Central Electricity Authority/ केे ीय िवुतु ाधकरण Renewable Energy Project Monitoring Division/ नवीकरणीय ऊजा परयोजना बोधन भाग

Total Page:16

File Type:pdf, Size:1020Kb

Central Electricity Authority/ केे ��ीय िव�ुतु �ा�धकरण Renewable Energy Project Monitoring Division/ नवीकरणीय ऊजा� � प�रयोजना �बोधन �भाग Central Electricity Authority/ केे ीय िवुतु ाधकरण Renewable Energy Project Monitoring Division/ नवीकरणीय ऊजा परयोजना बोधन भाग Daily Renewable Generation Report (ISGS)/ दिैै नक अय ऊजा उपादन रपोट (ISGS) 22 May 2021 Cumulative Generation during May Sector Installed Actual State/ Region Owner Type 2021 Station (Central/State/Private) Capacity Generation (MU) (MU) (MU) AURAIYA Uttar Pradesh Central NTPC Solar 8.0 0.06 1.97 DADRI SOLAR Uttar Pradesh Central NTPC Solar 5.0 0.02 0.4 SINGRAULI SOLAR Uttar Pradesh Central NTPC Solar 15.0 0.08 1.33 UNCHAHAR SOLAR Uttar Pradesh Central NTPC Solar 10.0 0.05 0.8 ADANI RENEWABLE ENERGY FOUR PVT Rajasthan Private IPP Solar 50.0 0.37 8.13 LTD MAHOBA SOLAR (UP) PRIVATE LTD Rajasthan Private IPP Solar 200.0 1.36 30.76 AZURE POWER FORTY THREE PRIVATE Rajasthan Private IPP Solar 250.0 2.29 43.82 LTD ACME CHITTORGARH ENERGY PVT LTD. Rajasthan Private IPP Solar 250.0 1.75 36.69 AZURE POWER INDIA PVT LTD Rajasthan Private IPP Solar 200.0 1.27 27.54 AZURE POWER THIRTY FOUR PRIVATE Rajasthan Private IPP Solar 130.0 0.92 20.43 LTD M/S ADANI SOLAR ENERGY JODHPUR TWO Rajasthan Private IPP Solar 50.0 0.37 8.25 LTD CLEAN SOLAR POWER (BHADLA) PVT LDT Rajasthan Private IPP Solar 300.0 2.19 48.6 RENEW SOLAR POWER PVT LTD Rajasthan Private IPP Solar 50.0 0.36 7.88 RENEW SOLAR POWER PVT LTD. BIKANER Rajasthan Private IPP Solar 250.0 1.85 35.49 SB ENERGY FOUR PVT LTD Rajasthan Private IPP Solar 200.0 1.34 29.88 TATA POWER RENEWABLE ENERGY LTD Rajasthan Private IPP Solar 150.0 1.2 22.31 उरी ेे / Northern Region 2118.0 15.48 324.28 Madhya ACME SOLAR (RAMNAGAR) Private IPP Solar 250.0 1.92 32.54 Pradesh Madhya ARINSUN SOLAR (BARSAITADESH) Private IPP Solar 250.0 1.85 32.19 Pradesh Madhya MAHINDRA SOLAR (BADWAR) Private IPP Solar 250.0 1.9 33.01 Pradesh ALFNAR WIND Gujarat Private IPP Wind 300.0 4.5 85.82 RENEW SOLAR (BHUVAD) Gujarat Private IPP Solar 250.0 2.83 48.27 RENEW AP2 WIND(GHADSISA) Gujarat Private IPP Wind 300.0 3.49 23.51 GIWEL-II WIND (VADVA) Gujarat Private IPP Wind 250.0 2.83 47.27 GIWEL-III WIND (NARANPAR) Gujarat Private IPP Wind 300.0 3.2 55.44 IWISL WIND (DAYAPAR) Gujarat Private IPP Wind 500.0 2.03 40.37 ADANI