PROJECT MAPS/LISTS

HOW TO READ THE PROJECT MAPS

 As noted earlier in this chapter, projects  See below for a key to the that are “Constrained” within projected abbreviations. In addition, Planned funds are included in the following Projects, which have not secured maps. Projects that need new funds funding through the RTC, include a “P” above and beyond revenues anticipated in the project number. over the next 25 years are unconstrained and have not been  Projects may be shown on more than mapped. one map in some instances.

 There are 10 maps showing the Within  Some projects cannot be mapped and Projected Funds projects—two maps for are listed as “not mapped” on the each of five geographic areas. One of project list next to the maps. the maps shows projects which have already secured funds through the RTC,  Appendix B shows the descriptions and called “Programmed Projects”. Most are cost estimates for each project. Project expected to be completed by 2015. costs include environmental review, Other projects that could be constructed design, right-of-way and construction. or implemented over the next twenty- Due to revenue limitations, some five years are shown on the Planned projects cannot be fully funded with Projects maps. projected revenues.

 The project number contains an  Additional details on the Programmed abbreviation denoting the project projects can be found in the RTC’s sponsor or the agency responsible for Regional Transportation Improvement constructing the improvements. Program, available online at www.sccrtc.org/rtip.html.

PROJECT IDENTIFICATION ABBREVIATIONS

AIR Watsonville Municipal Airport CT Caltrans CAP City of Capitola CO County of Santa Cruz CTSA Consolidated Transportation Services Agency/Lift Line MTD Santa Cruz Metropolitan Transit District RTC Santa Cruz County Regional Transportation Commission SC City of Santa Cruz SV City of Scotts Valley UC University of California, Santa Cruz WAT City of Watsonville

2010 Regional Transportation Plan (RTP) p. 4‐19

Programmed Projects - Santa Cruz County Map

Mapped RTC-P01 SAFE: Call Box System Along Hwys CO 02 Graham Hill Road RTC-P07 SCCRTC Administration Improvements near Roaring (TDA) Camp RTC-P08 SCCRTC Planning CO 16b Wilder Ranch Bike/Pedestrian Path: Phase 2 CO 55 Lump Sum Road Repairs- 2010 CO 56 Bear Creek Rd Overlay CO 57 Soquel-San Jose Rd Overlay

CO 59 Empire Grade Road Overlay CT 03B Hwy 1/17 Merge Lanes - Landscaping RTC 01 Freeway Service Patrol (FSP) on Hwy 1 and Hwy 17 RTC 03 SC Branch Rail Line Acquisition, Corridor Preservation and Improvements RTC 24 Hwy 1 HOV Lanes (Morrissey to Larkin Vly Rd) RTC 28 Hwy 1 Auxiliary Lanes: Soquel Ave. to Morrissey Blvd. RTC 30 Hwy 1 Bicycle/Ped Overcrossing at Mar Vista Not Mapped

CO 50 Community Traffic Safety Coalition CO 50B South County CTSC Program MTD 18 Replacement Transit Fareboxes RTC 02 Commute Solutions Rideshare Program RTC 04 Planning, Programming & Monitoring (PPM) - SB45 RTC 16 Bike Parking Subsidy Program RTC 17 Ecology Action Transportation Program RTC 26 Bike To Work/School Program RTC 31 Park and Ride Lot Development RTC 32 Bicycle Route Signage

p. 4-20 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map.

BEA R CR 9 EEK 236|ÿ |ÿ RD|ÿ35 CO 55 CO 56 CO 55

N CREE SO K I R M D A J E É M P IR E G R A CO 59 D E |ÿ17 CO 55

CO 57 |ÿ17 |ÿ1 CO 55 SCOTTS RTC 01 G RA H VALLEY D A R M E

H S

I O L J L CO 02 N R D A S

L

CO 55 E SANTA CRUZ COUNTY

G U L Q EN

9 C O |ÿ A S N

Y

O

N

R RTC 28 CT 03B D RTC 24 RTC 01 SANTA CRUZ |ÿ1 RTC 30 RTC 03 |ÿ1 CO 55 |ÿ1 CAPITOLA F R E E D O M 152 |ÿ CO 16b B CO 55 PACIFIC OCEAN L

HOLOHAN RD WATSONVILLE MONTEREY BAY RTC 03 |ÿ1 129 Programmed Projects |ÿ (! Programmed Projects StateHighways Major Roads Miles Rail Line 0 5 10 Projects Programmed by SCCRTC (2010-2015)

