Bicycle Comfort Level

Total Page:16

File Type:pdf, Size:1020Kb

Bicycle Comfort Level 1 mile 8 min bike 1 mile 8 min bike 1 mile 8 min bike 1 mile 8 min bike ARLINGTON COUNTY’S 2020 A How to Use This Map A This map is your guide to the least BICYCLE COMFORT CHAIN BRIDGE RD stressful or most comfortable routes to get around Arlington. Instead of CHAIN BRIDGE just showing bike trails, bike lanes, LEVEL MAP N Randolph St and sharrows, this map uses a rating 41st St N system of “perception of comfort” to rate roads as easy, medium, N GLEBE RD GLEBE N challenging, or expert level. Military Rd Old Glebe Rd WASHINGTON, D.C. Easy B Chesterbrook Rd B Medium N Albemarle St N Glebe Rd Challenging Potomac Overlook Regional Military Rd Park Expert Level OLD DOMINION DR Williamsburg Blvd N Harrison St N Glebe Rd Prohibited N George Mason Dr 31st St N St 31st OL D DO C M C IN FAIRFAX IO N D R COUNTY N Harrison St DONALDSON RUN TRAIL 26th St N N Kensington St N Stuart St Nelly Custis Dr Little Falls Rd Vacation Ln KEY BRIDGE Yorktown Blvd N Powhatan St Yorktown Blvd Old Dominion Dr Lorcom Ln N GLEBE RD Williamsburg Blvd Yorktown Blvd N John Marshall Dr Little Falls Rd G N Kenmore St 24th St N e 26th St N o Vacation Ln r N Fillmore St g Lorcom Ln e Lorcom Ln CUSTIS TRAIL Little Falls Rd M 22nd St N LD DOMINI O ON DR a s LEE Fort Myer Dr o Vacation Ln 21st St N n HIGHWAY LEE HWY N Lynn St 26th St N D N Harrison St N Calvert St 66 r Lee Hwy CUSTIS TRAIL John Marshall Dr 27th St N MT VERNON TRAIL N Sycamore St Sycamore N N Sycamore St Sycamore N Lee Hwy N Irving St Key Blvd 28th St N LEE HWY Scott N Quinn St WASHINGTON D.C. N Westmoreland N Culpeper St N Veitch St Wilson Blvd Lee Hwy N Rhodes St N Nash St D N Taylor St 66 D N Highland St Highland N Wilson Blvd LEE HWY N Monroe St ROSSLYN 22nd St N N Woodstock St N Stafford St John Marshall Dr Marshall John 26th St N Dr Marshall John Key Blvd Little Falls Rd N Custis Rd ROOSEVELT BRIDGE N Quincy St Quincy N (narrow width) 18th St N CUSTIS TRAIL Clarendon Blvd N Underwood St N Rhodes Kirkwood Rd Kirkwood 22nd St N Rd Kirkwood 66 N Dickerson St Key Blvd 26th St N N GLEBE RD 28th St N 14th St N Fairfax Dr 19th St N COURTHOUSE N Harrison St N Edison St N George Mason Dr N Highland St Washington Blvd N Jackson St N Lincoln St N Courthouse Rd N Lexington St Arlington Blvd 17th Rd N N Hartford St 22nd St N N Quincy St N Abingdon St Wilson Blvd N Barton St 15th St N Fairfax Dr LEE HWY 66 Fairfax Dr 22nd St N 16th St N Marshall Dr N Sycamore St Fairfax Dr Patrick Henry Dr 14th St N MEMORIAL BRIDGE 13th St N N Stafford St Clarendon Blvd EAST FALLS Washington Blvd 13th St N CLARENDON CHURCH Washington Blvd 16th St N 14th St N Washington Blvd N Westmoreland Dr N Wakefield St N Utah St ARLINGTON 19th Rd N Washington Blvd N Van Buren CEMETERY N Quincy St N Ohio St 66 N George Mason 11th St N 10TH ST N N Barton St WESTOVER Washington Blvd N Tuckahoe Wilson Blvd N Highland St VIRGINIA N Irving St N Stuart St 19th St 11th St N N Stafford St N Taylor St Washington Blvd BALLSTON SQUARE Fairfax Dr N Harrison St N Jackson St E St Kennebec N ROSSLYN-BALLSTON INSET MAP E Fairfax Dr (on reverse) Patrick11th Henry Dr St N N Sycamore St 9th St N N Monroe St MT VERNON TRAIL N Ohio St