GREEN ENERGY MP LTD(DAYAPAR) Gujarat Private IPP Wind 176.4 2.95 57.67 OSTRO WIND (KUTCH) Gujarat Private IPP Wind 250.0 2.87 54.97 पमी ेे / Western Region 3076.4 30.37 511.06 GREEN INFRA Tamil Nadu Private IPP Wind 250.0 1.08 20.48 ORANGE Tamil Nadu Private IPP Wind 200.0 0.83 15.76 MYTRA Tamil Nadu Private IPP Wind 250.0 1.16 16.07 BEETAM(TUTICORIN)** Tamil Nadu Private IPP Wind 250.0 0.87 17.02 NP KUNTA Andhra ACME (BIWADI) Private IPP Solar 50.0 0.15 7.27 Pradesh Andhra ACME (HISAR) Private IPP Solar 50.0 0.23 7.48 Pradesh Andhra ACME (KARNAL) Private IPP Solar 50.0 0.23 7.47 Pradesh Andhra AYANA Private IPP Solar 250.0 1.05 37.44 Pradesh Andhra AZURE Private IPP Solar 50.0 0.16 5.88 Pradesh Andhra FRV1 Private IPP Solar 50.0 0.22 8.28 Pradesh Andhra FRV2 Private IPP Solar 50.0 0.21 7.59 Pradesh Andhra NTPC Central NTPC Solar 250.0 0.7 25.48 Pradesh Andhra SBG ENERGY Private IPP Solar 250.0 1.15 42.59 Pradesh Andhra SPRING ANGITRA Private IPP Solar 250.0 0.39 16.03 Pradesh Andhra TATA POWER Private IPP Solar 100.0 0.88 26.26 Pradesh Total daily generation of NP KUNTA Solar Park 1400.0 5.37 191.77 PAVAGADA ADYAH BLOCK 2 Karnataka Private IPP Solar 50.0 0.27 7.66 ACME (KURUKSHETHRA) Karnataka Private IPP Solar 50.0 0.25 7.53 ACME (RIWARI) Karnataka Private IPP Solar 50.0 0.26 7.47 ADYAH BLOCK 1 Karnataka Private IPP Solar 50.0 0.27 7.72 ADYAH BLOCK 10 Karnataka Private IPP Solar 50.0 0.27 7.61 ADYAH BLOCK 13 Karnataka Private IPP Solar 50.0 0.26 7.57 ADYAH BLOCK 3 Karnataka Private IPP Solar 150.0 0.27 7.8 ADYAH BLOCK 6 Karnataka Private IPP Solar 50.0 0.27 7.77 AVAADA SOLAR Karnataka Private IPP Solar 150.0 0.73 21.03 AVAADA SOLARISE Karnataka Private IPP Solar 150.0 0.71 21.33 AZURE POWER EARTH Karnataka Private IPP Solar 100.0 0.51 15.11 FORTUM FIN SURYA Karnataka Private IPP Solar 100.0 0.44 13.07 FORTUM SOLAR Karnataka Private IPP Solar 250.0 1.19 35.5 KREDL Karnataka Private IPP Solar 50.0 0.25 6.97 PARAMPUJYA Karnataka Private IPP Solar 150.0 0.71 21.48 RENEW TN2 Karnataka Private IPP Solar 50.0 0.26 7.75 SBG ENERGY Karnataka Private IPP Solar 100.0 0.97 29.11 TATA RENEWABLES Karnataka Private IPP Solar 400.0 1.91 57.16 YARROW Karnataka Private IPP Solar 50.0 0.25 7.37 Total daily generation of PAVAGADA Solar Park 2050.0 10.05 297.01 दणी ेे / Southern Region 4400.0 19.36 558.11 Total Daily RE generation from ISGS (MU) 9594.4 65.21 1393.45 * ISGS RE Stations which are scheduled by RLDCs. ** 50 MW has been commissioned out of 250 MW..
