CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

D00 Norman County/Ada/Twin Valley Airport 2014 PAPI 0 80 20 50,000 0 40,000 10,000

2014 UPDATE ALP 0 80 20 30,000 0 24,000 6,000

2016 APRON AREA TIEDOWN UPDATE 0 80 20 50,000 0 40,000 10,000

2016 T-HANGAR (8 PLACE) - Hangar Loan 0 0 0 350,000 0 0 0

2018 AG APPLICATOR WASH FACILITY 0 0 0 150,000 0 0 0

Summary for 'FAASite' = 10504.11*A (5 detail records) Totals 630,000 0 104,000 26,000

AIT Aitkin Municipal Airport - Steve Kurtz Field 2013 Crosswind Runway & Obstructions 90 0 10 60,000 54,000 0 6,000

2014 Mower with Brush Attachment 0 67 33 25,000 0 16,668 8,333

2016 CRACK REPAIR & SEAL COAT AIRPORT PAVEMENT 90 0 10 435,000 391,500 0 43,500

2017 WILDLIFE MANAGEMENT PLAN 90 0 10 35,000 31,500 0 3,500

2017 Jet A Fuel Facility 90 0 10 186,000 167,400 0 18,600

Summary for 'FAASite' = 10505.*A (5 detail records) Totals 741,000 644,400 16,668 79,933

AEL Albert Lea Municipal Airport 2013 REMOVAL EQUIPMENT- TRUCK UNDERBODY 90 0 10 150,000 135,000 0 15,000 BLADE 2013 DESIGN FOR FIXED-BASE OPERATOR (FBO) AND 90 0 10 275,000 247,500 0 27,500 ARRIVAL/DEPARTURE BLDG 2014 SWEEPER ATTACHMENT 0 67 33 20,000 0 13,334 6,666

2014 LANDSIDE PARKING EXPANSION 0 70 30 100,000 0 70,000 30,000

2014 CONSTRUCT ARRIVAL/DEPARTURE BUILDING 0 70 30 1,050,000 0 735,000 315,000

2014 CONSTRUCT FIXED-BASE OPERATOR HANGAR 0 50 50 1,250,000 0 625,000 625,000

2014 DEMOLISH LARGE WOOD HANGAR (OBSTRUCTION 90 0 10 31,500 28,350 0 3,150 REMOVAL) 2015 RUNWAY GROOVING 0 70 30 100,000 0 70,000 30,000

Monday, December 10, 2012 Page 1 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

AEL Albert Lea Municipal Airport 2016 ILS 0 0 0 525,000 0 0 0

2016 DESIGN FOR 10 UNIT T-HANGAR 0 50 50 55,000 0 27,500 27,500

2016 CONSTRUCT 10-UNIT T-HANGAR 0 0 0 985,000 0 0 0

2016 CRACK SEALING/PAVEMENT MANAGEMENT 90 0 10 35,000 31,500 0 3,500

2016 PRECISION APPROACH PREP (ENVIRONMENTAL 90 0 10 210,000 189,000 0 21,000 ASSESSMENT, LAND) 2017 T-HANGAR SITE PREP 0 50 50 100,000 0 50,000 50,000

Summary for 'FAASite' = 10509.*A (14 detail records) Totals 4,886,500 631,350 1,590,834 1,154,316

AXN Alexandria Municipal Airport - Chandler Field 20142013 Large Aircraft Hangar 86 2 12 750,000 645,000 15,000 90,000

2014 Acquire SRE-Plow 0 67 33 300,000 0 200,010 99,990

2015 Re-Clad Two 6-Unit T-Hangars 0 50 50 150,000 0 75,000 75,000

2016 Mill & Overlay Runway 4/22 90 0 10 100,000 90,000 0 10,000

2016 Mill & Overlay Parallel Txwy 13/31 90 0 10 100,000 90,000 0 10,000

2016 Mill & Overlay Parallel Txwy 4/22 90 0 10 100,000 90,000 0 10,000

2016 Mill & Overlay Apron 90 0 10 100,000 90,000 0 10,000

2017 Runway 13/31 lighting 90 0 10 350,000 315,000 0 35,000

Summary for 'FAASite' = 10512.*A (8 detail records) Totals 1,950,000 1,320,000 290,010 339,990

AUM Austin Municipal Airport 2013 FACILITY SIGN 0 70 30 8,000 0 5,600 2,400

2013 EQUIPMENT - CARRIER VEHICLE 90 0 10 300,000 270,000 0 30,000

2014 AIRPORT MOWER 0 67 33 20,000 0 13,334 6,666

2014 FUEL TANK UPGRADES 0 50 50 30,000 0 15,000 15,000

Monday, December 10, 2012 Page 2 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

AUM Austin Municipal Airport 2014 APRON REHAB 90 0 10 50,000 45,000 0 5,000

2015 HANGAR SITE GRADING 0 50 50 150,000 0 75,000 75,000

2016 Obstruction Removal 0 70 30 20,000 0 14,000 6,000

2017 HANGAR ACCESS ROAD EXT/REHAB 90 0 10 50,000 45,000 0 5,000

Summary for 'FAASite' = 10524.*A (8 detail records) Totals 628,000 360,000 122,934 145,066

7Y3 Backus Municipal Airport 2013 Low Intensity Runway Lights (LIRLs) & PAPIs 0 80 20 15,000 0 12,000 3,000

2015 Clear & Grade Rwy 15 Safety Area 0 80 20 20,000 0 16,000 4,000

Summary for 'FAASite' = 10525.*A (2 detail records) Totals 35,000 0 28,000 7,000

7Y4 Bagley Municipal Airport 2014 Access Road Paving 0 80 20 62,000 0 49,600 12,400

2014 Hangar Site Prep 0 60 40 20,000 0 12,000 8,000

2014 Hangar 0 0 0 100,000 0 0 0

2014 Auto Parking/Taxilane 0 80 20 100,000 0 80,000 20,000

2015 Fueling System 0 50 50 52,000 0 26,000 26,000

2015 Apron Expansion 200' x 200' 0 80 20 155,000 0 124,000 31,000

2015 Airport Sign 0 80 20 15,000 0 12,000 3,000

2015 CRACK SEALING 0 80 20 6,000 0 4,800 1,200

2016 Mowing Equipment 0 67 33 62,000 0 41,335 20,665

2016 Crack Sealing 0 80 20 6,000 0 4,800 1,200

2016 Parallel Taxiway 0 80 20 258,000 0 206,400 51,600

2017 Crack Sealing 0 80 20 6,000 0 4,800 1,200

Monday, December 10, 2012 Page 3 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

7Y4 Bagley Municipal Airport 2017 Snow Removal Equipment 0 67 33 110,000 0 73,337 36,663

2017 Automated Weather Station 0 0 0 105,000 0 0 0

Summary for 'FAASite' = 10527.*A (14 detail records) Totals 1,057,000 0 639,072 212,928

BDE Baudette International Airport 2013 Mower 0 67 33 15,000 0 10,001 4,999

2013 8 Unit T-Hangar - Environmental 90 0 10 25,000 22,500 0 2,500

2014 Crack Seal Taxiway 90 0 10 20,000 18,000 0 2,000

20142014 Hangar Site Prep 85 7 8 150,000 127,500 10,500 12,000

2015 8 Unit T-Hangar 90 0 10 450,000 405,000 0 45,000

20162016 Remodel ARRIVAL/DEPARTURE BUILDING (elig est) 30 40 30 500,000 150,000 200,000 150,000

Summary for 'FAASite' = 10535.*A (6 detail records) Totals 1,160,000 723,000 220,501 216,500

BJI Bemidji Regional Airport 2013 Terminal Bus Stops / Lane 0 70 30 214,300 0 150,010 64,290

2013 AIRPORT ENTRY SIGNS (# 1) 95 0 5 60,000 57,000 0 3,000

20142014 Expand / Rehabilitate Snow Removal Equipment Building 80 10 10 1,890,000 1,512,000 189,000 189,000

2014 Rehabilitate Historical Apron 0 70 30 250,000 0 175,000 75,000

2014 General Aviation (GA) Apron Repairs 95 0 5 200,000 190,000 0 10,000

2014 Pavement Crack Sealing 0 70 30 25,000 0 17,500 7,500

2014 Airport Master Plan / Airport Layout Plan (ALP) Update 95 0 5 150,000 142,500 0 7,500

2014 Airport Service Vehicle-pick up truck 0 67 33 52,000 0 34,668 17,332

2014 Replacement Sander 95 0 5 546,000 518,700 0 27,300

2014 Airport Entry Sign (# 2) 95 0 5 75,000 71,250 0 3,750

Monday, December 10, 2012 Page 4 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

BJI Bemidji Regional Airport 2014 Land Acquisition 95 0 5 750,000 712,500 0 37,500

2014 Perimeter Road Paving (Ph 1) 95 0 5 78,000 74,100 0 3,900

2015 Pavement Crack Sealing 0 70 30 30,000 0 21,000 9,000

2015 Concrete Apron Repairs-Additional Panels 95 0 5 515,000 489,250 0 25,750

2015 Extend Twys C & F 95 0 5 775,000 736,250 0 38,750

2015 Perimeter Road Paving (Ph 2) 95 0 5 206,000 195,700 0 10,300

2016 SNOW REMOVAL EQUIPMENT (SRE)-Loader 90 0 10 206,000 185,400 0 20,600

2016 Crack Sealing 0 70 30 35,000 0 24,500 10,500

2016 Glycol Containment System upgrades-add tanks 90 0 10 105,000 94,500 0 10,500

2016 Maintenance Equipment 0 67 33 78,000 0 52,003 25,997

2016 Perimeter Road Paving (Ph 3) 90 0 10 206,000 185,400 0 20,600

2017 Perimeter Road Paving (Ph 4) 90 0 10 206,000 185,400 0 20,600

2017 Expand East Apron 90 0 10 275,000 247,500 0 27,500

2017 Crack Sealing 0 70 30 40,000 0 28,000 12,000

2017 Northside Taxiways 90 0 10 3,190,000 2,871,000 0 319,000

2017 Airport Water Tower 0 70 30 515,000 0 360,500 154,500

Summary for 'FAASite' = 10546.*A (26 detail records) Totals 10,672,300 8,468,450 1,052,181 1,151,669

BBB Benson Municipal Airport - Veterans Field 2014 Entrance Road - Crack Seal and Seal Coat 0 70 30 20,000 0 14,000 6,000

20152015 New Arrival/Departure Building with Snow Removal Equipment 80 10 10 400,000 320,000 40,000 40,000 (SRE) Storage Included 2015 Snow Removal Equipment 90 0 10 200,000 180,000 0 20,000

2015 Airfield Fence - Replace 3-Strand Fence 90 0 10 50,000 45,000 0 5,000

Monday, December 10, 2012 Page 5 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

BBB Benson Municipal Airport - Veterans Field 2015 Land Acquisition - Segment of Rwy 32 Runway Protection Zone 90 0 10 25,000 22,500 0 2,500 (RPZ) 2016 Crosswind Runway-Justification Study 0 0 100 15,000 0 0 15,000

2016 Crosswind Runway-Environmental Assessment 90 0 10 65,000 58,500 0 6,500

2017 Crosswind Runway-Construction(paved) 90 0 10 2,700,000 2,430,000 0 270,000

2018 Construct Parellel Taxiway to Crosswind Runway 90 0 10 1,000,000 900,000 0 100,000

Summary for 'FAASite' = 10551.1*A (9 detail records) Totals 4,475,000 3,956,000 54,000 465,000

FOZ Bigfork Municipal Airport 2013 MOWERS 0 67 33 10,000 0 6,667 3,333

2014 Reconstruct Twy & Apron 0 80 20 300,000 0 240,000 60,000

2014 Obstruction Removal 0 80 20 10,000 0 8,000 2,000

2014 PAPI Installation 0 80 20 80,000 0 64,000 16,000

2015 PAVE ENTRANCE ROAD 0 80 20 50,000 0 40,000 10,000

2016 ARRIVAL/DEPARTURE BUILDING 0 80 20 200,000 0 160,000 40,000

2017 HANGAR SITE PREPARATION 0 50 50 100,000 0 50,000 50,000

2017 Bay Hangar (Hangar Loan) 0 0 0 260,000 0 0 0

2017 Bay Hangar (local share) 0 0 100 65,000 0 0 65,000

2017 Jet Fuel Facility 0 50 50 80,000 0 40,000 40,000

2017 AVGAS FACILITY 0 50 50 80,000 0 40,000 40,000

Summary for 'FAASite' = 10562.*A (11 detail records) Totals 1,235,000 0 648,667 326,333

SBU Blue Earth Municipal Airport 2013 APRON EXPANSION - YEAR 2 PAYBACK 90 0 10 166,667 150,000 0 16,667

2014 HANGAR DOOR REPAIRS 0 50 50 15,000 0 7,500 7,500

Monday, December 10, 2012 Page 6 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

SBU Blue Earth Municipal Airport 2014 APRON EXPANSION - YEAR 3 PAYBACK 90 0 10 94,145 84,731 0 9,415

2016 SRE BUILDING AND ELECTRIC BUILDING 90 0 10 378,000 340,200 0 37,800

2016 CONSTRUCT A/D BUILDING EXPANSIONS 90 0 10 140,000 126,000 0 14,000

2017 REHAB HANGAR AREA PAVEMENT (FAA ELIGIBLE) 90 0 10 310,000 279,000 0 31,000

2017 REHAB HANGAR AREA PAVEMENT (FAA INELIGIBLE) 0 50 50 690,000 0 345,000 345,000

Summary for 'FAASite' = 10569.*A (7 detail records) Totals 1,793,812 979,931 352,500 461,381

BRD Brainerd Lakes Regional Airport 2013 High Speed Snowplow 95 0 5 600,000 570,000 0 30,000

2013 Crack Sealing 95 0 5 75,000 71,250 0 3,750

2014 Update Zoning 0 70 30 25,000 0 17,500 7,500

2014 Terminal Furnishings 0 70 30 20,000 0 14,000 6,000

2014 Terminal Security Cameras 0 70 30 60,000 0 42,000 18,000

2014 Additional Jet-A Storage 0 50 50 100,000 0 50,000 50,000

2014 Master Plan Update 90 0 10 350,000 315,000 0 35,000

2014 Snow blower 90 0 10 710,000 639,000 0 71,000

20152014 Hangar Area Site Prep 45 25 30 350,000 157,500 87,500 105,000

2015 Hangar Loan 0 0 0 550,000 0 0 0

2015 Airport Maintenance Truck 0 67 33 30,000 0 20,001 9,999

2015 E. Bldg. Access Road & Parking 0 70 30 35,000 0 24,500 10,500

2015 10' Mower 0 67 33 90,000 0 60,003 29,997

2016 Cold Storage Building 0 70 30 150,000 0 105,000 45,000

20162015 Sewer and Water Connection 57 28 15 300,000 171,000 84,000 45,000

Monday, December 10, 2012 Page 7 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

BRD Brainerd Lakes Regional Airport 2016 Replace Flail Mower 0 67 33 50,000 0 33,335 16,665

2016 Crack Sealing 90 0 10 150,000 135,000 0 15,000

2017 High Speed Dedicated Broom 90 0 10 875,000 787,500 0 87,500

2017 MALSR - Rwy 05 0 0 0 290,800 0 0 0

2018 Replace Tractor for Mower 0 67 33 90,000 0 60,003 29,997

2018 Long Term Parking Additions 90 0 10 300,000 270,000 0 30,000

Summary for 'FAASite' = 10576.*A (21 detail records) Totals 5,200,800 3,116,250 597,842 645,908

6D1 Brooten Municipal Airport 2013 Arrival Departure Building, Lighting Improvements, and Fuel 0 80 20 500,000 0 400,000 100,000 System 2013 Move Runway End 0 0 100 20,000 0 0 20,000

2013 Crack Repair & Sealing 0 80 20 10,000 0 8,000 2,000

2014 Crack Repair and Sealing 0 80 20 10,000 0 8,000 2,000

2015 Crack Repair and Sealing 0 80 20 10,000 0 8,000 2,000

2016 Crack Repair & Sealing 0 80 20 10,000 0 8,000 2,000

Summary for 'FAASite' = 10592.*A (6 detail records) Totals 560,000 0 432,000 128,000

CFE Buffalo Municipal Airport 2013 LAND ACQ. (PARCELS 10 & 12 - 17.7 AC) 90 0 10 581,000 522,900 0 58,100

2014 SNOW REMOVAL EQUIPMENT (SRE) 90 0 10 170,000 153,000 0 17,000

2014 REPLACE/REPAIR BEACON 0 70 30 30,000 0 21,000 9,000

2014 UPGRADE FUEL FACILITY - NEW 10,000 GAL 100LL TANK 0 50 50 100,000 0 50,000 50,000

2015 CRACK REPAIR/SLURRY SEAL - HANGAR AREA, 90 0 10 120,000 108,000 0 12,000 TAXILANES, ENTRANCE RD & PARKING LOT 2015 10-UNIT T-HANGAR - SITE PREPARATION 0 50 50 300,000 0 150,000 150,000

Monday, December 10, 2012 Page 8 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

CFE Buffalo Municipal Airport 2015 10-UNIT T-HANGAR - BUILDING 0 0 0 980,000 0 0 0

2016 WILDLIFE HAZARD ASSESSMENT STUDY 90 0 10 50,000 45,000 0 5,000

2017 CRACK REPAIR/SLURRY SEAL - RUNWAY 18/36, TAXIWAY 90 0 10 270,000 243,000 0 27,000 & APRON 2018 ENV. ASSESSMENT - EAST TERMINAL SITE 90 0 10 160,000 144,000 0 16,000

Summary for 'FAASite' = 10605.*A (10 detail records) Totals 2,761,000 1,215,900 221,000 344,100

CHU Houston County Airport 2013 ZONING UPDATE 0 70 30 35,000 0 24,500 10,500

2013 LAND ACQUISITION 90 0 10 400,000 360,000 0 40,000

2013 DESIGN RUNWAY 13/31 RELOCATION (PHASE I) 90 0 10 200,000 180,000 0 20,000

2014 AWOS INSTALLATION 0 100 0 125,000 0 125,000 0

2014 RUNWAY 13/31 RELOCATION CONSTRUCTION (PHASE I) 90 0 10 2,100,000 1,890,000 0 210,000

2014 DESIGN RUNWAY 13/31 RELOCATION (PHASE II) 90 0 10 200,000 180,000 0 20,000

2015 RUNWAY 13/31 RELOCATION CONSTRUCTION (PHASE II) 90 0 10 2,100,000 1,890,000 0 210,000

2015 SITE PREPARATION FOR HANGARS 90 0 10 100,000 90,000 0 10,000

Summary for 'FAASite' = 10610.*A (8 detail records) Totals 5,260,000 4,590,000 149,500 520,500

CBG Cambridge Municipal Airport 2013 BROOM FOR LOADER 90 0 10 30,000 27,000 0 3,000

2013 OBSTRUCTION SURVEY AND CERTIFICATION 90 0 10 7,500 6,750 0 750

2014 AIRPORT SNOW REMOVAL EQUIPMENT BUILDING 90 0 10 300,000 270,000 0 30,000

2014 RUNWAY 16/34 - REHAB ASPHALT SURFACE 90 0 10 850,000 765,000 0 85,000

2015 MASTER PLAN & AIRPORT LAYOUT PLAN UPDATE 90 0 10 200,000 180,000 0 20,000

2015 RELOCATE AUTOMATED WEATHER OBSERVATION 000 20,000 0 0 0 STATION (AWOS)

Monday, December 10, 2012 Page 9 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

