Electric Pow Er Industry of Serbia

Total Page:16

File Type:pdf, Size:1020Kb

Electric Pow Er Industry of Serbia TECHNICAL REPORT ELECTRIC POWER INDUSTRY OF SERBIA 2017 EPS INSTALLED CAPACITIES 1 ZRENJANIN NOVI SAD KOSTOLAC B3 S. MITROVICA KOSTOLAC A ĐERDAP 1 2 KOSTOLAC B N. TESLA B N. TESLA А KOSTOLAC ZVORNIK 5 ĐERDAP 2 MORAVA KOLUBARA А KOLUBARA B KOLUBARA B. BAŠTA MEĐUVRŠJE PSHPP B. BAŠTA OVČAR BANJA KOKIN BROD 3 BISTRICA POTPEĆ UVAC 4 PIROT VRLA 2 VRLA 4 VRLA 1 KOSOVO B VRLA 3 KOSOVO А PSP LISINA * KOSOVO = 500 MW Power plants and coal mines: Distribution areas: TPP 1_Novi Sad TPP UNDER CONSTRUCTION 2_Beograd TPP potentially place 3_Kraljevo CHP 4_Niš HPP 5_Kragujevac COAL MINE *_PE Elektrokosmet, Priština * As of June 1999, EPS does not operate its facilities on the territory of Kosovo and Metohija EPS 2017 Data related to capacities managed by Public Enterprise Electric Power Industry of Serbia GENERATION CAPACITIES Net output capacity 7,355 MW ELECTRICITY GENERATION 34,004 GWh COAL PRODUCTION 39,064,457 t 2017 EPS OVERBURDEN REMOVAL 103,429,947 bcm ELECTRICITY SALE 35,474 GWh In EPS Group 33,533 GWh Out of EPS Group 1,941 GWh ELECTRICITY PURCHASE Out of EPS Group 1,492 GWh NUMBER OF CUSTOMERS Total 3,477,716 Guaranteed supply 3,446,386 Last resort supply 1,454 Commercial supply 29,876 GENERATION CAPACITIES Net output POWER PLANT capacity MW TPP Nikola Tesla A 1,597 TPP Nikola Tesla B 1,220 TPP Kolubara 216 CAPACITIES TPP Morava 108 TPP Kostolac A 281 TPP Kostolac B 632 THERMAL Power Plants 4,054 CHP Novi Sad 208 CHP Zrenjanin 100 CHP Sremska Mitrovica 28 COMBINED Heat and Power Plants 336 HPP Đerdap 1 1,099 HPP Đerdap 2 270 Vlasina HPPs 129 HPP Pirot 80 HPP Bajina Bašta 420 PSHPP Bajina Bašta 614 HPP Zvornik 103 HPP Elektromorava 18 HPP Potpeć 51 HPP Bistrica and HPP Kokin Brod 124 HPP Uvac 36 Mini HPPs 21 HYDRO Power Plants 2,965 EPS POWER PLANTS 7,355 ELECTRICITY GENERATION POWER PLANT GWh TPP Nikola Tesla A 8,457 TPP Nikola Tesla B 7,750 TPP Kolubara 781 TPP Morava 390 TPP Kostolac A 2,063 TPP Kostolac B 4,799 THERMAL Power Plants 24,240 CHP Novi Sad 185 CHP Zrenjanin 0 CHP Sremska Mitrovica 0 COMBINED Heat and Power Plants 185 GENERATION HPP Đerdap 1 4,904 HPP Đerdap 2 1,538 Vlasina HPPs 261 HPP Pirot 67 HPP Bajina Bašta 1,168 PSHPP Bajina Bašta 594 HPP Zvornik 368 HPP Elektromorava 62 HPP Potpeć 162 HPP Bistrica and HPP Kokin Brod 377 HPP Uvac 38 Mini HPPs 40 HYDRO Power Plants 9,579 TOTAL 34,004 ELECTRICITY SUPPLY SALES CHARACTERISTICS Supply type Number of Number of Electricity metering points customers (GWh) GUARANTEED 3,512,066 3,446,386 15,601 LV I Level 15,970 14,341 527 CS 3,494,103 3,431,256 15,026 LV II Level 255,336 218,354 1,214 Households 3,238,767 3,212,902 13,811 PL 1,993 789 48 LAST RESORT 2,969 1,454 187 HV 0 0 0 MV 70 49 33 LV 2,899 1,405 154 COMMERCIAL 114,317 29,876 11,911 SUPPLY HV 30 27 2,074 MV 4,065 2.537 6,249 LV 92,421 27,049 3,127 PL 17,801 263 461 TOTAL 3,629,352 3,477,716 27,699 LV - Low Voltage CS - Consumer Spending MV - Midlle Voltage PL - Public Lighting HV - High Voltage HOUSEHOLD CATEGORY AVERAGE CONSUMPTION per month 356 kWh NUMBER OF METERING POINTS 3,238,767 