NYC Bike Share Designed by New Yorkers 159 DOT’s 18-month public planning process for Citi Bike included 159 public bike share meetings, presentations and demonstrations since September 2011, plus another 230 meetings with elected officials, property owners and other stakeholders.
10,000 DOT’s interactive station planning map (nyc.gov/bikeshare) received over 10,000 station suggestions, and over 55,000 “supports” for these suggestions.
2,881 In total, DOT planners presented the public, Community Boards and other stakeholders with 2,881 technically viable options for the 600 bike share stations; almost 5 options for each station.
74% 74% of New Yorkers support bike share (August 2012 Quinnipiac poll)
2 NYC BIKE SHARE: Designed by New Yorkers Inside this Report
Planning New York’s Newest Travel Option long-term public dialogue Reaching the public Bringing in all new yorkers putting it all together APPENdix A: Community Planning Workshops APpendix B: Bike Share Station Siting Guidelines Appendix C: Planning Partners Appendix D: In the News
3 NYC BIKE SHARE: Designed by New Yorkers Planning New York’s newest travel option
New York is a biking city. Bike ridership has grown cycling as a means of transportation continues to fourfold in the last 10 years and biking is the become a more attractive transportation option city’s fastest growing transportation option for for New Yorkers. New Yorker’s looking for a fast, safe, convenient and affordable way to get around. Polls released Enthusiasm for Citi Bike is also reflected in by Quinnipiac University’s Polling Institute in numerous independent polls that show broad and October 2011 and August 2012 found that more sustained support for bike facilities. Communities than 70% of New Yorkers support Citi Bike, across the city are increasingly requesting that New York City’s proposed bike share system. lanes and other bike infrastructure be built in These findings are the culmination of growth in their neighborhoods. New York City, with its flat innovative, community requested and supported geography and high density, is perfectly suited infrastructure, from the nation’s first protected to bike riding. Citi Bike will take advantage of bike paths to bike parking corrals. With bike safety these strengths by offering an unlimited number remaining at the same high levels as a decade of affordable, short bike trips—provided to New ago, despite 75% more riders on the street, Yorkers without using any public funds.
Over 70% of New Yorkers support New York’s proposed bike share system.
4 NYC BIKE SHARE: Designed by New Yorkers Another reason for the strong public embrace Choosing sites for 600 bike share stations across of bike share is the exhaustive and highly a wide area of Manhattan, Brooklyn and Queens participatory planning process used to develop has been one of the most participatory planning Citi Bike station sites within the system’s processes ever undertaken in New York. The initial service area. This report describes and effort encompassed close to 400 meetings with documents the process from 2011 to 2013. a wide variety of stakeholders, an innovative on- line portal for gathering input (which has since Bike share lends itself to a community planning been emulated across North America), dozens process. Successful bike share systems rely of demonstration events, hands-on community on an effective density of stations in a network, planning workshops, and an extended dialogue rather than on the specific placement of any and set of meetings between the New York single station. It was essential to cast a very wide City Department of Transportation (NYCDOT), outreach and communication net to introduce community boards and members of the NYC City a new transportation system that many New Council. Yorkers had not experienced before.
Choosing sites for 600 bike share stations across a wide area of Manhattan, Brooklyn and Queens has been one of New York’s most participatory planning undertakings.
5 NYC BIKE SHARE: Designed by New Yorkers Long Term Public Dialogue
The rhythm of bike share planning in New York followed a pattern of DOT engagement, feedback from stakeholders, synthesis by DOT of many and diverse sources of input, and a return to stakeholders to discuss results. The work and process included these main steps:
2011 2012 2013 STEPS Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Discussion with NYC City Council about the bike share program and planning process
Announcement of bike share program
Briefings for City Council members
Discussions with business improvement districts and major property owners
Briefings for community board leaders
Briefings for state and federal elected officials
Presentations to community board committees and full board meetings nyc.gov/bikeshare website allows all New Yorkers to suggest bike share station sites
Demonstrations, open houses and exhibits
Discussions with civic organizations, block associations, city agencies and public authorities
Receipt of written input from many stakeholders
Presentation of maps with potential station sites to elected officials, community boards and other stakeholder groups 14 community planning workshops to provide hands-on forums for New Yorkers to discuss and suggest station sites. Receipt of detailed feedback on potential station sites from all stakeholders Planning work to synthesize specific input from all sources Presentations and briefings to all stakeholders on draft final station site plan
On-line posting of draft final station site maps
Follow-up briefings for City Council members
Receipt of detailed feedback on draft station maps
Adjustment of sites and maps to reflect additional feedback and input
6 NYC BIKE SHARE: Designed by New Yorkers Reaching the Public
The planning process for the Citi Bike program 2012, DOT staff met with the 15 Community established an open door policy, encouraging Boards in the program area 39 times. In addition, input early and often from the citizens of New over the same time period, DOT staff hosted 31 York City. Beginning in the fall of 2011, DOT meetings with business improvement districts staff met repeatedly with Community Boards (BIDs) and other neighborhood and civic groups, at the leadership, committee, and full board and conducted 25 briefings for City and State levels, elected officials, leaders of business elected officials. improvement districts, and other business and civic organizations. Public Meetings
Early meetings explained the bike share concept, At each initial meeting, DOT staff provided outlined the upcoming public process and stakeholders with maps showing a wide range of gathered input on suggested sites. From the options for where bike share stations could be announcement of Alta Bicycle Share (known in placed. DOT requested direct input on which New York as NYC Bike Share) as the New York locations might be desirable and which should City bike share operator in September 2011 to be avoided. The maps showed three to five times the end first phase of public outreach in February the number of stations that would ultimately
“… it’s going to be a great program for the city. [DOT has] spent a lot of time qualifying these sites and getting feedback from residents.” Manhattan CB3 committee chair David Crane (The Villager, April 19th, 2012)
7 NYC BIKE SHARE: Designed by New Yorkers be necessary, allowing for a significant degree basic technical criteria (Appendix B). Qualifying of public influence from the earliest planning sites were added to the map of options for further stages. In total, stakeholders considered 2,881 review. In addition, DOT staff and organizations options for the 600 bike share stations. At such as the DUMBO BID, Flatiron/23rd St each meeting, DOT provided maps showing the Partnership, Union Square Partnership and the universe of possible station locations based on Hudson River Park Trust conducted numerous physical space and other technical criteria (see site visits to review potential locations and find Appendix B) and invited participants to select new ones. where the stations should go in their communities or districts. Stakeholders were asked to take Demonstrations the maps for close review and return them to DOT at their convenience. Locations flagged as Public outreach to announce the proposed undesirable were removed from consideration. system and its planning process went well beyond meetings. Following the announcement Community boards, BIDs and community groups of New York City Bike Share (NYCBS) as New were also involved in suggesting potential York’s bike share operator, NYCBS and DOT station locations. Some organizations, especially staff embarked upon a heavy schedule of bike Manhattan community boards, set up internal task share equipment demonstrations. The teams forces to scout additional sites for consideration. conducted twenty-one field demonstrations in Each site suggested by any source was subjected six weeks, to introduce the public to the program to a rigorous vetting process to ensure it met and its planning process.
