M/S. Mrutyunjay Stone Crusher

PRE-FEASIBILITY REPORT

1.0. Executive Summary M/s. Mrutyunjay Stone Crusher proposes to implement mining activity at Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka , District Ahmednagar and State . The proposed project shall produce or mined 86508 MT of stones per annum and shall be sold in the nearby areas for different uses. During mining operation, stone is obtained by digging, blasting, or cutting operation. Occasionally drilling and channelling is also done using hand chisels and hammers. However, due to industrialization and technological advancement, presently, quarrying of minerals is being undertaken with the help of different types of mining machinery to speed up the work and to secure required quantities in time.

The proposed site is located within the co-ordinates of 18°51’24.2” N and 74°25’49.3” E, 18°51’27.7” N and 74°25’49.6” E, 18°51’24.5” N and 74°25’41.2” E, 18°51’22.3” N and 74°25’44.4” E. The Ahmednagar-Pune Highway SH 27 is at a distance of 1.9 km in the West and National highway (NH 222) Kalyan-Ahmednagar is at 34.4 km in the Northeast. The nearest village of Yadavwadi, is in the Northeast at distance of 1.7 km and taluka place of Parner is at 16.14 km in the North direction. All these shows good connectivity of the area by the road to the nearby villages and towns for easy supply of mined material.

This project is expected to meet the demand supply gap of the area for the different uses in the domestic market. The demand for the material will be on increasing scale because of population growth and to meet their demand for housing and other infrastructural facilities. Similarly, government projects need the material on delivery basis at the work site. Apart from the fulfilling the requirement of material, this project will add into the income of the local people and thereby will help in increasing the standard of living and livelihood. The proposed project is in the possession of various permissions from statutory authorities as per the requirement to start the mining activities. The list of all these required documents shall be enclosed in the subsequent paras of the prefeasibility report.

The project proponent also undertakes all the responsibilities to safeguard the environment and personal health of the workers those will be working at the site in the future. Some of the control measures shall include plantation of trees at the periphery of the project and periodical medical check-up for the Employees to assess the impact of dust if any on the health. In-addition to these control measures, fogging system or water spraying during mining and crushing operation shall be followed strictly.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

1.1. Introduction

India possesses a wide spectrum of stones such as granite, marble, sandstone, limestone, slate, and quartzite which are spread all over the country. is amongst the largest producer of raw stone material and is quite developed and vibrant in the South India, as well as in Rajasthan and Gujarat. The Indian stone industry has evolved into the production and manufacturing of blocks, flooring slabs, structural slabs, calibrated and ready to fix tiles, monuments, tomb stones, sculptures, artefacts, cobbles, cubes, kerbs, pebbles and landscape garden stones.

During the India's history, dating back to 3200 BC has been influenced considerably by the disposition, development and use of stones and other construction materials. Dimension stones have also left deep imprints on the architectural heritage of the country. Innumerable temples, forts and palaces of Ancient Indian Civilisation have been carved out of locally available stones. The Taj Mahal at Agra was constructed from Indian marble. Some of the rock-cut structures include Khajuraho Temple, Elephanta Caves, and Konark Temple. Besides, all major archaeological excavations have revealed exquisitely carved statuettes and carvings in stone. Ancient Buddhist monuments like the Sanchi Stupa of III century BC have also been carved out of stone. This tradition of Stone Architecture has continued to the present era, with most of the important modern buildings in India like the Presidential House, Parliament House and Supreme Court made of high quality sandstone from Rajasthan. Stones are still the mainstays of civil construction in India, with stones being used extensively in public buildings, hotels and temples.

India is pioneer in the exploration, mining of commercial rock deposits and in establishing a firm base for stone industry. India, with an estimated resource of about 1,690 million cu m, comprising over 160 shades of Dimension Stone Granites (DSG), accounts for about 205 of the world resources. Of the 300 varieties being traded in the world market, nearly half of them are from India. Commercially viable granite and other rock deposits are available from Andhra Pradesh, Bihar, Gujarat, Karnatka, Maharashtra, Orissa, Rajasthan, Tamil Nadu, and Uttar Pradesh.

