wads wets wsrart wiferen cor Zeit / Tele: 0866-2483910 Cree ase atte rae Hate) Fee eae National Highways Authority of (Ministry of Road Transport & Highways) e Hate aaa wear, wigsea aa Office of the Regional Officer, Region ARAATAT AC..29, Gad Fel, TEAS AT aM, aay 20 oo¢ ATT SHARATMALA Plot No.21, Teacher's Colony, Gurunanak Nagar Road, -520 008. A.P. ROAD TO PROSPERITY

Lr.No NHAI/RO-VJA/1 1045 /NOC/2020-21f }94 Dt.25.01.2021

INVITATION OF PUBLIC COMMENTS

Sub: RO - Vijayawada - Permission for providing Drinking water supply scheme to Area of District - Laying of Drinking Water Pipelines along and across NH-16 from Km 484+000 to Km.532+100 in - Section of NH-16 in the State of Andhra Pradesh -Public comments - Reg.

The Project Director, PIU - submitted a proposal of Rural Water Supply and Sanitation Department, Govt. of Andhra Pradesh, Srikakulam for laying drinking water pipeline along and across NH-16 from Km.484:000 to Km.532+049 i.e. for a total length of 48.409 Km. including the length of 6 crossings for providing drinking water supply scheme to Uddanam area of .

As per MORTH guidelines vide letter No. RW/NH-33044/29/2015/S&R® dated 224 November 2016, the Highway Administration will put out the application in the Ministry’s website for 30 days seeking claims ‘and objections (on grounds of public inconvenience, safety and general public interest).

In view of the above, the comments of public, if any, on the above mentioned proposal is invited on below mentioned address.

Regional Officer - Vijayawada, National Highways Authority of India, Plot No,21, Teachers’ Colony, Gurunanak Nagar Road, Vijayawada, Andhra Pradesh. Pin: 520 008. Email: [email protected]

(R.K, Singh), Regional Officer RO - Vijayawada

F:\RO CORRESPONDENCE\PIU-VSP Corres\NOC.docx

Mae waters : s-5 Ua 6, Aeet-10, gent, AS fereit - 110 075. AaaIse : http:/www.nhai.org Corporate Office : G-5 & 6, Sector -10, Dwaraka, New Delhi - 110 075 Website : http://www.nhai.org AA TS MAT MUAH National Highways Authority of India

(ase Uae sie wT ATA) sma eet aa OF ROAD TRANSPORT & HIGHWAYS) BHARATMALA vitor (MINISTRY arate are (FH), LALA. TRA, PH ANZIG AAS, gram / Phone + 0894-2707600 Project — Unit (GQ), NHAI Enclave, KM 2/8 NH-16 , waa , emangor - 530 040, 2.8., AA ea rex No : 0891-2714118 Visakhapatnam - 530 040, A.P., India) | y) Hanumanthavaka, — -mail : [email protected]

Ref, No.: NHAI/PIU-VSP/Uddanam-WSPL/2020/ [9.5 J— wae Date : 08.01.2021

To Officer, The Regional lo JAN eel National Highways Authority of India Office, Plot No. 21, Regional U3 Teacher’s Colony, Gurunanak Nagar Road, VIJAYAWADA - 520 008

Project - Providing Drinking water supply Sub: NHAI, PIU, Visakhapatnam : Water Grid Laying of Drinking Water Pipelines scheme to Uddanam Area of Srikakulam District - - Proposal submitted - Reg. along and across NH-16 from Km 477.33 to 532.100

Permissions/AEE-2/220-21 dated 1 Letter No. 372/Uddanam Project/NHAI Ref: & S, Srikakulam 19.09.2020 of the Superintending Engineer, RWS dated 21 .09.2020 2. This office letter No. NHAI/PIU-VSP/IE/TOT/2020-21/5976 dated 20.10.2020 of the 3 Letter No. LION/IE-0819/2019/NHAI-SC-NIP/452 M/s LION Engineering Consultants. Independent Engineer, dated A, This office letter No. NHAI/PIU-VSP/TOT/RWS-Uddanam/2019/6234 26.10.2020 dated 5. Letter No. 372/Uddanam Project/NHAI Permissions/AEE-2/220-21 Superintending Engineer, RWS & S, Srikakulam 04.11.2020 of the dated 6. This office letter No. NHAI/ PIU-VSP/TOT/RWS-Uddanam/2019/6403 16.11.2020 dated 28.11.2020 of the 7. Letter No. LION/IE-0819/2019/NHAI-SC-NIP/485, Consultants Independent Engineer, M/s LION. Engineering water project/2020/6551 8. This office letter No. NHAI/PIU-VSP/TOT/Uddanam dated 04.12.2020 Permissions/AEE-2/220-21 dated 9. Letter No. 372/Uddanam Project/NHAI S, Srikakulam 08.12.2020 of the Superintending Engineer, RWS & 10. This office mail dated 18.12.2020 dated 23.12.2020 of the 11. Letter No. LION/IE-0819/2019/NHI-SC-NIP/508 Pvt. Ltd., Independent Engineer, M/s LION Engineering Consultants Superintending Engineer, RWS & 12. This office email dated 28.12.2020. addressed S, Srikakulam Permissions/AEE-2/220-21 dated 13: Letter No. 372/Uddanam Project/NHAI & S, Srikakulam 28.12.2020 of the Superintending Engineer, RWS Sir, RWS & S, Srikakulam vide letter 01" _ It is to submit that the Superintending Engineer Water Pipelines along and across cited has submitted the proposal laying of Drinking drinking water supply scheme to Uddanam NHAI from Km 477.334 to Km 532.100 under forwarded to the Independent Engineer Area of Srikakulam District which has been ietter 02" cited vide this office [Contd....2/p]

; : Building a Nation, Not Just Roads wa.6, Aaer-10, ara, a Re-110 075. ea Ae : http:\\www.nhai.org L fait sata : Wes, Corporate Office : G-5 & 6, Sector-10, Dwaraka, NEW DELHI - 110 075, Website : http:\\www.nhai.org wi28

. Vide reference 03 cited, the Independent Engineer. has communicated certain observations which have been communicated to the Superintending Engineer, RWS &S, Srikakulam vide this office letter 4'" cited. Vide letter 05‘ cited, the Superintending Engineer, RWS &S, Srikakulam has resubmitted the proposal which has been forwarded to the Independent Engineer vide this office letter 6 cited. A joint inspection has been carried out on 26.11.2020.

