Diverging Diamond Interchange (DDI) Informational Guide

Total Page:16

File Type:pdf, Size:1020Kb

Diverging Diamond Interchange (DDI) Informational Guide Michigan Department of Transportation Diverging Diamond Interchange (DDI) Informational Guide April 2015 Engineering Manual Preamble This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall: 1. Hold paramount the safety, health, and welfare of the public. 2. Perform Services only in areas of their competence. 3. Issue public statement only in an objective and truthful manner. 4. Act for each employer or client as faithful agents or trustees. 5. Avoid deceptive acts. 6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession. This page is intentionally blank. FOREWORD The Federal Highway Administration (FHWA) Every Day Counts (EDC) initiative is designed to identify and deploy innovation aimed at reducing project delivery time, enhancing safety and protecting the environment. In 2012, FHWA chose Intersection & Interchange Geometrics (IIG) to feature as one of the innovative technologies in EDC-2. Specifically, IIG consists of a family of alternative intersection designs that improve intersection safety while also reducing delay, and at lower cost and with fewer impacts than comparable traditional solutions. As part of the effort to mainstream these intersections, FHWA has produced a series of guides to help transportation professionals routinely consider and implement these designs. Concurrent with a Diverging Diamond Interchange (DDI) Informational Guide, FHWA developed and published guides for three other designs: Median U-turn (MUT), Displaced Left Turn (DLT), and Restricted Crossing U-turn (RCUT). These guides represent summaries of the current state of knowledge and practice, and are intended to inform project planning, scoping, design and implementation decisions. An electronic version of the FHWA DDI document is available on the Office of Safety website at http://safety.fhwa.dot.gov/. Additionally, limited quantities of hard copies are available from the Report Center; inquiries may be directed to [email protected] or 814-239-1160. In response to the growing interest in DDIs, the Michigan Department of Transportation has developed this DDI Informational Guide based on the August 2014 FHWA version. The Michigan guide will serve as the basis of future DDI design in the state of Michigan. Michigan Department of Transportation Diverging Diamond Interchange Informational Guide i DDI INFORMATIONAL GUIDE TABLE OF CONTENTS CHAPTER 1 INTRODUCTION ..................................................................................................1 Overview of Alternative Intersections and Interchanges .................................................................1 Intersection Control Evaluations and Considerations .....................................................................1 Organization of the Guidelines ........................................................................................................2 Scope of the Guide .........................................................................................................................3 DDI Overview ..................................................................................................................................3 Application ......................................................................................................................................4 Geometric Design Considerations ................................................................................................10 Resource Documents ...................................................................................................................12 CHAPTER 2 POLICY AND PLANNING ................................................................................14 Planning Considerations for Alternative Intersections and Interchanges ......................................14 Serving Pedestrians and Bicycles ................................................................................................14 Traffic Volume Relationships .........................................................................................................15 Stakeholder Outreach ...................................................................................................................16 Policy Considerations ...................................................................................................................20 Asset Management .......................................................................................................................20 Planning Considerations ...............................................................................................................21 Planning Challenges .....................................................................................................................22 Project Performance Considerations ............................................................................................23 Project Development Process ......................................................................................................24 Summary of DDI Advantages and Disadvantages ........................................................................24 CHAPTER 3 MULTIMODAL CONSIDERATIONS...............................................................26 Design Principles and Approach ..................................................................................................27 Pedestrians ...................................................................................................................................30 Bicyclists .......................................................................................................................................45 Transit ...........................................................................................................................................49 Heavy Vehicle Considerations ......................................................................................................51 CHAPTER 4 SAFETY ................................................................................................................52 Safety Principles ...........................................................................................................................52 General Safety Concerns ..............................................................................................................54 Observed Safety Performance .....................................................................................................57 Incident Response Considerations ...............................................................................................63 Safety Evaluation Considerations .................................................................................................63 Michigan Department of Transportation ii Diverging Diamond Interchange Informational Guide DDI INFORMATIONAL GUIDE TABLE OF CONTENTS CHAPTER 5 OPERATIONAL CHARACTERISTICS ...........................................................64 Introduction ...................................................................................................................................64 Operational Considerations ..........................................................................................................68 Signal Timing and Coordination ....................................................................................................76 Comparative Performance Studies ...............................................................................................83 CHAPTER 6 OPERATIONAL ANALYSIS ..............................................................................85 Operational Analysis Tool Overview..............................................................................................86 Planning-Level Analysis ................................................................................................................86
Recommended publications
  • Chapter 10 Grade Separations and Interchanges
    2005 Grade Separations and Interchanges CHAPTER 10 GRADE SEPARATIONS AND INTERCHANGES 10.0 INTRODUCTION AND GENERAL TYPES OF INTERCHANGES The ability to accommodate high volumes of traffic safely and efficiently through intersections depends largely on the arrangement that is provided for handling intersecting traffic. The greatest efficiency, safety, and capacity, and least amount of air pollution are attained when the intersecting through traffic lanes are grade separated. An interchange is a system of interconnecting roadways in conjunction with one or more grade separations that provide for the movement of traffic between two or more roadways or highways on different levels. Interchange design is the most specialized and highly developed form of intersection design. The designer should be thoroughly familiar with the material in Chapter 9 before starting the design of an interchange. Relevant portions of the following material covered in Chapter 9 also apply to interchange design: • general factors affecting design • basic data required • principles of channelization • design procedure • design standards Material previously covered is not repeated. The discussion which follows covers modifications in the above-mentioned material and additional material pertaining exclusively to interchanges. The economic effect on abutting properties resulting from the design of an intersection at-grade is usually confined to the area in the immediate vicinity of the intersection. An interchange or series of interchanges on a freeway or expressway through a community may affect large contiguous areas or even the entire community. For this reason, consideration should be given to an active public process to encourage context sensitive solutions. Interchanges must be located and designed to provide the most desirable overall plan of access, traffic service, and community development.
    [Show full text]
  • 2013 Legislative Report Template
    2016 Report on the MnDOT Cost Participation Policy DRAFT – 12/11/15 1 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774 TTY, Voice or ASCII: 1-800-627-3529 2 Contents Contents .............................................................................................................................................................. 3 Legislative request .............................................................................................................................................. 4 Summary .............................................................................................................................................................. 5 Interpretation ...................................................................................................................................................... 6 Interpreting the Law ..................................................................................................................................... 6 Policy Principles ............................................................................................................................................. 7 Consulting Representatives of Local Units of Government ....................................................................... 8 Policy Recommendations ................................................................................................................................. 9 Non-Policy
    [Show full text]
  • GUIDELINES for TIMING and COORDINATING DIAMOND November 2000 INTERCHANGES with ADJACENT TRAFFIC SIGNALS 6
    Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. TX-00/4913-2 4. Title and Subtitle 5. Report Date GUIDELINES FOR TIMING AND COORDINATING DIAMOND November 2000 INTERCHANGES WITH ADJACENT TRAFFIC SIGNALS 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Nadeem A. Chaudhary and Chi-Leung Chu Report 4913-2 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project No. 7-4913 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Research: Construction Division September 1998 – August 2000 Research and Technology Transfer Section 14. Sponsoring Agency Code P. O. Box 5080 Austin, Texas 78763-5080 15. Supplementary Notes Research performed in cooperation with the Texas Department of Transportation. Research Project Title: Operational Strategies for Arterial Congestion at Interchanges 16. Abstract This report contains guidelines for timing diamond interchanges and for coordinating diamond interchanges with closely spaced adjacent signals on the arterial. Texas Transportation Institute (TTI) researchers developed these guidelines during a two-year project funded by the Texas Department of Transportation. 17. Key Words 18. Distribution Statement Diamond Interchanges, Capacity Analysis, Traffic No restrictions. This document is available to the Signal Coordination, Traffic Congestion, Signalized public through NTIS: Arterials National Technical Information Service 5285 Port Royal Road Springfield, Virginia 22161 19. Security Classif.(of this report) 20. Security Classif.(of this page) 21. No. of Pages 22. Price Unclassified Unclassified 50 Form DOT F 1700.7 (8-72) Reproduction of completed page authorized GUIDELINES FOR TIMING AND COORDINATING DIAMOND INTERCHANGES WITH ADJACENT TRAFFIC SIGNALS by Nadeem A.
