Efficiency Through Quality

Total Page:16

File Type:pdf, Size:1020Kb

Efficiency Through Quality EFFICIENCY THROUGH QUALITY [email protected] www.moldocor.ro 2 Company name: S.C. “ MOLDOCOR “ S.A. � Registered Address: RO - 610058, PIATRA NEAMT, No. 73, Decebal Bd., NEAMT County Settlement act : H.G.R. No. 1224 / 1990 Registration at the National Office for Trade Registry J 27/ 2 / 1990 NEAMT Trade Registry Office. RO2046250 Fiscal Registration code Joint stock company - S.A. Legal form Entirely private Ownership form Entirely private Share Capital 0233 – 210660 ; 210587; 210588 TELEPHONE 0233 – 210589 FACSIMILE [email protected] E – MAIL www.moldocor.ro � WEB 3 SC MOLDOCOR SA is a company specialised in construction, mounting and repair works, settled in 1975, well-known on all the industrial platforms, in particular on oil, chemical, refineries and gas platforms. Please find in the next pages a series of investments and beneficiaries, investments executed by our company throughout the time. 4 BENEFICIARIES - INVESTMENTS Rompetrol-Rominserv Petromidia Work Location Rompetrol-Rominserv Downstream Rompetrol-Rominserv Vega Work Location OMV Petrom Petrobrazi Work Location OMV Petrom – Petromar Constanta Oltchim Petrotel Lukoil OMV Petrom-Arpechim Azomures Targu Mures SNGN Romgaz SA Medias SNTGN Trangaz SA Medias EON GAZ Targu Mures EON Electrica Rafo Onesti Chimcomplex Borzesti KMG –Atiran Refinery Pakmaia Pascani CET- Iasi CET – Midia Celuloza Hartie Dej Petrocart Piatra Neamt Letea Bacau Sofert Bacau Azochim Piatra Neamt Radici Savinesti Tnuva Bucuresti Fabrica de ulei alimentar Craiova Sano Bucuresti Combinat Chimic Arad Sometra Copsa Mica Carbosin Copsa Mica Oltcim Alesd Oltcim Hoghiz IMMN Baia Mare CNI Bucuresti – Gyms (the second gym with 4000 seat capacity) ANL Bucuresti Viromet Victoria AK-ROM Suceava European Funds –Rehabilitation of water and wastewater networks 5 IMPORTANT WORKS NEW – SRU Integration – TGP , foundations, pipe connections (tie-ins) , metallic con- structions – Rompetrol Petromidia NEW- SRU –metallic constructions , pipe connections (tie-ins) Rompetrol Petromidia PP and Pyrolysis Revamp – Rompetrol Petromidia Compressor K1 – metallic constructions RIS-RED-PART-FCC-Mechanical works, metallic structure, gas piping and mounting of ESP-Rompetrol Petromidia Planned TARs on equipment and pipes in Rompetrol, OMV Petrom, RAFO Onesti refineries at the units: DAV ; CC ; CCX ; DGRS ; RC ; Utilities ; Isomerisation ; HPM ; HPR; HB; ETBE; AD;PP; 6 Briquetting Plant – Rompetrol Petromidia Hydrogen Plant Equipment erection, pipe tie-ins (connections) – Rompetrol Petromidia MHC Plant– technological pipes – Rompetrol Petromidia 7 Repair and replacement works, petroleum products storage capacity increase in refineries (AFPE)- 70 tanks at Petrobrazi capacity from 100cm -15.000 cm ) , distribu- tion warehouses, capacity increase to 60.000 mc of T7 tank Petromidia , tanks between 100cm -10.000 cm – 25 units Stainless steel tank for azotic acid and liquid fertilizers storage tank on Azomures Platform Replacement at the Granulation Tower –metallic construction, perimeter fencing using boards, equipment erection, pipe tie-ins (connections)– Rompetrol Petromidia Execution of LPG terminal in Mangalia Harbour 8 Flare Utilities – Equipment erection, foundations, pipe connections Revamps of the NPK, AZOTAT, ACID AZOMURES Plants Natural Gas main transportation pipe Harlau-Bucecea TRANSGAZ Natural Gas main transportation pipe Vaslui-Iasi TRANSGAZ Gas emptying pipe in Deleni-Mures structure ROMGAZ 9 Natural water collectors Dn 250 Suceava-Radauti , Homocea-Glavanesti ROMGAZ Commissioning and over-ground techno- logical installations for natural gas extraction wells (gassers) in the structures: Deleni-Botorca, Barna, Cristur, Cetatea de Balta, Frasin, Davideni, Comanesti, Batranesti, Roman, Glavanesti, Caragele ROMGAZ Natural Gas transportation pipe