Green Building Program Manual

Total Page:16

File Type:pdf, Size:1020Kb

Green Building Program Manual Green Building Program Manual CC2014-01 (May 9, 2014) |COVER Table of Contents INTRODUCTION ............................................................................................................................... 1 Background and Purpose ................................................................................................................................ 1 Overview of Manual ........................................................................................................................................ 1 DESIGN PHASE ................................................................................................................................. 3 Applicability of DC Green Building Requirements ........................................................................................... 3 2013 DC Building Code ............................................................................................................................. 3 2013 DC Energy Conservation Code ......................................................................................................... 4 Green Building Act ................................................................................................................................... 5 2013 DC Green Construction Code .......................................................................................................... 7 Transitory Provisions ................................................................................................................................ 8 Requests for Determination ..................................................................................................................... 9 Preliminary Design Review Meetings ............................................................................................................ 10 Overview ................................................................................................................................................ 10 PDRM Process ........................................................................................................................................ 10 Green Review Meeting .................................................................................................................................. 11 Overview ................................................................................................................................................ 11 Green Review Process ............................................................................................................................ 11 PERMITTING PROCESS .................................................................................................................. 12 Overview ....................................................................................................................................................... 12 Green and Energy Plan Reviews ............................................................................................................. 12 Third-Party Green Plan Reviews ............................................................................................................. 12 Permitting Process ........................................................................................................................................ 12 Project Submittal Documents ....................................................................................................................... 13 Building Permit Submittals ..................................................................................................................... 14 Demolition or Razing Permit Submittals ................................................................................................ 16 Site Work Permit Submittals .................................................................................................................. 17 BUILDING INSPECTIONS ................................................................................................................ 18 Building Inspection Process ........................................................................................................................... 18 Building Footing ..................................................................................................................................... 18 Building Foundation / Slab on Grade ..................................................................................................... 18 Mechanical Rough-in .............................................................................................................................. 18 CC2014-01 (May 9, 2014) | i Electrical Rough-in.................................................................................................................................. 19 Plumbing Rough-in ................................................................................................................................. 19 Energy Efficiency and Insulation ............................................................................................................ 20 Mechanical/Electrical/Plumbing Final .................................................................................................... 20 Building Final .......................................................................................................................................... 20 Demolition or Razing Inspections Process ..................................................................................................... 21 Site Work Inspections Process ...................................................................................................................... 21 Third-party Inspections ................................................................................................................................. 21 CERTIFICATE OF OCCUPANCY ....................................................................................................... 22 Building Certificate of Occupancy Process .................................................................................................... 22 POST OCCUPANCY ......................................................................................................................... 24 After C/O Issuance Submittals ....................................................................................................................... 24 Green Building Act ................................................................................................................................. 24 Green Construction Code or ASHRAE 189.1 ........................................................................................... 24 Green Construction Code Alternative Compliance Path ........................................................................ 25 ENFORCEMENT ............................................................................................................................. 26 SECTIONAL REFERENCE GUIDE ..................................................................................................... 27 How to Use This Reference Guide ................................................................................................................. 27 ASHRAE 189.1 ................................................................................................................................................ 28 Section 3: Definitions, Abbreviations, and Acronyms ............................................................................ 28 Section 6: Water Use Efficiency ............................................................................................................. 28 Section 8: Indoor Environmental Quality ............................................................................................... 28 Section 9: The Building’s Impact on the Atmosphere, Materials and Resources ................................... 29 Section 10: Construction and Plans for Operation ................................................................................. 29 IgCC Chapter 4: Site Development and Land Use .......................................................................................... 30 Section 405: Management of Vegetation, Soils and Erosion Control .................................................... 30 Section 406: Building Site Waste Management ..................................................................................... 30 IgCC Chapter 5: Material Resource Conservation & Efficiency ..................................................................... 31 Section 502: Construction Material Management ................................................................................. 31 Section 505: Material Selection ............................................................................................................. 31 IgCC Chapter 6: Energy Conservation, Efficiency and CO2e Emission Reduction ......................................... 32 Section 602: Modeled Performance Pathway Requirements ................................................................ 32 Section 603: Energy Metering, Monitoring and Reporting .................................................................... 32 CC2014-01 (May 9, 2014) | ii Section 608: Building Electrical Power and Lighting Systems ................................................................ 33 Section 611: Energy Systems Commissioning and Completion .............................................................