“Beginning with the initial planning session and throughout all of the community meetings, there was ample opportunity for our concerns to be heard.” Grand Central Partnership
8 NYC BIKE SHARE: Designed by New Yorkers The demonstrations also provided an important let New Yorkers see first-hand just how easily the distribution point for information. Over the course no-excavation installation was completed. For of nine months, DOT distributed thousands of each demonstration, staff arrived about an hour wallet-sized cards asking New Yorkers to “Help in advance to install a fully functioning station. plan the system” by directing them to the DOT bike This simple display of the sophistication of the share Website and interactive Suggest-a-Station bike share equipment helped allay fears that the map, videos and more information. The schedule deployment of bike share stations would disrupt of demonstrations was widely distributed via traffic or that station locations, once selected, social media and print outlets. DOT added were set in stone. events to the schedule throughout the month to respond to community requests. Hundreds Targeting Diverse Populations of New Yorkers came to the demonstrations to ride the bikes. Thousands more stopped by for As part of the demonstration series, DOT information and to ask questions. engaged specific non-native English speaking constituencies. At the request of Manhattan The demonstrations showcased key system Community Board 3, DOT hosted two Spanish features such as the ease of installation and language presentations and one joint Mandarin the durability of the bikes, stations, and docks. and Cantonese presentation in the winter of 2011- New York is a four-season city, and the highly 2012. DOT developed these presentations in variable weather combined with intense use close coordination with local service organizations made durability of Citi Bikes a critical selling such as the Grand Street Settlement, El Puente, point for New Yorkers. The demonstrations also and the Chinese Consolidated Benevolent Association. In addition to online and print-media
DOT hosted Spanish, Mandarin, and Cantonese presentations.
9 NYC BIKE SHARE: Designed by New Yorkers outreach, publicity for these events involved Public Exhibits and Events heavy flyering and postering in local businesses As word spread about Citi Bike, DOT began to and housing developments. field requests from civic organizations, elected officials, private companies and property owners DOT also developed an open-house series which to present information about bike share. From included bike share bicycles and a short video of September 2011 to August 2012, the DOT bike share system features, which allowed hands- hosted, presented or attended 155 events. on outreach to continue on into the colder months. These included presentations at the New School, Open houses at places like the Whitehall Staten REBNY (Real Estate Board of NY), the 6th Avenue Island Ferry terminal and the Port Authority Bus Association, the Brooklyn Heights Association, Terminal allowed DOT to reach other audiences FXFowle Architects, the Turtle Bay Association, of potential bike share users who might work but Stuyvesant High School, the Grand Central not live in the bike share program area. Branch of the NY Public Library and others, as
well as a month long exhibition called Two Wheel Transit: NYC Bike Share at the AIA Center for Architecture. More than 2,700 visitors attended the exhibit during its month-long duration. The dialogue about Citi Bike also spread beyond
Two Wheel Transit: NYC Bike Share On January 11th, 2012, the widely-attended Two Wheel Transit: NYC Bike Share exhibit opened at the AIA Center for Architecture on LaGuardia Place. The opening included a standing-room only presentation about Citi Bike with DOT Commissioner Janette Sadik-Khan. The exhibit featured graphics showing size and density of bike share systems around the world, comparing travel times in New York City on bike, subway and car, and had a computer so visitors to the show could suggest a location on the nyc.gov/bikeshare Website. As a further attraction, a demonstration bike share bike was mounted to the wall so that visitors could spin the wheels and see the front and rear lights automatically illuminate. Over 2,700 visitors came to see Two Wheel Transit during its month-long run.
10 NYC BIKE SHARE: Designed by New Yorkers DOT-organized events. In October 2011, the Park Constant activity on the site ensured a steady Slope Civic Council organized its own roundtable stream of visitors and kept the site fresh and event to discuss opportunities for bike share engaging. At the site’s peak in September 2011 station sites in Park Slope and feedback from the it received 1,200 visits per hour. Since its launch, event was passed along to DOT for inclusion in almost every other US city looking to introduce the planning process. or expand bike share – Chicago, Washington DC, Portland - has replicated New York’s Website. nyc.gov/bikeshare At the core of the Website was the interactive On the virtual side, nyc.gov/bikeshare offered “Suggest-a-Station” map which was live from New Yorkers who might otherwise be unable to September 2011 to May 2012. Visitors were attend a community board meeting or community invited to place pins on the map identifying planning workshop an easy way to make their locations where they would want to see bike voices heard in the planning process. share stations, provide comments on why they thought a particular location was good and then Launched in September 2011, nyc.gov/bikeshare share their suggestion via facebook, twitter and combined a highly interactive “Suggest-a- other social media. Visitors were also invited Station” map with a regularly updating list of to support suggestions made by other visitors. events, informational blog entries and videos The “Suggest-a-Station” feature was widely explaining the planned New York system. publicized online, and the AIA Two Wheel Transit
11 NYC BIKE SHARE: Designed by New Yorkers show featured a computer set-up so visitors to responded to hundreds of questions regarding the show could access the site while attending the everything from job opportunities to suggestions exhibit. In total, New Yorkers placed over 10,000 for and concerns about specific stations sites. suggestion pins on the map and “supported” already-placed pins over 55,000 times.
The nyc.gov/bikeshare site served as a two-way conduit to keep New Yorkers involved in the planning process. DOT staff used the suggestions from the Website to identify locations they might have missed in initial siting work, adding sites to the planning maps presented to community boards and other stakeholders. In addition, everyone who suggested a station location was invited to provide their e-mail address and zip code. Throughout the process, DOT used this information to notify interested individuals about nearby community planning workshops. The site also included a “contact us” feature. DOT staff
12 NYC BIKE SHARE: Designed by New Yorkers Bringing in all New Yorkers
Ensuring access for lower-income residents is a In New York City, DOT chose to address issues of challenge that all American bike share systems equity and access from both a siting perspective have had to address. Two issues – a credit card as well as affordability. DOT, the New York City requirement, needed to ensure that each bike Housing Authority (NYCHA), community boards, rental can be linked to a specific person, and and NYCHA Resident Advisors found locations placement of bike share stations – have typically for bike share stations in and around NYCHA been the main barriers for low-income would be housing campuses. At launch, there will be Citi users. Low-income people are less likely than Bike stations within one block of all 29 NYCHA middle- and upper-income people to have a credit properties in the program area. In addition, the card. Unlike the heavily subsidized European and DOT contract requires NYCBS to ensure that the Chinese bike share systems, American bike share Citi Bike program area cover a number of lower- programs to date have been small, only covering income New York City neighborhoods. downtown areas and immediately adjacent residential neighborhoods. This often means To address financial access, DOT created two that stations are not located in lower-income discounted annual memberships programs. The neighborhoods. In Washington DC, a special programs, one for NYCHA residents and the other discount program developed with select “Bank for members of Community Development Credit on DC” credit unions has attempted to address Unions – offer annual Citi Bike memberships for the credit card and financial access issues. $60, an almost 40% reduction in price. To develop However, use of this program is limited and the these programs, DOT planners worked closely lack of station in lower-income neighborhoods with NYCHA and the Department of Consumer still depresses Capital Bikeshare use among low- Affairs Office of Financial Empowerment, the income residents. Nation Federation of Community Development Credit Unions, and community organizations such as Bed-Stuy Restoration, El Puente, and the Local Spokes Coalition.