Dn 150 Tepu-Munteni TRANSGAZ Repair works on the natural gas transportation pipes Posada-Comarnic, Targu Ocna -Slanic Moldova, Piatra Neamt TRANSGAZ Revamp of Technological Assembly – Natural Gas Transportation Pipes: Letcani, Onesti, Gheraiesti, Dealu Frumos TRANSGAZ Rehabilitation of Turbo-compressor Plants Onesti TRANSGAZ 10 Accommodations Constructions: 1200 apartments; School units constructions Inclusive education school centres and recovery centres; Rehabilitation , improvement, extension and endowment of cultural institutions; Roads and Bridges Rehabilitation 11 Customs headquarters Entertaiment areas Swimming pool for teaching purposes Construction of Gyms – Polyvalent Gym - 4000 seats in Piatra Neamt 12 Stainless steel tank for azotic acid and liquid fertilizers storage tank on Azomures Platform Replacement at the Granulation Tower –metallic construction, perimeter fencing using boards, equipment erection, pipe tie-ins (connections)– Rompetrol Petromidia Execution of LPG terminal in Mangalia Harbour Customs Gyms for local sports competition practice, headquarters handball fields and 150 seats for spectators Entertaiment ISPA Measure/ Cohesion Fund areas Urban Public Works – water and wastewater networks Swimming pool Transfer and selection stations for teaching purposes waste management Construction of Gyms – Polyvalent Gym - 4000 seats in Piatra Neamt 13 AUTHORISATIONS AND CERTIFICATES ANRE-NATURAL GAS TRANSPORT AND DISTRIBUTION: For the design of natural gas distribution systems, PDS type For the execution of natural gas distribution systems, EDS type For the design of natural gas usage installation with a working pressure lower or equal to 6 bar, PDI type For the execution, checking and revision of natural gas usage installation with a working pressure lower or equal to 6 bar, EDI type For the objectives execution of over-ground technological installations related to the natural gas production and/or storage activities (compression stations, adjustment- measurement stations, connections and upstream pipes) , EP type For the design of compression stations, pipes, connections and adjustment- measurement stations related to the natural gas transportation systems, as well as of natural gas usage installations with a working pressure above 6 bar, PCTRI type For the execution of compression stations and pipes related to the natural gas transportation pipes, ETC type For the execution of connections and adjustment-measurement stations related to the natural gas transportation systems, as well as of natural gas usage installations with a working pressure above 6 bar, ETRI type For the objectives execution of over-ground technological installations related to the natural gas production and/or storage activities (compression stations, adjustment- measurement stations, connections and upstream pipes), PP type 14 ANRE-ELECTRICAL A1 Type for “trials on low tension equipment and electrical installations “ B Type for “design and execution of outdoors/indoors electrical installations for buildings/civil and industrial constructions, over-ground and underground connec- tions, on a rated power of 0,4 kV” ISCIR C1-Installation, mounting and repair works on: -steam boilers with pmax=160 bar;Qmax=420t/h; Tmax=+540oC -hot water boilers with pmax=25 bar; Qmax=100Gcal/h C6-Mounting and repair works on: -metallic pipes for fluids with pmax=200 bar; Tmin=-50oC;Tmax==440oC C7-Check up (on opening –closing) repair works and adjustment on safety devices, with pmax=160 bar, DNmax=250 mm C9-Installation, mounting and repair works on: -hot water boilers with 400 kW Pmax≤6000 kW -low pressure steam boilers with 0,6t/h Qmax≤4,0 t/h C10-Mounting and repair works on: -metallic pipes for steam and hot water, with pmax=160 bar;Tmax=+440OC A 1-Installation, mounting, repair and maintenance works on: -fuel consuming devices with P≤400 kW -hot water boilers with P≤400 kW -low pressure steam boilers with Q≤0,6 t/h C11-Mounting, commissioning, repair and maintenance works on: -burning installations and automation installation for boilers -automation systems for thermal plants R1-Cranes repair works and mounting 15 IGSU execution of installation and maintenance works for firefighting systems and installations, except the sys- tems containing certain fluoride gas with greenhouse effect execution of installation and maintenance works for fire signaling, warning and alerting Execution of ther- mal protection works using gunite covery products Execution of thermal protection works using thermo- foam paints INSEMEX Blast prevention for the design, mounting, commis- sioning, usage, repair works and maintenance of tech- nical installation operating in potentially explosive medium -Nex 01-06 ISC 2nd degree Laboratory Authorization CNCAN- END Laboratory Gamma RINA SIMTEX ISO 9001:2008 ISO 14001:2005 SR OHSAS 18001:2008 ISO 3834-2:2006 8000:2008 16 17 S.C. “ MOLDOCOR “ S.A. Piatra Neamt was awarded the following trophies: “THE ARCH OF EUROPE“ FOR QUALITY - MADRID 1992 „QUALITY CROWN PLATINUM” LONDON 2003 „LEADER IN PRESTIGE AND QUALITY” ZURICH 2006 SI „INTERNATIONAL AWARD FOR THE BEST ENTERPRISE IMAGE 2007”. For the exquisite results achieved in its activity, the Company was awarded with Diplomas and trophies by Neamt County Trade and Industry Chamber, occupying the first position in the County Chart of Big Construction Companies each year, between 1995 – 2014, as well as “EXCELLENCE“ Diplomas in the years 1998, 1999, 2000, 2001, 2002, 2003 ,2004 ,2005 ,2006 ,2007 ,2008 ,2009 ,2010 , 2011 ,2012 ,2013 and 2014 ; on a national level in 2011, 2012, 2013 and 2014 the Chamber of Commerce of Romania awarded SC Moldocor SA the First Prize in the National Company Chart. 18 19 WEB: www.moldocor.ro E-MAIL: [email protected] Telephone:0233/ 210 660;210 588;210 587 FACSIMILE :0233/ 210 589.
Recommended publications
  • OMV Aktiengesellschaft Case Studies 1 of 2 , ANTAGE Responded
    LAbOrAtOry KnOwLedge. deLiVered.™ OMV Aktiengesellschaft Harmonizing Austria’s Largest Integrated Oil and Gas Company C LABVANTAGE OMV Aktiengesellschaft Company Background With group sales of 42.65 billion EUR and a workforce of nearly 30K employees in 2012, OMV Aktiengesellschaft is Austria’s largest listed industrial company. In late 2004, OMV acquired a major share of 51% of the privatized Romanian oil company, Petrom, and became the market leader in Central and Eastern Europe. OMV is active in Romania and Austria and holds a balanced international portfolio in Exploration and Production. As of 2012, OMV had oil and gas reserves of approximately 1.12 billion barrels of oil equivalent (BOE) and a production of approximately 303,000 BOE per day. In Gas and Power, OMV sold about 437 terawatt-hours of gas. In addition, it operated a 2,000km long gas pipeline network with a marketed capacity of around 103 billion cubic meters of natural gas in Austria. With a trading volume of around 528 terawatt-hours, OMV’s gas trading platform, the Central European Gas Hub, is amongst the most important hubs in Continental Europe. In Refining and Marketing, OMV had an annual refining capacity of 22 million tons and approximately 4,400 filling stations in 13 countries at the end of 2012. System Sought A When the major share of Petrom was taken over by OMV, two specialized internal laboratories became s available within E&P, both serving mostly their local OMV appreciated market and sometimes the OMV branch office. After the browser-based E major equipment investments for ICPT Campina were LiMs because it could done to adjust the analytical standards to the ones already existing in the Gänserndorf laboratory, the be used in a number St next step in supporting the harmonization of laboratory of labs and countries operations was to have a common approach in data management.