Looking into the importance of stones mining, M/s. Mrutyunjay Stone Crusher will be engaged in stone quarrying at Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra with an area of 2.0 ha. Initially, mining of minor minerals with the area of less than 5 ha was not covered under the EC as per the notification of 2006. However, due to various initiatives by the

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

Government of India to protect the environment and health of the workers as well as of public, all the mining activities involving minor minerals irrespective of area, now need to secure prior environmental clearance from the District Authorities (DEAC / DEIAA). To make the process of mining environment friendly, government has published notification of 15th January 2016 with respect to minor minerals including Stone quarry and categorized them into Category B2 project. And, made it mandatory to all these B2 category projects to secure Environment Clearance from the District Level Environment Impact Assessment Authority (DEIAA) before start of any activity at the site.

Table 1: Salient Features

Sr. No. Information Details

1 Project Name M/s. Mrutyunjay Stone Crusher

2 Name of Project Proponent 1) Shri. Sachin Pandurang Shelke

Gat No. 337, 338, 339, 340 & 342, Village 3 Address / Location Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra 4 Area 2.0 hectare

18°51’24.2" N 74°25’49.3" E

18°51'27.7" N 74°25'49.6" E 5 Geocodes 18°51'24.5" N 74°125'41.2" E

18°51'22.3" N 74°25'44.4" E

6 AMSL 606 - 614m

7 Topography Non-forest, Hilly, rocky and barren land

8 Name of Mineral to be Mined Basalt Stone

9 Production Capacity / Annum 86508 MT On small scale and electrical control blasting 10 Drilling and blasting for loosening rock will be done 11 Land use Private non-agriculture and non-forest land

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

12 Water Requirement and source 9 CMD

13 Solid Waste No Solid Waste generation

14 Manpower 10

15 Type of Land Private non-agricultural land

1.2. About the Project

According to Indian Bureau of Mines (IBM), India is one of the top ten nations having various types of mineral and resources. It produces more than 80 different mineral commodities from the various states. It has abundant reserves of barite, bauxite, chromites, coal, iron and manganese ore. As per the report of 2007, mining activities contributed 4.4% in the India’s economic growth. In Maharashtra, the stone quarrying process has become very important due to increasing requirement of quarried material for different types of infrastructural projects. The growing population and its requirement of housing, increased the demand of construction. The requirement of stone in bigger construction like building towers, roads, railway tracks and dams have increased many fold. Under the policy of Government for mining, “stone’ is categorized as “Minor Mineral”. The location of stone Quarrying and Crushing are permitted away from the human habitation to avoid the exposure to dust pollution to avoid the silicosis.

The said project shall produce variety of stones required for different uses in construction industry. It shall produce around 86508 MT of stones per annum and shall be sold to nearby areas to cater the needs of construction.

As per the requirement, Mining plan along with Mine closure plan showing the systematic development of the mine for next five years has been prepared and approved by the Dy. Directorate of Geology and Mining, Government of Maharashtra.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

Table 2: Year wise production plan Sr. No Year Cubic Meter Tonnes Brass

1 I 32040 86508 11361.7

2 II 32040 86508 11361.7

3 III 32040 86508 11361.7

4 IV 32040 86508 11361.7

5 V 32040 86508 11361.7 Total 160200 432540 56808.5

1.3 Stone Quarry

A quarry is a type of opencast mine from where stone, rock, construction aggregate, riprap, sand, gravel, or slate are being extracted. The Stone Quarries are generally used for extracting building materials as mentioned above. Stone quarries have different shapes and sizes. Some are, like gravel pits are relatively easy to reclaim. Many disused quarries, once they have been made safe, can be used for leisure areas such as camp sites or motor vehicle racing tracks but the reclamation is more difficult. The land where mining activities proposed to be carried out is owned by the proponent. As, the land is not suitable for cultivation, it is decided to use it for stone quarry to obtain income for livelihood. Mining plan along with closure plan is prepared initially for five years along with other requirements of the project.