ELECTRICITY TRADE Total scope of electricity trade in free wholesale market 3,106 GWh PURCHASE GWh 254 1,238 Free market According to agreements on business and technical cooperation with ERS and JSC EMS* on electricity delivery for compensation programs TOTAL 1,492 *ERS - Electric Power Industry of the Republic of Srpska JSC EMS - Elektromrežа Srbije Joint Stock Company Cooperation with Electric Power Industry of the Republic of Srpska According to agreements on business and technical cooperation Purchase 67 ELECTRICITY TRADE ELECTRICITY Sale 73 0 10 20 30 40 50 60 70 80 GWh Trading at BSP and CROPEX power exchanges, through the Company “EPS Trgovanje“ started on 11 July 2017. Total trading volume at BSP amounted to 13 GWh and at CROPEX 3 GWh. Total sale at HUPX through the Company “EPS Trgovanje“ amounted to 608 GWh and total purchase amounted to 70 GWh. Total sale at SEEPEX amounted to 101 GWh, and total purchase 105 GWh. SALE 73 Out of EPS Group 1,868 Free market According to agreements on business and technical cooperation with ERS TOTAL 1,941 SALE 938 In EPS Group 997 237 GWh 4,026 ELECTRICITY TRADE ELECTRICITY EPS Supply DSO EPS Distribucija 27,335 Power plants and coal mines PSHPP and PSP PE Elektrokosmet TOTAL 33,533 9.7 COAL AND Drmno 37.5 TPPs-OCMs Kostolac 9.7 OVERBURDEN 37.5 PRODUCTION Field G 0.2 2.1 CAPACITIES Field B 2.9 11.5 COAL Field D 9.5 OVERBURDEN 21.5 Tamnava West Field 16.8 30.8 29.4 MB Kolubara 65.9 0 10 20 30 40 50 60 70 80 million t, bcm COAL million t 40 COAL PRODUCTION 9 9 10 7 9 7 8 8 9 30 6 20 31 29 30 31 30 31 23 29 29 29 10 Branch MB Kolubara Branch TPPs-OCMs Kostolac 0 2008 '09 '10 '11 '12 '13 '14 '15 '16 '17 120 million bcm OVERBURDEN 100 41 30 39 40 REMOVAL 40 37 34 37 80 33 37 60 40 77 64 59 72 68 69 48 47 59 66 20 Branch MB Kolubara Branch TPPs-OCMs Kostolac 0 2008 '09 '10 '11 '12 '13 '14 '15 '16 '17 TOTAL COAL AND OVERBURDEN OUTPUT 120 111 110 million t, bcm 107 108 103 100 98 96 99 81 84 80 60 COAL 40 40 40 38 38 37 38 37 38 39 29 20 0 2008 '09 '10 '11 '12 '13 '14 '15 '16 '17 COAL OVERBURDEN STRUCTURE OF SUPPLY OF THE PRODUCED COAL (t) MB Kolubara TPPs-OCMs Kostolac EPS For TPPs 28,012,384 9,473,583 37,485,967 For drying 929,887 / 929,887 For industry 225,852 201,718 427,570 For heating plants 221,033 / 221,033 TOTAL 29,389,156 9,675,301 39,064,457 STATISTICAL DATA ON DISTRIBUTION GRID Distribution areas Number Installed capacity of substations of substations (MVA) Novi Sad 7,894 7,035 DISTRIBUTION Beograd 5,397 7,124 Kraljevo 12,374 7,954 Niš 6,648 5,394 Kragujevac 2,845 2,345 TOTAL 35,158 29,852 • THE PERCENTAGE OF REALIZED LOSSES IN DISTRIBUTION NETWORK 12.92 • CONSTRUCTION/RECONSTRUCTION/RENOVATION OF TRANSFORMER STATIONS 2 to 110/x kV 2 to 35/10 kV 318 to 20 (10)/0.4 kV • CONSTRUCTION OF CABLE LINES 35 kV 25.37 km 20 kV 181.48 km 10 kV 305.19 km 0.4 kV 702.29 km STRUCTURE OF DISTRIBUTION LINES (owned by DSO EPS DISTRIBUCIJA) km 29,233 Cable Overhead DISTRIBUTION 132,701 TOTAL 161,934 km DISTRIBUTION AREAS 5,818 12,211 13,177 18,003 Novi Sad Beograd 2,435 14,671 Kragujevac 5,701 3,068 57,652 29,198 Kraljevo Niš THANK YOU FOR ATTENTION ELECTRIC POWER INDUSTRY OF SERBIA.