13 NYC BIKE SHARE: Designed by New Yorkers Putting it all together Synthesizing 18 months of input and discussion
Hands-On Planning In total, more than 250 organizations, Fourteen community planning workshops – publications, community groups and elected hosted from January to May 2012 – formed officials participated in the 14 workshop. These the second phase of the outreach process. participants were important resources to help Borrowing from DOT’s experiences with other to get out the word to their communities. The participatory planning projects such as the Select workshops used interactive exercises and visual Bus Service community advisory committees, aids to stimulate in-depth conversations on the workshops were an opportunity for both transportation needs, how bike share could meet community groups and individual New Yorkers to those needs, the program itself, safety, and station weigh in directly on where stations should and locations. Participants worked on table-sized should not go. The workshops were designed maps showing all the technically qualified sites to elicit both general and specific input, ranging in their neighborhood and provided comment on from overall street or sidewalk preferences, and specific locations. details of specific sites. This range of feedback allowed DOT to eliminate specific locations and Each workshop map offered a wealth of develop a stronger understanding of the types of information for participants to use as they made locations that each neighborhood preferred.
Workshops elicited both general and specific input, from general street vs. sidewalk preferences and details of specific sites.
14 NYC BIKE SHARE: Designed by New Yorkers Below are samples of the table-sized maps used at public workshops showing all the technically qualified sites in a neighborhood. Station options that received significant negative comments were removed from the plans.
Map 1 Map of all possible options (3-5 times more station locations than necessary)
Map 2 Locations with numerous “no” votes at the workshop
Map 3 Proposed plan presented to the Community Boards
15 NYC BIKE SHARE: Designed by New Yorkers their decisions about what stations they might Each workshop was organized in close want to see in their neighborhoods. Each station coordination with community boards, elected was assigned an ID number, color, and shape. officials and local civic groups to determine Colors identified the location’s recommendation dates, times and locations that would work history – red for sites recommended by the best for as many people as possible. Business community board or elected official; purple improvement districts such as the Downtown for sites suggested by a local business, BID or Alliance generously promoted workshops via local institution; blue for sites identified through their e-mail lists. the Website. Shapes indicated location in the streetscape – squares for street sites, triangles In addition, DOT sent targeted e-mails to all the for sites on the sidewalk and circles for all people who had submitted station suggestions others. Workshop participants then were able and support messages via the Website to invite to place green, red and black stickers on the them to the workshops in the areas where they had maps to indicate likes, dislikes and brand-new placed stations on the online map. Newspapers station suggestions. The map was overlaid like El Diario and popular blogs like Streetsblog with a 1,000-square-foot grid, with three to five ran listings of upcoming workshops. DOT also options in each square. Selecting one station in posted all upcoming events prominently on its each grid roughly corresponded to the desired Website and alerted local blogs and publications. bike share network density. A DOT moderator and note-taker were at each table to record comments and facilitate a conversation about the sites participants had chosen.
Workshops were organized in close coordination with community boards, elected officials and civic groups.
16 NYC BIKE SHARE: Designed by New Yorkers Synthesizing the data
Eighteen months of meetings, demonstrations and discussion, 14 community planning workshops, and more than 10,000 online suggestions produced a vast quantity of information on where New Yorkers wanted to see Citi Bike stations. DOT’s first task was to code and synthesize the workshop results from nearly 3,000 possible station locations. Locations that received red “No” arrows during the workshops were removed and locations that received significant numbers of green “Yes” votes were highlighted. Suggestions for other stations not depicted on the maps were vetted by DOT staff to ensure they met the technical criteria. Comments received via the Website or recorded by note-takers at the workshops were added in. Stations that received votes via the Website were prioritized over stations that had not.
DOT planners then used a Geographic Information System (GIS) program to create a predictive model for how big each individual station would need to be. The model analyzed the surrounding land use (residential, commercial, parkland, schools, etc.), population, tourism rates and subway turnstile counts and other transit use throughout the program area. The model also made use of newly available taxi GPS data on origins and destinations of trips, as well as durations and times of day throughout the city.
The next step was to marry the public opinion information gathered in the workshops, through the Website, and through months of conversation with stakeholders to the overall map of technically viable locations and the station size model. DOT planners combined all the comments received over the 18 month process with the technical information in order to select one station within each grid square. A wide array of factors – specific requests or comments, neighborhood preferences, proximity to transit and other destinations, distance from other stations, access and proximity to bike lanes, station size in relation to the demand model – were all considered. Predictive model for bike share station size
17 NYC BIKE SHARE: Designed by New Yorkers DOT staff matched the overall community request Finalizing station sites profiles also generated in the workshops. For As the draft station plan for each neighborhood example, in Manhattan, Community Boards 2, was completed, DOT returned to the community 4, and 5 stated strong preferences that stations boards for further comment and review. Meetings not be sited on sidewalks, while Brooklyn’s were again held with BIDs, elected officials and Community Board 3 and Queens Community other stakeholders for additional comments. At Board 2 preferred locations on sidewalks. each community board meeting, DOT planners Stations selected in these areas were matched showed the full initial range of options, highlighted to these preferences. station that had received significant support or disapproval, and presented the draft plan. In addition, following lessons learned in other bike share cities, DOT worked to meet the basic rules of Once DOT had presented the station siting station spacing, making sure that stations would plan to each community board, the full city- be placed approximate 1,000 feet – a 3-5-minute wide proposed plan was posted on nyc.gov/ walk. In areas where a lot of activity could be bikeshare. The Website featured the plan in both expected, for example around Penn Station or a Google map version and as a printable PDF. Grand Central Terminal, DOT also made sure to Both formats clearly indicate the size of each site adjacent stations that were larger than the station and its location in the streetscape. In the average or placed additional stations in that area months that followed, DOT worked closely with to meet the expected demand. all the stakeholders to make adjustments to the plans. In total, 43% of the stations proposed in Constant dialogue with community groups, the draft plans were moved due to community stakeholders and elected officials continued as request. DOT was analyzing input and developing draft network plans. DOT staff also responded to Perhaps the greatest testament to the hundreds of comments and queries through its effectiveness of bike share planning in New York is [email protected] e-mail and through the the degree of emulation seen around the country nyc.gov/bikeshare Website. as bike sharing proposals proliferate. Chicago,
18 NYC BIKE SHARE: Designed by New Yorkers Portland, Columbus, and other municipalities share systems have seen in other large, transit- have largely replicated the approach documented based cities, demand to expand the system even in these pages. further is very likely. DOT’s proven outreach and participatory planning will allow additional parts In New York, the Citi Bike planning process of the city to adopt and take full advantage of will continue as city government, the program this latest additional to New York’s rich menu of sponsors and NYC Bicycle Share seek to expand transportation choices. the system to the projected level of 600 stations and 10,000 bikes. The expansion will lead to detailed station siting work in the Upper East and Upper West Sides, Park Slope, and Crown Heights. With the very high pre-launch approval rating noted at the outset of this report, and the high usage, demand, and popularity that bike
One testament to the effectiveness of bike share planning in New York is the degree of emulation seen around the country.