1.4 Location and Access

Village Yadavwadi, Taluka Parner,

District Ahmednagar, Maharashtra

Mining Lease area: 2.0 ha

Capacity of production: 86508 MTPA The proposed site is located within the co-ordinates of 18°51’24.2” N and 74°25’49.3” E, 18°51’27.7” N and 74°25’49.6” E, 18°51’24.5” N and 74°25’41.2” E, 18°51’22.3” N and 74°25’44.4” E. The Ahmednagar-Pune Highway SH 27 is at a distance of 1.9 km in the West and National highway (NH 222) Kalyan-Ahmednagar

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

is at 34.4 km in the Northeast. The nearest village of Yadavwadi, is in the Northeast at distance of 1.7 km and taluka place of Parner is at 16.14 km in the North direction. All these roads shows good connectivity of the area to the nearby villages and towns for easy supply of mined material. The nearest road Wadegavhan – Yadavwadi is at 0.5 km from the lease area in the North. The nearest water body is Kukadi River in Southwest direction at 4.47 km. The Visapur Railway Station is at 18.26 km in the East. All other required facilities such as Primary Health Centre, School, Market places and other infrastructural facilities are well developed in an around the Ahmednagar. The site is well connected by the roads to nearby areas and towns for easy transportation of excavated material. All other major areas are either connected through rail or road network which is also growing rapidly.

Major villages and towns like Ahmednagar, Pune, Kurkumbh, Parner, Supa, Ranjangaon, Daund, Rahuri all are within the 70 km from the site and well connected through the network of the road which is a plus point for the sustaining the business of the quarry in the long run and also to fulfil the demand supply gap. As area is having very few stone quarries in the nearby areas. There is also shortage of material as it is being used to make the different varieties of Pavers block.

2.0. Nature of project

The proposed project activities are mainly of excavation and extraction of stones from the land. The allotted land for the project is 2.0 hectare and the cost of project will be around 50 lakhs including machinery and building/Shed. Total manpower requirement shall be around 10, depending upon the demand of the material. The Stone Crusher, Conveyer Belt, Hopper, Trucks, and Tipper will be major requirement to run the stone quarry systematically. As per the mining plan, it proposes to mine the stones to the tune of 86508 MT per annum. There is good demand for the quarried material from the area as various developmental projects are undertaken by the locals and Government agencies. It is also understood and studied that whatever material shall be produced from the mining will be completely sold out in a time bound manner and there will not be any surplus stock. During visit to the site and nearby areas for baseline survey, it is understood that there is a shortage of material as it is being used on the large scale in place of sand for various purposes. Hence, it is envisaged that the proposed activity will definitely fulfil requirement and need of the nearby Villages and Towns as mentioned in the above paragraph.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

2.1. Need of the project

As mentioned above, stone quarrying activities are very much essential for the availability of required material for development of the area with respect to construction activities as availability of sand is becoming scares day by day due to stringent rules and regulation of the environment.Most of the developmental projects requires stone aggregate for the construction activities including Industrial Plant or Buildings / Towers. Apart from these requirements, quarried material is being used on the large scale for construction of Roads, Highways, Airways, Railway Tracks, and Dams. All these developmental activities cannot be implemented without availability of quarried material; hence this proposed project is very much essential to fulfil the requirement as well as for the overall growth in economy of the area, region and the country. All this infrastructural project plays the vital role in the development of economy of the region and hence the Nation. Recently, the announcement made by our Hon’ble Prime Minister with respect to home for all by 2020, also added in the requirement of this material and hence the quarry. It is also expected that the requirement of these material will be doubled within the span of two to five years due to various reasons as mentioned earlier.

In view of the above, there will be constant growth in the requirement of this material, and therefore, such type of projects becomes essential for the overall nations growth.