CBG Cambridge Municipal Airport 2016 PAVE BUILDING AREA 90 0 10 500,000 450,000 0 50,000

Summary for 'FAASite' = 10612.2*A (7 detail records) Totals 1,907,500 1,698,750 0 188,750

CNB Canby Municipal Airport - Myers Field 2013 Primary Runway/Apron Maintenance 90 0 10 200,000 180,000 0 20,000

2014 Wing Mower Deck 0 67 33 20,000 0 13,334 6,666

2014 Parallel Taxiway/Crosswind Runway-EA 90 0 10 100,000 90,000 0 10,000

2015 CROSSWIND RUNWAY 90 0 10 800,000 720,000 0 80,000

2016 RUNWAY 12 TURN-AROUND 90 0 10 100,000 90,000 0 10,000

2018 PARALLEL TAXIWAY 90 0 10 1,500,000 1,350,000 0 150,000

Summary for 'FAASite' = 10615.2*A (6 detail records) Totals 2,720,000 2,430,000 13,334 276,666

COQ Cloquet-Carlton County Airport 2013 12-unit T-Hangar Site Preparation 90 0 10 300,000 270,000 0 30,000

2014 12-Unit T-Hangar Building 90 0 10 600,000 540,000 0 60,000

2017 LOADER w/BLOWER & BROOM 90 0 10 335,000 301,500 0 33,500

2018 Extend Rwy 17/35 - Justification 90 0 10 25,000 22,500 0 2,500

2018 Terminal Fencing / Gates 90 0 10 600,000 540,000 0 60,000

Summary for 'FAASite' = 10623.*A (5 detail records) Totals 1,860,000 1,674,000 0 186,000

CQM Cook Municipal Airport 2013 Clear Obstructions Runway 7 90 0 10 20,000 18,000 0 2,000

2014 Crack Seal Rwy 13/31 & Twy 90 0 10 15,000 13,500 0 1,500

2015 New Fuel System 90 0 10 80,000 72,000 0 8,000

2015 Relocate Beacon & Automated Weather Observation Station 90 0 10 20,000 18,000 0 2,000 (AWOS) 2015 Taxiway to new Hangar Area 90 0 10 60,000 54,000 0 6,000

Monday, December 10, 2012 Page 10 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

CQM Cook Municipal Airport 2015 3/4 Ton Truck w/9' Plow 90 0 10 40,000 36,000 0 4,000

2015 Resurface Entrance Road 90 0 10 90,000 81,000 0 9,000

2015 Airport Layout Plan (ALP) Update with Narrative 90 0 10 25,000 22,500 0 2,500

2015 Resurface Parking Lot 90 0 10 30,000 27,000 0 3,000

2016 Parallel Txy 13/31 (4000' x 35') 90 0 10 450,000 405,000 0 45,000

2016 Expand Apron & Hangar Area 90 0 10 120,000 108,000 0 12,000

2016 Snow Removal Equipment (SRE) Building Addition 90 0 10 100,000 90,000 0 10,000

Summary for 'FAASite' = 10635.*A (12 detail records) Totals 1,050,000 945,000 0 105,000

CKN Crookston Municipal Airport - Kirkwood Field 2013 Replace Fuel System 90 0 10 200,000 180,000 0 20,000

20172016 Hangar with Site Prep 80 12 8 950,000 760,000 114,000 76,000

2017 Master Plan with Airport Layout Plan 90 0 10 150,000 135,000 0 15,000

2018 Medium Approach Lighting System Runway (MALSR) Align 90 0 10 300,000 270,000 0 30,000

Summary for 'FAASite' = 10642.*A (4 detail records) Totals 1,600,000 1,345,000 114,000 141,000

DTL Detroit Lakes Municipal Airport - Wething Field 2013 RPZ 13/31 - Land - Tessman Property 90 0 10 220,000 198,000 0 22,000

2013 Taxiway Rehab 90 0 10 50,000 45,000 0 5,000

20142013 Hangar Site Prep 20 50 30 220,000 44,000 110,000 66,000

2014 Construct T-Hangar (hangar loan) 0 0 100 330,000 0 0 330,000

2015 Extend Rwy 13/31 - Land - Howard Property 90 0 10 50,000 45,000 0 5,000

2016 Extend Parallel Txy 13/31 90 0 10 800,000 720,000 0 80,000

2017 Reconstruct Rwy 13/31 (4500' x 100') 90 0 10 4,140,000 3,726,000 0 414,000

Monday, December 10, 2012 Page 11 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

DTL Detroit Lakes Municipal Airport - Wething Field 2018 Extend Rwy 31 (900' x 100') 90 0 10 4,140,000 3,726,000 0 414,000

2018 Runway 13/31 - Nav Aids & Lighting 90 0 10 1,116,000 1,004,400 0 111,600

Summary for 'FAASite' = 10650.*A (9 detail records) Totals 11,066,000 9,508,400 110,000 1,447,600

TOB Dodge Center Municipal Airport 2013 6 UNIT T-HANGAR CONSTRUCTION 90 0 10 600,000 540,000 0 60,000

2013 SPLIT FUEL SYSTEM (JET-A & AVGAS) 90 0 10 150,000 135,000 0 15,000

2013 FENCING REPAIRS 0 70 30 2,000 0 1,400 600

2016 PARALLEL TAXIWAY ENVIRONMENTAL ASSESSMENT 90 0 10 60,000 54,000 0 6,000

2017 LAND ACQUISITION (APPROACH) 0 70 30 92,000 0 64,400 27,600

2017 PARALLEL TAXIWAY DESIGN 90 0 10 125,000 112,500 0 12,500

2018 PARALLEL TAXIWAY CONSTRUCTION 90 0 10 2,000,000 1,800,000 0 200,000

Summary for 'FAASite' = 10651.*A (7 detail records) Totals 3,029,000 2,641,500 65,800 321,700

DLH Duluth International Airport 2013 Replace 1-ton Operations Truck (#12) 0 67 33 35,000 0 23,333 11,667

2013 Pavement Maintenance 0 70 30 50,000 0 35,000 15,000

20132012 Terminal Construction Bid Pack 3- Demo Apron 80 15 5.3 10,200,000 8,155,500 1,500,000 544,500

2013 Replace Snow Removal Equipment (SRE) (#14) 90 0 10 500,000 450,000 0 50,000

2013 Wildlife Hazard Assessment 90 0 10 30,000 27,000 0 3,000

2013 Terminal Bid Pack 2D Overhead Walkway 90 0 10 790,000 711,000 0 79,000

2013 Terminal Bid Pack 2C, Phase 2 Demo, Apron Const. PBB 90 0 10 2,281,628 2,053,465 0 228,163

2013 Air Traffic Control Tower Repairs, Phase 1 0 70 30 103,085 0 72,160 30,926

2014 Taxiwy A Rehab Design and Construction, Phase 1 90 0 10 1,900,000 1,710,000 0 190,000

Monday, December 10, 2012 Page 12 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

DLH Duluth International Airport 2014 Purchase 972 Loader w/ snow box & bucket 90 0 10 500,000 450,000 0 50,000

2014 Airfield Electrical Manhole Drainage 90 0 10 350,000 315,000 0 35,000

2014 Replace Snow Removal Equipment (SRE) #19 grader w/160M 90 0 10 370,000 333,000 0 37,000 Wing, Moldboard Ext. &Plow 2014 Replace Equipment #14, #15, #36 (replace w/multi-task w/plow) 90 0 10 860,000 774,000 0 86,000

2015 Air Traffic Control Tower Repairs, Phase 2 (tuck point, ext.paint, 0 70 30 73,095 0 51,167 21,929 siding) 2015 Pavement Maintenance 0 70 30 25,000 0 17,500 7,500

2015 Taxiway A Rehab.Construction, Phase 2 90 0 10 1,900,000 1,710,000 0 190,000

2015 Airfield Sign Upgrade 90 0 10 100,000 90,000 0 10,000

2015 Obstruction Removal 90 0 10 100,000 90,000 0 10,000

2016 Access Road Paving & Repair 0 70 30 50,000 0 35,000 15,000

2016 Hangar 104 Repair - Roof & Hangar Doors 0 70 30 250,000 0 175,000 75,000

2016 Extend Rwy 3/21 - LAND ACQUISITION 0 0 100 1,500,000 0 0 1,500,000

2016 Air Traffic Control Tower Repairs Phase 3,(HVAC) 0 70 30 215,000 0 150,500 64,500

2016 Building Demolition - former 911 0 70 30 50,000 0 35,000 15,000

2016 Midfield Apron Repair 90 0 10 700,000 630,000 0 70,000

2016 Pavement Maintenance 0 70 30 50,000 0 35,000 15,000

2017 Ranch Hangar [Hangar Loan] 0 0 0 800,000 0 0 0

2017 Hangar & Roof Repair (BLDG 101) 0 70 30 50,000 0 35,000 15,000

2017 Extend/Reconstruct Rwy 3/21 (Ph 1) - Grade/Pave/Drainage 90 0 10 12,000,000 10,800,000 0 1,200,000

2017 Replace Equipment #42 Tandem Dump w/Sander Insert 90 0 10 400,000 360,000 0 40,000

2017 Pavement Maintenance 0 70 30 50,000 0 35,000 15,000

Monday, December 10, 2012 Page 13 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

DLH Duluth International Airport 2018 Pavement Maintenance 0 70 30 50,000 0 35,000 15,000

2018 Runway 3/21 Reconst. & Ext. w/Twy (grading,drainage, paving) 90 0 10 12,000,000 10,800,000 0 1,200,000 Phase 2 2018 General Aviation (GA) Arrival/Departure (A/D) Building - 0 36 64 2,000,000 0 714,000 1,286,000 Construct Summary for 'FAASite' = 10653.*A (33 detail records) Totals 50,332,808 39,458,965 2,948,659 7,125,184

DYT Duluth Sky Harbor Airport 2013 Plow Truck 0 67 33 40,000 0 26,666 13,334

2013 Reconstruct Apron - Design 90 0 10 75,000 67,500 0 7,500

2013 Rehabilitate Apron (Ph 1) - Reconstruct 90 0 10 595,000 535,500 0 59,500

2013 Rehabilitate Apron (Ph 2) - Seal Coat 90 0 10 35,000 31,500 0 3,500

2013 Pavement Maintenance 90 0 10 30,000 27,000 0 3,000

2014 Shift Runway - Design 90 0 10 450,000 405,000 0 45,000

2014 Shift Runway- Ph 1 90 0 10 3,000,000 2,700,000 0 300,000

2014 Fire Suppression System 0 33 67 90,000 0 30,000 60,000

2014 Pavement Maintenance 90 0 10 30,000 27,000 0 3,000

2015 Shift Runway Ph-2 90 0 10 2,000,000 1,800,000 0 200,000

2015 Tree/Waterway Mitigation 90 0 10 500,000 450,000 0 50,000

2015 Reconstruct Seaplane Ramp 90 0 10 100,000 90,000 0 10,000

2015 SEAPLANE BASE RETAINING WALL 90 0 10 80,000 72,000 0 8,000

2015 Pavement Maintenance 90 0 10 30,000 27,000 0 3,000

2016 Customs Border Patrol Building 0 50 50 275,000 0 137,500 137,500

2016 Arrival/Departure (A/D) Building Improvements 0 70 30 300,000 0 210,000 90,000

2016 Replace Fuel System 90 0 10 100,000 90,000 0 10,000

Monday, December 10, 2012 Page 14 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

DYT Duluth Sky Harbor Airport 2016 HANGAR CONSTRUCTION 90 0 10 500,000 450,000 0 50,000

2016 Pavement Maintenance Projects 90 0 10 30,000 27,000 0 3,000

2017 Airport Geographical Information System Survey 90 0 10 100,000 90,000 0 10,000

2017 Snow Removal Equipment (SRE) Storage Building Addition 90 0 10 150,000 135,000 0 15,000

2017 Beacon 90 0 10 75,000 67,500 0 7,500

2017 Upgrade Utilities (Gas & Sewer) 90 0 10 220,000 198,000 0 22,000

2017 Pavement Maintenance 90 0 10 30,000 27,000 0 3,000

Summary for 'FAASite' = 10655.*A (24 detail records) Totals 8,835,000 7,317,000 404,166 1,113,834

Y63 Elbow Lake Municipal Airport-Pride of the 2013 Hangar 90 0 10 700,000 630,000 0 70,000 Prairie 2016 AUTOMATED VEHICLE ACCESS GATE 90 0 10 50,000 45,000 0 5,000

2016 SECURITY FENCING 90 0 10 12,000 10,800 0 1,200

Summary for 'FAASite' = 10665.*A (3 detail records) Totals 762,000 685,800 0 76,200

ELO Ely Municipal Airport 2014 Crack Repair Runway/Taxiway/Apron 90 0 10 150,000 135,000 0 15,000

2015 Geothermal Heat for Arrival/Departure (A/D) Building 0 70 30 175,000 0 122,500 52,500

2015 Parallel Taxiway - Environmental Assessment (EA) 90 0 10 75,000 67,500 0 7,500

2016 Replace MIRLs and Electrical Distribution - Design 90 0 10 85,000 76,500 0 8,500

2016 Parallel Taxiway - Design 90 0 10 125,000 112,500 0 12,500

2017 Replace Medium Intensity Runway Lights (MIRLs) and Electrical 90 0 10 1,115,000 1,003,500 0 111,500 Distribution 2017 Parallel Taxiway - Wetland Mitigation 90 0 10 500,000 450,000 0 50,000

2017 Parallel Taxiway - Construct 90 0 10 2,700,000 2,430,000 0 270,000

Monday, December 10, 2012 Page 15 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

ELO Ely Municipal Airport 2018 North Side Apron Expansion- Phase 1 90 0 10 340,000 306,000 0 34,000

Summary for 'FAASite' = 10668.01*A (9 detail records) Totals 5,265,000 4,581,000 122,500 561,500

EVM Eveleth-Virginia Municipal Airport 2013 Rwy 9/27 Recon - Paving Construction 90 0 10 1,514,000 1,362,600 0 151,400

2013 Rwy 9/27 Recon - Electrical Construction 90 0 10 290,000 261,000 0 29,000

2013 Conn Txwy - Rwy 9 Thrshhld to Apron 90 0 10 155,000 139,500 0 15,500

2013 Rwy 9/27 Recon/Conn Txwy - Engineering/Design 90 0 10 230,000 207,000 0 23,000

2013 Shorten/Convert Rwy 14/32 to Turf to Clear Obstructions 90 0 10 750,000 675,000 0 75,000

2013 Crack SealingApron/Taxilanes 90 0 10 30,000 27,000 0 3,000

2014 Wildlife Assessment 90 0 10 50,000 45,000 0 5,000

2014 Snow Removal Equipment (SRE) 90 0 10 150,000 135,000 0 15,000

2014 Replace Beacon (re-use pole) 90 0 10 9,000 8,100 0 900

2015 Apron Reconstruction Environmental Assessment (EA) (CATEX) 90 0 10 1,000 900 0 100

2015 Storm Sewer Inspection 90 0 10 5,000 4,500 0 500

2015 Replace & Relocate Fuel Facilities 0 50 50 230,000 0 115,000 115,000

2016 Apron Reconstruction/Storm Sewer Repair 90 0 10 2,250,000 2,025,000 0 225,000

2017 Rwy 9/27 Parallel Twy - EA 90 0 10 200,000 180,000 0 20,000

2018 Rwy 9/27 Parallel Txwy - Design/Construct 90 0 10 1,500,000 1,350,000 0 150,000

Summary for 'FAASite' = 10677.*A (15 detail records) Totals 7,364,000 6,420,600 115,000 828,400

FRM Fairmont Municipal Airport 2014 LAND ACQUISITION FOR RNWY 13/31 RPZ & 90 0 10 239,000 215,100 0 23,900 OBSTRUCTIONS 2014 LAND ACQUISITION FOR RNWY 13/31 RPZ 90 0 10 100,000 90,000 0 10,000

Monday, December 10, 2012 Page 16 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

FRM Fairmont Municipal Airport 2014 REMOVE OFF AIRPORT OBSTRUCTIONS TO RNWY 13/31 90 0 10 90,000 81,000 0 9,000

2015 HANGAR AREA BIT REPAIR (INSIDE HANGAR BLDG) 0 50 50 30,000 0 15,000 15,000

2015 MAINTENANCE UTILITY TRUCK 0 67 33 25,000 0 16,750 8,250

2016 PARTITIONS IN EXISTING T-HANGARS 0 50 50 40,000 0 20,000 20,000

2017 SEWAGE SYSTEM UPGRADES 0 70 30 87,000 0 60,900 26,100

2017 FIXED-BASE OPERATOR (FBO) HANGAR EXPANSION 0 50 50 150,000 0 75,000 75,000

2017 TAXILANE REHABILITATION (EAST AREA) 0 50 50 761,000 0 380,500 380,500

2018 PRIVATE HANGAR SITE TAXILANE & SITE PREPARATION 90 0 10 191,000 171,900 0 19,100

2018 RUNWAY 2/20 PAVEMENT CRACK REPAIR & SLURRY 90 0 10 155,000 139,500 0 15,500 SEAL 2018 TAXIWAY & APRON PAVEMENT CRACK REPAIR AND 90 0 10 295,000 265,500 0 29,500 SLURRY SEAL Summary for 'FAASite' = 10684.*A (12 detail records) Totals 2,163,000 963,000 568,150 631,850

FBL Faribault Municipal Airport 2013 PAY BACK DODGE CENTER ENTITLEMENTS 90 0 10 140,244 126,220 0 14,024

2013 EAST TAXILANE IMPROVEMENTS(REHAB PAVEMENT, 90 0 10 40,000 36,000 0 4,000 DRAINAGE, PRE DESIGN) 2013 EAST TAXILANE IMPROVEMENTS (REHAB 90 0 10 443,000 398,700 0 44,300 PAVEMENT,DRAINAGE) FAA FUNDING) 2014 ARRIVAL/DEPARTURE BUILDING REMODEL 0 70 30 260,000 0 182,000 78,000

2015 EAST TAXILANE IMPROVEMENTS (REHAB 0 15 85 62,000 0 9,300 52,700 PAVEMENT,DRAINAGE) STATE LOCAL FUNDING 2015 COMMERCIAL TAXILANE DRAINAGE IMPROVEMENTS $ 90 0 10 245,000 220,500 0 24,500 PAVEMENT REHAB 2016 NEW TAXILANE; SEWER/WATER DESIGN & 0 50 50 516,000 0 258,000 258,000 CONSTRUCTION 2017 AIRCRAFT STORAGE HANGAR 0 0 0 773,000 0 0 0

2017 WILDLIFE HAZARD ASSESSMENT 90 0 10 35,000 31,500 0 3,500

2017 EA FOR RUNWAY EXTENSION - PHASE I 90 0 10 94,000 84,600 0 9,400

Monday, December 10, 2012 Page 17 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

FBL Faribault Municipal Airport 2018 HANGAR SITE PREPARATION FOR PUBLIC T-HANGAR 0 50 50 225,000 0 112,500 112,500

2018 8-UNIT PUBLIC T-HANGAR BUILDING 0 0 0 720,000 0 0 0

2018 EA FOR RUNWEAY EXTENSION - PHASE II 90 0 10 121,000 108,900 0 12,100

Summary for 'FAASite' = 10689.*A (13 detail records) Totals 3,674,244 1,006,420 561,800 613,024