2010 Regional Transportation Plan (RTP) Santa Cruz County Map p. 4-21 Planned Projects - Santa Cruz County Map

CO-P46b San Lorenzo Valley Trail: Hwy MTD-P33 Transit Security and Surveillance Mapped 9 - North Felton Bike Lanes & Systems Sidewalks CHP-P01 Hwy 17 Safety Program MTD-P35 Transit System Technology CO-P68 Thurwachter Road Bike Lanes Improvements CO 51 Corralitos Rd Left Turn Lane Metro facilities repair/upgrades (Bradley Elementary School) CT-P06 Hwy 1 Intelligent Transportation MTD-P36 System (ITS) Deployment CO-P03 Amesti Road Multimodal MTD-P43 Deviated Fixed-Route Pilot Improvements (Green Valley to CT-P06a Hwy 1 ITS: CCTV & Signs Program Brown Valley Rd) CT-P09a Hwy 9 Safety Improvements: RTC 24a Hwy 1 Ramp Metering CO-P04 Bear Creek Road Improvements Ben Lomond near Holiday Lane (Hwy 9 to Hwy 35) RTC 24b Hwy 1 Construction Authority CT-P09d Hwy 9 (HCA) CO-P08 Corralitos Road Rehab and Source Control Improvements (Freedom Blvd to RTC 24c Hwy 1 Ped/Bike Bridge at Hames Rd) MC-P1 Pajaro Rail Station Design and Chanticleer Construct CO-P09 East Cliff Drive Improvements RTC 24d Hwy 1: Revise Interchanges (41st Ave to Harbor) RTC 24 Hwy 1 HOV Lanes (Morrissey to Larkin Vly Rd) RTC 24e Hwy 1 Auxiliary Lanes: CO-P10 Empire Grade Improvements Bay/Porter to Park Avenue CO-P11 Freedom Blvd Multimodal Not Mapped RTC 24f Hwy 1 Auxiliary Lanes: 41st Improvements (Bonita Dr to City Avenue and Soquel Avenue Traffic Management of Watsonville) CHP-P02 RTC 24g Hwy 1 Auxiliary Lanes: State CO-P12 Green Valley Road CO-P35 Countywide General Road Park Dr. to Park Ave. Improvements Maintenance and Operations RTC 27 Monterey Bay Sanctuary Scenic CO-P14 La Madrona Dr Improvements CO-P37 Countywide Access Ramps Trail Network (El Rancho Dr to City of Scotts RTC-P03 Rail Line Management Valley) CO-P41 Countywide Sidewalks Senior Employment Ride CO-P17 Sims Road Improvements CT-P29 Lump Sum SHOPP: Roadway RTC-P43 (Graham Hill Rd to La Madrona Preservation on State Hwys Reimbursement Dr) Regional Land CT-P30 Lump Sum SHOPP: Collision VAR-P01 CO-P19 Soquel Dr Improvements (Soquel Reduction Use/Transportation Study Ave to Freedom Blvd) Mobility Management Center CT-P30b Lump Sum SHOPP: Legal VAR-P04 CO-P22 Paul Sweet Road Improvements Mandates (Soquel Dr to end) VAR-P08 Safe Paths of Travel CTSA-P01 Countywide Specialized CO-P26m Glen Canyon Rd Improvements Transportation VAR-P10 Safe Routes to Schools Studies (Branciforte Dr to City of Scotts Valley) CTSA-P04 Medically Fragile Specialized VAR-P13 Lump Sum Emergency Response Transportation Seascape Blvd Improvements CO-P26s VAR-P14 Lump Sum Bridge Preservation (Sumner Ave to San Andreas Rd) CTSA-P05 Agricultural Worker Transportation Program CO-P27f Mill St Improvements (entire VAR-P18 Mission St/Hwy 1 Bike/Truck length) MTD 02 ADA Paratransit Bus Safety Campaign Replacements CO-P27h Paulsen Rd Improvements VAR-P19 Safe Routes to School Programs (Green Valley Rd to Whiting Rd) MTD 15 Bus Trip Planner - Advanced Traveler Information System CO-P27l Winkle Ave Improvements (entire length from Soquel Dr) MTD-P04 Metro Bus Replacements CO-P28d Felton Empire Road MTD-P06 Transit Technological Improvements (entire length to Improvements State Hwy 9) MTD-P10 Local Transit - Continuation of CO-P28h Thurber Ln Improvements (entire Existing Service Levels 2010- length) 2035 CO-P28i Varni Rd Improvements MTD-P10 Hwy 17 Express Service - Cont. (Corralitos Rd to Amesti Rd) of Existing Service Levels CO-P36 Soquel-San Jose Rd MTD-P10 ADA Paratransit Service - Improvements (Paper Mill Rd to Continuation of Existing Service Summit Rd) MTD-P30 ParaCruz Scheduling Software; CO-P46 San Lorenzo River Valley Trail Mobile Data Terminals; Radios

p. 4-22 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map.