Recommended publications
  • U.S. India Partnership to Advance Clean Energy (PACE)
    U.S.-India Partnership to Advance Clean Energy (PACE) An initiative of the U.S.-India Energy Dialogue A Progress Report June 2013 “The relationship between the United States and India will be one of the de ning partnerships of the 21st century.” - Barack Obama The President of the United States A Progress Report by: The Department of Commerce (DOS), Department of Energy (DOE), Department of State (DOS), Export-Import Bank of the United States (Ex-Im), Overseas Private Investment Corporation (OPIC), U.S. Agency for International Development (USAID), and U.S. Trade and Development Agency (USTDA). Photos courtesy of the U.S. Government Websites (or as otherwise indicated). U.S.-India Partnership to Advance Clean Energy (PACE) Table of Contents Executive Summary 1 Recent Highlights 2 U.S.-India Energy Dialogue 3 • Working Groups 4 Partnership to Advance Clean Energy (PACE) 8 Clean Energy Finance 10 • Innovative Financing Mechanisms 10 • Insurance and Financial Products 11 Renewable Energy 12 • PACE-R Renewable Energy Consortia 12 – Solar Energy Research Institute for India and the U.S. (SERIIUS) 12 – U.S.-India Consortium for Development of Sustainable Advanced Lignocellulosic Biofuel Systems 13 • PACE-D Renewable Energy Component 14 – Scaling up Renewable Energy in India 14 – Support for Solar Deployment 15 – Wind Resources 16 – Energy Access for Inclusive Growth 17 Energy Effi ciency 20 • Smart Grid 20 • Building Effi ciency 22 – PACE-R Building Energy Effi ciency Consortium 22 – PACE-D Building Energy Effi ciency Component 23 • Industrial Effi
    [Show full text]
  • Fourth Quarter & Full Year Ended March 31, 2017
    India’s first private grid connected MW Solar plant India’s first distributed rooftop solar project over one megawatt Pan India portfolio of solar assets in 18 States Fourth Quarter & Full Year Ended March 31, 2017 Earnings Presentation June 19, 2017 1 | Copyright © 2017 Azure Power | www.azurepower.com Disclaimer Forward-Looking Statements This information contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934 and the Private Securities Litigation Reform Act of 1995, including statements regarding our future financial and operating guidance, operational and financial results such as estimates of nominal contracted payments remaining and portfolio run rate, and the assumptions related to the calculation of the foregoing metrics. The risks and uncertainties that could cause our results to differ materially from those expressed or implied by such forward-looking statements include: the availability of additional financing on acceptable terms; changes in the commercial and retail prices of traditional utility generated electricity; changes in tariffs at which long term PPAs are entered into; changes in policies and regulations including net metering and interconnection limits or caps; the availability of rebates, tax credits and other incentives; the availability of solar panels and other raw materials; our limited operating history, particularly as a new public company; our ability to attract and retain our relationships with third parties, including our solar partners; our ability to meet the covenants in debt facilities; meteorological conditions and such other risks identified in the registration statements and reports that we have file with the U.S. Securities and Exchange Commission, or SEC, from time to time.
    [Show full text]
  • Government of India Ministry of New and Renewable Energy Lok Sabha Unstarred Question No-1538
    GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO-1538 TO BE ANSWERED ON-26.07.2018 SOLAR PARK SCHEME 1538. SHRI GEORGE BAKER SHRI PARBHUBHAI NAGARBHAI VASAVA SHRI ANIL SHIROLE Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:- (a) the salient features of the Solar Park Scheme; (b) the details of the funds sanctioned, allocated and utilised for the setting up of these parks during the last three years and the current year across the country, State/UT-wise including Gujarat, Maharashtra and West Bengal; (c) the details of the number of solar parks approved and set up/in progress during the above-mentioned period across the country, State/UT-wise including Gujarat, Maharashtra and West Bengal; (d) the details of the target set and achievements made under this scheme so far; (e) the percentage of clean energy generated by these parks so far across the country, State/UT-wise; and (f) whether the Government has faced any difficulty in some of the States with regard to setting up of these parks after approval and if so, the details thereof and the reasons therefor along with the action taken by the Government in this regard? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (I/C) (SHRI R.K. SINGH) (a) The salient features of the Solar Park Scheme are given at Annexure-I. (b) The State/UT-wise details of the funds sanctioned for setting up of Solar parks during last three years and the current year are given at Annexure-II.
    [Show full text]
  • Government of India Ministry of New and Renewable Energy Lok Sabha Unstarred Question No
    GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO. 2316 TO BE ANSWERED ON 16.03.2017 FUNDS UNDER JNNSM 2316. SHRI K.C. VENUGOPAL: Will the Minister of NEW & RENEWABLE ENERGY be pleased to state: (a) the funds sanctioned and released under Jawaharlal Nehru National Solar Mission (JNNSM) to various States including Kerala during each of the last three years and the current year, State-wise; and (b) the details of solar parks and ultra mega solar power projects started functioning under the Mission during the said period, State-wise? ANSWER THE MINISTER OF STATE FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (INDEPENDENT CHARGE) (SHRI PIYUSH GOYAL) (a): State-wise budgetary allocation is not made under the schemes/programmes. However, details of amount released by this Ministry for installation of solar energy projects during last three years and current year are given below:- Total funds sanctioned for release Year (Rs. Crore) 2013-14 692.28 2014-15 1158.19 2015-16 3146.24 2016-17 2140.92 (as on 28.2.2017) State-wise details of funds released during the last three years and current year under few schemes are given at Annexure-I. (b): 34 Solar Parks have been sanctioned in 21 States for solar power capacity of 20,000 MW. As on date, Ananthapuramu solar park in Andhra Pardesh, Bhadla-II solar park in Rajasthan, Kasargod solar park in Kerala are partly functional. The details of sanctioned solar parks and ultra-mega solar power projects under the Mission (JNNSM) are given at Annexure-II.