FFM Fergus Falls Municipal Airport-Einar Mickelson 2013 Design Engineering for a Multi-Unit T-Hangar 90 0 10 30,000 27,000 0 3,000 Fld 2013 Extend City Water 0 70 30 90,000 0 63,000 27,000

2014 MULTI UNIT Tee HANGAR CONSTRUCTION 90 0 10 500,000 450,000 0 50,000

2014 HANGAR SITE PREPARATION AND PAVING (private) 0 50 50 300,000 0 150,000 150,000

2015 Seal Runway 13/31 & Parallel Taxiway 90 0 10 250,000 225,000 0 25,000

2015 UPDATE SEWER SYSTEM 0 70 30 20,000 0 14,000 6,000

2016 EMERGENCY GENERATOR 0 70 30 60,000 0 42,000 18,000

2016 Clean and Seal Apron Joints 0 70 30 200,000 0 140,000 60,000

2018 SNOW SWEEPER/BLOWER/DEICING EQUIPMENT 90 0 10 500,000 450,000 0 50,000

Summary for 'FAASite' = 10692.*A (9 detail records) Totals 1,950,000 1,152,000 409,000 389,000

D14 Fertile Municipal Airport 2014 improve drainage in approaches for access 0 80 20 42,786 0 34,229 8,557

2016 Resurface & Widen Rwy 14/32 (3000') 0 80 20 330,000 0 264,000 66,000

2016 Rehabilitate Apron 0 80 20 70,000 0 56,000 14,000

2017 Medium Intensity Runway Lights (MIRLs), etc., for Global 0 80 20 125,000 0 100,000 25,000 Positioning System (GPS) approach 2017 Arrival/Departure Building 0 80 20 120,000 0 96,000 24,000

Summary for 'FAASite' = 10693.*A (5 detail records) Totals 687,786 0 550,229 137,557

Monday, December 10, 2012 Page 18 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

25D Forest Lake Airport 2013 OBSTRUCTION REMOVAL - TREES 0 80 20 25,000 0 20,000 5,000

2013 EQUIPMENT - TRACTOR/MOWER/BLOWER 0 67 33 200,000 0 133,333 66,667

2013 LAND ACQUISITION - Runway Protection Zone (RPZ) (NORTH 0 80 20 220,000 0 176,000 44,000 END) 2013 BUILDING DEMOLITION - MACHINE SHED, BUNGALOW & 0 80 20 25,000 0 20,000 5,000 GARAGE 2013 AUTOMATED WEATHER STATION (AWOS) 0 0 0 100,000 0 0 0

2014 OBSTRUCTION LIGHTING - POWERLINE 0 80 20 50,000 0 40,000 10,000

2014 ENVIRONMENTAL ASSESSMENT - RWY PAVING 0 80 20 150,000 0 120,000 30,000

2016 OBSTRUCTION REMOVAL - HANGARS 0 80 20 25,000 0 20,000 5,000

2016 RUNWAY PAVED 2700' X 75' 0 80 20 1,100,000 0 880,000 220,000

2016 ELECTRICAL VAULT 0 80 20 200,000 0 160,000 40,000

2016 AIRFIELD LIGHTING (MIRL) 0 80 20 100,000 0 80,000 20,000

2016 PAPI 0 80 20 25,000 0 20,000 5,000

2017 T-HANGAR SITE PREPARATION 0 50 50 245,000 0 122,500 122,500

2017 T-HANGAR 15-UNIT 0 0 0 750,000 0 0 0

2018 AIRPORT PERIMETER FENCE 15,200' X 10' HIGH 0 80 20 364,800 0 291,840 72,960

2018 OBSTRUCTION REMOVAL - BURY POWERLINE 0 80 20 1,000,000 0 800,000 200,000

2018 RUNWAY PAVED EXTENSION - 600' X 75' 0 80 20 500,000 0 400,000 100,000

2018 PARALLEL TAXIWAY (3300' X 35') AND APRON 0 80 20 1,200,000 0 960,000 240,000

2018 FBO HANGAR 80' X 100' 0 50 50 250,000 0 125,000 125,000

Summary for 'FAASite' = 10695.15*A (19 detail records) Totals 6,529,800 0 4,368,673 1,311,127

FSE Fosston Municipal Airport 2013 Repay Moorhead Entitlement Dollars 90 0 10 166,667 150,000 0 16,667

Monday, December 10, 2012 Page 19 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

FSE Fosston Municipal Airport 2014 Repay Wheaton Entitlements 90 0 10 166,667 150,000 0 16,667

2015 Crack Repair 90 0 10 25,000 22,500 0 2,500

2015 Wetland Mitigation 90 0 10 140,000 126,000 0 14,000

20182017 Hangar Site Prep 15 40 45 300,000 45,000 120,000 135,000

2018 Multi Plane Storage Hangar (MPSH) 0 0 0 500,000 0 0 0

2018 Crack Repair 0 70 30 25,000 0 17,500 7,500

2018 Skid Steer 90 0 10 40,000 36,000 0 4,000

Summary for 'FAASite' = 10696.*A (8 detail records) Totals 1,363,333 529,500 137,500 196,333

GYL Glencoe Municipal Airport - Vernon Perschau 2013 CLOSING CROSSES FOR AIRPORT EMERGENCY PLAN 0 70 30 2,400 0 1,680 720 Field 2013 FUEL SYSTEM UPGRADES 0 50 50 10,000 0 5,000 5,000

2013 HANGAR DOOR REPLACEMENT 0 50 50 5,800 0 2,900 2,900

2013 LAND ACQUISITION 90 0 10 50,000 45,000 0 5,000

2013 WETLAND MITIGATION 0 0 0 25,000 0 0 0

2014 GRADING DRAINAGE & PAVEMENT - PARALLEL TAXIWAY 90 0 10 1,000,000 900,000 0 100,000

2014 RESURFACE RUNWAY 90 0 10 750,000 675,000 0 75,000

2014 REIL'S 90 0 10 40,000 36,000 0 4,000

2014 PAPI'S 90 0 10 90,000 81,000 0 9,000

2014 RELOCATE WINDSOCK 90 0 10 10,000 9,000 0 1,000

2015 APRON TAXIWAY RESURFACING 90 0 10 250,000 225,000 0 25,000

20152015 HANGAR AREA PAVEMENT REHAB 75 5 20 200,000 150,000 10,000 40,000

2016 REPLACE EXISTING 6 UNIT T-HANGAR 0 0 0 220,000 0 0 0

Monday, December 10, 2012 Page 20 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

GYL Glencoe Municipal Airport - Vernon Perschau 2016 REPLACE HANGAR FLOOR 0 50 50 150,000 0 75,000 75,000 Field Summary for 'FAASite' = 10706.7*A (14 detail records) Totals 2,803,200 2,121,000 94,580 342,620

GHW Glenwood Municipal Airport 2013 Security Cameras 0 70 30 15,000 0 10,500 4,500

2014 CRACK REPAIR & SEAL COATING - Runway and Taxiway 90 0 10 95,000 85,500 0 9,500

2014 Crack Repair and Seal Coat - Entrance Road and Parking Lot 90 0 10 45,000 40,500 0 4,500

2014 Crack Repair and Seal Coat - Apron 90 0 10 25,000 22,500 0 2,500

2014 Emergency Backup Generator - SRE Bldg 0 70 30 25,000 0 17,500 7,500

2015 Update Beacon 90 0 10 35,000 31,500 0 3,500

20162016 HANGAR CONSTRUCTION - 8 unit t-hangar - 85 5 10 485,000 412,250 24,250 48,500 Design/Site/Hangar 2017 Drainage Plan and Grading 90 0 10 245,000 220,500 0 24,500

2017 Zoning Ordinance Update 0 70 30 35,000 0 24,500 10,500

2017 Riding Mower and Snowblower Attachment 0 70 30 30,000 0 21,000 9,000

2017 Dumpster Containment Area 0 70 30 7,500 0 5,250 2,250

Summary for 'FAASite' = 10707.*A (11 detail records) Totals 1,042,500 812,750 103,000 126,750

CKC Grand Marais-Cook County Airport 2013 Widen/Extend Rwy 9/27 - Design 90 0 10 425,000 382,500 0 42,500

2013 Runway 9/27 Grading (extend & widen), Phase 1 90 0 10 3,413,750 3,072,375 0 341,375

2014 Runway 9/27 Widening, Phase 2 90 0 10 2,021,000 1,818,900 0 202,100

2015 Runway 9/27 Widening / Ext.- Phase 3 90 0 10 1,226,000 1,103,400 0 122,600

2016 Master Plan/Airport Layout Plan (ALP) Update 90 0 10 100,000 90,000 0 10,000

2016 Fuel System 90 0 10 125,000 112,500 0 12,500

Monday, December 10, 2012 Page 21 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

CKC Grand Marais-Cook County Airport 2016 SRE 90 0 10 150,000 135,000 0 15,000

2017 New Parallel Twy 9/27 - Design 90 0 10 500,000 450,000 0 50,000

2018 New Parallel Twy 9/27 (Ph 2) - Paving 90 0 10 3,000,000 2,700,000 0 300,000

2018 New Parallel Twy 9/27 (Ph 1) - Grade 90 0 10 4,800,000 4,320,000 0 480,000

Summary for 'FAASite' = 10713.4*A (10 detail records) Totals 15,760,750 14,184,675 0 1,576,075

GPZ Grand Rapids/Itasca Co-Gordon Newstrom Fld 2013 OBSTRUCTION REMOVAL - YUHALA BLDG DEMOLITION 90 0 10 10,000 9,000 0 1,000

20132013 RAMP REPLACEMENT - 8 & 10 UNIT T-HANGAR 50 25 25 250,000 125,000 62,500 62,500

2013 CRACK SEALING - TAXIWAY A 90 0 10 125,000 112,500 0 12,500

2013 LAND ACQUISITION - RWY 5/23 RPZ (EDVENSON AND 90 0 10 435,000 391,500 0 43,500 ITASCA PROGRESSIVE PARCELS) 2014 AP74 TRUCK REPLACEMENT 0 67 33 200,000 0 133,340 66,660

2014 Reconstruct GA Apron 90 0 10 250,000 225,000 0 25,000

2014 Master Plan / ALP Update 90 0 10 250,000 225,000 0 25,000

2015 Airport Zoning Update 0 70 30 50,000 0 35,000 15,000

2016 ENV. ASSESSMENT UPDATE - RWY 16/34 EXTENSION 90 0 10 50,000 45,000 0 5,000

2017 LAND ACQ. - SO. BOUNDARY TRACT 56 90 0 10 120,000 108,000 0 12,000

2017 RWY 16/34 - 1,500 FT. EXTENSION - DESIGN 90 0 10 350,000 315,000 0 35,000

2017 Slurry Seal, Runway 5/23 90 0 10 300,000 270,000 0 30,000

2018 RWY 16/34 - RESURFACE & RESOLVE L-O-S ISSUES 90 0 10 1,000,000 900,000 0 100,000

2018 RWY 16/34 - 1,500 FT. EXTENSION - CONSTRUCTION 90 0 10 3,000,000 2,700,000 0 300,000

Summary for 'FAASite' = 10716.*A (14 detail records) Totals 6,390,000 5,426,000 230,840 733,160

Monday, December 10, 2012 Page 22 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

GDB Granite Falls Muni-Lenzen-Roe Memorial Fld 2013 REMOVE OBSTRUCTIONS TO RUNWAY 15 0 80 20 37,000 0 29,600 7,400

2014 ACQUIRE SNOW REMOVAL EQUIPMENT & PLOW 0 67 33 150,000 0 100,005 49,995

2014 CONSTRUCT AGRICULTURAL SPRAY FACILITY 0 50 50 50,000 0 25,000 25,000

2014 CONSTRUCT APRON EXPANSION (220' x 175') 0 80 20 356,000 0 284,800 71,200

2014 UPDATE EXHIBIT A PROP MAP & AIRPORT LAYOUT PLAN 0 80 20 71,000 0 56,800 14,200 TO FAA STANDARDS 2014 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 16/34 - 0 80 20 121,000 0 96,800 24,200 TIER I 2014 CONSTRUCT ADDITION TO MAINTENANCE BUILDING 0 80 20 150,000 0 120,000 30,000

2015 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 16/34 - 0 80 20 121,000 0 96,800 24,200 TIER II 2015 COMPLETE DESIGN ENGINEERING FOR RNWY 16/34, 0 80 20 755,000 0 604,000 151,000 PARRALLEL TXWY, LIGHTING 2015 CONSTRUCT PAD FOR 10 UNIT T-HANGAR 0 50 50 131,000 0 65,500 65,500

2015 CONSTRUCT 10-UNIT T-HANGAR 0 0 0 974,000 0 0 0

2016 REHAB RUNWAY 15/33 (MILL & OVERLAY) 0 80 20 888,000 0 710,400 177,600

2016 ACQUIRE LAND FOR RNWY 16/34 CONST 0 80 20 2,839,000 0 2,271,200 567,800

2017 CONSTRUCT RNWAY 16/34 0 80 20 5,156,000 0 4,124,800 1,031,200

2017 CONSTRUCT 16/34 PARALLEL TXWY & CONNECTOR 0 80 20 2,614,000 0 2,091,200 522,800 TXWY'S 2017 CONSTRUCT LIGHTING FOR RNWY 16/34 0 80 20 752,000 0 601,600 150,400

Summary for 'FAASite' = 10722.*A (16 detail records) Totals 15,165,000 0 11,278,505 2,912,495

HCO Hallock Municipal Airport 2013 PAPIs 90 0 10 30,000 27,000 0 3,000

2013 Replace REILs 90 0 10 60,000 54,000 0 6,000

2014 Replace Hangar Door 0 50 50 60,000 0 30,000 30,000

2014 Txwy & Apron Expansion - Environmental Assessment (EA) 90 0 10 25,000 22,500 0 2,500

Monday, December 10, 2012 Page 23 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

HCO Hallock Municipal Airport 2015 Apron Expansion - Construct 90 0 10 120,000 108,000 0 12,000

2015 Crack Seal 90 0 10 50,000 45,000 0 5,000

2016 Parallel Txwy - Construction 90 0 10 220,000 198,000 0 22,000

20172016 Hangar Site Prep 87 5 8 40,000 34,800 2,000 3,200

2017 6 Unit T-Hangar 90 0 10 260,000 234,000 0 26,000

2017 SRE - Replacement 90 0 10 160,000 144,000 0 16,000

Summary for 'FAASite' = 10733.1*A (10 detail records) Totals 1,025,000 867,300 32,000 125,700

04Y Hawley Municipal Airport 2013 Master Plan 90 0 10 90,000 81,000 0 9,000

2014 Apron Rehabilitation (non Federal Aviation Administration 0 50 50 40,000 0 20,000 20,000 eligible) Hangar #1 2014 Apron Rehabilitation - Hangar #1 (Federal Aviation 90 0 10 102,000 91,800 0 10,200 Administration eligible areas) 20142014 Tee HANGAR SITE PREPARATION & PAVING 81 7 12 150,000 121,500 10,500 18,000

2015 8-UNIT Tee HANGAR 90 0 10 450,000 405,000 0 45,000

2015 Runway Justification Study-REIMBURSEMENT 90 0 10 60,000 54,000 0 6,000

2016 Runway Extension-Environmental Assessment 90 0 10 158,000 142,200 0 15,800

2017 Land Purchase (Runway Protection - Ramp) 90 0 10 135,000 121,500 0 13,500

2017 Extend Rwy 16/34 - Land Acquisition (50 acres) 90 0 10 113,000 101,700 0 11,300

2018 Extend Rwy 16/34 North 600' - Construction 90 0 10 260,000 234,000 0 26,000

Summary for 'FAASite' = 10734.8*A (10 detail records) Totals 1,558,000 1,352,700 30,500 174,800

1D6 Hector Municipal Airport 2014 WATER/SEWER EXTENSION TO AIRPORT 90 0 10 210,000 189,000 0 21,000

2014 HANGAR TAXIWAY 90 0 10 160,000 144,000 0 16,000

Monday, December 10, 2012 Page 24 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

1D6 Hector Municipal Airport 2015 CITY HANGAR DEVELOPMENT - SITE WORK 0 50 50 175,000 0 87,500 87,500

2015 CITY HANGAR DEVELOPMENT - BUILDING 0 0 0 175,000 0 0 0

2018 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 90 0 10 60,000 54,000 0 6,000 EXTENSION Summary for 'FAASite' = 10736.*A (5 detail records) Totals 780,000 387,000 87,500 130,500

05Y Henning Municipal Airport 2016 Update Airport Layout Plan (ALP) for a new cross-wind runway 0 80 20 20,000 0 16,000 4,000

Summary for 'FAASite' = 10736.02*A (1 detail record) Totals 20,000 0 16,000 4,000

06Y Herman Municipal Airport 2013 Misc Lighting - possibly upgrade runway lights 0 80 20 50,000 0 40,000 10,000

2013 Storm Water Pollution Prevention Plan (SWPPP) 0 80 20 5,000 0 4,000 1,000

2014 Mower 0 80 20 30,000 0 24,000 6,000

Summary for 'FAASite' = 10736.3*A (3 detail records) Totals 85,000 0 68,000 17,000

HIB Range Regional Airport 20132012 Passenger Terminal Expand/Remodel-Design 80 15 5 400,000 320,000 60,000 20,000

2013 Remove old Fuel Storage System (Expand Ramp Ph II) 90 0 10 50,000 45,000 0 5,000

2013 Rehab/Expand Apron - Air Carrier/Fixed-Base Operator (concrete) 90 0 10 3,000,000 2,700,000 0 300,000 (Expand Ramp - Ph III) 2013 Replace Fuel Storage System (Expand Ramp - Ph 1) 90 0 10 400,000 360,000 0 40,000

2013 Tractor/Mower 0 67 33 150,000 0 100,005 49,995

20142013 Passenger Terminal Expand/Remodel-Construct 80 15 5 4,500,000 3,600,000 675,000 225,000

2014 DNR concrete Ramp 0 0 100 350,000 0 0 350,000

2014 Security Camera System Upgrade 0 70 30 25,000 0 17,500 7,500

2014 Crack Seal Project 0 70 30 150,000 0 105,000 45,000

2014 Truck w/ Spreader 90 0 10 350,000 315,000 0 35,000

Monday, December 10, 2012 Page 25 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

HIB Range Regional Airport 2015 Resurface Txwy's A, B and South 2,500' of C 90 0 10 850,000 765,000 0 85,000

2015 Twy C Medium Intensity Threshold Lighting System (MITL) 90 0 10 350,000 315,000 0 35,000

2015 Rwy 13/31 HIRLs & Signage Update 90 0 10 1,000,000 900,000 0 100,000

2016 Extend Rwy 13/31 - Environmental Assessment (EA) 90 0 10 220,000 198,000 0 22,000

2016 Rwy 13 Transition Surface - Easement E - 2.8 acres 90 0 10 100,000 90,000 0 10,000

2017 Extend Rwy 13/31 - Design 90 0 10 250,000 225,000 0 25,000

2017 Truck/Snow Blower 90 0 10 800,000 720,000 0 80,000

2017 Extend Rwy 13/31 - Land Acquisition 90 0 10 50,000 45,000 0 5,000

2018 Extend Rwy 13/31 to 7,500' 90 0 10 3,500,000 3,150,000 0 350,000

Summary for 'FAASite' = 10737.*A (19 detail records) Totals 16,495,000 13,748,000 957,505 1,789,495

