October 26, 2017

Total Page:16

File Type:pdf, Size:1020Kb

October 26, 2017 City of Delta F.07 COUNCIL REPORT Regular Meeting To: Mayor and Council File No.: 5220-30/GMTR From: Engineering Department Date: October 26, 2017 Review of Bridge Traffic Volumes Since Tolls were Removed The following report has been reviewed and endorsed by the City Manager. • RECOMMENDATION: THAT this report be received for information . .• PURPOSE: The purpose of this report is to provide the recent traffic volume data for Fraser River crossings in the Lower Mainland since bridge tolls were removed. • BACKGROUND: Bridge tolls on the Port Mann Bridge and Golden Ears Bridge were removed on September 1, 2017. A press release from the Province indicated that removal of the tolls would shorten commute times, help improve traffic flow on other bridges and clear up other routes so people could spend less time queued in traffic. • DISCUSSION: Updated traffic count information has been provided from the Ministry of Transportation and Infrastructure for the Fraser River crossings in the Lower Mainland (Attachment A) . Table 1 below shows detailed traffic volumes for September 26, 2017 compared to September 27,2016. T a bl e 1 . D"IallY T ra ff"IC V o I ume C ompanson b'Y R"Iver C rossmg George Massey Alex Fraser Pattullo Port Mann Golden Ears Tunnel Bridge Bridge Bridge Bridge Daily Trips 94,101 123,877 78,595 122,770 42,501 September 2016 Daily Trips 92,216 121,361 68,854 155,329 55,182 September 2017 Change -2% -2% -12% +27% +30% Page 2 of 3 Review of Bridge Traffic Volumes Since Tolls were Removed 5220-30/GMTR October 26,2017 Based on a review of the data there are: • Increased trips at the Port Mann Bridge (+27%); • Minimal change to the number of trips at the George Massey Tunnel and Alex Fraser Bridge (-2%); and • A shift for a portion of the vehicles previously using the Pattullo Bridge to the Port Mann Bridge (-12%). Staff will continue to monitor traffic volume changes related to the removal of bridge tolls; however, early indications confirm that the removal of tolls will not aid in improving congestion at either the George Massey Tunnel or Alex Fraser Bridge. Further, recent traffic counts for the George Massey Tunnel indicated that there are over 94,000 trips through the tunnel on weekdays. Morning and evening rush hours at the George Massey Tunnel and Alex Fraser Bridge now typically last between seven to nine hours combined per day, making it more difficult for commuters to avoid being stuck in daily congestion. These two crossings also have high traffic volumes during the mid-day hours and are very sensitive to any regional traffic incidents. As traffic volumes increase, the morning and afternoon rush hours may start to blend together in the long term, if no action is taken to improve these crossings. As part of the George Massey Tunnel Replacement Project, the Ministry of Transportation and Infrastructure estimated the congestion levels on Highway 91 and Highway 99 without construction of a new bridge. Attachment B shows the Ministry of Transportation and Infrastructure's current queue lengths and estimates of queue lengths in 2045. The green lines update Attachment B to show the 2017 queue lengths currently being experienced along these corridors. Implications: Financial Implications - There are no financial implications to Delta. • CONCLUSION: Recent traffic data and queue lengths show that the removal of bridge tolls has not improved congestion at the George Massey Tunnel or Alex Fraser Bridge. Without significant improvements to the George Massey Tunnel crossing, economic growth and regional livability will be constrained by congestion and increasing travel times. Staff will continue to monitor traffic volume data and will report back to Council as updated information is available. ~~-/' .