Recommended publications
  • Gis Development Strategy of Pirot Municipality
    P i r o t M u n i c i p a l i t y GIS DEVELOPMENT STRATEGY OF PIROT MUNICIPALITY Pirot, August, 2006 Preparation of the document: MapSoft. d.o.o Željko Cvijetinović, Ph.D., M.Sc., B.Sc. Geod.Eng Momir Mitrović, B.Sc., Geod. Eng Project team for building Pirot Municipality GIS: Milorad Spasić, B.Sc. Constr.Eng, Pirot Municipality Jovan Jovanović, B.Sc. Constr.Eng, Local Government Pirot Ivan Todorović, Electr.Eng, Local Government Pirot Slaviša Jelenković, B.Sc. Electr.Eng, Local Government Pirot Ivica Mančić, B.Sc. Constr.Eng, Local Government Pirot Zoran Jovanović, B.Sc. Geod. Eng, Real Estate Cadastre Unit, Pirot Vladeta Gošić, B.Sc. Electr.Eng, ED ''Jugoistok'' d.o.o. Niš - ''Electrodistribution Pirot'' Danilo Vujičić, B.Sc. Electr.Eng, Telekom Srbija AD - RC Pirot Dragan Aleksić, Lawyer, PC “Komunalac” Novica Zlatanović, B.Sc. Constr.Eng, Land Development Agency, Pirot Žaklina Stojanović, Mech.Eng, '' Water and Sewage Company'' Ivana Džunić, B.Sc. Spatial planner, Public Town Planning Agency, Pirot Gordan Džunić, Mech.Eng, ‘‘Public Heating Company'' ii C O N T E N T S 1 Preface........................................................................................................ 1 2 Basic assumptions .................................................................................... 3 2.1 Legal aspect.................................................................................................... 3 2.2 Interest of all key participants for the Municipality GIS development......... 4 2.3 Taking into consideration the existing state concerning the data .............. 4 2.4 Taking into consideration the existing state concerning the authority ...... 5 2.5 Taking into consideration the existing state concerning IT development.. 5 2.6 Stable and sustainable development ............................................................ 6 3 Analysis of the existing state ................................................................... 7 3.1 Basic data about Pirot Municipality..............................................................
    [Show full text]
  • Investing to Integrate Europe & Ensure Security of Supply PE
    11/20/2014 Public enterprise "Electric power industry of Serbia" Europe‘s 8th energy region: Investing to integrate Europe & ensure security of supply Brussels, 19th November 2014 PE EPS is nearly a sole player in the Serbian electricity market Hydro power 2,835 MW plants Thermal power 5,171 MW* 3,936 MW** plants Combined heat and power 353 MW plants Total 8,359 MW* 7,124 MW** Electricity 37.5 TWh** Production Number of 3.5 mil ** customers Number of 33,335** employees Last power plant built in 1991. *With K&M ** Without K&M, end of 2013 As of June 1999 PE EPS does not operate its Kosovo and Metohija capacities (K&M) 2 1 11/20/2014 EPS facing 1200MW capacity decommissioning until 2025 Due to aging fleet and strict EU environmental regulations1 Net available EPS generation capacity, MW Successful negotiation about 8,000 -1,218 MW LCPD and IED implementation 20 eased the timing of lignite 7,239 25 111 decommissioning 208 210 630 100 6,021 6,000 20 25 280 Old gas-fired CHP capacity decommissioning 612 • Current Novi Sad gas/oil CHP (210 MW) and EPS small HPPs 1,200 Zrenjanin gas/oil CHP (111 MW) to terminate CHP SREMSKA MITROVICA - 321 MW 1,230 production CHP ZRENJANIN 4,000 CHP NOVI SAD 1,560 TPP MORAVA Old lignite-fired capacity decommissioning 1,239 (capacities to be closed in 2023 latest and to operate TPP KOLUBARA 211 20ths hours in total between 2018-20231) 211 TPP KOSTOLAC B TPP KOSTOLAC A 1,126 • Kolubara A1-3, A5 (208 MW) 1,126 2,000 • Nikola Tesla A1-2 (360 MW) TPP NIKOLA TESLA B • Kostolac A1-2 (280 MW) TPP NIKOLA TESLA A HPP
    [Show full text]
  • Forced Labour in Serbia Producers, Consumers and Consequences of Forced Labour 1941 - 1944