. The resubmitted proposal was not confirming to ministry’s guidelines. Hence, this office vide letter 08" cited while returning the proposal has requested the Superintending Engineer, RWS &S, Srikakulam for resubmitting the proposal as per the Ministry’s guidelines.

. Vide reference 09" cited, the Superintending Engineer, RWS &S, Srikakulam has submitted the proposal which has been forwarded to the Independent Engineer vide reference 10™ cited. The Independent Engineer vide reference 11" cited has furnished the comments / recommendations.

. Vide reference 12" cited, this office has communicated certain observations and requested for compliance of the same. Vide reference 13" cited, the SE, RWS & S has submitted the revised documents. -

. The proposed location falls under Ichapuram - Narasanneta Section of NH-16 which is under TOT mode. The consent has been furnished by the Concessionaire vide letter dated 09.10.2020. A copy of the same is enclosed herewith.

. The checklist submitted by the Executive Engineer PD-IIl, GVSCCL is duly verified and are found correct as per the requirement.

. The proposed site has been inspected and verified on 01.01.2021 and the points listed as per the guidelines prescribed in the MORTH and is hereby certified that all the standard conditions are being fulfilled. The drawings furnished have been verified at site. The following documents have been submitted by the agency:

(i) Checklist, (ii) Undertakings; (iii) | License Deed; (iv) | Methodology; (v) Details of structure falling in proposal (vi) Specification report (vii) License Fee (viii) Cross sections (ix) Strip plan - [Contd....3/p] a3

9. Keeping in view of the recommendation of the consultants, the proposal submitted by the RWS & S, Srikakulam for permission for Laying of Drinking Water Pipelines along and across NH-16 from Km 477.33 to 532.100 is herewith recommended for according necessary approval of the Competent Authority please.

Encl: Proposal in 2 sets (01 original + 01 duplicate)

Wfo1d B(L) WO VU A% AR 40 wee (4) se5euew “Ag

¢ é é 00S “SY X “SJIW GZ0‘GG"3"! (YIPIM / RIP ose 89 LE L WLWQQOL<) 19}8W J8}SW ayNOJ Jad -/QOG "SY X SETEW aINOY JO JOqUINN ]eIOL = Pej !Wqns aq 07 sajuRIeND yUeg SXUBWOJIad JO JUNOWY

, uolze]ND]e9 JUNOWY sajUeIeNyH YyUeg aDUeWIOLJed

(%EE.G06'6L‘88°L'SY “SE OLOZ “JSQUWIOAON ZZ :PEIEG (Y)YBS/SLOZ/6Z/PPOEE-HN/ MY 08S‘S0‘00‘L “ON 49339) SPIA saul] APNS HL YOW Jo G “ON JuLod Jad se saNAN yeLAsNpul yo YEE AWN DGNd 404) Rcecsseroneonoee=e-== YSAPPIg PIUPUY JO 3}e7S

OY} UL OOLZESG WY OF PEE LLP WY WO.) SaFHN $sOJoe pue suoje SoUljadid Jaye SULjULIG jo sulAe] 10} Aq ajqeAed saa y asus rt] je}0L

6£6°6L ‘EOE GZ baZEE GOS = SURAA G 10} S894 asUaDIT JeIOL

FZEE‘GO'S 2 ow | = mee - (Z1401)/828°6£°90'9 = (y}UOW/*sy) See 4 asUaI!7

828‘6£‘90°9 ‘ qunowly }2}0L ' : GZ0‘SS 12101

senee . . . ., {09 OSS* LES] LL OL LO09‘OL 69°9LL ELL 00°09 00000" ury 7e Bujssox

senat : . . . ; £ZL°9LSIOL OL" L09‘OL 69°9LL eLLhL 00°09 00000°+ | 00°09 wy 7e BuIssol

eperd . . 5 : ‘ 0£6"€0S 60°6EE‘L ZEZb LUTOL 00°09 00000"! | 00°09 dae BESSON) 6

er : ; F : ‘ 086°S6r 60°6EE‘L TEU LUZOL 00°09 00000°1 | 00°09 wie Sussory) 2

: ; ‘ ‘ . G76 €6r 60°6EE ene ‘LZ ZE7ZL LU 201 00°09 00000°1 | 00°09 wy 2e Suissa Z

er a . . . 009°98 ZB epepapes LESLE‘L 98°867‘Z €b°2Z6'L 00°09 00000" | 00°09 why 3 Buissou5 9

LU776‘S0'SL 69°9L1L el LFL OZ'EZS°8~ | 00009'L | OO°ZZE“S 6rO'7ZES | ZZZ"9ZS weindejyeyuarl ¢

85°696'90° LZ 69°9LL cL Leb 00°GZ6‘LL | 0000S"! | 00°0S6‘Z @L°97S | ZLL°815 weindejyeyuar}| +

Sr Ehz Or‘ LE LeCZb LU 0b og’ezs‘oe | 0000r'L | 00°zFS‘LZ @ZLBIS | 0£6°96F lAapeuuns}| ¢

0£°080‘78‘LO‘E 98°86Z‘Z €L°ZZ6'L 00'OEL‘EL —4 OOD0E"L | 00°00L‘OL 0€6°96r | O£8°98r esnyyndeneg] Z Zr OLS LZ 62‘Z 98°862‘Z €L'7Z6‘b 08°046‘6 000S0"L | 00°96r'6 €8°98P PEC LL esnyinderjeg) 1