    [Show full text]
  • Webgis OMV PETROM S.A
    OMV PETROM S.A. Exploration & Production The Solution is using: ArcGIS Server Advanced WebOffice 6 GeoNIS ArcGIS Desktop WebGIS The Company With activities in the business segments of Exploration and Production, Refining, Marketing and Power, OMV Petrom had in 2008 a production of 188,476 boe/day. OMV Petrom has a maximum refining capacity of 8 million metric tons per year, approximately 550 filling stations in Romania and 269 filling stations in Moldova, Bulgaria and Serbia. In 2008, the turnover of the company was EUR 4,552 mn and EBITDA was EUR 969 million. After its privati- zation in 2004, the company recorded pozitive results. The modernization process initiated in 2005 is underway in accor- dance. The Needs To find and operate new reserves OMV Petrom must under- stand needed infrastructure, business condition and environ- mental factors within a geographic framework. The implementation of an Enterprise GIS within the organiza- tion can optimize the usage of the available data within OMV Petrom. Starting to build up an Enterprise Geodatabase with data from whole Romania was just the first step. The use of ArcGIS Desktop needs high-level educated GIS professionals and very often the user doesn’t need the full desktop GIS functionality. The logical answer for this requirement was the implementa- tion of a WebGIS for the company wide use of GIS data. Not all users should get allowed to view all GIS data and re- lated entities like documents or scans. Therefore fine grained user role based access control is a must. A strong need for efficient administration tools for being able to manage change requests fast and easily was submitted to handle migration from employees from one branch office to another.
    [Show full text]
  • OMV Petrom Reports Perspective Oil Deposits in Romania Research Drills
    OMV Petrom reports perspective oil deposits in Romania research drills OMV Petrom (SNP) informed natural gas carrier company Transgaz Medias (TGN) that there are “beautiful” perspectives regarding the gas deposits in the Black Sea, the chief of the company’s gas Dispatch, Mihai Patarniche said yesterday in a seminar on energy, quoted by Mediafax. Answering questions asked by the media, he added that, when the extraction of gas in the Black Sea will begin, “tens of millions” of EUR will be necessary to lay the pipelines that will carry the gas to shore, with the government most likely to become involved in the operation. OMV Petrom and ExxonMobil could extract 6.5 billion cubic metres of gas each year from the Neptun perimeter in the Black Sea, according to preliminary estimations, a quantity equivalent to half of Romania’s annual consumption. The two companies jointly explore the Neptun perimeter of the Black Sea. In February last year, the two companies announced a significant gas find when drilling the Domino-1 well, with preliminary estimations speaking about 42-84 bln cubic meters of natural gas. If subsequent operations will confirm the technical and commercial feasibility of gas extraction in the Neptun block, the cumulated value of investments in the exploration and development phases might reach several billions of USD. The extraction of gas in the Black Sea is expected to start towards the end of the decade.Asked if OMV Petrom will be able to export the gas extracted from the Black Sea, the Transgaz official have an affirmative answer. “If Romania is obtuse, Petrom can export, although it cannot do whatever it likes, because it is under Romanian jurisdiction,” Patarniche explained.
    [Show full text]
  • Omv Petrom and Teraplast Shares Will Be Included in Ftse Indices Dedicated to Emerging Markets and Strengthen Romania's Weight in the Global Provider Indices
    PRESS RELEASE AUGUST 23rd, 2021 OMV PETROM AND TERAPLAST SHARES WILL BE INCLUDED IN FTSE INDICES DEDICATED TO EMERGING MARKETS AND STRENGTHEN ROMANIA'S WEIGHT IN THE GLOBAL PROVIDER INDICES • OMV Petrom (SNP) and TeraPlast (TRP) shares will be included, as of September 20th, in FTSE indices for Emerging Markets, joining Banca Transilvania (TLV) and Nuclearelectrica (SNN) shares. • Romania thus consolidates its weight in FTSE Russell indices, having five companies present in all the global provider’s indices: Banca Transilvania, Nuclearelectrica, OMV Petrom, TeraPlast and Bittnet (BNET). The inclusion of OMV Petrom, the largest energy company in South-Eastern Europe, and TeraPlast, the leader of the PVC pipe market and one of the most important players on the Romanian installations market, in FTSE Global Equity Index Series was decided by the global index provider following the half-yearly review, announced on Friday, August 20th. The two companies will be part of the index starting with September 20th. `FTSE’s decision regarding the inclusion of OMV Petrom in the All-Cap indices and, at the same time, TeraPlast’s upgrade from FTSE Global Micro-Cap index to FTSE Global All-Cap index validates the potential of the Romanian capital market and its dynamism. In just one year, Romania's presence in FTSE Russell indices has increased from three to five companies and we are glad that we are present with as diverse fields as possible, from energy and financial, to IT, because we present a relevant picture to global investors in regarding the offer of companies in which they can invest on BVB.