    [Show full text]
  • SOLAR PARKS Accelerating the Growth of Solar Power in India
    Cover Story SOLAR PARKS Accelerating the Growth of Solar Power in India Anindya S Parira, discusses about the objectives, targets, the progress made so far, the solar power park developers (SPPDs), and the challenges that lie ahead of the Solar Parks flagship scheme under the National Solar Mission of the Government of India. Solar Parks: Accelerating the Growth of Solar Power in India he recent downward trends in zone of development of solar various permissions, etc., which solar tariff may be attributed power generation projects and delays the project. To overcome to the factors like economies provides developers an area that these challenges, the scheme for Tof scale, assured availability is well characterized, with proper “Development of Solar Parks and of land, and power evacuation infrastructure and access to amenities Ultra-Mega Solar Power Projects” was systems under the Solar Park and where the risk of the projects rolled out in December 2014 with an Scheme. The scheme aims to provide can be minimized. Solar Park also objective to facilitate the solar project a huge impetus to solar energy facilitates developers by reducing the developers to set up projects in a generation by acting as a flagship number of required approvals. The plug-and-play model. demonstration facility to encourage most important benefit from the solar project developers and investors, park for the private developer is the Target prompting additional projects of significant time saved. It was planned to set up at least 25 similar nature, triggering economies solar parks, each with a capacity of of scale for cost-reductions, technical Objective 500 MW and above; thereby targeting improvements and achieving large Solar power projects can be set up around 20,000 MW of solar power scale reductions in greenhouse anywhere in the country, however installed capacity.
    [Show full text]
  • Plantwise Monthly RE Generation Report
    भारत सरकार Government of India वि饍युत मंत्रालय Ministry of Power के न्द्री य वि 饍यु त प्रा धि क रण Central Electricity Authority निीकरणीय ऊ셍ाा पररयो셍ना प्रबोिन प्रभाग Renewable Energy Project Monitoring Division संयत्रािारनिीकरणीय ऊ셍ाा उ配पादन ररपो셍ा Report on Plant wise Renewable Energy Generation अप्रैल-2021 April-2021 Preface Government of India has set an ambitious target of 175 GW of Renewable Energy installed capacity by year 2022. By the end of April 2021, India has successfully achieved approximately 95 GW of Renewable Energy Installed capacity. CEA is monitoring state-wise and source wise Renewable Energy Generation across the country. For better insight and measure of ground level performance of individual Plants there is a need for compiling Plant wise Renewable Energy Generation data. In this connection, effort are being made by CEA. Based on the information provided by various SLDCs to CEA, a report has been prepared incorporating the details of Plant wise Generation of Renewable Energy projects as furnished by the States/UTs of Rajasthan, Madhya Pradesh, Tamil Nadu, Jammu & Kashmir, West Bengal, Odisha, Chhattisgarh, Telangana, Punjab and Andaman & Nicobar. Table of Contents Summary of All India Plant wise Renewable Energy Generation………………………………………………………………………………………………………………… ...................................... 4 Plantwise Renewable Energy Generation Rajasthan ...............................................................................................................................................................................................................................................
    [Show full text]
  • The Business Case for Off-Grid Energy in India 2 the Business Case for Off-Grid Energy in India
    1 FINANCE Off-Grid Business Models IN PARTNERSHIP WITH THE BUSINESS CASE FOR OFF-GRID ENERGY IN INDIA 2 THE BUSINESS CASE FOR OFF-GRID ENERGY IN INDIA www.theclimategroup.org TABLE OF CONTENTS LIST OF FIGURES AND TABLES ii LIST OF ACRONYMS iv DEFINITIONS vi OBJECTIVES, SCOPE AND APPROACH vii METHODOLOGY AND RESEARCH SOURCES vii 1. Executive summary 01 2. The opportunity for off-grid renewable energy 06 2.1 Unmet electricity demand in India 06 2.2 The case for solar home system (SHS) and DRE businesses 09 3. Assessment of off-grid energy business models 14 3.1 Overview of SHS enterprises 14 3.1.1 SHS technology and pricing 14 3.1.2 SHS value chain and key players 15 3.1.3 Unit level economics 17 3.1.4 Consumer financing and affordability 21 3.1.5 Evolution of the SHS market 24 3.1.6 Market size and impact 31 3.2 Overview of decentralized renewable energy (DRE) enterprises 33 3.2.1 DRE technology and service offering 33 3.2.3 Pricing and payment mechanisms 37 3.2.4 Addressing challenges in the DRE space 39 3.2.5 Evolution of the DRE market 49 3.2.6 Market size and impact 51 4. Policy environment and the case for private sector investment 56 4.1 Government policies and implementation progress 56 4.2 Need for private sector involvement 61 www.theclimategroup.org THE BUSINESS CASE FOR OFF-GRID ENERGY IN INDIA 3 4.3 Challenges for investment 63 4.4 Specific financing needs of OGE enterprises 66 5.
