E. 14th St./Mission Blvd. and Fremont Blvd. Multimodal Corridor Project PROJECT UPDATE Fall 2019 Project Overview East 14th Street, Mission Boulevard, and Fremont Boulevard connect the Project Corridor communities of central and southern Alameda County with regional transportation facilities, employment areas, and activity centers. The corridor extends through five jurisdictions (San Leandro, unincorporated Alameda County, Hayward, Union City, and Fremont) and provides connections throughout the inner paralleling Interstate 880 and BART. The E. 14th St./Mission Blvd. and Fremont Blvd. Multimodal Corridor Project (Project) will identify specific near-, mid-, and long-term multimodal mobility improvements for implementation.

Project Goals Long-Term Improvements Multimodal improvements Long-term improvements (7+ years) for the Study Area will be will address mobility needs over the developed to advance the next 20 years within the Study Area following goals: resulting from projected growth. Study Area at a Glance • Support planned long-term growth and economic development

5 local jurisdictions • Address the range of What’s Happening 314,000 residents mobility needs for those living and working in the Soon? 90,000 employees Study Area Changes in the next 7 years will focus on improving existing issues 14 Priority Development • Move people more related to walking, biking, driving, Areas efficiently within the corridor and using transit in the Study Area.

120 signalized intersections • Increase use of alternate travel modes 16,800 to 36,000 vehicles per day • Improve connectivity between transportation 2/3 of corridor with bike modes lanes • Provide a safe and 7 transit providers plus convenient environment for public and private shuttles pedestrians, bicyclist, and 7 BART stations, 2 Capitol transit users Corridor stations, 1 ACE • Provide flexibility for future station (shared with Amtrak) changes in transportation technology

Alameda County Transportation Commission | www.AlamedaCTC.org E. 14th St./Mission Blvd. and Fremont Blvd.

Demographics Study Area Growth 2020 to 2040

25%

20%

15%

10%

5%

0% Study Area Alameda County Bay Area

Population Employment

Source – Play Bay Area 2040 Significant Employment Growth Projected Total employment in the Study Area is projected to grow by 25 percent between 2020 and 2040, double the rate for Alameda County as a whole and for the nine-county Bay Area region. Population in the Study Area is projected to grow at a rate comparable to the rest of the county and region.

Travel Markets Most trips made by auto BART mode of access Trips by auto (including drive-alone plus rideshare) Within the Study Area, a smaller share of BART make up almost 90 percent of trips for the Study Area. passengers walk and take the bus to reach the station as compared to the BART system as a whole.

Study Area BART Stations

All BART Stations

87% auto 2% bike 0 5 10 15 20 25 30 35 40 Percent of AM Boardings 4% transit 7% walk

Source – Alameda Countywide Source – 2015 BART Customer Model, 2018 Satisfaction Survey

2 | Alameda CTC E. 14th St./Mission Blvd. and Fremont Blvd.

Safety Traffic Operations Six intersections currently operate Fatal and Severe Injury Collisions Countywide High-Injury Network over capacity: • Foothill Blvd. and A St. 84 fatal or severe injury 40% of the corridor is collisions over five years part of the high-injury • Mission Blvd. and Niles Canyon PEDESTRIAN network Rd./Niles Blvd. 32 involving pedestrians • Mission Blvd. and Mowry Ave. 25% of the corridor is part of the high-injury • Mission Blvd. and I-680 10 involving bicyclists southbound ramps BICYCLIST network • Fremont Blvd. and Decoto Rd. The 2019 Countywide Active Between June 2012 and May Transportation Plan identifies • Fremont Blvd. and Automall Pkwy. 2017, half of fatal and severe several portions of the corridor collisions involved a pedestrian as part of the countywide or bicyclist. high-injury network.

Transit BART ridership Bus Ridership Facts Ridership at BART stations in the Study Area is generally lower than for the BART system as a whole. • Bus service frequencies Median – along the corridor are as All BART high as 13 buses per hour, San Fremont Stations accounting for multiple Leandro 6,700 6,500 6,100 Bay Fair South Warm transit providers and 5,500 Hayward Hayward Union City Springs service types. 4,700 3,200 4,700 3,500 • AC Transit Lines 10 and 99 have the highest bus ridership in the Study Area. Each carries more than 3,000 riders per day.

Source – BART, March 2018 • 40% of bus passengers in the Study Area board at a BART station. Travel Time Comparison – San Leandro to Fremont BART is currently twice as fast as driving for end-to-end travel during the PM peak. This highlights the need for strong connections to BART to leverage its travel time advantage.