    [Show full text]
  • Romania: Petrom Power Plant Non-Technical Summary [EBRD
    NON-TECHNICAL SUMMARY PETROBRAZI 860MW COMBINED CYCLE POWER PROJECT ROMANIA at PETROM REFINERY, PLOIESTI, ROMANIA January 2009 Petrom S.A. Power Division 239 Calea Dorobanţilor 010567, Bucharest Romania Tel. + 40 (21) 4060101 Fax + 40 (21) 4060436 TABLE OF CONTENTS Section Page 1. INTRODUCTION............................................................................................................... 1 1.1. Project Outline............................................................................................................... 1 1.1.1. Combined Cycle Power Plant ................................................................................... 1 1.1.2. Natural Gas Pipeline ................................................................................................. 3 1.1.3. Overhead Line (OHL) Connection............................................................................. 3 1.2. Benefits.......................................................................................................................... 5 1.3. Alternatives....................................................................................................................6 2. ENVIRONMENTAL IMPACT PROCESS .......................................................................... 7 2.1. Public Relations and Information Disclosure................................................................. 8 2.1.1. Combined Cycle Power Plant (CCPP)...................................................................... 8 2.1.2. Natural Gas Pipeline ................................................................................................
    [Show full text]
  • Accelerated Bookbuild Offering of OMV Petrom S.A
    ________________________________________________________________________________________________________ To: Bucharest Stock Exchange Report date: Financial Supervisory Authority 15 September 2020 London Stock Exchange Name of the issuing entity: Current report according to Article 99 (s) of the Code of the Bucharest Stock Exchange Market Operator, Title Fondul Proprietatea S.A. II, Issuers and Financial Instruments NOT FOR PUBLICATION, RELEASE OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN Registered office: PART, IN OR INTO THE UNITED STATES, AUSTRALIA, CANADA, JAPAN OR ANY OTHER 78-80 Buzesti Street JURISDICTION IN WHICH IT WOULD BE UNLAWFUL TO DO SO. PLEASE SEE THE IMPORTANT th NOTICE AT THE END OF THIS ANNOUNCEMENT. 7 floor, district 1, Bucharest, 011017 THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED TO CONSTITUTE INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF THE MARKET ABUSE REGULATION (EU) NO. Phone/fax number: 596/2014. UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW Tel.: + 40 21 200 9600 CONSIDERED TO BE IN THE PUBLIC DOMAIN. Fax: + 40 21 200 9631 Email: Important events to be reported: [email protected] Internet: Accelerated bookbuild offering of a base deal of minimum approximately www.fondulproprietatea.ro Sole Registration Code 1.4 billion existing shares in OMV Petrom S.A. with the Trade Register Office: Franklin Templeton Investment Management Ltd. United Kingdom Bucharest 18253260 Branch, in its capacity as Investment Manager of Fondul Proprietatea S.A. (the Order number in the Trade "Fund") announces the launch of an accelerated bookbuild offering of a base Register: J40/21901/2005 deal of minimum approximately 1.4 billion existing shares in OMV Petrom S.A.
    [Show full text]
  • OMV Petrom Celebrates 20 Years Since Its Listing on the Bucharest Stock Exchange
    PRESS RELEASE SEPTEMBER 3, 2021 OMV Petrom celebrates 20 years since its listing on the Bucharest Stock Exchange • OMV Petrom's capitalization has increased more than 15 times • OMV Petrom is the largest Romanian company on the Bucharest Stock Exchange. • In the last 20 years, the SNP stock has offered investors an average dividend yield of approximately 6%. OMV Petrom (SNP), the largest integrated energy company in South-Eastern Europe, managed to increase its market value more than 15 times in the 20 years of trading on the Bucharest Stock Exchange: from 1.6 billion lei at the end of 2001, to 25 billion lei at the closing of the stock exchange trading day of September 2, 2021. Based on the market capitalization, OMV Petrom is the largest Romanian company on the stock exchange. The company's shares have been traded under the SNP ticker symbol since September 3, 2001. Recently, global index provider FTSE Russell announced the inclusion of OMV Petrom in the FTSE Global Equity Index Series, starting September 20. "The history of the modern stock exchange, re-established in 1995, is closely related to the 20 years trading history of OMV Petrom shares on Bucharest Stock Exchange. Today, we mark an important moment for the entire capital market community, SNP being one of the shares that arouse the interest of both international and local investors. OMV Petrom’s performance in the last 20 years has become a benchmark for many Romanian companies and we want this success story to inspire other companies, both in the private sector and those owned by the State", said Radu Hanga, president of the Bucharest Stock Exchange.