    [Show full text]
  • Mercom Capital Group India Solar Market Update
    Mercom Capital Group India Solar Market Update India Solar Quarterly Market Update Indian Solar Market Picks Up Speed With More Than 4 GW Forecasted in 2016 March 2016 KEY FINDINGS India solar installations totaled 2,133 MW in 2015, up from 883 MW installed in 2014, year-over-year (YoY) growth of 142%. Mercom is forecasting 2016 installations to reach approximately 4 GW, almost 100% YoY growth. Auctions are being announced at a brisk pace even though delays and extensions are fairly common. Approximately 10 GW of solar projects are currently under development with about 8.4 GW more to be auctioned over the next few months. So far, 16 states have principally agreed to join the UDAY debt restructuring program. Of these states, only seven have signed a memorandum of understanding (MoU). The World Trade Organization (WTO) has ruled against India’s domestic content policy for solar cells and modules. Aggressive bidding continues to be a major concern with the latest auctions hitting new lows at ₹4.34 ($0.064)/kWh. The Clean Environment Cess (tax) has doubled from ₹200 (~$3)/ton to ₹400 (~$6)/ton in the 2016-17 budget. A national RPO of 8% by March 2022 has been approved by the Union Cabinet in the revised power tariff policy 2016. List of Charts/Tables India Solar Installations (MW) ……………………………………………………………..……………….. 2 India Solar Policy Map ………..…….………………….…….…………………………………….……….. 4 Utility-Scale Solar Projects in India …………………………………………………………….................. 5 All India Cumulative Solar Installations By Policy Type (MW) ……………………..…………………… 5 India Solar Project Pipeline (MW) …………………………….……………………………………….…… 6 JNNSM Phase II, Batch 2 Tenders/Auction Results ………………….................................................. 7 JNNSM Phase II, Batch 3 Tenders/Auction Results …………………................................................
    [Show full text]
  • Solar Is Driving a Global Shift in Electricity Markets
    SOLAR IS DRIVING A GLOBAL SHIFT IN ELECTRICITY MARKETS Rapid Cost Deflation and Broad Gains in Scale May 2018 Tim Buckley, Director of Energy Finance Studies, Australasia ([email protected]) and Kashish Shah, Research Associate ([email protected]) Table of Contents Executive Summary ......................................................................................................... 2 1. World’s Largest Operational Utility-Scale Solar Projects ........................................... 4 1.1 World’s Largest Utility-Scale Solar Projects Under Construction ............................ 8 1.2 India’s Largest Utility-Scale Solar Projects Under Development .......................... 13 2. World’s Largest Concentrated Solar Power Projects ............................................... 18 3. Floating Solar Projects ................................................................................................ 23 4. Rooftop Solar Projects ................................................................................................ 27 5. Solar PV With Storage ................................................................................................. 31 6. Corporate PPAs .......................................................................................................... 39 7. Top Renewable Energy Utilities ................................................................................. 44 8. Top Solar Module Manufacturers .............................................................................. 49 Conclusion .....................................................................................................................