    Forced Labour in Serbia Producers, Consumers and Consequences of Forced Labour 1941 - 1944 edited by: Sanela Schmid Milovan Pisarri Tomislav Dulić Zoran Janjetović Milan Koljanin Milovan Pisarri Thomas Porena Sabine Rutar Sanela Schmid 1 Project partners: Project supported by: Forced Labour in Serbia 2 Producers, Consumers and Consequences . of Forced Labour 1941 - 1944 This collection of scientific papers on forced labour during the Second World War is part of a wider research within the project "Producers, Consumers and Consequences of Forced Labour - Serbia 1941-1944", which was implemented by the Center for Holocaust Research and Education from Belgrade in partnership with Humboldt University, Berlin and supported by the Foundation "Remembrance, Responsibility and Future" in Germany. ("Stiftung Erinnerung, Verantwortung und Zukunft" - EVZ). 3 Impressum Forced Labour in Serbia Producers, Consumers and Consequences of Forced Labour 1941-1944 Published by: Center for Holocaust Research and Education Publisher: Nikola Radić Editors: Sanela Schmid and Milovan Pisarri Authors: Tomislav Dulić Zoran Janjetović Milan Koljanin Milovan Pisarri Thomas Porena Sabine Rutar Sanela Schmid Proofreading: Marija Šapić, Marc Brogan English translation: Irena Žnidaršić-Trbojević German translation: Jovana Ivanović Graphic design: Nikola Radić Belgrade, 2018. Project partners: Center for Holocaust Research and Education Humboldt University Berlin Project is supported by: „Remembrance, Responsibility And Future“ Foundation „Stiftung Erinnerung, Verantwortung und Zukunft“ - EVZ Forced Labour in Serbia 4 Producers, Consumers and Consequences . of Forced Labour 1941 - 1944 Contents 6 Introduction - Sanela Schmid and Milovan Pisarri 12 Milovan Pisarri “I Saw Jews Carrying Dead Bodies On Stretchers”: Forced Labour and The Holocaust in Occupied Serbia 30 Zoran Janjetović Forced Labour in Banat Under Occupation 1941 - 1944 44 Milan Koljanin Camps as a Source of Forced Labour in Serbia 1941 - 1944 54 Photographs 1 62 Sabine Rutar Physical Labour and Survival.
    [Show full text]
  • ASF in Europe Under the GF-Tads Umbrella 16Th Meeting (SGE ASF16) November 2020 ASF Serbian Experience EARLY REACTION and CONTROL MEASURES in DOMESTIC PIGS
    Standing Group of Experts on ASF in Europe under the GF-TADs umbrella 16th meeting (SGE ASF16) November 2020 ASF Serbian experience EARLY REACTION AND CONTROL MEASURES IN DOMESTIC PIGS S E R B I A NUMBER OF MARKED AND REGISTERED PIGS IN RS 2019. Total Number of marked pigs Holding Small Medium Big farm farm comercial DISTRICT farm BEOGRAD 10,587 25,310 7,348 26,155 69,400 BORSKI 5,785 1,010 619 7,414 BRANIČEVSKI 6,293 10,445 4,630 51,409 72,777 JABLANIČKI 7,862 6,859 1,748 5,399 21,868 JUŽNO-BANATSKI 10,898 7,526 3,825 139,800 162,049 JUŽNO-BAČKI 7,917 34,670 35,542 284,113 362,242 KOLUBARSKI 12,410 37,092 11,277 1,714 62,493 MAČVANSKI 16,539 146,467 153,052 101,234 417,292 MORAVIČKI 4,381 5,914 5,935 568 16,798 NIŠAVSKI 5,391 7,192 1,982 1,498 16,063 PIROTSKI 4,635 1,562 111 1,073 7,381 PODUNAVSKI 5,258 13,692 12,101 49,577 80,628 POMORAVSKI 5,446 18,212 7,440 530 31,628 PČINJSKI 2,637 392 134 3,163 RASINSKI 12,801 53,974 7,756 4,956 79,487 RAŠKI 3,743 3,577 2,897 14,704 24,921 SEVERNO-BANATSKI 8,201 20,665 19,356 172,764 220,986 SEVERNO-BAČKI 2,891 35,074 58,912 230,311 327,188 SREDNJE-BANATSKI 16,568 24,889 11,348 54,161 106,966 SREMSKI 11,792 105,698 132,770 212,914 463,174 TOPLIČKI 1,082 1,224 115 23,172 25,593 ZAJEČARSKI 7,236 8,983 651 37,592 54,462 ZAPADNO-BAČKI 4,693 37,385 30,990 128,234 201,302 ZLATIBORSKI 4,550 1,282 552 6,384 ŠUMADIJSKI 13,135 14,941 4,079 15,285 47,440 Grand Total 192,731 624,035 515,170 1,557,163 2,889,099 Domestic pigs population • in 2019, a total of 74,985 pig holdings were registered in Serbia, of which: • 50,1251 kept up to 10 pigs, • 21, 741 kept 10 to 100 pigs, • medium commercial farms of 100 to 500 pigs- 2,721 • large commercial farms with more than 500 pigs- 398.