HCD Hutchinson Municipal Airport - Butler Field 2013 MASTER PLAN UPDATE 0 67 33 265,000 0 176,676 88,324

2013 OBSTRUCTION REMOVALS 90 0 10 90,000 81,000 0 9,000

2014 PRELIM/FINAL DESIGN PAVEMENT REHAB TAXILANES 90 0 10 155,000 139,500 0 15,500

2014 PAVEMENT REHAB - CRACK REPAIR 90 0 10 225,000 202,500 0 22,500

20142014 APRON/TAXIWAY CONSTRUCTION-PHASE 1 (GRADING & 75 10 15 350,000 262,500 35,000 52,500 PAVING) 20142014 APRON/TAXIWAY CONSTRUCTION-PHASE 2 (PAVING & 75 10 15 250,000 187,500 25,000 37,500 CONCRETE HANGAR SLAB) 2015 AIRFIELD LIGHTING UPGRADES-LED 90 0 10 150,000 135,000 0 15,000

2015 PRELIM/FINAL DESIGN RUNWAY REHAB & SAFETY AREA 90 0 10 135,000 121,500 0 13,500 GRADING 2015 T-HANGAR CONSTRUCTION (10 UNITS) 0 0 0 1,200,000 0 0 0

2015 RUNWAY REHAB - BITUMINOUS OVERLAY 90 0 10 700,000 630,000 0 70,000

2015 SAFETY AREA GRADING ENHANCEMENTS 90 0 10 250,000 225,000 0 25,000

Monday, December 10, 2012 Page 26 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

HCD Hutchinson Municipal Airport - Butler Field 2016 UTILITY EXTENSIONS & SERVICES 90 0 10 225,000 202,500 0 22,500

2016 ENVIRONMENTAL ASSESSMENT FOR CROSSWIND 90 0 10 110,000 99,000 0 11,000 RUNWAY 2017 LAND ACQUISITION FOR CROSSWIND RUNWAY ~139 AC 90 0 10 1,200,000 1,080,000 0 120,000

2018 SNOW REMOVAL EQUIPMENT BUILDING 90 0 10 550,000 495,000 0 55,000

2018 PRELIM/FINALDESIGN RUNWAY 8-26 90 0 10 200,000 180,000 0 20,000

Summary for 'FAASite' = 10746.2*A (16 detail records) Totals 6,055,000 4,041,000 236,676 577,325

INL Falls International Airport 2013 Skid Steer 0 67 33 75,000 0 50,003 24,997

2013 Paint Terminal, Airport Rescue and Fire Fighting Bldg, ramp poles- 0 67 33 20,000 0 13,334 6,666 eligibility to be determined 2013 Land Acquisition 90 0 10 50,000 45,000 0 5,000

2013 CRACK REPAIR 90 0 10 50,000 45,000 0 5,000

20142013 Terminal Expansion/Remodel (Ph) 3 - Final Design 75 10 15 750,000 562,500 75,000 112,500

2014 CRACK REPAIR 90 0 10 50,000 45,000 0 5,000

2014 Land Acquisition 90 0 10 50,000 45,000 0 5,000

20152014 Terminal Expansion/Remodel 75 10 15 7,700,000 5,775,000 770,000 1,155,000

2015 Resurface Rwy 13/31 90 0 10 4,000,000 3,600,000 0 400,000

2015 Rwy 4/22 Medium Intensity Runway Lights (MIRLs) & Medium 90 0 10 50,000 45,000 0 5,000 Intensity Threshold Lighting System (MITLs) 2015 Crack Repair 90 0 10 50,000 45,000 0 5,000

2015 GENERAL AVIATION (GA) APRON LIGHTING 90 0 10 50,000 45,000 0 5,000

2015 LAND ACQUISITION 90 0 10 50,000 45,000 0 5,000

2016 Tractor 0 67 33 60,000 0 40,002 19,998

2016 Airport Rescue and Fire Fighting (ARFF) Vehicle 90 0 10 800,000 720,000 0 80,000

Monday, December 10, 2012 Page 27 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

INL Falls International Airport 2016 Crack Repair 90 0 10 50,000 45,000 0 5,000

2016 Land Acquisition 90 0 10 50,000 45,000 0 5,000

2017 Maintenance Hangar 90 0 10 1,000,000 900,000 0 100,000

Summary for 'FAASite' = 10749.*A (18 detail records) Totals 14,905,000 12,007,500 948,339 1,949,162

MJQ Jackson Municipal Airport 2013 ENTITLEMENT TRANSFER BACK TO LONG PRAIRIE 90 0 10 166,667 150,000 0 16,667

2013 AIRPORT MASTER PLAN UPDATE (PHASE I) 90 0 10 110,000 99,000 0 11,000

2014 AIRPORT PAVEMENT CRACK FILL 0 70 30 90,000 0 63,000 27,000

2014 AIRPORT MASTER PLAN UPDATE (PHASE II) 90 0 10 80,000 72,000 0 8,000

2015 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 14-32 - 90 0 10 130,000 117,000 0 13,000 PHASE 1 2016 ENTITLEMENT TRANSFER BACK TO MORRIS 90 0 10 166,667 150,000 0 16,667

2016 RUNWAY 13/31 APRON TAXIWAY CRACK REPAIR & 90 0 10 320,000 288,000 0 32,000 SURFACE TREATMENT 2016 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 14-32 - 90 0 10 60,000 54,000 0 6,000 PHASE 2 2017 ENTITLEMENT TRANSFER BACK TO MORRIS FROM 2012 90 0 10 166,667 150,000 0 16,667

2017 FAA AIRPORTS GIS DATA COLLECTION SURVEY FOR 90 0 10 130,000 117,000 0 13,000 RNWY 14/32 2017 ACQUIRE LAND FOR RNWY 14/32 90 0 10 2,620,000 2,358,000 0 262,000

2017 DESIGN RNWY 14/32, TXWY, APRON, PARKING LOT 90 0 10 890,000 801,000 0 89,000 IMPROVEMENTS 2018 CONSTRUCT RUNWAY 14-32 (4,500-FT X 75-FT) 90 0 10 4,910,000 4,419,000 0 491,000

Summary for 'FAASite' = 10753.*A (13 detail records) Totals 9,840,001 8,775,001 63,000 1,002,000

12Y Le Sueur Municipal Airport 2014 REHAB RUNWAY 13/31, TAXIWAY, APRON (CRACK 90 0 10 279,000 251,100 0 27,900 REPAIR & SLURRY SEAL) 2014 ACQUIRE REMAINING LAND FOR RNWY 13 RPZ/CZ/OBS, 90 0 10 771,000 693,900 0 77,100 TXWY, PRIMARY SURF (37 AC)

Monday, December 10, 2012 Page 28 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

12Y Le Sueur Municipal Airport 2014 REMOVE FAR PART 77 OBSTRUCTIONS & 90 0 10 274,000 246,600 0 27,400 ENVIRONMENTAL MITIGATION 2015 FAA AERONAUTICAL SURVEY FOR RUNWAY 13/31 100000000 APPROACHES 2015 UPDATE AIRPORT LAYOUT PLAN (FROM SURVEY) 90 0 10 50,000 45,000 0 5,000

2017 REHABILITATE APRON - MILL & OVERLAY 90 0 10 279,000 251,100 0 27,900

2017 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 13/31 90 0 10 124,000 111,600 0 12,400 EXTENSION (200 FEET) Summary for 'FAASite' = 10780.*A (7 detail records) Totals 1,777,000 1,599,300 0 177,700

LJF Litchfield Municipal Airport 2014 Pavement Rehab - Design 90 0 10 200,000 180,000 0 20,000

2015 Rehab Runway 13/31 90 0 10 890,000 801,000 0 89,000

2015 Rehab Parallel Txwy, Apron & Txln Pvmnt (Mill and Overlay) 90 0 10 593,000 533,700 0 59,300

2015 Rehab South Taxiway (crack fill and slurry seal) 90 0 10 83,000 74,700 0 8,300

2016 Acquire Snow Removal Equipment (Carrier Vehicle and Plow 90 0 10 202,000 181,800 0 20,200 Attachment) 2016 Acquire Snow Removal Equipment - Blower Attachment 90 0 10 84,000 75,600 0 8,400

2017 Rwy Length Justification Report, EA for Runway 13/31 Extension 90 0 10 153,000 137,700 0 15,300 (800') 2017 Conduct Wildlife Hazard Assessment 90 0 10 30,000 27,000 0 3,000

2018 Acquire Land for Future Hangar Site 90 0 10 160,000 144,000 0 16,000

2018 Acquire Land for Runway 13/31 Extension 90 0 10 626,000 563,400 0 62,600

Summary for 'FAASite' = 10786.01*A (10 detail records) Totals 3,021,000 2,718,900 0 302,100

LXL Little Falls-Morrison County Airport 2013 LAND ACQUISITION - RUNWAY 18/36 90 0 10 210,000 189,000 0 21,000

2013 PAVEMENT REHABILITATION - NORTH RAMP 90 0 10 350,000 315,000 0 35,000

2013 ZONING ORDINANCE UPDATE 0 70 30 30,000 0 21,000 9,000

Monday, December 10, 2012 Page 29 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

LXL Little Falls-Morrison County Airport 2013 AWOS SYSTEM MODIFICATIONS 0 0 0 10,000 0 0 0

2013 HANGAR LIGHTING REPLACEMENT 0 50 50 5,183 0 2,592 2,592

2014 AERONAUTICAL SURVEY 90 0 10 90,000 81,000 0 9,000

2014 RUNWAY 18/36 - PRELIMINARY/FINAL DESIGN 90 0 10 69,500 62,550 0 6,950

2015 RUNWAY 18/36 CONSTRUCTION - PHASE I (CLEARING, 90 0 10 850,000 765,000 0 85,000 GRADING, DRAINAGE, SUBBASE) 2016 RUNWAY 18/36 CONSTRUCTION - PHASE II (BASE, 90 0 10 1,250,000 1,125,000 0 125,000 PAVING, MARKING, SEEDING) 2017 RUNWAY 18/36 CONSTRUCTION - PHASE III (ELECTRICAL) 90 0 10 274,000 246,600 0 27,400

2018 MAIN TAXIWAY LIGHTS & SIGNS 90 0 10 165,000 148,500 0 16,500

2018 SEAL COAT - TAXIWAY 0 70 30 58,500 0 40,950 17,550

Summary for 'FAASite' = 10793.*A (12 detail records) Totals 3,362,183 2,932,650 64,542 354,992

13Y Littlefork Municipal Airport - Hanover Airport 2013 Airport Security Signs 0 70 30 3,000 0 2,100 900

Summary for 'FAASite' = 10796.*A (1 detail record) Totals 3,000 0 2,100 900

14Y Long Prairie Municipal Airport - Todd Field 2013 Runway 16/34-Reconstruct 90 0 10 1,302,000 1,171,800 0 130,200

20132013 Connecting Taxiway - Reconstruct 75 10 15 259,000 194,250 25,900 38,850

2013 Apron (West) Mill & Overlay 90 0 10 120,000 108,000 0 12,000

2013 Apron (East) - Reconstruct 50 0 50 285,000 142,500 0 142,500

2013 Rehab Hangar Site Taxilanes 90 0 10 78,000 70,200 0 7,800

2014 SWPPP 0 70 30 5,000 0 3,500 1,500

2014 UPDATE ZONING ORDINANCE - participation rate to be 0 45 55 48,000 0 21,600 26,400 determined 2014 Runway Justification Study-REIMBURSEMENT 90 0 10 16,400 14,760 0 1,640

Monday, December 10, 2012 Page 30 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

14Y Long Prairie Municipal Airport - Todd Field 2014 Extend Rwy 16/34 - ENVIRONMENTAL ASSESSMENT (1000') 90 0 10 160,000 144,000 0 16,000

2016 Extend Runway 16/34 - Land Acquisition 90 0 10 347,000 312,300 0 34,700

2016 Relocate 180th Street 90 0 10 482,000 433,800 0 48,200

2016 Extend Rwy 16/34 - Design & Construct 90 0 10 1,152,000 1,036,800 0 115,200

Summary for 'FAASite' = 10797.3*A (12 detail records) Totals 4,254,400 3,628,410 51,000 574,990

XVG Longville Municipal Airport 2013 Obstruction Removals 90 0 10 300,000 270,000 0 30,000

20142013 Expand SW Building Area - Design 75 10 15 30,000 22,500 3,000 4,500

20142013 Expand SW Building Area 75 10 15 425,000 318,750 42,500 63,750

2014 Resurface Txy / Apron - Design 90 0 10 15,000 13,500 0 1,500

20152014 SNOW REMOVAL EQUIPMENT BUILDING 90 5 5 360,000 324,000 18,000 18,000

2015 Resurface Txy / Apron 90 0 10 250,000 225,000 0 25,000

2016 NORTHEAST BUILDING AREA 90 0 10 250,000 225,000 0 25,000

2016 Partial Parallel Twy 90 0 10 500,000 450,000 0 50,000

Summary for 'FAASite' = 10798.1*A (8 detail records) Totals 2,130,000 1,848,750 63,500 217,750

LYV Luverne Municipal Airport - Quentin Aanenson 2013 Apron Reconstruction 90 0 10 480,000 432,000 0 48,000 Field 2015 Auto Parking Expansion/Entrance Security 90 0 10 150,000 135,000 0 15,000

2015 Arrival Departure Building 90 0 10 175,000 157,500 0 17,500

2016 NEW HANGAR 0 0 0 340,000 0 0 0

20162016 HANGAR AREA TAXIWAY 90 50 -40 160,000 144,000 80,000 -64,000

2016 APRON SLURRY SEAL 90 0 10 200,000 180,000 0 20,000

Monday, December 10, 2012 Page 31 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

LYV Luverne Municipal Airport - Quentin Aanenson 2017 Fuel System Upgrade/Relocation 90 0 10 150,000 135,000 0 15,000 Field 2018 Feasibility/Survey/Env. For water/Sewer 90 0 10 22,000 19,800 0 2,200

2018 Plans/Specs for Water/Sewer Extension 90 0 10 23,000 20,700 0 2,300

Summary for 'FAASite' = 10802.2*A (9 detail records) Totals 1,700,000 1,224,000 80,000 56,000

DXX Lac Qui Parle County Airport - Bud Frye Field 2015 Parallel Taxiway-EA 90 0 10 50,000 45,000 0 5,000

2016 Parallel Taxiway-Construction 90 0 10 1,250,000 1,125,000 0 125,000

2017 Airport Zoning 0 70 30 15,000 0 10,500 4,500

2018 Extend Runway 13/31-Justification Report 90 0 10 30,000 27,000 0 3,000

2018 Extend Runway 13/31- Environmental Assessment 90 0 10 50,000 45,000 0 5,000

Summary for 'FAASite' = 10806.*A (5 detail records) Totals 1,395,000 1,242,000 10,500 142,500

3N8 Mahnomen County Airport 2013 New Taxilane 90 0 10 100,000 90,000 0 10,000

20142013 Expand Apron - Relocate Hangar 7 - site prep 83 5 12 10,000 8,300 500 1,200

2013 Expand Apron - Relocate Hangar #7 90 0 10 20,000 18,000 0 2,000

2013 Expand Apron S (350' x 200') 90 0 10 300,000 270,000 0 30,000

2013 Snow Removal Equipment-Sweeper 90 0 10 30,000 27,000 0 3,000

20152014 6-unit T-hangar - Site Prep 81 7 12 280,000 226,800 19,600 33,600

2014 6 Unit T-Hangar 90 0 10 300,000 270,000 0 30,000

20162015 ARRIVAL/DEPARTURE BUILDING 71 14 15 150,000 106,500 21,000 22,500

2017 Security Fencing 90 0 10 50,000 45,000 0 5,000

Summary for 'FAASite' = 10807.5*A (9 detail records) Totals 1,240,000 1,061,600 41,100 137,300

Monday, December 10, 2012 Page 32 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MKT Mankato Regional Airport - Sohler Field 2014 Blower 0 67 33 133,000 0 88,671 44,329

2014 Repair Existing T-Hangar Re-Roof $3140 & 3150 0 50 50 140,000 0 70,000 70,000

2014 Overlay Community Development area Access Road & CFR Apron 0 70 30 300,000 0 210,000 90,000

2014 Wildlife Plan 90 0 10 100,000 90,000 0 10,000

2014 Airport Security Fence Repair 90 0 10 250,000 225,000 0 25,000

2015 Rwy 15/33 Crack Repair 0 70 30 840,000 0 588,000 252,000

2015 Repair Existing T-Hangar 0 50 50 120,000 0 60,000 60,000

2015 Terminal Remodel 0 70 30 200,000 0 140,000 60,000

2015 T-Hangar Design & Specs 0 50 50 75,000 0 37,500 37,500

2015 Rewire/Conduit Taxiway A 0 70 30 350,000 0 245,000 105,000

2015 Expand Commercial Hangar Development 0 50 50 750,000 0 375,000 375,000

2016 T-Hangar Construction 0 50 50 600,000 0 300,000 300,000

2016 Snow Removal Equipment Building 90 0 10 1,080,000 972,000 0 108,000

2016 (INT) Passenger Security Installation 90 0 10 600,000 540,000 0 60,000

2017 Slurry seal runway 4/22, Taxiways & Aprons 0 70 30 500,000 0 350,000 150,000

2017 PUBLIC PARKING 0 70 30 482,000 0 337,400 144,600

2017 Building Entrance Canopies 90 0 10 240,000 216,000 0 24,000

2018 Repair Existing T-Hangar 0 50 50 150,000 0 75,000 75,000

Summary for 'FAASite' = 10812.1*A (18 detail records) Totals 6,910,000 2,043,000 2,876,571 1,990,429

MGG Maple Lake Municipal Airport 2013 CRACK FILLING - HANGAR AREA 0 80 20 10,000 0 8,000 2,000

2014 PAVE PARKING LOT AND DRIVEWAY 0 80 20 37,000 0 29,600 7,400

Monday, December 10, 2012 Page 33 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MGG Maple Lake Municipal Airport 2015 SEAL COAT - HANGAR AREA 0 80 20 14,000 0 11,200 2,800

2016 MED INTENSITY RWY LIGHTS (MIRLs) 0 80 20 100,000 0 80,000 20,000

2017 PROPERTY ACQUISITION 0 80 20 40,000 0 32,000 8,000

2017 TREE TRIMMING 0 80 20 10,000 0 8,000 2,000

Summary for 'FAASite' = 10812.71*A (6 detail records) Totals 211,000 0 168,800 42,200

MML Southwest Regional-Marshall/Ryan 2013 Pressure Washer 0 67 33 4,250 0 2,833 1,417 Field 2013 Acquisition of Property - Bud Rose Flowers - Approach Protection 90 0 10 257,000 231,300 0 25,700

2014 MAINTENANCE EQUIPMENT BLDG (SNOW REMOVAL 0 70 30 750,000 0 525,000 225,000 EQUIP) 2014 ODALS (omni-directional aiport lighting system) 0 0 0 250,000 0 0 0