(96L'E anuaaay Jad sy) = x pue, “bs sad ayey) pier *saqw “bs wy wy “sy “saqw'bs/"sy ul puey “bs/*sy UL pue] Jo Realy pue] “saw 0} Wwol} “ON

sysewcy qunowy JO ae a]DIID Buyleaaid ayer Suljleaaid HN P28ZzyIN | YIPIM | e3noy YUS7 aseureyD ase]IA JO OWEN | “1S

PLYsig We|NYeyLIS jo Baly WeUeppN 0} aWaYp?s Ajddns Ja3eM SUYULP JapuN OOL'ZES WY O} PEE’LZP WY WO) [YHN SSOJDe pue Suoje sauyjadig Jaze SULjULIG Jo BuLAe] 404 yesodoid junowy aeyueleny yueg R Saa4 asuadr7] Jo UOLe]ND]eD | - JUNXANNV { (

CIN No. U74999MP2020PTCOSO788 Project Office: Lion Engineering Consuitanis Sri Sobha Rani Nilayam, 2-4 Floor, Opp. Durga Temple,

Cee co ‘Hutiond in i its Bg tb ibe «linet Kushalpuram, (Mandal), FareedhiPeta (Post), Stikakulam()Disi(AP)-532410

Email:

Letter No. LION/IE-0819/2019/NHAI-SC-NIP/508 Dated 23.12.2020

To The Project Director, National Highways Authority of India AW PIU, Visakhapatnam

Km.2/8, Hanumanthavaka, VISAKHAPATNAM- 530040. Andhra Pradesh. rence Email:[email protected]

Sub: “Independent Engineer Services for National Highway Stretches under Bundle-1 of Tolling, Operation and Maintenance & Transfer (TOT) Projects in the state of Andhra Pradesh & Gujarat” - (IE Package-3 for the section Icchapuram - Narasannapeta (484+000 to 580+700) in the state of Andhra Pradesh Water Gird Project - Providing drinking water supply scheme to Uddanam area of Srikakulam District - Laying of Drinking Water pipelines along and across NHAI- Permission Check the personal and submit your detail Report- Reg

Ref: 1) Your Letter No NHAI/PIU-VSP/RWS-Uddanam/2019/6698 on dated:-18,12.2020

Dear Sir,

With reference to the above subject, The IE verified the documents of Rural Water Supply and Sanitation Department (RWS&S) Srikakulam for proposal seeking permission laying of Drinking water pipelines along and across NHAI from Km 477.334 to 532.100 (RHS), In Icchapuram, , Kanchili, Kavity, , Vajrapukotturu & in Srikakulam District , and submitting the report here with as per the guidelines issued by the Ministry vide letter no RW/NH-33044/29/2015/SER ® dated 22.11.2016.

1) The pn is regarding permission for pe water supply pipe line starts from

2) The ROW details as per available records are 60mts.

3) The proposal has been submitted with open trench method along the highway,

4) The NH crossings with HDD method of length 59 meters,

5) An agency has submitted previously through wide letter no Lr.Re.372 / Uddanam Project /NHAI - Permissions / AEE -2 /2020 -21 .Dt. 4/11/20 ,the Location Map ,Breef details of the project ,Agreement with Government of Andhra Pradesh , Details of layout drawing , Details of crossings & methodology for laying of pipe line across the highway - NH 16 from RHS to LHS. by HDD method. Details of traffic management & Details of. cross section

6) An agency has submitted now current letter no Letter.No: 372 / Uddanam Peed ie /NHAI - Permissions / AEE -2 /2020 “24 .Dated. 08/12/20, The necessary checklis with

in Kelet Road Bhogal 462142 (MP r

signature, undertaking for Bank Guarantee , Not to damage to existing structures / Other utilities , shifting of water pipe lines as and when required by MORTH at applicant’s own cost , shifting due to 6 laning / widening of NH .

7) The submitted licence fee estimate calculation are wrongly, The Revised calculation attached here with this letter,

Keeping in view of the above, IE opinion that, after receiving of signed copy of the revised calculation sheet from the agency , the permission may be accorded to Rural Water Supply and Sanitation Department (RWS&S) Srikakulam for proposal seeking permission laying of Drinking water pipelines along and across NHAI from Km 477.334 to 532.100 (RHS), In Icchapuram, Sompeta, Kanchili, Kavity, Palasa, Vajrapukotturu & Mandasa in Srikakulam District in the state of Andhra Pradesh,

However, the Competent Authority may take appropriate decision to permit.

Thanking You,

Yours sincerely,

For & On Behalf of M/s Lion Engineering Consultants Private Limited ¥ f AR tomy GE Y. Rajkumar Babjee 23| i) (Team Leader)

Enclosure:- Corrected Specification Report

Copy for information:

1) Corporate Office, Lion Engineering Consultants Private limited, Bhopal.

2) Authorized Signatories, Safeway Concessions, Pidimgoyyapanchayat, - : 533107 (EG). Email: [email protected]

pupj/ pees 34 BLIO SI} OF U3 70 ysiy / 23nd | POs ABA. 1 9g asD2 Us ‘SP7IMIPS 210? 24 sspgou, ayy Jo ans} J2 Syed | ‘yr JO 12 eS © 4s pasodosd 0 souEsPUt

PzePUey: uo}upuo> 49 pansst jaye BUyULP auuayos Arddns Ja7eM - supa guoye seusedid { ' 41 V2141L439

Check list for getting approval for laying of water supply pipe line Crossings @ Km. in the section of Itchchapuram-Srikakulam Section of NH16 in the state of AP .