Recommended publications
  • Commissioning Engineer with Experience in Regulated Industries
    Commissioning Engineer with experience in regulated industries Are you looking for a career with a sense of purpose? Our purpose is to help all our clients achieve theirs! Join a company that provides decisive and measurable solutions for complex challenges in the Life Science Industry. We can turn what can be challenging situations into actionable and realistic solutions. Among our many exciting projects, we have helped clients “Feed the World,” “Detect Cancer Early, When it Can be Cured,” “Create the First Bioengineered Human Acellular Vessel (HAV),” and “Lower the Cost of Life-Saving Pharmaceutical and Biotechnology Products to Improve the Life of All Patients”. PEG is a full-service program, project, cost, and construction management firm that delivers customized innovative solutions focused on the Life Science industry. We work on a variety of project sizes and types and our expert, in-house team provides program and project management, construction management, cost estimating and management, scheduling, and commissioning services. We are a Service-Disabled Veteran-Owned Small Business (SDVOSB), North Carolina state HubZone certified, and a State of Virginia Small, Women-owned, and Minority-owned Business (SWaM) firm that offers a host of project support services to clients nationwide. This is a full-time, permanent position in a fast-paced environment. The role could alternate between our HQ office located in the Research Triangle Park, NC, and Client's locations. Job Overview: Commissioning engineers perform commissioning testing on facilities and manufacturing equipment; author commissioning plans, risk assessments, commissioning protocol, and standard operating procedures; and, provide client support for projects either independently or as part of a larger team.
    [Show full text]
  • Building Commissioning Guideline
    BUILDING COMMISSIONING GUIDELINE BY APEGM PRACTICE STANDARDS COMMITTEE June, 2002 Prepared By: M. J. Frye, P. Eng. , Chair R. Dewar, P. Eng. I. D. Kelly, P. Eng. R. I. McDowall, P. Eng. D. I. Waldman, P. Eng. 1617171166 Table of Contents 1 Overview ................................................................................................. 1 1.1 Objectives of the Guideline........................................................... 1 1.2 Definition of Commissioning........................................................ 1 1.3 Benefits of a Comprehensive Commissioning Program................. 1 1.4 Scope of the Guideline.................................................................. 3 2 Fundamentals of a Comprehensive Commissioning Program ................... 5 2.1 Introduction .................................................................................. 5 2.2 Planning ...................................................................................... 5 2.3 Preparation.................................................................................... 7 2.4 Implementation............................................................................. 9 2.4.1 Facility Start-Up Activities........................................................... 9 2.4.2 Post Construction Phase ............................................................. 12 2.5 Project Evaluation....................................................................... 13 3 Organizational Considerations ..............................................................
    [Show full text]
  • The Building Commissioning Guide
    GSA Public Buildings Service the building commissioning guide the building commissioning guide U.S. General Services Administration Public Buildings Service Office of the Chief Architect April 2005 table of contents foreword iii introduction v building commissioning philosophy vii building commissioning process 1 overview 3 planning stage 5 design stage 21 construction stage 35 post-construction stage 47 appendices 55 a sample scope for commissioning services 57 b commissioning systems selection matrix 72 c resources and references 77 d glossary 79 acknowledgements 83 ii foreword The U.S. General Services Administration, through its Public Buildings Service (PBS), manages buildings that house over a million Federal associates and has an on-going planning, design and construction program to meet our federal customers housing needs. PBS’ project delivery program is the vehicle for transforming our customer agencies’ vision into reality. The built environment for our nation’s public buildings, including courthouses, federal office buildings, laboratories, and border stations, in turn shapes the communities and landscape in which they reside. The comfort, productivity and job satisfaction of a million Federal associates in many ways rests with the quality of their immediate working environment. Critical to our management role is providing our customer agencies with the assurance that we are delivering to them facilities which meet or exceed their expectations for performance, efficiency, safety, sustainability, security and occupant satisfaction. Integrating the process of Total Building Commissioning into project delivery is one way we can provide the occupants of our facilities with this level of assurance. Total Building Commissioning, as presented in this Guide, is GSA’s quality delivery process which translates expectations into documented and tangible facility results.