    [Show full text]
  • Quantifying CO2 Abatement Costs in Serbian Power Sector in 2014
    Quantifying CO2 abatement costs in Serbian power sector in 2014. [Document Subtitle] Aleksandar Macura RES Foundation T: +381 (0)11 218 8897 Matični broj: 28828357 Zmaja od Noćaja T: +381 (0)11 2910362 PIB: 108822050 3a www.resfoundation.org Račun broj: 11000 Beograd 275001022539489576 Table of Contents TABLE OF TABLES 2 TABLE OF FIGURES 3 1 DISCLAIMER 5 2 INTRODUCTION 6 3 SUMMARY OF RESULTS 7 4 BASIC PLANT DATA- 2014 12 5 DEVELOPMENTS IN 2014. 13 6 ELECTRICITY AND COAL BALANCES 14 6.1 ELECTRICITY BALANCES 14 6.1.1 ELECTRICITY IMPORTS AND EXPORTS DATA AND EXPLANATIONS 15 6.2 COAL BALANCES 17 7 CO2 BALANCES 18 7.1 GHG EMISSIONS IN SERBIA 18 7.2 AVOIDED EMISSIONS IN 2014 19 8 POWER SECTOR FINANCIAL DATA 19 9 CALCULATION OF ABATEMENT COSTS 22 9.1 METHODOLOGY DESCRIPTION 22 9.1.1 ADDITIONAL NET IMPORT COSTS 25 9.1.2 AVOIDED ELECTRICITY PURCHASES 26 9.1.3 LOST PROFIT 28 9.2 RESULTS 29 TABLE OF TABLES TABLE 1 EPS NET OUTPUT PLANT CAPACITY (MW). SOURCE: EPS .......................................................... 12 TABLE 2 2014. ELECTRICITY PRODUCTION OF EPS POWER PLANTS. SOURCE: EPS ........................ 12 TABLE 3 ELECTRICITY PRODUCTION IN SERBIA IN THE PERIOD FROM 2008. TO 2014. .............. 14 TABLE 4 ELECTRICITY CONSUMPTION IN SERBIA IN THE PERIOD FROM 2008. TO 2014. ........... 15 TABLE 5 ELECTRICITY EXPORTS AND IMPORTS IN SERBIA. SOURCE: STATISTICAL OFFICE ...... 16 TABLE 6 NET ELECTRICITY IMPORTS . SOURCES: STATISTICAL OFFICE (RZS), REGULATORY ENERGY AGENCY (AERS), ELECTRICAL UTILITY (EPS), TRANSMISSION UTILITY (EMS) .... 17 TABLE 7 COAL BALANCES IN THE YEARS 2008-2014. .................................................................................... 17 2 Quantifying CO2 abatement costs in Serbian power sector in 2014.
