Area 001.Qxd
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
30C Denham Way, Maple Cross, Rickmansworth, WD3 9SP Guide Price £325,000
• Two double bedroom 30c Denham Way, Maple Cross, Rickmansworth, WD3 9SP Guide Price £325,000 • Ground floor maisonette Andrews Residential are delighted to offer to the market this well presented two double bedroom ground floor maisonette.The property offers deceptively spacious modern interiors throughout, benefitting from combination boiler, double glazing, privat e rear • Well presented throughout garden and garage in a block. Denham Way is situated in Maple Cross with its excellent transport links close to M25, Denham m ain line station and Rickmansworth town centre is within easy reach. Internal viewings are strongly recommended to avoid • Deceptively spacious disappointment. Property Description ACCOMMODATION Composite front door with frosted double glazed panel leading to entrance hall. ENTRANCE HALL Built in storage cupboard housing meters, radiator, built in storage cupboard housing fridge / freezer, wall mounted thermostat, insolation switch for extractor fan, hardwood flooring, doors to all rooms: SITTING ROOM Double glazed window to front aspect, radiator, hardwood flooring. KITCHEN Double glazed window to front aspect, range of eye and base level units with worksurface incorporating four ring gas hob, extractor above, sink, taps and draining unit, space and plumbing for washing machine, part tiled walls, built in oven and grill. BEDROOM ONE Double glazed window to rear aspect, radiator, built in wardrobes with overhead storage. BEDROOM TWO Double glazed window to rear aspect, built in wardrobe one housing combination boiler. BATHROOM Frosted double glazed window, low level w.c, panel enclosed bathw with glass shiower screen with taps and shower attachment, wall mounted shower, unit, pedestal wash hand basin, tiled floor. REAR GARDEN Fenced, patio area, laid to lawn area, retaining hedge, outside tap, security lighting, pathway to parking area and garage. -
Maple Cross and West Hyde Playscheme Maple Cross Junior Middle & Infant School, Denham Way, Maple Cross, RICKMANSWORTH, Hertfordshire, WD3 9SS
Maple Cross and West Hyde Playscheme Maple Cross Junior Middle & Infant School, Denham Way, Maple Cross, RICKMANSWORTH, Hertfordshire, WD3 9SS Inspection date 20/08/2014 Previous inspection date 20/04/2011 The quality and standards of the This inspection: 1 early years provision Previous inspection: 2 How well the early years provision meets the needs of the range of children who 1 attend The contribution of the early years provision to the well-being of children 1 The effectiveness of the leadership and management of the early years provision 1 The quality and standards of the early years provision This provision is outstanding Staff use a range of imaginative teaching methods to engage children in exciting and well-thought-out activities and free play opportunities. As a result, children's personal and social skills are promoted to an outstanding level. Children make excellent progress in relation to their starting points, including those who have special educational needs and/or disabilities. Young children are cared for in a vibrant, nurturing environment. Staff interact and support children's learning to an exceptionally high level, building on the strong partnerships with parents. Children are involved in making decisions about what they would like to do, understanding how important their views are and that their needs and feelings really matter. The staff team's knowledge of safeguarding is exemplary. Staff know the children well, they are vigilant in managing and monitoring children as they play. Robust assessments of risk enable them to provide a safe environment for children to play and learn. Leadership and management is inspirational. -
Three Rivers and South Bucks District Councils Local Environmental Management Plan
Local Environmental Management Plan - Three Rivers and South Bucks District Councils Document no: 1EW03-FUS-EV-PLN-C000-002625 Revision Date Author Checked by Approved by Revision Details: P01 Dec 2017 Robyn Melanie Knight, Bianca Rees, First Issue to HS2 Cummings Fusion Fusion C02 July 2018 Will Burke Conor Paul Liz Greenaway Update to scope i Document title: Local Environmental Management Plan – Three Rivers and South Bucks District Councils Document no: 1EW03-FUS-EV-PLN-C000-002625 Rev: C02 Contents 1 Introduction 5 1.2 Area and scope 7 2 Purpose of the Local Environmental Management Plan 8 3 Policy and environmental management principles 8 4 Implementation 8 5 General requirements 9 5.2 Community relations 9 5.3 Construction site layout and good housekeeping 11 5.4 Site lighting 11 5.5 Worksite security 11 5.6 Hoardings, fencing and screening 12 5.7 Unexploded ordnance 12 5.8 Electromagnetic interference 12 5.9 Temporary living accommodation 13 5.10 Occupational healthcare 13 5.11 Clearance and re-instatement of sites on completion 13 5.12 Pollution incident control and emergency preparedness 13 5.13 Fire prevention and control 14 5.14 Extreme weather events 14 5.15 Carbon management plans 14 5.16 Interface management between adjacent construction areas 14 6 Agriculture, forestry and soils 14 6.2 Sensitive receptors 15 6.3 Local control measures 15 7 Air quality 16 7.2 Sensitive receptors 16 7.3 Local control measures 17 7.4 Monitoring Procedures 18 8 Cultural heritage 19 8.2 Sensitive receptors 19 8.3 Local control measures 20 8.4 -