N Pershing Dr N Wakefield St Wilson Blvd CUSTIS TRAIL 66 St Quincy N N Vermont StN GLEBEWilson RD Blvd Ft. Myer CITY OF N Harrison St N Pershing Dr (restricted access) N Jefferson St WASHINGTON BLVD 9th Rd N 5th St N N Cleveland St Arlington 4th St N Boundary Channel Dr FALLS CHURCH N Fillmore St N George Mason National W & OD TRAIL N Jackson St N Irving St McKinley Rd McKinley 5th St N Cemetery Wilson Blvd Springs Rd (restricted access) N Park Dr Park N N Jefferson St N Edison St N Carlin Dr Park N GEORGE MASON BRIDGE N Thomas St N Pershing Dr Patrick Henry Dr N Oakland St N GeorgeHenderson Mason Rd N GLEBE RD Arlington Blvd Wilson Blvd Wilson Blvd 3rd St NRd Henderson 4th St N Arlington Blvd S Uhle St 2nd Rd N N Pershing Dr Boundary Channel Dr Glencarlyn Trails (steep hills) N CARLIN SPRINGS RD 2nd St S BLUEMONT JUNCTION TRAIL Lubber N Irving St d Run 2nd St N Cathedral Ln S Dr Park N 2nd St S Arlington Blv Park PENTAGON C S Courthouse Rd 1st St S r Southgate Rd F olum N Granada St 6th St S F 1st Rd N Arlington Blvd U.S. Army Orme St D t N GLEBE RD S 1st St S George Mason Nat’l Guard S Walter Reed Dr S Readiness b rk Arlington Blvd Arlington Blvd u en Center S Wayne St 2nd St S s Army Navy Dr R (Arlington S S de 7th St S r Hall) S Highland St d S Pa St Joyce S 395 I 3r J e Arlington Blvd Long Bridge Dr d St S l S COLUMBIA PIKE e l b S i n f L Ke ferso oi 3rd St S 9th St S e S A N Monroe St x 7th St S s S n i t 4th S n S S Abington St PENTAGON 12th St S si 3rd St S S Park Dr S Quincy St S Eads St g n t CITY S Hayes St Hayes S ng S Clark Dr Crystal t S Wakefield St Army Navy Dr S Cleveland St S 9th St S COLUMBIA PIKE COLUMBIA o 5th St S S George Mason 7th St S t PIKE n t o W & OD TRAIL 15th St S S n S S CARLIN SPRINGS RD 9th St S t 5th Rd S Glencarlyn 8th St S Glencarlyn 11th St S MT VERNON TRAIL t 15th St S St 6th 15th St S S Eads St Park S Hayes St S Fern St S Bell St S Park S 12th St S 395 CRYSTAL Harris G (steep CITY r 16th St S e S GLEBE RD S hills) 12th St S S Joyce St e 6th Pl 9th St S n 18th St o b GLENCARLYN TRAILS INSET MAP n r SS COLUMBIA PIKE i S Quincy St S Monroe St e S Fern St St St S Eads Crystal Dr S F h S CARLIN SPRINGS RD Army Navy Dr r t lori t 7 S S Walter Reed Dr S d d Army-Navy 20th S 7th St S t a 20th St S S Country Club G th R t G 7 (private) 16th St S S Pollard St 23rd St S Legend 23rd St S S Clark St COLUMBIA PIKE 23rd St S 1 ROUTE S George Mason RONALD S Eads St Eads S REAGAN S Kenmore St S WASHINGTON A NATIONAL 28th St S St 28th r l AIRPORT W & OD TRAIL i n ARLINGTON LOOP g 26TH ST S S GLEBE RD t BIKE SHOPS o n R S George Mason i d FOUR MILE RUN TRAIL g Ave Potomac MT VERNON TRAIL Army Navy Dr e 28th St S OFF STREET TRAIL CAPITAL BIKESHARE STATION R 27th St S d Download the Capital Bikeshare app to S Adams S Dinwiddie St S Walter Reed Dr St Meade S rent bikes, find stations, and get S Culpeper St W & OD TRAIL S Troy St real-time bike and dock availability. FAIRFAX St Eads S BIKE LANE Barcroft 33rd 395 ROUTE 1 MT VERNON TRAIL easy medium challenging COUNTY Park S Arlington Mill Dr 28th Rd S S GLEBE RD COMMUNITY CENTER S GLEBE RD 27th St S Shirlington Rd FOUR MILE RUN TRAIL SUGGESTED ROUTE H S Nelson St FOUR MILE RUN TRAIL H COMMUTER STORE 28th Rd S easy medium