{.srSteven Lan, P.Eng. Director of Engineering Department submission prepared by: Heather Thicke, AScT, PMP, Project Technologist HT/dm/bm/1i Page 3 of 3 Review of Bridge Traffic Volumes Since Tolls were Removed 5220-30/GMTR October 26, 2017 This report has been prepared in consultation with the following listed department. Concurring Department Department Name Signature A' Corporate Services Sean McGill ..". r • ATTACHMENTS: A. Fraser River Bridge Crossing Volumes - September 26, 2017 B. Estimated Queue Lengths on Highway 91 and Highway 99 Corridors Fraser River Bridge Crossing Volumes - Se ~l .LLJliltiU': west V:inCOO~ 1 Average Percent a 1ange during Average Percent Change during oc:rp -3% Previous Week Previous Week Tu esday, September 26, 2017 Tuesday, Se ptember 26, 2017 188 203 Volume Volume ' Tuesday, September27, 2016 Tuesday, September 27, 2016 190 74-3 Volume Volume ' ott I'/< ~ u,::1!iJX Burnaby 7 Mapl Average Percent Change during Previous Week Tue$day, September 26, 2017 Volume Tu esday, September 27, 2016 Volume c-~rsrOt Average Percent Ch ange during Previ ous Week MoT Bridees "U » TransUnk Bridees P> :::: CO P> - CD (") - ...... ::::r o_CD 3 ...... ~ » - "E __.. ..aolii;~~ .. .......~,.Q j it'" ....... ~"'5 o ::: ~ C .::;<1. 2017 QUEUE LENGTHS SHOWN IN GREEN -0» Pl :::: <.OPl * Th e estimat ed 2045 queue lengths at th e Alex Fraser Bridge do not include t he recent announcements of fut ure upgrades (I) () including the Alex Fraser counter-flow lane and Highway 91 and 72 Avenue interchange improvements. ...... :::r o 3 -(I) ...... ~ OJ .
Recommended publications
  • Port Mann/Highway 1 Improvement Project—PP Shows Status As of Summer 2010 • Project Construction Started August 2008
    • Total project cost $2.5 billion (Canadian) • Financed by tolls – about $3 each direction. • Total project length 37 km (McGill St in Vancouver to 216th in Langley) • The new Port Mann bridge – 10 lanes (existing bridge has 5 lanes). – Replaces the existing 45 year old bridge. – Includes Rapid Bus service from Langley to Burnaby SkyTrain. – Can accommodate installation of light rapid transit underneath the main deck at a future date. Source: “Port Mann Bridge Plans Unveiled Today,” CBC News, February 4, 2009. • Project website – http://www.pmh1project.com/ • Port Mann/Highway 1 Improvement Project—PP shows status as of Summer 2010 • Project construction started August 2008. • Port Mann Bridge to be operational by December 2012. • All of project complete by December 2013. North Approximate Vancouver project limits Coquitlam Vancouver Burnaby Port Mann YVR Richmond Surrey Langley All satellite images in PP from Google Maps Coquitlam side of bridge Surrey side of bridge • Three major parts – Cable-stayed main bridge across Fraser River. • Main span 470 m. • South span 190 m. • North span 190 m. – South approach • 350 m constructed using 327 precast sections with HMA road surface. – North approach • 820 m constructed using 831 precast sections also with an asphalt surface. Source: PMH1 newsletter—Summer 2010 • Designer: T.Y. Lin International • Materials – New bridge deck requires 25,000 tonnes of HMA – 28,000 tonnes of rebar – 13,000 tonnes of structural steel Source: PMH1 newsletter—Summer 2010 78 drilled shafts 2.5 m in 129 driven piles 1.8 m in 30 drilled shafts 2.5 m diameter with average diameter with average in diameter with depth = 53 m.