    [Show full text]
  • Azure Power Provides an Update on 4 GW Tender
    Azure Power Provides an Update on 4 GW Tender December 23, 2020 NEW DELHI, Dec. 23, 2020 /PRNewswire/ -- Azure Power continues to work towards signing PPAs for the 4 GW manufacturing linked tender for which a Letter of Award ("LOA") has already been received. The Solar Energy Corporation of India ("SECI") has informed us that so far there has not been adequate response from the state electricity distribution companies ("DISCOMs") for SECI to be able to sign the PSAs at this stage even though we have a LOA. SECI has mentioned that they will be unable to sign PPAs until PSAs have been signed, and they have committed to inform Azure Power of developments in their e orts with the DISCOMS. Capital costs, interest rates and foreign exchange rates have improved since Azure Power won the 4 GW auction a year ago which have resulted in lower tari s in other recent SECI auctions. We expect these savings likely will be passed on to state electricity distribution companies (DISCOMS). We expect a tari markdown from the price discovered in the auction, which will facilitate signing of PSAs. We will continue our discussions with SECI towards signing PPAs in respect of the 4GW tender and expect the PPAs to be signed in tranches over a period of time. We will continue our policy to only take on contracts that create shareholder value and earn returns that are above our cost of capital. About Azure Power Azure Power (NYSE: AZRE) is a leading independent solar power producer with a pan-India portfolio of 7.1 gigawatts on September 30, 2020 of which 1.8 GWs is operational, 1.3 GWs are under construction and 4.0 GWs have received a Letter of Award but for which PPAs have yet to be signed.
    [Show full text]
  • Policy and Financial Barriers to Micro-Grid Development in India
    Policy and Financial Barriers to Micro-Grid Development in India Roberts Environmental Center at Claremont McKenna College Sustainable Development Policy and Finance Team May 16, 2019 Will Cullen CMC ‘19 Matt Psaltakis CMC ’19 Ally So CMC ‘21 Katie O’Neill CMC ‘21 Cade Moffatt CMC ‘21 Samantha Murphy CMC ‘21 Abby Gilliland CMC ‘21 Sam Willett CMC ‘20 Lude Rong CMC ‘20 TABLE OF CONTENTS INTRODUCTION Katie O’Neill (CMC ‘21) 5 Goals of Research 5 Methodology 5 BACKGROUND Katie O’Neill (CMC ‘21), Sami Murphy (CMC ‘21) 6 1. Energy Poverty in India 6 2. Sustainable Development Goals 6 3. Vision for Achieving Universal Electrification in India 7 4. Challenges to Micro-Grid Investment 8 1. Federal Government Policies Sami Murphy (CMC ‘21) 9 1. India’s Central Government’s Policy Goals 10 2. Multilateral Partnerships 10 3. Electricity Act of 2003 11 4. RGGVY 11 2. State & Local Level Policy Sami Murphy (CMC ‘21) 12 1. Overview 13 2. Case Study: Uttar Pradesh 14 Room for Improvement 15 3. Financing Barriers Sam Willett (CMC ‘20) and Cade Moffatt (CMC ‘21) 16 4. Comparing Strategies for Electrification Katie O’Neill (CMC ‘21) 18 1. Central Grid 18 2. Solar Home Systems 19 3. Micro-Grid 20 5. Current Companies Operating Matt (CMC ‘19) 23 Introduction 23 6. Case Studies: Micro-grid Companies ​ Sami Murphy (CMC ‘21), Cade Moffatt (CMC ‘21), Ally So (CMC ‘21) 26 1. Gram Oorja 26 2. Zola Electric 26 3. OMC Power 27 2 4. SELCO Foundation 27 5. Mera Gao 28 7. Case Studies: Funding Organizations ​ Cade Moffatt (CMC ‘21), Ally So (CMC ‘21) 30 1.
    [Show full text]
  • Azure-Power-Operational-And-Financial-Update-V1.Pdf
    Azure Power Operational and Financial Update Ebene, Mauritius, September 8, 2019: Azure Power Global Limited (NYSE: AZRE) (the “Company”), a leading independent solar power producer in India, today announced certain operational and financial updates. This is not an offer to sell or purchase nor the solicitation of an offer to sell or purchase securities and shall not constitute an offer, solicitation or sale in any state or jurisdiction in which, or to any person to whom such an offer, solicitation or sale would be unlawful. Operational Update Overview Our mission is to be the lowest-cost power producer in the world. We sell solar power in India on long-term fixed price contracts to our customers, at prices which in many cases are at or below prevailing alternatives for these customers. We are also developing micro-grid applications for the highly fragmented and underserved electricity market in India. Since 2011, we have achieved an 85% reduction in total solar project cost, including an 86% decrease in balance of systems costs, due in part to our value engineering, design and procurement efforts. Indian solar capacity installed reached approximately 29.4 GW at the end of June 2019 with a target to achieve 100 GW of installed solar capacity by 2022. Solar power is a cleaner, faster-to-build and cost-effective alternative energy solution to coal and diesel-based power, the economic and climate costs of which continue to increase every year. Through its use of solar power, we estimate that the Company has avoided the release of approximately 4.9 million tons CO2, which is equivalent to the byproduct of burning approximately 3.4 million tons of coal.
    [Show full text]