challenging S Walter Reed Dr King St S 28th St EXPERT LEVEL FIX IT STATION S Columbus St S Abingdon St SHIRLINGTON S Quincy St S Randolph NEIGHBORHOOD STREETS are generally low trac/low speed routes DRINKING FOUNTAIN 31st St S 30th St S 395 PROHIBITED OR MAJOR CAR THOROUGHFARES LIBRARY 33rd St CITY OF 395 34th St S ALEXANDRIA ARROWS POINT UPHILL RESTROOM CITY OF BRIDGE ALEXANDRIA SCHOOL I USE CAUTION I METRO STATION 1 2 3 4 5 6 7 8 1 mile 8 min bike 1 mile 8 min bike 1 mile 8 min bike 1 mile 8 min bike ARLINGTON COUNTY’S 2020 ARLINGTON COUNTY’S 2020 Riding Safely Route Colors and Markings How to Use This Map A OFF STREET CONNECT WITH BICYCLE COMFORT A BIKEARLINGTON LEVEL MAP Easy Medium Challenging This map is your guide to the least Solid green lines indicate Blue lines designate roads Orange routes generally BikeArlington.com BICYCLE COMFORT CHAIN BRIDGE RD stressful or most comfortable routes quiet neighborhood streets. with moderate traffic volume. have higher traffic speeds and Green lines with dots indicate Riders along these routes may volume than green or blue.
Recommended publications
  • Barry Mackintosh Park History Program National Park Service
    GEORGE WASHINGTON MEMORIAL PARKWAY ADMINISTRATIVE HISTORY Barry Mackintosh Park History Program National Park Service Department of the Interior Washington, DC 1996 CONTENTS INTRODUCTION . 1 I. THE MOUNT VERNON MEMORIAL HIGHWAY • • • 7 II. THE CAPPER-CRAMTON ACT 21 III. EXPANDING THE PARKWAY, 1931-1952 • 33 IV. EXPANDING THE PARKWAY, 1952-1970 57 V. THE UNFINISHED PARKWAY. 87 VI. ARLINGTON HOUSE .•• . • 117 VII. THEODORE ROOSEVELT ISLAND . • 133 VIII. OTHER ADDITIONS AND SUBTRACTIONS • . • • . 147 Fort Hunt •.. • • . • • . • • . 147 Jones Point . • • . • • . • . • • . • • . • • • . 150 Dyke Marsh and Daingerfield Island . • • • . • • . • 153 Arlington Memorial Bridge, Memorial Drive, and Columbia Island • . • • • • • • . • • • • . • . • 164 The Nevius Tract • • . • . • • • • • • • . • • • . • • • 176 Merrywood and the Riverfront Above Chain Bridge • • • . 184 Fort Marcy . • • • • . • • • • . • • . • • • . 187 The Langley Tract and Turkey Run Farm • • • • . • • • 188 Glen Echo Park and Clara Barton National Historic site • 190 GWMP Loses Ground • • • . • • • • .. • . • • . • • • 197 INTRODUCTION The George Washington Memorial Parkway is among the most complex and unusual units of the national park system. The GWMP encompasses some 7,428 acres in Virginia, Maryland, and the District of Columbia. For reasons that will later be explained, a small part of this acreage is not administered by its superintendent, and a greater amount of land formerly within GWMP now lies within another national park unit. Some of the GWMP acreage the superintendent administers is commonly known by other names, like Great Falls Park in Virginia and Glen Echo Park in Maryland. While most national park units may be characterized as predominantly natural, historical, or recreational, GWMP comprises such a diverse array of natural, historic, and recreational resources that it defies any such categorization. Further complicating matters, GWMP's superintendent also administers four other areas classed as discrete national park units-Arlington House, The Robert E.
