Inflow and Infiltration Reduction Program

Total Page:16

File Type:pdf, Size:1020Kb

Inflow and Infiltration Reduction Program Grafton Sewer System Update Town of Grafton | Board of Sewer Commissioners | April 2016 | Maintaining Your Sewer System Infiltration and Inflow Reduction The Grafton Sewer System Program Sewage from homes and The Town of Grafton Sewer Department has businesses enters the begun conducting an Inflow and Infiltration sewer system from building Sewers & Pumping inspection program as ordered by the Massa- connections. Sewers and Stations Acadia Blackstone chusetts Department of Environmental Protec- Street Grafton pumping stations transport River tion and the United States EPA. The purpose Pumping Wastewater the wastewater to the Acadia Grafton Homes Station Treatment of this inspection program is to identify those Street pumping station where and Businesses Facility properties in town that have or potentially it is pumped to the Grafton have illegal discharges to the town’s sanitary wastewater treatment facility. The treated wastewater is then discharged into the sewer system. These illegal discharges allow Blackstone River. excessive Infiltration and Inflow (I/I), which is extraneous flow (groundwater and rainwater) that enter the sewer system potentially causing The Importance of I/I Control sanitary sewer overflows (SSOs). Excessive I/I can cause many problems in the sewer system. Although most sewers are designed to carry some I/I, excessive quanti- ties can overwhelm pipes and cause overflow of untreated sewage into the environment and backups onto streets and into private homes. Communities and residents must also pay to pump and treat this clean water once it enters the sewer system. Therefore, any I/I removed from the sewer system will help reduce flows and costs a well as prevent these adverse consequences. Private Inflow Sources Inflow from private sources such as sump A cleaner and safer Blackstone River will benefit recre- pumps and floor/foundation drains have the ation and fishing. greatest impact on the sewer system. During a rain event these sources discharge large from your building lessens the likelihood of volumes of clean water to the sewer and can- water reentering your structure or causing wet quickly overwhelm the capacity of the system, foundation conditions. resulting in overflows to the environment or backups onto the streeta and into homes. It 2. To a dry well or other in ground drainage only takes a few sump pumps to cause major system on your property. sewer infiltration (top left), roof gutter connection (top right), problems into the sewer system. sump pump (bottom left), sewer overflow (bottom right) 3. Nearby storm drainage system. This provides I/I Reduction Actions Needed you with the most reliable discharge location which avoids nuisance conditions on your Sources of Infiltration and InflowInflow WorkSources to be Done to Eliminate/Reduce u Roof Drain Connection property or those adjacent to you. However v SumpInflow Pump w Uncapped Cleanout your site may not allow this option. x FaultyThe Manhole Cover excess inflow entering the sewer system or Frame This work should be completed by a licensed y Root Intrusionthrough Into Lateral improper (illegal/illicit) connections Inflow Sources z Stormcan Cross-Connection only be addressed with your help. If you contractor of your choice. If you have any questions or need assistance with regard to a u u Roof Drain Connection Infiltrationhave Sources an ILLEGAL SUMP PUMP CONNEC- { w v Sump Pump { ConnectedTION Foundation TODrain THE SEWER SYSTEM . Please sump pump or its removal from the sanitary v y | Broken House Lateral sewer system please contact the Grafton Sewer | w Uncapped Cleanout } Faultycontact Lateral Connection the Town of Grafton Sewer Depart- z ~ Cracked or Broken Pipe Department at 508-839-8526. x x Faulty Manhole Cover ment to discuss option to modify the plumbing } Deteriorated Manhole or Frame on your property to permanently redirect your ~ Storm Sewer Sanitary Sewer y Root Intrusion Into Lateral sump pump discharge to an appropriate loca- z Storm Cross-Connection tion outside your house. Please note: your new chosen drainage location should not create a u Inflow Sources Infiltration Sources nuisance condition for your neighbors or FOR MORE INFORMATION { w u Roof Drain Connection { Connected Foundation Drain be in the public right of way. Please contact: v Sump Pump v | Broken House Lateral Options for exterior discharge include: The Town of Grafton, y w Uncapped Cleanout } | Faulty Lateral Connection Board of Sewer Commissioners z x Faulty Manhole Cover ~ Cracked or Broken Pipe 1. To your property, at least 5 feet from x Grafton, MA 01519 } or Frame Deteriorated Manhole the building. Placing the drainage 5 feet y Root Intrusion Into Lateral Phone: 508-839-8526 z Storm Cross-ConnectionStorm Sewer [email protected] Sanitary Sewer ~ u Infiltration Sources { w { Connected Foundation Drain v y | Broken House Lateral | } Faulty Lateral Connection z x ~ Cracked or Broken Pipe } Deteriorated Manhole Storm Sewer Sanitary Sewer ~.
