Project Track Record (2018)

Total Page:16

File Type:pdf, Size:1020Kb

Project Track Record (2018) PROJECT TRACK RECORD (2018) Project Title Contractor Scope of Works Delivery (Country) Design and Fabricate Segment Moulds Extension of Metro Alger Lot 1 SELI OVERSEAS S.p.A ID9300mm (5 sets), Segment Handling December 2018 Equipment Shanghai Tunnel Engineering Co. Design and Fabricate Segment Moulds DTSS 2 – T11 (Singapore) November 2018 (Singapore) Pte Ltd ID3505mm (7 sets) Design and Fabricate Segment Moulds DTSS 2 – T10 (Singapore) TBM 3 Nishimatsu Construction Co., Ltd October 2018 ID4005mm (3 sets), Taper Liner DTSS 2 – T07 (Singapore) South ZUBLIN PRECAST INDUSTRIES Design and Fabricate Segment Moulds September 2018 Tunnel SDN BHD ID6.58m (5 sets) Design and Fabricate Segment Moulds DTSS 2 – T07 (Singapore) ZUBLIN PRECAST INDUSTRIES ID4.08m (6 sets) and Segment Handling August 2018 NorthWest Link Sewer Tunnel SDN BHD Equipment China Railway Tunnel Group Co., Design and Fabricate Segment Moulds Circle Line 6 – C885 (Singapore) July 2018 Ltd (Singapore Branch) ID5.8m (2 sets) Thomson East Coast Line Project Design and Fabricate Steel Segment Samsung C&T June 2018 T307 (Singapore) Moulds ID5.8m (1 set) Design and Fabricate Rectangular Moulds Shanghai Tunnel Engineering Co. FUNAN Underpass (Singapore) Inner 6600mm x 4875mm x 550mm x March 2018 (Singapore) Pte Ltd 1500mm (2 sets) PROJECT TRACK RECORD (2017) Project Title Contractor Scope of Works Delivery (Country) Thomson East Coast Line Project Design and Fabricate Steel Segment Samsung C&T December 2017 T307 (Singapore) Moulds ID5.8m (3 sets) Thomson East Coast Line Project SSANGYONG-HYUNDAI Joint Design and Fabricate Steel Segment September 2017 T308 (Singapore) Venture Moulds ID5.8m (4 sets) China Jingye Engineering Thomson East Coast Line Project Design and Fabricate Steel Segment Corporation Limited (Singapore July 2017 T311 (Singapore) Moulds ID5.8m (2 sets) Branch) Design and Fabricate Steel Segment PUB P5 (Singapore) Tiong Seng Contractors (Pte) Ltd June 2017 Moulds ID3.8m (2 sets) Mae Tang – Mae Ngat Water Design and Fabricate Steel Segment Transmission Tunnel Pacakge 1 Right Tunnelling Co., Ltd. Moulds ID4m, Hexagonal (New 6 sets) and May 2017 (Chiang Mai, Thailand) Segment Handling Equipment. Design and Fabricate Steel Segment Mumbai Metro Line 3 – UGC 07 L & T STEC JV MUMBAI Moulds ID5.7m (New 5 sets, Refurbishment April 2017 (India) 2 sets) Mae Tang – Mae Ngat Water Design and Fabricate Steel Segment SIAMPHAN ENTERPRISE Transmission Tunnel Package 2 Moulds ID4m, Hexagonal (New 8 sets) and April 2017 CO.,LTD (Chiang Mai, Thailand) Segment Handling Equipment. Design and Fabricate Steel Segment Mumbai Metro Line 3 – UGC 02 HCC-MMS JOINT VENTURE Moulds ID5.7m (New 2 sets, Refurbishment March 2017 (India) 12 sets) Design and Fabricate Steel Segment Mumbai Metro Line 3 – UGC 5&6 J.KUMAR INFRAPROJECTS Moulds ID5.7m (New 4 sets, Refurbishment February 2017 (India) LTD., 8 sets) Design and Fabricate Steel Segment DUBAI METRO ROUTE 2020 ACCIONA-GULERMAK JV Moulds ID8.5m (4 sets) and Segment January 2017 Handling Equipment. PROJECT TRACK RECORD (2016) Project Title Contractor Scope of Works Delivery (Country) Thomson East Coast Line Project China Railway First Group Co., Design and Fabricate Steel Segment December 2016 T302 (Singapore) Ltd. Moulds ID5.8m (4 sets) Thomson East Coast Line Project Design