    [Show full text]
  • 2015 Corridor Analysis of the Potomac Heritage National Scenic Trail in Northern Virginia
    2015 Corridor Analysis Of the Potomac Heritage National Scenic Trail in Northern Virginia 0 http://www.novaregion.org/index.aspx?nid=299 Acknowledgements The Northern Virginia Regional Commission (NVRC) thanks the following individuals for their contributions to this report: • Donald Briggs, Superintendent of the Potomac Heritage National Scenic Trail for the National Park Service; • Ursula Lemanski, Rivers, Trails and Conservation Assistance Program for the National Park Service; • Mark Novak, Loudoun County Park Authority; • Debbie Andrews of Prince William County Department of Parks and Recreation; and • Members of the Potomac Heritage Trail Association. The report is an NVRC staff product, supported with funds provided by a cooperative agreement with the National Capital Region National Park Service (Grant Cooperative Agreement P14AC01704). Any assessments, conclusions, or recommendations contained in this report represent the results of the NVRC staff’s technical investigation and do not represent policy positions of the Northern Virginia Regional Commission unless so stated in an adopted resolution of said Commission. The views expressed in this document are those of the authors and do not necessarily reflect the views of the jurisdictions, the National Park Service, or any of its sub agencies. Report prepared by: Corey Miles, Senior Environmental Planner Northern Virginia Regional Commission Debbie Spiliotopoulos, Senior Environmental Planner Northern Virginia Regional Commission Figure 1 Potomac Heritage National Scenic Trail Corridor 1 http://www.novaregion.org/index.aspx?nid=299 The Northern Virginia Regional Commission 2015 Commissioners Listed by Jurisdiction (As of December 2015) Commissioners are appointed by and from the governing bodies of NVRC’s member localities on a population-based representation formula.
    [Show full text]
  • Northern Virginia District
    THE VIRGINIA TRANSPORTATION NORTHERN VIRGINIA DISTRICT 2014 – 2019 WORKINGCommonwealth DRAFT Transportation Board Virginia Department of Transportation Virginia Department of Rail and Public Transportation This Page Is Intentionally Left Blank 480 05/15/2013 FY14 DRAFT SYIP FY2014-2019 Six-Year Improvement Program NORTHERN VIRGINIA DISTRICT Funding Allocation Summary (000's) NORTHERN VIRGINIA DISTRICT System Fund Source Name FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 Totals Interstate Accounts Receivable Local $1,663 $0 $0 $0 $0 $0 $1,663 CMAQ TERMS - Federal 2,114 0 0 0 0 0 2,114 TERMS - State Match 529 0 0 0 0 0 529 CTB Formula Bridge - State 0 7,414 5,000 0 0 0 12,414 High Priority - Federal 499 0 0 0 0 0 499 High Priority - Soft Match 125 0 0 0 0 0 125 High Priority - State 0 5,249 11,049 4,419 23,028 44,328 88,073 Paving - Federal 497 0 0 0 3,858 0 4,356 Paving - Soft Match 124 0 0 0 965 0 1,089 Paving - State 0 11,021 27,267 0 0 0 38,288 Highway Safety Improvements Federal 5,812 0 0 0 0 0 5,812 Soft Match 646 0 0 0 0 0 646 NHPP Statewide - Federal 53,000 23,604 22,500 6,819 2,376 0 108,298 Statewide - Soft Match 13,250 5,901 5,625 1,705 594 0 27,075 RSTP (STP Regional) MPO - Federal 5,984 0 0 0 0 0 5,984 MPO - State Match 1,496 0 0 0 0 0 1,496 Total $85,739 $53,189 $71,440 $12,943 $30,821 $44,328 $298,460 Primary Bond Proceeds CPR Bonds $15,410 $0 $0 $0 $0 $0 $15,410 CMAQ MPO - Federal 4,561 2,930 5,200 3,735 5,354 8,384 30,164 MPO - State Match 1,140 733 1,300 934 1,339 2,096 7,541 PM 2.5 - Federal 0 3,693 0 2,099 0 0 5,793 PM 2.5
