Company Profile
Total Page:16
File Type:pdf, Size:1020Kb
COMPANY PROFILE ERACLES S.r.l. is a technical office that deals with Environmental and Sanitary Engineering since 1997. 1 COMPANY NAME AND CONTACT INFORMATION ERACLES S.r.l. Via G. Paglia 7, 24065 LOVERE (BG) tel. 035 983738 - fax 035 4345102 e-mail: [email protected] 2 MANAGER Name: Dott. Ing. Remo Bordini Place of birth: Lovere (Bg) Date of birth: 05/10/1964 Residence: Italy, Lovere (Bg), Via Tadini n°22 VAT number: 02672140163 Professional register: Engineers of Bergamo n° 2470 first inscription: 1994 Professional condition: freelancer 3 PROFESSIONAL SERVICES Main sector: Environmental and sanitary engineering Services: • conception, environmental impact assessment, economical assessment and works direction for the construction of landfill and waste treatment plant; • projects of environmental remediation; • research activities in the environmental sector with technical and scientific partners. 4 MAIN WORKS 4.1.1 Landfills Conception, environmental impact assessment and works direction of the landfills listed in the table below. Place Type of waste Activities Volume Year (mc) Cologno Hazardous Conception 210'000 1995-1998 Monzese (MI) - special waste and works Italy direction Calcinato (BS) Hazardous Conception 500'000 1999-2008 - Italy and non- and works hazardous direction special waste Cazzago S.M. Special waste Conception 1’420’000 2000 (BS) - Italy Environmental impact assessment Kosovo Polje Municipal Conception 100'000 2000 (Kosovo) waste and works direction Calcinato (BS) Non-hazardous Conception 2.000'000 2002 - Italy special waste Environmental 2009-2010 impact 2015-2016 assessment Montichiari Non-hazardous Conception 985’000 2003-2011 (BS) - Italy special waste Environmental impact assessment and works direction Montichiari Special waste Conception 875’000 2005-2016 (BS) - Italy containing Environmental asbestos impact assessment and works direction Paderno Inert waste Conception 50'000 2006 Franciacorta Environmental (BS) - Italy impact assessment Bedizzole (BS) Hazardous Conception 800.000 2007-2008 – Italy and non- and works 2015-2016 hazardous direction special waste Crotta d’Adda Inert waste Conception 2.900.000 2007-2012 (CR) - Italy Environmental 2015-2016 impact assessment and works direction Rezzato (BS) - Inert waste Conception 450.000 2008-2010 Italy and works direction Ghedi (BS) - Inert waste Conception 1.500.000 2015-2016 Italy Valona Municipal solid Conception 2.000.000 2008 (Albania) waste Rezzato (BS) - Non-hazardous Conception 1’890’000 2011-2016 Italy special waste Environmental impact assessment Landfill in Calcinato (BS) Landfill in Calcinato (BS) Landfill in Bedizzole (BS) Landfill in Montichiari (BS) Plant of energy recover from biogas Landfill in Crotta d’Adda (CR) Drilling for piezometer installation 4.1.2 Waste treatment plants Conception, environmental impact assessment and works direction of the waste treatment plants listed in the table below. Place Type of Activity Potentiality Year treatment (ton/y) Calcinato (BS) Waste inerting Conception 120'000 1999-2001 - Italy Environmental impact assessment Leffe (BG) - recover of non- Conception 30'000 2002 Italy hazardous special waste Bussolengo Waste inerting Conception 30'000 2002 (VR) - Italy Cologno Composting Works 2002 Monzese (MI) - direction Italy Brescia (BS) - recover of non- Conception 150.000 2003 Italy hazardous Works special waste direction Adro (BS) - recover of non- Conception 14'500 2003 Italy hazardous Environmental special waste impact assessment Adro (BS) - recover of non- Conception 14'500 2004 Italy hazardous Environmental special waste impact assessment Carbonara Po recover of non- Environmental 100.000 2004 (MN) - Italy hazardous impact special waste assessment Annone Composting Conception 30.000 2004-2010 Brianza (LC) - Italy Vobarno (BS) - recover of non- Conception 65’000 - Italy hazardous 2014-2015 special waste Sarezzo (BS) - recover of non- Conception 65’700 2015-2016 - Italy hazardous special waste Chivasso (TO) recover of non- Conception 400’000 2015-2016 - Italy hazardous special waste Vobarno (BS) - recover of non- Conception 75’000 - Italy hazardous 2015-2016 special waste Waste treatment plant in Brescia Waste treatment plant in Brescia Waste treatment plant in Adro (BS) Waste treatment plant in Carbonara Po (Mn) Composting plant in Cologno Monzese (MI) Composting plant in Cologno Monzese (MI) 4.1.3 Environmental impact assessments • Landfill and waste inerting plant in Cazzago S.M. (BS) year 2000 • Mine of inert materials in Foresto Sparso (BG) year 2001 • Landfill for non-hazardous special waste in Calcinato (BS) year 2002 • Landfill for non-hazardous special waste in Montichiari (BS) year 2003 • Treatment plants for non-hazardous special waste in Adro (BS) year 2004 • Landfill for non-hazardous special waste in Rovato (BS) year 2004 • Landfill and waste treatment plant in Carbonara di Po. (MN) year 2004 • Landfill for special waste containing asbestos in Montichiari (BS) year 2005 • Treatment plants for hazardous and non-hazardous special waste in Gavardo (BS) year 2005 • Landfill for non-hazardous special waste in Calcinato (BS) year 2006 • Landfill for inert waste in Paderno Franciacorta (BS) year 2006 • Landfill for inert waste in Crotta d’Adda (CR) year 2007 • Landfill for non-hazardous special waste in Rezzato (BS) year 2011 • Landfill for inert waste in Ghedi (BS) year 2015 Lovere 15/04/2016 Dott. Ing. Remo Bordini .