19 NYC BIKE SHARE: Designed by New Yorkers APPENDIX A Community Planning Workshops
The community planning workshops helped elicit Introduction feedback on where bike share stations should What is Bike share? In order to ensure that be placed in the New York City streetscape. The everyone had the same base level of knowledge workshops rooms were set with 8-10 tables, each about bike share, the workshop began with a seating 8-10 people including a moderator and 10 minute presentation discussing the planning note-taker. Each workshop started on a rolling process, features of the program, types of basis; as soon as a table filled with people, the station locations, safety, and maintenance. The session would begin. A Citi Bike was brought presentation was followed by 10 -15 minute in to each workshop so that participants could question and answer period. check out the equipment while waiting for their table to fill. The three main sections of the workshop are as follows:
• Introduction
• Getting to know bike share board exercises
• Community map
Renderings of sidewalk and curb lane Citi Bike stations.
20 NYC BIKE SHARE: Designed by New Yorkers Getting to Know Bikeshare etc. The moderator then facilitated discussion Board Exercises: about the different station typologies and asked participants to think about where they would Using a large “board game” style table graphic, like and expect to see stations around the city. DOT moderators led participants through three The note-taker distributed a short survey which exercises. participants were asked to fill-out identifying station typology preference and some use 1. How Would You Use Bike share? generator preferences. Surveys were collected, Participants were asked to place an arrow on and the note-taker recorded the total on a tally a trip type (work/school, recreation, shopping sheet. The moderator then led the table in a etc) which they would consider making via discussion of why participants selected the types bike share and then discuss their choice. This of sites they did. The purpose of the location conversation helped to facilitate a discussion exercise was to solicit participant feedback on about the usefulness of bike share. Participants generally preferred station locations in each were then encouraged to place additional arrows district. on all types of trips for which they would use bike share. The note-taker recorded all the different 3. What Features Should Bike share types of trips and destinations suggested, and Have? made special note of trips where multiple people Using the large table graphic, the moderator was placed flags. The exercise served as an ice- able to show participants images of the kiosk, breaker. membership key, smart phone apps, and more. The features section allowed DOT to solicit 2. Where Should Stations Go? participant options on the usefulness of these The moderator asked participants to look at features, and collect suggestions for additional renderings of different types of station locations; features. sidewalk, curb lane, park verges, private property,
21 NYC BIKE SHARE: Designed by New Yorkers
hop S Work Y it N Commu Share Bike NYC hop S Work Y it N Commu Share Bike NYC
Pedestrian Plazas Pedestrian Sidewalks Wide
NYC Bike Share Commu N it Y APPS
S hop
Work
Parks Work
Train/Bus Parking Lanes Parking
Work
OTHER College S hop
NYC Bike Share Commu N it Y NYC
Museums
Sidewalk Verges Sidewalk KIOSK
Features Locations
T
s
r
p i
i p
...and more ...and
r
s
T
Waterfront
Locations Trips Features
KIOSK Sidewalk Verges
Tourism NYC Bike Share Commu N it Y S hop OTHER
Lunch Work Parking Lanes Pedestrian Plazas Parks
Work Parks Shopping S hop APPS WEBSITE NYC Bike Share Commu N it Y NYC Wide Sidewalks Pedestrian Plazas
NYC Bike Share CommuNitY WorkShop NYC Bike Share CommuNitY WorkShop
Workshop table graphic.
22 NYC BIKE SHARE: Designed by New Yorkers The Community Map for stations they liked, red arrows to indicate dislike and black arrows on locations where they After the board game exercises were completed, wanted to see a station but one was not already participants were shown a table-sized map of depicted. Throughout the placement of the the community board which depicted all the arrows, the table moderator conducted a lively technically qualified sites. The map was overlaid conversations asking participants to explain with the 1,000 square foot grid and each site was their thinking as they placed their respective assigned an ID number, color, and shape. Colors arrows. The participants were able to continue identified the location’s recommendation history to place arrows on sites and have discussions -- if it was recommended by the community with others at their table and the moderator for board, elected official, local business, business as long as they wished. The note-taker recorded improvement district, local institution, or if it participant’s statements about site locations. was identified by the general public through the web portal tool. Shape indicated location in the streetscape -- if the station was to be located on a sidewalk, street, or “other” location. The map included three to five times more stations than would ultimately be necessary, giving participants ample choice for each grid square location. Participants placed stickers on sites to indicate their preferences: green arrows
23 NYC BIKE SHARE: Designed by New Yorkers
