District Project Description BE 2017-18 NOWSHERA NR16D00006-151825-Excavating and PCC Road from house Ameen 872,850 ullah khan to mohall zarkhel at vc aza khel payan NOWSHERA NR16D00013-151836-Construction of PCC Road in Mali Khel payan 508,890 (400x12)Mula kile NOWSHERA NR16D00020-1151846-PCC Road at different places.Kotar Pan 642,211

NOWSHERA NR16D00028-151855-PCC road and construction drains at VC 5,586,622 KandarKandar NOWSHERA NR16D00056-161767:construction of boundry wall for grave yard 457,347 at uc akbarpura NOWSHERA NR16D00068-151702-Constructio of Drain 1'x1' 400ft 182,562 NOWSHERA NR16D00069-151703-Construction of PCC Road in PakirBaba 106,662 (150x12) NOWSHERA NR16D00088-161711:sanitation works pavement of stre 58,737 NOWSHERA NR16D00090-161723:Sanitation works, pavement of str 629,999 NOWSHERA NR16D00092-161720:Sanitation works, pavement of street and 674,752 pressure /hand pumpsetcat UC . NOWSHERA NR16D00094-161701-Construction of protection Wall &Pavement 632,811 of street at UC Nizampur. NOWSHERA NR16D00098-161729-Street Pavement various places atInzari. 563,608

NOWSHERA NR16D00100-"161731-Pavement of street andconstruction of 672,000 drain, filling pipe culverts, installation of PressurePumps at UC Pir Sabaq." NOWSHERA NR16D00103-"161739-Pavement of street andconstruction of 1,319,980 drain, P/Wall & Installation of Pressure Pumps at UCKabul River."

NOWSHERA NR16D00104-"161742-Installation of Pressure Pumps,Street 2,372,222 pavement, drains and flood protection wall at various places ofUC Manki Sharif." NOWSHERA NR16D00105-"161743-Installation of Pressure Pumps,Street 575,708 pavement, drains and flood protection wall at various places ofUC Ziarat Ka Ka Sahib." NOWSHERA NR16D00108-161746-Construction of Masjid atBadrashi. 294,000 NOWSHERA NR16D00110-161751-Construction of room at MasjidShamsul 257,400 Quran and Madina Masjid Bara Khel at Chowki Town.

NOWSHERA NR16D00112-161753-Construction of room at MasjidShah Hussaini 104,772 at Chowki Town. NOWSHERA NR16D00117-161758-Existing of Janazgah at TalabAbad Khat Killi 552,000 UC Dheri Katti Khel. NOWSHERA NR16D00120-161761-Supply and fixing Solar Systemfor different 1,459,000 Masjid at UC Nawan Killi. NOWSHERA NR16D00122-"161763-Construction/Renovation ofMasjid Tar Khel 617,635 Bala, Ziarat Ka Ka Sahib, District Nowshera." NOWSHERA NR16D00124-161768-Supply and fixing of Solar StreetLights at 1,014,000 Khat Killi NOWSHERA NR16D00127-sanitation works, pavement of street 1,676,000 NOWSHERA NR16D00128-161725:sanitation works, pavement of street and 2,376,000 pressure pumps at ucBalu NOWSHERA NR16D00129-161718: improment of dranis , pavments of steet 370,529 and pressure pumps hand pumpsfiltration plants at UC TARU

NOWSHERA NR16D00130-pavement of street and Drain village bha 9,368,415 NOWSHERA NR16D00131-construction of janazgah at Maulana Abdad, village 630,475 manki sharif NOWSHERA NR16D00133-161772 Renovation and Rehabiliation of District 5,563,000 Council SecretriatBuilding /Hall NOWSHERA NR16D00134-161714:Sanitation works, pavement of street and 930,954 pressure/hands pumps atvillage pushtoon Ghari UC DAGI

NOWSHERA NR16D00135-161721:Sanitation works,Pavement of street and 552,730 pressure/hand pumps etcat UC DAG Ismail khel NOWSHERA NR16D00138-161708:Sanitation works, pavements of 87,696 street/pressure pumps ect at district nowshera NOWSHERA NR16D00140-161726:installaion of hands/pressure at uc dak ismail 296,986 khel, uc shah kot, uc spin khak ,ucjaloazi , uc chowki mumrez and uc akbar pura. etc at district nowshera NOWSHERA NR16D00143-161737:sanitation works, pavements of strette 850,000 drains, and pressure pumps ect at UCAdamzai NOWSHERA NR16D00144-161703:Construction of PCC street pavement drains 490,747 retaining wall pressure pumps andsolar units for mosques at uc rashaki NOWSHERA NR16D00145-161765:construction of pcc road and 2,429,412 NOWSHERA NR16D00146-Construction of Masjid Noor in national colony in 1,486,625 Gujar Kass U/C NOWSHERA NR16D00149-161735:sanitation works, pavements of streets, and 420,220 pressure pumps / hands pumps etc atUC Shaidu

NOWSHERA NR16D00150-161764: Construction /rehabilitation of madrasa and 1,080,007 PCC raod at U C Bara Banda Districtnowshera NOWSHERA NR16D00152-161707: sanitatin works, pamements of street and 102,000 pressure pumps hand pumps at districtnowshera NOWSHERA NR16D00154-161717:installation of pressure pumps hand pumps 551,169 at UC aman kot NOWSHERA NR16D00155-161712:Sanitation woks, pavements of streets and 689,554 pressure pumps hands pumps at ucshah kot NOWSHERA NR16D00156-161770:installation of street lights at district 100,320 nowshera NOWSHERA NR16D00158-161709:sanitation works, pavements of street , and 88,000 pressure pumps at district nowshera NOWSHERA NR16D00159-161750:construction of PCC Road ,Drains and 1,800,000 Retaining wall at UC Mandoori DistrictNowshera NOWSHERA NR16D00160-161774-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES AT GGHS AKBARPURA. NOWSHERA NR16D00161-161775-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES AT GGHS TARKHA. NOWSHERA NR16D00162-161776-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES IN DIFFERENT SCHOOLS OF UC .

NOWSHERA NR16D00163-161777-INSTALLATION OF SOLAR PANELSWITHOUT 900,000 BATTERIES INSTALLATION OF FILTRATION PLANT AND CONSTRUCTION OFROOM AT GMS AMANKOT. NOWSHERA NR16D00164-161778-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES INSTALLATION OF FILTRATION PLANT AT GGHS AMANKOT. NOWSHERA NR16D00165-"161779-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, CEILING FANS AT GGHS AZA KHEL BALA."

NOWSHERA NR16D00166-"161780-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, CEILING FANS AT GHS AZA KHEL BALA."

NOWSHERA NR16D00167-"161781-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, CEILING FANS AT GMS AZA KHEL BALA."

NOWSHERA NR16D00168-161782-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES AT DIFFERENT SCHOOLS OF UC AZA KHEL PAYAN.

NOWSHERA NR16D00169-161783-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES AND CONSTRUCTION OF WATER TANK AT GHS BADRASHI. NOWSHERA NR16D00170-"161784-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, AT GGHS BADRASHI." NOWSHERA NR16D00171-"161785-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, AT GHS BADRASHI." NOWSHERA NR16D00172-"161786-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES, WHITE BOARD AT DIFFERENT SCHOOLS OF UC BALOO."

NOWSHERA NR16D00173-161787-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES AND CONSTRUCTION OF ROOM AT DIFFERENT SCHOOLS OF UCCHOWKI MUMREZ. NOWSHERA NR16D00174-"161788-INSTALLATION OF SOLAR PANELSWITHOUT 2,500,000 BATTERIES, CONSTRUCTION OF ROOMS, BATHROOMS AT GMS SHALA KHEL,CHOWKI TOWN." NOWSHERA NR16D00175-"161789-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES, INSTALLATION OF FILTRATION PLANTS, H/PRESSURE PUMPS,RCC DRAIN, PAVEMENT, FILLING OF GROUND ETC. AT DIFFERENT NOWSHERA NR16D00176-"161790-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES, INSTALLATION OF FILTRATION PLANT AT VARIOUS SCHOOLSOF UC DAG BEHSUD."

NOWSHERA NR16D00177-161791-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES AND FLOORING OF GROUND AT GHS DAGI JADEED.