S No Item Information/Status Remarks | General Information

. SE,RWS&S,Srikakulam 1.1 1 IN ame an d Address ress of of the the Applicant/A Applicant/Agency Circle i Srikakutam,AP a,

1.2. |National Highway Number NH-16 13 State AP . Itchchapuram-Palasa (Bendi ht. |bocation GateArea) Vizag Section of NH

. . 477/334 to 532/049--Along the 1.3 |(Chainage in km) NH-16 and Across the NH-16

1.6 |Length in Meters 54715 mtrs 1.7 Width of available ROW Enclosed (a) Left side from center line towards increasing chainage/kin direction . (b) Right side from center line towards increasing chainage/km direction

1.8 |Proposal to lay underground water Pipe Line ---

(a) Left side from Center ---

(b) Right side from center line yes

1.10 Whether proposal is in the same side where . land is not to be acquired yes If not then where to lay the pipeline --- La Details of already laid services, if any along _ ‘ the proposed route 1.12. |Number of lanes (2/4 / 6/8 lanes) existing 4 LB Proposed Number of lanes (2 lane with _ ‘ paved shoulders/4 / 6/8 lanes) _ 1.14 |Service road existing or not List -Enclosed = If yes then which side --- S (a) Left side from center line — s = (b) Right side from center line -—- © < é < 1.15 |Proposed Service road --- $ = : (a) Left side from center line -- a = z avin A Raion at Dal — Be Lee - ToT -TE cutive Engineer Superintending Enginee: cu each 1 RWS&S, Division Palasa RWS&S, Circle Srikakulam Neary gyri) sad (b) Right side from center line Whether proposal to lay Water Supply Pipe 1.16 line is after the Service road or between the Service road and main carriageway

The Permission fro laying of Water Supply Pipe Line shall be considered for approval / rejection based on the Ministry Circulars mentioned as above. (a) Carrying of Sewage / Water Supply pipelines on highway bridges shall not be permitted as Furmes / gases pipes can accelerate the process of corrosion may cause explosions, thus, being much more injurious than leakage of Water. (b) Carrying of gas Water pipe lines on bridges shall also be discouraged. However, if the watersupply authorities seem to have no other viable alternative and approach the highway authority well in time before the design of the bridge is finalized, they may be permitted to carry the pipeline on ACCEPTED independent superstructure, supported on extended portions of piers and abutments in such a manner that in the final arrangement enough free spade around the superstructure of the bridge remains available for inspection and repairs, etc —_ (c) Cost of required extensionsion of the substructure as well as that of the supporting superstructure shall be borne by the agency- in - charge of the utilities. (d) Services are not being allowed indiscriminately on the parapet/any part of the bridges , safety of the bridges, safety of the bridges has to be kept in view while permitting various services along bridge. Approvals are to be accorded in this regard with the concurrence of the Ministry's project CE only

YA: RS Bate “a renee Lee - TO -T oe — Saintes @uliva Engineer Superintending Engineer Nee () wld RWS&S, Division Palasa RWS8S, Circle Srikakulam Wary

t Director National Highways Authority of India P.i.U. VISAKHAPATNAM

If Crossings of the road involved If Yes, it shall be either encased in pipes or BY HDD-METHOD -WITH 1.18 through structure or conduits specially built /ENCASING -PROVIDED for that purpose at the expenses of the agency owning the line

(a) Existing drainage structures shall not be yes allowed to carry the lines.

(b) Is it on a line normal to NH yes

(c) Crossings shall not be too near the existing structures on the National Highway, MORE THAN 15 Mtrs the minimum distance being15 meter. What is the distance from the existing structures

(d) The Casing pipe (or Conduit pipe in the case of electric cable) carrying the utility line shall be of steel, cast iron, or reinforced yes cement concrete and have adequate strength and be large enough to permit ready withdrawal of the carrier pipe/cable.

(e) Ends of the Casing/conduit pipe shall be sealed from the outside, so that it does not yes act as a drainage path

(f) The Casing/conduit pipe should, as minimum extend from drain to drainin cuts yes and toe of slope toe of slope in the fills.

(g) The top of the Cassing/conduit pipe should be atleast 1.2meter below the surface Cross Section-Drawing-- of the road subject to being at least 0.3m Enclosed below the drain inverts.

(h) Crossing shall be by boring method (HDD) Specially where the existing road HDD pavement is of cement concrete or dense bituminous concrete type.

(i) The Casing/conduit pipe shall be installed with an even bearing throughout its COMPILED length and in such a maner as to prevent the formation of a waterway along it.

Y Ran Gade \- LGe ~TH-T 5 Exeedlive Engineer fsx &S, Division Palasa . gids Superintending RWSéS, Engine Circle Srikakulan, ANA SAUTE wala) Nak t— Prevéct Director National Highways Authority of India P.i.U. VISAKHAPATNAM Document/ Drawings enclosed with the Proposal Ane Crvssiny

Cross Section showing the size of trench for benckn the [Cp open trenching method (Is its normal size of tha wre] 1.2m deep X 0.3m wide) (i) Bhatt be Should not be greater than 60 Cm wider than ad the outer diameter of the pipe (ii) located as close to the extreme edge of the right-of-way as possible but not less than 15 ph 4 meter from the centre-lines of the nearest sph 4 2.1 Enclosed carriageway (iii) Shall i not be permitted to run along the National we [haa Mond Highways when the road formation is ath Nene situated in double cutting. Nor shall these be laid over the existing culverts and bridges (iv) These should be so laid that their top is at least 0.6meter below the ground levelso as not to obstruct drainage of the road land.

Cross section showing the size of pit and 2.2 Enclosed location of cable for HDD method

Strip Plan / Route Plan Showing Water Supply pipe line, Chainage, width of ROW, 2:3 distance of proposed, cable from the edge of Enclosed ROW, important mile stone, intersections, cross drainage works etc.,

Methodology for laying of showing Water 2.4 Enclosed supply pipe line.