    [Show full text]
  • Cue Sheet of the Ride
    Arlington History Ride Cue Sheet 2021 version Distance Directions Total 0.0 Start at Arlington Historical Museum, 1805 S. Arlington Ridge Rd. 0.0 Museum may be closed for pandemic distancing. 0 R on Arlington Ridge out of parking lot 0.0 0.2 Note Little Tea Room stone tower on R at Lynn 0.2 0.3 Stop for the view at Prospect Hill, then take S. Nash St down hill 0.5 0.2 At T, turn L onto Army-Navy Drive 0.7 0.8 L on 28th Street South 1.5 0.5 R on South Meade 2.0 0.2 Cross Glebe, take sidewalk to R, cross bridge and bear left onto asphalt trail 2.2 0.2 At railings, L to remain on trail and pass under I-395 (Sign says to W&OD) 2.4 0.6 R when trail emerges at Shirlington Road 3.0 0.1 L at light to cross Shirlington Road onto W&OD Trail 3.1 1.7 Cross Columbia Pike—Barcroft historic markers on L. Continue on trail 4.8 0.5 Pass Sparrow Pond observation deck on right 5.3 0.3 Cross bridge and turn sharply left on trail down toward bathroom facility. 5.6 0 Right/Left jog to take trail behind bathrooms to T at second parking lot 5.6 0.2 Look for George Washington Survey Marker behind a curved stone wall to L. 5.8 Park may be closed for pandemic distancing. 0 Follow through second parking lot, stay on road to climb steep hill.
    [Show full text]
  • Little Hunting Creek Bridge HAER No. VA-42D
    Mount Vernon Memorial Highway: Little Hunting Creek Bridge HAER No. VA-42D Carries the Mount Vernon Memorial Highway over Little Hunting Creek along the Potomac, 8.6 miles south of 1-95 Mount Vernon Vicinity Fairfax County Virginia 3\ <*-> PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA Historic American Engineering Recoi National Park Service Department of the Interior Washington, DC 20013-7127 HISTORIC AMERICAN ENGINEERING RECORD MOUNT VERNON MEMORIAL HIGHWAY: LITTLE HUNTING CREEK BRIDGE b~$ HAER No. VA-42D Location: Carrying the Mount Vernon Memorial Highway across Little Hunting Creek at the Potomac, 8.6 miles south of 1-95 and 1.1 miles north of Mount Vernon in Fairfax County, Virginia, UTM: 18/319650/4286750 Quad.: Mount Vernon Date of Construction: Designed 1929, Completed 1932 Architect: Gilmore D. Clarke Engineer: E.J. Budge, Resident Engineer F.M. DeWaters, Assistant Resident Engineer J.V. McNary, Senior Engineer, U.S. Bureau of Public Roads Contractor: Merritt-Chapman & Scott Corporation, New York, New York Present Owner George Washington Memorial Parkway National Park Service Department of the Interior Present Use: Vehicular bridge Significance: This parkway bridge is significant because it typifies the style of bridges which were designed for this new type of roadway. This bridge was designed to harmonize with the landscape by incorporating the natural shape of the arch, facing the bridge with native stone, and using careful attention regarding the plantings and landscape surroundin; the bridge. Historian: Elizabeth M. Nolin, 1988 LITTLE HUNTING CREEK BRIDGE HAER Mo. VA-42D (page 2) The final bridge on the Mount Vernon Memorial Highway (see HAER Mo.
