Form-1 M Application for Mining
Total Page:16
File Type:pdf, Size:1020Kb
FORM-1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) BASIC INFORMATION S.No ITEM DETAILS (i) Name of the Mining Lease site M/s. Lepakshi Stone Crusher (ii) Location/site (GPS Co-ordinates) 1) 16° 7'55.43"N - 80° 2'42.94"E, 2) 16°7'53.85"N - 80°2'41.78"E, 3) 16°7'53.86"N - 80°2'39.06"E 4) 16°7'55.60"N - 80°2'37.96"E,, (iii) Size of the Mining Lease (Hectare) 0.607 Ha (iv) Capacity of Mining Lease(TPA) 6042 m3/Annum (v) Period of Mining Lease 15 Years (vi) Expected cost of the project Rs. 15 lakhs (vii) Contact Information M/s. Lepakshi Stone Crusher, Prop. Sri G. Leelakrishna Murthy,Kattubadivaripale Village, Chilakaluripet Mandal, Guntur District., Andhra Pradesh (II) ENVIRONMENTAL SENSITIVITY S. No. Areas Distance in kilometer / Details 1. Distance of project site from Guntur - Nandyal - 9.2km nearest rail or road bridge over the concerned River, Rivulet, Munumaka RS at 9.3km in NW Nallah etc. direction. Vogaru Vagu – 2.5 km – W Distance from infrastructural facilities 2. Railway line Guntur - Nandyal - 9.2km National Highway National Highway (NH-5) connecting Guntur – Ongole at a distance of about 13.6 km in SE direction, State Highway TThe State Highway (SH- 45) connecting from Narasaraopet – Chilakaluripet is at distance of 8.0 km in ENE direction. The State Highway (SH-50) connecting from Narasaraopet – Vinukonda is at distance of 6.0 km in NW direction. Major District Road Any Other Road Kondakavuru 1.0 km-W Electric transmission line pole or No Electric transmission line tower pole or tower is present in the Lease Area Canal or check dam or reservoirs Vogaru Vagu – 2.5 km – W or lake or ponds In-take for drinking water pump Not Applicable house Intake for Irrigation canal pumps Not Applicable 3. Areas protected under None international conventions, national or local legislation for their ecological, landscape, cultural or other related value 4. Areas which are important or Uppalapadu Bird Sanctuary – sensitive for ecological reasons - 53.5 km – ENE Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 5. Areas used by protected, important or sensitive species of Uppalapadu Bird Sanctuary – flora or fauna for breeding, 53.5 km – ENE nesting, foraging, resting, over wintering, migration 6. Inland, coastal, marine or None underground waters 7. State, National Boundaries Andhra Pradesh – Telangana – 56.3 km – N 8. Routes or facilities used by the - public for access to recreation or other tourist, pilgrim areas 9. Defence installations None Densely populated or built-up Kondakavuru 1.3 km-W 10. area, distance from nearest human habitation Areas occupied by sensitive man- Kondakavuru 1.3 km-W made land uses (hospitals, 11. schools, places of worship, community facilities) Areas containing important, high None quality or scarce resources 12. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to None pollution or environmental 13. damage. (those where existing legal environmental standards are exceeded) Areas susceptible to natural None hazard which could cause the project to present environmental problems 14. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Is proposed mining site located No 15. over or near fissure/fracture for ground water recharge Whether the proposal involves Not Applicable approval or clearance under the following regulations or acts, namely:- (a) The Forest (Conservation) Act, 1980; 16. (b) The Wildlife (protection) Act,1972 (c) The Coastal Regulation Zone Notification, 2011. If yes, details of the same and their status to be given 17. Forest land involved (Hectares) Forest land is not involved Whether there is any litigation No litigation is pending against pending against the project and / the project. or land in which the project is propose to be set up? (a) Name of the Court 18. (b) Case No. (c) Orders or directions of the court, if any, and its relevance with the proposed project. .