    [Show full text]
  • February 2015 Issue
    PAGE 1 JANUARY 2015 GrapeVine RIDGE MEADOWS SENIORS SOCIETY– MAPLE RIDGE & PITT MEADOWS February 2015 Issue Photo Maple Ridge Seniors Activity Centre Pitt Meadows Seniors Centre 12150 224th Street 19065 119B Ave Maple Ridge, BC V2X 3N8 Pitt Meadows, BC V3Y 0E6 604-467-4993 604-457-4771 RMSS- Maple Ridge, 12150 224th www.rmssseniors.orgStreet Maple Ridge BC V2X 3N8 Tel. (604)467-4993 Web: www.rmssseniors.org RMSS- Pitt Meadows, 19065 119B Ave Pitt Meadows BC V3Y 1XK Tel. (604)457-4771 PAGE 2 JANUARY 2015 BUS TRIPS Chinese New Year St Patrick's Day Parade & Pub Lunch February 22nd- $79 March 15 -$79 The exciting, fun-filled event The 11th Anniversary St. Patrick’s features lion dances, marching Day Parade draws people from all bands, parade floats, martial arts cultures, backgrounds, performances, cultural dance ages and all walks of life to this troupes, firecrackers, and more. colourful (very green) display of The parade includes over 3,000 fabulous sight and sounds. people from various cultural and community groups in Vancouver, Enjoy a traditional pub lunch at and also features the largest Steamworks Brew Pub in Gastown congregation of lion dance teams and visit the Celtic Village and Street in Canada. The colourful and ener- Market in Robson getic lions are just one of the many Square for a dizzying array of Celtic highlights of the parade each year treasures and the works of gifted attracting more than 50,000 s artisans. Friends and pectators annually. Experience families can gather and wander, authentic Chinese multi course soaking in that special Celtic feeling lunch at the very popular restau- with music, fun and frolic, food -- rant Peaceful Restaurant recently and shopping! featured on the Food Network's Pitt Meadows, 9:15am - 4:15pm.
    [Show full text]
  • Alex Fraser Bridge Capacity Improvement Project
    p ALEX FRASER BRIDGE CAPACITY IMPROVEMENT PROJECT Date: Tuesday, February 20,2018 Time: 4:30 - 5:00 p.m. Location: Annacis Room Introduction: Steven Lan, Director of Engineering Presentation: Gerry Fleming, Project Manager South Coast Region Ministry of Transportation and Infrastructure Background Materials: • Memorandum from the Director of Engineering dated February 14, 2018 M M RANDUM City of Delta Engineering To: Mayor and Council From: Steven Lan, P.Eng., Director of Engineering Date: February 14, 2018 Subject: Council Workshop: Alex Fraser Bridge Capacity Improvement Project File No.: 5220-20/ALEX F CC: Ken Kuntz, Acting City Manager The Alex Fraser Bridge Capacity Improvement Project incorporates improvements to the Alex Fraser Bridge and Highway 91 including the introduction of counter-flow over the bridge to increase the capacity. Besides other improvements, an additional centre lane will be created that will provide for four lanes northbound and three lanes southbound during the morning commute and, four lanes southbound with three lanes northbound during the rest of the day. Staff from the South Coast Region of the Ministry of Transportation and Infrastructure will be presenting the project to Council on Tuesday, February 20,2018. An overview of the presentation is included (Attachment A) for Council's information. Please do not hesitate to contact me if you have further questions at 604-946-3299. ,-f{N~-----~ '~Steven Lan, P.Eng. Director of Engineering Attachment: A. Alex Fraser Bridge Capacity Improvement Project Overview GWB/bm -'-_'-___-.:-.:_..:....,._ ·-,o.:!.-..:·.:;·..:.:.:.::..=.::::.:...:= ~~~~~, ....l ' .. _.-- --.---:;; ~.- ..... -n-'- -~---;""'"" --.-..-::--: .'"tf': .~"-;;.~w:---~-:" Alex Fraser Bridge Capacity Improvement Project BRITISH COLUMBIA Project Overview February 201 -8 Gerry Fleming Project Ma nager -0» om :::::m CD () South Coast Region, Ministry of Transportation a nd Infrastruc ture ::::r ->'3 o CD -::l """-I»c..v ......
