Village Alipur Arian, District Patiala

Total Page:16

File Type:pdf, Size:1020Kb

Village Alipur Arian, District Patiala MINING PLAN INTRODUCTORY NOTES Very small B'2' category mines: All B2 Category mines excluding very small B2 category mines i.e. manual opencast mines not using explosives and where the average daily employment does not exceed 25. 1 GENERAL a Name of the applicant Baldev Singh Address Village Alipur Arian, District Patiala District PATIALA State PUNJAB Pin Code 147001 Phone - Status of Applicant CONTRACTOR Mineral (s) Which the applicant intends Ordinary Earth to mine. Period for which the mining lease is 12 month required or granted/renewed 2 LOCATION Detail of Location (with location map) Barsat District & State Patiala, Punjab Tehsil Patiala Village Barsat Khasra No. HADBAST NO 47 KHEWAT NO 34/29 KHATONI NO 97 KHASRA NO Area 75 Hectare Whether the area is in the forest (please No specify whether protected, reserved etc.) Ownership/Occupancy The land has been taken on lease for mining of Ordinary earth from the following; Site 1 Land use pattern Agriculture use only b Attach a location map showing N.A. boundaries of the mining lease, adjoining areas roadways, railways, natural drainage system and any other surface features, if any. It is preferred that the area be marked on a Survey of India topographical map or a cadastral map or forest map as the case may be. However, if none of these are available, the area should be marked on a plan prepared especially for the purpose on a scale of 1: 5000 linking it with any 1 important reference point available in and around the area. 3 GEOLOGY AND EXPLORATION Describe briefly the general topography The area falls under the Indo-Gangetic explaining whether it is a plain land or a alluvial plains. The geological formations hilly area and local geology of the met within the district comprise alluvium mineral deposit within the leasehold. of quaternary age. It consists of alternating beds of sand, silt and clay. In the southwestern part, the alluvium is over laid by thin layer unstrained loam. 4 RESERVES Give details of the reserves using The lease holders would mine the standard methods of estimation. ordinary earth upto 2 feet depth. 5 DEVELOPMENT AND PRODUCTION PROGRAM a Outline briefly, year wise, development The lease holders are having the mining and production program for five years. lease of 12 months for the excavation of Also indicate the precautions to be ordinary earth. During this period, the observed to prevent hap-hazard lease holders would excavate around excavation of pits, scattering of wastes 637m3 of ordinary earth at their site. and avoidable loss of mineral in ground From there, the ordinary earth would be used for the ordinary work. To prevent the effect of excavation of the surrounding area, the lease holders would leave 2.5 ft. land around the boundary so that there is no negative impact on the surrounding lands. The top soil i.e. 6 inch would be stored at the mining i.e. and would be reused for leveling after the mining operations are complete. b State average daily employment for the Less than 5 persons mining activity 6 WASTE DISPOSAL ARRANGEMENTS Describe briefly the arrangements made The top soil i.e. 6 inch would be stored at for the top soil, mineral reject and waste the mining site and would be reused for disposal including precautions to be leveling after the mining operations are taken in the selection of disposal site(s) complete. along with their respective quantity likely to be generated for the five years There would not be any mineral reject from the mining. 7 RECLAMATION PLAN Describe briefly the year wise After the excavation of the ordinary reclamation plan earth, the top soil stored at the site would be used for the leveling of the land. a Rivers Courses No river courses within 500 meters of the mining area b Nalas No nalas within 500 meters of the mining area 2 c Water Tanks No water tanks within 500 meters of the mining area d Villages/Houses/Hutments, agriculture No Villages/houses/hutments within 500 land meters of the mining area. Only agricultural land is surrounded by the mining site. e Important Monuments No monuments within 500 meters of the mining area ANY OTHER RELEVANT INFORMATION through its contractor. Baldev Singh would be responsible for the implementation of the environmental Management Plan of the Ordinary earth mining project. The EMP would be implemented within 3 and 4 months