    [Show full text]
  • Omv Petrom Together with Enel X to Install 10 Fast Charging Stations for Electric Cars in Filling Stations in Romania
    Media Relations T +40 372 115 694 F +40 372-87.33.42 [email protected] enelX.ro OMV PETROM TOGETHER WITH ENEL X TO INSTALL 10 FAST CHARGING STATIONS FOR ELECTRIC CARS IN FILLING STATIONS IN ROMANIA ➢ Each charging station will have an available power of minimum 50 kW ➢ Charging cycle for 80% of car battery to take up to approximately 25 minutes Bucharest , September 9, 2020 - OMV Petrom, the largest energy company in Southeastern Europe, and Enel X România, member of Enel X, the division of advanced energy services of Enel Group, will install 10 fast charging stations for electric cars, in OMV and Petrom filling stations, during the next months. The fast charging stations will be installed in OMV and Petrom filling stations covering a distance of approximately 380 kilometers on the main roads in Romania, connecting cities from the east, center and west of the country. In this way, OMV Petrom and Enel X continue their plans to develop the charging points network in Romania, thus encouraging the customers’ road mobility by electric cars. All charging stations for electric cars installed within the partnership will have an available power of minimum 50 kW, and a charging cycle for 80% of a car battery capacity will be done in approximately 25 minutes. “We believe that the answer to our customers’ mobility needs is a mix of fuels and alternative solutions. Through this partnership, we contribute to the development of the national charging infrastructure to enable the transit of electric cars in Romania. We estimate that, by the end of 2021, over 40 charging stations for electric cars will be installed in our regional network”, said Radu Căprău, member of OMV Petrom Executive Board, responsible for Downstream Oil.
    [Show full text]
  • Study on Companies from the Energy Sector from the Perspective of Performance Through the Operating Cash Flow
    energies Article Study on Companies from the Energy Sector from the Perspective of Performance through the Operating Cash Flow 1 1 1, 2 Claudia Diana Sabău-Popa , Luminit, a Rus , Dana Simona Gherai *, Codrut, a Mare 1 and Ioan Gheorghe T, ara 1 Department of Finance—Accounting, Faculty of Economic Sciences, University of Oradea, 410087 Oradea, Romania; [email protected] (C.D.S.-P.); [email protected] (L.R.); [email protected] (I.G.T, .) 2 Department of Statistics-Forecasts-Mathematics, Faculty of Economics and Business Administration, Babes-Bolyai University, 400000 Cluj-Napoca, Romania; [email protected] * Correspondence: [email protected] Abstract: In this paper we analyzed the link between companies’ performance, in terms of cash and income, and the labor productivity or management rates, in case of the companies from the energy sector listed on the Bucharest Stock Exchange. We focused on the energy sector because of the impact that its expansion has on the evolution of economies around the world and because of its dynamics in the sense of gradually shifting to the use of energy from renewable sources. We have used panel regression models to analyze the operating cash flow and the profitability rates and the determination of a causal or dependency relationship with labor productivity or management rates. The results of this study show a significant negative correlation between operating cash flows and the average duration of stock rotation, and no correlation between productivity and the operating cash flow. Instead, the average duration of stock turnover does not at all influence the profitability Citation: Sab˘au-Popa,C.D.; Rus, L.; rates, and productivity is always significant for the return on assets, ie forthe return on equitywith Gherai, D.S.; Mare, C.; T, ara, I.G.