    [Show full text]
  • Recommended Ramp Design Procedures for Facilities Without Frontage Roads
    Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-05/0-4538-3 4. Title and Subtitle 5. Report Date RECOMMENDED RAMP DESIGN PROCEDURES FOR September 2004 FACILITIES WITHOUT FRONTAGE ROADS 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. J. Bonneson, K. Zimmerman, C. Messer, and M. Wooldridge Report 0-4538-3 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project No. 0-4538 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Technical Report: Research and Technology Implementation Office September 2002 - August 2004 P.O. Box 5080 14. Sponsoring Agency Code Austin, Texas 78763-5080 15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Project Title: Ramp Design Considerations for Facilities without Frontage Roads 16. Abstract Based on a recent change in Texas Department of Transportation (TxDOT) policy, frontage roads are not to be included along controlled-access highways unless a study indicates that the frontage road improves safety, improves operations, lowers overall facility costs, or provides essential access. Interchange design options that do not include frontage roads are to be considered for all new freeway construction. Ramps in non- frontage-road settings can be more challenging to design than those in frontage-road settings for several reasons. Adequate ramp length, appropriate horizontal and vertical curvature, and flaring to increase storage area at the crossroad intersection should all be used to design safe and efficient ramps for non-frontage-road settings.
    [Show full text]
  • Interchange Modification Report
    INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation – District One February 2015 Interchange Modification Report Interstate 75 and State Road 884 (Colonial Boulevard), Lee County, Florida I, Akram M. Hussein, Florida P.E. Number 58069, have prepared or reviewed/supervised the traffic analysis contained in this study. The study has been prepared in accordance and following guidelines and methodologies consistent with FHWA, FDOT and Lee County policies and technical standards. Based on traffic count information, general data sources, and other pertinent information, I certify that this traffic analysis has been prepared using current and acceptable traffic engineering and transportation planning practices and procedures. ______________________________ Akram M. Hussein, P.E. #58069 ______________________________ Date TABLE OF CONTENTS Page SECTION 1 EXECUTIVE SUMMARY ......................................................................... 1-1 SECTION 2 PURPOSE AND NEED .............................................................................. 2-1 SECTION 3 METHODOLOGY ...................................................................................... 3-1 SECTION 4 EXISTING CONDITIONS ......................................................................... 4-1 4.1 DATA COLLECTION METHODOLOGY ........................................................................ 4-5 4.2 TRAFFIC FACTORS .........................................................................................................
    [Show full text]
  • Diverging Diamond Interchange (DDI)
    What Why How CFI - SR 400 @ SR 53, Dawson County, GA Intersection Control Evaluation A performance-based approach to objectively screen alternatives by focusing on the safety related benefits of each. Traditional Intersections SR 11 @ SR 124, Jackson County, GA Johnson Rd @ SR 74, Fayette County, GA Dogwood Trail @ SR 74, Fayette County, GA Roundabout SR 138 @ Hembree Rd, Fulton County, GA Roundabout • 215+ Existing • 50+ On System/or GDOT $$ • 165+ Off System • 20+ Currently Under Construction • 155+ Planned/programmed RBTs 6 Diverging Diamond Interchange (DDI) I-95 @ SR 21, Port Wentworth, Chatham County, GA Diverging Diamond Interchange (DDI) • 6 Existing • 2 Design/under construction • 10+ Under consideration Total: 18+ Continuous Green T SR 120 @ John Ward Rd SW, Cobb County, GA Single Point Urban Interchange (SPUI) SR 400 @ Lenox Rd NE, Fulton County, GA Reduced Conflict U-Turn (RCUT) SR 20 @ Nail Rd, Henry County, GA Continuous Flow Intersection (CFI) SR 400 @ SR 53, Dawson County, GA Unsignalized Signalized • Minor Stop • Signal • All-Way Stop • Median U-Turn • Mini Roundabout • RCUT • Single Lane Roundabout • Displaced Left Turn (CFI) • Multilane Roundabout • Continuous Green-T • RCUT • Jughandle • RIRO w/Downstream U-Turn • Diamond Interchange (signal) • High-T (unsignalized) • Quadrant Roadway • Offset-T Intersections • Diverging Diamond • Diamond Interchange (Stop) • Single Point Interchange • Diamond Interchange (RAB) • Turn Lane Improvements • Turn Lane Improvements • Other Intersection Control Evaluation Deliver a transportation