    [Show full text]
  • Arlington Finished Sixth Among Male 10K Runners with a Time of 34:09 in the 7Th Annual Dulles Day 5K/10K on the Runway on Sept
    Page, 8 Michael Wardian #3889 from Arlington finished sixth Classifieds, Page 14 Classifieds, v among male 10k runners with a time of 34:09 in the 7th annual Dulles Day 5k/10k on the Runway on Sept. 14. Immigrants and Fast Times on The Runway Calendar page 10 Refugees Welcome News, page 6 News, page 3 Requested in home 9-19-19 home in Requested Time sensitive material. material. sensitive Time Pickleball Over Postmaster: Attention permit #322 permit Easton, MD Easton, Parkinson’s? PAID U.S. Postage U.S. Senior Olympics, page 6 STD PRSRT Photo by Tom Manning by Tom Photo September 18-24, 2019 online at www.connectionnewspapers.com 2 ❖ Arlington Connection ❖ September 18-24, 2019 www.ConnectionNewspapers.com News OLQP Outreach to Immigrants Serves Great Need By Shirley Ruhe Arlington Connection t is 9:30 a.m. on Sept. 11, and Our Lady Queen of Peace Catholic Church Iis already handing out number 137 to immigrant families waiting in line for their assistance programs. A large sign in the parish yard proclaims “Immigrants and Refugees Welcome.” Chrissy Gelson, co-director of Gabriel’s Project that gives support to pregnant women and babies under one-year-old, says last week they served over 250 families be- tween their three ministries for immigrants. She says Gabriel’s Project serves anyone Sally Diaz-Wells, Social Justice and pregnant and infants. “We don’t ask ques- Outreach Minister, Our Lady Queen tions like their income or nationality.” of Peace (OLQP) Catholic Church. Gabriel’s Project offers diapers, wipes, cribs and strollers, whatever the women need.
    [Show full text]
  • Table of Contents
    20130904 Table of Contents Table of Contents 1.0 Introduction ............................................................................................................................. 1-1 1.1 Highlights from the Final Report ................................................................................. 1-1 1.2 Supplemental Report Objectives .................................................................................. 1-6 2.0 Refined Multimodal Package ............................................................................................... 2-1 2.1 Roadway Refinement ..................................................................................................... 2-1 2.2 Transit Refinement ......................................................................................................... 2-5 2.3 Refined Package Model Results ................................................................................... 2-8 2.4 Peak-Only Tolls versus All Day Tolls .......................................................................... 2-20 2.5 Refined Multimodal Package Conclusions ................................................................. 2-22 3.0 Refined Bicycle and Pedestrian Recommendations ......................................................... 3-1 3.1 Bicycle and Pedestrian Project Refinement ................................................................ 3-2 3.2 Regionally Significant Bicycle and Pedestrian Projects ............................................ 3-4 3.3 Additional Considerations for Bicycle
    [Show full text]
  • USACE, Baltimore District Overview of Upcoming Work Opportunities SAME and ACEC Forum 17 June 2015
    USACE, Baltimore District Overview of upcoming work Opportunities SAME and ACEC Forum 17 June 2015 Presented by: William Tully, PE , DBIA Program Manager, Capital Area 6050 1st Street – Bldg 1444 Fort Belvoir, VA 22060 Contact info: Phone: 202-345-7573 Email: [email protected] US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG® BUILDING STRONG® Baltimore District: What are we known for? . One of the largest and most visible military missions in the country (National Capital Region) . Support to the Intelligence Community (NSA, DIA and others) . Support to the Port of Baltimore and regional economy . The Washington Aqueduct – drinking water for Washington DC . Protection and restoration of the Chesapeake Bay . Regional HTRW Design Center/National Military Munitions Design Center . Regulatory