    [Show full text]
  • Research Article Integrative Approach to the Plant Commissioning Process
    Hindawi Publishing Corporation Journal of Industrial Engineering Volume 2013, Article ID 572072, 12 pages http://dx.doi.org/10.1155/2013/572072 Research Article Integrative Approach to the Plant Commissioning Process Kris Lawry,1 and Dirk John Pons2 1 Department of Chemical and Process Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand 2 Department of Mechanical Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand Correspondence should be addressed to Dirk John Pons; [email protected] Received 20 September 2012; Revised 2 December 2012; Accepted 19 December 2012 Academic Editor: Xueqing Zhang Copyright © 2013 K. Lawry and D. J. Pons. is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Commissioning is essential in plant-modi�cation projects, yet tends to be ad hoc. e issue is not so much ignorance as lack of systematic approaches. is paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering. ree strategies for commissioning emerge, identi�ed as direct, advanced, and parallel. Direct commissioning is the traditional approach of stopping the plant to insert the new unit. Advanced commissioning is the commissioning of the new unit prior to installation. Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational. Results are reported for two plant case studies, showing that advanced and parallel commissioning can signi�cantly reduce risk.
    [Show full text]
  • Automation Contractor and Electrical Consulting Services PROJECT DESIGN and IMPLEMENTATION GUIDE MAC/ECS PROJECT IMPLEMENTATION GUIDE 1
    PROCESS AUTOMATION Main Automation Contractor and Electrical Consulting Services PROJECT DESIGN AND IMPLEMENTATION GUIDE MAC/ECS PROJECT IMPLEMENTATION GUIDE 1. Executive summary TABLE OF CONTENTS PAGE The main automation contractor (MAC) and electrical contractor services (ECS) approach is the most effective way to reduce cost overruns and eliminate schedule delays in heavy 1. Executive summary 1 industry sectors. This approach has been demonstrated to lower the overall risks for both 1.1 OVERVIEW OF CAPABILITIES 1 the owner/operator and the engineering procurement and construction (EPC) contractor, 1.2 RESPONSIBILITIES 1 providing benefits in both capital expenditure (CAPEX) and operating expenditure (OPEX) 2. Main Automation Contractor (MAC) 2 savings and schedule reduction. 2.1 MAC MANAGEMENT SERVICES 2 The savings from the reduction in schedule leads to early 1.1 OVERVIEW OF CAPABILITIES 2.2 MAC INSTRUMENT SERVICES 2 production and can yield benefits that often exceed the overall Sensia as a MAC can provide the following services: 2.3 MAC COMMISSIONING SERVICES 2 cost of the MAC/ECS contractor. 1. Project management The Sensia approach to providing total lifecycle solutions for 2.4 MAC AUTOMATION 3 2. Interface management integrated control, power, and safety (ICPS) applications is 3. Electrical Consulting Services (ECS) 5 to work with the plant designers to fully understand the plant 3. Control, shutdown, and fire and gas (F&G) systems 3.1 ECS MANAGEMENT SERVICES 5 operation our systems control and help protect, hence enabling 4. Design (instrument and electrical) 3.2 ECS ELECTRICAL SERVICES 5 Sensia to take full responsibility for the performance of those 5.
    [Show full text]
  • A Practical Guide to Construction, Commissioning and Qualification Documentation – and Its Critical Role in Achieving Complian
    Commissioning and Qualification This article Reprinted from The Official Journal of ISPE focuses on PHARMACEUTICAL ENGINEERING® July/August 2005, Vol. 25 No. 4 construction contractors who can deliver A Practical Guide to Construction, qualified facilities and Commissioning and Qualification presents the advantages of Documentation – and its Critical Role using a construction in Achieving Compliance contractor who can perform by Wael Allan and Andrew D. Skibo Commissioning and Qualification. ood documentation is essential for Naturally, the initial focus must be on the pharmaceutical and biotech manufac- proper construction and start-up of the facility. turing facilities to achieve regulatory Yet, a well-constructed facility that is on time, compliance. As defined by the Food within budget, and whose every system is per- Gand Drug Administration (FDA), “Validation is forming to specifications is of no value to the a documented program providing a high degree operating company if the associated documen- of assurance that a process/system consistently tation does not effectively support the qualifi- meets pre-determined specifications.” The clear cation process – it is a classic case of failing to presumption is that if the required activities see the forest through trees. In fact, the con- have not been properly documented, then they struction contractor must appreciate the sig- have not been performed. nificance of documentation, and make it an integral part of the con- Figure 1. Validation life cycle. struction planning, im- plementation, and com- missioning process from day one. Note: the term “Con- struction Contractor” is used to indicate a third party company respon- sible for construction, commissioning and qual- ification.