from the date of grant of environmental clearance. EMP FUND A sum of Rs. 20,000/- has been proposed as separate fund for building the infrastructure required for the management of EMP such as Sprinkler, Pipes, Medical Aids etc. however annual Rs 5000/- has also been earmarked towards the recurring cost. 3 UNDERTAKING 1 I, Sh. Baldev Singh S/o Sheesha Singh Village Alipur Arian, District Patiala do hereby solemnly affirm and declare as under: 1. That the periphery of any other area of borrowing/excavation does not falls within a radius of 500m from the periphery of proposed area of borrowing/excavation Place: Date: ................. (Baldav Singh) VERIFICATION:- I, the above named deponent do hereby solemnly affirm and declared that the statement given above are true and correct to the best of my knowledge and belief and nothing has been concealed therein. Place: Date: ................. (Baldev Singh) 4 UNDERTAKING 2 I. Sh. Baldev Singh S/o Sheesha Singh Village Alipur Arian, District Patiala do hereby solemnly affirm and declare as under: II. That the activity associated with borrowing/excavation of 'ordinary earth' and ordinary earth' for purpose of general work, construction of roads, embankments etc shall not involve blasting. III. That the borrowing/excavation activity shall be restricted to a maximum depth of 2m below general ground level at the site. IV. That the borrowing/excavation activity shall be restricted to 2m above the ground water table at the site. V. That the borrowing/excavation activity shall not be alter the natural drainage pattern of the area VI. That the borrowing/excavation activity shall be restored by the project proponent for useful purpose(s). VII. that appropriate fencing all around the borrowed/excavated pit shall be made to prevent any mishap. VIII. That measures shall be taken to prevent dust emission by covering of borrowed/excavated earth during transportation. IX. That safeguards shall be adopted against health risks on account of breeding of vectors in the water bodies created due to borrowing/excavation of earth X. That workers/labourers shall be provided with facilities for drinking water and sanitation XI. That a berm shall be left from the boundary of adjoining fiels having a width equal o at least half the depth depth of proposed excavation XII. That a mnimum distance of 15 m from any civil structure shall be kept from the periphery of any excavation area. XIII. That the concerned DEIAA while considering granting environmental clearance for such activity for ordinary earth will prescribe the guidelines as stated at (i) to (xi) above and specify that the clearance so granted shall be liable to be cancelled in case of any violation of above guidelines Place: Date: ................. (Baldev Singh) Verification: I, the above named deponent do hereby solemnly affirm and declared that the statement given above are true and correct to the best of my knowledge and belief and nothing has been concealed therein. Place: Date: ................. (Baldev Singh) 5 UNDERTAKING 3 I Sh. Baldev Singh S/o Sheesha Singh Village Alipur Arian, District Patiala do hereby solemnly affirm and declare as under: 1. That I am Prop. in the firm and have applied environmental clearance before DEIAA for mining related activity of our Ordinary earth mining. 2. That I give an undertaking that there is no boundary of National Park of Wild Life within a distance of 1 Km radius from our mining site and no protected area notified under the Wildlife (Protection) Act, 1972 or Notified eco-sensitive area as notified under section 3 of the Environmental (Protection) Act, 1986 exists within 10 Km radius from the project site. (Baldev Singh) 6.
Recommended publications
  • Ranking of Districts Wrt Per Capita Income
    Index Sr.No. Item Page No. 1 Ranking of Districts w.r.t. Per Capita Income (PCI) at current prices. 1 2 Yearwise Per Capita Gross District Domestic Product at current Prices 2 3 Yearwise Per Capita Gross District Domestic Product at constant (2011-12) Prices 3 4 Yearwise Per Capita Net District Domestic Product at current Prices 4 5 Yearwise Per Capita Net District Domestic Product at constant (2011-12) Prices 5 6 Yearwise Gross District Domestic Product at current Prices 6 7 Yearwise Gross District Domestic Product at constant (2011-12) Prices 7 8 Yearwise Net District Domestic Product at current Prices 8 9 Yearwise Net District Domestic Product at constant (2011-12) Prices 9 24 Sectorwise Gross District Domestic Product at current Prices year 2015-16 11.