BART Auto Bus 0 20 40 60 80 100 Minutes

www.AlamedaCTC.org | 3 E. 14th St./Mission Blvd. and Fremont Blvd. 680 § ¨ ¦ 880 § ¨ ¦ Septemer 2019 BART Warm Springs

sgood Rd 680 § ¨ ¦ See full extent of corridor Inset A for

Fremont Blvd BART ongTerm Concept

(Future) Irvington Auto Mall Pkwy Mall Auto DRAFT Recommended 680 Exhiit is for illustrative purposes only. § ¨ ¦ Fremont CLASS IV

BIE LANES PROTECTED Stevenson Blvd Stevenson Newark Dotted lines indicate improvements that are existing or planned to e implemented separately from this proect

Fremont Mission Blvd BART County Ave Mowry Fremont Alameda

RAPID BUS SERVICE Fremont Blvd Fremont E. 14th St./Mission Blvd. and Fremont Multimodal Corridor Proect FREMONT MICROTRANSIT/FLE Moility Hu

Union City Fremont Ave Thornton Centerville Station DRAFT For illustrative purposes only Recreation Area uarry Lakes Regional 880 § ¨ ¦ CLASS IV

BIE LANES PROTECTED Decoto Rd Decoto BART Union City Newark Union City New Class II uffered ike lanes 84

County

Alameda Bridge

Regional Park To Dumarton Dumarton To ry Creek Pioneer

Mission Blvd RAPID BUS SERVICE

Fremont Whipple Rd Whipple Union City EAST BAY ETENSION GREENWAY Fremont County BART Alameda Fremont Hayward

Hayward Industrial Pkwy Industrial Union City County BART Alameda

South Hayward Tennyson Rd Tennyson Hayward LANES EAST BAY BUS-ONLY GREENWAY 580 § ¨ ¦ ffStreet Multiuse Trail Busnly anes limited stop service with usonly lanes Rapid Bus limitedstop service without usonly lanes nStreet Protected Bike anes Microtransit/Flex ondemand us service with flexile route and schedule 880 § ¨ ¦ 92

Jackson St A St A BART Hayward BART 580 Station § ¨ ¦ Hayward

Castro Valley San Mateo Bridge Mateo San Water Bodies Jurisdiction Boundary Freeway/Arterial Parks/pen Space Freight Rail and Capitol Corridor Tracks CLASS IV Hayward 92 Cherryland BIE LANES PROTECTED

E 14th St

238

§ ¨ ¦ ewelling Blvd ewelling Bay Fair BART Lake Chabot Regional Park Ashland San Lorenzo LANES 680 § ¨ ¦

BUS-ONLY County Dr Halcyon 880 § ¨ ¦ Alameda 2 262 § ¨ ¦ Mission Blvd Regional Park Anthony Chabot San Leandro

Warm Springs Blvd 880 BART Aove/Below round Capitol Corridor Stations ACE/Capitol Corridor Station § ¨ ¦ BART Station EAST BAY Oakland GREENWAY San Leandro 1 BART Warm

Washington Ave Springs S rimmer Blvd rimmer S Legend: BART 0.5

San Leandro sgood Rd Davis St Davis 0 BRT Mile BAY EAST 580

§ ¨ ¦ Fremont Blvd Fremont Inset A Long-Term Concept

4 | Alameda CTC E. 14th St./Mission Blvd. and Fremont Blvd.

Rapid Bus and Bus-Only Lanes FEATURES OF RAPID BUS FEATURES OF BUS-ONLY LANES • Express bus service with fewer stops to speed up buses • Part of BRT (bus rapid transit) system • Local routes continue to operate at all stops to • Buses have a speed advantage compared to maintain coverage automobiles • Low-floor buses to help riders get on and off faster • Raised bus stop platform • Traffic signal technology reduces traffic delays • Tickets are purchased on the platform, not on the bus • Boarding islands so that buses do not block bike lanes • Traffic signal technology reduces traffic delays • Bus stops have real time arrival data for the next bus • Bus stops have real time arrival data for the next bus • Rapid bus stops can be shared with local routes • Separate stops for BRT and local bus service • Amenities like wifi, cushioned seats, and space for luggage

Bus-only lanes may be in the center of the street or along the outside curb.

Center-Running Bus Only Lanes

Source – AC Transit

Source – AC Transit Curb-Running Bus Only Lanes

Source – AC Transit Source – NYMTA

MICROTRANSIT IN Features of microtransit Benefits Include FREMONT Today, most of the trips • On-demand service • Broader community access to transit along Fremont Blvd. • Flexible route and schedule • Increased overall transit ridership stay within the City of • Uses small shuttles or vans Fremont, making this • Examples include AC Transit Flex area a good candidate for flexible, on-demand service.

www.AlamedaCTC.org | 5 E. 14th St./Mission Blvd. and Fremont Blvd.