and Fabricate Steel Segment Wohhup-STEC JV November 2016 T310 (Singapore) Moulds ID5.8m (4 sets) Thomson East Coast Line Project Shanghai Tunnel Engineering Design and Fabricate Steel Segment October 2016 T305 (Singapore) Co Ltd Moulds ID5.8m (4 sets) Lucknow Metro LKCC-06 Gulermak TPL Joint venture, C/o Design and Fabricate Steel Segment September 2016 (India) Tata Projects Ltd Moulds ID5.7m (6 sets) Atakoy İkitelli Metro Project ASKER NAKLIYAT INŞAAT Design and Fabricate Steel Segment July 2016 (Turkey) TAAHUT VE TIC. LTD. STI. Moulds ID5.7m (6 sets) IDRIS MAIN TRUNK SEWER Design and Fabricate Steel Segment SHP (Strabag-Hochtief- MTS -02 CENTRAL Moulds ID5m (14 sets), Segment Handling May 2016 Petroserv) CONTRACTORS JV (Doha, Qatar) Equipment. UNDERGROUND Design and Fabricate Steel Segment PUB SDC – C3 (Singapore) TECHNOLOGY ENGINEERING February 2016 Moulds ID6m (2 sets) CONSTRUCTION PTE LTD Kiralı Bakırkoy Metro Project ASKER NAKLIYAT INŞAAT Design and Fabricate Steel Segment January 2016 (Turkey) TAAHUT VE TIC. LTD. STI. Moulds ID5.7m (6 sets) PROJECT TRACK RECORD (2015) Project Title Contractor Scope of Works Delivery (Country) Tiong Seng Contractors (Pte) Design and Fabricate Steel Segment PUB SDC – C2 (Singapore) August. 2015 Ltd Moulds ID4.5m (2 sets) Thomson Line Project T227 Design and Fabricate Steel Segment Sembawang-Sinohydro JV August. 2015 (Singapore) Moulds ID5.8m (2 sets) Thomson Line Project T225 Shanghai Tunnel Engineering Design and Fabricate Steel Segment August. 2015 (Singapore) Co Ltd Moulds ID5.8m (3 sets) Thomson Line Project T228 Nishimatsu Construction Co., Design and Fabricate Steel Segment July. 2015 (Singapore) Ltd Moulds ID5.8m (3 sets) DEVOLL HYDROPOWER Design and Fabricate Steel Segment Limak-AGE, JV (Turkey) July. 2015 PROJECT (Albania) Moulds ID5.4m (5 sets) Thomson Line Project T216 Daewoo Engineering and Design and Fabricate Steel Segment April. 2015 (Singapore) Construction Co., Ltd Moulds ID5.8m (5 sets) Thomson Line Project T222 Design and Fabricate Steel Segment Daelim Industrial Co., Ltd March. 2015 (Singapore) Moulds ID5.8m (4 sets) Thomson Line Project T209 Design and Fabricate Steel Segment China Railway No 5 February. 2015 (Singapore) Moulds ID5.8m (4 sets) Thomson Line Project T211 Design and Fabricate Steel Segment Penta Ocean January. 2015 (Singapore) Moulds ID5.8m (6 sets) PROJECT TRACK RECORD (2014) Project Title Contractor Scope of Works Delivery (Country) Thomson Line Project T215 RSEA-ENG LEE-WAI FONG Design and Fabricate Steel Segment Nov. 2014 (Singapore) J.V. Moulds ID5.8m (2 sets) Thomson Line Project T217 Design and Fabricate Steel Segment Sinohydro Nov. 2014 (Singapore) Moulds ID5.8m (3 sets) Thomson Line Project T212 Design and Fabricate Steel Segment Sato Kogyo Pte Ltd Oct. 2014 (Singapore) Moulds ID5.8m (4 sets) Design and Fabricate Steel Segment Thomson Line Project T208 Leighton – Eastern Pretech Moulds ID5.8m (4 sets) and 1 Lot of Sep. 2014 (Singapore) Carrousel Plant Thomson Line Project T202 Design and Fabricate Steel Segment Penta Ocean Jul. 2014 (Singapore) Moulds ID5.8m (4 sets) SPPA – Cable Tunnel JIPCT Design and Fabricate Steel Segment Penta Ocean Jun. 2014 (Singapore) Moulds ID6m (7 sets) Abu Hamour (Doha, Impregilo s.P.A. Qatar Branch/ Additional Segment Moulds ID3.7m (6 May. 2014 Qatar) Smeet-MTD JV sets) SPPA – Cable Tunnel NS2 SK Engineering & Construction Additional Segment