2014 Rehabilitate Beacon 0 70 30 7,500 0 5,250 2,250

2014 Acquisition of Property - Helena Chemical - Approach Protection 0 70 30 575,000 0 402,500 172,500

2014 Ramp Area - Phase II to Airpark East (Schedule 2) 0 70 30 700,000 0 490,000 210,000

2014 Parking lot paving-East Airpark 0 70 30 140,000 0 98,000 42,000

2014 Crack Seal Parking Lot 0 70 30 30,000 0 21,000 9,000

2014 A/D Building Light Fixtures 0 70 30 23,000 0 16,100 6,900

2014 A/D Building Signage & Building Addressing 0 70 30 15,000 0 10,500 4,500

2014 Acquisition of Property and Relocation - Gas Facility - Approach 90 0 10 116,000 104,400 0 11,600 Protection 2015 Update ALP 0 70 30 50,000 0 35,000 15,000

2015 Additional T-Hangar 0 0 0 250,000 0 0 0

2016 FENCING 90 0 10 100,000 90,000 0 10,000

2017 Extend Runway & Taxiway 2/20 (100' wide)- Design 90 0 10 267,000 240,300 0 26,700

Monday, December 10, 2012 Page 34 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MML Southwest Minnesota Regional-Marshall/Ryan 2017 Extend Runway & Taxiway 2/20 (100' wide)-Land Acquisition 90 0 10 500,000 450,000 0 50,000 Field 2017 Extend Runway & Taxiway 2/20 (100' wide)-Construction 90 0 10 2,033,000 1,829,700 0 203,300

2017 Extend Runway & Taxiway 2/20 (100' wide)-Engineering 90 0 10 267,000 240,300 0 26,700 Inspection 2018 NEW BUSINESS - HANGAR SITE-Rough Grading 0 50 50 1,500,000 0 750,000 750,000

Summary for 'FAASite' = 10815.*A (20 detail records) Totals 7,834,750 3,186,000 2,356,183 1,792,567

HZX McGregor - Isedor Iverson Airport 2014 ZONING for Ultimate ALP Development 0 80 20 20,000 0 16,000 4,000

2014 INSTALL FENCE AROUND FUEL SYSTEM 0 50 50 2,000 0 1,000 1,000

2014 CROSSWIND RWY - EAW 0 80 20 8,000 0 6,400 1,600

2015 CROSSWIND RWY 5/23 - LAND ACQ. 0 80 20 200,000 0 160,000 40,000

2015 WETLAND MITIGATION 0 80 20 80,000 0 64,000 16,000

2016 TURF CROSSWIND RWY 5/23 - CONSTRUCTION 0 80 20 400,000 0 320,000 80,000

2017 SOUTH BLDG AREA - SITE PREPARATION PHASE 1 0 50 50 70,000 0 35,000 35,000

2018 4-UNIT T-HANGAR 0 0 0 130,000 0 0 0

Summary for 'FAASite' = 10818.5*A (8 detail records) Totals 910,000 0 602,400 177,600

18Y Milaca Municipal Airport 2013 PAVED PARKING LOT FOR ARRIVAL/DEPARTURE BLDG 0 80 20 60,000 0 48,000 12,000

2013 POWER GATE AND CHAIN LINK FENCE 0 80 20 25,000 0 20,000 5,000

2013 MASTER PLAN/AIRPORT LAYOUT PLAN UPDATE 0 80 20 15,000 0 12,000 3,000

2014 RUNWAY OVERRUN 0 80 20 100,000 0 80,000 20,000

2014 MOWER REPLACEMENT 0 67 33 50,000 0 33,333 16,667

2016 FUEL SYSTEM UPGRADE 0 50 50 50,000 0 25,000 25,000

Monday, December 10, 2012 Page 35 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

18Y Milaca Municipal Airport 2016 LAND ACQUISITION - 6.2 ACRES (JUDD PARCEL) 0 80 20 75,000 0 60,000 15,000

2017 A/D BLDG & FBO UPGRADES 0 80 20 20,000 0 16,000 4,000

2017 RUNWAY END IDENTIFIER LIGHTS (REILs) 0 80 20 50,000 0 40,000 10,000

Summary for 'FAASite' = 10820.*A (9 detail records) Totals 445,000 0 334,333 110,667

MIC Crystal Airport 20142014 2014 PAVEMENT REHABILITATION 18 53 29 1,700,000 300,000 900,000 500,000

2016 OBSTRUCTION REMOVALS 0 0 100 300,000 0 0 300,000

2017 MATERIALS STORAGE BUILDING 0 0 100 600,000 0 0 600,000

2018 ALLEYWAY REHABILITATION 0 0 100 550,000 0 0 550,000

Summary for 'FAASite' = 10821.*A (4 detail records) Totals 3,150,000 300,000 900,000 1,950,000

LVN Airlake Airport 2013 2013 PAVEMENT REHABILITATION 75 0 25 200,000 150,000 0 50,000

2014 MAINTENANCE BUILDING IMPROVEMENTS 0 0 100 50,000 0 0 50,000

2015 SOUTH BUILDING AREA DEVELOPMENT 0 0 0 2,700,000 0 0 0

2015 SOUTH BUILDING AREA ALLEYWAY DEVELOPMENT 0 0 100 1,000,000 0 0 1,000,000

2016 2016 PAVEMENT REHABILITATION 0 0 100 400,000 0 0 400,000

2018 RUNWAY 12/30 EXTENSION 0 0 100 8,000,000 0 0 8,000,000

2018 MATERIALS STORAGE BUILDING 0 0 100 600,000 0 0 600,000

Summary for 'FAASite' = 10821.02*A (7 detail records) Totals 12,950,000 150,000 0 10,100,000

MSP Minneapolis-St.Paul Int'l-Wold Chamberlain 2013 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

2013 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2013 2013 PAVEMENT REHABILITATION - APRONS 74 0 26 1,900,000 1,400,000 0 500,000

Monday, December 10, 2012 Page 36 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MSP Minneapolis-St.Paul Int'l-Wold Chamberlain 2013 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

2013 MILL AND OVERLAY 0 0 100 275,000 0 0 275,000

2014 NOISE MITIGATION SETTLEMENT 0 0 100 3,420,000 0 0 3,420,000

2014 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

2014 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2014 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

2014 APRON EXPANSION - NORTH 71 0 29 7,000,000 5,000,000 0 2,000,000

2014 SITE UTILITIES 59 0 41 850,000 500,000 0 350,000

2015 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

2015 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2015 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

2015 BAGGAGE QUARANTINE BUILDING 0 0 100 1,225,000 0 0 1,225,000

2015 SIDA INCURSION UPGRADES 0 0 100 800,000 0 0 800,000

2015 ASR SHADOW MITIGATION 0 0 100 5,000,000 0 0 5,000,000

2015 SANITARY SEWER REPLACEMENTS 0 0 100 4,450,000 0 0 4,450,000

2016 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

2016 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2016 2016 PAVEMENT REHABILITATION - APRONS 0 0 100 10,500,000 0 0 10,500,000

2016 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

2016 SOUTH FIELD MAINTENANCE BUILDING WASH BAY 0 0 100 1,300,000 0 0 1,300,000

2017 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

Monday, December 10, 2012 Page 37 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MSP Minneapolis-St.Paul Int'l-Wold Chamberlain 2017 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2017 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

2018 AIRSIDE BITUMINOUS REHAB/ELEC CONSTRUCTION 0 0 100 500,000 0 0 500,000

2018 PAVEMENT JOINT SEALING/REPAIR 0 0 100 650,000 0 0 650,000

2018 PAVEMENT RECONSTRUCTION TWY DELTA (W TO S) 0 0 100 7,000,000 0 0 7,000,000

2018 MISCELLANEOUS AIRFIELD CONSTRUCTION 0 0 100 400,000 0 0 400,000

Summary for 'FAASite' = 10824.*A (30 detail records) Totals 53,020,000 6,900,000 0 46,120,000

FCM Flying Cloud Airport 20132013 RUNWAY 18/36 EXTENSION/ IMPROVEMENTS 21 53 26 1,700,000 350,000 900,000 450,000

2013 EAST/WEST PERIMETER ROAD 0 0 100 250,000 0 0 250,000

2015 2014 PAVEMENT REHABILITATION - TWY A PHASE 1 0 0 100 800,000 0 0 800,000

2015 SOUTH BUILDING AREA DEVELOPMENT 0 0 0 600,000 0 0 0

2016 2016 PAVEMENT REHABILITATION - TWY A PHASE 2 0 0 100 900,000 0 0 900,000

2017 EQUIPMENT STORAGE BUILDING 0 0 100 2,500,000 0 0 2,500,000

Summary for 'FAASite' = 10827.*A (6 detail records) Totals 6,750,000 350,000 900,000 4,900,000

ANE Anoka County/Blaine Airport - Janes Field 20132013 2013 PAVEMENT REHABILITATION - ALLEYWAYS 19 50 31 800,000 150,000 400,000 250,000

2015 TAXIWAY CHARLIE - A2/C2 EXTENSION 0 0 100 900,000 0 0 900,000

2015 AIRFIELD SIGNAGE/ELECTRICAL IMPROVEMENTS 0 0 100 500,000 0 0 500,000

2016 BLDG AREA DEV. - WEST ANNEX 0 0 0 850,000 0 0 0

2017 BLDG AREA DEV. - XYLITE ST. RELOCATION 0 0 100 1,000,000 0 0 1,000,000

2017 MATERIALS STORAGE BUILDING 0 0 100 600,000 0 0 600,000

Monday, December 10, 2012 Page 38 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

ANE Anoka County/Blaine Airport - Janes Field 2018 BLDG AREA DEVELOPMENT - EAST ANNEX 0 0 0 2,400,000 0 0 0

Summary for 'FAASite' = 10827.2*A (7 detail records) Totals 7,050,000 150,000 400,000 3,250,000

MVE Montevideo-Chippewa County Airport 2013 Card Reader for Av-Gas Fuel System 90 0 10 35,000 31,500 0 3,500

2014 Snow Removal Equipment - Tractor with Broom 90 0 10 50,000 45,000 0 5,000

20162015 HANGAR SITE PREPARATION for MULTIPLE PLANE 80 10 10 80,000 64,000 8,000 8,000 STORAGE HANGAR 2016 CONSTRUCT MULTIPLE PLANE STORAGE HANGAR (80' X 90 0 10 650,000 585,000 0 65,000 80') Summary for 'FAASite' = 10832.*A (4 detail records) Totals 815,000 725,500 8,000 81,500

JKJ Moorhead Municipal Airport 2013 Airfield Pavement Rehab&Tiedown Replacement 90 0 10 100,000 90,000 0 10,000

2015 Zoning - Zone A Easements 0 70 30 200,000 0 140,000 60,000

20152014 T-Hangar Design, Site Work & Improvements 85 5 10 350,000 297,500 17,500 35,000

2015 Construct T-Hangar 90 0 10 400,000 360,000 0 40,000

2018 Airport Pavement Rehabilitation - Mill and Overlay 90 0 10 1,000,000 900,000 0 100,000

Summary for 'FAASite' = 10836.51*A (5 detail records) Totals 2,050,000 1,647,500 157,500 245,000

MZH Moose Lake-Carlton County Airport 20152015 8-Unit "T" Hangar 94 1 5 700,000 658,000 7,000 35,000

2015 Reconstruct Twy 90 0 10 200,000 180,000 0 20,000

2018 WILDLIFE FENCES / SECURITY 90 0 10 375,000 337,500 0 37,500

Summary for 'FAASite' = 10837.*A (3 detail records) Totals 1,275,000 1,175,500 7,000 92,500

JMR Mora Municipal Airport 2013 LAND ACQ. - YANKOWIAK PARCEL 90 0 10 130,000 117,000 0 13,000

2013 X-WIND RWY 11/29 - CONSTRUCTION 90 0 10 1,350,000 1,215,000 0 135,000

Monday, December 10, 2012 Page 39 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

JMR Mora Municipal Airport 2013 FUEL TANK UPGRADE 0 50 50 15,000 0 7,500 7,500

2013 SECURITY UPGRADES (VIDEO SYSTEM) 0 70 30 18,000 0 12,600 5,400

2014 NEW BEACON/RELOCATE WINDSOCK 90 0 10 85,000 76,500 0 8,500

2014 DEER FENCING 90 0 10 250,000 225,000 0 25,000

2014 TAXILANE REHABILITATION IN BLDG AREA (20' W) 90 0 10 250,000 225,000 0 25,000

2015 SNOW REMOVAL EQUIPMENT BUILDING 90 0 10 200,000 180,000 0 20,000

2015 TAXILANE REHABILITATION IN BLDG AREA (20' W) 90 0 10 250,000 225,000 0 25,000

2015 LAND ACQ. - KASTENBAUER PARCEL 90 0 10 35,000 31,500 0 3,500

2016 TAXIWAY LIGHTING 90 0 10 200,000 180,000 0 20,000

2017 10-UNIT T-HANGAR - SITE PREPARATION 90 0 10 75,000 67,500 0 7,500

2017 10-UNIT T-HANGAR - CONSTRUCTION 90 0 10 600,000 540,000 0 60,000

Summary for 'FAASite' = 10838.*A (13 detail records) Totals 3,458,000 3,082,500 20,100 355,400

MOX Morris Municipal Airport - Charlie Schmidt 2013 Land Acquisition-Parallel Taxiway 90 0 10 80,000 72,000 0 8,000 Field 20142013 Bay Hangar with Site Prep 87 2 11 700,000 609,000 14,000 77,000

20142013 Taxilane & Apron Slurry Seal 45 45 10 20,000 9,000 9,000 2,000

2015 Equipment Storage Bay Addition 0 70 30 140,000 0 98,000 42,000

2016 TRUCK, SNOWPLOW/SNOW BLOWER 0 67 33 145,000 0 96,672 48,328

2016 Parallel Taxiway (rwy14/32) - Construct 90 0 10 1,350,000 1,215,000 0 135,000

2017 Runway Length Justification Study 0 0 100 15,000 0 0 15,000

2017 Airport Layout Plan Update w/ Narrative Report 90 0 10 120,000 108,000 0 12,000

2018 Extend Runway 14/32 500'-EA 90 0 10 65,000 58,500 0 6,500

Monday, December 10, 2012 Page 40 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 10842.*A (9 detail records) Totals 2,635,000 2,071,500 217,672 345,829

ULM New Ulm Municipal Airport 2013 Reconstruct Parallel Taxiway and Connectors 90 0 10 2,100,000 1,890,000 0 210,000

2013 Engineering Services, Design, Bidding & Construction 90 0 10 400,000 360,000 0 40,000 Administration 2013 Land acquisition 90 0 10 800,000 720,000 0 80,000

2014 Concrete Apron Repair 0 70 30 40,000 0 28,000 12,000

2014 T-Hangar Roof Replacement 0 50 50 100,000 0 50,000 50,000

2014 Land Acquisition - Runway 4/22 90 0 10 720,000 648,000 0 72,000

2014 Pre/Final Design Runway 4/22 90 0 10 350,000 315,000 0 35,000

2015 Construct/Relocate Runway 4/22 90 0 10 3,000,000 2,700,000 0 300,000

2015 Engineering Services 90 0 10 350,000 315,000 0 35,000

2016 T-HANGAR SITE DEV AREA 0 50 50 200,000 0 100,000 100,000

2017 HANGAR/STORAGE FACILITY 0 50 50 800,000 0 400,000 400,000

2017 SECURITY/WILDLIFE FENCING 90 0 10 800,000 720,000 0 80,000

2018 AIRPORT MASTER PLAN UPDATE 90 0 10 250,000 225,000 0 25,000

Summary for 'FAASite' = 10869.*A (13 detail records) Totals 9,910,000 7,893,000 578,000 1,439,000

43Y Northome Municipal Airport 2013 Obstruction Removal 0 80 20 1,500 0 1,200 300

2013 Highway Entrance signs 0 80 20 1,000 0 800 200

2013 Rehab Beacon 0 80 20 7,000 0 5,600 1,400

2013 Additional Gravel Entrance Road Lane 0 80 20 10,000 0 8,000 2,000

2013 Lighting improvements 0 80 20 30,000 0 24,000 6,000

Monday, December 10, 2012 Page 41 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

43Y Northome Municipal Airport 2014 REMODEL HANGAR 0 0 0 10,000 0 0 0

2015 Arrival/Departure Building Rehab 0 80 20 20,000 0 16,000 4,000

2016 REMODEL STORAGE BUILDING 0 80 20 4,000 0 3,200 800

Summary for 'FAASite' = 10875.*A (8 detail records) Totals 83,500 0 58,800 14,700

OVL Olivia Regional Airport 2014 ALP UPDATE 0 80 20 50,000 0 40,000 10,000

2014 ZONING 0 70 30 25,000 0 17,500 7,500

2014 BUILDING CODE UPGRADES IN MAINTENANCE BUILDING 0 70 30 10,000 0 7,000 3,000

2015 APRON EXPANSION & ADDITIONAL TIEDOWNS 0 80 20 250,000 0 200,000 50,000

2016 PAVEMENT REHAB 0 80 20 50,000 0 40,000 10,000

2017 SITE PREP FOR T-HANGAR 0 50 50 150,000 0 75,000 75,000

2017 6 UNIT T-HANGAR 0 0 0 300,000 0 0 0

2018 LAND ACQUISITION RNWY 29 RPZ 0 0 0 125,000 0 0 0

2018 PARALLEL TXWY EXT 0 80 20 500,000 0 400,000 100,000

2018 JET FUEL SYSTEM 0 50 50 100,000 0 50,000 50,000

Summary for 'FAASite' = 10880.31*A (10 detail records) Totals 1,560,000 0 829,500 305,500

ORB Orr Regional Airport 2014 SNOW REMOVAL EQUIPMENT - PLOW 90 0 10 250,000 225,000 0 25,000

2015 Update Airport Layout Plan 90 0 10 50,000 45,000 0 5,000

2017 New Well for Arrival/Departure Building & Hangar 0 70 30 7,500 0 5,250 2,250

2017 MAINTENANCE BUILDING 55' X 85' 90 0 10 300,000 270,000 0 30,000

Summary for 'FAASite' = 10883.11*A (4 detail records) Totals 607,500 540,000 5,250 62,250

Monday, December 10, 2012 Page 42 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

VVV Ortonville Municipal Airport - Martinson Field 2013 Crack Seal Runway 90 0 10 25,000 22,500 0 2,500

2013 RECONSTRUCT ENTRANCE ROAD AND PARKING LOT 90 0 10 180,000 162,000 0 18,000

2014 Construct Taxiway (Finish taxiway to Hangar Sites) 90 0 10 200,000 180,000 0 20,000

2015 ARRIVAL/DEPARTURE BUILDING 90 0 10 180,000 162,000 0 18,000

2016 Maintenance Hangar 90 0 10 300,000 270,000 0 30,000

2018 Parallel Taxiway-EA 90 0 10 60,000 54,000 0 6,000

Summary for 'FAASite' = 10885.*A (6 detail records) Totals 945,000 850,500 0 94,500

OWA Owatonna Degner Regional Airport 2013 MOWER ATTACHMENT 0 67 33 40,000 0 26,667 13,333