Recommended publications
  • A Model-Based Assessment of Infiltration and Inflow in the Scope of Controlling Separate Sanitary Overflows at Pumping Stations Olivier Raynaud, C
    A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations Olivier Raynaud, C. Joannis, Franck Schoefs, F. Billard To cite this version: Olivier Raynaud, C. Joannis, Franck Schoefs, F. Billard. A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations. 11thInter- national Conference on Urban Drainage (ICUD 08), 2008, Edinburgh (Sotland), United Kingdom. hal-01007760 HAL Id: hal-01007760 https://hal.archives-ouvertes.fr/hal-01007760 Submitted on 18 Nov 2017 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations O. Raynaud1, C. Joannis1, F. Schoefs2, F. Billard3 1Laboratoire Central des Ponts et Chaussées, Route de Bouaye, B.P 4129, 44 341 Bouguenais Cedex, France 2Institut de Recherche en Génie Civil et Mécanique (Gém), Nantes, France 3Nantes Métropole, Direction de l’assainissement, Nantes, France ABSTRACT Infiltration & Inflow (I&I) are a major cause for separate sanitary sewers overflows (SSOs). A proper planning of actions for controlling SSOs needs a precise quantification of these events, as well as an identification of the respective contributions of infiltration into sewer and inappropriate connection of runoff water to sanitary sewers.
    [Show full text]
  • Graham Park Sewage Pumping Station and Force Main Improvement Project
    Graham Park Sewage Pumping Station and Force Main Improvements Project Number: SPS112 Project Summary Project Commencement: Anticipated Start of Construction - Spring 2019 Project Description: Replacement of an existing antiquated Sewage Pumping Station (SPS) and force main (FM), and raise the SPS control building and equipment above the 100-year flood plain elevation. Scope of Work: This project will consist of installing a new submersible SPS with new controls, motors, emergency generator, by-pass connection on FM, and new flow metering equipment. The proposed pump control enclosure will be about 12’ in height and will be approximately 7’ by 13’ in size consisting of a faux-brick façade. The facility will be enclosed with an 8’ high chain-link fence with barbed-wire and locked for security. Additionally, the project will provide emergency backup supply and protect pump station facilities from storm surge flooding. Project benefits: The project will improve service reliability, safety conditions, and provide permanent back-up power. Project impact on residents/customers Noise associated with construction. Construction trucks accessing the SPS. Daily cleanup during construction to remove dust and dirt. Potential impact on traffic: Our standard roadway and traffic matters are outlined below. The Construction Contractor will be required to comply with Department of Environmental Quality (DEQ) Erosion and Sediment Control requirements to ensure all construction traffic does not track dirt on roads. The Service Authority will include in the construction contract a provision for fees to be assessed if the Construction Contractor does not comply with these requirements. Regular project updates to the impact of traffic will be listed on the website Graham Park Project.
    [Show full text]
  • Pump Station Design Guidelines – Second Edition
    Pump Station Design Guidelines – Second Edition Jensen Engineered Systems 825 Steneri Way Sparks, NV 89431 For design assistance call (855)468-5600 ©2012 Jensen Precast JensenEngineeredSystems.com TABLE OF CONTENTS INTRODUCTION ............................................................................................................................................................. 3 PURPOSE OF THIS GUIDE ........................................................................................................................................... 3 OVERVIEW OF A TYPICAL JES SUBMERSIBLE LIFT STATION ....................................................................................... 3 DESIGN PROCESS ....................................................................................................................................................... 3 BASIC PUMP SELECTION ............................................................................................................................................... 5 THE SYSTEM CURVE ................................................................................................................................................... 5 STATIC LOSSES....................................................................................................................................................... 5 FRICTION LOSSES .................................................................................................................................................. 6 TOTAL DYNAMIC HEAD ........................................................................................................................................
