District Project Description BE 2017-18 NOWSHERA NR16D00006-151825-Excavating and PCC Road from house Ameen 872,850 ullah khan to mohall zarkhel at vc aza khel payan NOWSHERA NR16D00013-151836-Construction of PCC Road in Mali Khel payan 508,890 (400x12)Mula kile NOWSHERA NR16D00020-1151846-PCC Road at different places.Kotar Pan 642,211 NOWSHERA NR16D00028-151855-PCC road and construction drains at VC 5,586,622 KandarKandar NOWSHERA NR16D00056-161767:construction of boundry wall for grave yard 457,347 at uc akbarpura NOWSHERA NR16D00068-151702-Constructio of Drain 1'x1' 400ft 182,562 NOWSHERA NR16D00069-151703-Construction of PCC Road in PakirBaba 106,662 (150x12) NOWSHERA NR16D00088-161711:sanitation works pavement of stre 58,737 NOWSHERA NR16D00090-161723:Sanitation works, pavement of str 629,999 NOWSHERA NR16D00092-161720:Sanitation works, pavement of street and 674,752 pressure /hand pumpsetcat UC Jalozai. NOWSHERA NR16D00094-161701-Construction of protection Wall &Pavement 632,811 of street at UC Nizampur. NOWSHERA NR16D00098-161729-Street Pavement various places atInzari. 563,608 NOWSHERA NR16D00100-"161731-Pavement of street andconstruction of 672,000 drain, filling pipe culverts, installation of PressurePumps at UC Pir Sabaq." NOWSHERA NR16D00103-"161739-Pavement of street andconstruction of 1,319,980 drain, P/Wall & Installation of Pressure Pumps at UCKabul River." NOWSHERA NR16D00104-"161742-Installation of Pressure Pumps,Street 2,372,222 pavement, drains and flood protection wall at various places ofUC Manki Sharif." NOWSHERA NR16D00105-"161743-Installation of Pressure Pumps,Street 575,708 pavement, drains and flood protection wall at various places ofUC Ziarat Ka Ka Sahib." NOWSHERA NR16D00108-161746-Construction of Masjid atBadrashi. 294,000 NOWSHERA NR16D00110-161751-Construction of room at MasjidShamsul 257,400 Quran and Madina Masjid Bara Khel at Chowki Town. NOWSHERA NR16D00112-161753-Construction of room at MasjidShah Hussaini 104,772 at Chowki Town. NOWSHERA NR16D00117-161758-Existing of Janazgah at TalabAbad Khat Killi 552,000 UC Dheri Katti Khel. NOWSHERA NR16D00120-161761-Supply and fixing Solar Systemfor different 1,459,000 Masjid at UC Nawan Killi. NOWSHERA NR16D00122-"161763-Construction/Renovation ofMasjid Tar Khel 617,635 Bala, Ziarat Ka Ka Sahib, District Nowshera." NOWSHERA NR16D00124-161768-Supply and fixing of Solar StreetLights at 1,014,000 Khat Killi NOWSHERA NR16D00127-sanitation works, pavement of street 1,676,000 NOWSHERA NR16D00128-161725:sanitation works, pavement of street and 2,376,000 pressure pumps at ucBalu NOWSHERA NR16D00129-161718: improment of dranis , pavments of steet 370,529 and pressure pumps hand pumpsfiltration plants at UC TARU NOWSHERA NR16D00130-pavement of street and Drain village bha 9,368,415 NOWSHERA NR16D00131-construction of janazgah at Maulana Abdad, village 630,475 manki sharif NOWSHERA NR16D00133-161772 Renovation and Rehabiliation of District 5,563,000 Council SecretriatBuilding /Hall NOWSHERA NR16D00134-161714:Sanitation works, pavement of street and 930,954 pressure/hands pumps atvillage pushtoon Ghari UC DAGI NOWSHERA NR16D00135-161721:Sanitation works,Pavement of street and 552,730 pressure/hand pumps etcat UC DAG Ismail khel NOWSHERA NR16D00138-161708:Sanitation works, pavements of 87,696 street/pressure pumps ect at district nowshera NOWSHERA NR16D00140-161726:installaion of hands/pressure at uc dak ismail 296,986 khel, uc shah kot, uc spin khak ,ucjaloazi , uc chowki mumrez and uc akbar pura. etc at district nowshera NOWSHERA NR16D00143-161737:sanitation works, pavements of strette 850,000 drains, and pressure pumps ect at UCAdamzai NOWSHERA NR16D00144-161703:Construction of PCC street pavement drains 490,747 retaining wall pressure pumps andsolar units for mosques at uc rashaki NOWSHERA NR16D00145-161765:construction of pcc road and 2,429,412 NOWSHERA NR16D00146-Construction of Masjid Noor in national colony in 1,486,625 Gujar Kass U/C kabul river NOWSHERA NR16D00149-161735:sanitation works, pavements of streets, and 420,220 pressure pumps / hands pumps etc atUC Shaidu NOWSHERA NR16D00150-161764: Construction /rehabilitation of madrasa and 1,080,007 PCC raod at U C Bara Banda Districtnowshera NOWSHERA NR16D00152-161707: sanitatin works, pamements of street and 102,000 pressure pumps hand pumps at districtnowshera NOWSHERA NR16D00154-161717:installation of pressure pumps hand pumps 551,169 at UC aman kot NOWSHERA NR16D00155-161712:Sanitation woks, pavements of streets and 689,554 pressure pumps hands pumps at ucshah kot NOWSHERA NR16D00156-161770:installation of street lights at district 100,320 nowshera NOWSHERA NR16D00158-161709:sanitation works, pavements of street , and 88,000 pressure pumps at district nowshera NOWSHERA NR16D00159-161750:construction