2.2. Demand Supply Gap

The Stone was used since ages in the past for various purposes by our Ancestors. They have used it for Sculpting, good and durable construction material, to make the war memorials of our past Heroes who laid down their life for motherland. The lime stone is also being used to manufacture of the Cement. As a stone, it was mainly used for road base, paving, ready mixed concrete, and asphalt. Sandstone is used for garden wall and for landscaping. Similarly, Basalt is mainly quarried and crushed and used as road-base and reinforced concrete as an aggregate. Stones are used for varied purpose like Building material for foundation and walling of buildings, dams and bridges. It was also used to make Stone wall, Roof tile in the form of Slates. The Murram is used for covering the base of the road surface. The Granite, another type of stone is used for architectural construction, ornamental and for monuments. Apart from all these varieties, marble is used on the large scale in the construction industry for aesthetic purposes, beautification, and strength of structure. It was also used extensively to build Temples, Churches, and Castles in the past.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

In view of the above various uses of the Stone and its strong and weather resistant properties, its demand is constantly growing. So, as the demand for stone is growing, naturally we need to go for increasingly quarrying activities.

2.3. Domestic Market

As the infrastructural developmental activities are growing day by day due to increased population and industrial growth, there is always demand for the stone material for various uses. In and around the area of project site, there is lot of demand for the material for construction of roads, Railways, housing and in industrial area. Hence, there will be good demand from the local market. If the quarries are not working properly and unable to give desired output, there will be stunted growth which will directly affect the local, regional and national economy. And, also it will add into the environmental damage of flora and fauna due to excavation of sand from the River bed beyond the capacity.

Therefore, to fulfil the routine and increasing requirement / demand of material more numbers of quarries are required to be operated efficiently and effectively to protect the environment and health of the workers. To fulfil the demand supply gap, M/s. Mrutyunjay Stone Crusher proposes mining at Yadavwadi in the district of Ahmednagar.

3.0. Employment Generation

There will be scope for direct employment of skilled and semiskilled persons from the local areas and it will help to uplift the standard of living of locals and downtrodden families living in the nearby areas. Apart from direct employment, there will be an opportunity for indirect employment from the area. It is observed that People from the area are not much qualified and are in the need of employment. Apart from above opportunities, there will be requirement of Trucks and Tippers with Drivers and Cleaners to take care of different activities.

4.0. Geology

The entire area of is covered with Deccan Trap lava flows. These volcanic rocks (Basaltic flows) are the product of fissure type eruption of Upper Cretaceous to lower Eocene age and popularly known as Deccan traps. It is found that alluvium has been deposited all along the course of major Rivers. These lava-flows are sometimes associated with inter-trappean beds such as limestone, sandstone,

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

clay shales, red bole beds, and porous ash or scoriaceous beds. Thin mantle of black cotton soil, river alluvium, sands, gravel, clays and silts represent the recent deposits in the district. Calcareous concretions and nodules, known as kankar, is commonly associated with the soil, more concentrated near the stream- courses.

Rock types: Every flow of the basalt is generally composed of two different units: (a) the lower and middle parts are hard and compact, dark grey to greenish grey or black in colour and almost non-vesicular or very minutely vesicular. They are traversed by numerous joints and fractures on weathering at the surface give rise to spheroidal blocks with inter-spaces between the spheroids filled with soft weathered material, (b) the upper parts of the flows are comparatively soft and vesicular. They have reddish pink to purplish colour and the vesicles almost everywhere filled up by zeolites and at places by other secondary minerals like calcite, greenish chlorapatite, quartz or ferruginous material. The thickness of the flows ranges from 3 m to as much as 40 m, the average thickness being around 15 m. According to Roy (1948), the thickness of the volcanic rocks is around 900 m.