9 236|ÿ |ÿ |ÿ35 CO-P04 D R K E E R C É

R E A M BE P IR E G R A D E |ÿ17 CO-P27f CT-P09d CO-P10 CT-P09a |ÿ17 CO-P36 CO-P46b

1 FELT D O R |ÿ N EM CO-P46 E P CHP-P01 S IRE R O D J G R N AH AM A S H IL L L CO-P26m E

CO-P28d R CO-P12 D U Q O CO-P22 S CO-P14 G SANTA CRUZ COUNTY LE N C 9 A CO-P28h |ÿ N CO-P27l Y

O

N

R

CO-P17 D CO-P19 CO-P08 |ÿ1 CT-P06 CO 51 CO-P03 CT-P06a |ÿ1 1 RTC 24 CO-P27h |ÿ FREEDOM BL CT-P06a 152|ÿ PACIFIC OCEAN CO-P09 CO-P26s CO-P11 CO-P28i MONTEREY BAY |ÿ1 129 Planned Projects |ÿ (! Planned Projects StateHighways (! MC-P1 Major Roads Miles Rail Line 0 5 10 CO-P68 Within Projected Funds: Planned Projects (2010-2035)

2010 Regional Transportation Plan (RTP) Santa Cruz County Map p. 4-23 Programmed Projects - Capitola/Soquel/Aptos Map

Mapped

CAP 12 38th Avenue Reconstruction CO 36 State Park Drive/Seacliff Village Improvements CO 58 Soquel Drive Overlay RTC 01 Freeway Service Patrol (FSP) on Hwy 1 and Hwy 17 RTC 03 SC Branch Rail Line Acquisition, Corridor Preservation and Improvements RTC 24 Hwy 1 HOV Lanes (Morrissey to Larkin Vly Rd) RTC 30 Hwy 1 Bicycle/Ped Overcrossing at Mar Vista

p. 4-24 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. Figure xx.

TROUT GULCH RD VALENCIARD

FAIRWAY DR D R SOQUEL SAN JOSE RD É H C UL R G RTE PO PERIMETER RD

MAIN ST APTOS CREEK RD SOQUEL PARK AV SOQUEL DR SOQUEL DR R D E G RTC 24 E L L RTC 1 O PORTERST C C CO 58

ABRILL O C

ÿ1 A | RTC 30 T H

BAY AV |ÿ1 E

D

SOQUEL WHARF RD R A L

CAPITOLA AV D VALENCIA RD R CLARES ST

PARK AV MONTEREY AV MAR VISTA DR SEARIDGE RD RTC 03 APTOS

41ST AV SEACLIFF DR CENTER AV SOQUEL DR CAP 12 CAPITOLA RD FREEDOM BL RIO DEL MAR BL 30THAV BROMMER ST JADE ST SEACLIFF DR BONITA DR1 CAPITOLA CO 36 CLUB HOUSE DR |ÿ CLIFF DR TOWNSEND DR CLIFF DR R D F LIF C L PORTOLA DRA P O RTC 03

MONTEREY BAY CLIFF DR

38THAV SUMNER AV

PINEHURST DR

Programmed Projects

(! Programmed Projects DOLPHIN DR Major Roads

StateHighways SEASCAPE BL Miles Rail Line 0 0.5 1 Projects Programmed by SCCRTC (2010-2015)

2010 Regional Transportation Plan (RTP) Capitola/Soquel/Aptos Map p. 4-25 Planned Projects - Capitola/Soquel/Aptos Map

Mapped CO-P27l Winkle Ave Improvements (entire length from Soquel CAP-P04 Park Avenue Sidewalks Dr) CO-P28g Soquel-Wharf Rd CAP-P04b Capitola Village Multimodal Improvements (Robertson St Enhancements - Phase 2/3 to Porter St) CAP-P12 Monterey Avenue CO-P30d Cabrillo College Dr. Multimodal Improvements Improvements (Park Ave to CAP-P16 Clares Street Pedestrian Twin Lakes Church) Crossing west of 40th Ave CO-P30n Rio Del Mar Blvd. CAP-P22 Brommer Street Sidewalk Improvements (Esplanade to and Bike Lanes State Hwy 1) CAP-P23 McGregor Drive Park and CO-P31g Opal Cliff Dr. Improvements Ride Lot Improvements (41st Av to Portola Dr) CAP-P24 Pacific Cove Expansion for CO-P33c Esplanade Improvements Park-N-Ride Lot (entire loop: Aptos Beach Dr to Moosehead/Aptos Beach CO 24 East Cliff Dr. Bike/Ped Path: Dr) 32nd-41st CO-P36 Soquel-San Jose Rd CO-P09 East Cliff Drive Improvements (Paper Mill Improvements (41st Ave to Rd to Summit Rd) Harbor) CT-P06 Hwy 1 Intelligent CO-P11 Freedom Blvd Multimodal Improvements (Bonita Dr to Transportation System (ITS) Deployment City of Watsonville) CT-P06a Hwy 1 ITS: CCTV & Signs CO-P18 Soquel Ave Improvements (City of SC to Gross Rd) RTC 24 Hwy 1 HOV Lanes CO-P19 Soquel Dr Improvements (Morrissey to Larkin Vly Rd) (Soquel Ave to Freedom RTC 33 Go Green Cabrillo College Blvd) CO-P20 State Park Drive Not Mapped Improvements Phase 2 CAP-P06 Citywide General CO-P26a 41st Ave Improvements Maintenance and Operations (Hwy 1 Interchange to Soquel Dr) CAP-P27 Wheelchair Access Ramps CO-P26h Center Ave/Seacliff Dr Improvements (State Park Dr to Aptos Beach Dr) CO-P26s Seascape Blvd Improvements (Sumner Ave to San Andreas Rd) CO-P27a 38th Ave Improvements (UPRR to E. Cliff Dr) CO-P27e Main St Improvements (Porter St to Cherryvale Ave) CO-P27i Pinehurst Dr Improvements (entire length) CO-P27j Seacliff Dr Improvements (entire length) CO-P27k Spreckels Dr Improvements (Soquel Dr to Aptos Beach Dr)