    [Show full text]
  • Sanitary Sewer Overflow Corrective Action Plan/Engineering Report
    FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES, INC. Engineers in Water and Earth Sciences Nashville, Tennessee TABLE OF CONTENTS Page 1 INTRODUCTION 1.1 Background and Purpose Scope 2 EXISTING SEWER SYSTEM 2.1 Gravity Sewers 2.2 Pumping Stations 2.2 Wastewater Treatment Plant 2.3 3 EXISTING WASTEWATER TREATMENT PLANT 3.1 Plant Design Data 3.2 Influent Pump Station 3.2 Headworks 3.2 Aeration Basins 3.3 Secondary Clarifiers 3.3 Return Sludge Pump Station 3.3 Disinfection Facilities 3.4 Sludge Digestion and Holding Facilities 3.4 Sludge Disposal Site 3.4 Drying Beds 3.5 Staff 3.5 Operating Review 3.5 4 PREVIOUS SEWER SYSTEM OVERFLOWS (SSO’s) 4.1 Existing Problems 4.2 5 EXISTING AND FUTURE SEWER FLOWS 5.1 Flow Measurement Data 5.2 Projection of Future Flows 5.4 6 PLAN FOR I/I REDUCTION AND ELIMINATION OF SSO’s 6.1 New Construction Sewer System Rehabilitation 7 RECOMMENDED CAPITAL IMPROVEMENTS 7.1 Projects Currently Under Design/Construction 7.2 Projects Planned for Construction 7.3 Project Schedule 7.6 Project Maps LIST OF TABLES 2.1 Pump Station Information 2.3 3.1 Discharge Monitoring Reports Summary 3.5 4.1 Overflows/Bypasses 4.2 5.1 Flow Monitoring Sites 5.2 TABLE OF CONTENTS (Continued) LIST OF TABLES (Continued) Page 5.2 Historical Sewer and Water Customers 5.4 5.3 Future Flow Projections 5.5 7.1 Project Schedule 7.6 Follows Page LIST OF FIGURES 2.1 General Map 2.2 3.1 Site
    [Show full text]
  • Sanitary Sewer & Pumping Station Manual
    SANITARY SEWER AND PUMPING STATION MANUAL FOR SPRINGFIELD WATER AND SEWER COMMISSION Last Revised: _July 20, 2017______________ Page 1 TABLE OF CONTENTS Title Section Number General 1 Drawing Requirements 2 Construction Procedures 3 Flow Determination 4 Computer Modeling 5 Sanitary Sewers 6 Pump Stations 7 Appendices A – Checklist B – Construction Specifications C – Standard Drawings Page 2 SECTION 1 – GENERAL 1.1 General................................................................ 4 1.2 Purpose................................................................ 4 1.3 Structure of the Manual................................................ 4 1.4 Definitions............................................................ 4 1.5 References............................................................. 9 Page 3 1.1 General The Sanitary Sewer and Pumping Station Manual is for the design and construction of infrastructure. The specific subjects of these manuals are: • Procedures Manual for Infrastructure Development • Sanitary Sewer and Pumping Station • Structures • Geotechnical • Construction Inspection 1.2 Purpose The purpose of this manual is to provide information regarding design and construction requirements for sanitary sewers, pumping stations, and force mains in Springfield, Kentucky. The goal is to provide uniform design and construction standards. The end result will be public infrastructure that is cost effective and maintainable by the Springfield Water and Sewer Commission (SWSC)in the long term. 1.3 Structure of the Manual The manual
    [Show full text]
  • Evaluation of Sanitary Sewer Overflows and Unpermitted Discharges Associated with Hurricanes Hermine & Matthew
    EVALUATION OF SANITARY SEWER OVERFLOWS AND UNPERMITTED DISCHARGES ASSOCIATED WITH HURRICANES HERMINE & MATTHEW JANUARY 6, 2017 THIS PAGE WAS LEFT BLANK INTENTIONALLY EVALUATION OF SANITARY SEWER OVERFLOWS AND UNPERMITTED DISCHARGES ASSOCIATED WITH HURRICANES HERMINE & MATTHEW Financial Project No.: January 6, 2017 PR9792143-V2 RS&H No.: 302-0032-000 Prepared by RS&H, Inc. at the direction of the Florida Department of Environmental Protection ii THIS PAGE WAS LEFT BLANK INTENTIONALLY TABLE OF CONTENTS Chapter 1 INTRODUCTION ............................................................................................................................................................... 1 1.1 SCOPE OF THE EVALUATIONS..................................................................................................................................... 1 1.2 METHODOLOGY ............................................................................................................................................................... 2 1.3 DOCUMENT OVERVIEW ................................................................................................................................................ 2 Chapter 2 STORMWATER AND WATER LEVEL ANALYSIS .................................................................................................... 3 2.1 PRECIPITATION DATA .................................................................................................................................................... 3 2.1.1 Hurricane Hermine ...................................................................................................................................................