of PCC Road ,Drains and 1,800,000 Retaining wall at UC Mandoori DistrictNowshera NOWSHERA NR16D00160-161774-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES AT GGHS AKBARPURA. NOWSHERA NR16D00161-161775-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES AT GGHS TARKHA. NOWSHERA NR16D00162-161776-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES IN DIFFERENT SCHOOLS OF UC AKORA KHATTAK. NOWSHERA NR16D00163-161777-INSTALLATION OF SOLAR PANELSWITHOUT 900,000 BATTERIES INSTALLATION OF FILTRATION PLANT AND CONSTRUCTION OFROOM AT GMS AMANKOT. NOWSHERA NR16D00164-161778-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES INSTALLATION OF FILTRATION PLANT AT GGHS AMANKOT. NOWSHERA NR16D00165-"161779-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, CEILING FANS AT GGHS AZA KHEL BALA." NOWSHERA NR16D00166-"161780-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, CEILING FANS AT GHS AZA KHEL BALA." NOWSHERA NR16D00167-"161781-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, CEILING FANS AT GMS AZA KHEL BALA." NOWSHERA NR16D00168-161782-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES AT DIFFERENT SCHOOLS OF UC AZA KHEL PAYAN. NOWSHERA NR16D00169-161783-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES AND CONSTRUCTION OF WATER TANK AT GHS BADRASHI. NOWSHERA NR16D00170-"161784-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, AT GGHS BADRASHI." NOWSHERA NR16D00171-"161785-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, AT GHS BADRASHI." NOWSHERA NR16D00172-"161786-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES, WHITE BOARD AT DIFFERENT SCHOOLS OF UC BALOO." NOWSHERA NR16D00173-161787-INSTALLATION OF SOLAR PANELSWITHOUT 1,600,000 BATTERIES AND CONSTRUCTION OF ROOM AT DIFFERENT SCHOOLS OF UCCHOWKI MUMREZ. NOWSHERA NR16D00174-"161788-INSTALLATION OF SOLAR PANELSWITHOUT 2,500,000 BATTERIES, CONSTRUCTION OF ROOMS, BATHROOMS AT GMS SHALA KHEL,CHOWKI TOWN." NOWSHERA NR16D00175-"161789-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES, INSTALLATION OF FILTRATION PLANTS, H/PRESSURE PUMPS,RCC DRAIN, PAVEMENT, FILLING OF GROUND ETC. AT DIFFERENT NOWSHERA NR16D00176-"161790-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES, INSTALLATION OF FILTRATION PLANT AT VARIOUS SCHOOLSOF UC DAG BEHSUD." NOWSHERA NR16D00177-161791-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES AND FLOORING OF GROUND AT GHS DAGI JADEED. NOWSHERA NR16D00178-161792-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES AND FLOORING OF GROUND AT GHS PUSHTOON GARHI. NOWSHERA NR16D00179-161793-INSTALLATION OF SOLAR PANELSWITHOUT 500,000 BATTERIES AND FLOORING OF GROUND AT GHS BANDA NABI. NOWSHERA NR16D00180-"161794-INSTALLATION OF SOLAR PANELSWITHOUT 300,000 BATTERIES CONSTRUCTION OF R/WALL, FLOORING AT GMS DAG ISMAILKHEL." NOWSHERA NR16D00181-"161795-INSTALLATION OF SOLAR PANELSWITHOUT 600,000 BATTERIES, PRESSURE PUMP AND WATER TANK REPAIR OF BATHROOMS ATGGHS DAK ISMAIL KHEL. " NOWSHERA NR16D00182-"161796-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, PRESSURE PUMP ALONG WITH PIPES, REPAIR OF MASJID ATGHS DAK ISMAIL KHEL. " NOWSHERA NR16D00183-"161797-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, FILTRATION PLANT, PRESSURE PUMPS AND WHITEBOARD ATDIFFERENT SCHOOL OF DISTRICT NOWSHERA." NOWSHERA NR16D00184-"161798-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, WHITEBOARD AT DIFFERENT SCHOOL OF DISTRICT NOWSHERA." NOWSHERA NR16D00185-"161799-INSTALLATION OF SOLAR PANELSWITHOUT 800,000 BATTERIES IN HIGH SCHOOL PUSHTOON GHARI, GGMS PUSHTOON GHARI,GMS PUSHTOON GHARI, UC DAGAI." NOWSHERA NR16D00186-"16I800-NSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES, INSTALLATION OF FILTRATION PLANT, HAND/ PRESSUREPUMPS, RCC, FILLING OF GROUND ETC. AT DIFFERENT SCHOOLS UC PABBI." NOWSHERA NR16D00187-"161801-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES INSTALLATION OF FILTRATION PLANT, HAND/ PRESSUREPUMPS, RCC, FILLING OF GROUND ETC. AT DIFFERENT SCHOOLS UC PABBI." NOWSHERA NR16D00188-161802-INSTALLATION OF SOLAR PANELSWITHOUT 700,000 BATTERIES AT DIFFERENT SCHOOL DISTRICT NOWSHERA. NOWSHERA NR16D00189-161803-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS BEHRAM KILLI. NOWSHERA NR16D00190-161804-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS GANDEHRI. NOWSHERA NR16D00191-161805-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS MASKEEN ABAD KALINGER. NOWSHERA NR16D00192-161806-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES AT GHS SHEIKHAN. NOWSHERA NR16D00193-"161807-INSTALLATION OF SOLAR PANELSWITHOUT 400,000 BATTERIES, REPAIR OF ELECTRICITY WORKS AT GHS TOHA GHAREEB PURA,INZARI." NOWSHERA NR16D00194-161808-INSTALLATION OF SOLAR PANELSWITHOUT 200,000
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages24 Page
-
File Size-