    [Show full text]
  • Pirot Pirot Leskovac Veles
    Ivanec BUSINESS FRIENDLY MUNICIPALITY SOUTH EAST EUROPE Bjelovar Ruma Stara Pazova Prijedor Pančevo Sanski Most Banja Luka Pirot Pirot Leskovac Veles Strumica 43o09’N, 22o35’E www.pirot.rs Location South East Serbia Population 57,928 Territory 1,232 km²; 56.7% arable land, 33.9% forests, 9.4% roads and other Budget € 14.1 million, 25 % capital investments Address 82 Srpskih vladara street, 18300 Pirot, Serbia, +381 10 305 500, [email protected] Vienna (923 km) Pirot municipality is situated in the south-east part of Serbia, half way between PROXIMITY TO NEAREST Nis and Sofia, on international road to the Near and Middle East. Pirot is chara- Budapest (683 km) BORDER CROSSINGS cterized by a favorable geographical position and good connection with road Bulgaria 30 km and railway network: international road E-80, Corridor X, main road M-9, rail- Romania 160 km way Niš-Pirot-Sofia, airports in Niš and Sofia (70 km away). Pirot is surrounded Macedonia 180 km Zagreb by mountains, the dominant being Stara planina, reaching the altitude of (699 km) P2169 m and developing into one of the most popular ski centers in Serbia. The dominant industries in the municipality include rubber, textile, food and Belgrade (306 km) chemical industry. The main economic pillars are Tigar Tyres and Tigar AD, operating in rubber industry and AHA Mura - Prvi maj in the textile industry. Pirot was one of the first municipalities in Serbia to establish a Free trade zone and Industrial zone, and with a range of additional benefits and exemptions Sarajevo PIROT from fees, the municipality is an excellent location to invest in, which was re- (517 km) cognized by international investors such as Michelin and Slovenian AHA Mura.
    [Show full text]
  • Response of the Government of Serbia to the Report of the European
    CPT/Inf (2018) 22 Response of the Government of Serbia to the report of the European Committee for the Prevention of Torture and Inhuman or Degrading Treatment or Punishment (CPT) on its visit to Serbia from 31 May to 7 June 2017 The Government of Serbia has requested the publication of this response. The CPT’s report on the May/June 2017 visit to Serbia is set out in document CPT/Inf (2018) 21. Strasbourg, 21 June 2018 Table of Contents Answers and comments of the competent authorities of the Republic of Serbia to the Report of the European Committee for the Prevention of Torture and Inhuman or Degrading Treatment or Punishment (CPT) on its ad hoc visit to the Republic of Serbia conducted in the period from 31 May to 7 June 2017 .........................................................................................................................................3 Supplementary responses and comments of the Ministry of the Interior and the Republican Public Prosecutor on the Report of the Committee for the Prevention of Torture and Inhuman or Degrading Treatment or Punishment regarding the ad hoc visit to the Republic of Serbia conducted from 31 May to 7 June 2017 ................................................................................................18 3 Answers and comments of the competent authorities of the Republic of Serbia to the Report of the European Committee for the Prevention of Torture and Inhuman or Degrading Treatment or Punishment (CPT) on its ad hoc visit to the Republic of Serbia conducted in the period from 31 May to 7 June 2017 А. Establishments under the authority of the Ministry of the Interior 15. In line with the European Committee’s recommendation to “conduct effective investigations into allegations of ill-treatment to demonstrate that criminal acts by the police will be punished”, we inform you that the Internal Control Sector (hereinafter referred to as: SUKP) in order to implement the activities 3.1.1.8.
    [Show full text]
  • Corridor X Highway Project Preliminary Design for E-80 Highway NIS – DIMITROVGRAD Section: Prosek-Border of Bulgaria
    Corridor X Highway Project Preliminary Design for E-80 Highway NIS – DIMITROVGRAD Section: Prosek-border of Bulgaria CORRIDOR LEVEL EIA REPORT F I N A L Мay 2009 EXECUTIVE SUMMARY Introduction and Project Description Construction of the E-80 highway section from Prosek to Dimitrovgrad is stated as one of the highest state priorities and thus the PE “Putevi Srbije” (PEPS), as Project proponent has taken all necessary activities prepared planning, design and environmental documents. On the basis of the preliminary Project designs detailed EIAs were carried out for all 5 sections of the prospective E-80 highway. The five sections are: Prosek – Crvena Reka Crvena Reka – Čiflik Čiflik – Ponor – Pirot Pirot – commencement of Dimitrovgrad bypass Northern Dimitrovgrad bypass 1.1 The PE “Putevi Srbije” (PEPS), as Project proponent, has taken all necessary activities and prepared planning, design and environmental documents. As part of the preparation of preliminary designs preparation, detailed EIA were prepared for all five sections of the proposed E- 80 highway. In accordance with Serbian law, the preliminary designs and EIAs were submitted to the Institute for Nature Protection (INP) and the Institute for Protection of Cultural Monuments in Serbia (IPCM), which have issued approvals subject to a range of pre-conditions which must be satisfied prior to final approval and receipt of construction permits. The conditions from INP address measures to safeguard vegetation, rare and endangered species and sensitive ecological systems and features, while the IPCM identified important architectural sites which need to be further investigated in order to develop appropriate conservation and mitigation measures. The five existing EIAs were integrated into this Corridor X level EIA Report for section E-80, covering the proposed highway route from Prosek to Pirot and the Norther Dimitrovgrad bypass.