    [Show full text]
  • East-West Lower Mainland Routes
    Commercial Vehicle Safety and Enforcement EAST-WEST OVERHEIGHT CORRIDORS IN THE LOWER MAINLAND East-west Lower Mainland Routes for overall heights greater than 4.3 m up to 4.88 m Note that permits from the Provincial Permit Centre, including Form CVSE1010, are for travel on provincial roads. Transporters must contact individual municipalities for routing and authorizations within municipal jurisdictions. ROUTE A: TSAWWASSEN ↔ HOPE Map shows Route A Eastbound EASTBOUND Over 4.3 m: Tsawwassen Ferry Terminal, Highway 17, Highway 91 Connector, Nordel Way, Highway 91, Highway 10, Langley Bypass, Highway 1A (Fraser Highway), turn right on Highway 13 (264 Street), turn left on 8 Avenue (Vye Road), turn left on Highway 11 and enter Highway 1 (see * and **), continue on Highway 1 to Hope, Highway 5 (Coquihalla). * If over 4.5 m: Exit Highway 1 at No. 3 Road off-ramp (Exit # 104, located at ‘B’ on the map above), travel up and over and re-enter Highway 1 at No. 3 Road on-ramp; and ** If over 4.8 m: Exit Highway 1 at Lickman Road off-ramp (Exit # 116, located at ‘C’ on the map above), travel up and over and re-enter Highway 1 at Lickman Road on-ramp. WESTBOUND Over 4.3 m: Highway 5 (Coquihalla), Highway 1 (see ‡ and ‡‡), exit Highway 1 at Highway 11 (Exit # 92), turn left onto Highway 11 at first traffic light, turn right on 8 Avenue (Vye Road), turn right on Highway 13 (264 Street), turn left on Highway 1A (Fraser Highway), follow Langley Bypass, Highway 10, Highway 91, Nordel Way, Highway 91 Connector, Highway 17 to Tsawwassen Ferry Terminal.
    [Show full text]
  • Mayor and Council From
    City of Delta COUNCIL REPORT F.07 Regular Meeting To: Mayor and Council From: Corporate Services Department Date: February 21, 2018 George Massey Tunnel Replacement Project Update The following recommendations have been endorsed by the Acting City Manager. • RECOMMENDATION: THAT copies of this report be provided to: • Honourable Marc Garneau, Minister of Transport • Honourable Carla Qualtrough, Member of Parliament for Delta • Chief Bryce Williams, Tsawwassen First Nation • Honourable Claire Trevena, Minister of Transportation & Infrastructure • Ravi Kahlon, MLA Delta-North • Ian Paton, MLA Delta-South • Metro Vancouver Board of Directors • Mayors' Council on Regional Transportation • PURPOSE: The purpose of this report is to provide an update on some of the key issues related to the George Massey Tunnel Replacement Project (GMTRP), particularly in light of the Province's recent announcement regarding the Pattullo Bridge, and to provide a consolidated summary for Council's information. • BACKGROUND: On February 16, 2018, the BC government announced that it is moving forward with the construction of a $1.38 billion bridge to replace the Pattullo Bridge. This raises some questions regarding the George Massey Tunnel Replacement Project, which has been on a five-month hiatus since the Province announced last September that it was undertaking an independent technical review of the crossing. Both projects are badly needed; however, unlike the Pattullo project which is only part-way through the environmental assessment process, the tunnel replacement project is shovel-ready, has received its environmental assessment certificate and has completed the bidding process. Furthermore, in terms of both vehicular and transit traffic, the George Massey Tunnel carries Page 2 of 5 GMTRP Update February 21 , 2018 significantly higher volumes than the Pattullo Bridge (Attachments 'A' and 'B' show the volumes for all the Fraser River crossings).