NOWSHERA NR16D00178-161792-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES AND FLOORING OF GROUND AT GHS PUSHTOON GARHI. NOWSHERA NR16D00179-161793-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES AND FLOORING OF GROUND AT GHS BANDA NABI.

NOWSHERA NR16D00180-"161794-INSTALLATION OF SOLAR PANELSWITHOUT 300,000 BATTERIES CONSTRUCTION OF R/WALL, FLOORING AT GMS DAG ISMAILKHEL." NOWSHERA NR16D00181-"161795-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, PRESSURE PUMP AND WATER TANK REPAIR OF BATHROOMS ATGGHS DAK ISMAIL KHEL. " NOWSHERA NR16D00182-"161796-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, PRESSURE PUMP ALONG WITH PIPES, REPAIR OF MASJID ATGHS DAK ISMAIL KHEL. " NOWSHERA NR16D00183-"161797-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, FILTRATION PLANT, PRESSURE PUMPS AND WHITEBOARD ATDIFFERENT SCHOOL OF DISTRICT NOWSHERA."

NOWSHERA NR16D00184-"161798-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, WHITEBOARD AT DIFFERENT SCHOOL OF DISTRICT NOWSHERA." NOWSHERA NR16D00185-"161799-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES IN HIGH SCHOOL PUSHTOON GHARI, GGMS PUSHTOON GHARI,GMS PUSHTOON GHARI, UC DAGAI."

NOWSHERA NR16D00186-"16I800-NSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, HAND/ PRESSUREPUMPS, RCC, FILLING OF GROUND ETC. AT DIFFERENT SCHOOLS UC ." NOWSHERA NR16D00187-"161801-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES INSTALLATION OF FILTRATION PLANT, HAND/ PRESSUREPUMPS, RCC, FILLING OF GROUND ETC. AT DIFFERENT SCHOOLS UC PABBI." NOWSHERA NR16D00188-161802-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES AT DIFFERENT SCHOOL DISTRICT NOWSHERA.

NOWSHERA NR16D00189-161803-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS BEHRAM KILLI. NOWSHERA NR16D00190-161804-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS GANDEHRI. NOWSHERA NR16D00191-161805-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS MASKEEN ABAD KALINGER.

NOWSHERA NR16D00192-161806-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS SHEIKHAN. NOWSHERA NR16D00193-"161807-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, REPAIR OF ELECTRICITY WORKS AT GHS TOHA GHAREEB PURA,INZARI." NOWSHERA NR16D00194-161808-INSTALLATION OF SOLAR PANELSWITHOUT 200,000 BATTERIES AT GGMS GHAREEB PURA. NOWSHERA NR16D00195-"161809-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, REPAIR OF ELECTRICITY WORKS AT GMS SIAVI."

NOWSHERA NR16D00196-"161810-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, REPAIR OF ELECTRICITY WORKS AT GHS INZARI."

NOWSHERA NR16D00197-161811-INSTALLATION OF SOLAR PANELSWITHOUT 200,000 BATTERIES AT GGHS INZARI. NOWSHERA NR16D00198-"161812-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES, AND PRESSURE PUMP, CONSTRUCT OF PCC AT GHS JABBI." NOWSHERA NR16D00199-161813-INSTALLATION OF SOLAR PANELSWITHOUT 300,000 BATTERIES AT GGHS JABBI. NOWSHERA NR16D00200-161814-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES CONSTRUCTION / ESTABLISHMENT OF PLAYGROUND ATDIFFERENT SCHOOLS OF UC JALOZAI.

NOWSHERA NR16D00201-161815-INSTALLATION OF SOLAR SYSTEM ATGGHS 800,000 NODEH JEHANGIRA. NOWSHERA NR16D00202-161816-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES AT GGMS HABIB ULLAH KOROONA JEHANGIRA.

NOWSHERA NR16D00203-161817-INSTALLATION OF SOLAR PANELSWITHOUT 300,000 BATTERIES AT GGHS KAHI. NOWSHERA NR16D00204-161818-INSTALLATION OF SOLAR PANELS WITHOUT 900,000 BATTERIES, CONSTRUCTION OF02 CLASSROOMS AND SUPPLY OF 50 NOS CEILING FANS AT GHS KAHI NOWSHERA NR16D00205-161819-INSTALLATION OF SOLAR PANELS WITHOUT 150,000 BATTERIES, SUPPLY /INSTALLATION OF ELECTRICITY AT GMS SHAMANGAI. NOWSHERA NR16D00206-161820-INSTALLATION OF SOLAR PANELS WITHOUT 250,000 BATTERIES, SUPPLY OF 03 NOSWHITEBOARDS, 03 NOS. CEILING FANS AT GMS KAHI. NOWSHERA NR16D00207-161821-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES, CONSTRUCTION OFBOUNDARY WALLS AT DIFFERENT SCHOOLS OF UC KHAIRABAD. NOWSHERA NR16D00208-161822-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AT DIFFERENTSCHOOLS OF UC KHESHGI PAYAN.

NOWSHERA NR16D00209-161823-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES AT DIFFERENTSCHOOLS OF UC KHAN SHER GHARI/KHUDREZI. NOWSHERA NR16D00210-161824- INSTALLATION OF FILTRATION AT 800,000 DIFFERENT SCHOOLS OF UC KHAN SHERGHARI/KHUDREZI. NOWSHERA NR16D00211-161825-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES, INSTALLATION OFP/HAND PUMP AT GHS KOTARPAN .

NOWSHERA NR16D00212-161826-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AT DIFFERENTSCHOOLS OF UC KURVI. NOWSHERA NR16D00213-161827-INSTALLATION OF SOLAR PANELS WITHOUT 320,000 BATTERIES AT GGHS MANDORI. NOWSHERA NR16D00214-161828-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AT DIFFERENTSCHOOLS OF UC MOHIB BANDA.

NOWSHERA NR16D00215-161829-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AND 25 NOS CEILINGFAN AT DIFFERENT SCHOOLS OF MUGHALKI. NOWSHERA NR16D00216-161830-INSTALLATION OF SOLAR PANELS WITHOUT 500,000 BATTERIES AND 5 NOSPRESSURE PUMPS AT DIFFERENT SCHOOLS OF UC NAWAN KILLI. NOWSHERA NR16D00217-161831-INSTALLATION OF SOLAR PANELS WITHOUT 500,000 BATTERIES CONSTRUCTION OFBATHROOMS AT DIFFERENT SCHOOLS OF UC NAWAN KILLI. NOWSHERA NR16D00218-161832-INSTALLATION OF SOLAR PANELS WITHOUT 600,000 BATTERIES, CONSTRUCTION OFVERANDAH ON GROUND FLOOR AND CONSTRUCTION OF ONE ROOM ON 1ST FLOORAT GHS SAMANDAR GHARI, NAWAN KILLI, NOWSHERA KALAN.

NOWSHERA NR16D00219-161833-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES, SUPPLY /INSTALLATION OF FILTRATION PLANTS AT DIFFERENT SCHOOLS OF UC NIZAMPUR

NOWSHERA NR16D00220-161834-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES AT DIFFERENTSCHOOLS OF UC NIZAMPUR

NOWSHERA NR16D00221-161835-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES AT GGHS NO. 2NOWSHERA KALAN. NOWSHERA NR16D00222-161836-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES AT GHS ENGLISHMEDIUM NO.1 NOWSHERA KALAN.

NOWSHERA NR16D00223-161837-INSTALLATION OF SOLAR PANELS WITHOUT 600,000 BATTERIES, INSTALLATION OFFILTRATION PLANT AT GHS PABBI. NOWSHERA NR16D00224-161838-INSTALLATION OF SOLAR PANELS WITHOUT 600,000 BATTERIES, INSTALLATION OFFILTRATION PLANT AT GMS PABBI.

NOWSHERA NR16D00225-161839-INSTALLATION OF SOLAR PANELS WITHOUT 1,000,000 BATTERIES AT DIFFERENTSCHOOL OF UC PABBI. NOWSHERA NR16D00226-161840-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AT GMS SPIN KANAYKALAN NOWSHERA NR16D00227-161841-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES TO EACH SCHOOL,GMS SADU KHEL AND GGMS SADU KHEL. NOWSHERA NR16D00228-161842-INSTALLATION OF SOLAR PANELS WITHOUT 150,000 BATTERIES AT GHS KATI KHEL. NOWSHERA NR16D00229-161843-INSTALLATION OF SOLAR PANELS WITHOUT 150,000 BATTERIES AT GHS KHAISARI. NOWSHERA NR16D00230-161844-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES TO EACH SCHOOL,GGHS PALOSAI AND GHS PALOSAI.

