FURTHER NOTICE

THE COUNCIL OF THE BOROUGH OF (ALL ROADS WITHIN MILTON KEYNES – HIGHWAY MAINTENANCE) (TEMPORARY CLOSURE) ORDER 2021

FURTHER NOTICE IS HEREBY GIVEN in relation to a temporary prohibition of vehicles from entering, waiting or proceeding along parts of roads within Milton Keynes whilst essential inspections, maintenance and repair works are carried out to the carriageway. The restrictions were brought into effect under the provisions of the above-named Order, which was made by the Council of the on 10th March 2020 under Section 14(1) of the Road Traffic Regulation Act 1984, as first notified on 5th March 2020.

TAKE NOTICE that works are for Defects works, it is necessary to introduce a road closure in order for the works to be carried out.

The following lengths of road will be closed on the following Dates and Times:

22nd March 2021 • Woodruff Avenue, Conniburrow (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Marigold Place, Conniburrow Boulevard, Germander Place (and vice versa)

• Edison Square, Shenley Lodge (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Faraday Drive, Edison Square (and vice versa)

• Common Street, Ravenstone (Between 12:30pm and 4:30pm)

Whilst the following length of road is closed the alternative route will be Common Street, Weston Road, High Street, Ravenstone Mill Road (and vice versa)

• Pickering Drive, Emerson Valley (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Coldeaton Lane, Wolfscote Lane, Hawkshead Drive (and vice versa)

• Filgrave to Road, (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be A509, Hill, Road, B526 (and vice versa)

• Chaffron Way, V2 to V3 (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Tattenhoe Street, Childs Way and Fulmer Street (and vice versa)

23rd March 2021 • Rosemullion Avenue, Tattenhoe (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Tattenhoe Street, Standing Way and Rhoscolyn Drive (and vice versa)

• London Road, (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be London Road, Queen Eleanor Street, Road, High Street, Horsefair Green, Silver Street, Church Street (and vice versa)

24th March 2021 • Grafton Street, H8 to A5 (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Standing Way, Marlborough Street and Groveway (and vice versa)

• Northfield Drive, Fox Milne (Between 9:30am and 4:30pm)

Whilst the following length of road is closed the alternative route will be Northfield Drive and Tongwell Street (and vice versa)

• Stacey Bushes Roundabout (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Great Monks Street, Millers Way, Grafton Street (and vice versa)

• Knebworth Gate, Giffard Park (Between 12:30pm and 4:30pm)

Whilst the following length of road is closed the alternative route will be Hainault Avenue, Horton Gate, Brickhill Street, Monks Way (and vice versa)

• Whaddon Way, (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Whaddon Way, Whalley Drive, Church Green Road, Road (and vice versa)

25th March 2021 • Whaddon Way, Bletchley (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Whalley Drive, Melrose Avenue (and vice versa)

• Ashpole Furlong, Loughton (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Bradwell Road, Whitworth Lane (and vice versa)

• Oxford Street, Wolverton (Between 9:30am and 12:30pm)

Whilst the following length of road is closed the alternative route will be Street, Stacey Avenue, Green Lane (and vice versa)

• Sherington Road, (Between 9:30am and 4:30pm)

Whilst the following length of road is closed the alternative route will be Chicheley Hill, A509, B526 (and vice versa)

TAKE NOTICE that works are for Street Lighting works, it is necessary to introduce a road closure in order for the works to be carried out.

The following lengths of road will be closed on the following Dates and Times:

22nd March 2021 – 24th March 2021 • Marlborough Street, H8 to H9 (Northbound) (24 Hours)

Whilst the following length of road is closed the alternative route will be Groveway, Saxon Street and Standing Way (and vice versa)

The above roads are scheduled to be closed only when maintenance or repair works are required and only when indicated by the appropriate traffic signs, which will be erected in advance of any closure.

Access to affected properties will be granted where possible. All other provisions of the Order remain as previously notified on 5th March 2020.

For information on any affected bus service please visit the Council website at: https://www.milton- keynes.gov.uk/highways-and-transport-hub/bus-and-taxi/bus-service-disruptions-and-diversions

You can see what lengths of road are affected by visiting www.roadworks.org. 18th March 2021 Synergy Park Chesney Wold Bleak Hall Milton Keynes MK6 1LY PP Davina Millership Head of Highways