p. 4-26 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. Figure xx.

TROUT GULCH RD CO-P27l VALENCIARD

FAIRWAY DR D R SOQUEL SAN JOSE RD É H C UL R G CO-P36 RTE PO PERIMETER RD

MAIN ST APTOS CREEK RD SOQUEL PARK AV (! SOQUEL DR RTC 33 SOQUEL DR R D E G CO-P28g E L CO-P26a CO-P27e CT-P06a CO-P30d L O PORTERST C C

ABRILL O CO-P19 C

ÿ1 A

| (! T H

BAY AV RTC 24 |ÿ1 E D CO-P18 SOQUEL WHARF RD R A L CAP-P23 CAPITOLA AV D VALENCIA RD R CLARES ST (! CO-P26h CO-P11 PARK AV CAP-P16 MAR VISTA DR MONTEREY AV SEARIDGE RD CO-P19 CAP-P04 (! APTOS 41ST AV CAP-P24 CAP-P12 CO-P27j SEACLIFF DR CENTER AV SOQUEL DR CAPITOLA RD CT-P06 CAP-P22 CO-P27k FREEDOM BL

30THAV RIO DEL MAR BL BROMMER ST JADE ST CO-P20 SEACLIFF DR BONITA DR1 CAPITOLA CLUB HOUSE DR |ÿ CLIFF DR CO-P30n CAP-P04b TOWNSEND DR CLIFF DR R CO-P27j D F LIF C L CO-P33c PORTOLA DRA CO-P27a P O MONTEREY BAY CLIFF DR CO-P31g

38THAV SUMNER AV PINEHURST DRCO-P27i

CO-P09 Planned Projects

(! Planned Projects DOLPHIN DR CO 24 StateHighways

Major Roads SEASCAPE BL Miles Rail Line 0 0.5 1 CO-P26s Within Projected Funds: Planned Projects (2010-2035)

2010 Regional Transportation Plan (RTP) Capitola/Soquel/Aptos Map p. 4-27 Programmed Projects - Santa Cruz/Live Oak Map

Mapped

CT 03B Hwy 1/17 Merge Lanes - Landscaping MTD 01B MetroBase - Operations Facility RTC 01 Freeway Service Patrol (FSP) on Hwy 1 and Hwy 17 RTC 03 SC Branch Rail Line Acquisition, Corridor Preservation and Improvements RTC 24 Hwy 1 HOV Lanes (Morrissey to Larkin Vly Rd) RTC 28 Hwy 1 Auxiliary Lanes: Soquel Ave. to Morrissey Blvd. SC 07 Broadway-Brommer Bike/Ped Path (Arana Gulch Multiuse Path) SC 40 West Cliff Drive Path Repairs

SC 43 Beach Area Roundabout

SC 43a West Cliff/Pacific Ave Roundabout SC 44 Lump Sum Pavement Repairs - Citywide (Phase 2 ARRA)

p. 4-28 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to

the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. R

D OCEAN ST EXT BROOKWOOD DR

ISBEL DR B

R E R

L A L

CT 03B N

E MCLAUGHLIN DR G C EMPIRE GRADE

H R I

A F

H RTC 01 O

A R

M T

17 E

|ÿ D

H UPPER PARK RD É PROSPECT HEIGHTS I R L L

|ÿ9 RD (! RTC 01 THURBER LN MTD 01B RIVER ST |ÿ1 |ÿ1 SOQUEL DR HAGAR DR

EMELINE ST RTC 28 SANTA CRUZ MARKET ST

SPRING ST RTC 24 RTC 01 MORRISSEY BL R E D G WATER ST SOQUEL AV D I 1 N. BRANCIFORTE AV L |ÿ O HIGHLAND AV FREDERICK ST O