Moulds ID6m (2 sets) Arp. 2014 (Singapore) Red Line North (Doha, Smeet-MTD JV Segment Handling Equipment (2 sets) Mar. 2014 Qatar) SPPA – Cable Tunnel EW2 SK Engineering & Construction Additional Segment Moulds ID6m (2 sets) Mar. 2014 (Singapore) PROJECT TRACK RECORD (2013) Project Title Contractor Scope of Works Delivery (Country) Abu Hamour (Doha, Impregilo s.P.A. Qatar Branch/ Design and Fabricate Steel Segment Dec. 2013 Qatar) Smeet-MTD JV Moulds ID3.7m (8 sets) SPPA – Cable Tunnel NS1 Design and Fabricate Steel Segment Samsung C&T Sep. 2013 (Singapore) Moulds ID6m (6 sets) Design and Fabricate Steel Segment Delhi Metro CC34 (India) HCC-Samsung JV Moulds ID5.8m (Refurbished 5sets and Aug. 2013 new 7sets) SPPA – Cable Tunnel NS2 Design and Fabricate Steel Segment SK Engineering & Construction Aug. 2013 (Singapore) Moulds ID6m (4 sets) SPPA – Cable Tunnel EW2 Design and Fabricate Steel Segment SK Engineering & Construction Aug. 2013 (Singapore) Moulds ID6m (6 sets) SPPA – Cable Tunnel EW1 Design and Fabricate Steel Segment Obayashi Corporation July. 2013 (Singapore) Moulds ID6m (7 sets) Design and Fabricate Steel Segment Cable Tunnel (Iran) MTS Perforator Moulds ID2.4m (6 sets) and Vacuum Lift June. 2013 &Turning Device Design and Fabricate Steel Segment Fortaleza Metro Line 3 (Brazil) Robbins Company Moulds ID6m (16 sets) ) and Segment May. 2013 Carrousel Plant (2 plants) Grosvenor Mine Excution Design and Fabricate Steel Segment Phase, Transport Drift TBM Robbins Company Moulds ID7m (5 sets) for Carrousel Line Feb. 2013 Tunnel (Australia) and Segment Handling Equipment PROJECT TRACK RECORD (2012) Project Title Contractor Scope of Works Delivery (Country) Delhi Metro CC-20 & CC24 Design and Fabricate Steel Segment TERRATEC Oct. 2012 (India) Moulds ID5.8m (7 sets) Design and Fabricate Steel Segment MRT DTL 3 C935 (Singapore) Leighton – John Holland JV Aug. 2012 Moulds ID5.8m (2 sets) Design and Fabricate Steel Segment Delhi Metro CC-07 (India) TERRATEC Aug. 2012 Moulds ID5.8m (4 sets) Design and Fabricate Steel Segment MRT DTL 3 C923 (Singapore) Samsung C & T Jun. 2012 Moulds ID5.8m (2 sets) Design and Fabricate Steel Segment MRT DTL 3 C937 (Singapore) GS Engineering & Construction May. 2012 Moulds ID5.8m (4 sets) for Carrousel Line Design and Fabricate Steel Segment Abu Dhabi STEP T-01 (UAE) Samsung C & T Apr. 2012 Moulds ID4.5m (2 sets) Additional Design and Fabricate Steel Segment Yamanli II HEPP Project The Robbins Company Moulds ID3.5m (7 sets) and Segment Apr. 2012 (Turkey) Handling Equipments Marmaray Project BC1, (Istanbul, Design and Fabricate Steel Segment Taisei Corporation Mar. 2012 Turkey) Moulds ID6.4m (1 set) C.M.C. Ravenna Singapore Design and Fabricate Steel Segment MRT DTL 3 C926 (Singapore) Mar. 2012 Branch Moulds ID5.8m (7 sets) Shanghai Tunnel Engineering Design and Fabricate Steel Segment MRT DTL 3 C923A (Singapore) Feb. 2012 Co Ltd Moulds ID5.8m (5 sets) C.M.C. Ravenna Singapore Design and Fabricate Steel Segment MRT DTL 3 C927 (Singapore) Jan. 2012 Branch Moulds ID5.8m (4 sets) PROJECT TRACK RECORD (2011) Project Title Contractor Scope of Works Delivery (Country) MRT DTL 2 C921 Project Ssangyong Engineering & Design and Fabricate Steel Segment Dec. 2011 (Singapore) Construction Co., Ltd. Moulds ID5.8m (2 sets) MRT DTL 3 C928 & C932 Design and Fabricate Steel Segment Sato Koygo Pte Ltd Dec. 2011 (Singapore) Moulds ID5.8m (5 sets) SK E&C Design and Fabricate Steel Segment MRT DTL 3 C930 (Singapore) Dec.