-14 25 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2015-16 15-18 26 Sectorwise Net District Domestic Product at current Prices year 2015-16 19-22 27 Sectorwise Net District Domestic Product at constant (2011-12) Prices year 2015-16 23-26 20 Sectorwise Gross District Domestic Product at current Prices year 2014-15 27-28 21 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2014-15 29-30 22 Sectorwise Net District Domestic Product at current Prices year 2014-15 31-32 23 Sectorwise Net District Domestic Product at constant (2011-12) Prices year 2014-15 33-34 16 Sectorwise Gross District Domestic Product at current Prices year 2013-14 35-36 17 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2013-14 37-38
    [Show full text]
  • Dr. Rajbans Singh Gill B.A (Hons.) Gold Medalist, M.A (Gold Medalist), Ph.D
    Curriculum Vitae Dr. Rajbans Singh Gill B.A (Hons.) Gold Medalist, M.A (Gold Medalist), Ph.D Present Position: Head (Chairman), Department of Public Administration, Punjabi University, Patiala, Punjab, 147002 0175-3046244, 9888009000 [email protected] University teaching/ Administrative Experience (Permanent): 17 years Date of Birth: 14-10-1974 Important Academic/ Administrative Positions held: Dean- Faculty of Dairying, Animal Husbandry & Agriculture (2009-10) Panjab University, Chandigarh Fellow on the Senate (2008-12)- Panjab University, Chandigarh Member Syndicate (2010) –Panjab University, Chandigarh Member- National Assessment & Accreditation Council (NAAC) team for grading Colleges (2016) Member- National Assessment & Accreditation Council (NAAC) team for grading Colleges (2017) Chairman- Board of Post Graduate Studies (Pub. Admn.), Punjabi University, Patiala (2015-18) Member Regulation Committee (2010)- Panjab University, Chandigarh Member- Expert Committee (Public Administration), Indira Gandhi National Open University (IGNOU), New Delhi (2016) Chairman- Board of Under Graduate Studies (Public Administration), Punjabi University, Patiala (2015- 18) Expert Member- Academic Performance Indicator Committee for Promotion of Professors in the Government Colleges of Punjab (2015) Expert - Member of Selection Committees for Appointment of Assistant Professor in the State of Punjab Degree Colleges (2008-16) Head- Budget and Maintenance Committee, Punjabi University Patiala (2015-18) Member – Academic Council, Punjabi
    [Show full text]
  • CHITKARA ACM STUDENT CHAPTER Address: Chitkara
    CHITKARA ACM STUDENT CHAPTER Address: Chitkara University (Punjab),Chandigarh-Patiala National Highway (NH- 64), Village Jhansla, Patiala, Punjab 140401,India. Chapter Officers and Faculty Sponsor: Faculty Sponsor: Mr. Saravjeet Singh ([email protected]) Chairperson: Mr. Saurabh Chauhan ([email protected]) Vice Chairperson: Mr. Pankaj Ranga ([email protected]) Secretary: Ms. Nikita Singla ([email protected]) Membership Chair: Ms. Nikita Goyal ([email protected]) Web Master: Mr. Saurabh Ranjan ([email protected]) Treasurer: Mr. Shashank Pandey ([email protected]) Number of Chitkara ACM Student Chapter Members: 800 Number of Faculty Volunteer: 10 Number of members associated with ACM (membership holders): 35 Student count in Chitkara University Institute of Engineering and Technology (CUIET): Under Graduation Course (B.E.) Computer Science = 1750 Students Electronics and Communication = 250 Students Mechanical Engineering =350 Electrical Engineering= 100 Post Graduation Course (M.E.) Computer Science & Engineering = 40 Students Electronics & Communication Engineering = 25 Students Construction Technology & Management in collaboration with ACC Limited = 20 Students Mechanical Engineering = 20 Students About Chitkara University: http://www.chitkara.edu.in/ Facebook: www.facebook.com/ChitkaraU Twitter: twitter.com/ChitkaraU Chitkara University in Punjab has been founded by Dr.Ashok Chitkara and Dr.Madhu Chitkara who have been passionate teachers for more than 40 years now. Since inception, Chitkara University has been different. Our students have been different. So are our faculty, our academic strengths and our outlook on teaching and learning. Within a decade, most of our academic programs are ranked in top 50 programs in the country. The unique difference being that Chitkara University has been established by and managed by passionate academicians with the sole mission of making each and every student “industry-ready".