C

SEABRIGHT AV HIGH ST SC 07 CAPITOLA RD 17TH AV CLARES ST

SOQUEL AV

S. BRANCIFORTE CHANTICLEER AV BAY DR PACIFIC AV BROADWAY SC 44 WALNUT AV CAPITOLA RD OCEAN ST FRONT ST

WESTERN DR

NOBEL DR LINCOLN ST 7TH AV LAURENT ST LIVE OAK KING ST |ÿ1

BROMMER ST 30THAV

LAUREL ST CENTER ST RIVERSIDE AV SC 44 SC 44 MURRAY ST BAY ST LAKE AV RTC 03 CALIFORNIA ST (! 2ND ST SC 43 EAST CLIFF DR EAST CLIFF DR ESCALONA DR MISSION ST (! BEACH ST PORTOLA DR |ÿ1 GRANDVIEW ST RANKIN ST

MISSION ST ALMAR AV CALIFORNIA AV FAIR AV SC 43a

WOODROW AV

COLUMBIA ST

30THAV

SHAFFER RD DELAWARE AV

SWIFT ST PELTON AV MONTEREY BAY Programmed Projects (! R WEST CLIFF DR Programmed Projects D F IF CL ST StateHighways WE Major Roads SC 40 Rail Line Miles 0 0.5 1 Projects Programmed by SCCRTC (2010-2015)

2010 Regional Transportation Plan (RTP) Santa Cruz/Live Oak Map p. 4-29 Planned Projects - Santa Cruz/Live Oak Map

Mapped CO-P33d Harper St Improvements SC-P66 Ocean Street Bike Lanes (entire length-El Dorado Ave (Soquel-Barson) to end) CAP-P16 Clares Street Pedestrian SC-P69 Seabright Avenue Bike Crossing west of 40th Ave CO-P46 San Lorenzo River Valley Lanes (Pine-Soquel) Trail CAP-P22 Brommer Street Sidewalk SC-P77 Bay Street Corridor and Bike Lanes CO-P50 East Cliff Drive Pedestrian Modifications Pathway (5th-12th Ave) CHP-P01 Hwy 17 Safety Program SC-P79 Market St/Goss Avenue and CT-P06 Hwy 1 Intelligent Branciforte/Goss Intersection CO 24 East Cliff Dr. Bike/Ped Path: Transportation System (ITS) Modifications 32nd-41st Deployment SC-P83 West Cliff/Bay Street CO-P09 East Cliff Drive CT-P06a Hwy 1 ITS: CCTV & Signs Modifications Improvements (41st Ave to Harbor) MTD 13 Santa Cruz Metro SC-P84 Ocean St/Water St Intersection Modification CO-P10 Empire Grade Improvements Center/Pacific Station Renovation SC-P85 Ocean St/San Lorenzo Blvd CO-P12 Green Valley Road RTC 24 Hwy 1 HOV Lanes Intersection Modification Improvements (Morrissey to Larkin Vly Rd) SC-P86 Ocean St/ Plymouth St CO-P18 Soquel Ave Improvements SC 23 West Cliff Path Widening Intersection Modification (City of SC to Gross Rd) (Bay-Swanton) SC-P90 High St/Moore St CO-P19 Soquel Dr Improvements SC 25 Hwy 1/9 Intersection Intersection Modification (Soquel Ave to Freedom Modifications Blvd) SC-P93 Beach/Cliff Intersection SC 37 Murray St Bridge Signalization CO-P22 Paul Sweet Road Replacement Improvements (Soquel Dr to UC-P01 UCSC Main Entrance end) SC 38 Hwy 1/San Lorenzo Bridge Improvements Widening CO-P26i Chanticleer Ave UC-P34 Spring Street Bikeway Improvements (Hwy 1 to SC 42 Soquel Ave at Frederick St UC-P53 West Entrance Signalization: Soquel Dr) Minor Widening Empire Grade/Heller CO-P26p Mattison Ln Improvements SC-P101 Swift/Delaware Intersection Intersection (Chanticleer Ave to Soquel improvements Ave) Not Mapped SC-P103 East Cliff Dr Bike/Ped CO-P27a 38th Ave Improvements Connection SC-P07 Citywide Operations and (UPRR to E. Cliff Dr) SC-P21 Brookwood Drive Maintenance CO-P27c Corcoran Ave Improvements Bike/Pedestrian Path SC-P09 Sidewalk Program (Alice St to Felt St) SC-P23 Delaware Avenue Bike lanes SC-P104 Measure H Road Projects CO-P27l Winkle Ave Improvements SC-P29 Morrissey Blvd. Bike Path (entire length from Soquel SC-P73 Neighborhood Traffic over Hwy 1 Dr) Management Improvements SC-P30 Murray St to Harbor Path CO-P28c Commercial Way SC-P75 Lump Sum Bike Projects Improvements (Mission Dr. Connection to Soquel Dr.) SC-P31 San Lorenzo River Bike/Ped UC-P23 Transit Vehicles Path at RR Bridge CO-P28h Thurber Ln Improvements UC-P28 UCSC Disability Van (entire length) SC-P34 Bike/Ped Vehicle Acquisition and CO-P29e Maciel Ave. Improvements Crossing Replacement (Capitola Rd to Mattison Ln) SC-P35 San Lorenzo River Levee UC-P41 Vanpool Van Acquisition Path Connection CO-P29f Paul Minnie Ave. UC-P44 UCSC Pedestrian/Transit Improvements (Rodriguez St SC-P38 Shaffer Road Multiuse Path Zone to Soquel Ave) (Mission St Ext-Delaware Ave) UC-P45 Transit Stop Accessibility CO-P30e Eaton St Improvements Project (Lake Ave to 9th Ave) SC-P59 King Street Bike Lanes (entire length)