Recommended publications
  • Dubai Review 2020 – 2021 Outlook
    Dubai Review Outlook www.valustrat.com ValuStrat Price Index – VPI Dubai Residential Base: January 2014=100 ValuStrat Price Index – VPI Dubai Office Base: January 2015=100 All prices are quoted in UAE Dirhams unless otherwise stated Sales and Rent performance are measured on a quarterly basis while hotel performance are on yearly basis 2020 Review FIRST QUARTER REVIEW 2020 VPI Residential VPI Residential VPI Office Capital Values Rental Values Capital Values 73.3 69.6 63.1 -10.1% -8.9% -14.7% Y-o-Y Y-o-Y Y-o-Y Residential Ready Residential Ready Ticket Size Sales Volume 1.71m 3,491 AED Transactions 0.6% -0.3% Q-o-Q Q-o-Q Residential Off-Plan Residential Off-Plan Ticket Size Sales Volume 1.45m 5,224 AED Transactions -8.6% -26.3% Q-o-Q Q-o-Q Office Sales Office Sales Office Ticket Size Volume Rent 0.92m 269 863 per sq m AED Transactions AED -17.9% 11.2% -5.2% Q-o-Q Q-o-Q Q-o-Q Jan COVID - 19 PANDEMIC • The VPI – residential capital values for Dubai as of March 2020 stood at 73.3 points, dipping 0.9% since February, -10% annually. 1W • First confirmed case in the UAE recorded on 29th January • The Dubai VPI for residential rental values during Q1 2020 stood at 69.6 points, • Suspension of all flights except cargo, halting operation of major public mass declining 1.7% quarterly and 8.9% annually. On an annual basis, apartment and transport (Dubai Metro and Tram) villa asking rents fell 9.4% and 8% respectively • Countrywide curfew and disinfection drive started • VPI for Dubai’s office capital values stood at 63.1 points, suggesting that
    [Show full text]
  • World Expo 2020: Destination Dubai
    World Expo 2020: Destination Dubai August 2015 Dubai World Trade Centre www.thebig5.ae 23-26 Nov 2015 Definition of World Expo The World Expo is a major event, considered to be the third-largest global non- commercial event in terms of economic and cultural impact, after the Olympic Games and the FIFA World Cup. The World Expo is an universal exposition sanctioned by the Bureau of International Expositions (BIE) and organised every five years by the nation that wins the right to host the event. They attract millions of visitors who explore and discover pavilions, exhibitions and cultural events staged by hundreds of participants including nations, international organisations and businesses. Each one is a catalyst for economic, cultural and social transformation and generates important legacies for the host city and nation. The current World Expo is being held at Milan, Italy (May 1st to October 31st, 2015). The Dubai Expo 2020 and its significance The Dubai Expo 2020 will be the first one to be held in the MENA region, and it will run for a six-month period between October 2020 and April 2021. Approximately 182 countries and companies are expected to participate in the Dubai Expo 2020. The purpose of the Dubai Expo 2020 is to provide a platform for the global community to share innovations and engage in debate about key issues facing the world. The reason the Dubai Expo 2020 is evincing huge interest is because analysts believe it will boost tourism and other parts of the economy as the government is likely to spend a predicted US$ 7 billion on infrastructure, with the benefit expected to trickle down to other industries.