The basalts are composed of plagioclase feldspars and clinopyroxenes, usually augite or pigeonite, with iron ores and other minor constituents. They exhibit porphyritic texture wherein thin laths of plagioclase and feldspars are set between the plates of augite. Such porphyritic trap having minor laminations or patches of pink, vesicular trap, is exposed in the Mula river bed near Ahmednagar cantonment. The porphyritic trap is hard and compact but the vesicular portions are comparatively soft and weathered. Climbing up the right bank-cliff, this porphyritic variety is traceable right up to 754 m from the Mean Sea Level (MSL). Where it is over-laid by 0.6 m thick red clay followed in turn by a series of pink or green, highly amygdular lava beds, the total thickness of the section being around 20 m. The amygdular varieties are characterised by geodes or vesicles of various shapes, varying from round to elliptical bodies, sometimes in the form of mere stringers or veins, following the bedding or running irregularly in the trap. Their size varies from that of peas to bigger bodies which are usually not inter-connected. The removal of infillings, e.g., calcite, zeolite, quartz, etc. due to action of running water and weathering has brought about a marked porousness giving rise to a type of cellular or spongy traps at the river-banks.

Red bole beds: These are thin reddish horizons occurring in-between the successive flows of basalt and are exposed in discontinuous patches. They are very well exposed along the hill-sides.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

Calcareous Kankar: These are either associated with soil or occurring as small nodules or concretions either associated with soil or as infillings in cracks, fissures and joints in rocks. Whitish kankar clay are commonly seen in the cliff at both the banks of Mula River near Ahmednagar Cantonment.

Soil and alluvium: Black cotton soil is the ultimate product of decomposition and weathering of basalt. This is highly absorbent and cracks and crumbles after a period of long drought. Recent alluvium and consolidated gravels have attained a thickness of 24-30 mm on the right bank of the Mula River near the dam-site.

The regional strategic sequence in the region is as follows:

Sr. No Type Structure / Contents

1 Age Lithology

2 Recent, Sub recent Laterite Bauxite, soil and sand etc.

Basaltic lavas flows (Deccan Trap 3 Upper Cretaceous to Eocene Basalt

The entire area of the region is covered with Deccan Traps Basalt. The rocks are exposed and there is no vegetation. The petrological composition of the Deccan Basalts is singularly uniform. The most common rock is normal basalt with mean specific gravity of 2.9. Most of Basalt is exposed at the Hill slopes. Surface plan and geology of the area is shown in different plates of Mining plan.

5.0. Topography

The survey was conducted using Pentax Station and GPS Instrument and surface plan was prepared. Latitude and longitude measurements were taken by using GPS Instrument. All these reading is taken with respect to MSL. It is observed that area is rectangular and major dimensions along with East – West direction. The length of area is about 160 m and width is about 125 m. The bench mark is at Boundary pillar 3 which is at 614 m from MSL. There is even slope in the area. Overall downward slope of the area is from south to north

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

with lowest side near the north western boundary while highest level is towards southern boundary. The lowest contour in the area is 606 m MSL, while the highest is at 614 m MSL. No specific drainage pattern is observed in the area of study, however, natural flow of water during monsoon shall be south to north. The area is part of private, virgin and non-forest land. There is no vegetation in and around the area as it is completely rocky in nature. There is no human settlement within impact zone of the project. During survey, no ground water is encountered in the pit or anywhere in this area. There is good network of local as well highways network at distance of from 04 to 55 km from all the sides.

Land Forms: There are different types of land forms in Ahmednagar district. There are hill ranges of Sahyadris in the western part of the district. They are called Kalsubai, Adula, Baleshwar and Harishchandragad hill ranges. Kalsubai, the highest peak lies in Ahmednagar district. In the northern part of the district, plains are found along the banks of the rivers Godavari and Pravara. Based on the physical setup, there are three main physical division such as Western Hilly region, Central Plateau region and Northern and southern plains.

The area is virgin in nature and there is no pit or other any kind of water storage. It is part of private, non- agriculture, non-forest land. It is hard and rocky in nature without any type of vegetation on it. No settlement or any agriculture field was observed in the area. No ground water is encountered in the area. This area falls in the rain shadow belt. It lies in the agro-climatic zone, western plateau and hill region of western Maharashtra which is known for scarcity zone. It has moderate temperature climate with average temperature ranges from 12.3 to 38ºC. In the recent times, highest recorded temperature was 43.7ºC on 9th May 1960 and lowest was 2.2ºC on 7th January 1945. The average recorded humidity was found in the range of 60 to 80% and the average annual recorded rainfall is in the range of 484 to 879 mm.