    [Show full text]
  • Technology Supply Curves for Low-Carbon Power Generation
    TECHNOLOGY SUPPLY CURVES FOR LOW- CARBON POWER GENERATION A report to the Committee on Climate Change ION June 2013 CARBON POWER GENERAT - RVES FOR LOW TECHNOLOGY SUPPLY CU TECHNOLOGY SUPPLY CURVES FOR LOW-CARBON POWER GENERATION Contact details Name Email Telephone Gareth Davies [email protected] +44 1865 812204 Ali Lloyd [email protected] +44 1865 812227 Pöyry is an international consulting and engineering company. We serve clients globally across the energy and industrial sectors and locally in our core markets. We deliver strategic advisory and engineering services, underpinned by strong project implementation capability and expertise. Our focus sectors are power generation, transmission & distribution, forest industry, chemicals & biorefining, mining & metals, transportation, water and real estate sectors. Pöyry has an extensive local office network employing about 7,000 experts. Pöyry's net sales in 2012 were EUR 775 million and the company's shares are quoted on NASDAQ OMX Helsinki (Pöyry PLC: POY1V). Pöyry Management Consulting provides leading-edge consulting and advisory services covering the whole value chain in energy, forest and other process industries. Our energy practice is the leading provider of strategic, commercial, regulatory and policy advice to Europe's energy markets. Our energy team of 200 specialists, located across 14 European offices in 12 countries, offers unparalleled expertise in the rapidly changing energy sector. Copyright © 2013 Pöyry Management Consulting (UK) Ltd All rights reserved No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the prior written permission of Pöyry Management Consulting (UK) Ltd (“Pöyry”).
    [Show full text]
  • Achieving Success in the Commissioning and Startup of Capital Projects: Implementing Critical Success Factors
    Achieving Success in the Commissioning and Startup of Capital Projects: Implementing Critical Success Factors Implementation Resource 312-2 Volume I CII Member Companies Abbott AECOM Ameren Corporation AMEC Foster Wheeler American Transmission Company AZCO Anadarko Petroleum Corporation Aecon Group Anglo American Affiliated Construction Services Anheuser-Busch InBev Alstom Power Aramco Services Company Atlas RFID Solutions ArcelorMittal Autodesk Architect of the Capitol Baker Concrete Construction AstraZeneca Barton Malow Company BG Group Bechtel Group BP America Bentley Systems Cargill Bilfinger Industrial Services Chevron Black & Veatch ConocoPhillips Burns & McDonnell Consolidated Edison Company of New York CB&I DTE Energy CCC Group The Dow Chemical Company CDI Engineering Solutions DuPont CH2M Eastman Chemical Company CSA Central Ecopetrol Construtora Norberto Odebrecht Enbridge Coreworx EnLink Midstream Day & Zimmermann Eskom Holdings SOC Emerson Process Management ExxonMobil Corporation Enstoa General Electric Company Faithful+Gould General Motors Company Fluor Corporation GlaxoSmithKline Hargrove Engineers + Constructors Global Infrastructure Partners Hilti Corporation Honeywell International IHI E&C International Corporation Huntsman Corporation IHS Intel Corporation International Rivers Consulting Irving Oil Limited JMJ Associates Kaiser Permanente JV Driver Projects Koch Industries Jacobs Eli Lilly and Company KBR LyondellBasell Kiewit Corporation Marathon Petroleum Corporation Lauren Engineers & Constructors National Aeronautics
    [Show full text]
  • Research Article Integrative Approach to the Plant Commissioning Process
    Hindawi Publishing Corporation Journal of Industrial Engineering Volume 2013, Article ID 572072, 12 pages http://dx.doi.org/10.1155/2013/572072 Research Article Integrative Approach to the Plant Commissioning Process Kris Lawry,1 and Dirk John Pons2 1 Department of Chemical and Process Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand 2 Department of Mechanical Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand Correspondence should be addressed to Dirk John Pons; [email protected] Received 20 September 2012; Revised 2 December 2012; Accepted 19 December 2012 Academic Editor: Xueqing Zhang Copyright © 2013 K. Lawry and D. J. Pons. is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Commissioning is essential in plant-modi�cation projects, yet tends to be ad hoc. e issue is not so much ignorance as lack of systematic approaches. is paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering. ree strategies for commissioning emerge, identi�ed as direct, advanced, and parallel. Direct commissioning is the traditional approach of stopping the plant to insert the new unit. Advanced commissioning is the commissioning of the new unit prior to installation. Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational. Results are reported for two plant case studies, showing that advanced and parallel commissioning can signi�cantly reduce risk.