p. 4-30 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to

the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. R

D OCEAN ST EXT BROOKWOOD DR

ISBEL DR CO-P28h B

R

E CO-P12 R

L A

L N E MCLAUGHLIN DR G

EMPIRE GRADE C CO-P22

H R I

A F

CHP-P01 O H

A R

M T 17 E SC-P21

|ÿ D

H UPPER PARK RD É

PROSPECT HEIGHTS I R L L

RD SC-P79 CO-P27l |ÿ9 (! (! SC-P79 CT-P06 CO-P28c THURBER LN CO-P19 (! RIVER ST 1 |ÿ SOQUEL DR UC-P53 SC 38 |ÿ1 HAGAR DR SANTA CRUZ CT-P06a EMELINE ST SC-P29 CO-P26i UC-P34 (! (! MARKET ST SPRING ST SC-P86 CO-P10 CO-P46 MORRISSEY BL RTC 24 R E D CO-P18 G SC 25 WATER ST SOQUEL AV D I 1 N. BRANCIFORTE AV L |ÿ CO-P26p O HIGHLAND AV FREDERICK ST O CO-P29f C UC-P01 (! SC-P84 SC 42 CO-P29e SEABRIGHT AV

(! HIGH ST 17TH AV SC-P90 CAPITOLA RD CLARES ST SOQUEL AV (!

S. BRANCIFORTE CHANTICLEER AV BAY DR PACIFIC AV SC-P34 BROADWAY LIVE OAK CAP-P16 WALNUT AV SC-P69 CAPITOLA RD OCEAN ST FRONT ST

WESTERN DR

NOBEL DR LINCOLN ST 7TH AV LAURENT ST SC-P66 CO-P33d KING ST 1 SC-P77 |ÿ MTD 13 (! BROMMER ST 30THAV SC-P85 SC-P103 SC-P30

SC-P59 CENTER ST LAUREL ST RIVERSIDE AV (! SC-P35 CAP-P22 MURRAY ST

BAY ST LAKE AV CO-P30e CALIFORNIA ST SC 37 2ND ST EAST CLIFF DR EAST CLIFF DR CO-P27c ESCALONA DR MISSION ST (! BEACH ST PORTOLA DR 1 |ÿ GRANDVIEW ST RANKIN ST SC-P93 (! SC-P31 CO-P27a MISSION ST ALMAR AV CALIFORNIA AV

FAIR AV CO-P50

WOODROW AV

COLUMBIA ST SC-P83 CO-P09 30THAV SC-P38 SHAFFER RD DELAWARE AV (! Planned Projects (! SWIFT ST SC-P101 PELTON AV MONTEREY BAY Planned Projects SC-P23 CO 24 R WEST CLIFF DR StateHighways D F IF CL ST Major Roads WE Bike Paths SC 23 SC 23 Rail Line Miles 0 0.5 1 Within Projected Funds: Planned Projects (2010-2035)

2010 Regional Transportation Plan (RTP) Santa Cruz/Live Oak Map p. 4-31 Programmed Projects - Scotts Valley/Felton Map

Mapped

CO 02 Graham Hill Road Improvements near Roaring Camp CO 55 Lump Sum Road Repairs - Phase 2 (Pavement Mgmt Cape Seal FY09/10) RTC 01 Freeway Service Patrol (FSP) on Hwy 1 and Hwy 17 SV 24 Bean Creek Road Sidewalks

p. 4-32 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map.