    [Show full text]
  • Inside View Dubai 2020
    INSIDE VIEW DUBAI 2020 PAGE 1 Overview few cities could manage both at The upcoming Dubai Expo 2021 the world’s tallest building at over the same time. is a major private and public one kilometre high and the future sector focus, and the project and world's largest mall. The largest However, Dubai is not one for its significant investments are China town in the Middle East will standing still. Over the last year, coming to fruition. The six-month also feature here. Dubai, and the UAE, has continued event, the first to be held in the to improve its ease of doing Middle East, is expected to attract In the mainstream market, business by implementing a new an estimated 25 million visitors. competition is fierce and law that allows 100% on-shore Key infrastructure improvements developers continue to offer foreign business ownership for 122 include the Metro extension and an array of sophisticated dbb activities across 13 sectors. the continuing development of developments and incentives to entice buyers. Opportunities Visa regulations have also been Al Maktoum International airport, which once complete will have include Emaar Beachfront, Port De eased. New legislations include La Mer, Central Park at City Walk the introduction of five year capacity to handle over 200 million passengers annually. and Madinat Jumeirah Living. This retirement visa for those over influx of supply has put downward 55 years old with an investment These developments will help pressure on values but has also of AED 2 million or more in the the fabric of Dubai to continually enhanced affordability; allowing property market, income in excess mature and attract an even families to upsize, first time buyers of AED 20,000 per month or more diverse group of buyers to to enter the market, and an array those with more than AED 1 million the market.
    [Show full text]
  • Delivering a Sustainable Expo
    DELIVERING A SUSTAINABLE EXPO Expo 2020 Dubai Sustainability Report 2018 “We pay the utmost care and attention to our environment for it is an integral part of the country, our history and our heritage. Our forefathers and our ancestors lived in this land and coexisted with its environment, on land and sea, and instinctively realised the need to preserve it.” LATE SHEIKH ZAYED BIN SULTAN AL NAHYAN Founder of the UAE “Protection of the environment and achievement of sustainable development in the UAE is a national duty; it has its own institutional structures, integrated legislature and advanced systems.” HIS HIGHNESS SHEIKH KHALIFA BIN ZAYED AL NAHYAN President of the United Arab Emirates “We are building a new reality for our people, a new future for our children, and a new model of development.” HIS HIGHNESS SHEIKH MOHAMMED BIN RASHID AL MAKTOUM Vice-President and Prime Minister of the UAE and Ruler of Dubai “The civilised, advanced nation we seek to build and the sustainable development we are keen to achieve both require concerted efforts from all sectors of the community and from all public and private entities and organisations. They require consistent and harmonious work in order to achieve our goals and promote and underpin our nation’s status with its distinct role regionally and internationally.” HIS HIGHNESS SHEIKH MOHAMED BIN ZAYED AL NAHYAN Crown Prince of Abu Dhabi and Deputy Supreme Commander of UAE Armed Forces INTRODUCTION HIS HIGHNESS SHEIKH AHMED BIN SAEED AL MAKTOUM President, Dubai Civil Aviation Authority Chairman of the Expo Dubai 2020 Higher Committee It gives me great pleasure to introduce the first Expo 2020 Dubai Sustainability Report (2018) as we build up to the World Expo in 2020.