6.0. Proposed Mining method

The stone shall be obtained from area by a digging, blasting or cutting. This process is known as quarrying and the pit or open excavation from which the stone is obtained is called a quarry. Based on the excavation method, quarries can be divided into two broad categories: vertical Quarries and horizontal Quarries. In the digging, when the stone is obtained in the form of raw material, the walls of the quarry are known as a vertical Quarry whilst stone gathered from the bed or floor is known as a Horizontal Quarry. The drilling and channelling is also performed sometime using hand chisels and hammers. Many quarries now have mining machinery, such as dampers, trucks, hammer and Excavators. Once the stone is obtained it is further

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

processed for the next stage of production. In this process, open cast mining shall be followed. The drilling and blasting will be carried out to produce required size of crude rock. This rock shall be fed to the crusher. This mining activity shall consist of following operation / steps:

i) Removal of morrum soil, weathered basalt, wherever available and stack at dumping site ii) Mining of Basalt iii) Removal of mined ROM to surface yard for proper sizing, sorting and stacking

Opencast Working:

Each cycle of operation shall consist of removal of morrum soil, weathered rock / basalt wherever present, followed by extraction of exposed basalt subject to following condition shall be strictly complied

1. Quarrying operation shall be conducted from top to bottom 2. No person shall be engaged on work or allowed to travel close to high sides / benches from which one is likely to fall from more than 1.8 m height vertically down, unless provided with and uses a safety belt or rope 3. A garland drains of 7.5 m of barrier will be maintained 4. At surface all along the boundary of site vegetation growth will be generated to isolate mining operation from the rest of the area 5. The surface drainage channels governing the water drainage of the area will be maintained by proper garland drain to collect the water at the periphery of excavation and discharge the same at the natural outlets by passing the excavation 6. Wherever top morrum soil is excavated would be stacked properly for the use of vegetation

6.1 Plant and Machinery

As mentioned above, monthly production is computed based on the six working days per week. Following equipment and machinery shall be required to carry out the mining operation efficiently and scientifically.

 Compressor  Jack Hammer  Poclain  Dumper / Tipper

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

 Tractor  Drilling Machine  Trucks

6.2. Blasting

 Proper blasting whole geometry shall be designed  Blast site shall be wetted before and after blasting operations are completed  Only optimum quantity explosives shall be used so that the vibrations do not damage the structures/houses if the quarrying operations are close to human habitation  Blasting shall be conducted only during favourable weather conditions and day time and permissible hours  The blasting operations shall be given publicity so that local people become aware of the blasting activities being undertaken  The vibrations should be monitored periodically in consultation with the local Mining authorities  The storage of the explosives and its transfer to and the quarry area shall be strictly in accordance with the conditions listed in the permission granted by Explosives Department  For getting quarried material, blasting shall be adopted. To carry out these blasting operations in a scientific manner, advanced blasting procedures with skilled personnel shall be used  Depth of hole : 1.50 to 1.75 m  Blasting pattern : Single row blasting  Space between holes : 1.50 m  Consumption of : As per the requirement Explosive  Charge per hole : 500 g gelatin along with detonator and adequate length of safety fuse

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

6.3. Loading

As mentioned earlier that entire mining operation shall be manual nature. Loading of the material in the Trucks shall be manual. Basalt after blasting will be fragmented as per the requirement to meet the demand. Thereafter it shall be loaded to Tractors or Tippers for onwards dispatch to crushing unit.

6.4. Storage of Explosive

The Blasting operation shall be carried out as per the requirement and convenient time, normally in the afternoon depending upon the local conditions. A portable magazine box and other material will be brought by licensed Shot Firer and blasting will be carried out. During blasting, care shall be taken so that nearby passers are aware about the blasting operation. Even, during blasting, intimation shall be provided by use of speaker system so that people at distance are aware of the operation and blasting to avoid any type of incidence.