BROOKLYN CB1 Bike Share Community Workshop Community Share Bike CB1 BROOKLYN *There are 4 times more sites proposed on this map than will be installed. be will than map this on proposed sites more times 4 are *There 49 AVENUE installed. be will than map this on proposed sites more times 4 are *There 51 AVENUE 50 AVENUE
*There are 4 times more sites proposed on this map than will be installed. EAST 23 STREET
AVENUE C 47 AVENUE
BORDEN AVENUE
Suggested by: Type of station: Other LEGEND 25 STREET PULASKI BRIDGE Districts Improvement Business Other Business Improvement Districts Local Businesses and Community Board Public (via the website) On-sidewalk Station On-street station
PEDESTRIAN PATH 27 STREET ASH STREET and Businesses Local
ALLEY 32 PLACE Board Community
30 STREET 48 AVENUE ALLEY BOX STREET 33 STREET website) the (via Public 30 PLACE
31 STREET 34 STREET PEDESTRIAN PATH 31 PLACE Suggested by: ALLEY Suggested EAST 20 STREET QUEENS MIDTOWN EXPRESSWAY
VAN DAM STREET COMMERCIAL STREET Station On-sidewalk CLAY STREET PAIDGE AVENUE 36 STREET 37 STREET
GALE AVENUE On-street station On-street 39 PLACE
38 STREET 29 STREET station: of Type
DUPONT STREET 39 STREET
HUNTERS POINT AVENUE 35 STREET LEGEND
PULASKI BRIDGE BIKE PATH
STARR AVENUE
EAGLE STREET MC GUINNESS BOULEVARD
34 STREET LIE WESTBOUND EXIT 15 31 PLACE FREEMAN STREET ALLEY
BRADLEY AVENUE 34 STREET 35 STREET 50 AVENUE
AVENUE C LOOP GALE AVENUE
34 STREET 39 PLACE 35 STREET BORDEN AVENUE GREEN STREET
40 STREET HURON STREET LIE WESTBOUND EXIT 16
UNNAMED STREET ALLEY 35 STREET GREENPOINT AVENUE ALLEY
INDIA STREET EAST 16 STREET 51 AVENUE
PROVOST STREET
JAVA STREET 37 STREET
EAST 15 STREET
KENT STREET will be installed. on this map than sites proposed 4 times more are *There EAST 14 STREET JJ BYRNE MEMORIAL BRIDGE
EAST 12 STREET GREENPOINT AVENUE
EAST 13 STREET
WEST STREET
FRANKLIN STREET EAST 11 STREET MILTON STREET
NOBLE STREET BIKE PATH
MOULTRIE STREET ALLEY AVENUE D 54 AVENUE
EAST 10 STREETSZOLD PLACE
LEONARD STREET OAK STREET REVIEW AVENUE
MONITOR STREET
BROOKLYN CB1 Bike Share Community Workshop Community Share Bike CB1 BROOKLYN *There are 4 times more sites proposed on this map than will be installed. be will than map this on proposed sites more times 4 are *There 49 AVENUE installed. be will than map this on proposed sites more times 4 are *There 51 AVENUE 50 AVENUE
*There are 4 times more sites proposed on this map than will be installed. EAST 23 STREET EAST 9 STREET
AVENUE C 47 AVENUE
BORDEN AVENUE CLIFFORD PLACE 54 ROAD ECKFORD STREET
Suggested by: Type of station: Other
LEGEND 25 STREET CALYER STREET MESEROLE AVENUE PULASKI BRIDGE Districts Improvement Business
Other Business Improvement Districts Local Businesses and Community Board Public (via the website) On-sidewalk Station On-street station MC GUINNESS BOULEVARD
PEDESTRIAN PATH 27 STREET Local Businesses and and Businesses Local JEWEL STREET ASH STREET LORIMER STREET LAUREL HILL BOULEVARD
ALLEY 32 PLACE Board Community
30 STREET 54 DRIVE
48 AVENUE
ALLEY BOX STREET QUAY33 STREET STREET website) the (via Public 30 PLACE
31 STREET 34 STREET PEDESTRIAN PATH 31 PLACE Suggested by: ALLEY Suggested EAST 20 STREET QUEENS MIDTOWN EXPRESSWAY
VAN DAM STREET
NEWEL STREET COMMERCIAL STREET Station On-sidewalk CLAY STREET PAIDGE AVENUE 36 STREET 37 STREET 55 AVENUE
GALE AVENUE
On-street station On-street 39 PLACE NORMAN AVENUE
38 STREET 29 STREET station: of Type BANKER STREET 43 STREET DUPONT STREET 39 STREET GUERNSEY STREET
HUNTERS POINT AVENUE 35 STREET LEGEND DIAMOND STREET GEM STREET
PULASKI BRIDGE BIKE PATH
STARR AVENUE
EAGLE STREET MC GUINNESS BOULEVARD
34 STREET LIE WESTBOUND EXIT 15 31 PLACE FREEMAN STREET ALLEY
BRADLEY AVENUE KINGSLANDAVENUE
34 STREET 35 STREET 50 AVENUE DOBBIN STREET AVENUE C LOOP GALE AVENUE BRIDGEWATER STREET 34 STREET 39 PLACE NORTH 15 STREET 44 STREET 35 STREET EET EAST RIVER ESPLANADE BORDEN AVENUE GREEN STREET
40 STR 56 ROAD HURON STREET
LIE WESTBOUND EXIT 16 NORTH HENRY STREET
UNNAMED STREET RUSSELL STREET ALLEY 35 STREET GREENPOINT AVENUE ALLEY EAST 5 WALK NASSAU AVENUE INDIA STREET EAST 16 STREET 51 AVENUE
PROVOST STREET NORTH 11 STREET
JAVA STREET 37 STREET KOSCIUSZKO BRIDGE NORTH 13 STREET NORTH 14 STREET SCOTT AVENUE EAST 15 STREET
VAN DAM STREET KENT STREET will be installed. on this map than sites proposed 4 times more are *There EAST 14 STREET JJ BYRNE MEMORIAL BRIDGE HAUSMAN STREET MORGANAVENUE THOMAS STREET 57 AVENUE GARDNER AVENUE
ALLEY
NORTH 12 STREET SUTTON STREET EAST 12 STREET GREENPOINT AVENUE THOMAS STREET
EAST 13 STREET
WEST STREET F D R DRIVE
FRANKLIN STREET EAST 11 STREET MILTON STREET APOLLO STREET
BQE WESTBOUND EXIT 34 NOBLE STREET NORTH 10 STREET BIKE PATH
MOULTRIE STREET KENT AVENUE ALLEY AVENUE D 54 AVENUE CHERRY STREET
EAST 10 STREETSZOLD PLACE VARICK AVENUE
LEONARD STREET OAK STREET NORTH 8 STREET REVIEW AVENUE
MONITOR STREET
BROOKLYN CB1 Bike Share Community Workshop ANTHONY STREET EAST 9 STREET
PORTER AVENUE
CLIFFORD PLACE 54 ROAD CALYER STREET ECKFORD STREET MESEROLE AVENUE
MC GUINNESS BOULEVARD
JEWEL STREET LAUREL HILL BOULEVARD LORIMER STREET BROOME STREET 54 DRIVE QUAY STREET ANTHONY STREET WYTHE AVENUE NEWEL STREET 55 AVENUE NORMAN AVENUE NORTH 9 STREET
BANKER STREET 43 STREET GUERNSEY STREET DIAMOND STREET ENGERT AVENUE GEM STREET
KINGSLANDAVENUE DOBBIN STREET LOMBARDY STREET BRIDGEWATER STREET NORTH 7 STREET NORTH 15 STREET 44 STREET EAST RIVER ESPLANADE