NOWSHERA NR16D00231-161845-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES, GGMS SHEIKHI ANDGMS SHEIKHI. NOWSHERA NR16D00232-161846-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AT DIFFERENTSCHOOLS OF UC PIR PIAI.

NOWSHERA NR16D00233-161847-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AT GHS PIR SABAQ. NOWSHERA NR16D00234-161848-INSTALLATION OF SOLAR PANELS WITHOUT 500,000 BATTERIES, PCC FLOORING ATGHS PIR SABAQ. NOWSHERA NR16D00235-161849-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AT GGHS PIR SABAQ(SANOBAR KALLY).

NOWSHERA NR16D00236-161850-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES AT (ONE EACH TOGHS GHALADIR KOROONA, GHS ZANDO BANDA AND GGMS ZANDO BANDA. )

NOWSHERA NR16D00237-161851-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES, CONSTRUCTION OFBOUNDARY WALL, 02 NOS CLASSROOMS ALONGWITH WASHROOM AT DIFFERENTSCHOOLS UC RASHAKAI. NOWSHERA NR16D00238-161852-INSTALLATION OF SOLAR PANELS WITHOUT 480,000 BATTERIES, CONSTRUCTION OFROOM AND FLOORING OF GROUND AT GHS SHAH KOT PAYAN, INSTALLATION OFELECTRIC METER AND ELECTRICITY WORKS AT GGHS SHAH KOT

NOWSHERA NR16D00239-161853-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AT DIFFERENTSCHOOLS OF UC SHAH KOT.

NOWSHERA NR16D00240-161854-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES ,CONSTRUCTION OFFLOORING AT GGHS KOTLI KALAN. NOWSHERA NR16D00241-161855-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AT DIFFERENTSCHOOL OF UC SHAH KOT.

NOWSHERA NR16D00242-161856-INSTALLATION OF SOLAR PANELS WITHOUT 250,000 BATTERIES, PAVEMENT OFGROUND AT GHS SALEH KHANA.

NOWSHERA NR16D00243-161857-INSTALLATION OF SOLAR SYSTEM WITHOUT 1,600,000 BATTERY, CEILING FANS, CONST:OF 02 ROOMS AND 01 HALL AT GGMS SHAIDU. NOWSHERA NR16D00244-161858-INSTALLATION OF SOLAR PANELS WITHOUT 1,600,000 BATTERIES AT DIFFERENTSCHOOLS OF UC SHAIDU.

NOWSHERA NR16D00245-161859-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AND PRESSUREPUMPS AT GGHS SPIN KHAK

NOWSHERA NR16D00246-161860-INSTALLATION OF SOLAR PANELS WITHOUT 800,000 BATTERIES AND PRESSUREPUMPS AT GHS SPIN KHAK

NOWSHERA NR16D00247-161861-INSTALLATION OF SOLAR PANELS WITHOUT 400,000 BATTERIES AND PRESSUREPUMPS AT GHS JAROBA.

NOWSHERA NR16D00248-161862-INSTALLATION OF SOLAR PANELS WITHOUT 450,000 BATTERIES CONSTRUCTION OFBASKETBALL AND VOLLEYBALL GROUND AT GHS TARU JABBA. NOWSHERA NR16D00249-161863-INSTALLATION OF SOLAR PANELS WITHOUT 300,000 BATTERIES AT JAPAN GIRLSMIDDLE SCHOOL TARU, GGHS TARU AND GHS TARU. NOWSHERA NR16D00250-"161864-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, INSTALLATION OF 01 NO OF FILTRATION PLANT AT GHS NO.1TARU." NOWSHERA NR16D00251-161865-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES INSTALLATION OF 01 NO OF FILTRATION PLANT AT GGHS TARU(AKHOON BABA). NOWSHERA NR16D00252-161866-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES CONSTRUCTION OF TWO NEW CLASSROOMS AT GHS NO.1 TARU. NOWSHERA NR16D00253-"161867-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES AT GGHS KHAT KILLI AND GHS KHAT KILLI, DHERI KATTIKHEL." NOWSHERA NR16D00254-161868-INSTALLATION OF SOLAR PANELSWITHOUT 300,000 BATTERIES GROUND FILLING / LEVELING OF GHS KHAT KILLI.

NOWSHERA NR16D00255-"161869-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, FLOORING AT GGHS KHAT KILLI." NOWSHERA NR16D00256-"161870-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, CONSTRUCTION/ ESTABLISHMENT OF PLAY AREA AT GHS KHATKILLI AND GGHS KHAT KILLI DHERI KHATTI KHEL."

NOWSHERA NR16D00257-161871-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES AT DIFFERENT SCHOOLS OF UC ZARA MIANA.

NOWSHERA NR16D00258-161916-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS NO.1 NOWSHERA CANTT:

NOWSHERA NR16D00259-1611917-INSTALLATION OF SOLAR 400,000 PANELSWITHOUT BATTERIES AT GGHS ASC Center NOWSHERA CANTT: NOWSHERA NR16D00260-161918-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GMS KHATTAK BUILDING NOWSHERA CANTT:

NOWSHERA NR16D00261-161919-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GGHS KHUSHAL COLONY NOWSHERA CANTT:

NOWSHERA NR16D00262-"161914-AWARDING SCHOLARSHIPS TOTALENTED, 5,000,000 POOR AND NEEDY STUDENTS READING IN GOVERNMENT AS WELL AS INPRIVATE SCHOOLS AND COLLEGES INCLUDING THE CHILDREN OF DISTRICT NOWSHERA NR16D00263-161916-INSTALLATION OF SOLAR PANELSWITHOUT 350,000 batteries AT GGHS KANA KHEL UC MANKI SHARIF

NOWSHERA NR16D00264-161917-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GGMS BAHADAR KHEL UC MANKI SHARIF

NOWSHERA NR16D00265-161918-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GGMS MIRAJI PAYAN UC MANKI SHARIF

NOWSHERA NR16D00266-161919-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GGMS SADU KHEL UC MANKI SHARIF

NOWSHERA NR16D00267-161920-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GGMS SHEIKHI UC MANKI SHARIF

NOWSHERA NR16D00268-161921-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GMS BAHADAR KHEL UC MANKI SHARIF

NOWSHERA NR16D00269-"161922-INSTALLATION OF SOLAR PANELSWITHOUT 225,000 batteries, ELECTRIFICATION AT GMS KANA KHEL UC MANKI SHARIF" NOWSHERA NR16D00270-161923-INSTALLATION OF SOLAR PANELSWITHOUT 175,000 batteries AT GMS MERAJI BALA UC MANKI SHARIF NOWSHERA NR16D00271-"161924-INSTALLATION OF SOLAR PANELSWITHOUT 275,000 batteries, BOUNDARY WALL AT GMS TANGI KHATTAK UC MANKI SHARIF" NOWSHERA NR16D00272-"161925-CONSTRUCTION OF BOUNDARY 600,000 WALL,BICYCLE STAND AND FILLING OF GROUND AT GHS AMANGARH." NOWSHERA NR16D00273-"161926-CONSTRUCTION OF BOUNDARY 600,000 WALL,WASHROOMS AND FILLING OF GROUND AT GHS LABOUR COLONY AMANGARH." NOWSHERA NR16D00274-161927-CONSTRUCTION OF WASHROOMS AT 400,000 GMSAMANGARH. NOWSHERA NR16D00275-161872-INSTALLATION OF SOLAR SYSTEM 616,000 ANDSUPPLY OF FURNITURE AT BHU INZARI. NOWSHERA NR16D00276-161874-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 SHAIDU. NOWSHERA NR16D00277-161875-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 MOHIB BANDA. NOWSHERA NR16D00278-161876-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 GANDERI. NOWSHERA NR16D00279-161878-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 JALOZAI NOWSHERA NR16D00280-161879-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 KHAT KILLI. NOWSHERA NR16D00281-161880-INSTALLATION OF SOLAR SYSTEM / 01HP 440,000 WATER MOTOR AT BHU BANDA MULAHAN NOWSHERA NR16D00282-161881-INSTALLATION OF SOLAR SYSTEM / 01HP 410,000 WATER MOTOR AT BHU SPIN KHAK. NOWSHERA NR16D00283-161882-INSTALLATION OF SOLAR SYSTEM ATCIVIL 390,000 DISPENSARY TARKHA. NOWSHERA NR16D00284-161884-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 MANDORI. NOWSHERA NR16D00285-161886-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 SALEH KHANA. NOWSHERA NR16D00286-161888-INSTALLATION/ SUPPLY OF GENERATORAT 600,000 MIAN RASHID HUSSAIN SHAHEED HOSPITAL PABBI.