    [Show full text]
  • TCEP I-10-County Line Interchange
    CALIFORNIA TRANSPORTATION COMMISSION SB 1 Program Application Transmittal Sheet Project Name: I-10/County Line Road Interchange Project Nominating Agency/Agencies: City of Calimesa and City of Yucaipa Implementing Agency/Agencies: City of Calimesa and City of Yucaipa Total Project Cost: $8,800,000 Requesting Cost: $6,160,000 Project Location: Interstate 10 and County Line Road City/Cities: City of Calimesa and City of Yucaipa County/Counties: County of Riverside and County of San Bernardino Post Miles: SBD R38.949 to RIV R0.239 Legislative Districts: Assembly Districts: 42nd District Senate Districts: 23rd District Program(s) Applying for: Local Partnership Program ([email protected]) Solutions to Congested Corridors Program ([email protected]) X Trade Corridor Enhancement Program ([email protected]) For Agencies with Multiple Project Submissions: Priority # 1 of 1 projects CALIFORNIA TRANSPORTATION COMMISSION 2018 TRADE CORRIDOR ENHANCEMENT PROGRAM (TCEP) Interstate 10 and County Line Road Interchange I-10/County Line Road Interchange Project TCEP APPLICATION Section B. Government Code Section 14525.3 The Interstate 10 (I-10) and County Line Road Interchange Project is not a new bulk coal terminal project and will not be used to handle, store, or transport coal in bulk. As such, the Project will not have significant environmental impacts related to bulk coal handling. Section C. Street and Highway Code Section 100.15 The I-10/County Line Road Interchange Project is an interchange improvement project in the Cities of Calimesa and Yucaipa, and in the Counties of Riverside and San Bernardino, but reversible lanes are not a viable solution for this project.
    [Show full text]
  • Diverging Diamond Interchange Agenda
    Diverging Diamond Interchange Agenda . DDI Design . DDI vs. SPUI . SPUI Lessons Learned . DDI Retrofit Design . DDI – I-15/Pioneer Crossing What is a DDI? A DDI is a concept that requires drivers to briefly cross to the left, or opposite side of the road at carefully designed crossover intersections, to eliminate a signal phase. Primary Goal: Better accommodate left turns and eliminate a phase in the signal cycle. What is a DDI? Advantages Disadvantages . Reduces Signal Phases; . Lower Speed Through Improves Operations Interchange . Reduces Conflict Points; . Requires Longer Footprint Improves Safety Between Intersections . Reduces Bridge Area; . Not Practical with a One-way Lowers Costs Frontage Road DDI Design Signal Phasing Alternating Progression Left Turn Progression DDI Design Safety . About 50% Fewer Points of Conflict . Conflict Comes From Only One Direction . Lower Speed Conflicts (less severity, fewer accidents) DDI Design . When is a DDI a possible solution? • Heavily Congested Locations • Intersections Spacing of Approximately 500 Feet or More • Skewed Intersections Work Well Interchange Design DDI Intersection DDI Facts: First 5 Constructed in 3 States DDI Facts: Currently 34 Locations in 14 States SPUI Facts: First 3 Constructed in 3 States SPUI Facts: Currently over 250 in 35 States SPUI’s in Arizona: First Constructed . University Dr/Hohokam Expwy (SR-143) . I-10/7th Street and 7th Avenue . SR-51 (Squaw Peak Parkway) SPUI’s in Arizona: ADOT Comments . Early Designs Work Well . Tight Footprint is Most Effective . Right Turns can be an Issue . Pedestrian Crossings need more research . Left Turn Design is Critical University/Hohokam, Phoenix, AZ DDI Retrofit Design - St George, Utah DDI Retrofit Design - St George, Utah DDI Retrofit Design - SR 210/Baseline DDI Retrofit Design - SR 210/Baseline DDI Retrofit Design - Graves Mill Rd/US 501 DDI Retrofit Design - Graves Mill Rd/US 501 CPHX Examples I-10/University Drive CPHX Examples SR 101/Thunderbird Selection of DDI - I-15/Pioneer Crossing .