View PDF: W1 Timetable, Stops And
W1 bus time schedule & line map W1 Maple Cross - Watford / Garston View In Website Mode The W1 bus line (Maple Cross - Watford / Garston) has 2 routes. For regular weekdays, their operation hours are: (1) Garston: 8:35 AM - 6:35 PM (2) Maple Cross: 7:15 PM Use the Moovit App to ƒnd the closest W1 bus station near you and ƒnd out when is the next W1 bus arriving. Direction: Garston W1 bus Time Schedule 48 stops Garston Route Timetable: VIEW LINE SCHEDULE Sunday 8:35 AM - 6:35 PM Monday Not Operational Downings Wood Terminus, Maple Cross Downings Wood, England Tuesday Not Operational Hornhill Road, Maple Cross Wednesday Not Operational Denham Way, Maple Cross Thursday Not Operational Friday Not Operational Woodland Road, Maple Cross Saturday Not Operational The Cross, Maple Cross Crosslands, England Hertford Place, Maple Cross W1 bus Info Long Lane, Rickmansworth Direction: Garston Stops: 48 Whip & Collar Ph, Rickmansworth Trip Duration: 52 min Line Summary: Downings Wood Terminus, Maple Church Lane, Moneyhill Cross, Hornhill Road, Maple Cross, Denham Way, Maple Cross, Woodland Road, Maple Cross, The Vine Tree Court, England Cross, Maple Cross, Hertford Place, Maple Cross, Parade, Moneyhill Long Lane, Rickmansworth, Whip & Collar Ph, Rickmansworth, Church Lane, Moneyhill, Parade, Uxbridge Road, England Moneyhill, The Halfway House Ph, Moneyhill, High The Halfway House Ph, Moneyhill Street, Rickmansworth, Rickmansworth Railway Station, Rickmansworth, Roman Catholic Church, Belfry Lane, Rickmansworth Rickmansworth, Scots Bridge, Rickmansworth, -
Amended Statement General Permitted Development Order
Amended Statement General Permitted Development Order (GPDO) M25 Widening Junction 16 to Junction 23 Two Environmental Mitigation Bunds – Off Junction 17 1. Introduction This Statement is an Amendment to a Statement which the Skanska Balfour Beatty Joint (SBBJV or JV) submitted to Three Rivers District Council in January 2009. The original Statement described the construction of an environmental mitigation bund to the east of the M25 motorway, north of Junction 17, in the area of Mill End in Rickmansworth. This Amendment does not repeat the review of the M25 Widening project which was described in the original Statement. The widening works started on 27 May 2009, four weeks later than planned as a result of the delay to the signing of the Highways Agency contract. Since the submission of the original Statement in January 2009, the Highways Agency has held the Start of Works Exhibitions during March. During these events Local Authority representatives, local residents and other interested parties discussed the bund proposals with the Highways Agency and the JV. As a result of these discussions, and residents’ concerns about the original design, Three Rivers District Council and the JV have reconsidered the opportunities to maximise the benefit of bunding in this area. This consultation has identified that a bund on the eastern side of the motorway, north of Junction 17, would benefit residents of Mill End and Rickmansworth. This bund would be smaller in design than the bund originally submitted. A second, small bund on the western side of the motorway, north of Junction 17, was promoted by a number of residents of Chorleywood. -
Colne Valley | CFA7 | Clevle Valley Colne
LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA7 | Colne Valley | CFA7 | Colne Valley November 2013 VOL VOL VOL ES 3.2.1.7 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA7 | Colne Valley November 2013 ES 3.2.1.7 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Colne Valley/No 7 | Contents Contents Contents i 1 Introduction 3 1.1 Introduction to HS2 3 1.2 Purpose of this report 3 -
Managing Serious and Organised Crime