EAST ZAYANTE RD HIHN RD

D R GLENWOOD DR É K

E

E

R

C

L N

O

A

C E

K B

H

A

R RTC 01 T

G U

LC VINE HILL RD HILL VINE

H CO 55 R D |ÿ17 ZAYANTE RD 9 FELTON |ÿ MT HERMON RD

R CONFERENCE D CON R FERE NCE D SCOTTS VALLEY DR

FELTON EMPIRE RD HIHN ST SCOTTSBEAN CREEK RD VALLEY

MT HERMON RD GRAHAM HILL RD SV 24

GRANITE CREEK RD

CO 02

GLEN CANYON RD

LOCKEWOOD LN

|ÿ9

CO 55

GRAHAM HILL RD

BRANCIFORTE DR |ÿ17 Programmed Projects (! Programmed Projects

GLEN CANYON RD StateHighways Major Roads Miles Rail Line 0 0.5 1 MYSTERY SPOT RD Projects Programmed by SCCRTC (2010-2015)

2010 Regional Transportation Plan (RTP) Scotts Valley/Felton Map p. 4-33 Planned Projects - Scotts Valley/Felton Map

Mapped SV-P36 El Rancho Dr. Bike Lanes SV-P37 Lockhart Gulch Rd Bike Hwy 17 Safety Program CHP-P01 Lanes CO 46 Mt. Hermon Rd. Rehab: SV-P42 Synchronize Traffic Signals Zayante Bridge to 1 mi. E of along Mt. Hermon Road Graham Hill SV-P43 Mt. Hermon Rd./Scotts CO-P10 Empire Grade Improvements Valley Dr. Intersection Operations Improvement CO-P12 Green Valley Road Project Improvements CO-P14 La Madrona Dr Not Mapped Improvements (El Rancho Dr to City of Scotts Valley) SV-P05 Citywide Sidewalk Program CO-P24 Lockwood Lane SV-P06 Citywide Access Ramps Improvements (Graham Hill Rd to SV limits) SV-P27 Citywide General Maintenance and Operations CO-P26m Glen Canyon Rd Improvements (Branciforte SV-P28 Neighborhood Traffic Dr to City of Scotts Valley) Calming CO-P26q Mt. Hermon Rd. SV-P41 Citywide Bike Lanes Improvements (Lockhart Gulch to Graham Hill Rd) CO-P28d Felton Empire Road Improvements (entire length to State Hwy 9) CO-P46 San Lorenzo River Valley Trail CO-P46a San Lorenzo Valley Trail: Hwy 9 - Downtown Felton Bike Lanes & Sidewalks CO-P46b San Lorenzo Valley Trail: Hwy 9 - North Felton Bike Lanes & Sidewalks CO-P54 Graham Hill Rd Left Turn Lane (Lockewood Ln) CT-P09d Hwy 9 San Lorenzo River Source Control CT-P10a Hwy 17 Safety Project: Santa's Village Rd-Crescent Dr. SV 18A Green Hills Road Bike Lanes SV-P13 Mt Hermon, Lockewood, Springs Lake widening SV-P21 Lockwood Ln Pedestrian Signal near golf course SV-P29 Glen Canyon Rd. Bike Lanes SV-P30a Mt. Hermon Road Sidewalk Connections SV-P35 Bean Creek Road Sidewalks (SVMS to Blue Bonnet)

p. 4-34 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map.

EAST ZAYANTE RD HIHN RD

D R GLENWOOD DR É K

E E CT-P10a R

C

L N

O

A

C E

K B

H

A

R

T

G U LC

CO-P26q RD HILL VINE CO-P46b H

R D |ÿ17 ZAYANTE RD 9 FELTON SV-P37 |ÿ MT HERMON RD

R CO 46 CONFERENCE D CON R CO-P28d FERE NCE D SCOTTS VALLEY DR

FELTON EMPIRE RD

SV-P42 BEAN CREEK RD HIHN ST SCOTTS VALLEY SV 18A SV-P35

MT HERMON RD CO-P46a GRAHAM HILL RD (! SV-P21 SV-P30a GRANITE CREEK RD CHP-P01 CO-P46 (! SV-P13 SV-P43 GLEN CANYON RD CO-P12 CT-P09d LOCKEWOOD LN SV-P29 CO-P54 |ÿ9 CO-P24 CO-P26m

GRAHAM HILL RD SV-P36

BRANCIFORTE DR |ÿ17 Planned Projects CO-P14 (! Planned Projects CO-P10 GLEN CANYON RD StateHighways Major Roads Miles Rail Line 0 0.5 1 MYSTERY SPOT RD Within Projected Funds: Planned Projects (2010-2035)

2010 Regional Transportation Plan (RTP) Scotts Valley/Felton Map p. 4-35 Programmed Projects - Watsonville Map

Mapped

CO 17 Calabasas Rd widening, bike lanes and sidewalks CO 42b Green Valley Rd Pedestrian Safety Project CO 55 Lump Sum Road Repairs- 2010 RTC 03 SC Branch Rail Line Acquisition, Corridor Preservation and Improvements WAT 01 Hwy 1/ Harkins Slough Road Interchange WAT 31 Freedom Blvd Rehab (High- Broadis/Lincoln) WAT 36 Green Valley Road Rehab- Phase 2 Not Mapped