    [Show full text]
  • Appendix C Emergency Procedures
    Appendix C: Emergency Procedures APPENDIX C EMERGENCY PROCEDURES This appendix contains generic standard operation procedures (SOPs) for emergency collection system activities. These generic SOPs can be adapted to fit specific collection system needs. They are not presented as inclusive of all situations or circumstances. Please contact the appropriate state or federal environmental regulatory agency for guidance on your state’s specific emergency circumstances and procedures. Partially or Totally Blocked Siphon C-3 Wastewater Pump Station Alarms—General Response Actions C-5 Pumping Station Failure Caused by Force-Main Break Inside the Drywell, Pump or Valve Failure. (Wetwell/Drywell Type Station) C-7 Pumping Station Failure Caused by Force-Main Break Inside Valve Pit, Pump or Valve Failure. (Submersible Type Application) C-9 Pumping Station Failure Caused by Secondary Power Failure During Power Outage C-11 Sewer Blockage or Surcharging into Basement C-13 Overflowing Sewer Manhole Resulting from Surcharged Trunk Sewer (No backup into building) C-17 Sewage Force-Main Break (residential neighborhood) C-19 Sewage Force-Main Break (cross country easement non-residential area) C-23 Sewer Main Break/Collapse C-25 Air Release and Vacuum Relief Valve Failure C-27 Cavities and Depressions in Streets and Lawns C-29 C-1 This page is intentionally blank. Appendix C: Emergency Procedures PROBLEM: Partially or Totally Blocked Siphon EMERGENCY PROCEDURES: • Dispatch sewer crew to failing siphon immediately. • Immediately have jet-flushing vehicle brought to the site if a blockage is discovered. • If the cause of a blockage is unknown use a single port cutting nozzle and attach the nozzle to the jet-flushing machine.
    [Show full text]
  • TECHNICAL SPECIFICATIONS Sewer Pump Station Wet Well Atmosphere Monitoring System
    TECHNICAL SPECIFICATIONS Sewer Pump Station Wet Well Atmosphere Monitoring System The Town of Groton is seeking to purchase Ten (10) Sewer Pump Station Wet Well Atmosphere Monitoring Systems with Oxygen, Hydrogen Sulfide and Methane Detectors to be installed at different Sewage Pumping Station Wet Wells in the Wastewater Collection System. 1.0 Equipment The Atmosphere Detector System shall be RKI Instruments Beacon 410 Gas Monitor and associated RKI detector heads or equal. This procurement is for the gas monitor and detection heads only. It does not include installation, conduit, electrical fittings or any other associated items needed for installation. All equipment shall meet the following requirements: 1.1 Gas Monitor/Control Panel A. General Specifications: All equipment shall be rated and capable of being mounted inside a sewer wet well space or on an exterior surface. The typical wet well contains high humidity and explosive and corrosive gases. i. Housing: Meets NEMA 4X. ii. Environmental Conditions: 1. Indoor or Outdoor locations (Type 4X) 2. -4F to 122F maximum ambient temperature 3. Maximum relative humidity: 80% iii. Input Power: 100/115/120V ~+/-10%, 50/60Hz, 1.0/1.0/0.5A B. Gas monitor will be a fixed-mounted, continuous-monitoring controller. System shall be a multiple channel monitor capable of sampling gas at 4 locations. C. Monitor system will have visible and audible alarms that activate when detector setpoints are exceeded. D. Monitor shall be capable of exporting data to an external recording device. E. Monitor shall be capable of being checked via remote systems such as SCADA or Mission.