1 Contents Executive Summary ....................................................................................................... 3 Demand Matrix Methodology ........................................................................................ 7 Chief Constable Declaration ........................................................................................ 11 Introduction to Athena ................................................................................................. 11 Local Priorities ............................................................................................................. 12 Section 1 – Finance and Budgets ................................................................................. 13 Section 2 – Responding to the Public .......................................................................... 17 2.1 Requests for Service ......................................................................................... 17 2.2 Incident Response ............................................................................................ 25 Section 3 – Prevention and Deterrence ....................................................................... 33 Section 4 – Criminal Justice and Investigations ........................................................ 43 4.1 Volume Crime ................................................................................................. 43 4.2 Major Crime .................................................................................................... 49 4.3 Criminal -
Rickmansworth Maple Cross
FREEHOLD 222 BED HOTEL DEVELOPMENT SCHEME Freehold site with an approximate site area of 1.31 hectares (3.33 acres) Rare opportunity to acquire development site within M25, close to J17 Planning consent for a 222 bed hotel with restaurant, function rooms and health club DENHAM WAY FOR SALE MAPLE CROSS WD3 9XD lsh.co.uk Description Location M25 J17 Type: Hotel development site. The property is strategically located in the Rickmansworth village of Maple Cross, a short distance Floor Area Proposed: DENHAM WAY to the east of Junction 17 of the M25. M25 15,523 sq m (167,088 sq ft) UXBRIDGE ROAD Rickmansworth town centre is 2 miles to the Rickmansworth Aquadrome Accommodation: north east while Watford and Slough are 9 Planning permission has been obtained for miles and 11 miles distant respectively. It is Stocker’s Lake a 222 bedroom four star hotel with facilities a 30 minute train ride to Marylebone Station Nature Reserve including restaurant, bar, club lounge, health via Rickmansworth Station with a train club, conference and banqueting centre. running every 30 minutes. Heathrow airport Site Area: 1.31 hectares (3.33 acres). is 16 miles away. The site is located on the DENHAM WAY eastern side of Denham way and is flanked by the Three Rivers Business Park. Maple Cross Planning Use For further Nick Boyd information T: 020 7198 2049 Use Class: C1. please contact: M: 07979 541237 [email protected] Planning consent 07/1401/FUL (amended by consent 13/1483/FUL) Certificate of Hugh Anderson T: 0161 242 7098 Lawful Proposed Use Ref No. -
Three Rivers Guide
Three Rivers Guide Sport and leisure Shopping Eating out Parks and open spaces Contents Page Background 3 Calendar of the year 4-5 Abbots Langley 6-7 Bedmond and Leavesden, Langleybury Warner Brothers Studios 8-9 and the Harry Potter visitor centre Chorleywood 10 Croxley Green 11 Maple Cross, Heronsgate, 12 West Hyde and Mill End Moor Park and Eastbury 13 Rickmansworth and Loudwater 14 Spotlight on Watersmeet 15 Spotlight on golf 16-17 South Oxhey, Carpenders Park 18-19 and Oxhey Hall Sarratt and Chandlers Cross 20 Something for everyone 21 Leisure activities in Three Rivers 22-23 Business and prosperity 24-25 Published spring 2016. Three Rivers District Council. Editor: Tim Ashby Graphic Design: Diane Bugeja [email protected] 01923 776611 Advertisments in this guide are not endorsed by the Council. We would welcome your comments on this guide. 2 Background Communications in the area Travel information are very good with road and rail By rail - despite its beautiful links to London and elsewhere, rural setting, Three Rivers has The district has much to offer with including the M1, M25, the visitor attractions, shopping, eating excellent train and London West Coast Main Line and the Underground links. Moor Park, and drinking, sport and leisure, culture Metropolitan Tube Line into Rickmansworth, Chorleywood and history and places to stay, making central London. In addition, and Croxley have their own Three Rivers an ideal place to live and the planned Croxley Link will Metropolitican Underground work. It offers beautiful countryside, provide direct links to central stations. Rickmansworth, excellent leisure facilities and a wealth Watford and Watford Junction Carpenders Park and Kings of culture and history. -
Introduction and Engagement