    [Show full text]
  • List of Punjab Pradesh Congress Seva Dal
    LIST OF PUNJAB PRADESH CONGRESS SEVA DAL CHIEF ORGANISER 1. Shri Nirmal Singh Kaira Chief Organiser Punjab Pradesh Congress Seva Dal Kira Property Dealer 2322/1, Basti Abdulpur Dist- Ludhiana, Punjab Tel:0161-2423750, 9888183101 07986253321 [email protected] Mahila Organiser 2 Smt. Mukesh Dhariwal Mahila Organiser Punjab Pradesh Congress Seva Dal, H.No.32, Pritam Park Ablowal Road, District- Patiala Punjab Tel-09417319371, 8146955691 1 Shri Manohar Lal Mannan Additional Chief Organiser Punjab Pradesh Congress Seva Dal Prem Street,Near Police Station Cheharta Dist- Amritsar Punjab Tel: 0183-2258264, 09814652728 ORGANISER 1 Shri Manjit Kumar Sharma 2. Mrs. Inder Mohi Organiser Organiser Punjab Pradesh Congress Seva Dal Punjab Pradesh Congress Seva Dal Sharma House Sirhind House No- 4210, Street No-10 Ward No- 15, G.T. Road Bara Guru Arjun Dev Nagar Sirhind, Fatehgarh Sahib Near Tajpur Road Punjab Dist- Ludhiana(Punjab) Tel: 01763- 227082, 09357129110 Tel: 0161-2642272 3 Shri Surjit Singh Gill 4 Shri Harmohinder Singh Grover Organiser Organiser Punjab Pradesh Congress Seva Dal Punjab Pradesh Congress Seva Dal C.M.C. Maitenary Hospital Street No-5, New Suraj Nagari Ludhiana(Punjab) Abohar Tel: 09815304476 Punjab Tel-09876867060 5 Shri Thakur Saheb Singh 6 Shri S. Gurmail Singh Brar Organiser Organiser Punjab Pradesh Cong.Seva Dal Punjab Pradesh Congress Seva Dal House No-M-163, Phase-7 190, New Sunder Nagar , Mohali Po –Thricko Dist- Ropar(Punjab) Dist- Ludhiana(Punjab) Tel: 9417040907 Tel: 0161- 255043, 9815650543 7 Smt. Leela
    [Show full text]
  • Punjab Public Works Department (B&R)
    Punjab Public Works Department (B&R) Establishment Chart ( Dated : 17.09.2021 ) Chief Engineer (Civil) S. Name of Officer/ Email Qualification Present Place of Posting Date of Home Date of No address/ Mobile No. Posting District Birth 1. Er. Arun Kumar M.E. Chief Engineer (North) 12.11.2018 Ludhiana 28.11.1964 [email protected] Incharge of:- [email protected] Construction Circle, Amritsar 9872253744 and Hoshiarpur from 08.03.2019 And Additional Charge Chief Engineer (Headquarter-1), and Chief Engineer (Headquarter-2) and Nodal Officer (Punjab Vidhan Sabha Matters)(Plan Roads) 2. Er. Amardeep Singh Brar, B.E.(Civil) Chief Engineer (West) 03.11.2020 Faridkot 25.03.1965 Chief Engineer, Incharge of: [email protected] Construction Circle Bathinda, and 9915400934 Ferozepur 3. Er.N.R.Goyal, Chief Engineer (South) 03.11.2020 Fazilka 15.05.1964 Chief Engineer Incharge of: [email protected] Construction Circle Patiala - 1 and [email protected] Sangrur, Nodal Officer –Link [email protected] Roads,PMGSY & NABARD 9356717117 Additional Charge Chief Engineer (Quality Assurance) from 19.04.2021 & Chief Vigilance Officer of PWD (B&R) Chief Engineer (NH) from 20.08.2021 Incharge of: National Highway Circle Amritsar, 4. Er.B.S.Tuli, M.E.(Irrigation) ChiefChandigarh, Engineer Fe (Centrozepurral) and Ludhiana 03.11.2020 Ludhiana 15.09.1964 Chief Engineer and Hydraulic Incha rge of: [email protected] Structure) Construction Circle No. 1 & 2 Jalandhar., 9814183304 Construction Circle Pathankot. Nodal Officer (Railways) from 03.11.2020 , Jang-e-Azadi Memorial, Kartarpur and Works under 3054 & 5054 Head 5.