oversight for natural gas industry pipelines in PA’s Marcellus Shale Formation 2 BUILDING STRONG® Military Missions …through a very large military program in support of 12 military installations in the states of: USAMRIID, Fort Detrick Maryland NGA, Fort Belvoir Pennsylvania West Virginia District of Columbia Northern Virginia • Projects include design and construction of: USAMRICD, Aberdeen Administrative spaces DISA, Fort Meade Proving Ground Medical and laboratory facilities Training facilities Childcare centers Barracks • $1.9 billion program in the next 5 FYs • We made major contributions to the success of BRAC ’05 ($4.2 billion) Horse Stables, Fort Myer Lincoln Hall, Fort McNair BUILDING STRONG® Civil
    [Show full text]
  • M a R Y L a N D V I R G I N
    300 ¢ U.S. Coast Pilot 3, Chapter 12 26 SEP 2021 77°20'W 77°W 76°40'W 76°20'W 39°N Annapolis Washington D.C. 12289 Alexandria PISCATAWAY CREEK 38°40'N MARYLAND 12288 MATTAWOMAN CREEK PATUXENT RIVER PORT TOBACCO RIVER NANJEMOY CREEK 12285 WICOMICO 12286 RIVER 38°20'N ST. CLEMENTS BAY UPPER MACHODOC CREEK 12287 MATTOX CREEK POTOMAC RIVER ST. MARYS RIVER POPES CREEK NOMINI BAY YEOCOMICO RIVER Point Lookout COAN RIVER 38°N RAPPAHANNOCK RIVER Smith VIRGINIA Point 12233 Chart Coverage in Coast Pilot 3—Chapter 12 NOAA’s Online Interactive Chart Catalog has complete chart coverage http://www.charts.noaa.gov/InteractiveCatalog/nrnc.shtml 26 SEP 2021 U.S. Coast Pilot 3, Chapter 12 ¢ 301 Chesapeake Bay, Potomac River (1) This chapter describes the Potomac River and the above the mouth; thence the controlling depth through numerous tributaries that empty into it; included are the dredged cuts is about 18 feet to Hains Point. The Coan, St. Marys, Yeocomico, Wicomico and Anacostia channels are maintained at or near project depths. For Rivers. Also described are the ports of Washington, DC, detailed channel information and minimum depths as and Alexandria and several smaller ports and landings on reported by the U.S. Army Corps of Engineers (USACE), these waterways. use NOAA Electronic Navigational Charts. Surveys and (2) channel condition reports are available through a USACE COLREGS Demarcation Lines hydrographic survey website listed in Appendix A. (3) The lines established for Chesapeake Bay are (12) described in 33 CFR 80.510, chapter 2. Anchorages (13) Vessels bound up or down the river anchor anywhere (4) ENCs - US5VA22M, US5VA27M, US5MD41M, near the channel where the bottom is soft; vessels US5MD43M, US5MD44M, US4MD40M, US5MD40M sometimes anchor in Cornfield Harbor or St.
    [Show full text]
  • Public Spaces Master Plan
    PUBLIC SPACES MASTER PLAN Arlington’s Public Spaces... Where the Community Comes Together! ADOPTED DECEMBER 10, 2005 COPIES OF THE PUBLIC SPACES MASTER PLAN ARE AVAILABLE: b On line at www.arlingtonva.us b At Arlington's Central Library b Upon request by calling (703) 228-3322 b Emailing [email protected] Gunston Park The Public Spaces Master Plan was adopted by the Arlington County Board on December 10th, 2005. This plan has replaced the 1994 Open Space Master Plan, which no longer has any force or effect. TABLE OF CONTENTS Acknowledgements . 5 Executive Summary . 6 Chapter 1. Past and Present – The Planning Context . 12 A. Vision . 12 B. Purpose of this Plan . 13 C. Progress over the Last 10 Years . 14 D. History of Public Spaces . 16 E. Related Planning Efforts and Integration . 17 Chapter 2. Community Profile and Trends . 19 A. Demographics . 19 B. Community and Stakeholder Input . 20 C. Current Trends. 21 Chapter 3. Overview of Existing and Planned Public Spaces . 23 A. Existing Indoor Recreation Facilities . 24 B. Outdoor Active Facilities and Sports . 26 C. Parks and Natural Resources Facilities . 26 D. Arts, Cultural and Historic Resources . 27 E. Urban Public Spaces and Streetscaping . 29 F. Major Focus Areas . 31 Chapter 4. Administration and Planning . 34 A. Overview of Public Spaces Management and Services . 34 B. Traditional Funding Mechanisms . 34 C. Alternative Funding Mechanisms. 35 D. Open Space Acquisition . 35 E. Planning Considerations . 37 F. Benchmarking . 38 Chapter 5. Recommendations. 40 A. Objectives and Priority Recommendations . 40 B. Next Steps . 53 Appendices. 54 Arlington, Virginia 3 APPENDICES A.