6.5. Mining Drainage

a) The proposed area is on plateau portion with overall slope in the direction of north and west. There no perennial water coursed in and around the area. However, Kukadi River Flows in the South at 4.47 km. During monsoon, surface water will flow following the natural relief of the area.

6.6. Haulage and Transportation of Material

It is a small mine and transportation of basalt will be carried out by Tractors / Trucks within the quarry and onward dispatch to various customers will be by Tippers. Quarry can be approached by asphalted road from the Village Yadavwadi.

6.7. Storage of Basalt

At any time, aggregate produced will be dispatched immediately after production to either Crusher or to the Customers. In case of storage is required at the site, open space will be available in the large area for the open storage.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

6.8. Usage of Processed Material

The quarried material shall be used for the following different purposes mainly in the local areas including nearby towns and MIDC as there is lot of demand for this material due to various development activities undertaken by the locals and Government.

a) Housing b) Road c) Railway d) Industries in MIDC

7.0. Safety and Health

To ensure the health and safety while working, following instructions shall be followed during blasting operation. In-addition to these instruction, people working on the site shall be provided with earplugs and muffs, Safety Shoes to avoid any type of damage to their feet while working near crusher or in the quarry. They also need to be provided with the dust mask to avoid the inhalation of dust as it contains silica. During drilling operations, life line with Safety belt shall be provided. From blasting site, up to 500 m shall be marked as unsafe 1.Workers will be deployed with flags and whistle at boundary to give warning 2.Workers need to wear helmets 3.Sufficient time gap shall be kept during two blasts

8.0. Quality of Water

There will not be any impact on quality of water due to mining activity. There is no discharge of water or any other effluent from this mine. There will be no generation of any toxic or hazardous substance which may affect the quality of ground water. There will be no impact of mining on quality of water by the mining operation as no water from other source is getting mixed with rainwater.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

8.1 Water Demand

Table 3: Water Use and Quantity

Sr. no. Use Quantity (m3 /day) 1 Water Sprinkler 2 2 Plantation 2 3 Domestic 5 Total 9

There is no water or waste water generation form the site as only 10 Workers shall be working at the site. Even there is no generation of solid and hazardous waste.

9.0 Anticipated Land Use Pattern Presently land is barren and not used for any useful purposed. It is lying vacant without any trees or other infrastructure facilities. Hence, this land will be used for proposed mining activity as follows:

Table 4: Proposed Uses of Mining Area

Sr. no Proposed Uses of Area Area in Ha

1 Area of top soil spread for a forestation 1.320

2 Over burden dump -

3 Mineral Storage -

4 Infrastructure -

5 Mine Road 0.100

6 Un Utilized area for mining 0.150

7 Virgin lease area for mine 0.430

Total 2.0

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

10.0 Physical Infrastructures

The facility shall be provided with approach road which can be used for transportation of man, material and machineries. The power requirement will be met from the nearest power station. The labours, which will be required to operate the quarry shall be made available from the nearby villages and those joined shall be trained to suit the mining requirements. Health care, including provision of first aid at work site and periodical medical checking of the employees. Other facilities such as rest room, food and communication shall be provided.

11.0 Rehabilitation and Resettlement Plan

There will be no requirement of any rehabilitation or resettlement plan to be adopted or implemented as the land is private land and there is no habitation in and around the proposed project site.

12.0 Environment Management Plan

12.1 Air Pollution Control

Drilling

1) Drilling machine shall be fitted with dust suppression, collection and disposal arrangement 2) Deep wetting of drilling zones shall be done by water sprinkling before starting drilling 3) During the drilling operations, efforts shall be made to reduce dust generation by responding appropriately

Blasting

1) Proper blasting whole geometry shall be designed and maintained 2) Blast site shall be wetted before and after blasting operations are completed. 3) Only optimum quantity of permissible explosives shall be used so that the vibrations do not damage the structures/houses from the nearby areas if any. 4) Blasting shall be conducted only during favourable weather conditions and day time. 5) The blasting operations shall be given publicity in the local area on Speaker and other available media so that local people become aware of the blasting activities being undertaken in the area. 6) The vibrations should be monitored periodically in consultation with the local Mining authorities.