Open trenching method. (May be allowed in utility corridor only where pavement is 2.4.1 neither cement concrete nor dense Enclosed bituminous concrete type. If yes,Methodology of refilling of trench

(a) The trench width should be at least 30cm, but not more than 60cm wider than Will be Complied the outer diameter of the pipe.

(b) For filling of the trench, Bedding shall be to a depth of not less than 30 cm. It shall Consist of granular material, free of lumps,

clods and cobbles and graded to yield a firm india Will be Complied

Of

surface without sudden change in the ¥ bearing value. Unsuitable soil and rock edged should be excavated and replaced by

APATNARy selected material. Director

fect ISAKH

Y, i

Hi WU, 4 Catton Be

Pi tee cn ant Weu —T2T -TL

Superintending we Nationa; Engineer ER yd at va Enolose: RWS6S, Circle Srikakulam "RWS8S, Division P

(C ) The backfill shall be completed in two stages (i) side - fill to the level of the top of Will be Complied the pipe and (ii) overfill to the bottom of the road crust.

(d) The side-fill shall consist of granular Material laid in 15cm layers each consolidated by mechanical tempering and controlled addition of moisture to 95% of the proctor's Density overfill shall be compacted to the same density as the material that had been removed. Will be Complied consolidation by saturation or ponding will not be perimitted. (e) The Road Crust shall be built to the same strength as the existing crust on either side of the trench, Care shall be taken to avoid the formation of a dip at the trench

(f) The excavation shall be protected by flagman, signs and barricades, and red lights Will be Complied during night hours.

(g) If required, a diversion shall be constructed at the expense of agency owning Will be Provided,if required the utility line Horizontal Directional Drilling (HDD) 2.4.2 HDD Method

Laying of Water Supply Pipe Line through 2.4.3 Separate Sheet -Enclosed CD Works and Method of laying

(a) On approaches, the gas mains/cables shall be carried along a line as close to the edge of the right-of-way as possible up-to a distance of 30m from the bridge and subject to all other stipulations contained in this Ministry's guidelines issued with letter No. NH-HI/P/66/76 dated 19.11.1976

Draft License Agreement signed by wo Enclosed

|two witness |

Paw be -toT TL aie ee — Sea xeeutiva Engines ” Superintending Engineer A RWS&S, Division Pal lasa RWS8&S, Circle Srikakulam ae ge ee

roject Director Hational Highways Authority of India P.i.U. VISAKHAPATNAM 3.1 3:2 Performance Bank Guarantee in favour of NHAT has to be obtained @Rs50/- per running meter(parallel to NH) and Rs 1,00,000/- per crossing of NH, for a period of one year initially (extendable if required till satisfactory completion of work) as a security for ensuring/making good the Will be provided ,After excavated trench for laying the cables/ducts Approval by proper filling and compaction, clearing debris/loose earth produced due to execution of tenching at least 50m away from the edge of the right of way .No payment shall be payable by the NHAI to the licensee for clearing debris/loose earth

Performance BG as per above is to be 4.1 obtained. After approval.

Confirmation of BG has been obtained as Will be obtained after 4.2 per NHAI guidelines submission of BG.---

Affidavit/ Undertaking from the Applicant for

Not to damage to ther utility, if damaged Enclosed 5.1 then to pay the losses either to NHAI or to the concerned agency

5.2 Renewal of Bank Guarantee Enclosed

Confirming all standard condition of NHAI's Enclosed a3 guidelines

Shifting of water supply pipe line as and Enclosed 5.4 when required by NHAI at their own cost

5.5 Shifting due to 6-laing / widening of NH Enclosed

Indemnity against all damages and clains Enclosed 5.6 clause (xxiv)

Traffic movement during laying os water Enclosed 37 supply pipe line to be managed by the applicant

EE,RWS&S,, DIVISION If any claim is raised by the Concessionaire 5.8 OFFICE, PALASA then the same has to be paid by the applicant

5.9 Prior approval of NHAI shall be before Enclosed

YW Rglowney Qe ToT “NS

foject Director nd ity of 0 India National i Highways igh Authority Pvi.U. VISAKHAPATNAM

alterations to the showing Water Supply Pipe Line located in the National Highway right-of-ways.

Expenditure if any incurred by NHAI for repairing any damage caused to the National EE,RWS&S,, DIVISION 5.10 Highway by the laying. Maintenance, or OFFICE, PALASA shifting of the water supply pipe line will be borne by the agency owning the line

If NHAI considers it necessary in future to move the utility line for any work of improvement or repairs to the road, it will be 5.11 carried out as desired by the NHAI at the UNDER TAKING IS cost of the agency owning the utility line ENCLOSED within a reasonable time (not exceeding 60 days) of the intimation given

Certificate from the applicant in the following format: (i) Laying of Water supply pipe line will not have any deleterious effects on any of the bridge components and roadway safety for traffic. (ii) 5.12 Enclosed for 6-laing " We do undertake that I will relocate service Road/ approach Road/ utilities at my own cost notwithstanding the permissiongranted within such time as will be stipulated by NHAI" for future six- laning or any other development.

Executive Engineer, Who will sign the agreement on behalf of Palasa,RWS&S,Division, Water Supply pipeline agency Srikakulam District.

Certificate from the Project Director

Certificate for confirming of all standard condition issued vide Ministry Circular No. Ministry Circular No. NH-41 (58)/(68) dated 31.1.1969, Ministry Circular No. NH- III/P/66/76 dated 18/19.11.1976, Ministry Circular No. RW/NH-III/P66/76 dated 11.5.1982, Ministry Circular No. RW/NH- 7.1 11037/1/86-DOI (ii) dated 28.7.1993, Enclosed Ministry Circular No. RW/NH- India

11037/1/86/DOI dated 19.1.1995, Ministry of Circular No. RW/NH-34066/2/95/ S& R dated 25.10.1999 and Ministry Circular No.