    [Show full text]
  • Known Wetlands Within the District of Columbia
    Government of District 36 of Columbia District Department of the of the Environment Water Quality Division 1200 First St. NE, 5th Floor Washington, DC 20002 (202) 535-2190 46 47 48 40 38 4 3 37 11 5 41 6 1 10 8 39 12 7 14 17 2 15 13 9 16 42 44 18 19 45 43 20 21 22 23 26 24 27 Key to Features 29 25 30 31 32 28 Wetlands Waterbodies 33 34 Known Wetlands within the Note: 1. Delineation based on 1996 field reconnaissance 2. Wetland boundaries shown are intended for District of Columbia planning purposes and do not reflect jurisdiction 35 under Section 404 of the Clean Water Act. Identified by Number 3. Wetlands shown do not include the Potomac and Anacostia open water areas. Source: District of Columbia Wetland Conservation Plan, 1997 3036Miles Projection: UTM spheroid Clarke 1866 Zone: 18 Date: January, 2001 The following is a list of the KNOWN wetlands in the District of Columbia based on the District of Columbia Wetland Conservation Plan (1997). There are many wetlands within the city that are not listed here including the open water areas of the Potomac and Anacostia. Wetland Location ADC Grid Longitude Latitude No. 1 Beaverdam Creek at Kenilworth Courts 11-D11 76-56'-38"/56'06" 38-54'-56"/54'-39" 2 Kenilworth Aquatic Gardens 11-B,C12 76-57'-00"/56'-28" 38-54'-54"/54'-30" 3 Fort Lincoln New Town between Rt. 50 and 11-C9 76-56'-39" 38-55'-02" Fort Lincoln cemetery 4 Fort Lincoln between Rt.
    [Show full text]
  • USACE, Baltimore District Program Overview Presentation for Design Build Institute of America 18 Nov 14
    USACE, Baltimore District Program Overview Presentation for Design Build Institute of America 18 Nov 14 Presented by: Frank Benvenga, PMP 10 South Howard Street, Baltimore, Md Contact info: 410.962.6785 (Desk) 410.977.6733 (BB) Email: [email protected] US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG ® BUILDING STRONG ® Baltimore District: What are we known for? ° One of the largest and most visible military missions in the country (National Capital Region) ° Support to the Intelligence Community (NSA, DIA and others) ° Support to the Port of Baltimore and regional economy ° The Washington Aqueduct – drinking water for Washington DC ° Protection and restoration of the Chesapeake Bay ° Regional HTRW Design Center/National Military Munitions Design Center ° Regulatory oversight for natural gas industry pipelines in PA’s Marcellus Shale Formation 2 BUILDING STRONG ® Baltimore District Snapshot Region Navigation • 15 military installations • 290 miles of federal channels • 49,000 square miles • 2.5 million cubic yards of material dredged/year Flood Risk Management Regulate wetlands • 14 Reservoir projects • 4,200 permit applications received/4,100 completed • Preventing $3.9 billion in damages through in 2010 2011 • Completed 1,500 jurisdictional determinations in • 58 local flood protection projects 2010 • Preventing $12 billion in damages through 2011 Supply Drinking Water • 175 million gallons of drinking water per day to D.C., Recreation Arlington County and Falls Church, Va. • 14 million visitor hours
    [Show full text]