    [Show full text]
  • Seismic Design of Bridges in British Columbia: Ten-Year Review
    SEISMIC DESIGN OF BRIDGES IN BRITISH COLUMBIA: TEN-YEAR REVIEW Jamie McINTYRE Structural Engineer, Hatch Mott MacDonald, Vancouver Canada [email protected] Marc GÉRIN Consultant, Ottawa Canada [email protected] Casey LEGGETT Structural Engineer, Hatch Mott MacDonald, Vancouver Canada [email protected] ABSTRACT: Seismic design of bridges in British Columbia has evolved significantly in the last ten years. Developments have comprised three major changes in seismic design practice: (1) improved understanding of seismic hazard—including raising the design earthquake from a 475-year return period to 2475-year return period and better knowledge of the contribution of the nearby Cascadia subduction zone; (2) a shift to a performance-based design philosophy with emphasis on improved post-earthquake performance—including multiple service and damage objectives for multiple levels of ground motions; and (3) increased sophistication of seismic analyses—including both inertial analyses and analyses for liquefaction hazards. The result of these changes should be bridges that perform better and remain functional post-earthquake. These changes are expected to encourage alternatives to the traditional use of column plastic hinging, such as base-isolation. Over the last ten years, base-isolation has been used on few bridges in British Columbia—primarily retrofits of existing structures; however, given its ability to preserve post-earthquake functionality, base-isolation should be a serious consideration for any project. 1. Introduction – Evolution of Seismic Design Practice Seismic design of bridges in British Columbia has evolved significantly in the last ten years, going from a bridge design code using outdated principles to a state of the art new code that implements performance- based design.
    [Show full text]
  • 10472 Scott Road, Surrey, BC
    FOR SALE 10472 Scott Road, Surrey, BC 3.68 ACRE INDUSTRIAL DEVELOPMENT PROPERTY WITH DIRECT ACCESS TO THE SOUTH FRASER PERIMETER ROAD PATULLO BRIDGE KING GEORGE BOULEVARD SOUTH FRASER PERIMETER ROAD (HIGHWAY #17) 10472 SCOTT ROAD TANNERY ROAD SCOTT ROAD 104 AVENUE Location The subject property is located on the corner of Scott Road and 104 Avenue, situated in the South Westminster area of Surrey, British Columbia. This location benefits from direct access to the South Fraser Perimeter Road (Highway #17) which connects to all locations in Metro Vancouver via Highways 1, 91, and 99. The location also provides convenient access south to the U.S. border, which is a 45 minute drive away via the SFPR and either Highway 1 or Highway 91. The property is surrounded by a variety of restaurants and neighbours, such as Williams Machinery, BA Robinson, Frito Lay, Lordco, Texcan and the Home Depot. SCOTT ROAD Opportunity A rare opportunity to acquire a large corner Scott Road frontage property that has been preloaded and has a development permit at third reading for a 69,400 SF warehouse. 104 AVENUE Buntzen Lake Capilano Lake West Vancouver rm A n ia North d n I 99 Vancouver BC RAIL Pitt Lake 1 Harrison Lake Bridge Lions Gate Ir o Port Moody n 99 W o PORT METRO r VANCOUVER Burrard Inlet k e r s M e m o r i a l B C.P.R. English Bay r i d g e 7A Stave Lake Port Coquitlam Vancouver Maple Ridge 7 Key Features CP INTERMODAL Coquitlam 7 1 7 9 Burnaby Pitt 7 Meadows 7 VANCOUVER P o r t M a C.P.R.