    [Show full text]
  • ID 141 Study of Service Operations of Metro: Action Research Embedded
    Proceedings of the International Conference on Industrial Engineering and Operations Management Paris, France, July 26-27, 2018 Study of Service Operations of Metro: Action research embedded with case study Niyazudeen Kamarudeen, Balan Sundarakani University of Wollongong in Dubai, Knowledge Park, Dubai, UAE – 20183 [email protected] , [email protected] Mohammad Nabhan Director, Road & Transport Authority, Dubai, UAE [email protected] Abstract The main objective of this paper is to analyze the operational strategies of metro train service in Dubai. The proposed methodology follows with a literature review, action research and case study approach. The research identifies various service measures the metro rail and challenges of operational expansion process involved towards 2020. The research is therefore limited to the city of Dubai. Further, an in-depth understanding of customer usage behavior related to service operations could extend this research in future. In view of this the research contributes to both the theory and practice of the metro transportation service. Keywords Rail service operations, Action research, Dubai Metro case study 1. Introduction: In this era, metro represents the symbol of how far the country has developed in terms infrastructure and service. This is because, the construction of the metro costs heavy, which requires lot of resources and investment in order to put it in action. The government of Dubai, given its high GDP has preplanned the necessity of building a metro network as a response to the challenges posed by the road networks around the city (Keilo, 2012). The main reason to deploy metro into the city is because of the growing demand for public transport in major cities, along with the huge traffic and pollution problems; which has forced the governments to think about an alternate mode of transport which satisfies the sustainability factors.
    [Show full text]
  • Inauguration of Dubai Route 2020 Metro Alstom-Led Consortium Delivers Extension of Dubai Metro Red Line
    PRESS RELEASE Inauguration of Dubai Route 2020 Metro Alstom-led consortium delivers extension of Dubai Metro Red Line 10 July 2020 – Alstom congratulates Dubai’s Roads and Transport Authority (RTA), on the inauguration of the Dubai Route 2020 Metro. This iconic project was ceremonially inaugurated by H. H. Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the United Arab Emirates, and Ruler of the Emirate of Dubai on 7 July 2020, and was also attended by Henri Poupart-Lafarge, Alstom’s CEO and Chairman of the Board as well as the top management of the ExpoLink Consortium via video conference technology. The new line project, commenced in July 2016 and carried out by the Alstom-led ExpoLink consortium, also composed of ACCIONA and Gülermak, consists of a 15km-long line, of which 11.8km is above ground and 3.2km underground, and an interchange on the Red Line. The extension of the metro has seven stations including Jabel Ali Station and the flagship metro station at the Expo exhibition site. The project is worth a total KEY TAKEWAYS of €2.6 billion. - A full turnkey integrated system As part of the Consortium, Alstom was responsible for the integration of the - 15km-long entire metro system including 50 Metropolis trainsets produced in Alstom’s site - 50 Metropolis trainsets in Katowice, Poland, power supply, communication, signalling, automatic - Total value of the project is €2.6 ticket control, track works, platform screen doors and a three-year warranty billion on the whole system, as well as the enhancement of the existing metro line by upgrading power supply, signalling systems, miscellaneous communication and track works.
    [Show full text]
  • EXPO 2020 DUBAI DUBAI EXHIBITION CENTRE 20 October 2020 - 10 April 2021
    expo2020dubai.com [email protected] EXPO 2020 DUBAI DUBAI EXHIBITION CENTRE 20 October 2020 - 10 April 2021 HOST YOUR EVENT AT THE HEART OF THE WORLD’S GREATEST SHOW Destination Dubai 3 DESTINATION DUBAI Dubai is the gateway between east and west. A destination where people, languages, cultures and commerce connect to create endless possibilities for business, tourism and leisure. DID YOU KNOW Expo 2020 Dubai presents an extraordinary opportunity to host events and connect with global audiences from October 2020 to April 2021. Welcome to Dubai 5 The fastest growing city in the Middle East is where the DUBAI world’s largest businesses choose to live, work and play. IN NUMBERS Dubai is a seven-hour flight from two-thirds of the world’s population and represents a truly cosmopolitan destination, offering the very best in global hospitality, entertainment and unmatched infrastructure that connects visitors to some of the world’s most 132,000Hotel rooms in Dubai iconic hotels, entertainment and conference venues, alongside luxurious leisure facilities. 5 billion 15.92m People living within a seven-hour flight International guests who visited from Dubai Dubai in 2018 684 257 9,000 Hotels in Dubai One- to three-star hotels Restaurants and cafés in Dubai across the city 200+ 140 2nd Nationalities residing Languages spoken in Dubai is the World’s in Dubai Dubai, including primarily second safest city* Arabic and English *According to a 2017 World Economic Forum (WEF) report World of Expos 7 WORLD EXPOS INSPIRING A BETTER FUTURE World Expos have a long and rich history of contributing to the sum of human knowledge.