RW/NH-34066/7/2003 S7R (B) dated Authority

Director 17.9.2003 \

I> VISAKHAPATNAM

Project Highways

ge 4 2 glow GLP P.i.U. Suparintending Enginser ENA GTS \ Vee TL TOT yr

RW: tive Encinser National S&S, Circle Srikgkuiam ye Ae wi WS&S, Division Palasa

Certificate from PD in the following format (i) " It is certified that any other location of the Water Supply pipe line would be extremelydifficult and unreasonable costly and the installation of Water Supply pipe line withibn ROW will not adversely affect the design, Stability & traffic safety of the higway nor the likely future improvement such as widening of the carriageway, easing 7.2 of curve etc". (ii) for 6- Enclosed lanning (a) where feasibility is available "/ do ceryify that there will be no hindrance to proposed six- laning based on the feasibility report considering proposed structures at the said location" (b) In case feasibility report is not available : I do certify that sufficient ROW is available at site for accomodation proposed six-laning".

If NH section proposed to be taken up by NHAI on BOT basis - a clause is to be inserted in the agreement. "The permitted Highway on which Licensee has been granted the right to lay cable/duct has also been granted as a right if way to the Inserted concessionaire under the concession agreement for up- gradation of [ ------section from Km------to Km------of NH No.----- Build, Opearate and Transfer Basis] and therefore, the licensess shall honour the same." Who will supervise the work of laying of RWS&S,Quality water supply pipe line Control, Vijayawada »AP Who wil ensure that the defects in road Executive Engineer, portion after laying of Water Supply pipe 10 Palasa,RWS&S,Division, line are corrected and if not corrected then Srikakulam District. what action will be taken.

|

Executive Engineer, nia Who will pay the claims for damages done/ of Palasa,RWS&S,Division, disruption in working of concessionaire if Srikakulam District. asked by the concessionaire? ctor

Authority

Dire

A Certificate from PD that he will enter the YS proposed permission in the register of SAKHAPATNG

ject

yy

records of the permissions in the prescribed P

Highwa proforma (copy enclosed). I Pau, 4 2am Be spo aI

TT - TE “CE. Natong i ae “Ned oo tay Executive E; Rwsés, Circle Srikakuleant RWS&S, Division F Pala sa No Previous permissions were If any previous approval is accorded for accorded. laying of underground Water Supply Pipe line then Photocopy of register of records of permissions accorded as maintained by PD then copy be enclosed

Ae Gow yee 8 oi gi"

Exeeutive Engincer inolncne RWSSBS, Division Palage Superintending Engineer RWS&S, Circle Srikake nm

Ta 5 wT Project Director oe nut National Highways Authority of India P.i.U. VISAKHAPATNAM

Road Crossings through HDD 4. MpijnitnawCe & SERVice By RWSHS

From Km. (RHS)toKm. (LHS)Itchchpuram-Srikakulam(ICHCHAPURAM-VIZAG) Section of NH-16

Proposed- . 7 . S.No ; Chainape Location Work Procedure F easible ble Ch Chainage ENCLOSED SHEETS REMARKS

1 487.09 From Right to Left AT VUP-/486.600-487.0 Sheet-A

2 495.203 From Right to Left 495.980 cheers According to your

: HORIZONTAL Consultants(M/s.Lion Eng 3 anand From Right to Left 503.980 Sheet-C Consultants/SafeWay Concessions)

DISSE HONSL 4 516.723 i remarks,We ’ changed the locations Frou Right ‘€ 1.e8 DRIECING 516.723 Sheet-D of Pipe line Crossing- chainages

5 532.1 From Right ; to Left 531.850 Sheet-E .(Appended its Copies)

6 493.925 From Right to Left 498.025 Sheet

Ache Dy. Executiv q\ity ek niet Dy. Beécutive Engineer RWS& Execueve Engineer VS&S,Sub-Division \ Sompet Superintending Engineer NSES, Division Palasa i Palasa (Projects) RWS &S, Circle S rikakulam man our”

Man

Foundation

Precast

hole

Casing

ops

Casing

sobokiia

75

|

50mm

cover

Road-Ridge

Reception

thick

|RCC

wcuastoo

Pipe

Bottom,LvI-87,50

Pipe

.G.Lvl-91,

Pipe

900x90

Dia

Top.Lvl-84.50

a

Pit PCC

Bottom.LvI-83.268

Slab

h.

G.!

Ton

Lvl.

=

Bed |

a

Vent

100.00

|

Pipe L

Casing

FOR

Service-Road ||.

(\

pipe

300

,

co

$

Bottom

> SECTION

Lvl.

UDHAANAM

|

support

rf

96.714

Jpiets =

PIPE

cosrer

IAAAA

eS

pa

at

2000nm

Retaining

=

High

support

rein]

LINE

Casing

Carrier

coma,

AA

Density "yey"

avciding Y-Y

carrier EXISISTING

A

———

at

Wall

(

Pipe

Pipe

venun

+

LAYING

PROJECT

MAINTNANCE

pipe

Retaining

Location

Sra

-1000mm os

-1200mm

at

So

roxndoton

2000mm

ofthePipe

a

Wall

Spacers

TT

c/c

ACROSS

—"

VUP

TTT max.

to

casing

GrevenSecon

=

Ground

avoiding

&

---(FEASIBLE-AT

pipe

Service

3.00m

OF

=

Our

at

to

Lvl

A THE

the the

Centre

CHAINAGE

“OF

Depth

reat

Of

=

Pipe

Casing

|

| Road

Road

Casing NGL-91.00m

From

NATIONAL

By

=

Pipe-Inv

Line

of

Pipe

RWSKS,

Bottom

7.5m

Top

é

SECTION

= 486

cies

Will

-

LvI-84.5

Lvl-83.268

(

BENEATH

From

be HIGH

ac /600--487

of

SRikakutay].