    [Show full text]
  • District Fact Sheet Patiala Punjab
    Ministry of Health and Family Welfare National Family Health Survey - 4 2015 -16 District Fact Sheet Patiala Punjab International Institute for Population Sciences (Deemed University) Mumbai 1 Introduction The National Family Health Survey 2015-16 (NFHS-4), the fourth in the NFHS series, provides information on population, health and nutrition for India and each State / Union territory. NFHS-4, for the first time, provides district-level estimates for many important indicators. The contents of previous rounds of NFHS are generally retained and additional components are added from one round to another. In this round, information on malaria prevention, migration in the context of HIV, abortion, violence during pregnancy etc. have been added. The scope of clinical, anthropometric, and biochemical testing (CAB) or Biomarker component has been expanded to include measurement of blood pressure and blood glucose levels. NFHS-4 sample has been designed to provide district and higher level estimates of various indicators covered in the survey. However, estimates of indicators of sexual behaviour, husband’s background and woman’s work, HIV/AIDS knowledge, attitudes and behaviour, and, domestic violence will be available at State and national level only. As in the earlier rounds, the Ministry of Health and Family Welfare, Government of India designated International Institute for Population Sciences, Mumbai as the nodal agency to conduct NFHS-4. The main objective of each successive round of the NFHS has been to provide essential data on health and family welfare and emerging issues in this area. NFHS-4 data will be useful in setting benchmarks and examining the progress in health sector the country has made over time.
    [Show full text]
  • Militancy and Media: a Case Study of Indian Punjab
    Militancy and Media: A case study of Indian Punjab Dissertation submitted to the Central University of Punjab for the award of Master of Philosophy in Centre for South and Central Asian Studies By Dinesh Bassi Dissertation Coordinator: Dr. V.J Varghese Administrative Supervisor: Prof. Paramjit Singh Ramana Centre for South and Central Asian Studies School of Global Relations Central University of Punjab, Bathinda 2012 June DECLARATION I declare that the dissertation entitled MILITANCY AND MEDIA: A CASE STUDY OF INDIAN PUNJAB has been prepared by me under the guidance of Dr. V. J. Varghese, Assistant Professor, Centre for South and Central Asian Studies, and administrative supervision of Prof. Paramjit Singh Ramana, Dean, School of Global Relations, Central University of Punjab. No part of this dissertation has formed the basis for the award of any degree or fellowship previously. (Dinesh Bassi) Centre for South and Central Asian Studies School of Global Relations Central University of Punjab Bathinda-151001 Punjab, India Date: 5th June, 2012 ii CERTIFICATE We certify that Dinesh Bassi has prepared his dissertation entitled MILITANCY AND MEDIA: A CASE STUDY OF INDIAN PUNJAB for the award of M.Phil. Degree under our supervision. He has carried out this work at the Centre for South and Central Asian Studies, School of Global Relations, Central University of Punjab. (Dr. V. J. Varghese) Assistant Professor Centre for South and Central Asian Studies, School of Global Relations, Central University of Punjab, Bathinda-151001. (Prof. Paramjit Singh Ramana) Dean Centre for South and Central Asian Studies, School of Global Relations, Central University of Punjab, Bathinda-151001.
    [Show full text]
  • A Minority Became a Majority in the Punjab Impact Factor: 8
    International Journal of Applied Research 2021; 7(5): 94-99 ISSN Print: 2394-7500 ISSN Online: 2394-5869 A minority became a majority in the Punjab Impact Factor: 8. 4 IJAR 2021; 7(5): 94-99 www.allresearchjournal.com Received: 17-03-2021 Dr. Sukhjit Kaur Accepted: 19-04-2021 Abstract Dr. Sukhjit Kaur This study will focus on the Punjabi Suba Movement in Punjab 1966. The Punjabi Suba came into Assistant Professor, being after various sacrifices and struggles. The Indian Government appointed ‘Shah Commission’ to Department of History, Guru demarcate the boundaries of Punjab and Haryana. The reorganization bill was passed on the basis of Nanak College, Budhlada, recommendations of this committee only. Punjab was divided into two states; Punjabi Suba and Punjab, India Haryana under Punjab Reorganization Act, 1966. Certain areas of undivided Punjab were given to Himachal Pradesh. However, Haryana was raised as a rival to the state of Punjabi language (which was to be made for Punjab). Common links had been made for Punjab and Haryana. Haryana was the area of Hindi-speakers. It could have been easily amalgamated with neighboring Hindi states of Rajasthan and U.P. But, the state of Punjab, which was demanding the areas of Punjabi –speakers, was crippled and made lame as well. Such seeds were sown for its future of economic growth that would not let it move forward. Haryana welcomed the Act of reorganization. As a result, the common forums were removed for Haryana and Punjab and Sant Fateh Singh and the Akali Dal welcomed this decision. Methodology: The study of this plan of action is mainly based on the available main material content.