2013 UPDATE AIRPORT LAYOUT PLAN & MASTER PLAN 90 0 10 180,000 162,000 0 18,000

2014 T-HANGAR SITE PREPARATION 0 50 50 200,000 0 100,000 100,000

2014 10-UNIT T-HANGAR 0 80 20 650,000 0 520,000 130,000

2014 BIFOLD DOOR REPLACEMENT-MAIN HANGAR 0 50 50 90,000 0 45,000 45,000

2014 REHAB PH3 EAST TAXILANES & APRON EXPANSION 90 0 10 275,000 247,500 0 27,500

2015 Wildlife Assessment 90 0 10 50,000 45,000 0 5,000

2015 Environmental Assessment (EA) Airport Development 90 0 10 400,000 360,000 0 40,000

2015 LAND ACQUISITION-WEST BUILDING AREA 90 0 10 500,000 450,000 0 50,000

2016 MAINTENANCE BUILDING EXTENSION 0 70 30 175,000 0 122,500 52,500

2016 RIDING MOWER 0 67 33 80,000 0 53,333 26,667

2016 PAVEMENT REHAB RWY 5/23 90 0 10 150,000 135,000 0 15,000

2017 ONE-TON UTILITY TRUCK 0 67 33 85,000 0 56,667 28,333

2017 LOADER WITH BLOWER ATTACHMENT 0 67 33 250,000 0 166,667 83,334

Monday, December 10, 2012 Page 43 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

OWA Owatonna Degner Regional Airport 2017 AIRPORT PERIMETER FENCE 90 0 10 1,500,000 1,350,000 0 150,000

2018 CITY SEWER AND WATER EXTENSION 90 0 10 275,000 247,500 0 27,500

2018 WEST BUILDING AREA APRON & ENTRANCE RD 90 0 10 850,000 765,000 0 85,000

Summary for 'FAASite' = 10890.*A (17 detail records) Totals 5,750,000 3,762,000 1,090,833 897,167

PKD Park Rapids Municipal Airport - Konshok Field 2013 Rwy 18 Approach Obstruction Removal - Trees 90 0 10 65,000 58,500 0 6,500

2013 Pave & Extend Crosswind Rwy 18/36 (3,500' x 75') 90 0 10 1,685,000 1,516,500 0 168,500

2013 Rwy 18/36 Medium Intensity Runway Lights (MIRLs)& Signs 90 0 10 286,000 257,400 0 28,600

2013 Runway End Identification Lights (REILs) 18/36 (both ends) 90 0 10 80,000 72,000 0 8,000

2013 Precision Approach Path Indicator (PAPIs) Rwy 18/36 90 0 10 60,000 54,000 0 6,000

2013 Parallel Twy-North- Rwy 18/36 (1800'x35') 90 0 10 540,000 486,000 0 54,000

2013 MITLs - North - 18/36 Parallel Twy 90 0 10 140,000 126,000 0 14,000

2013 Parallel Txwy - South - Rwy 18/36(1400'x35') 90 0 10 405,000 364,500 0 40,500

2013 MITLs - South - Parallel Txwy 18/36 90 0 10 85,000 76,500 0 8,500

2014 Apron Overlay 90 0 10 250,000 225,000 0 25,000

2014 TAXIWAY OVERLAY 90 0 10 250,000 225,000 0 25,000

2014 Expand Auto Parking Lot 90 0 10 80,000 72,000 0 8,000

2015 SRE-FRONT END LOADER/BLOWER 90 0 10 165,000 148,500 0 16,500

2016 John Deere 445 Mower 0 67 33 11,500 0 7,667 3,833

2017 HANGAR SITE PREP 0 65 35 175,000 0 113,750 61,250

2017 16-UNIT T-HANGAR 0 0 0 350,000 0 0 0

2018 16 Unit T-Hangar, Replace Floor 90 0 10 200,000 180,000 0 20,000

Monday, December 10, 2012 Page 44 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 10894.*A (17 detail records) Totals 4,827,500 3,861,900 121,417 494,183

PEX Paynesville Municipal Airport 2013 Land Acquisition for Hangar Area (Parcel 12 &13) 90 0 10 140,000 126,000 0 14,000

2013 Rehab Fuel System 90 0 10 35,000 31,500 0 3,500

2014 Zoning Update - funding level TBD 0 50 50 36,000 0 18,000 18,000

2014 Parallel Taxiway-EA Phase I & II 90 0 10 90,000 81,000 0 9,000

2014 Construct Airport Beacon 90 0 10 70,000 63,000 0 7,000

2017 Parallel Twy 11/29 - Design and Grade 90 0 10 890,000 801,000 0 89,000

2018 Runway 11/29, Taxiway, Apron, Taxilane, Rehab (mill and 90 0 10 1,600,000 1,440,000 0 160,000 overlay) Summary for 'FAASite' = 10899.*A (7 detail records) Totals 2,861,000 2,542,500 18,000 300,500

47Y Pelican Rapids Municipal Airport - Lyon's Field 2014 Seal Coat Apron and TaxiLanes 0 80 20 40,000 0 32,000 8,000

2015 Paint Beacon Tower 0 80 20 8,000 0 6,400 1,600

2015 Hangar Site Prep (grade & pave pad) - Tee Hangar 0 50 50 130,000 0 65,000 65,000

2016 8 UNIT HANGAR (LOAN) 0 0 0 500,000 0 0 0

Summary for 'FAASite' = 10901.*A (4 detail records) Totals 678,000 0 103,400 74,600

16D Perham Municipal Airport 2014 Painting Hangar-public hangar 0 50 50 9,000 0 4,500 4,500

2014 Site Prep and Concrete Work for Hangar 0 60 40 240,000 0 144,000 96,000

2014 T-Hangar [Loan] 0 0 0 400,000 0 0 0

2015 Snow Removal Equipment-Loader 0 67 33 120,000 0 80,000 40,000

2017 Master Plan 0 80 20 30,000 0 24,000 6,000

2018 Mower 0 67 33 55,000 0 36,669 18,331

Monday, December 10, 2012 Page 45 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 10903.*A (6 detail records) Totals 854,000 0 289,168 164,832

PWC Pine River Regional Airport 2013 Update Zoning Maps 0 70 30 20,000 0 14,000 6,000

2013 SRE Building 90 0 10 325,000 292,500 0 32,500

2014 Gravel Access Road to South Hangar Area 90 0 10 20,000 18,000 0 2,000

2014 Extend Rwy 16/34 N 300' - Env. Assessment 90 0 10 80,000 72,000 0 8,000

2015 Pickup w/plow 0 67 33 35,000 0 23,335 11,665

2015 Construct Helicopter Landing Area 90 0 10 30,000 27,000 0 3,000

2015 Apron electric/lighting 90 0 10 20,000 18,000 0 2,000

2015 Replace N Apron 90 0 10 250,000 225,000 0 25,000

2015 Extend Rwy 16/34 - Land 90 0 10 200,000 180,000 0 20,000

2016 Extend Rwy 16/34 N [550' x 75'] 90 0 10 600,000 540,000 0 60,000

2016 Extend Parallel Taxiway 16/34 90 0 10 200,000 180,000 0 20,000

2017 Relocate Automated Weather Observation Station (AWOS) 90 0 10 30,000 27,000 0 3,000

2018 New Turf Crosswind 8/26 - Environmental Assessment 90 0 10 90,000 81,000 0 9,000

Summary for 'FAASite' = 10910.5*A (13 detail records) Totals 1,900,000 1,660,500 37,335 202,166

PQN Pipestone Municipal Airport 2013 REPLACE FLOOR IN EXISTING HANGAR 0 50 50 75,000 0 37,500 37,500

2013 FIVE GROUND MOBILE RADIOS 90 0 10 5,381 4,843 0 538

2014 JET A FUEL TANK 90 0 10 55,000 49,500 0 5,500

2015 Environmental Assessment (EA) for Parallel Taxiway 90 0 10 50,000 45,000 0 5,000

2015 Security Improvements - Fencing 90 0 10 50,000 45,000 0 5,000

Monday, December 10, 2012 Page 46 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

PQN Pipestone Municipal Airport 2016 PARALLEL TAXIWAY 90 0 10 1,500,000 1,350,000 0 150,000

Summary for 'FAASite' = 10912.*A (6 detail records) Totals 1,735,381 1,494,343 37,500 203,538

FKA Preston - Fillmore County Airport 2013 SRE BLOWER ATTACHMENT 90 0 10 80,000 72,000 0 8,000

2013 FUEL SYSTEM CARD READER 90 0 10 18,000 16,200 0 1,800

2014 HANGAR SITE PREPARATION 90 0 10 73,000 65,700 0 7,300

2014 WIDEN HANGAR TAXILANE 90 0 10 9,400 8,460 0 940

2014 HANGAR TAXILANES 90 0 10 68,000 61,200 0 6,800

2014 CRACK REPAIR 90 0 10 12,000 10,800 0 1,200

2015 4 UNIT T-HANGAR SITE PREP 90 0 10 30,200 27,180 0 3,020

2015 4 UNIT T-HANGAR 90 0 10 100,000 90,000 0 10,000

2016 SNOW REMOVAL EQUIPMENT (SRE) MAINTENANCE 90 0 10 100,000 90,000 0 10,000 BUILDING 2016 ENVIRONMENTAL ASSESSMENT (EA) FOR CROSSWIND 90 0 10 60,000 54,000 0 6,000

2018 LAND ACQUISITION FOR CROSSWIND 90 0 10 215,400 193,860 0 21,540

Summary for 'FAASite' = 10919.5*A (11 detail records) Totals 766,000 689,400 0 76,600

PNM Princeton Municipal Airport 2013 HANGAR AREA TAXILANE REHABILITATION 90 0 10 200,000 180,000 0 20,000

2013 NEW HANGAR AREA GRADING & TAXILANE 90 0 10 200,000 180,000 0 20,000

2014 E.A. Phase I - TURF CROSSWIND RUNWAY 90 0 10 80,000 72,000 0 8,000

2014 PERIMETER DEER FENCING 90 0 10 300,000 270,000 0 30,000

2014 SNOW REMOVAL EQUIPMENT (SRE) BUILDING - 90 0 10 300,000 270,000 0 30,000 CONVERT EXISTING HANGAR 2014 HANGAR AREA DRAINAGE SYSTEM 90 0 10 100,000 90,000 0 10,000

Monday, December 10, 2012 Page 47 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

PNM Princeton Municipal Airport 2014 WILDLIFE HAZARD ASSESSMENT 90 0 10 50,000 45,000 0 5,000

2015 E.A. Phase II - TURF CROSSWIND RUNWAY 90 0 10 80,000 72,000 0 8,000

2015 LAND/EASEMENTS - TURF CROSSWIND RUNWAY 90 0 10 450,000 405,000 0 45,000

2015 WEST SIDE LAND ACQUISITION - TURF CROSSWIND 90 0 10 500,000 450,000 0 50,000 RUNWAY 2016 TURF CROSSWIND RUNWAY - CONSTRUCTION 90 0 10 1,700,000 1,530,000 0 170,000

2017 MASTER PLAN/AIRPORT LAYOUT PLAN UPDATE 90 0 10 200,000 180,000 0 20,000

2017 FIXED-BASE OPERATOR (FBO) FACILITY 0 50 50 300,000 0 150,000 150,000

2018 10-UNIT T-HANGAR - CONSTRUCTION 90 0 10 600,000 540,000 0 60,000

Summary for 'FAASite' = 10922.1*A (14 detail records) Totals 5,060,000 4,284,000 150,000 626,000

D81 Red Lake Falls Municipal Airport 2014 Replace Hangar Doors/Openers (3 of 8) 0 50 50 72,000 0 36,000 36,000

2014 RUNWAY CRACK REPAIR 0 80 20 12,000 0 9,600 2,400

2015 Rehabilitate Low Intensity Runway Lighting System (LIRLs) 0 80 20 50,000 0 40,000 10,000

2015 Length Justification Study 0 80 20 10,000 0 8,000 2,000

2016 Crack Seal Runway 0 80 20 15,000 0 12,000 3,000

2017 Extend Rwy 15/33 - 1,000' 0 80 20 350,000 0 280,000 70,000

2018 FEE SIMPLE LAND PURCHASE (12-?? ACRES) 0 80 20 10,000 0 8,000 2,000

Summary for 'FAASite' = 10933.01*A (7 detail records) Totals 519,000 0 393,600 125,400

RGK Red Wing Regional Airport 2013 RECONSTRUCTION of GENERAL AVIATION (GA) APRON & 90 0 10 262,500 236,250 0 26,250 TAXIWAY 2013 RUNWAY/TAXIWAY CRACK SEALING 90 0 10 20,000 18,000 0 2,000

2014 FUEL TANK MONITOR 0 50 50 24,000 0 12,000 12,000

Monday, December 10, 2012 Page 48 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

RGK Red Wing Regional Airport 2014 BLOWER FOR TRACTOR 0 67 33 140,000 0 93,338 46,662

2015 RECONSTRUCTION OF GENERAL AVIATION (GA) APRON 90 0 10 157,500 141,750 0 15,750 & TAXIWAY 2015 WILDLIFE MITIGATION(FENCE) 90 0 10 580,000 522,000 0 58,000

2016 TAXILANE REPAIR 90 0 10 220,000 198,000 0 22,000

2016 LED LIGHTING UPGRADE 90 0 10 50,000 45,000 0 5,000

2017 DEICING EQUIPMENT 0 70 30 30,000 0 21,000 9,000

2018 FIXED-BASE OPERATOR (FBO) HANGAR SITE 0 50 50 1,100,000 0 550,000 550,000 PREPARATION & CONSTRUCTION 2018 10-UNIT T-HANGARS 0 0 0 450,000 0 0 0

Summary for 'FAASite' = 10934.*A (11 detail records) Totals 3,034,000 1,161,000 676,338 746,662

RWF Redwood Falls Municipal Airport 2014 UPDATE AIRPORT ZONING ORDINANCE 0 70 30 54,000 0 37,800 16,200

2014 INSTALL A/D BUILDING ELEVATOR 0 70 30 275,000 0 192,500 82,500

2014 ACQUIRE LAND FOR RPZ, CLEAR ZONE FOR RNWY 23, 90 0 10 326,000 293,400 0 32,600 BRL FOR RNWY 12/30 2014 REMOVE & MITIGATE RNWY 5/23, OTHER TRANSITIONAL 90 0 10 256,000 230,400 0 25,600 FAR PART 77 OBSTR 2015 CRACK SEAK AIRPORT PAVEMENTS 0 70 30 50,000 0 35,000 15,000

2015 TERMINAL AREA FENCING AND CONTROLLED ACCESS 90 0 10 175,000 157,500 0 17,500 GATES 2016 ACQUIRE LAND FOR FAA RPZ, OBS REMOVAL FOR RNWY 90 0 10 405,000 364,500 0 40,500 12 2016 REMOVE & MITIGATE RWNY 12/30 FAR PART 77 OBSTR 90 0 10 165,000 148,500 0 16,500

2017 REHAB HANGAR AREA PAVEMENT (CRACK FILL & 0 50 50 103,000 0 51,500 51,500 SLURRY SEAL) 2017 REHAB RNWY 12/30, TXWY, SECONDARY APRON (CRACK 90 0 10 268,000 241,200 0 26,800 FILL & SLURRY SEAL) 2017 REHAB PRIMARY APRON (MILL & OVERLAY) 90 0 10 325,000 292,500 0 32,500

2017 CONSTRUCT PARALLEL TAXIWAY, SOUTH WATERSHED 90 0 10 3,466,000 3,119,400 0 346,600 DRAINAGE IMPROVEMENTS

Monday, December 10, 2012 Page 49 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 10938.*A (12 detail records) Totals 5,868,000 4,847,400 316,800 703,800

52Y Remer Municipal Airport 2013 CLEARING & GRUBBING 0 80 20 10,000 0 8,000 2,000

2014 ESTABLISH TURF 0 80 20 5,000 0 4,000 1,000

2015 Replace Entrance Signs 0 80 20 2,500 0 2,000 500

2016 Clearing & Grubbing 0 80 20 10,000 0 8,000 2,000

2018 Gravel Parking Lot & Entrance Road 0 80 20 4,500 0 3,600 900

Summary for 'FAASite' = 10945.1*A (5 detail records) Totals 32,000 0 25,600 6,400

RST Rochester International Airport 2013 BITUMINOUS SHOULDERS W/RUNWAY END BLAST 90 0 10 3,250,000 2,925,000 0 325,000 PADS - RUNWAY 13/31 2013 DEICING FACILITY - TERMINAL APRON 90 0 10 2,300,000 2,070,000 0 230,000

2014 ROOF REPLACEMENT FOR AIRPORT MAINTENANCE 0 70 30 150,000 0 105,000 45,000 FACILITY 2014 WILDLIFE HAZARD ASSESSMENT PER FAA REQUIREMENT 0 70 30 50,000 0 35,000 15,000

2014 AIRPORT STRATEGIC PLANNING 0 70 30 15,000 0 10,500 4,500

2014 SAFETY MANAGEMENT SYSTEM (FAA MANDATED) 0 70 30 100,000 0 70,000 30,000

2014 SNOW REMOVAL EQUIPMENT - HIGH SPEED AIRFIELD 0 67 33 700,000 0 469,000 231,000 BROOM 2014 SNOW REMOVAL EQUIPMENT - SUBURBAN W/AIRFIELD 0 67 33 60,000 0 40,200 19,800 BRAKING EQUIP 2014 CAT II ILS - RUNWAY 13/31 & GPS 0 100 0 1,000,000 0 1,000,000 0

2014 AIRFIELD PERIMETER ROAD 90 0 10 1,400,000 1,260,000 0 140,000

2014 PASSENGER LOADING BRIDGE/GPU, AIR CONDITIONER 0 0 0 700,000 0 0 0

2015 FUEL FARM UPGRADES - 40K ABOVE GROUND TANK, 0 50 50 350,000 0 175,000 175,000 TANK REHAB 2015 CARGO RAMP AND TERMINAL RAMP REHAB 0 70 30 750,000 0 525,000 225,000

Monday, December 10, 2012 Page 50 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

RST Rochester International Airport 2015 T-HANGAR #6 SITE DEVELOPMENT 0 50 50 175,000 0 87,500 87,500

2015 T-HANGAR #6 10-UNIT BUILDING 0 0 0 375,000 0 0 0

2015 SNOW REMOVAL EQUIPMENT-AIRFIELD SNOW BLOWER 0 67 33 810,000 0 542,700 267,300

2015 PURCHASE EXISTING AIRPORT CARGO BUILDING 0 70 30 600,000 0 420,000 180,000

2015 EARTHWORK/GRADING/UTILITIES - REPL. TERMINAL 90 0 10 9,425,000 8,482,500 0 942,500

2015 REPLACEMENT TERMINAL ROADWAY IMPROVEMENTS 90 0 10 3,000,000 2,700,000 0 300,000

2016 TAXIWAY IMPROVEMENTS FOR REPL. TERMINAL & BIT 90 0 10 5,286,000 4,757,400 0 528,600 SHLDS FOR C-IV 2016 REPLACEMENT TERMINAL A/E SERVICES 90 0 10 3,500,000 3,150,000 0 350,000

2016 PARKING AND SURFACE TRANSPORTATION 90 0 10 2,200,000 1,980,000 0 220,000

2016 TAXIWAY DELTA 90 0 10 7,425,000 6,682,500 0 742,500

2016 AIRFIELD CONCRETE MAJOR REHAB PROJECT 90 0 10 3,500,000 3,150,000 0 350,000

2017 INDUSTRIAL PARK ROAD EXTENSION 0 50 50 700,000 0 350,000 350,000

Summary for 'FAASite' = 10950.1*A (25 detail records) Totals 47,821,000 37,157,400 3,829,900 5,758,700

ROX Roseau Municipal Airport - Rudy Billberg Field 2013 RWY 6/24 - LAND ACQUISITION 90 0 10 60,000 54,000 0 6,000