    [Show full text]
  • Section 3 - Design Standards for Sewage Pumping Stations and Force Mains
    SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS 3.1. General Requirements. 3.1.01 The design of sewage pumping stations and force mains is an engineering matter and is not subject to detailed recommendations or requirements other than as required by these Standards. 3.1.02 Sewage pumping stations and force mains are to be provided solely for the conveyance of sanitary wastes. Under no circumstances shall any roof, foundation, surface or sub-surface drainage, or any other form of storm drainage be allowed to pass through the proposed facilities. 3.1.03 A detailed engineering report shall be submitted to and approved by the County prior to design. The report shall fully comply with all requirements of Paragraph 1.1.02A; shall evaluate the proposed sanitary sewer service area; shall evaluate overall effect downstream County facilities and shall justify the proposed station peaking factor. 3.1.04 The design must conform to the minimum standards set forth in the Virginia Department of Environmental Quality Sewerage Regulations. County requirements for specific equipment and submittals will be detailed during engineering review. 3.1.05 An Operations and Maintenance (O & M) Manual shall be prepared in accordance with the Virginia Department of Environmental Quality Sewerage Regulations and approved by the State and County before the County will accept the station for operation and maintenance. The manual shall contain complete operating information for all equipment, a complete set of approved shop drawings and a copy of the as-built plans for the station. The as-built plans shall be updated to include all plan revisions and field changes made during bidding and construction.
    [Show full text]
  • Bypass Pumping
    WASTEWATER DEPARTMENT STANDARD SPECIFICATIONS SECTION 406 BYPASS PUMPING JANUARY 1, 2019 RIVIERA UTILITIES WASTEWATER DEPARTMENT Table of Contents 406.01 GENERAL ....................................................................................................................... 1 406.02 SETUP AND REMOVAL .................................................................................................. 1 406.03 BYPASS PUMPS ............................................................................................................. 2 406.04 REDUNDANCY ............................................................................................................... 2 406.05 SOUND ATTENUATION ................................................................................................. 2 406.06 BYPASS HOSE OR PIPING .............................................................................................. 2 406.07 BYPASS PUMPING PLAN ............................................................................................... 2 406.08 CONTRACTOR’S RESPONSIBILITIES REGARDING SANITARY SEWER OVERFLOWS ....... 3 SECTION 406 BYPASS PUMPING TOC RIVIERA UTILITIES WASTEWATER DEPARTMENT 406.01 GENERAL No sewage or solids shall be dumped, by-passed or allowed to overflow into streets, streams, ditches, catch basins or storm drains nor shall it be allowed to "back-up" upstream to such an extent that homes, businesses, etc., along the sewer are flooded. When pumping/by-passing is required, the Contractor shall supply the necessary pumps, pipe
    [Show full text]
  • Sewage Pumping Station
    INDEX TO SECTION 02558 – SEWAGE PUMPING STATION Paragraph Title Page PART 1 – PRODUCTS .............................................................................................................. 1 1.01 GENERAL ....................................................................................................................... 1 1.02 PUMPING STATION ....................................................................................................... 1 1.03 PRODUCT REVIEW ........................................................................................................ 5 PART 2 - EXECUTION .............................................................................................................. 6 2.01 CONSTRUCTION OBSERVATION.................................................................................... 6 2.02 LOCATION AND GRADE ................................................................................................. 6 2.03 EXCAVATION ................................................................................................................. 6 2.04 BRACING AND SHEETING .............................................................................................. 7 2.05 SEWAGE PUMPING STATION ........................................................................................ 7 2.06 BACKFILLING ................................................................................................................. 8 2.07 STONE BACKFILL ..........................................................................................................
    [Show full text]
  • 4 SEWAGE PUMPING STATIONS Design Specifications
    Design Specifications & Requirements Manual 4 SEWAGE PUMPING STATIONS 4.1 DEFINITION AND PURPOSE ...................................................................................... 1 4.2 PERMITTED USES ..................................................................................................... 1 4.3 DESIGN CRITERIA ..................................................................................................... 1 4.3.1 General ........................................................................................................ 1 4.3.2 Site Layout and Servicing ............................................................................ 2 4.3.3 Structural ..................................................................................................... 3 4.3.4 Flow Capacity .............................................................................................. 3 4.3.5 Pumps ......................................................................................................... 4 4.3.6 Channels ..................................................................................................... 5 4.3.7 Pump Controls ............................................................................................. 5 4.3.8 Valves and Fittings ...................................................................................... 5 4.3.9 Flow Measurement ...................................................................................... 6 4.3.10 Wet Wells ...................................................................................................
    [Show full text]