WAT 08 Pajaro Valley Transportation Management Association (TMA) WAT 08b Alternativos & Rules of the Road Safety Program

p. 4-36 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. AMESTI RD

LARKIN VALLEY RD CO 55 FREEDOM BL CO 42b CO 17 GREEN VALLEY RD É BUENA VISTA DR CO 55

HOLOHAN RD

LOMA PRIETA AV COLLEGE RD

|ÿ1 AIRPORT BL |ÿ152 WATSONVILLE

CLIFFORD AV FREEDOM BL LAKEVIEW RD

HOLM RD

ARTHUR RD

WAT 36 P MARIN ST E

SOUTH GREEN VALLEY RD N BREWINGTON AV

V N

A S HA Y

L EAST LAKE AV R D K V

I A N R N

S I O A S F L F D BRIDGE ST R O MAIN ST I D L R WAT 31

B A U U IST C

ENA V G

H

R

D WAT 01 |ÿ152 BLACKBURN ST (! |ÿ129

HARKINS SLOUGH RD WALKER ST

EAST BEACH ST

O H

L O RTC 03 WEST LAKE AV RIVERSIDE DR

N

RTC 03 E WALKER ST P

A

R K W 1 A |ÿ Y Programmed Projects SAN ANDREAS RD INDUSTRIAL RD (! LEE RD Programmed Projects StateHighways

WEST RIVERSIDE DR Major Roads WEST BEACH ST Miles Rail Line 0 0.5 1 |ÿ129 Projects Programmed by SCCRTC (2010-2015)

2010 Regional Transportation Plan (RTP) Watsonville Map p. 4-37 Planned Projects - Watsonville Map

Mapped

AIR-P01 Lump Sum Watsonville Airport Capital Projects AIR-P02 Watsonville Airport Operations CO 42a Green Valley Rd/Holohan Dr/Airport Blvd Intersection Improvements CO-P02 Airport Blvd Improvements (City limits to Green Valley Rd) CO-P03 Amesti Road Multimodal Improvements (Green Valley to Brown Valley Rd) CO-P11 Freedom Blvd Multimodal Improvements (Bonita Dr to City of Watsonville) CO-P13 Green Valley Road Improvements CO-P69 Hwy 152/Hollohan/College Road Intersection Improvements WAT 27A Main St. (Hwy 152)/Freedom Blvd Roundabout WAT-P01 Freedom Blvd Reconstruction (Lincoln to Alta Vista) WAT-P11 Freedom Blvd Improvements (Green Valley to Compton Terrace) WAT-P28 Airport Boulevard Improvements Not Mapped

CHP-P03 Hwy 129 Safety Program VC-P1 Volunteer Center Transportation Program WAT-P04 Neighborhood Traffic Plan WAT-P06 Citywide General Maintenance and Operations WAT-P13 Neighborhood Traffic Plan Implementation WAT-P15 Citywide Pedestrian Facilities

WAT-P19 Lump Sum Bicycle Projects WAT-P24 Citywide Transportation Projects

p. 4-38 2010 Regional Transportation Plan (RTP) This map was created for graphical illustration purposes only. The mapped location and extent of individual projects are approximate. Please refer to the project list or project sponsors for more detailed information about individual projects. Some projects appear on more than one map. . AMESTI RD CO-P11 LARKIN VALLEY RD FREEDOM BL CO-P03 CO-P02 GREEN VALLEY RD É BUENA VISTA DR (! CO-P13

CO 42a HOLOHAN RD AIR-P01 WAT-P28 WAT-P11 CO-P69 AIR-P02 (! (! (! AV COLLEGE RD

|ÿ1 AIRPORT BL |ÿ152 WATSONVILLE WAT-P01

CLIFFORD AV FREEDOM BL LAKEVIEW RD

HOLM RD

ARTHUR RD

P MARIN ST E

SOUTH GREEN VALLEY RD N BREWINGTON AV

V N

A S HA Y

L EAST LAKE AV R D K V

I A N R N

S I O A S F L F D BRIDGE ST R O MAIN ST I D L R

B A U U IST C ENA V G

H WAT 27A

R D 152 BLACKBURN ST |ÿ (! |ÿ129

HARKINS SLOUGH RD WALKER ST

EAST BEACH ST

O H

L O WEST LAKE AV RIVERSIDE DR

N

E WALKER ST P

A

R K W 1 A |ÿ Y Planned Projects SAN ANDREAS RD INDUSTRIAL RD (! LEE RD Planned Projects StateHighways

WEST RIVERSIDE DR Major Roads WEST BEACH ST Miles Rail Line 0 0.5 1 |ÿ129

Within Projected Funds: Planned Projects (2010-2035) (!

2010 Regional Transportation Plan (RTP) Watsonville Map p. 4-39