    [Show full text]
  • Office Name Division / Circle / Office Name Mobileno Designation Email
    S. Office Name Division / Circle / Office Name MobileNo Designation Email IDs No 1 DIVISION CIVIL AMRITSAR AMRITSAR GURDEV SINGH 9646136553 EXECUTIVE ENGINEER pmb[dot]xencasr[at]punjab[dot]gov[dot]in 2 DIVISION CIVIL AMRITSAR AMRITSAR AMIT KHOSLA 7966476577 JUNIOR ASSISTANT ja1[dot]xenc[dot]pmb[dot]asr[at]punjab[dot]gov[dot]in 3 DIVISION CIVIL AMRITSAR AMRITSAR VIKRAMJIT 9781777885 JUNIOR ASSISTANT je2[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 4 DIVISION CIVIL AMRITSAR AMRITSAR BALJIT SINGH 9814473092 JUNIOR ASSISTANT je3[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 5 DIVISION CIVIL AMRITSAR AMRITSAR SURINDER KAUR 9779220442 SENIOR ASSISTANT sa1[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 6 DIVISION CIVIL AMRITSAR AMRITSAR HARJINDER SINGH 9779560158 SUPERINTENDENT supdt1[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 7 DIVISION CIVIL AMRITSAR AMRITSAR SUKHDEEP SINGH GILL 8054935435 SENIOR ASSISTANT sa2[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 8 DIVISION CIVIL AMRITSAR AMRITSAR MALKEET RAM 9417630264 DRAFTSMAN dm1[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 9 DIVISION CIVIL AMRITSAR AMRITSAR TARLOK SINGH 9646129938 HEAD DRAFTSMAN hdm1[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in 10 DIVISION CIVIL AMRITSAR AMRITSAR NIRMAL SINGH 9888100845 SENIOR ASSISTANT sa3[dot]xencasr[dot]pmb[at]punjab[dot]gov[dot]in SUB DIVISION CIVIL AMRITSAR- 11 AMRITSAR HARPREET SINGH 9646136506 SUB DIVISIONAL OFFICER 1 pmb[dot]sdoamr1[at]punjab[dot]gov[dot]in SUB DIVISION CIVIL AMRITSAR- 12 AMRITSAR JASWINDER PAL SINGH 9646136520 ASSISTANT ENGINEER 1 ae1[dot]sdoamr1[dot]pmb[at]punjab[dot]gov[dot]in
    [Show full text]
  • Punjab Amritsar
    Base For Official Use Pathankot WASTELAND MAP 2 0 0 3 Pathankot Punjab Amritsar LEGEND Gullied and / or Degraded pasture Ludhiana ravinous (1) and grazing land (9) Chandigarh Land with scrub Degraded (2) plantation crops(10) Patiala Bathinda Land without Sand - Inland Amritsar scrub (3) / coastal (11) Waterlogged and Mining / Industrial marshy (4) waste (12) Watershed Saline / Alkaline Barren rocky / 1C1B3 (5) Stony waste (13) 1C1A2 Shifting cultivation - Abandoned (6) Steep sloping (14) Shifting cultivation Snow covered 1A1C3 - Current (7) and / Glacial (15) 1A1B2 Ludhiana Degraded forest 1A1C3 (8) OTHERS Chandigarh Water bodies Sand (tank 6D2B2 (river, tank, Settlement 1A1A3 / river bed) reservoir) Intern. Boundary Major Roads State Boundary Railway Line Administrative Patiala Pathankot Bathinda Dist. Boundary River Amritsar Taluk Boundary Source: Wasteland Maps - 2003 on 1:50,000 scale (Based on IRS Satellite AREA STATISTICS LISS - III Imagery, Wasteland Maps (1986 - 2000), limited field check, Revenue Records / Maps. 11% 15% Prepared by: Ludhiana 2 11 PUNSEN / RRSSC - J Chandigarh 7% 3 P.A.U. Campus / CAZRI Campus Ludhiana, Punjab / Jodhpur, Rajasthan Patiala 10 Bathinda 31% 4 Co-ordinated by: Sponsored by: Total Geog. Area (TGA) :50362.00 sq.km. Land Use Division, RS & GIS AA Dept. of Land Resources Total Wasteland Area : 1172.84 National Remote Sensing Agency Min. of Rural Development 36% Wasteland Area : 2.33 percent Dept. of Space, Govt. of India, G - Wing, Nirman Bhawan, Note: Refer legend for category Balanagar, Hyderabad - 500
    [Show full text]
  • Assistant Professor in Computer Science. Department : Punjabi Univ