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

7) The storage of the explosives and its transfer to and from the quarry shall be strictly in accordance with the conditions listed in the permission granted by Explosives Department.

12.2 WATER POLLUTION CONTROL

Garland drains shall be provided around the working pits to prevent entry of rain water inside pit. Selection of waste dumps site will be in non-mineralized zone of mining lease area. Water will be collected in the mines sump after deposition of silts in the catch drain. The drain will be de-silted regularly and maintained properly.

12.3 NOISE POLLUTION CONTROL

Following steps will be initiated or undertaken to minimize the generation of the noise:

1.The latest machinery will be used during mining operation 2.Periodical preventive maintenance schedule will be maintained 3.Use sharp drill bits to reduce noise generation during drilling 4.Controlled blasting with adequate charge per hole will be practiced 5.Plantation will be done on the sides of approach roads, around rest shelter and workshop area which will act as buffer zone to reduce the propagation of noise 6.Earmuffs will be provided to all operators and employees working near machineries involving generation of high noise 7.Periodical monitoring of noise level at appropriate locations to measure the noise level so that required control measures can be initiated in time 8.Training at regular intervals for use of personal protective equipment like earplugs & earmuffs will be imparted to all employees 9.All the operators will be provided with earplugs & earmuffs.

12.4 GREEN BELT

33% Green belts surrounding the ML area and along the permanent roads shall be developed with tree species having broad leaves, with minimum of three rows, keeping 5×5 m interval. Spacing between the tree saplings shall be used for development of under growth. Mostly local varieties of plants are proposed

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

to be planted to improve the soil quality with humus and carbon over a span of five years. The detail plan shall be as presented in below Table no.5.

Table 5: Plantation / Afforestation program Year Area in Hectare Species of the Tree Number Pongia, Pinnatta, Azadicrta, Indica, I General Surface 0.05536 75 Babul and Imli II General Surface 0.05536 Pongia, Pinnata, Azadicrta Indica 75 III General Surface 0.05536 Pongia, Pinnata, Azadicrta Indica 75 IV General Surface 0.05536 Pongia, Pinnata, Azadicrta Indica 75 V General Surface 0.05536 Pongia, Pinnata, Azadicrta Indica 75 Total 375

12.5 Land

The total mining area shall be is 2.0 ha. Out of this, only 0.100 ha will be utilized for roads and other infrastructure required at the site and rest shall be utilized for tree plantation and mining activities. This excavated area can be effectively used as water reservoir in the future. The rest of the area will be converted into the green belt with two row plantations. The post mining land use of the area will improve the overall ground water regime and green cover in the area which create the positive impact on environment and enhance the aesthetic / beautification of the mined and nearby area. Which will also contribute into the protection of the environment.

13.0 Project Cost

Plant and Machinery 32 lakhs

Manpower 10 lakhs

Environmental Management Cost 08 lakhs

Total 50 lakhs

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra M/S. Mrutyunjay Stone Crusher

14.0 Conclusion

The surrounding inhabitants are mainly barren land due to rocky in nature and there is no habitation in and around the site. The frequent drought prone condition leads to migration of the people to other areas. Unemployment and underemployment are the main problems of the inhabitants. Opportunities for jobs in activities such as mining serve as a source of permanent livelihood. To access the mine approach roads are/or maintained by the operating company, which is also beneficial to the surrounding population. The village roads are usually strengthened for transportation of minerals. The mined-out area is also becoming source of water for villagers as good quantity of water can be stored in future. Thus, in the interest of mineral development and to improve the social condition of the local habitants this project shall be considered for the grant of EC

Gat No. 337, 338, 339, 340 & 342, Village Yadavwadi, Taluka Parner, District Ahmednagar and State Maharashtra