    [Show full text]
  • TRANSGAZ Higher Risks but Still Solid
    Romania Company report 27 September 11 Utilities TRANSGAZ Higher risks but still solid ν Investment case We have adjusted our target price for Transgaz to RON 237.8 and we (12m) Buy have maintained our BUY recommendation given the market price of RON 189 registered on Price 26/09/2011 12m target September 26, 2011. Gas transported has registered a 5.3% yoy advance in H1’11, while for RON 189 RON 237.8 end 2011 we expect a 3.4% growth because of a slowdown in the second half of the year. On Sector medium term (2012 – 2020) we have changed our CAGR from 3% to 2% because of weaker Weighting than expected economic recovery and negative effect of gas price liberalization. The tariff for Neutral Market Share 2011/2012 has not been amended by ANRE, for the second time in this regulatory period and 100% we conservatively projected no change in tariffs until mid 2012 and an average 4-5% annual Last Recommendation increase for the third regulatory period. According to the budget approved on July 12, 2011, the BUY (May 13, 2011) company expects operating revenues worth RON 1.25bn (-6.7% yoy) and a net profit of RON Type of investment 124m (-67% yoy), in 2011, according to RAS. Our IFRS forecasts point now to higher values of Defensive 9 RON 1.28bn for revenues and RON 230m for the bottom line, on the back of a mild increase of Dividend play 9 transported gas (3.4%) and no change in tariffs. Regulatory risk 9 ν Catalysts for the share price Just as in the case of Transelectrica, the main catalyst is the 1 year, price-volume upcoming listing of an additional 15% by the State.
    [Show full text]
  • Valuation Multiples in the Context of Bucharest Stock Exchange and Local M&A Market
    Valuation multiples in the context of Bucharest Stock Exchange and local M&A market www.pwc.ro Content 3 | Foreword 4 | Executive summary 5 | Scope and methodology 9 | Macroeconomic outlook 14 | Romanian Stock market performance 16 | Listed companies valuation multiples Key results in 2017 context Multiples trend analysis by sector between 2007 and 2017 Key highlights 25 | M&A valuation multiples M&A index in 2017 Multiples trend analysis by sector between 2007 and 2017 Foreword Valuation and Economics department of PricewaterhouseCoopers Romania is pleased to present the first edition of this study focused on the analysis of listed companies on the Regulated Market of Bucharest Stock Exchange and of the Romanian local M&A market. • The study presents the valuation multiples trend for 79 listed companies covering the period between 2007 and 2017 with a focus on the consumer, oil & gas, financial services, healthcare, industrial, materials and electricity sectors. We have also performed an analysis of valuation multiples trend based on 50 closed transactions between 2007 and 2017 for which robust financial data were readily available. • PwC V&E Romanian practice envisages that potential users of the study will gain insights on: • Overall equity market performance between 2007 and 2017 (BET, BET-Div.Adj.Value, BET-TR compared to the yield of Romanian government bonds); • The performance of valuation multiples on different sectors for listed companies over the shifting phases of the economy; • The analysis of valuation multiples derived from local transactions. • Such studies increase in value due to recurrence, while data from various years and sectors add to existing analysis with each new edition.
    [Show full text]
  • Compliance Or Not with the New Corporate Governance Code
    digitales archiv ZBW – Leibniz-Informationszentrum Wirtschaft ZBW – Leibniz Information Centre for Economics Ivan, Oana Raluca Article Compliance or not with the new corporate governance code Provided in Cooperation with: Dimitrie Cantemir Christian University, Bucharest This Version is available at: http://hdl.handle.net/11159/4133 Kontakt/Contact ZBW – Leibniz-Informationszentrum Wirtschaft/Leibniz Information Centre for Economics Düsternbrooker Weg 120 24105 Kiel (Germany) E-Mail: [email protected] https://www.zbw.eu/econis-archiv/ Standard-Nutzungsbedingungen: Terms of use: Dieses Dokument darf zu eigenen wissenschaftlichen Zwecken This document may be saved and copied for your personal und zum Privatgebrauch gespeichert und kopiert werden. Sie and scholarly purposes. You are not to copy it for public or dürfen dieses Dokument nicht für öffentliche oder kommerzielle commercial purposes, to exhibit the document in public, to Zwecke vervielfältigen, öffentlich ausstellen, aufführen, vertreiben perform, distribute or otherwise use the document in public. If oder anderweitig nutzen. Sofern für das Dokument eine Open- the document is made available under a Creative Commons Content-Lizenz verwendet wurde, so gelten abweichend von diesen Licence you may exercise further usage rights as specified in Nutzungsbedingungen die in der Lizenz gewährten Nutzungsrechte. the licence. https://creativecommons.org/licenses/by-nc-nd/4.0/ Leibniz-Informationszentrum Wirtschaft zbw Leibniz Information Centre for Economics Academic Journal of Economic Studies
    [Show full text]