56 ROAD
NORTH HENRY STREET
RUSSELL STREET NASSAU AVENUE EAST 5 WALK NEWTON STREET ALLEY NORTH 11 STREET BEADEL STREET KOSCIUSZKO BRIDGE BEDFORD AVENUE NORTH 13 STREET NORTH 14 STREET SCOTT AVENUE
VAN DAM STREET
HAUSMAN STREET NORTH 3MORGANAVENUE STREET THOMAS STREET 57 AVENUE GARDNER AVENUE
ALLEY
NORTH 12 STREET RIVER STREET SUTTON STREET THOMAS STREET DRIGGS AVENUE NORTH HENRY STREET
DEBEVOISE AVENUE F D R DRIVE HERBERT STREET
APOLLO STREET
BQE WESTBOUND EXIT 34 DIVISION PLACE NORTH 10 STREET BAYARD STREET KENT AVENUE CHERRY STREETNORTH 5 STREET
VARICK AVENUE NORTH 8 STREET NORTH 4 STREET
BROOKLYN CB1 Bike Share Community Workshop ANTHONY STREET
PORTER AVENUE
BROOME STREET NORTH 1 STREET RICHARDSON STREET GRAND STREET ANTHONY STREET WYTHE AVENUE ALLEY NORTH 9 STREET NORTH 6 STREET ENGERT AVENUE MEEKER AVENUE RICHARDSON STREET LOMBARDY STREET NORTH 7 STREET
NEWTON STREET WILLIAMSBURGALLEY BR BIKE AND PED PTH BEDFORD AVENUE BEADEL STREET
FROST STREET FROST STREET VANDERVOORT AVENUE 48 STREET NORTH 3 STREET RIVER STREET MEEKER AVENUE DRIGGS AVENUE NORTH HENRY STREET
DEBEVOISE AVENUE HERBERT STREET WITHERS STREET BAYARD STREET DIVISION PLACE NORTH 5 STREET WITHERS STREET NORTH 4 STREET WITHERS STREET GRAND STREET NORTH 1 STREET SOUTH 1 STREET RICHARDSON STREET ALLEY NORTH 6 STREET 58 ROAD Workshop Community Share CB1 Bike BROOKLYN MEEKER AVENUE RICHARDSON STREET JACKSON STREET WILLIAMSBURG BR BIKE AND PED PTH WILLIAMSBURG BRIDGE FROST STREET FROST STREET VANDERVOORT AVENUE 48 STREET MEEKER AVENUE JACKSON STREET WITHERS STREET WITHERS STREET MASPETH AVENUE WITHERS STREET SOUTH 1 STREET BQE WESTBOUND EXIT 32 B WOODPOINT ROAD FILLMORE PLACE 58 ROAD Workshop Community Share CB1 Bike BROOKLYN SKILLMAN AVENUE JACKSON STREET WILLIAMSBURG BRIDGE JACKSON STREET MASPETH AVENUE SKILLMAN AVENUE BQE WESTBOUND EXIT 32 B WOODPOINT ROAD UNNAMED STREET FILLMORE PLACE SKILLMAN AVENUE 47 STREET SKILLMAN AVENUE UNNAMED STREET SOUTH 2 STREET HAVEMEYER STREET47 STREET
SOUTH 2 STREET HAVEMEYER STREET
BERRY STREET CONSELYEA STREET BERRY STREET CONSELYEA STREET HOPE STREET HOPE STREET
GRAHAMAVENUE SOUTH 3 STREET WILLIAMSBURG BR PEDESTRIAN PATH
SOUTH 6 STREET IVY HILL ROAD GRAHAMAVENUE SOUTH 4 STREET METROPOLITAN AVENUE MARCY AVENUE SOUTHSHARON STREET3 STREET WILLIAMSBURG BR PEDESTRIAN PATH ORIENT AVENUE REWE STREET
SOUTH 6 STREET IVY HILL ROAD ALLEY SOUTH 4 STREET METROPOLITAN AVENUE DEVOE STREET MARCY AVENUE GRAND AVENUE SHARON STREET SOUTH 5 STREET ORIENT AVENUE
HOPE STREET JUDGE STREET REWE STREET AINSLIE STREET
ALLEY OLIVE STREET GRAND STREET ALLEY ROEBLING STREET DEVOE STREET GRAND STREET ALLEY SOUTH 8 STREET BQE EB ENTRANCE WILLIAMSBURG BR POWERS STREET STEWART AVENUE SOUTH 2 STREET GRAND AVENUE RAMP CATHERINE STREET HAVEMEYER STREET
VARICK AVENUE BORINQUEN PLACE UNIONAVENUE SOUTH 5 STREET
GARDNER AVENUE SOUTH 1 STREET HOPE STREET JUDGE STREET SOUTH 4 STREET SOUTH 2 STREET AINSLIE STREET SOUTH 9 STREET SOUTH 5 STREET
WATERBURY STREET SOUTH 10 STREET ALLEY OLIVE STREET MAUJER STREET GRAND STREET MAUJER STREET ROEBLING STREET METROPOLITAN AVENUE SOUTH 11 STREET SOUTH 3 STREET MEADOW STREET
BROADWAY ONDERDONK AVENUE TEN EYCK STREET TEN EYCK STREET GRAND STREET ALLEY DIVISION AVENUE TEN EYCK WALKSOUTH 8 STREET BQE EB ENTRANCE WILLIAMSBURG BR POWERS STREET STEWART AVENUE STAGG STREETSOUTH 2 STREET RAMP CATHERINE STREET STAGG STREET MEADOW STREETBOGART STREET SCHOLES STREET HAVEMEYER STREET
VARICK AVENUE CLYMER STREET STAGG STREET UNIONAVENUE MORTON STREET BORINQUEN PLACE KAYAVENUE MANHATTANAVENUE SCHOLES STREET GARDNER AVENUE RUSH STREET ONDERDONK AVENUESOUTH 1 STREET SOUTH 4 STREET TAYLOR STREET SCHOLES STREET MESEROLE STREET SOUTH 2 STREET WILSON STREET HEWES STREET SOUTH 9 STREET RODNEY STREET SOUTH 5 STREET ALLEY MORTON STREET
*There are 4 times more sites proposed on this map than will be installed. HARRISON AVENUE WATERBURY STREET
SOUTH 10 STREET MESEROLE STREET
WYTHE PLACE HUMBOLDT STREET JAY AVENUE NEW MONTROSE AVENUE MAUJER STREET
SCOTT AVENUE METROPOLITAN AVENUE MONTROSE AVENUE MAUJER STREET ROSS STREET RANDOLPH STREET SOUTH 3 STREET KEAP STREET SOUTH 11 STREET RAILROAD AVENUE GEE AVENUE MEADOW STREET RODNEY STREET WILLIAMSBURG ST EAST JOHNSON AVENUE TAYLOR STREET BROADWAY ONDERDONK AVENUE PENN STREET
LEE AVENUE HOOPER STREET BUSHWICKAVENUE TEN EYCK STREET JOHNSON AVENUE CYPRESS AVENUE TEN EYCK STREET BUSHWICK PLACE
WILSON STREET ALLEY DIVISION AVENUE TEN EYCK WALK BOERUM STREET BOERUM STREET GEE AVENUE INGRAHAM STREET STAGG STREET BROOKLYN QUEENS EXPRESSWAY HEWES STREET PEDESTRIAN PATH MC KIBBIN STREET AVENUE GARDNER
MC KIBBIN COURT ST NICHOLAS AVENUE ALLEY ALLEY MEADOW STREETBOGART STREET
RODNEY STREET RUTLEDGE STREET MC KIBBIN STREET HARRISON PLACE STAGG STREET SCHOLES STREET STEWART AVENUE STEWART
KEAP STREET ALLEY STARR STREET
CLYMER STREET SEIGEL STREET GRATTAN STREET STAGG STREET PORTER AVENUE PORTER ASSEMBLY ROAD MORTON STREET KAYAVENUE
BOGART STREET MANHATTANAVENUE SCHOLES STREET HOOPER STREET MOORE STREET
WHITE STREET RUSH STREET WILLOUGHBY AVENUE MIDDLETON STREET LEGEND WELDING ROAD THAMES STREET ONDERDONK AVENUE MOORE STREET ALLEY
WASHINGTON AVENUE HEYWARD STREET THROOP AVENUE MARKET STREET Type of station: HEWES STREET VARET STREET TAYLOR STREET SCHOLES STREET MESEROLE STREET On-street station WALTON STREET VARET STREET PAULDING STREET ROCK STREET ALLEY WILSON STREET HEWES STREET On-sidewalk Station WYCKOFF AVENUE COOK STREET RODNEY STREET HART STREET ALLEY LYNCH STREET Suggested by: ALLEY WALLABOUT MORTONSTREET STREET COOK STREET 9 AVENUE *There are 4 times more sites proposed on this map than will be installed. HARRISON AVENUE GERRY STREET