2013 Rwy 16/34/Twy Pavement Improvements 90 0 10 175,000 157,500 0 17,500

2014 Bay Hangar 90 0 10 325,000 292,500 0 32,500

2015 RELOCATE ARRIVAL/DEPARTURE BLDG 90 0 10 135,000 121,500 0 13,500

2015 Parking Lot Relocation 90 0 10 200,000 180,000 0 20,000

2017 INSTALL PAPIs 90 0 10 150,000 135,000 0 15,000

2017 DEER FENCING (Phase 1) 90 0 10 100,000 90,000 0 10,000

2018 APRON RELOCATION 90 0 10 200,000 180,000 0 20,000

Monday, December 10, 2012 Page 51 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 10955.1*A (8 detail records) Totals 1,345,000 1,210,500 0 134,500

ROS Rush City Regional Airport 2013 LAND ACQUISITION - HANGAR AREA (REIMBURSEMENT) 90 0 10 200,000 180,000 0 20,000

2013 OBSTRUCTION SURVEY AND REMOVAL 90 0 10 150,000 135,000 0 15,000

2013 LAND ACQUISITION - CROSSWIND RUNWAY 90 0 10 850,000 765,000 0 85,000

2014 CROSSWIND RUNWAY - PLANS AND SPECIFICATIONS 90 0 10 225,000 202,500 0 22,500

2014 CROSSWIND RUNWAY CONSTRUCTION 90 0 10 2,800,000 2,520,000 0 280,000

2015 DEER FENCING 90 0 10 300,000 270,000 0 30,000

2015 SOUTH HANGAR AREA - ACCESS ROAD 0 70 30 150,000 0 105,000 45,000

2016 RUNWAY PAVEMENT REHABILITATION 90 0 10 1,500,000 1,350,000 0 150,000

2017 HANGAR AREA DEVELOPMENT - PHASE 1 90 0 10 875,000 787,500 0 87,500

2018 HANGAR AREA DEVELOPMENT - PHASE 2 90 0 10 875,000 787,500 0 87,500

Summary for 'FAASite' = 10958.9*A (10 detail records) Totals 7,925,000 6,997,500 105,000 822,500

55Y Rushford Municipal Airport 2014 AWOS 0 0 0 125,000 0 0 0

2014 RELOCATE AND UPGRADE FUEL SYSTEM 90 0 10 250,000 225,000 0 25,000

2014 REPLACE RUNWAY LIGHTING & WIRING 90 0 10 140,000 126,000 0 14,000

2014 CRACK SEAL AIRFIELD PAVEMENTS 90 0 10 35,000 31,500 0 3,500

2015 MOWER 0 67 33 10,000 0 6,667 3,333

2017 RUNWAY LENGTH JUSTIFICATION & FEASIBILITY 90 0 10 40,000 36,000 0 4,000 ANALYSIS (PHASE I) 2017 LAND PURCHASES (DOC PETERSON) 90 0 10 50,000 45,000 0 5,000

2018 CRACK SEAL & SEAL COAT AIRFIELD PAVEMENTS 90 0 10 95,000 85,500 0 9,500

Monday, December 10, 2012 Page 52 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

55Y Rushford Municipal Airport 2018 ENVIRONMENTAL ASSESSMENT - PHASE II 90 0 10 150,000 135,000 0 15,000

Summary for 'FAASite' = 10959.1*A (9 detail records) Totals 895,000 684,000 6,667 79,333

STC St. Cloud Regional Airport 2013 CROSSWIND RUNWAY 5/23 RECONSTRUCTION 90 0 10 1,600,000 1,440,000 0 160,000

2013 RUNWAY 13/31 EXTENSION - E.A. 90 0 10 250,000 225,000 0 25,000

2013 RUNWAY 13/31 EXTENSION - DESIGN 90 0 10 500,000 450,000 0 50,000

2013 AIRPORT SECURITY IMPROVEMENTS 0 70 30 130,000 0 91,000 39,000

2013 UTILITY VEHICLE W/FRICTION MEASURING EQUIPMENT 0 70 30 30,000 0 21,000 9,000

2013 ANNUAL CRACK SEAL (BIDS MAR 2013) 0 70 30 25,000 0 17,500 7,500

2014 INSET PAVEMENT LIGHTING - RUNWAY 13/31 90 0 10 1,000,000 900,000 0 100,000

2014 RUNWAY 13/31 EXTENSION - CONSTRUCTION 90 0 10 6,500,000 5,850,000 0 650,000

2014 RUNWAY 13/31 NAVAID RELOCATIONS 0 0 100 1,500,000 0 0 1,500,000

2014 TERMINAL PARKING LOT EXPANSION 0 50 50 250,000 0 125,000 125,000

2014 FBO HANGAR CONSTRUCTION 0 50 50 1,500,000 0 750,000 750,000

2015 SOUTH G.A. SITE DEVELOPMENT - E.A. 90 0 10 200,000 180,000 0 20,000

2015 HANGAR SITE PREPARATION 0 50 50 100,000 0 50,000 50,000

2015 10-UNIT T-HANGAR 0 0 0 260,000 0 0 0

2016 NORTH G.A. APRON REHABILITATION 90 0 10 1,000,000 900,000 0 100,000

2016 SOUTH G.A. SITE DEVELOPMENT - CONSTRUCTION 90 0 10 2,000,000 1,800,000 0 200,000

2017 PAY PARKING SYSTEM 0 0 100 400,000 0 0 400,000

Summary for 'FAASite' = 10962.1*A (17 detail records) Totals 17,245,000 11,745,000 1,054,500 4,185,500

Monday, December 10, 2012 Page 53 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

JYG St. James Municipal Airport 2013 REHAB RUNWAY 15/33 - CRACK SEAL 90 0 10 40,000 36,000 0 4,000

2013 SNOW REMOVAL EQUIPMENT-BLOWER ATTACHMENT 90 0 10 137,000 123,300 0 13,700

2014 6 UNIT T-HANGAR SITE PREP 0 50 50 200,000 0 100,000 100,000

2014 6 UNIT T-HANGAR BUILDING 0 0 0 250,000 0 0 0

2014 TRACKLESS MOWER 0 67 33 174,000 0 116,006 57,994

2014 ENVIRONMENTAL ASSESSMENT FOR RNWY 15/33 & 90 0 10 60,000 54,000 0 6,000 TXWY EXT 2015 PROPERTY ACQUISITION FOR RNWY & TXWY EXT 90 0 10 240,000 216,000 0 24,000

2016 RUNWAY AND TAXIWAY EXTENSION - DESIGN 90 0 10 250,000 225,000 0 25,000

2016 SNOW REMOVAL EQUIPMENT 90 0 10 180,000 162,000 0 18,000

2017 FIXED-BASE OPERATOR HANGAR 0 50 50 300,000 0 150,000 150,000

2017 RUNWAY AND TAXIWAY EXTENSION - CONSTRUCTION 90 0 10 1,500,000 1,350,000 0 150,000

Summary for 'FAASite' = 10967.1*A (11 detail records) Totals 3,331,000 2,166,300 366,006 548,694

21D Lake Elmo Airport 2013 2013 PAVEMENT REHABILITATION 50 0 50 300,000 150,000 0 150,000

2015 RUNWAY 14/32 REPLACEMENT 90 0 10 5,000,000 4,500,000 0 500,000

2015 2015 PAVEMENT REHABILITATION - ALLEYWAYS 0 0 100 900,000 0 0 900,000

2017 EAST BUILDING AREA DEVELOPMENT 0 0 0 2,800,000 0 0 0

2017 EAST SIDE PARALLEL TAXIWAY 0 0 100 1,200,000 0 0 1,200,000

2018 MATERIALS STORAGE BUILDING 0 0 100 600,000 0 0 600,000

Summary for 'FAASite' = 10973.*A (6 detail records) Totals 10,800,000 4,650,000 0 3,350,000

STP St. Paul Downtown Airport - Holman Field 2013 STORM SEWER IMPROVEMENTS 0 60 40 500,000 0 300,000 200,000

Monday, December 10, 2012 Page 54 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

STP St. Paul Downtown Airport - Holman Field 2014 JOINT AND CRACK REPAIRS 0 0 100 100,000 0 0 100,000

2014 METROPOLITAN AIRPORTS COMMISSION (MAC) 0 0 100 200,000 0 0 200,000 BUILDING MAINTENANCE 20142014 2014 PAVEMENT REHABILITATION 20 53 27 1,500,000 300,000 800,000 400,000

2015 ELECTRICAL VAULT IMPROVEMENTS 0 0 100 700,000 0 0 700,000

2016 JOINT AND CRACK REPAIRS 0 0 100 100,000 0 0 100,000

2016 METROPOLITAN AIRPORTS COMMISSION (MAC) 0 0 100 200,000 0 0 200,000 BUILDING MAINTENANCE 2016 AIRFIELD SIGNAGE/WIND CONE UPGRADE 0 0 100 500,000 0 0 500,000

2018 HOLMAN TERMINAL SUBDRAIN 0 0 100 600,000 0 0 600,000

2018 JOINT AND CRACK REPAIR 0 0 100 100,000 0 0 100,000

2018 MAC BUILDING MAINTENANCE 0 0 100 200,000 0 0 200,000

2018 COMPENSATORY EXCAVATION MITIGATION 0 0 100 1,000,000 0 0 1,000,000

2018 COLD EQUIPMENT STORAGE BUILDING 0 0 100 750,000 0 0 750,000

Summary for 'FAASite' = 10974.*A (13 detail records) Totals 6,450,000 300,000 1,100,000 5,050,000

D39 Sauk Centre Municipal Airport 2014 Pave Entrance Road 0 70 30 174,156 0 121,909 52,247

20142013 Replace Lighted Windsock 50 50 0 30,275 15,138 15,138 0

2014 Access Control Fencing 90 0 10 144,126 129,713 0 14,413

2015 Zoning Update-Participation rate TBD 0 50 50 52,000 0 26,000 26,000

2015 Approach Clearing 90 0 10 50,000 45,000 0 5,000

2015 Mill & Overlay Rwy 14/32 90 0 10 430,000 387,000 0 43,000

2015 Runway 14/32 Turnarounds 90 0 10 85,000 76,500 0 8,500

2015 Widen Rwy 14/32 to 75' 90 0 10 450,000 405,000 0 45,000

Monday, December 10, 2012 Page 55 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

D39 Sauk Centre Municipal Airport 2015 Runway 14/32 RSA Grading 90 0 10 75,000 67,500 0 7,500

2015 Medium Intensity Runway Lights (MIRLs) - Rwy 14/32 90 0 10 240,000 216,000 0 24,000

2015 Precision Approach Path Indicator (PAPIs) - 14 & 32 90 0 10 40,000 36,000 0 4,000

2015 Rehab Taxiway-Mill & Overlay 90 0 10 150,000 135,000 0 15,000

2015 Runway End Identification Lights (REILS) - 14 & 32 90 0 10 40,000 36,000 0 4,000

2015 Rehab Apron-Mill & Overlay 90 0 10 150,000 135,000 0 15,000

2015 Construct Electrical Vault 90 0 10 50,000 45,000 0 5,000

2016 Extend Rwy 14/32 - Environmental Assessment Phase I 90 0 10 101,000 90,900 0 10,100

2017 Extend Rwy 14/32 - EA Phase II 90 0 10 65,000 58,500 0 6,500

2018 Land Acquisition - S Rwy Extension & Runway Protection Zone 90 0 10 970,000 873,000 0 97,000

Summary for 'FAASite' = 10984.*A (18 detail records) Totals 3,296,557 2,751,251 163,047 382,259

BFW Silver Bay Municipal Airport - Wayne Johnson 2015 Flail Mower 0 67 33 25,000 0 16,666 8,334

2014 Remove Arrival/Departure (A/D) Building/Construct Electrical 90 0 10 120,000 108,000 0 12,000 Vault 2014 Snow Removal Equipment - Tractor w/ Blower & Broom 90 0 10 95,000 85,500 0 9,500

2016 Tee-Hangar Improvement 0 50 50 50,000 0 25,000 25,000

2016 Improve Runway Drainage 90 0 10 200,000 180,000 0 20,000

2017 Pavement Rehabilitation 90 0 10 120,000 108,000 0 12,000

Summary for 'FAASite' = 10992.5*A (6 detail records) Totals 610,000 481,500 41,667 86,834

DVP Slayton Municipal Airport 2014 CRACK FILL, PATCH, FOG SEAL APRON 0 80 20 22,000 0 17,600 4,400

2014 NORTH HANGAR - CONCRETE FLOORS, DRAINAGE & 0 50 50 50,000 0 25,000 25,000 REPAIR DOORS

Monday, December 10, 2012 Page 56 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

DVP Slayton Municipal Airport 2015 REPLACE MIRLs/REILs/VASIs 0 80 20 150,000 0 120,000 30,000

2016 CRACK FILL RUNWAY/APRON 0 80 20 20,000 0 16,000 4,000

2017 SEAL COAT RUNWAY & APRON 0 80 20 60,000 0 48,000 12,000

Summary for 'FAASite' = 10995.01*A (5 detail records) Totals 302,000 0 226,600 75,400

Y58 Sleepy Eye Municipal Airport 2015 AIRFIELD LIGHTING IMPROVEMENTS - RNWY 13/32, 0 80 20 270,000 0 216,000 54,000 TAXIWAY, TURNOFFS, WINDCONE 2016 MAINTENANCE STORAGE BUILDING (40' X 50') & SITE 0 80 20 224,000 0 179,200 44,800 IMPROVEMENTS 2017 NORTH TAXILANE PAVEMENT REHAB (SEGMENT 5) 0 50 50 71,000 0 35,500 35,500

2018 6-UNIT T-HANGAR SITE PREPARATION & T-HANGAR 0 50 50 399,000 0 199,500 199,500 ACCESS TAXILANES Summary for 'FAASite' = 10998.*A (4 detail records) Totals 964,000 0 630,200 333,800

SGS South St. Paul Municipal Airport - Fleming Field 2013 ASPHALT MAINTENANCE - RAMP 0 70 30 70,000 0 49,000 21,000

2013 IMPLEMENT RESULTS (EA & ALP UPDATE) - PHASE 2 90 0 10 157,895 142,106 0 15,790

2014 ASPHALT MAINTENANCE - HANGAR AREA 0 50 50 50,000 0 25,000 25,000

2014 LAND ACQUISITION - RWY 16 RUNWAY PROTECTION 90 0 10 1,000,000 900,000 0 100,000 ZONE (4 PARCELS) 2015 ASPHALT MAINTENANCE- HANGAR AREA 0 50 50 50,000 0 25,000 25,000

2015 RAMP RECONSTRUCTION (& SOME TAXIWAY) 90 0 10 720,000 648,000 0 72,000

2015 TAXILANE RECONSTRUCTION - CESSNA, DECATHLON, & 90 0 10 120,000 108,000 0 12,000 HOTEL 2015 NORTH DIAGONAL TAXIWAY - MILL & OVERLAY 90 0 10 52,333 47,100 0 5,233

2016 ASPHALT MAINTENANCE - WEST HANGAR AREA 0 50 50 50,000 0 25,000 25,000

2016 12-UNIT T-HANGAR - SITE PREPARATION (WEST) 0 50 50 120,000 0 60,000 60,000

2016 12 UNIT T-HANGAR - CONSTRUCTION (WEST) 0 0 0 540,000 0 0 0

Monday, December 10, 2012 Page 57 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

SGS South St. Paul Municipal Airport - Fleming Field 2016 HANGAR #5 - HANGAR DOOR REPLACEMENT 0 50 50 45,000 0 22,500 22,500

2016 LOADER WITH PLOW AND SNOW PUSHER 90 0 10 224,438 201,994 0 22,444

2017 ASPHALT MAINTENANCE - WEST PARALLEL TAXIWAY 0 70 30 50,000 0 35,000 15,000

2017 HANGARS #2-#5 REPLACE NORTH FACADES (4) (STREET 0 50 50 120,000 0 60,000 60,000 SIDE) 2017 HANGAR #6-#8 - REPLACE FACADES & REROOF 0 50 50 250,000 0 125,000 125,000

2017 FUEL TRUCK - JET-A 0 50 50 128,100 0 64,050 64,050

2017 PARALLEL TWY - MILL AND OVERLAY 90 0 10 360,000 324,000 0 36,000

2018 ASPHALT MAINTENANCE 0 70 30 50,000 0 35,000 15,000

Summary for 'FAASite' = 11001.*A (19 detail records) Totals 4,157,766 2,371,199 525,550 721,017

D42 Springfield Municipal Airport 2013 AIRPORT MASTER PLAN UPDATE 90 0 10 95,000 85,500 0 9,500

2014 OBSTRUCTION CLEARING 0 70 30 22,500 0 15,750 6,750

2014 REPLACE EXISTING FUEL SYSTEM INCLUDING NEW 90 0 10 125,000 112,500 0 12,500 CARD READER 2014 PAVEMENT MAINTENANCE 90 0 10 90,000 81,000 0 9,000

2014 NEW LOADER (SNOW REMOVAL) 90 0 10 125,000 112,500 0 12,500

2015 DESIGN TAXIWAY 90 0 10 150,000 135,000 0 15,000

2016 TAXIWAY CONSTRUCTION PHASE I 90 0 10 530,000 477,000 0 53,000

2017 TAXIWAY CONSTRUCTION PHASE II 90 0 10 750,000 675,000 0 75,000

2018 TAXIWAY CONSTRUCTION PHASE III (ELEC/INC NEW 90 0 10 165,000 148,500 0 16,500 SHELTER) 2018 PAVEMENT MAINTENANCE 90 0 10 140,000 126,000 0 14,000

Summary for 'FAASite' = 11003.12*A (10 detail records) Totals 2,192,500 1,953,000 15,750 223,750

Monday, December 10, 2012 Page 58 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

SAZ Staples Municipal Airport 2013 PARALLEL TAXIWAY CONSTRUCTION 90 0 10 450,000 405,000 0 45,000

2014 Mower 0 67 33 100,000 0 66,670 33,330

20152014 Hangar Area and Taxilane Rehab 75 10 15 350,000 262,500 35,000 52,500

2016 Parking Lot & Entrance Road Rehab 90 0 10 90,000 81,000 0 9,000

2016 Construct Access Road 90 0 10 75,000 67,500 0 7,500

20172016 Hangar Site Prep-6 Unit T-Hangar 70 15 15 160,000 112,000 24,000 24,000

2017 6-Unit T-Hangar [Hangar Loan] 0 0 0 275,000 0 0 0

20172016 Transient Aircraft Storage Hangar 83 7 10 300,000 249,000 21,000 30,000

Summary for 'FAASite' = 11011.*A (8 detail records) Totals 1,800,000 1,177,000 146,670 201,330

D32 Starbuck Municipal Airport 2014 Large Mower/Tractor 0 67 33 25,000 0 16,668 8,333

2015 New Hangar 0 80 20 50,000 0 40,000 10,000

2015 hangar site prep 0 50 50 10,000 0 5,000 5,000

2016 New Taxiway 0 80 20 10,000 0 8,000 2,000

2017 FENCING 0 80 20 20,000 0 16,000 4,000

Summary for 'FAASite' = 11011.5*A (5 detail records) Totals 115,000 0 85,668 29,333

D41 Stephen Municipal Airport 2014 Hangar Area/Taxilane Pavement Repair 0 60 40 20,000 0 12,000 8,000