    [Show full text]
  • Pattullo Bridge Replacement
    L P PATTULLO BRIDGE REPLACEMENT Date: Monday, July 15, 2013 Location: Annacis Room Time: 4:15 - 4:45 pm Presentation: Steven Lan, Director of Engineering Background Materials: Memorandum from the Director of Engineering dated July 9, 2013. i. MEMORANDUM The Corporation of Delta Engineering To: Mayor and Council From: Steven Lan, P.Eng., Director of Engineerin g Date: July 9, 201 3 Subject: Council Workshop: Pattullo Bri dge Replacement File No.: 1220·20/PATT CC: George V. Harvi e, Chief Administrative Officer TransLink recently completed the initial round of public consultation sessions in New Westminster and Surrey to solicit feedback from the public on the Pattullo Bridge. A number of alternative crossings were developed for three possible corridors: 1. Existing Pattullo Bridge Corridor 2. Sapperton Bar Corridor • New crossing located east of the existing Pattullo Bridge that would provide a more direct connection between Surrey and Coquitlam 3. Tree Island Corridor • New crossing located west of the existing Pattullo Bridge that would essentially function as an alternative to the Queensborough Bridge Based on the initial screening work that has been undertaken, six alternatives have been identified for further consideration: 1. Pattullo Bridge Corridor - Rehabilitated Bridge (3 lanes) 2. Pattullo Bridge Corridor - Rehabilitated Bridge (4 lanes) 3. Pattullo Bridge Corridor - New Bridge (4 lanes) 4. Pattullo Bridge Corridor - New Bridge (5 lanes) 5. Pattullo Bridge Corridor - New Bridge (6 lanes) 6. Sapperton Bar Corridor - New Bridge (4 lanes) coupled with Rehabilitated Pattullo Bridge (2-3 lanes) Options involving a new bridge are based on the implementation of user based charges (tolls) to help pay for the bridge upgrades.
    [Show full text]
  • George Massey Tunnel Expansion Plan Study
    Report to MINISTRY OF TRANSPORTATION AND HIGHWAYS i On GEORGE MASSEY TUNNEL EXPANSION PLANNING STUDY TTaffic Impact Taffic Operations Parking ransit Tansportation rucking Planning Modelling 4 March 26, 1991 Ministry of Transportation and Highways South Coast Regional District 7818 Sixth Street Burnaby, B.C. V3N 4N8; Attention:: Ms. Maria Swan, P.Eng. Senior Transportation Planning Engineer Dear Sir: RE: Expansion of George Massey Tunnel - Preliminary Planning Studv In accordance with your instructions, we have now carried out the preliminary planning study of the future expansion of the George Massey Tunnel on Highway 99. The attached report presents an overview of the study together with the resultant conclusions and recommendations. Thank you for the opportunity to work on this project on behalf of the Ministry. I trust that this report enables your staff to continue with the next steps necessary to bring these recommendations to fruition. 145gmasy\gmt.rpt 520 - 1112 West Pender Street, Vancouver, British Columbia, Canada V6E 2S1 Tel: (604) 688-8826 Fax: 688-9562 TABLE OF CONTENTS Page 1.0 INTRODUCTION ........................................... 1 1.1 Background to Study ....................................... 1 1.2 Scope of Study ........................................... 2 1.3 History and Role of the George Massey Tunnel ...................... 2 2.0 EXISTING TRANSPORTATION SYSTEM .......................... 5 2.1 Regional Road Network ..................................... 5 2.2 Current Traffic Volumes on Fraser River Crossings .................... 8 2.3 Historic Growth in Traffic Volumes .............................. 12 2.4 Growth in Capacity Across the South Arm ......................... 21 2.5 Physical Constraints on Highway 99 .............................. 22 2.6 Projected Growth in Ferry Traffic ............................... 22 2.7 Role of Transit ........................................... 23 3.0 GROWTH IN TRAVEL DEMAND ...............................
    [Show full text]
  • Pattullo Bridge Replacement Project Strategic Options Analysis
    Pattullo Bridge Replacement Project Strategic Options Analysis January 2018 Pattullo Bridge Replacement Project January 2018 Strategic Options Analysis Page 2 of 37 TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................................................... 3 1.1 Purpose and Approach ............................................................................................................... 3 1.2 Multiple Account Evaluation ........................................................................................................ 4 2 CONTEXT ............................................................................................................................................. 5 2.1 Historic analysis .......................................................................................................................... 5 3 CURRENT SITUATION, PROJECT GOALS AND OBJECTIVES, AND STRATEGIC OPTIONS ..... 8 3.1 Project Goals and Objectives ..................................................................................................... 8 3.2 Current Situation ....................................................................................................................... 10 3.3 Strategic Project Delivery Options ............................................................................................ 11 3.4 Strategic options – Capital Costs and Operational Considerations .......................................... 13 4 MULTIPLE ACCOUNT EVALUATION ..............................................................................................