Public (via the website) MELROSE STREET
BARTLETT STREET DEBEVOISE STREET EVERGREEN AVENUE JEFFERSON STREET MESEROLE STREET
Community Board14 AVENUE
WYTHE PLACE HUMBOLDT STREET SOUTH STREET JAY AVENUE TROUTMAN STREET NEW MONTROSE AVENUE Local Businesses and WHIPPLE STREET FORREST STREET KNICKERBOCKER AVENUE CENTRAL AVENUE SCOTT AVENUE On-street station On-street Station On-sidewalk website) Public (via the Community Board Businesses and Local Districts Business Improvement Other Business Improvement Districts WILLIAMSBURG ST WEST NOLL STREET WILSON AVENUE IRVING AVENUE FLUSHING AVENUE THORNTON STREET GARDEN STREET GEORGE STREET MONTROSE AVENUE LEGEND Other station: of Type Suggested by: RANDOLPH STREET BEAVER STREET ROSSMONTIETH STREET STREET KEAP STREET RAILROAD AVENUE SUMNER PLACE GEE AVENUE HOPKINS STREET FRANKLINAVENUE DE KALB AVENUE will be installed. on this map than sites proposed 4 times more are *There
CLINTONAVENUE
WAVERLY AVENUE WAVERLY FORREST STREET PARK AVENUE HALL STREET FAYETTE STREET WILLIAMSBURG ST EAST SUYDAM STREET JOHNSON AVENUE
TAAFFE PLACETAAFFE RODNEY STREET
WARSOFF PLACE *There are 4 times more sites proposed on this map than will be installed. SPENCER STREET BROOKLYN CB1 Bike Share Community Workshop *There are 4 times more sites proposed on this map than will be installed.STANHOPE STREET SKILLMAN STREET GRANDAVENUE STOCKHOLM STREET
CLASSONAVENUE
WALWORTH STREET RYERSON STREET TAYLOR STREET PENN STREET
LEE AVENUE HOOPER STREET BUSHWICKAVENUE JOHNSON AVENUE CYPRESS AVENUE BUSHWICK PLACE WILSON STREET Neighborhood map from ALLEY BOERUM STREET BOERUM STREET GEE AVENUE INGRAHAM STREET BROOKLYN QUEENS EXPRESSWAY HEWES STREET PEDESTRIAN PATH
Brooklyn Community Board AVENUE GARDNER MC KIBBIN STREET ALLEY MC KIBBIN COURT ST NICHOLAS AVENUE ALLEY RODNEY STREET RUTLEDGE STREET MC KIBBIN STREET HARRISON PLACE
One AVENUE STEWART KEAP STREET ALLEY STARR STREET
SEIGEL STREET GRATTAN STREET PORTER AVENUE PORTER ASSEMBLY ROAD
BOGART STREET HOOPER STREET MOORE STREET
WHITE STREET WILLOUGHBY AVENUE MIDDLETON STREET LEGEND WELDING ROAD THAMES STREET MOORE STREET ALLEY
WASHINGTON AVENUE HEYWARD STREET THROOP AVENUE MARKET STREET Type of station: HEWES STREET VARET STREET On-street station WALTON STREET VARET STREET PAULDING STREET ROCK STREET ALLEY
On-sidewalk Station WYCKOFF AVENUE COOK STREET HART STREET LYNCH STREET Suggested by: ALLEY WALLABOUT STREET COOK STREET 9 AVENUE GERRY STREET
Public (via the website) MELROSE STREET
BARTLETT STREET DEBEVOISE STREET EVERGREEN AVENUE JEFFERSON STREET
Community Board14 AVENUE SOUTH STREET TROUTMAN STREET Local Businesses and WHIPPLE STREET FORREST STREET KNICKERBOCKER AVENUE CENTRAL AVENUE On-street station On-street Station On-sidewalk website) Public (via the Community Board Businesses and Local Districts Business Improvement Other Business Improvement Districts WILLIAMSBURG ST WEST NOLL STREET WILSON AVENUE IRVING AVENUE FLUSHING AVENUE THORNTON STREET GARDEN STREET GEORGE STREET LEGEND Other station: of Type Suggested by: BEAVER STREET MONTIETH STREET
SUMNER PLACE HOPKINS STREET FRANKLINAVENUE DE KALB AVENUE will be installed. on this map than sites proposed 4 times more are *There
CLINTONAVENUE
WAVERLY AVENUE WAVERLY FORREST STREET PARK AVENUE HALL STREET FAYETTE STREET SUYDAM STREET
TAAFFE PLACETAAFFE
WARSOFF PLACE *There are 4 times more sites proposed on this map than will be installed. SPENCER STREET BROOKLYN CB1 Bike Share Community Workshop *There are 4 times more sites proposed on this map than will be installed.STANHOPE STREET SKILLMAN STREET GRANDAVENUE STOCKHOLM STREET
CLASSONAVENUE
WALWORTH STREET RYERSON STREET
24 NYC BIKE SHARE: Designed by New Yorkers Appendix B Bike-Share Station Siting Guidelines
The following are the siting criteria for bike share stations.
General Requirements On-Street Site Requirements
• Sites must have unrestricted, 24/7 public • Sites must meet DOT safety criteria. access. • Minimum allowable curb-lane width: 8 feet. • Sites should ensure maximum visibility and access. • Sites may not be in bus stops.
• Sites must not impede the use of any existing • Sites may not be in lanes that become driving facilities, such as bus stops or fire hydrants. lanes at certain times (e.g., rush- hour lanes). • Stations may be placed in non-parking areas Sidewalk Site Requirements in curb lanes, such as locations that have been “daylighted” to enhance safety and • Preferred minimum sidewalk width: 16 feet. improve visibility. Medians may be considered.
• Sites should not interfere with existing Parks, NYCHA, and Other City pedestrian travel patterns. Property
• Lateral measurements for sidewalk sites shall • Sites may be on Parks Department property not be: or on other City properties at the discretion of the relevant agency. • Within 15 feet in front of the opening of subway stairs or subway elevators; • Sited on a sidewalk less than 15 feet from Private Property a bus stop shelter entrance; or • Sites may be on private property at the • Directly in front of the main entrances to property owner’s discretion. major buildings (e.g. Empire State Building) • Sites on private property must have 24/7, unrestricted public access.