[Fas

Crossed

Raft

Structure)

'X-x'

the

WAY-16.

Retaining

Foundation

OF

Natural

a

Wall

THE

the

s

a

NH-16

Ground

STRUCTURE)

SHEET.A

Service-Road

=~

NG

7s

Of

Lvl.

99.300

=

50mm

Fly

75

_

at

Level thick

a Dia

Over.(i.e.

Drive

Man

ma

em

PCC

Pit

G.I

Depth

hole

|

Vent

p

of Bed

feces

pre

,

cover

the Pipe

tRtc

of

LF

900x900

At

si

BS

ab

{ 4 MAINTNANCE &\SERvice. By KWS£S, Seiedieutam,

EXISISTING OF CHAINAGE 495 /203 SHEET.B PIPE LINE LAYING ACROSS THE NATIONAL HIGH WAY-16. (FEASIBLE) FOR UDHAANAM PROJECT Centre Of the Road |

Retaining Wall surface L-100,00m Retaining Wall

. ; 50mm 50mm Dia G.} Vent Pipe Gravel-Section Dia G.1 Vent Pipe Pp’

Man hole cover 900x900 n hole cover 900x900 Precast|RCC Slab Service-Road Service-Road

by we east Rec Stab SS Ground Lvl | NGL-91.00m TCE) | on

2 f 3 5 ai 1 | Foundation fe ___ _| Foundation Sill Lvl 87.5 _Foundation | | Casing Pipe -1200mm Casing Pipe Top Lvl-84.5 |

Carrier Pipe -1000mm

_———_- os —=— —= a at “pee at = = = = a _ es TL —=— st

ay ue

Lvl-83.268 seek Casing pipe Bottom Lvl. 96.714 % Casing Pipe-Inv - Lssishos 1 L_3000mm Lt | High Density Polyethylene Spacers to casing pipe to a 75 thick PCC Bed support carrier pipe at 2000mm c/c max. avoiding at 75 thick PCC Bed : joints Cenfre Reception he Rad Drive Pit SECTION ' X-xX<"' Pit

Road-Ridge Lvl. 100.00 Retaining Wall gopo Our Pipe Line Will be Crossed the NH-16 ata Depth of N.G.LvI-91.000 3.00m From Bottom of Raft Foundation Of Fly Over.(i.e. At 3500 MQ) Ratt Foundation Foundation Bottom, LvI-87,50 From the Natural Ground Level of the Casing Pipe Top.Lvl-84.50 3q A Depth of 7.5m + Pro, Ce 120mmG MLS i Casing | He, "4 Location + ofthePipe 7 pre tro MS Ctr 16 Structure) Casing Pipe Bottom.LvI-83.268 + seaport High erst cartier | pppa xt 2000mm Spacers cic to max. casing woking pipe al to SECTION 'Y-Y" he ( ST joi

Man

oe Precast|RCC

hole

tachg

Casing 5

[_sobetum

75

50mm yd = cover

.

Road-Ridge re Reception thick

Pipe

Ege 900x901 Dia

“a

Pit PCC

TenstAeD

Bottom.Lv-83.268 Slab ,

G.I

Lvi. =

| Bed

Vent =

100.00 _————

Pipe ipa ; Service-Road

4

sase

SECTION gate

=

a

\nupport

pe

PIPE

carla

pipe Feunaation =

at

joints A support

20000rm Retaining Soon High

LINE Carrier Casing

ce es

maxx. 15

= Density

'Y-Y"' =

avoiding

FEASIBLITY carrier ee

at Wall Pipe Pipe eee Polyethylene

LAYING ——

— pipe Te -1000mm -1200mm x at

rn 2000mm

Spacers a

FOR c/c Bitman

ACROSS max. to

AT casing Gravdl-

7!

UDHAANAM Ground avoiding Surf _ pipe

CHAINAGE

3.00m

Section =

Our __._| at to Lvl

A

THE the ihe Centre Cenire Depth mit Of

Pipe

| Road I Casing Foundation NGL-91.00m Casing usd

From

NATIONAL =

PROJECT

Line

of

503 Pipe-Inv Pipe

Bottom

7.5m sill Top SE SECTION Lv

Will

/980 - Lvl-84.5 Lvl-83.268 87.5

From

be

HIGH a

of

Crossed

Raft

Structure) | the — X-x°" san

WAY-‘16. Foundation Retaining ny

Foundation

Natural a ps _t Wall

the

|

SHEET.C

NH-16

Ground

Service-Road aE

Of 50mm

Fly 75

ata

Level thick Dia

Over.(i.e. Drive we PCC Pit

G.I

Depth n

hole ; | Vent

of Precast Bed

= = cover

the Pipe

p MM

of ROC i

At 900x900

Slab |

2

Man

Foundation

Precast|RCC

hole

Casing

3

Casing

75

50mm se

cover

Road-Ridge

Reception thick

Pipe

Bottom.

Pipe

or

900x90!

Dia

at

Pit

PCC

Bottom.Lvl-83.268 Slab

Top.Lvl-84.50

G.I

Lvi-87,50

Lvl.

-

Bed I Ni

Vent

100.00

=

--—

‘Casing Pipe

Service-Road pipe

ago

—-—

~~

4 Bottom Lvl.

-—-— ~~

oat

segs

support 96.714

PIPE

carro

cay

—--—-—--—---"-

“1

tle

pipe

Et =X

aacea

2000™m

Retaining

eee

ne

High

“Foundation

LINE

Casing Carrier

eke

max, ecioen

Density

=

avoiding

carrier

FEASIBLITY

oon

at

Wall Pipe

Pipe

Polyethyléne

LAYING

pipe

= -1000mm -1200mm

at

|

2000mm

Spacers

------

———~*~

FOR

c/c

ACROSS

max.

to

AT

casing Gravel-Section

a

UDHAANAM

Ground

avoiding

pipe

CHAINAGE

3.00m

-_

Our

er

at

to

Lv)

A

THE

the

Centre

Depth ination

:

Pipe

|

| Casing

a

Road

NGL-91.00m Casing

From

NATIONAL

ie

PROJECT Pipe-Inv

Line

of

516

Pipe Bottom

St

7.5m

Top

Li

SECTION a

/#23

Will -

LvI-84.5 LvI-83.268

87.5

From

be

HIGH

=

of

«|=

Crossed

Raft

Pa

Structure)

|

the —

X-X'

CPoundation”

et

WAY-16.