NOWSHERA NR16D00287-161890-SUPPLY AND INSTALLATION OF 390,000 SOLARSYSTEM AT BHU SHEIKHAI. NOWSHERA NR16D00288-161891-SUPPLY AND INSTALLATION OF 390,000 SOLARSYSTEM AT BHU KATI KHEL NOWSHERA NR16D00289-161892-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 AZAKHEL PAYAN. NOWSHERA NR16D00290-161893-INSTALLATION OF SOLAR SYSTEM ATMCH 390,000 ABA KHEL. NOWSHERA NR16D00291-161894-INSTALLATION OF SOLAR SYSTEM ATBHU 390,000 KHUSHMUQAM. NOWSHERA NR16D00292-161895-INSTALLATION OF SOLAR SYSTEM ATRHC 390,000 NIZAMPUR. NOWSHERA NR16D00293-161896-INSTALLATION OF SOLAR SYSTEM ATAT BHU 390,000 RASHAKAI. NOWSHERA NR16D00294-161897-INSTALLATION OF SOLAR SYSTEM ATBHU 420,000 TARU JABBA. NOWSHERA NR16D00295-161898-INSTALLATION OF SOLAR SYSTEM /AND 420,000 SUPPLY OF WAITING CHAIRS 20 NO. AT BHU KAHI. NOWSHERA NR16D00296-161899-INSTALLATION OF SOLAR SYSTEM / 01HP 410,000 WATER MOTOR AT BHU MAMA KHEL. NOWSHERA NR16D00297-161900-FLOOR REPAIR AT BHU MAMA KHEL 200,000 NOWSHERA NR16D00298-161901-REPAIR OF SOLAR SYSTEM / PURCHASEOF 700,000 ELECTRIC WIRE (HEAVY DUTY) FOR X-RAY PLANT AT RHC AKORA KHATTAK. NOWSHERA NR16D00299-161902-INSTALLATION OF SOLAR SYSTEM ATBHU PIR 420,000 SABAQ. NOWSHERA NR16D00300-161903-INSTALLATION OF SOLAR SYSTEM ATBHU 420,000 AMANKOT. NOWSHERA NR16D00301-161905-INSTALLATION OF SOLAR SYSTEM ATBHU 420,000 JEHANGIRA. NOWSHERA NR16D00302-161906-INSTALLATION OF SOLAR SYSTEM ATBHU 420,000 DAGAI. NOWSHERA NR16D00303-161908-INSTALLATION OF 03 NO. ULTRASOUND 1,800,000 MACHINES IN OTHER / PABBI HOSPITAL. NOWSHERA NR16D00304-"161773-INSTALLATION OF SOLAR SYSTEM ATBHU 400,000 MANAI, UC ZIARAT KA KA SAHIB." NOWSHERA NR16D00306-161889:Complete white wash of Main Rahid Hussain 600,000 Shaheed Memorial Hospital Pabbi NOWSHERA NR16D00307-161769: Supply and Fixing solar street lights in UC 2,643,529 khesgi bala NOWSHERA NR16D00308-2 % share of CMD pavement of street , construction 5,750,000 of Drains/Culverts, installation ofpressure pumps /handspumps construction of janazgah /eid gah/masjids in different village of UC KHANSHERgARHI. NOWSHERA NR16D00309-2 % share of CMD. pavements of street/construction 7,774,114 of drains/culverts, installation ofpressure pumps/hands pumps construction of Janazgah/eid gah/masjids in differentvillages of UC Taru NOWSHERA NR16D00311-161703:installation of solar system in different 470,000 masjid at UC RAHAKAI NOWSHERA NR16D00312-2 % share of CMD pavements of street ,construction 10,000,000 of drains/ culverts, installation ofpressurre pumps /hnads pumps /construction of masjids/ janazgah/ eid gah in differentvillages of UC BALU NOWSHERA NR16D00313-2 % SHARE OF CMD: PAVEMENT OF STREETS, 8,510,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC DAGE ISMAIL KHEL NOWSHERA NR16D00314-2 % SHARE OF CMD: PAVEMENT OF STREETS, 8,712,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC SHAH KOT NOWSHERA NR16D00315-2 % SHARE OF CMD: PAVEMENT OF STREETS, 7,875,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC JALOZAI NOWSHERA NR16D00316-2 % SHARE OF CMD: PAVEMENT OF STREETS, 8,043,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC SPIN KHAK NOWSHERA NR16D00317-2 % SHARE OF CMD: PAVEMENT OF STREETS, 5,808,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC PABBI NOWSHERA NR16D00318-2 % SHARE OF CMD: PAVEMENT OF STREETS, 8,510,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC DAG BEHSUD NOWSHERA NR16D00319-2 % SHARE OF CMD: PAVEMENT OF STREETS, 7,849,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC CHOKI MUMRIAZ NOWSHERA NR16D00320-2 % SHARE OF CMD: PAVEMENT OF STREETS, 10,000,000 CONSTRUCTION OF DRAINS/VULVERTS,INSTALLATION OF PRESSURE PUMPS/HANDS PUMPS,CONSTRUCTION OFJANAZGAH/EID GAH/MASJIDS INDIFFERENT VILLAGES OF UC AKBAR PURA NOWSHERA NR16D00321-161912:construction of janazgah at UC JEHANGIRA 5,310,000

NOWSHERA NR16D00322-161929:CONSTRUCTION OF STREET PAVEMENTS 878,925 DRAINS CULVERTS AT UCJEHANGIRA. NOWSHERA NR16D00323-saving 10% share: street pavements and drains/of 8,520,000 eid gah at village ziarat kaka sahib. NOWSHERA NR16D00324-2 % share of CM: CONSTRUCTION /IMPROMENTS OF 4,485,000 JANAZ GAH AT KHESHGI PAYAN NOWSHERA NR16D00325-REMAINING PFC SHARE OF CHM 2016-17: PURCHASE 1,000,000 OF LAND FOR SERVICEDELIVERY CENTER AT VILLAGE SHAIDU DISTRICT NOWSHERA NOWSHERA NR16D00326-Awarding Scholerships to the students of MR & PH 500,000 Center Run by Social welfare DepttNOwshera NOWSHERA NR16D00327-Strengthening of Existing Vocational Training 10,000,000 Centeres of Social Welfare Nowshera NOWSHERA NR16D00328-Provision of Rehabilitative Devices (Wheel chairs 5,000,000 and tri cycles to disable persons) fromDistrict ADP 2016-17 to Socail Welafe Nowshera NOWSHERA NR16D00329-pavements of street ,drains, culverts in different 4,709,000 villages of UC gandheri district nowshera NOWSHERA NR16D00330-construction of protection walls/bunds in UC zkks 3,162,000

NOWSHERA NR16D00331-161736 :Sanitation works, pavements of streets etc 923,272 at stadium jungle road UC Jehangira NOWSHERA NR16D00332-Construction of community hall at pir pai (Remaining 920,000 work) UC PIR PAI NOWSHERA NR16D00333-Remaining Share of PFC 2016-17 to PHE 53,350,000 NOWSHERA NR16D00334-2 % PFC share of CM Directive 2016-17 to C & W 124,018,000 building division NOWSHERA NR16D00335-INSTATLLATION OF PRESSURE PUMPS IN DIFFERENT 3,579,000 VILLAGES OF UC ZAIRAT KAKASAHIB UC ZKKS NOWSHERA NR16D00336-Pavements of street and construction of drains 1,320,000 culverts, village Titara District nowshera NOWSHERA NR16D00337-SANITAITON WORKS, PAVEMENTS OF STREETS AND 2,474,142 PRESSURE PUMPS HAND PUMPSAT UC SHAIDU