    [Show full text]
  • Bridges to Buntzen 200K
    Permanent Brevet #53 Submitted by: Tracy Barill Bridges to Buntzen 200K Distance Distance (km- Turn Direction Route (Interval) cumulative) Start – King Edward Canada Line Station (Cambie Street and King Edward Ave, Vancouver) 0 R W 5.9 King Edward Avenue 5.9 R N 0.9 Crown Street 6.8 L W 4.1 W 16th Ave 10.9 L S 4.1 SW Marine Drive 15.0 BR S 5.4 SW Marine Drive 20.4 R S 0.4 SW Marine Drive 20.8 BL E 0.1 SW Marine Drive 20.9 R S 0.2 SW Marine Drive CAUTION – Bear left to follow Grant 21.1 BL S 1.1 McConachie Way over Arthur Laing Bridge 22.2 R N 0.3 new BIKE PATH to access Grauer Road 22.5 L SW 1.1 Grauer Road 23.6 R SW 5.2 Templeton Street – becomes Ferguson Road CONTROL 1: IONA ISLAND Park Gate – Information Control (washrooms 28.8 another .5 km further) 28.8 T NE 7.1 Ferguson Road becomes Templeton Street 35.9 SO E 0.1 Cross Grant McConachie Way 36.0 L N 0.4 Miller Road Wellington Crescent (1st on right – may not have a 36.4 R E 1.0 sign – bike access only) 37.4 R NE 0.4 Airport Road 37.8 R E 0.4 Russ Baker Way 38.2 SO E 2.0 No. 2 Road (continue over bridge) 40.2 R S 0.8 Granville Ave (becomes Railway) 41.0 BL E 2.4 Railway Ave 43.4 R S 1.6 Williams Ave 45.0 L E 0.6 Springmont Dr.
    [Show full text]
  • Outcomes in Suicidal Bridge Jumping in the Lower Mainland-JRB
    Outcomes in suicidal bridge jumping in the Lower Mainland by DYLAN STEPHANIAN BASc, The University of British Columbia, 2014 Thesis submitted in partial fulfilment of the requirements for the degree of Master of Science in The Faculty of Graduate and Postdoctoral Studies (Experimental Medicine) The University of British ColumbiA (Vancouver) December, 2019 © Dylan Stephanian, 2019 The following individuals certify that they have read, and recommend to the faculty of Graduate and Postdoctoral Studies for acceptance, the thesis entitled: Outcomes in suicidal bridge jumping in the Lower Mainland Submitted by Dylan Stephanian in partial fulfillment of the requirements for the degree of MAster of Science in Experimental Medicine. Examining committee Dr Jeff Brubacher, Emergency Medicine Supervisor Dr Doug Brown, Emergency Medicine Supervisory Committee Member Dr Andrew MacPherson, Emergency Medicine External Examiner ii Abstract On average, one person attempts suicide by jumping from a bridge in the Lower Mainland of British ColumbiA once every 14 days, but the population that jumps and their outcomes following a suicide attempt are poorly understood. A multi-agency retrospective chart review was performed using records from the Canadian Coast Guard, Joint Rescue Coordination Center, police departments, and the British Columbia Coroner’s Service to identify incidents. A complete picture of each incident was then built by identifying corresponding BC Ambulance Service and hospital records, and linking all records for each incident. This methodology successfully identified a comprehensive list of incidents, and may be useful in future prehospital and search and rescue medicine research. Records from the ten agencies involved in these incidents were collected and linked to create a dataset describing all known jumps from a bridge >12m in height in the Lower Mainland of BC from January 1, 2006 to February 28, 2017.
    [Show full text]