanapalli Suvarnamukhi Vangara 80 4.00 Aug.09 Working - Revival Not working. Fit for Works 2 Kinjangi Vegavathi - do - 450 3.43 Jun-05 Revival under progress Abandoned. Ayacut 3 Voni Nagavali - do - 300 12.07 Oct-93 covered under other - source Regidi 4 - do - Regidi 650 32.07 Aug-97 - Amadalavalasa Sub-total:- 1480 51.57 F) AMADALAVALASA Constituency: 1 Laxminarasupeta Vamsadhara L.N.Peta 500 11.30 May-95 Working - Naira Agriculture 2 - do - - do - 200 39.00 July.2002 working. - College,IFW's Sub-total:- 700 50.30 sub-total G) PATHAPATNAM Constituency: 1 Kittalapadu VLMC Hiramandalam 600 439.00 Aug.2012 Working - 2 Rugada Vamsadhara - do - 900 502.30 Sep.2012 - do - - 3 Makanapalli Mahendratanaya Meliaputti 200 29.62 Dec.2005 - do - - Not working. Fit for To be 4 Peddapadmapuram - do - - do - 350 25.60 Aug-94 Revival sanctioned Revival Not working. Fit for 5 Pathapatnam - do - Pathapatnam 250 10.00 Jul-99 Works taken Revival up Sub-total:- 2300 1006.52 H) SRIKAKULAM Constituency: Abandoned. Ayacut 1 Ponnam Vamsadhara Srikakulam 500 25.00 Jun-94 covered under other - source 2 Ronanki - do - - do - 1200 60.00 Jul-99 - Sub-total:- 1700 85.00 45 GRAND TOTAL 23855 6709.06

A.P.S.I.D.C.Division, Srikakulam. Srikakulam District - Mandal Wise Ayacut Details Under Lift Irrigtion Scheme

S.No. Constituency Mandal No. oF L.I.S's Ayacut in Acres 1 Tekkali Kotabommali 7 6600 http://irrigationap.cgg.gov.in/wrd/getDistricts 27/28 10/31/2018 District Irrigation Profiles 2 Narasannapeta Jalumuru 4 4550 Saravakota 3 2050 Narasannapeta 2 490 Polaki 1 50 3 Itchapuram Sompeta 1 200 Kanchili 3 750 Itchapuram 1 1200 4 Palakonda Seethampeta 5 685 Palakonda 5 600 Bhamini 1 500 4 Rajam Vangara 3 830 Regidi 1 650 5 Amadalavalasa L.N.Peta 1 500 6 Pathapatnam Hiramandalam 2 1500 Meliaputti 2 550 Pathapatnam 1 250 8 Srikakulam Srikakulam 2 1700 TOTAL :- 45 23655

Status of Budget & Expendiutre for the years 2013-14, 2014-15 & 2015 -16 inrespect of Chief Engineer, North Coast, Visakhapatnam

Name of Budget Expenditure Budget Expenditure Incurred Funds S.No Name of The Proejct Component 2014-15 Incurred 2014-15 2015-16 Upto 31.08.2015 Available MH : 106 Vamsadhara Project 1 Works 1895.69 1194.02 1780.00 677.56 1102.44 Stage -I Lands 10.00 -- 20.00 0 20.00 Total :- 1905.69 1194.02 1800.00 677.56 1122.44 MH : 131 Neradi Barrage 2 Works 488.00 166.07 3000.00 138.24 2861.76 Vamsadhara Stage-II Lands 301.00 63.67 2501.00 137.38 2363.62 R&R 1494.27 1385.04 779.00 726.41 52.59 Buildings 10.00 -- 20.00 0 20.00 Total :- 2293.27 1614.98 6300.00 1002.03 5297.97 3 MH: 143 Madduvalasa Project Works 304.99 172.01 300.96 73.62 227.34 Lands 250.00 7.12 199.00 67.55 131.45 R&R 0.04 -- 0.04 0 0.04 Total :- 555.03 179.13 500.00 141.17 358.83 MH: 245 Mahendratanaya River 4 Works 398.70 188.65 399.00 0 399.00 Flood Flow Canal Lands 600.00 387.57 150.00 339.02 -189.02 R&R 101.00 -- 51.00 0 51.00 Total :- 1099.70 576.22 600.00 339.02 260.98 NON - PLAN 5 MH: 115 Vamsadhara Stage-I Works 90.00 1.75 60.00 10.08 49.92 Total :- 90.00 1.75 60.00 10.08 49.92 MH: 129 Neradi Barrage 6 Works 20.00 4.04 6.00 0.39 5.61 Vamsadhara Stage-II Total :- 20.00 4.04 6.00 0.39 5.61

http://irrigationap.cgg.gov.in/wrd/getDistricts 28/28