    1 of 8 BIO-DATA Name : Prof. (Er.) Hardeep Singh Sidhu Designation : Assistant Professor in Computer Science. Department : Punjabi University Baba Jogipeer Neighbourhood Campus, Ralla, Mansa, Punjab (India) Mob: 9463819021 E-mail: [email protected] Date of joining (first) : 1st October, 2008 (Contract basis) Area of Academic interest : Information Technology, Information Security Academic and Professional Qualification: S.No. Degree Year University Subjects/Major Discipline 1 M.Tech. IT 2005 IASE Deemed Uni. Information Technology Rajasthan 2 M.Phil. CS 2008 Periyar University Computer Science 3 M.Sc. Software 2002 Kurukshetra Uni. KUK Computer Science 4 PGDCA 2001 Kurukshetra Uni. KUK Computer Application Detail of Experience: Total 13 years S.No. Institute/Employer Designation Duration Job responsibility 1 Punjabi University Assistant Professor 03-08-2011 to Teaching and research, Patiala (Contract) till date academic activities 2 Punjabi University Lecturer 01-10-2008 to Teaching and research, Patiala (Contract) 31-07-2011 as academic activities per Uni. norms 3 National college Lecturer Jan-2008 to Teaching Bhikhi (Regular) Sep-2008 4 PICTES Computer Faculty April-2004 to Teaching (Punjab Govt.) (contract) Dec-2007 2 of 8 List of Papers/Courses taught at PG and UG level: S.No. Paper Class 1 Information Technology MCA, BCA, M.Sc. IT, PGDCA 2 Computer Network MCA, BCA, M.Sc. IT, PGDCA 3 Operating System MCA, BCA, M.Sc. IT, PGDCA 4 E-Commerce BCA 5 System Analysis & Design BCA 6 Modern Information System BCA 7 Drug Abuse: Problem, Management and BCA & B.Com Prevention 8 Project Work (Minor) MCA, M.Sc.IT Technical Proficiency: 1.
    [Show full text]
  • The Sikh Struggle for Khalistan: Refocusing on the Punjabi Suba
    2021 Ali, Chawla & Ahmad. This is an Open Access article distributed under the terms of the Creative Commons‐ Attribution‐Noncommercial‐Share Alike License 4.0 International (http://creativecommons.org/licenses/by-nc- sa/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly attributed, not used for commercial purposes, and, if transformed, the resulting work is redistributed under the same or similar license to this one. Journal of Political Studies Vol. 28, No. 1, January–June, Summer 2021, pp.01– 09 The Sikh Struggle for Khalistan: Refocusing on the Punjabi Suba (Province) Movement in India Amir Ali PhD Scholar, Department of History & Pakistan Studies, University of the Punjab, Lahore. Muhammad Iqbal Chawla Former Dean Arts & Humanities, Former Chairman, Department of History & Pakistan Studies, University of the Punjab, Lahore. Correspondence: [email protected] Dr Muhammad Abrar Ahmad, HOD, History Department, Education University, Lahore ABSTRACT This study problematizes the Sikh’s demand for Khalistan, a separate country of their own. To begin with, they demanded a greater degree of political autonomy within the domains of India. During the colonial period the Sikhs supported the Indian National Congress’s demand for the division of Punjab and inclusion of the East Punjab into Bharat. But soon after the creation of Bharat(India), `the Sikhs realized that they were betrayed and they started to vow for more autonomy. Initially, they felt that PEPSU was a step towards their aspirations but later they felt that they had missed the train and moved for Punjabi Province. After much deliberation and delaying tactics, finally the Punjab emerged on the Indian Territory in the form that always proved a nightmare for the Sikh community.
    [Show full text]