    [Show full text]
  • Dubaiat a Glance
    Dubai gulfconstructiononline.com DUBAI AT A GLANCE Package name Owner Status** $ Million* Consultant Contractor Start date End date Al Maktoum International Airport Expansion – Overview Dubai Aviation Engineering Projects (DAEP) Construction 30,000 - Al Naboodah Contracting (Alec) – National Contracting & Transport Company (NCTC) 2014-Q1 2019-Q2 Al Maktoum International Airport Expansion – West Terminal DAEP EPC ITB 33,000 - - 2018-Q1 2030-Q1 Building & Concourse 1 Al Qusais Area – Low Income Residential Development Wasl Construction 681 - - 2016-Q1 2019-Q3 Al Sufouh Tram System Road Transport Authority (RTA) Construction 866 Systra Consulting Alstom – Besix 2006-Q4 2020-Q1 Deira Islands Development – Deira Islands Boulevard Nakheel EPC ITB 1,300 - - 2017-Q1 2020-Q4 Deira Islands Development – Deira Mall Nakheel Construction 1,600 RSP Architects United Engineering Construction (Unec) 2016-Q1 2021-Q1 Deira Waterfront Development – Phase 1 Investment Corporation of Dubai (ICD) Construction 800 - Ssangyong E&C 2015-Q1 2019-Q2 Dubai Creek Harbour – Chinatown Emaar Properties Design 2,000 - - 2018-Q3 2021-Q1 Dubai Creek Harbour – Dubai Square Dubai Holding – Emaar Properties Project Announced 2,722 . - 2018-Q3 2021-Q1 Dubai Creek Harbour – The Tower Emaar Properties EPC ITB 1,000 - - 2016-Q2 2021-Q1 Dubai Creek Harbour Residences Emaar Properties – Dubai Holding Construction 1,750 Turner Construction International Al Basti & Muktha 2013-Q2 2019-Q2 Dubai Hills Estate – Dubai Hills Mall Emaar Properties Construction 770 - Alec 2016-Q3 2019-Q4
    [Show full text]
  • UAE: Keolis Wins 15-Year Contract to Operate Dubai's World Class
    PRESS RELEASE Paris, 22 March 2021 UAE: Keolis wins 15-year contract to operate Dubai’s world class driverless metro and tram networks • Following Dubai’s Roads & Transport Authority (RTA) announcement on 20 March 2021, Keolis is honoured that the company and its international partners were the successful bidders for a 9-year contract, with a possible 6-year extension1 and worth approximately 125 million euros per year, to operate and maintain the city’s world class metro and tram networks. • The new contract provides a perfect opportunity to blend the RTA’s reputation for innovation and efficiency with Keolis’ international experience and expertise. Keolis will be the lead partner in a joint venture (JV)2, which will also deliver the talents of both Mitsubishi Heavy Industries Engineering (MHI) and Mitsubishi Corporation (MC). Both partners have already worked successfully with the RTA over several years. Under this contract, Keolis and its partners will manage Dubai’s world-leading metro and tram network from September 2021. • Keolis has been a dominant force in automated metros for 40-years. The company has a track record of running one of the world’s most iconic systems in London (Docklands Light Railway) and is also the long-standing operator of choice for the world’s first automated metro in Lille. The extent of Keolis’ metro experience is reflected in the many other automated metro networks the business successfully manages across the world, which includes Lyon and Rennes in France, Doha (Qatar), Shanghai (China) and Hyderabad (India). • The value of Keolis’ experience of operating tram networks across the world will be an equally important feature of the new contract.