NOWSHERA NR16D00338-SANITATION WORKS , PAVT OF STREET AND 3,164,663 PRESSURE PUMPS/ HANDS PUMPS ETCAT UC SHAIDU NOWSHERA NR16D00339-161935:Construction of Marble Floor at Cantt chruch 1,469,470 Risalpur District Nowshera. NOWSHERA NR16D00340-161936:Construction of PCC Road, Main Gate and 1,472,000 Pressure pumps at CMH Mandar ,supplyline, nowshera cantt, mandir and grave yard noor gul baba NOWSHERA NR16D00341-161951:Construction of Water supply Schemes at UC 5,000,000 PIR Pai PK 13 District Nowshera NOWSHERA NR16D00342-2 % PFC share of CM: Construction improvments of 2,983,710 janaz gah in afrido kili uc ganderhidistrict nowshera

NOWSHERA NR16D00343-Remaining PFC share of CM 2016-17: vide letter No 156,003,195 3172-76/DC/F&P/PFC/ 2016-17/NSR2017-18 dated 13-12-2017

NOWSHERA NR16D00344-171800:Construction/improment of Masjid at DC 1,500,000 Secretriate Nowshera NOWSHERA NR16D00345-161873:Repairs of Building and construction of 69,000 repair of boundry wall supply of electricityceiling work at bhu inzari

NOWSHERA NR16D00346-161904:construction of waiting room at BHU aman 230,000 kot NOWSHERA NR16D00347-161907:construction of waiting area for females 230,000 construction of 02 no bathrooms (male andfemale) at BHU Dagai NOWSHERA NR16D00348-161887:Construction of protection wall at BHU Saleh 255,000 khana NOWSHERA NR16D00349-161877:Construciton of bathroom waiting area 255,000 boundry wall reapirs of rooms at BHUGanderi NOWSHERA NR16D00350-161883:Construction of 02 no of bathroom at civil 255,000 Dispensery Tarkkha NOWSHERA NR16D00351-161885:Construction of 400X100 PCC and 60X6 wall 255,000 at BHU Mandoori NOWSHERA NR16D00352-Scheme 1 M and R Release to Deputy Commisoner 152,569 Nowshera 2016-17 NOWSHERA NR16D00353-Scheme 2 M and R Release to Deputy Commisoner 302,065 Nowshera 2016-17 NOWSHERA NR16D00354-Scheme 3 M and R Release to Deputy Commisoner 152,942 Nowshera 2016-17 NOWSHERA NR16D00355-Scheme 4 M and R Release to Deputy Commisoner 373,978 Nowshera 2016-17 NOWSHERA NR16D00356-Scheme 5 M and R Release to Deputy Commisoner 302,065 Nowshera 2016-17 NOWSHERA NR16D00357-151736:PROVISION OF 01 NO 100 KVA AND 01 NO 1,000,000 50 KVA TRANSFORMERS ALONGWITH POLES AT UC DAG BESUD

NOWSHERA NR16D00358-161765:CONSTRUCTION OF PCC ROAD DRAIN UC 7,071,128 MANDOORI NOWSHERA NR16D00359-151693:CONSTRUCTION OF STREET PAVEMENTS 406,423 AND 10 NO OF PRESSURE PUMPSAT UC PIR PAI NOWSHERA

NOWSHERA NR16D00360-151852:PCC ROAD FROM MASJID GULZAR TO 245,341 FLOOD NALA AT UC AMAN GARAH NOWSHERA NR16D00361-151853:PCC ROAD AT MOH: GULSHAN ABAD ASHOR 176,687 ABAD AT UC AMANGARAH NOWSHERA NR16D00362-161750:CONSTRUCTION OF PCC ROAD AND RETAING 719,993 WALL AT UC MANDOORI NOWSHERA NR16D00363-151727:INSTALLATION OF PRESSURE PUMPS AT 95,082 MOH: GULZAR KHATTAK MUSAFERDHERI KORRONA AT WARD AMANGARAH NOWSHERA NR16D00364-151851:PCC ROAD AT DDT COLONY AMANGARH 113,574

NOWSHERA NR16D00365-151752:SUPPLY AND INSTALLATION OF 1,000,000 TRANSFORMERS AT PABBI I,II NOWSHERA NR16D00366-151743:INSTALLATION AND SUPPLY OF 03 NO 50 1,000,000 KVA TRANSFORMERS AT MISKEENKHEL SADU KHEL JANABAD PIRPAI NOWSHERA NR16D00367-151737-Supply and Installation 03 Nos 50 KV 1,000,000 transformers.WARD JALOZAI NOWSHERA NR16D00368-151738-Supply of 220 W Electric Wire at Ward Shah 200,000 Kot. NOWSHERA NR16D00369-151875-Installation 01 No 100 KV Transformers 700,000 along with Poles and wires at WardKhudrezi Khan Sher Garhi

NOWSHERA NR16D00370-151740-Provision of 03 Nos of 50 KVA Transformers 1,100,000 along with Poles at Ward Dagai NOWSHERA NR16D00371-161948:installation of filtration plant at Pabbi 699,930 NOWSHERA NR16D00372-161950::installation of pressure pumps at dag ismail 148,500 khel NOWSHERA NR16D00373-161944:installation of pressure pumps , street 2,338,180 pavements drains and flood protection walletc at various places of UC khesghi payan NOWSHERA NR16D00374-14121704:pavements of streets and construction of 7,997,051 drains , culverts and retaining wall indifferent villages of UCs in district nowshera NOWSHERA NR16D00375-14121705:installation of pressure pumps hands 8,840,000 pumps and pvements of streets in variousvillages of union councils of district nowshera NOWSHERA NR16D00376-14121706:installation of filtration plant in different 6,064,212 villages of district nowshera NOWSHERA NR16D00377-151702:construction of dr:1x1 40 feet ayab abad 1,765,171

NOWSHERA NR16D00378-Remaining PFC Share :construction of wariz Ghari 3,449,450 Road to link road internal wazir Ghari atUC dag besud

NOWSHERA NR16D00379-construction of raod at MOH: Hakeem abad , malook 2,528,229 abad (hospital koroona khush maqAMat uc choki mumriz EA:C&W HIGHWARY:SOURCE REMAINING PFC SHARE OF CM 2016-17

NOWSHERA NR16D00380-Construction of Darlu ulooom taleem ul quran at 877,127 Bara khel risal pure nowshera NOWSHERA NR16D00381-161945:installation of Pressure pumps at different 2,161,540 places in UC Badrashi NOWSHERA NR16D00382-161943:installation of pressure pumps street 1,795,002 pavements drains, and flood protection walletc at various places of UC ziarta kaka sahib NOWSHERA NR16D00383-161941:installation of pressure pumps ,street 2,277,000 pavements drains and flood protection walletc at various places of UC manki sharif NOWSHERA NR16D00384-161942:installation of pressure pumps , street 2,352,900 pavements drains and protection wall etc atvarious places at uc aza khel bala NOWSHERA NR16D00385-14121709:2% PFC share :imp/construction of masjids 3,825,546 in different villages/ union councilsin nowsheraEA: TMA PABBI SOURCE 2 % SHARE OF CM 2017-18

NOWSHERA NR16D00386-Remaining PFC Share:HT line Tube well feeder to 481,903 khushal feeder at uc adamzai NOWSHERA NR16D00387-151754:supply and installation of 100 kva 700,000 transformer alongwith trolly NOWSHERA NR16D00388-14121701:pcc floring in janazgah village shaikhan uc 999,900 jalozai NOWSHERA NR16D00389-151721:installation of pressure pumps bara banda 250,332

NOWSHERA NR16D00390-161954:pavements of street and construction of 771,066 drains pipe, culverts and installation ofhand pumps /pressure pumps at pashtoon gari uc DAgi NOWSHERA NR16D00391-14121702:PCC flooring in janazgah village chapri 999,600

NOWSHERA NR16D00392-161940:Construction of street pavement, drains, 4,000,000 culverts , rehabilitation and construction ofjanazgah , masjid solar system at masjid , solar system for street light installation of handpumps NOWSHERA NR16D00393-161939:construction of street pavements ,drains, 4,000,000 culverts rehabilitation and construction ofjanazgah masjid solar system at masjid solar system of street light installation of handpumps pressure pumps reapirs of transforms at khair abad