    [Show full text]
  • PUTARINA) Važi Od: 25
    Beograd, Bul. Kraqa Aleksandra 282 POSEBNA NAKNADA ZA UPOTREBU AUTOPUTA (PUTARINA) važi od: 25. februara 2021. god. u 07:00 h (po kusnoj listi NBS br. 173 od 10.09.2018. god.) BEOGRAD PUTARINA u RSD ROAD TOLL in EUR Deonica: Beograd - Preševo I-а I II III IV Naplatne stanice I-а I II III IV 40 80 120 230 460 MALI POŽAREVAC 0,50 1,00 1,50 2,00 4,00 50 100 160 310 630 UMČARI 0,50 1,00 1,50 3,00 5,50 70 130 190 390 770 VODANJ 1,00 1,50 2,00 3,50 7,00 80 150 230 460 930 KOLARI 1,00 1,50 2,00 4,00 8,00 90 180 270 540 1.070 SMEDEREVO 1,00 2,00 2,50 5,00 9,50 90 180 280 550 1.110 POŽAREVAC 1,00 2,00 2,50 5,00 9,50 150 300 460 910 1.830 VELIKA PLANA 1,50 3,00 4,00 8,00 15,50 180 350 530 1.060 2.120 MARKOVAC 2,00 3,00 4,50 9,00 18,00 190 380 570 1.140 2.280 LAPOVO 2,00 3,50 5,00 10,00 19,50 200 400 590 1.190 2.370 BATOČINA 2,00 3,50 5,00 10,50 20,50 250 490 730 1.460 2.920 JAGODINA 2,50 4,50 6,50 12,50 25,00 270 540 810 1.620 3.230 ĆUPRIJA 2,50 5,00 7,00 14,00 27,50 290 580 880 1.750 3.500 PARAĆIN 2,50 5,00 7,50 15,00 30,00 320 630 950 1.900 3.800 POJATE 3,00 5,50 8,50 16,50 32,50 350 690 1.030 2.060 4.120 RAŽANJ 3,00 6,00 9,00 17,50 35,00 390 770 1.160 2.310 4.630 ALEKSINAČKI RUDNICI 3,50 7,00 10,00 20,00 39,50 400 790 1.190 2.380 4.750 ALEKSINAC 3,50 7,00 10,50 20,50 40,50 450 890 1.340 2.680 5.360 NIŠ jug 4,00 8,00 11,50 23,00 45,50 460 920 1.380 2.750 5.500 MEROŠINA 4,00 8,00 12,00 23,50 46,50 480 960 1.440 2.880 5.770 DOLJEVAC SELO 4,50 8,50 12,50 24,50 49,00 500 990 1.480 2.960 5.920 BRESTOVAC 4,50 8,50 13,00 25,50 50,50 510 1.020 1.520
    [Show full text]
  • Small Towns in Serbia – the “Bridge” Between the Urban and the Rural
    Europ. Countrys. · 4· 2016 · p. 462-480 DOI: 10.1515/euco-2016-0031 European Countryside MENDELU SMALL TOWNS IN SERBIA – THE “BRIDGE” BETWEEN THE URBAN AND THE RURAL Marko Filipović, Vlasta Kokotović Kanazir, Marija Drobnjaković1 1 MSc Filipović Marko, ResearchAssociate MSc, Kokotović Kanazir Vlasta Research Associate, MSc Drobnjaković Marija (corresponding author) ResearchAssociate Geographical Institute “Jovan Cvijić”, Serbian Academy of Science and Arts, Belgrade; e-mails: [email protected]; [email protected]; [email protected] 462/480 Received 16 April 2016; Accepted 19 July 2016 Abstract: The study presented in this paper deals with the definition and role of small towns in the spatial development of the Republic of Serbia. An analysis of the profiles of small towns was performed and they were compared based on their spatial and population characteristics. The aim of this study is to determine the role of small towns in the development of settlement networks and the balanced population development of a country as a whole by identifying their specific features and establishing a ranking of their importance in local and regional contexts. Key words: urban settlement, small town, role, Serbia Abstrakt: Istraživanje u ovom radu odnosi se na problematiku malih gradova, njihovog definisanja i uloge u prostornom razvoju Republike Srbije. Izvršena je analiza I komparacija profila malih gradova kroz njihove prostorne i demografske karakteristike. Cilj rada je da odredi ulogu malih gradova u razvoju mreže naselja, kao i uravnoteženom populacionom razvoju zemlje, kroz sagledavanje njihovih specifičnosti i gradaciju značaja u lokalnim I regionalnim okvirima. Ključne reči: gradska naselja, mali gradovi, uloga, Srbija 1.