    [Show full text]
  • Alstom, ACCIONA and Gulermak Sign a Contract with RTA for the Extension of Dubai Metro’S Red Line
    A fully integrated metro project worth approximately €2.6 billion in the UAE Alstom, ACCIONA and Gulermak sign a contract with RTA for the extension of Dubai Metro’s Red line 10 October 2016 – The Alstom-led consortium Expolink, also composed of ACCIONA and Gulermak, has signed a contract with RTA (Roads & Transport Authority) to design and build the extension of Dubai’s Red metro line and upgrade the system of the existing line. The total value of the project, also called Route 2020, is €2.6 billion. Alstom’s share represents half1 and the civil works, led by ACCIONA including Gulermark, represent the other half. The extended line, which will connect the city to the Expo 2020 site, is expected to start commercial service in 2020 for the World Expo2. The signature of the contract follows the announcement made by HE Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of the RTA at a press conference that was held in Dubai on June 29, 2016. The event was also attended by the three Chairmen of the companies forming the Expolink Consortium: Henri Poupart-Lafarge, Chairman and CEO of Alstom, José Manuel Entrecanales, Chairman of ACCIONA and Kemal Guleryuz, Chairman of Gulermak. The project involves the construction of a 15-kilometre-long line – of which 11.8 kilometers of elevated metro line and 3.2 kilometers underground metro line - branching off the existing red line at the Nakheel Harbour & Tower station. The metro extension will have seven stations, including an interchange at Nakheel Harbour and an iconic metro station at the World Expo site.
    [Show full text]
  • Declares 2017 As Year of Giving
    JANUARY 2017 JANUARY JANUARY 2017 A monthly publication issued by Zayed International Foundation for the Environment 167 Issue 167 creating green communities for a better tomorrow UAE President HH Sheikh Khalifa bin Zayed Al Nahyan declares 2017 as Year of Giving HH Sheikh Mohammed transforms Dubai into an international role model for sustainability January 2017 | 1 2 creating green communities for a better tomorrow 3 The UAE ushered in the New Year in a spirit of generosity and benevolence as 2017 has been earmarked as the Year of Giving under the directives of President HH Sheikh Khalifa bin Zayed Al Nahyan. This call for sowing the seeds of generous giving has resonated well throughout the widely diverse communities of the UAE and even beyond. As a nation known for its humanitarian approach - the UAE is one of the top countries in the world in terms of per capita contributions to humanitarian assistance and development aid - the marking of 2017 as the Year of Giving underlines the values of human dignity, tolerance and cooperation that the nation proudly upholds. Prof. Mohammed bin The Year of Giving is the culmination of many initiatives launched by the wise and Fahad benevolent rulers of the UAE and is also the embodiment of the long-standing Executive Editor philanthropic approach established by the nation’s founder, the late Sheikh Zayed bin Sultan Al Nahyan. It must be remembered that the launch of the Year of Giving follows the concluding ceremony of the Year of Reading 2016, during which more than 1,500 reading initiatives were launched and most significantly, a strategy that aimed at transforming the act of reading into a lifestyle in the UAE was also launched.
    [Show full text]
  • EN-URB-SG-FICHE RÉFÉRENCE Métro De Dubai
    Independent Safety Assessment: Metro line of Dubaï 2020 Customer: Roads & Transport Authority (operator) Place of execution: Dubai (United Arab Emirates) Project duration : 2016– 2020 Team: 1 Project Manager and 14 assessors PROJECT’S DESCRIPTIO N: The 15 km branch will start at Nakheel Harbour & Tower on the existing Red Line, then run on 11·8 km of viaduct with stations serving The Gardens, Discovery Gardens and Al Furjan. The stations at Jumeirah Golf Estates and Dubai Investment Park would be on a 3·2 km underground section, before the terminus at Expo 2020 site. Trial operation is expected to start in the fourth quarter of 2019, with passenger services due to begin on May 20 2020, five months ahead of the opening of the Expo. The journey time from the Expo site to Dubai Marina is expected to be 16 min. Roads & Transport Authority had awarded the contract to build Route 2020 in June to the Expolink consortium of Alstom, Acciona and Gülermak. The 10·6bn dirham contract includes the supply of 50 trainsets, of which 15 are needed for the new line and 35 to increase capacity on existing routes. Thales will provide railway systems. SCOPE OF WORK: In this project, Certifer is working closely with RTA (Roads & Transport Authority) from the definition to the commissioning of the line (Operation and Maintenance aspects are also included in the scope of work), on the following aspects: Certifer performs an ISA mission on Dubai metro line, • Operation Control System (OCS) • Automatic Train Control (ATC) • Power Supply and Distribution System
    [Show full text]