—--

Retaining

Foundation

Natural

—--—

1s

Wall

the —H

=

[OT

NH-16

Ground

a

SHEET.D

Service-Road

TLCS

Of

§

50mm

Fly

75

.

ata

=

Level

thick

Dia

Over.(i.e.

Drive

4

Man

=.

PCC

Pit

G.|

Depth

hole

| 7

Vent {____

of Precast

Bed

3000

cover

the

Pipe

mm

of

REC Ly

At

900x900

Slab

fs

FEASIBLITY AT CHAINAGE 531 /850 SHEET.E PIPE LINE LAYING ACROSS THE NATIONAL HIGH WAY-16. FOR UDHAANAM PROJECT Centre Of the Road |

Retaining Wall gitman H Retaining Wall

50mm Dia G.| Vent Pipe Gravel-Section 50mm Dia G.I Vent Pipe

Man hole cover 900x90 in hole cover 900x900 Precast|RCC Slab Service-Road Service-Road Lvl. 99.300 by ee east C Slab = — —__—_ x x __Ground Lvl NGL-91.00m NG

5 CT. TO Ssunmnon Foundation Sill Lvl- 87.5 NS ee Ss ei Se ey eed a it a k aT Casing Pipe -1200mm Casing Pipe Top LvI-84.5 | -

Carrier Pipe -1000mm et es a — 3 a a — = 7a mar = a = ae ot = a =)

salalaa Casing pipe Bottom Lvl. 96,714 \ Casing Pipe-Inv - Lvl-83.268 ipo L l 3000 MM_ | High Density Polyethyléne Spacers to casing pipe to x 75 thick PCC Bed a carrier pipe at 2000mm c/c max. avoiding at Cenire 75 thick PCC Bed Reception the Baad Drive Pit aie SECTION | X-x!' Pit

Road-Ridge Lvl. 100.00 Our Pipe Line Will be Crossed the NH-16 ata Depth of SO oe 3.00m From Bottom of Raft Foundation Of Fly Over.(i.e. At Foundation Bottom. LvI-87,50 » Gana Fs Ta Weed =p A Depth of 7.5m From the Natural Ground Level of the

Casing Pipe Bottom.LvI-83.268 t to omy fi pce nan Structure) SECTION (Y-¥.

rdle Si Poy (now

Man

Foundation

A

eer

a

hole

Casing

Casing

te

75

50mm

see cover

Road-Ridge

thick

Reception

Pipe

Pipe

wGLvot.000

Bottom

‘CC

;

900x900

Dia

-

;

PCC

Bottom.LvI-83,268

Top.Lvi-84.50

Slab

Pit

“Th

Lvl-87_50

G.|

Lvl.

Bee

Vent

100.00

[senor

|

oe

er

Pipe

7

ago

fou

ee

ees eee

PIPELINELAYINGACROSSTHENATIONALHIGHWAY—16.(FEASIBLE)

ee

=

Retaining

High

coe

Casing

Carrier

OM

oa

Density

a

7

EXISISTING

carrier

Pipe

P Wall

Pipe

:

Polyethylene

=

pipe

Location

me

“120mm ~y

n

-1000mm

at

2000mm

ofthePipe

FOR

Spacers

c/c

OT

max.

to

UDHAANAM

OFCHAINAGE

casing

Giava-Sacion an

Ground

avoiding

Surta!

HTHHttTEL

pipe

3.00m

A

Our

at to

Lvl

Depth the

Cenfre

the

Centre

°

41 Road of wo

Pipe Road

Casing

Casing Foundation

From

=

100.00m

PROJECT

of

Line

493/925

Pipe-Inv

Pipe

7.5m

Bottom

Sill

Top

a

Lvl-

Will

LvI-84.5

Lvl-83

87.5

From

-run_'x-x

be =

of 268

Raft Crossed

Stru

r

Fy

the

a

Retaining

Foundation

cture)

Foundation

Natural

!

a

Wall

=F

the

SHEET.F

|

NH-16

Ground

Service-Road

AG

Of

Lal

©9300

50mm

Fly

=

75

~

at

thick

Level

Over-.(i-e.

Dia

Drive

a

we

Mbn

PCC

Pit

G.I

Depth

TT...

H hole

Vent

Bed te

of

cover

Pipe

the

REC

of

At

900x900

=

i,

Slab

S

|

“LL~

“eB

ww ’e~ up

ipndnper

009

fe

& = 3

e1q

ww wosol=7 wieIMAeMLS apg

spguioug

902 e

IG

SLED

oy 5

buipusd

up opt eGnandedyeug 2PHD

ww eS?

oo¢

Y

c. One

é 5 : SBSMM

ea

SO nS

Ww

wSPlet 002

BG

wid

Bedwos

nau iy

ggz ye

9)-Aemybip

eg

wugoeig

WySle]

ul

“" moyeueeEr

[euOneN

=

umoogeg

WoOEss=]

'

UOISING-GNS'S

esEleARed (sipaforg)

8

g : . 7

saaynoax3

ereduiog a

mai ws SMH

euonien

‘Aq

“|

3

7 7 . “a

:

eeu6uy UOISIAIG-ans'secnay

=

(syoefoig)

by

aagnos

sven

&

d

(Ag. ZES) Sbyzes (H)