    [Show full text]
  • Energy Storage Commissioning Engineer Location: Alpharetta, Georgia (Eligible to Work Remotely)
    4601 N. Fairfax Drive, Suite 600 Arlington, VA 22203 +1 703 682 6629 fluenceenergy.com Energy Storage Commissioning Engineer Location: Alpharetta, Georgia (Eligible to work remotely) About Fluence Fluence, a Siemens and AES company, is the leading global energy storage technology solutions and services company that combines the agility of a fast-growing technology company with the expertise, vision, and financial backing of two industry powerhouses. Building on the pioneering work of AES Energy Storage and Siemens energy storage, Fluence’s goal is to create a more sustainable future by transforming the way we power our world. The company offers proven energy storage technology solutions designed to address the diverse needs and challenges of customers in a rapidly transforming energy landscape, providing design, delivery and integration in over 160 countries. Fluence works closely with customers throughout their journey and provides advisory, financing, and project lifecycle services. Responsibilities Fluence seeks an Energy Storage Commissioning Engineer to drive energy storage project commissioning and to support project delivery. The Energy Storage Commissioning Engineer will: • Commission Fluence Projects working in cooperation with multiple project stakeholders including Fluence construction managers, contractors, suppliers, automation teams, control systems teams, etc. • Develop and execute commissioning plans including resourcing and scheduling. • Lead commissioning effort to achieve commercial operations, and handover from delivery/construction team to the O&M team for each project. • Define, develop and execute testing protocols based on market rules, local utility requirements, off-taker and third-party supply contracts. • Oversee complete commissioning and acceptance testing of the following systems: 1) project networks, communications, and control systems; 2) balance of plant relay protection, metering, HVAC, fire suppression, and electrical systems; 3) battery subsystem; 4) inverter subsystem.
    [Show full text]
  • Commissioning Management Mark Bridges; Msc, B‐Eng (Hons)
    28/02/2012 Commissioning Management Mark Bridges; MSc, B‐Eng (hons) 22 February 2012 A bit about me •Electrical Apprentice/Engineering Technician ‐ APCM •Attained an HNC Electrical Engineering 1988 ‐ 1993 •Project/Commissioning Engineer –SatchwellControl Systems 1993 ‐ 1995 •Project Engineer/Manager – lGlaxoSmithkline •Attained First Class Honours Degree Mechanical Engineering; Masters Degree in Sustainable Energy Systems 1995 – 2005 •Building Services Manager –Laing O’Rourke 2005 – 2008 •Associate Director – Topic Plan 2008 – 2010 •Commissioning Manager – Brookfield Multiplex 2010 ‐ 1 28/02/2012 What is Commissioning Management? •The execution of commissioning management procedures that control and monitor the project from commencement to practical completion and beyond •The procedures should provide traceability of the commissioning activities •This should result in documentary evidence illustrating the completeness of a project to the original design intent Commissioning Management Road Map 2 28/02/2012 Commissioning Management Road Map • Consider commissioning in the client brief •Ensure budget assigned for commissioning Commissioning Management Road Map • Appoint a commissioning management specialist •Perform commissioning focused design reviews 3 28/02/2012 Commissioning Management Road Map • Compile a commissioning plan • Make clear the expectation during tender Commissioning Management Road Map • Produce a commissioning programme • Review ‘for Construction’ drawings 4 28/02/2012 Commissioning Management Road Map • Validate setting
    [Show full text]
  • Commissioning for Federal Facilities
    Introduction Chapter 1 Introduction uilding commissioning Building commissioning has has often been likened to its roots in the Quality Control commissioning of a ship, programs of the 1970s and is B where the Owners thor- a direct product of the Total oughly verify and prove the func- Quality Management pro- 1 tional performance of all parts – grams of the 1980s. Commis- engines, compasses, sonar, radar, sioning is a direct response to radio, generators, potable water building Owners who com- systems, and so on – under all pos- plain that their facilities do not sible conditions and as a condition meet performance expecta- of acceptance before placing the tions, are extraordinarily ex- ship in service. And where the pensive to operate and Owner checks the presence of sys- maintain, lack valuable docu- tem operating and procedures mentation, and are staffed by manuals and the availability of up- personnel who are unfamiliar to-date navigation charts. And with and have never been where the crew has been properly trained on the building’s highly and thoroughly trained on the ship’s complex operations and control sys- “Building commissioning has systems’ operations and emergency tems. often been likened to the procedures. Commissioning is not commissioning of a ship.” new – ships and aircraft have been Until now, many of us thought of commissioned for years. building construction completion and turnover as physically completing an installation, throwing the switch, making a few adjustments, Goals of Commissioning: spending minimal time with the operators by ◆ Provide a safe and healthy facility. pointing to the equip- ◆ Improve energy performance and minimize ment with one hand energy consumption.
    [Show full text]