NOWSHERA NR16D00394-14121728:construction of janazgah in village dawa 2,374,790 killi EA C&W SOURCE: 2 % PFC SHAREOF CM 2017-18 NOWSHERA NR16D00395-14121746:construction of janaz gah at jalozai district 4,870,566 nowshera NOWSHERA NR16D00396-14121730:construction of janaz gah at qasim killi 4,000,000 EA:C&W(BUILDING)SOURCE:2 % pfcshare of cm 2017-18

NOWSHERA NR16D00397-14121726:construction of janaz gah at balu 4,000,000 NOWSHERA NR16D00398-14121703:installation of solar pannels in madrasa 4,147,000 /masjd in different villages tehsil pabbi NOWSHERA NR16D00399-161772 Renovation and Rehabiliation of District 867,717 Council SecretriatBuilding /Hall NOWSHERA NR16D00400-14121742:Construction of hall at madrasa mohallah 3,997,220 miangan farman uc aza khel payannowshera NOWSHERA NR16D00401-161951:Construction of water suply schemes at uc 5,000,000 pir pai NOWSHERA NR16D00402-14121729:Construction of Janaz gah in village aurang 4,000,000 abad nowshera EA:C&W(BUILDING)SOURCE 2 % SHARE OF CM 2017-18 NOWSHERA NR16D00403-080118108:2 % PFC share of CM 2017-18: 12,130,000 construction of janaz gah in nawan killinowshera NOWSHERA NR16D00404-161937:Supply of Medinies to all BHU at district 4,000,000 nowshera NOWSHERA NR16D00405-161938:Supply of medinies to other hospitals at 6,000,000 district nowshera NOWSHERA NR16D00406-2% PFC share: 080118103: street pavement and 1,019,775 drains armor colony no 2. hakim abad NOWSHERA NR16D00407-14121743:2 %PFC share : construction of janaz gah 4,740,000 in dagi qadeem near dagai khwarnowshera NOWSHERA NR16D00408-141217236"2 % pfc share: improvement/ 10,000,000 construction of madrasa of pir of manki sharif NOWSHERA NR16D00409-14121731:2 % pfc share: improment of janaz gah 3,255,000 tangi khattak NOWSHERA NR16D00410-2 % pfc share: pavements of streets, construction of 6,751,123 drains/culverts, installation of pressurepumps /hands pumps , construction of janaz gah /eid gah /masjids in different villages of ucjallozai NOWSHERA NR16D00411-161953:construction /improment of new dagai khel 3,540,075 road uc nowshera NOWSHERA NR16D00412-161952:s/fixing water cooler at different places in pir 758,227 pai NOWSHERA NR16D00413-2 % PFC Share: Construction of Community hall at 2,959,812 media colony district nowshera NOWSHERA NR16D00414-14121722:2 % pfc share:installation of solar panel in 1,949,250 masjid khan raziq, masjid jallar,madrassa arabia sirajia, madrasa taleem quran (abdur rasheed ustad) , masjid sadiq andmasjid saad bin abi waqas (spin jummat) in village dagi jadeed uc dagai district nowshera NOWSHERA NR16D00415-2 % pfc share: construction of masjid at media colony 3,215,428 district nowshera NOWSHERA NR16D00416-080118105:saving 2 5 pfc share of cm 2016-17: 1,205,775 installation of pressure pumps at shahabkhel uc zkk sahib NOWSHERA NR16D00417-Remaining PFC Share of CM 2016-17:construction of 10,000,000 village ali mohammad internal roaduc mughalki

NOWSHERA NR16D00418-080118190:2 % PFC share of cm 2016-17: installation 1,013,298 of pressure pumps and handspumps at jalozai: NOWSHERA NR16D00421-08011879: 2 % SHARE OF CM 2016-17: 2,000,000 CONSTRUCTION OF MASJID MANKI SHARIF NOWSHERA NR16D00427-08011877:2 % share of CM 2016-17:Retaining wall at 595,464 shahab khel miangan zkk sahib NOWSHERA NR16D00428-08011878: 2 % SHARE OF CM 2016-17: 1,983,927 CONSTRUCTION OF COMMUNITY HALL ATBARAKHEL UC PAHARI KHATTI KHEL NOWSHERA NOWSHERA NR16D00430-08011881: 2 % SHARE OF CM 2016-17: 532,099 CONSTRUCTION /REHABILIATION OF MASJIDATVILLAGE TANGI KHATTAK U/C MANKI SHARIF NOWSHERA NR16D00431-Remaining PFC Share of CM 2016-17: installation of 2,359,840 solar panels in different masjids in u/ckaka sahib

NOWSHERA NR16D00432-080118189:construction of street, pavements/ 4,276,834 drains, installation of hand pumps pressurepumps etc at various places at uc DAG BEHSUD DISTRICT NOWSHERA NOWSHERA NR16D00433-08011884: 2 % share of cm 2016- 3,044,000 17:madrassa/masjid/solar system at uc gandheri NOWSHERA NR16D00434-161764: construction rehabilitation of madrasa at uc 775,533 Bara banda NOWSHERA NR16D00435-14121708:2 % share of pfc 2017-18: 1,962,576 imp/construction of janaza gah in village tarunowshera NOWSHERA NR16D00436-080118179: out of saving remaining amount of pfc 3,490,183 share of cm 2016-17: construction ofstreet pavt; at alam gul koroona uc misri banda district nowshera NOWSHERA NR16D00437-080118193: 2 % share of pfc of cm 2016-17: 2,300,748 construction/rehabilitation of masjid block cwapda colony NOWSHERA NR16D00438-080118191: 2 % share of pfc of cm 2016-17: 915,109 rehabilitation of masjid nimra khan sher ghariEA:TMA PABBI SOURCE :2 % SHARE OF CM 2016-17 NOWSHERA NR16D00439-161957:construction of mazaar at famous pushto 395,000 poet abdullah ustad nowshera kalan NOWSHERA NR16D00440-080118192:2 % share of pfc of cm 2016-17: 1,100,407 construction of janaz gah at khushmuqamnowshera NOWSHERA NR16D00441-161955:supply and fixing of solar street lights at 638,374 pashtoon Garhi uc Dagai NOWSHERA NR16D00442-151730: installation of 05 no's pressure pumps in uc 340,000 kabal river NOWSHERA NR16D00443-151842: PCC Road in v/c I and v/c II shagai ward 594,527

NOWSHERA NR16D00444-151843: pcc road and construction of drains v/c 1,402,335 nizam pur NOWSHERA NR16D00445-08011866: 2 % pfc share of cm 2016-17:construction 978,925 of masjid gulzari madeena dagijadeed NOWSHERA NR16D00446-08011862: 2 % pfc share of cm 2016-17: 394,611 construction/ rehab of msjid mohallah khizer abadnear surf factory village dagi jadeed NOWSHERA NR16D00447-08011863: 2 % pfc share of cm 2016-17: construction 888,972 /rehabilitation of masjid mohallahfazal abad near khawar village dagi jadeed NOWSHERA NR16D00448-080118107: Saving FMD 2016-17: const/rehab: of 600,192 masjid mohallah shagai village dagijadded pk-13 NOWSHERA NR16D00449-ADP 2016-17: installation filtration plant at ummah 609,787 children academy watter districtnowshera NOWSHERA NR17D00002-172108:JASHNI KHUSHAL 700,000 NOWSHERA NR17D00003-172109:YOUNG LEADER - HUM SI HAI 2,070,000

NOWSHERA NR17D00005-172110:EASTER CELEBRATION 448,000 NOWSHERA NR17D00006-14121732: 2 % pfc share of cm 2017-18: improment 5,000,000 of masjid mohallah ghazni khel mankisharif nowshera

NOWSHERA NR17D00007-14121740:2 % PFC share of cm 2017-18: improment 2,367,520 of madeena GT road pirpai nowshera NOWSHERA NR17D00011-NR17D00008-14121749:2 % Share OF PFC of cm 1,397,484 2017-18:impt/construction of madrasamohalla awandagai dadeem nowshera NOWSHERA NR17D00012-NR17D00009-14121738: 2 % pfc share of cm 2017- 2,063,282 18: impt/construction of masjid awanbadrashi NOWSHERA NR17D00013-NR17D00010-14121734: 2 % pfc share of cm 2017- 1,801,693 18: impromnet/construction in ameenabad koroonamank sharif