    [Show full text]
  • Serbia 2Nd Periodical Report
    Strasbourg, 23 September 2010 MIN-LANG/PR (2010) 7 EUROPEAN CHARTER FOR REGIONAL OR MINORITY LANGUAGES Second periodical report presented to the Secretary General of the Council of Europe in accordance with Article 15 of the Charter SERBIA The Republic of Serbia The European Charter for Regional or Minority Languages The Second Periodical Report Submitted to the Secretary General of the Council of Europe Pursuant to Article 15 of the Charter Belgrade, September 2010 2 C O N T E N T S 1. INTRODUCTION ……………………………………………………………………6 2. Part I …………………………………………………………………………………12 2.1. Legislative and institutional changes after the first cycle of monitoring of the implementation of the Charter …………………………………………………….12 2.1.1. Legislative changes ……………………………………………………….12 2.1.2. The National Strategy for the Improvement of the Status of Roma ……..17 2.1.3. Judicial Reform …………………………………………………………...17 2.1.4. Establishment of the Ministry of Human and Minority Rights …………..23 2.2. Novelties expected during the next monitoring cycle of the implementation of the Charter …………………………………………………………………………….24 2.2.1. The Census ………………………………………………………………..24 2.2.2. Election of the national councils of the national minorities ……………...26 2.3. Implementation of the recommendations of the Committee of Ministers of the Council of Europe (RecChL(2009)2) 28) …………………………………………29 2.4. Activities for the implementation of the box-recommendation of the Committee of Experts with regard to the implementation of the Charter ………………………...33 3. PART II Implementation of Article 7 of the Charter ……………………………..38 3.1. Information on the policy, legislation and practice in the implementation of Part II - Article 7 of the Charter ……………………………………………………………..38 3.1.1.
    [Show full text]
  • THE POSSIBILITIES and CHANCES of the PROJECT ENERGY COMPLEX KOVIN — NEW COAL MINE and POWER PLANT 1. Introduction 2. General P
    Górnictwo i Geoinżynieria • Rok 35 • Zeszyt 3 • 2011 Milan Radunović*, Obrad Kecman*, Tanja Mihajlović*, Jörg Schlenstedt**, Peter Denke**, Dusan Djuric*** THE POSSIBILITIES AND CHANCES OF THE PROJECT ENERGY COMPLEX KOVIN ⎯ NEW COAL MINE AND POWER PLANT 1. Introduction The first geological studies in Kovinski basin started in 1976 to 1979. The results of these studies showed the presence of interesting economic coal beds. Coal is of such quality that can be used in thermal power plants. The entire studies took place in stages that are aimed at determining the quantity and quality of coal required to open the power plant. Due to the specific areas and great influence of underground water, the experimental test pit was opened on the banks of the Danube. In this pit method that was used is underwater mining of coal, and this method proved to be an alternative to dry mine Kostolac the other side of the Danube. Due to the specific conditions in the protected part of the deposit fields A and B, were considered two types of mining coal: dry open pit mining and underwater. 2. General part 2.1. Geographical location In geographical terms Kovin coal deposit is situated about 50 km east of Belgrade, in the municipality of Kovin, in the villages Malo Bavanište i Beli Breg and it is bounded by the Danube on south, line Dubovac-Gaj on north, Deliblato- delta river V. Morava to the west and village Gaj to the east. * Energy Consulting and Engineering, Novi Sad, Serbia ** LMBV International, Senftenberg, Germany *** Insitut Jaroslav Černi, Beograd, Serbia 291 2.2.
    [Show full text]