The HS2 route in the Chilterns and the Colne Valley High Speed Two (HS2) N North Portal Chesham Rd Intervention Shaft Little Missenden Vent Shaft Amersham Vent Shaft In design development In design development In design development In design development is the new high speed Next event Next event Next event Next event North Portal – Design event, Chesham Road Intervention Shaft ‑ Little Missenden ‘You Said, We Did’ Amersham – ‘You Said, We Did’, railway for Britain. Late 2021 Design event, Late 2021 event, Summer 2021 Spring 2021 Chesham What we are doing Great Missenden Align is working on behalf of HS2 Ltd to HERTFORDSHIRE Chilterns Area build 22 kilometres of the high speed of Outstanding Amersham rail line, running between the Colne Natural Beauty Valley and the Chilterns. It includes the 3.4 kilometre‑long Colne Valley High Viaduct and the Chiltern tunnel with Chalfont Wycombe four ventilation (vent) shafts to regulate St Giles airflow, one intervention shaft and the shaft headhouses which contain Chalfont St Peter electrical equipment. GREATER LONDON Our main works programme is now Colne Valley underway and we are holding regular Regional Park BUCKINGHAMSHIRE information events to share details Old Oak Euston on the progress of the designs, Common Station construction, and to seek views and Station respond to feedback. Chalfont St Giles Vent Shaft Chalfont St Peter Vent Shaft Colne Valley Viaduct South Portal/Western Slopes Due to Covid‑19 we have postponed all Next event Next event Next event This event public face‑to‑face engagement events Construction update, Construction update, Construction update, ‘You Said, We Did’ event, March 2021 and meetings, but we will continue to Autumn 2021 Autumn 2021 Spring 2021 Next event find new ways to involve the community. -
Thames Water Development Planning Department Maple Lodge STW
Three Rivers District Council Three Rivers House Northway Rickmansworth Herts WD3 1RL Tel: (01923) 776611 Fax: (01923) 896119 Thames Water Development Planning Department 28 June 2019 Maple Lodge STW, Denham Way Maple Cross Herts WD3 9SQ Dear Sir/Madam Town and Country Planning (Development Management Procedure) (England) Order 2015 Application: Comprehensive redevelopment to provide 2 no. warehouse Class B1c/B2/B8 units comprising a total of 16,590 sqm including 1,986 sqm ancillary B1a office space, access, landscaping and associated works. Address: Development Site Maple Lodge Maple Lodge Close Application No: 19/1179/FUL The above application has been submitted to this Council for determination. The plans are available to view by visiting the Council’s website and using the Planning Online facility at the following web address http://www3.threerivers.gov.uk/online-applications/ However, you will need to allow up to 5 working days from the date of this letter for the plans to be uploaded. We need to receive your comments on this application by 19 July 2019 so that they can be considered before a decision is made. Please note that it is important to quote the planning reference 19/1179/FUL at all times to ensure that your comments are logged against the correct application. To submit your comments and any attachments log onto Consultee Access at the following location http://www3.threerivers.gov.uk/online-applications/ and select the relevant application number. If you are not a registered user of Consultee Access please email [email protected] to request registration. On receipt of this email a form will be sent to you for completion which will enable us to register you to use this system. -
Proposal for Northern Extension of Northolt Tunnel SIFT Report
C222-ATK-DS-REP-020-000034 |P06 | 27 Feb 2015 Proposal for Northern Extension of Northolt Tunnel SIFT Report Revision Date Issued for/Revision details Revised by P01 13.06.2014 Issued for review HSF Review and update to include P02 30.01.2015 SS HS2 comments Updated to include comments P03 24.02.2015 AR and Rail Systems info P04 26.02.2015 Updated following review AR P05 27.02.2015 Updated for final review AR P06 02.03.2015 Final AR Name Data FOI / EIR None Document type Report Directorate London West Midlands WBS B320 & PE.06.57 Keywords Colne Valley Viaduct, Northolt Tunnel, River Colne Authors H S Farrant Checker Roger Weber Accepted Approver Andy Robson - Owner C222 Atkins 1 Review Directorate LWM TD Employer’s Lead Reviewer Neil Cowie Authorised for use `Code Uncontrolled when printed INTERNAL INFORMATION Northern Extension of Northolt Tunnel SIFT Report London West Midlands Northolt Tunnel Extension - SIFT Report Contents Page number 1. Executive Summary ................................................................................................... 5 2. Introduction ............................................................................................................... 6 3. Scope of the Sift ......................................................................................................... 8 4. Assumptions .............................................................................................................. 9 4.1 General .................................................................................................................