NOWSHERA NR17D00014-14121727:2 % pfc share of cm 2017-18: construction 2,863,464 of janazgah in village natal NOWSHERA NR17D00015-14121733: 2 % share of cm 2017-18: improvment of 887,781 masjid mohallah mostam baba dagmanki sharif nowshera

NOWSHERA NR17D00016-080118208: 2 % PFC share of CM 2017-18: 968,083 construction or retaining/ protection of wall indfferenent places in uc mandoori NOWSHERA NR17D00017-080118207:2 % PFC share of cm 2017-18: 2,097,759 construction of pavements of streets in UCMandoori nowshera:EA:TMAJANGIRA:SOURCE:2%PFC SHARE OF CM 2017-18

NOWSHERA NR17D00018-080118201:2 % PFC share of cm 2017-18: installation 2,197,998 of 7X8 TW Bore in different villagesof uc inzari nowshera

NOWSHERA NR17D00019-080118202: 2 % PFC share of cm 2017-18: 947,110 installation of 17x6 TW bore in different villagesof uc inzari

NOWSHERA NR17D00020-080118203:2 % share of cm 2017-18: construction of 335,567 retaining /protection wall in differentplaces of uc inzari

NOWSHERA NR17D00021-14121725: 2 % share of pfc of cm 2017-18: 3,417,257 construction of janaz gah at ali shah nowshera NOWSHERA NR17D00022-08011896:2 % pfc share of cm 2017-18:construction 1,499,985 retaining /protection walls at differentplaces in uc nizam pur

NOWSHERA NR17D00023-171803:Supply of Furniture to Thirty (30) Nos of BHU 4,000,000 in nowshera. NOWSHERA NR17D00024-171804:Supply of Furniture to 7 Nos of RHC in 1,000,000 nowshera NOWSHERA NR17D00025-171805:Supply of furniture to civil /ohters hospitals 1,500,000 and main rashid hussain shaheedhospital pabbi NOWSHERA NR17D00026-171809:Supply of medicines to civil/other hospitals 5,000,000 at district nowshera NOWSHERA NR17D00027-14121707:2 % pfc share of cm 2017-18: improment 2,129,552 /construction of janaz gah in villagetarkha union council akbar pura NOWSHERA NR17D00029-080118181:2 % pfc share of cm 2017-18: 1,559,409 construction of masjid tarkha majzoob babanowshera EA:TMA PABBI SOURCE:2 % SHARE OF CM 2017-18 NOWSHERA NR17D00030-Construction of security room at mian rasheed 674,748 hussain shaeedhospital pabbi EA:TMA PABBI SOURCE:ADP 2017-18

NOWSHERA NR17D00031-171806:ADP 2017-18:whitewash /paint at main 676,201 rashid hussain shaheed hospital pabbi NOWSHERA NR17D00032-08011892: 2 % pfc share of cm 2017-18: pavt: of 2,073,541 street and construction of drains in wazirabad och khawar uc mughlkai NOWSHERA NR17D00033-08011889: 2 % pfc share of cm 2017-18: installation 817,000 of pressure pumps at maira akorakhattak NOWSHERA NR17D00034-080118194: 2 % pfc share of cm 2017-18: 1,265,146 Construction of street pavement in uc nizam purnowshera NOWSHERA NR17D00035-14121750:2 % pfc share of cm 2017-18: impt/ 2,457,215 construction of masjid gulab ustad mohallahhassan khel village dagi qadeem nowshera NOWSHERA NR17D00036-M & R : Annual repairs & Maintaince of residential 1,300,000 /non residential building sector for theyear 2017in district nowshera NOWSHERA NR17D00037-14121741: 2 % pfc share of cm 2017-18: construction 533,458 of janaz gah mohallah wara khelshiekhi nowshera

NOWSHERA NR17D00038-14121737: 2 % pfc share of cm 2017-18: 5,112,166 imp/construction of masjid pir of manki sharif NOWSHERA NR17D00039-ADP 2016-17:Construction /renovation of masjid 197,575 kandi payan pashtoon ghari u/c dagainowshera NOWSHERA NR17D00040-ADP 2017-18: construction of street pavements , 620,894 r/wall, drains,etc installation of pressurepumps /hand pumps at various uc in district nowshera

NOWSHERA NR17D00041-ADP 2017-18: construction of street pavements , 665,529 r/wall, drains,etc installation of pressurepumps /hand pumps at various uc in district nowshera

NOWSHERA NR17D00042-ADP 2017-18: installation of hands pumps /pressure 1,299,239 pumps at uc chowkitownEA:TMANSR:SOURCE ADP 2017-18

NOWSHERA NR17D00043-ADP 2017-18: installation of solar street light at 1,384,239 different places in uc jalazai nowshera NOWSHERA NR17D00044-ADP 2017-18: pavements of street and construction 1,365,164 of drains filling pressure pumps watersupply pips at aman garah

NOWSHERA NR17D00045-ADP 2017-18: construction of community hall at 1,577,390 village behram killi ward gandheri NOWSHERA NR17D00046-ADP 2017-18: construction of building at madrasah 1,659,189 amamah aysha saddiqa lilbanat moh:zowani khel nowshera

NOWSHERA NR17D00047-"171901-Construction of Watercourse atTube Well 400,000 No. 1, Shaidu." NOWSHERA NR17D00048-"171902- Construction of Watercourse atTube Well 400,000 No. 2, Shaidu." NOWSHERA NR17D00049-171904- Construction of Tube WellWatercourse at 300,000 Khaleq Muhammad Land MeraAkora NOWSHERA NR17D00050-"171905- Construction of Tube WellWatercourse at 301,000 Abdul Hameed Land Ismail Khel, MeraAkora."

NOWSHERA NR17D00051-"171906- Construction of Tube WellWatercourse at 490,000 GulAzeem, WatterMeraAkora." NOWSHERA NR17D00052-171907- Construction of Water StorageTank at 250,000 Jehanzeb Land MeraAkora NOWSHERA NR17D00053-171908- Construction of Watercourse atMogha No. 800,000 38700/R Kurvi. NOWSHERA NR17D00054-171909- Construction of Tube Well WaterCourses 800,000 and Water Storage Tank at Amir Zada Land Kahi.

NOWSHERA NR17D00055-171910- Construction of Water StorageTank at Jamil 400,000 Shah Land Spin Khak. NOWSHERA NR17D00056-171911- Construction of Water StorageTank at 400,000 NaseemKhaliq Land Spin Khak. NOWSHERA NR17D00057-171912- Construction of Watercourse atUC 800,000 TaruJabba. NOWSHERA NR17D00058-171913- Construction of Watercourse atUC Dagai. 800,000