Protected Bike Lanes Long-Term Vision - 2040 Projects Underway and Proposed On-street protected bike lanes • Alameda County, Hayward, and The draft recommendations aim to: from San Leandro to Fremont, Fremont have projects underway • Address safety for bicyclists and which will provide safer, more that will add protected bike lanes pedestrians comfortable biking experience. to the corridor. This would involve physical • Additional near-term • Provide comfortable travel for all separation between bike lanes and improvements provide new or ages and abilities moving traffic, (on-street parking, improved bike lanes in areas that landscaping, or flex posts). are part of the Countywide High • Increase travel options for these Injury Network. shorter-distance trips

Source – Kittelson & Associates Source – Alameda County Public Works Agency

Pedestrian and Bicyclist Safety

Pedestrian safety treatments ADA Ramp Improvement Pavement Resurfacing throughout the corridor will provide safer, higher-quality travel for pedestrians. Bike safety treatments along the corridor and at intersections will make it more comfortable for people to bike.

Projects Underway and Proposed

Pedestrian projects: • Sidewalk gap closures Source – Kittelson & Associates Source – Kittelson & Associates • ADA pedestrian improvements • Pedestrian signal phasing • Crosswalk improvements Mid-block Pedestrian Refuge Leading Pedestrian Phase • Streetscape improvements

Bicycle projects: • Signalized intersection improvements • Bike lane restriping • Facilities on parallel and connecting streets • Driveway consolidation • Streetscape improvements • Wayfinding

Source – Alameda CTC Source – City of Long Beach

6 | Alameda CTC E. 14th St./Mission Blvd. and Fremont Blvd. East Bay Greenway Extension A VISION FOR THE FUTURE The long-term vision is for an East Bay Greenway extension from South Hayward BART to Warm Springs BART. This would use existing trails and planned bikeways, and provide safer, more comfortable travel for people walking and riding bikes.

Already Underway: East Bay Greenway from Lake Merritt BART to South Hayward BART The East Bay Greenway Project proposes to construct a bicycle and pedestrian facility that will generally follow the BART alignment for 16 miles through the cities of Oakland, San Leandro, and Hayward as well as the unincorporated communities of Ashland and Cherryland. Existing Trails Source – Alameda CTC • Quarry Lakes Trail – Alvarado Niles Rd. to Trail • Alameda Creek Trail – Decoto Rd. to Mission Blvd. • East Bay Greenway – Central Park to Irvington BART New Trails and Trail Connections • South Hayward BART to Quarry Lakes Trail • Alameda Creek Crossing: New bike/ped bridge • East Bay Greenway, Alameda Creek Bridge to Fremont BART: Class I trail (further feasibility assessment is required).

• East Bay Greenway, Fremont BART to Central Park: Class I trail Source – Alameda Magazine www.AlamedaCTC.org | 7 E. 14th St./Mission Blvd. and Fremont Blvd. POTENTIAL MOBILITY HUB IMPROVEMENTS

Mobility Hubs Electric Vehicle Secure Bike Charging Stations Transit Shuttle Parking Carshare Mobility Hubs will be developed around major transportation hubs and may include: • Bike station/bike lockers • Real-time transit information • Informational signage Source – Alemeda Source – Kittelson & Source – City of Source – Kittelson & CTC Associates Oakland Associates • On-demand rideshare/ carpooling Improved • Microtransit services Pedestrian Improved Bike • Shared vehicle options (carshare, Access Shared Scooters Rideshare Access bikeshare, scooters) • Electric vehicle charging stations • Real-time parking information • Pedestrian and bike access infrastructure Source – Kittelson & Source – Lime Source: GIG Car Source – Alameda • Supporting land uses (package Associates Share CTC delivery, convenience retail, etc.)

Technology and Traffic Operations VISION FOR THE FUTURE - WHAT’S HAPPENING SOON? 2040 Fremont Blvd. Safe and Smart Corridor – This project uses technology The long-term vision for the and new innovation opportunities to move traffic efficiently and improve corridor accommodates potential safety and circulation for pedestrians, bicyclists, and transit users. www. advances in technology related to fremontsmartcorridor.org connected vehicles. Connected Adaptive Signal Control (Hayward and Alameda County) – Adaptive signal vehicles are able “talk” to roadway systems use real-time traffic information from video cameras or road sensors infrastructure and/or other vehicles. to determine when a traffic light should be red or green. Vehicle to infrastructure Pedestrian Detection (San Leandro and Fremont) – Caltrans is in the process communication – Information of completing pedestrian signal improvements along E. 14th St. in San shared between vehicles and Leandro and Mission Blvd. in Fremont. roadway infrastructure (cameras, traffic lights, lane markers, and Improved Safety and Collision Avoidance signage). Vehicle to vehicle communication – enables vehicles to exchange information about their speed and location. This technology would help avoid collisions.

1111 Broadway Suite 800 Oakland, CA 94607 (510) 208-7400 AlamedaCTC.org

Source – www.extremetech.com 8 | Alameda CTC