2014 Tractor with Loader, Blade & Radio 0 67 33 45,000 0 30,002 14,998

2015 Hangar Site Prep 0 50 50 220,000 0 110,000 110,000

2016 T-Hangar 0 0 0 440,000 0 0 0

Summary for 'FAASite' = 11012.6*A (4 detail records) Totals 725,000 0 152,002 132,999

Monday, December 10, 2012 Page 59 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

TVF Thief River Falls Regional Airport 2014 Route & Crack Seal Runway 3/21, Parallel Taxiway B & C 0 70 30 121,000 0 84,700 36,300

2014 Mobile Refueling Truck(Replacement) 0 67 33 400,000 0 266,680 133,320

2014 Construct Taxiway A1a (200' from 13 end) 90 0 10 150,000 135,000 0 15,000

2015 Zoning Update 0 70 30 25,000 0 17,500 7,500

2015 Extend Rwy 13/31 - ENVIRONMENTAL ASSESSMENT 90 0 10 150,000 135,000 0 15,000

2015 Crack Seal & Seal Coat Runway 13/31 90 0 10 60,000 54,000 0 6,000

2015 Request NAVAID Reimbursable agreement for NAVAID Design 90 0 10 5,600,000 5,040,000 0 560,000

2015 Rehab Taxiway A2 90 0 10 100,000 90,000 0 10,000

20162015 Rehab Apron to/at Cargo Apron 50 30 20 83,000 41,500 24,900 16,600

2016 New Fixed-Base Operator (FBO) Building 0 50 50 300,000 0 150,000 150,000

2016 Extend Rwy 13/31 - Land Acquisition 90 0 10 325,000 292,500 0 32,500

2016 Extend Rwy 13/31 - Final Design 90 0 10 275,000 247,500 0 27,500

2016 Extend Parallel Taxiway - Design 90 0 10 100,000 90,000 0 10,000

2016 Extend Rwy 13/31 - Construction 90 0 10 2,800,000 2,520,000 0 280,000

2016 Extend Parallel Taxiway-Construction 90 0 10 800,000 720,000 0 80,000

20172017 Parking Lot Mill & Overlay 65 28 7 250,000 162,500 70,000 17,500

20172017 Hangar area pvmnt Mill & Overlay 65 28 7 250,000 162,500 70,000 17,500

20182017 Hangar Taxilane Construction 70 15 15 180,000 126,000 27,000 27,000

2018 Remove Sewage Treatment Lagoons 90 0 10 1,500,000 1,350,000 0 150,000

2018 Relocate CSAH 17 90 0 10 5,400,000 4,860,000 0 540,000

2018 ARFF Truck 90 0 10 650,000 585,000 0 65,000

Monday, December 10, 2012 Page 60 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 11024.*A (21 detail records) Totals 19,519,000 16,611,500 710,780 2,196,720

12D Tower Municipal Airport 2013 Snow Removal Equipment (SRE) Building (45 x 50) 90 0 10 300,000 270,000 0 30,000

2015 Hangar Area Taxilane Ext. - Environmental Assessment & Wetland 90 0 10 150,000 135,000 0 15,000 Mitigation Plan 2016 Hangar Area Taxilane Ext. 90 0 10 200,000 180,000 0 20,000

2016 Hangar Area Taxilane Ext. - Purchase Wetland Credits 90 0 10 125,000 112,500 0 12,500

2016 Wildlife Hazard Assessment 90 0 10 25,000 22,500 0 2,500

2017 Deer Fence 90 0 10 100,000 90,000 0 10,000

Summary for 'FAASite' = 11028.4*A (6 detail records) Totals 900,000 810,000 0 90,000

TKC Tracy Municipal Airport 2015 REHAB RUNWAY 90 0 10 650,000 585,000 0 65,000

2016 TAXILANE PAVING 90 0 10 120,000 108,000 0 12,000

2016 PAVE ENTRANCE ROAD 90 0 10 60,000 54,000 0 6,000

2016 PAVE PARKING LOT 90 0 10 40,000 36,000 0 4,000

2017 HANGAR RENOVATION 0 50 50 40,000 0 20,000 20,000

2017 RUNWAY EXTENSION JUSTIFICATION REPORT 90 0 10 30,000 27,000 0 3,000

2017 ENVIRONMENTAL ASSESSMENT FOR RUNWAY 90 0 10 50,000 45,000 0 5,000 EXTENSION 2018 FUEL SYSTEM CARD READER 0 50 50 15,000 0 7,500 7,500

Summary for 'FAASite' = 11028.5*A (8 detail records) Totals 1,005,000 855,000 27,500 122,500

TWM Two Harbors Municipal - Richard B. Helgeson 2014 Construct Fixed-Base Operator (FBO) Hangar 0 50 50 800,000 0 400,000 400,000 Field 2015 Addition to Arrival/Departure Building 90 0 10 250,000 225,000 0 25,000

2016 Relocate Automated Weather Observation System (AWOS) 0 0 0 15,000 0 0 0

Monday, December 10, 2012 Page 61 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

TWM Two Harbors Municipal - Richard B. Helgeson 2016 Expand Hangar Area 90 0 10 285,000 256,500 0 28,500 Field 20172016 Resurface Access Taxiways/Aprons for City T-Hangars 80 10 10 400,000 320,000 40,000 40,000

Summary for 'FAASite' = 11029.9*A (5 detail records) Totals 1,750,000 801,500 440,000 493,500

63Y Tyler Municipal Airport 2013 JOHN DEERE WIDE MOWER 0 67 33 63,000 0 42,002 20,998

2014 TRUCK w/SNOW BLOWER 0 67 33 39,000 0 26,000 13,000

2015 Arrival/Departure Building w/Fixed-Base Operator (estimated 0 72 28 120,000 0 86,400 33,600 prorates) 2016 LAND ACQUISITION FOR RWY EXTENSION 0 80 20 25,000 0 20,000 5,000

2017 OBSTRUCTION REMOVAL 0 80 20 5,000 0 4,000 1,000

2018 JOHN DEERE WIDE MOWER 0 67 33 69,000 0 46,002 22,998

Summary for 'FAASite' = 11030.5*A (6 detail records) Totals 321,000 0 224,404 96,596

ADC Wadena Municipal Airport 2013 Replace Existing Fence Post 90 0 10 100,000 90,000 0 10,000

2014 Fuel System-Replace Pump, Card Reader&Computer System 0 50 50 50,000 0 25,000 25,000

2014 TURF CROSSWIND RUNWAY CONSTRUCTION 90 0 10 200,000 180,000 0 20,000

2014 Rehabilitate Apron 90 0 10 50,000 45,000 0 5,000

2014 Rehabilitate Airport Access Road, Veh. Parking, & install 90 0 10 200,000 180,000 0 20,000 Automated Gate 2014 Additional Airfield Perimeter Fence 90 0 10 50,000 45,000 0 5,000

20152014 Rehab Hangar Area & Taxilane Pvmnts: Drainage Improvements 80 5 15 200,000 160,000 10,000 30,000

2015 SNOW REMOVAL EQUIPMENT STORAGE BUILDING 90 0 10 300,000 270,000 0 30,000

2016 Runway Rehab-Mill and Overlay 90 0 10 500,000 450,000 0 50,000

2016 Parallel Taxiway Rehab-Mill and Overlay 90 0 10 180,000 162,000 0 18,000

Monday, December 10, 2012 Page 62 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 11047.01*A (10 detail records) Totals 1,830,000 1,582,000 35,000 213,000

Y49 Walker Municipal Airport 2013 Obstruction Removal - Transitional Surface 90 0 10 50,000 45,000 0 5,000

20142014 8-Unit T-Hangar - Site Prep 83 7 10 200,000 166,000 14,000 20,000

2014 Perimeter Fencing 90 0 10 200,000 180,000 0 20,000

2014 8-Unit T-Hangar 90 0 10 275,000 247,500 0 27,500

2016 Deer/ Perimeter Fence 90 0 10 300,000 270,000 0 30,000

2017 FBO Building/Site Prep 0 50 50 325,000 0 162,500 162,500

Summary for 'FAASite' = 11051.*A (6 detail records) Totals 1,350,000 908,500 176,500 265,000

D37 Warren Municipal Airport 2014 Relocate Apron 0 80 20 225,000 0 180,000 45,000

2014 Asphalt Apron Rehab - Hangar Area 0 50 50 100,000 0 50,000 50,000

2015 Tractor Mower 0 67 33 65,000 0 43,336 21,664

2016 Turf Parallel Taxiway Construction 0 80 20 83,000 0 66,400 16,600

2017 Relocate existing Arrival/Departure Bldg 0 80 20 200,000 0 160,000 40,000

2018 Turf Taxiway - Construct 0 80 20 200,000 0 160,000 40,000

Summary for 'FAASite' = 11052.8*A (6 detail records) Totals 873,000 0 659,736 213,265

RRT Warroad International Memorial Airport 2013 Crack Seal 0 70 30 10,000 0 7,000 3,000

2014 Pickup and Plow 0 67 33 40,000 0 26,668 13,332

2014 Crack Seal Runway 0 70 30 12,000 0 8,400 3,600

2014 Taxiway Slurry Seal Coat 90 0 10 150,000 135,000 0 15,000

2015 Crack Seal Runway 0 70 30 12,000 0 8,400 3,600

Monday, December 10, 2012 Page 63 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

RRT Warroad International Memorial Airport 2016 Crack Seal 0 70 30 12,000 0 8,400 3,600

2016 Airport Fencing - East Side 90 0 10 300,000 270,000 0 30,000

2017 Airport Fencing - North End 90 0 10 300,000 270,000 0 30,000

2017 LIRLs Rwy 4-22 90 0 10 100,000 90,000 0 10,000

2018 Perimeter Fencing - West Side 90 0 10 200,000 180,000 0 20,000

Summary for 'FAASite' = 11053.*A (10 detail records) Totals 1,136,000 945,000 58,868 132,132

ACQ Waseca Municipal Airport 2013 APRON RECONSTRUCTION 90 0 10 35,000 31,500 0 3,500

2014 RUNWAY SLURRY SEAL 90 0 10 150,000 135,000 0 15,000

2014 RUNWAY LIGHTING REPLACEMENT 90 0 10 250,000 225,000 0 25,000

2015 80-FT X 80-FT HANGAR CONSTRUCTION 0 0 0 450,000 0 0 0

2015 SNOW REMOVAL EQUIPMENT 90 0 10 300,000 270,000 0 30,000

2016 Rnwy Length Justification Study 90 0 10 35,000 31,500 0 3,500

2017 SNOW REMOVAL EQUIPMENT BUILDING 90 0 10 250,000 225,000 0 25,000

2017 ENVIRONMENTAL ASSESSMENT RUNWAY EXTENSION 90 0 10 60,000 54,000 0 6,000

2018 RUNWAY EXTENSION CONSTRUCTION 90 0 10 1,800,000 1,620,000 0 180,000

Summary for 'FAASite' = 11055.1*A (9 detail records) Totals 3,330,000 2,592,000 0 288,000

VWU Waskish Municipal Airport 2014 Environmental Assessment Worksheet for Rwy Paving 0 80 20 25,000 0 20,000 5,000

2014 Bay HANGAR [Hangar Loan] 0 0 0 30,000 0 0 0

2014 Update Airport Layout Plan 0 80 20 25,000 0 20,000 5,000

2015 Pave Primary Rwy 0 80 20 200,000 0 160,000 40,000

Monday, December 10, 2012 Page 64 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

Summary for 'FAASite' = 11058.11*A (4 detail records) Totals 280,000 0 200,000 50,000

68Y Wells Municipal Airport 2014 BITUMINOUS TAXIWAY REPAIR 0 80 20 60,000 0 48,000 12,000

2014 INSTALL AIRPORT SIGNAGE 0 80 20 5,000 0 4,000 1,000

2015 ACQUIRE TRACTOR WITH MOWER ATTACHMENT 0 67 33 90,000 0 60,003 29,997

2015 ACQUIRE LAND FOR RNWY CLEAR ZONES, BUILDING 0 80 20 540,000 0 432,000 108,000 RESTRICTION AREAS (40 ACRES) 2016 CONSTRUCT NORTH-SOUTH TAXILANE (HANGAR SITE) 0 50 50 81,384 0 40,692 40,692

2016 CONSTRUCT EAST-WEST TAXILANE (HANGAR SITE) 0 80 20 80,000 0 64,000 16,000

2016 CONSTRUCT 8 UNIT T-HANGAR SITE TAXILANES & 8 UNIT 0 50 50 288,000 0 144,000 144,000 T-HANGAR SITE PREP 2016 CONSTRUCT 8 UNIT T-HANGAR (HANGAR LOAN) 0 0 0 831,000 0 0 0

2017 CONSTRUCT NORTH HANGAR SITE PREP (ROUGH 0 50 50 140,000 0 70,000 70,000 GRADUNG ONLY) 2018 REPLACE AIRFIELD LIGHTING (LIRL TO MIRL) 0 50 50 230,000 0 115,000 115,000

Summary for 'FAASite' = 11068.1*A (10 detail records) Totals 2,345,384 0 977,695 536,689

ETH Wheaton Municipal Airport 2013 Storm Water Pollutin Prevention Plan (SWPPP) 90 0 10 5,000 4,500 0 500

2014 Crack Seal & Sealcoat Runway 90 0 10 60,000 54,000 0 6,000

20152014 Crackseal & Sealcoat Entrance Road 20 50 30 60,000 12,000 30,000 18,000

2015 Grade, Seed & Mulch Runway 6/24 90 0 10 150,000 135,000 0 15,000

Summary for 'FAASite' = 11072.*A (4 detail records) Totals 275,000 205,500 30,000 39,500

BDH Willmar Municipal Airport - John L. Rice Field 2013 MALSR/Approach Lightning Installation 0 0 0 250,000 0 0 0

2013 MASTER PLAN UPDATE 90 0 10 250,000 225,000 0 25,000

2013 Apron Expansion-Design 90 0 10 80,000 72,000 0 8,000

Monday, December 10, 2012 Page 65 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

BDH Willmar Municipal Airport - John L. Rice Field 2014 Tiling Improvements - Improve Drainage Around Nav Aids 0 70 30 100,000 0 70,000 30,000

2014 Terminal Building Irrigation System 0 0 100 60,000 0 0 60,000

2014 Fencing 90 0 10 120,000 108,000 0 12,000

2014 Apron Expansion-Main Phase 1 90 0 10 400,000 360,000 0 40,000

2014 Evironmental Assessment - Rwy & Txwy 13/31 Ext 90 0 10 85,000 76,500 0 8,500

2014 Airfield Back-up Generator 90 0 10 70,000 63,000 0 7,000

2014 Crack Repair and Sealing taxilane,apron 90 0 10 30,000 27,000 0 3,000

20152014 Overlay Taxilanes in East Hangar Area 75 10 15 350,000 262,500 35,000 52,500

2015 PERIMETER FENCING - phase 1&2 90 0 10 650,000 585,000 0 65,000

2015 Extend Runway & Taxiway 13/31-Design 90 0 10 320,000 288,000 0 32,000

2016 County Road 116 Realignment 90 0 10 400,000 360,000 0 40,000

2016 Extend Runway & Taxiway 13/31 - Grading 90 0 10 700,000 630,000 0 70,000

2016 Extend Sewer Line to Airport 90 0 10 385,000 346,500 0 38,500

2017 Extend Runway & Taxiway 13/31 - Paving& Lighting 90 0 10 1,100,000 990,000 0 110,000

2017 Maintenance Equipment Storage Building 0 70 30 600,000 0 420,000 180,000

Summary for 'FAASite' = 11082.01*A (18 detail records) Totals 5,950,000 4,393,500 525,000 781,500

MWM Windom Municipal Airport 2013 Jet Fuel Station 90 0 10 150,000 135,000 0 15,000

2014 Runway Length Justification Study 0 70 30 15,000 0 10,500 4,500

2015 Environmental for Rnwy ext, X-Wind Rnwy, Parallel Taxiway 90 0 10 70,000 63,000 0 7,000

2016 Rnwy Extension/Parallel Taxiway - Land 90 0 10 125,000 112,500 0 12,500

2016 Runway extension - Design 90 0 10 100,000 90,000 0 10,000

Monday, December 10, 2012 Page 66 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

MWM Windom Municipal Airport 2017 Runway Extension - Construction 90 0 10 1,000,000 900,000 0 100,000

2018 Crosswind Rnwy - Design 90 0 10 150,000 135,000 0 15,000

2018 Crosswind Rnwy - Land 90 0 10 900,000 810,000 0 90,000

Summary for 'FAASite' = 11088.2*A (8 detail records) Totals 2,510,000 2,245,500 10,500 254,000

ONA Winona Municipal Airport - Max Conrad Field 2013 RUNWAY Phase 1 DESIGN 90 0 10 250,000 225,000 0 25,000

2014 Airport Zoning 0 70 30 45,000 0 31,500 13,500

2014 RUNWAY AND TAXIWAY CONSTRUCTION PHASE I 90 0 10 5,200,000 4,680,000 0 520,000

2015 RUNWAY AND TAXIWAY CONSTRUCTION PHASE II 90 0 10 3,525,000 3,172,500 0 352,500

2016 RUNWAY AND TAXIWAY CONSTRUCTION PHASE III 90 0 10 3,400,000 3,060,000 0 340,000 {ELEC/INC NEW SHELTER} 2016 PAVEMENT MAINTENANCE 90 0 10 165,000 148,500 0 16,500

20172016 ARRIVAL/DEPARTURE BUILDING DESIGN 50 25 25 325,000 162,500 81,250 81,250

20182017 ARRIVAL/DEPARTURE BUILDING CONSTRUCTION 50 25 25 3,500,000 1,750,000 875,000 875,000

Summary for 'FAASite' = 11098.*A (8 detail records) Totals 16,410,000 13,198,500 987,750 2,223,750

10D Winsted Municipal Airport 2013 Runway 9/27 Rehabilitation - Design (Turf) 90 0 10 167,000 150,300 0 16,700

2013 2007 Turf Runway Rehabilitation Design Reimbursement 90 0 10 27,800 25,020 0 2,780

2014 Update Airport Zoning Ordinance - Participation Rate To Be 0 50 50 54,000 0 27,000 27,000 Determined 2014 Runway 9/27 Rehabilitation-Construction 90 0 10 894,000 804,600 0 89,400

2014 Replace Runway 9/27 Lighting (MIRLs) 90 0 10 294,000 264,600 0 29,400

2017 Rehab Apron & Taxilane Pavement 90 0 10 95,000 85,500 0 9,500

Summary for 'FAASite' = 11098.2*A (6 detail records) Totals 1,531,800 1,330,020 27,000 174,780

Monday, December 10, 2012 Page 67 of 68 CIP State Wide 2013- 2018 Funding Rates ST Fed Project FAA State Local Ident Name FY FY Description FAA St Mun Cost Funding Funding Funding

OTG Worthington Municipal Airport 2013 TAXIWAY B JOINT REPAIRS 90 0 10 89,638 80,674 0 8,964

2014 TAXIWAY C EXTENSION 90 0 10 1,278,028 1,150,225 0 127,803

2016 AIRPORT SIGN 0 70 30 18,000 0 12,600 5,400

Summary for 'FAASite' = 11104.*A (3 detail records) Totals 1,385,666 1,230,899 12,600 142,167

Grand Total 365,062,864 58,700,363 Grand Total 595,143,221 143,821,195

Monday, December 10, 2012 Page 68 of 68