NOWSHERA NR17D00059-171914- Construction of Watercourse atUC Jalozai. 800,000

NOWSHERA NR17D00060-171915- Construction of Water StorageTank at Abdul 250,000 Jabbar Land Adamzai. NOWSHERA NR17D00061-171916- Construction of Water StorageTank at Mir 250,000 Aslam Land Adamzai. NOWSHERA NR17D00062-171917- Construction of Water StorageTank at 250,000 FayazMuhammad LandAdamzai. NOWSHERA NR17D00063-171919- Construction of Tube Well WaterCourse at 800,000 Hassamuddin Land KheshgiBala. NOWSHERA NR17D00064-171921- Construction of Water WaterCourse in UC 800,000 Pabbi. NOWSHERA NR17D00065-"171924- Construction of Water StorageTank at 383,000 Fawad Amir Land, MeraAkora. " NOWSHERA NR17D00066-"171925- Construction of Tube Well WaterCourse Pb 800,000 No. 81, Chowki Drab/ Pabbi" NOWSHERA NR17D00067-171927- Construction of Watercourse atDag 800,000 Behsood. NOWSHERA NR17D00068-171928- Construction of Watercourse atIsrarGul 600,000 Land DheriKatti Khel. NOWSHERA NR17D00069-171929- Construction of Water StorageTank at 199,000 Fakhralam Land DheriKatti Khel. NOWSHERA NR17D00070-"171930- Construction of Water StorageTank at 421,000 Mushtiaq Land Hasar Tang, Mandori." NOWSHERA NR17D00071-171931- Construction of IrrigationWatercourse at 622,000 Tube Well No. 3 Nizampur. NOWSHERA NR17D00072-171932- Construction of IrrigationWatercourse at 1,500,000 Tube Well No. 7 Nizampur NOWSHERA NR17D00073-171933- Construction of Watercourse/Water Storage 256,000 Tank at Mandori. NOWSHERA NR17D00074-171935- Construction of CanalWatercourse at 800,000 Mogha No.9800/R Koroona MisrBanda.. NOWSHERA NR17D00075-171936- Construction of Tube Well WaterCourse at 500,000 Khadim Shah Land Akbarpura. NOWSHERA NR17D00076-"171937- Construction of CanalWatercourse at 300,000 Mogha No.28798/R Tarkha, Akbarpura." NOWSHERA NR17D00077-171938- Construction of canalWatercourse at Mogha 941,000 No.27700/L Rashakai. NOWSHERA NR17D00078-171939- Construction of Tube WellWatercourse at 158,000 Asim Land Rashakai. NOWSHERA NR17D00079-171940- Construction of CanalWatercourse at 800,000 Mogha No.22675/R Khushmuqam. NOWSHERA NR17D00080-171941- Construction of CanalWatercourse at 746,000 Mogha No.3095 L Pirsabaq. (Haji Muhammad Afzal) NOWSHERA NR17D00081-171942- Construction of CanalWatercourse at 653,000 Mogha No.3100 L Pirsabaq. (Haji Muhammad Afzal) NOWSHERA NR17D00082-171943- Construction of CanalWatercourse at 700,000 Mogha No.4200 L Mohib Banda. NOWSHERA NR17D00083-171944- Construction of Tube WellWatercourse at 400,000 Haji Saeed Land Mohib Banda. NOWSHERA NR17D00084-171945- Construction of Tube WellWatercourse at 1,200,000 QaziManzoorUlHaq Land Behram Kelley

NOWSHERA NR17D00085-171946- Construction of Watercourse /Water 800,000 Storage Tank in UC ZiaratKaKa Sahib. NOWSHERA NR17D00086-"171947- Construction of Water StorageTank at 421,000 YaghiGul Land Kotar Pan, Ward Bara Banda." NOWSHERA NR17D00087-"171948- Construction of Watercourse atKotar Pan, 378,000 Ward Bara Banda." NOWSHERA NR17D00088-171949- Construction of Watercourse atSaid Ali Shah 800,000 Land Amanghar. NOWSHERA NR17D00089-"171950- Construction of Water StorageTank at 243,000 RazGul Land, Spin Kana, Ward PhariKatti Khel." NOWSHERA NR17D00090-"171951- Construction of Water StorageTank at Mir 134,000 Aman Khan Land, Spin Kana, Ward PhariKatti Khel." NOWSHERA NR17D00091-"171952- Construction of Water StorageTank at 383,000 Badshah Khan Land, Spin Kana, Ward PhariKatti Khel." NOWSHERA NR17D00092-"171953- Construction of Water StorageTank at 383,000 Mumraz Land, Spin Kana, Ward PhariKatti Khel." NOWSHERA NR17D00093-"171954- Construction of Water StorageTank at Noor 243,000 Faroz Land, Spin Kana, Ward PhariKatti Khel." NOWSHERA NR17D00094-"171955- Construction of Tube WellWatercourse at 124,000 Gulzar Hussain Land, Yar Khan Banda, Ward PhariKattiKhel."

NOWSHERA NR17D00095-"171956- Construction of Tube WellWatercourse at 128,000 RahmanGul Land, Spin Kana Mera, Ward PhariKatti Khel."

NOWSHERA NR17D00096-"171957- Construction of Tube WellWatercourse at 129,000 Lajbar Khan Land, Spin Kana Mera, Ward PhariKatti Khel."

NOWSHERA NR17D00097-"171958- Construction of Tube WellWatercourse at 129,000 Mumtaz Ali Land, Spin Kana Mera, Ward PhariKatti Khel."

NOWSHERA NR17D00098-"171959- Construction of Tube WellWatercourse at 378,000 Liaqat Noor Land, Jalozai, Dak Ismail Khel."

NOWSHERA NR17D00099-"171960- Construction of Water StorageTank at 421,000 Liaqat Noor Land, Jalozai, Dak Ismail Khel." NOWSHERA NR17D00100-171961- Construction of Watercourse atWard Balu 800,000

NOWSHERA NR17D00101-"171962- Construction of Tube WellWatercourse at 400,000 Pb 72, PirPiai." NOWSHERA NR17D00102-"171963- Construction of CanalWatercourse at 400,000 Mogha No. 222780/L, PirPiai." NOWSHERA NR17D00103-"171964- Construction of Tube WellWatercourse and 634,000 Water Storage Tank at Zatoon Mehmood Land, Shah Kot."

NOWSHERA NR17D00104-"171965- Construction of Watercourse 165,000 atNawabZaman Land, Shah Kot." NOWSHERA NR17D00105-"171966- Construction of Watercourse 200,000 atMuhammad Khan Land, Nowdiya, Jehangira." NOWSHERA NR17D00106-"171967- Construction of Watercourse atTaj 250,000 Muhammad Land, Nowdiya, Jehangira." NOWSHERA NR17D00107-"171968- Construction of Tube WellWatercourse at 150,000 SherAfzal Land, Jehangira." NOWSHERA NR17D00108-"171969- Construction of Watercourse atShah Wali 200,000 Land, NariNowdiay, Jehangira." NOWSHERA NR17D00109-"171970- Construction of CanalWatercourse at 800,000 Mogha No.1077/L Hassan Abad, Kabul River." NOWSHERA NR17D00110-"171971- Construction of CanalWatercourse at 800,000 Mogha No.12997/L Behram Kali, Gandehri." NOWSHERA NR17D00111-"171972- Construction of Watercourse atKhalid Zia 800,000 Land, Amankot." NOWSHERA NR17D00112-171973- Construction of Tube WellWatercourse and 800,000 Water Storage Tank in the land Haji Nawaz Gul&ZahidKhattak in UC Nizampur. NOWSHERA NR17D00113-171974- Construction of Watercourse atMuhammad 800,000 Islam Land Mogha No.22222/L+ TW KheshgiPayan.

NOWSHERA NR17D00114-"171975- Construction of CanalWatercourse at 800,000 Mogha No. 217714/L, Aza Khel Payan" NOWSHERA NR17D00115-171976- Construction of Tube WellWatercourse and 800,000 Water Storage Tank at Ward Aza Khel Bala.

NOWSHERA NR17D00116-"171977- Construction of Watercourse /Water 800,000 Storage Tank at Ward, Zara Miana." NOWSHERA NR17D00117-171978- Construction of Tube WellWatercourse and 400,000 Water Storage Tank at Awal Khan Land Khair Abad.

NOWSHERA NR17D00118-"171979- Construction of Tube WellWatercourse at 400,000 Khalid Khan Land, PitaoPayan.." NOWSHERA NR17D00119-"171980- Construction of Tube WellWatercourse at 400,000 GhulamKhaliq Land, Mian Essa." NOWSHERA NR17D00120-"171981- Construction of Tube WellWatercourse at 400,000 Wadood Land, Ward Mian Essa." NOWSHERA NR17D00121-"171982- Construction of Water StorageTank at Said 421,000 Ali Khan Land, Ward Badrashi." NOWSHERA NR17D00122-"171983- Construction of Water StorageTank at Ibrar 188,000 Land, Ward Badrashi." NOWSHERA NR17D00123-171984- Construction of Tube WellWatercourse at 450,000 FazalMula Land Ward Manki Sharif NOWSHERA NR17D00124-171985- Construction of Water StorageTank at 350,000 AhyaUd Din Land Ward Manki Sharif NOWSHERA NR17D00125-171986- Construction of Tube WellWatercourse / 800,000 Water Storage Tank at Ward Inzari. NOWSHERA NR17D00126-172008- Construction of Watercourse/Water 350,000 Storage Tank in Nowshera City. NOWSHERA NR17D00127-172009- Construction of Watercourse/Water 1,200,000 Storage Tank in Nawan Kally NOWSHERA NR17D00128-172012- Construction of Canal WaterStorage Tank in 350,000 Hazrat Taj land Dehri Ketti Khel. NOWSHERA NR17D00129-172013- Construction of Water StorageTank in 350,000 Bakhtiar Amin Dehri Ketti Khel. Total 968,040,250