25 NYC BIKE SHARE: Designed by New Yorkers Appendix C Planning Partners
Over the 18 month station siting process, DOT worked with the following partners:
133 Lafayette Corporation CodeGreen Real Estate GreeNYC 23rd Street Partnership/Flatiron BID Columbus Ave BID GrowNYC 34th Street Partnership NYC Comptroller Liu Heart of Brooklyn Cultural 59 Maiden Lane Management Concord Village Tenants Association Association Corporation Confucius Plaza Co-op Hines Realty 5th Ave BID Continuum Health Hospital for Special Surgery 5th Avenue BID Cooper Union Hudson River Park Trust 5th Avenue Park Slope BID Deutsche Bank Hudson Square Connection BID Adelphi University Diamond District BID JRT Realty AIA Center for Architecture Downtown Alliance JSRE LLC Realty Avenue of the Americas Association Downtown Brooklyn Partnership League of Conservation Voters Bank of New York Melon DUMBO BID LES BID Basketball City Durst Realty LES Credit Union Battery Park City Authority East Midtown Partnership LIC Partnership Battery Park Conservancy East River Ferry Lincoln Center BID Bed-Stuy Restoration EWVIDCO Lincoln Square BID Bicycle Habitat El Puente Local Spokes Bike & Roll Essex Street Market Lower Manhattan Construction Command Center Bike New York Fashion Center BID Madison Ave BID Borough of Manhattan Community The Fashion Institute of Technology College Madison Square Garden Fischer Brothers Realty Boston Properties Manhattan Borough President Flatiron/23rd Street Partnership Brookfield Properties Stringer Forrest City Ratner Brooklyn Borough President Manhattan Community Board 1 Markowitz Foursquare Manhattan Community Board 2 Brooklyn Brewery Friends of Duane Park Manhattan Community Board 3 Brooklyn Community Board 1 Friends of the High Line Manhattan Community Board 4 Brooklyn Community Board 2 Friends of Petrosino Square Manhattan Community Board 5 Brooklyn Community Board 3 Ft. Greene Park Manhattan Community Board 6 Brooklyn Community Board 6 Fulton Area Business Alliance Manhattan Community Board 7 Brooklyn Community Board 8 Fulton Ferry Landing Association Manhattan Community Board 8 Brooklyn Community Board 9 FX FOWLE Architects Marriott Brooklyn Heights Association Goldman Sachs Memorial Sloan Kettering Brooklyn Navy Yard Google MiMA Central Park Conservancy The Gotham Organization MoMA PS1 Chelsea Improvement Company Governors Island Montague BID Chinese Chamber of Commerce Graham Avenue BID MTA Chinese Consolidated Benevolent Grand Avenue BID Municipal Arts Society Association Grand Central Library Myrtle Avenue BID City University of New York Grand Central Partnership Natural Resources Defense Council Clinton Hill Apartments Grand St Settlement
26 NYC BIKE SHARE: Designed by New Yorkers Neighborhood Economic NYC Department of Sanitation Related Development Advocacy Project NYC Economic Development Corp. Rockefeller Foundation The New School NYC Office of Economic Rockrose New York City Department of Empowerment Rodale Press Environmental Protection NYCHA Resident Leaders Seward Park Co-Op New York City Fire Department NYS Assembly Member Brennan Silverstein Properties New York City Housing Authority NYS Assembly Member Camara SL Green New York City Police Department NYS Assembly Member Glick Stuyvesant High School New York Presbyterian Hospital NYS Assembly Member Gottfried Sutton Area Community New York Public Interest Research NYS Assembly Member Jeffries Group TF Cornerstone NYS Assembly Member Kavanagh New York State Department of Times Square Alliance Transportation NYS Assembly Member Kellner Tishman Speyer New York University NYS Assembly Member Lentol Transportation Alternatives New York’s Waterfront Bicycle Shop NYS Assembly Member Lopez Turtle Bay Association Nicholas & Lence NYS Assembly Member Millman Two Trees Management Company NOHO BID NYS Assembly Member Nolan Union Square Partnership North Flatbush BID NYS Assembly Member Quart U.S. Representative Clarke Northside Merchant Association NYS Assembly Member Robinson U.S. Representative Nadler NY Waterway NYS Assembly Member Rosenthal U.S. Representative Rangel NYC & Co NYS Assembly Speaker Silver U.S. Representative Towns NYC Council Member Brewer NYS Assembly Member Towns U.S. Representative Velasquez NYC Council Member Cabrera NYS Senator Adams U.S. Representative Maloney NYC Council Member Chin NYS Senator Dilan Village Alliance NYC Council Member Comrie NYS Senator Duane Vornado NYC Council Member Garodnick NYS Senator Espaillat Woodhull Hospital NYC Council Member James NYS Senator Gianaris NYC Council Member Lander NYS Senator Krueger NYC Council Member Lappin NYS Senator Montgomery NYC Council Member Levin NYS Senator Squadron NYC Council Member Mark-Viverito NYU Polytechnic NYC Council Member Mealy Pace University NYC Council Member Mendez Park Slope Civic Council NYC Council Speaker Quinn Park Slope Food Co-op NYC Council Member Reyna Partnership for NYC NYC Council Member Rose Partnerships for Parks NYC Council Member Vacca Pier 79 NYC Council Member Van Bramer Port Authority Bus Terminal NYC Council Member Vann Port Authority of New York and New Jersey NYC Department of City Planning Public Advocate de Blasio NYC Department of Citywide Administrative Services Queens Community Board 2 NYC Department of Health Real Estate Board of New York NYC Department of Park and Recycle-a-Bicycle Recreation Red Lantern Bicycles
27 NYC BIKE SHARE: Designed by New Yorkers Appendix D In the News
From the very beginning, Citi Bike planning was heavily reported which ensured widespread participation.
28 NYC BIKE SHARE: Designed by New Yorkers Acknowledgements
Planning and conducting a broad and inclusive public process for North America’s largest bike share system was a large scale undertaking that required the hard work and talent of dozens of people at the NYC Department of Transportation. Kate Fillin-Yeh was the architect of both the planning and engagement efforts and deserves special mention and thanks for her skill and dedication.
Citi Bike engagement Ed Janoff designed by and planning Cheryl Johnson New Yorkers Preston Johnson Ruchita Acharya Altagracia Jorge-Smith report team Keith Kalb Keith Bray Carly Clark Colleen Chattergoon Michelle Kaucic Patrick Kennedy Kate Fillin-Yeh Carly Clark Stephanie Levinsky Kate Fillin-Yeh Inbar Kishoni Vaidila Kungys Jon Orcutt Margaret Forgione Seth Solomonow Neil Freeman Jessica Lax John Frost Jennifer Leung Hillary Gietz Hayes Lord Nina Haiman Kim Lua Jennifer Harris-Hernandez Alan Ma Chris Hrones Jeff Malamy Audrey Koh Brooke McKenna Mike Lenore Eric Miu Robin Lester-Kenton Wallace Murray Stephanie Levinsky Zephreny Parmenter Maura McCarthy Nick Peterson Devin McDowell Ed Pincar Laura MacNeil Sean Quinn Kate Mikuliak Kimberly Rancourt Jon Orcutt Taylor Reiss Joe Palmieri Matthew Roe Suchi Sanagavarapu Sandra Rothbard Al Silvestri Krzysztof Sadlej Seth Solomonow Julie Schipper Andrew Watanabe Joan Scholvin David Woloch Dan Scott Lacy Shelby Karin Sommer Demonstrations Aaron Sugiura and other events Joyce Tam Anthony Taylor Onyinye Akujo Robert Thompson Linda Bailey Malina Tran Andrea Baskerville Keri Tyler Jacob Bogitsh Charles Ukegbu Patricia Bryant Steven Waters Michael R. Bloomberg Nick Carey Emily Weidenhof Mayor Will Carry Ron Whittaker Sophia Choi Kim Wiley-Schwartz Maria Cruz Ted Wright Alex Engel Jessica Wurwarg Michael Flynn Jin Yang Elizabeth Franklin Kelley Yemen Nicole Garcia Ellen Zielinski Janette Sadik-Khan Sheila Grant Commissioner Nathan Gray Lori Ardito Naomi Iwasaki First Deputy Commissioner