    [Show full text]
  • Upgrade U.S. 30 Whitley County
    Upgrade U.S. 30 Whitley County A Concept for a U.S. 30 Freeway across Whitley County, Indiana Whitley County U.S. 30 Planning Committee January 2017 TABLE OF CONTENTS Executive Summary ........................................................................................................................................................ 5 Introduction ....................................................................................................................................................................... 7 Existing Conditions ......................................................................................................................................................... 9 Public Participation ...................................................................................................................................................... 15 The Concept for U.S. 30 ............................................................................................................................................... 19 Improvement Examples .............................................................................................................................................. 37 Implementation Strategies ........................................................................................................................................ 41 WHITLEY COUNTY U.S. 30 PLANNING COMMITTEE Ryan Daniel, Mayor Mark Hisey, Vice President of Facilities Design City of Columbia City Parkview Health George Schrumpf, Commissioner Jon Myers,
    [Show full text]
  • Alameda County
    County Summaries Alameda County Overview Located at the heart of the nine-county San Francisco Bay Area, Alameda County is the second-largest county in the Bay Area, with a population of over 1.66 million. The extensive transportation network of roads, rails, buses, trails and pathways carries roughly 1.2 million commute trips daily to, from, within and through the county, supporting economic growth in the Bay Area, California and the rest of the nation. The county’s transportation system is multimodal, with non-auto trips growing more quickly than auto trips: between 2010 and 2018, for every new solo driver, four people began using transit, walking, biking, or telecommuting. Roads and Highways Alameda County roadways move people and goods within the county and beyond and support multiple transportation modes. As regional economic and population growth increase demand for goods and services, a variety of modes, including cars, transit, bikes and trucks, are competing to access the same facilities. The majority of Alameda County’s 3,978 road miles are highways, arterials and major local roads that provide access to housing, jobs, education and transit. Forty percent of daily trips in Alameda County are carried on arterials and major roads. Currently, five of the Bay Area’s top 10 most-congested freeway segments are in Alameda County, and average freeway delays are growing. The congestion in Alameda County is compounded by the large amount of vehicle, rail and Travelers have made over 14.5 million trips on the I-580 freight travel through Alameda Express Lanes since opening in February 2016.
    [Show full text]
  • TM 27 – NJ-29 Interchange Roundabout Evaluation Study
    Prepared for: I-95/Scudder Falls Bridge Improvement Project TM 27 – NJ-29 Interchange Roundabout Evaluation Study Contract C-393A, Capital Project No. CP0301A, Account No. 7161-06-012 Prepared by: Philadelphia, PA In association with: Kittelson & Associates, Inc March 2006 TM 29 – NJ-29 Interchange Roundabout Evaluation Study Contract C-393A, Capital Project No. CP0301A, Account No. 7161-06-012 I-95/Scudder Falls Bridge Improvement Project TABLE OF CONTENTS Table of Contents ................................................................. i Introduction ........................................................................ 1 Project Background .............................................................. 1 The KAI Assessment Scope ................................................... 3 Development of Additional Alternative Interchange Options4 Option 1A Modified: DMJM Folded Diamond w/Roundabout ........ 4 Option 1C Modified: NJDOT Roundabout Modified ..................... 5 Operational Assessment...................................................... 6 Assessment Tool Selection .................................................... 6 Assessment Results.............................................................. 6 I-95 Northbound Ramps/NJ-29 (Southern Intersection)............. 7 Intersection Levels of Service (LOS) ......................................................................... 7 Volume to Capacity Ratio (V/C) ............................................................................... 9 Intersection Delay ..............................................................................................
    [Show full text]
  • Potential Improvements Have Been Identified for Consideration with the Goals of Improving Corridor Mobility for All Modes of Transportation
    Potential improvements have been identified for consideration with the goals of improving corridor mobility for all modes of transportation. Information from existing transportation conditions, environmental screening, public input, and stakeholder meetings was used to identify several potential improvements for consideration and evaluation. The recommended potential improvements are categorized as Highway Improvements; Interchanges and Auxiliary Lane Improvements; Local Street Improvements; and Noise Abatement Improvements to address the needs of the corridor. The categories of potential improvements to address these key operational issues are listed in Table 5. Within each category, the list of viable potential projects is listed in a table and shown on the corridor map. Exhibits illustrating the potential improvements are included in Attachment 1. Study Goals Need/Deficiency Potential Improvements Improve travel time reliability; Improve operations and reduce Highway Improvements Preserve and enhance the travel time delay along highway ▪ HOV Lanes environment corridor ▪ EL ▪ Mainline Metering (system interchanges) Improve mainline and Address highway bottlenecks and Interchanges Improvements interchange operations improve weaving conditions ▪ HOV/EL direct connectors ▪ HOV by-pass lanes on ramps ▪ Interchange reconfigurations Promote multiple modes of Promote and develop alternative Local Street Improvements travel; Promote transit modes of transportation ▪ Add Bicycle Lanes alternatives; Improve bicycle ▪ Add or improve sidewalks
    [Show full text]