August1999 Need a Fast Ferry Design? Call Us! Phone +61 2 9488 9877 Fax +61 2 9488 8144 Email: [email protected] the AUSTRALIAN NAVAL ARCHITECT
Total Page:16
File Type:pdf, Size:1020Kb
THE AUSTRALIAN NAVAL ARCHITECT Volume 3 Number 3 August1999 Need a fast ferry design? Call us! phone +61 2 9488 9877 fax +61 2 9488 8144 Email: [email protected] www.amd.com.au THE AUSTRALIAN NAVAL ARCHITECT Journal of The Royal Institution of Naval Architects (Australian Division) Volume 3 Number 3 August 1999 Cover Photo: The 86 metre high-speed catamaran ferry CONTENTS Carmen Ernestina, built by Austal Ships, during trials in June 1999. (Photo courtesy 4 A Note from the Division President Austal Ships) 4 Editorial The Australian Naval Architect is published 5 News from the Sections four times per year. All correspondence and 8 Letters to the Editor advertising should be sent to: 9 Coming Events The Editor 12 General News The Australian Naval Architect 26 Education News c/o RINA 27 Professional Notes PO Box No. 976 EPPING, NSW 2121 31 What is wrong with modern ocean- AUSTRALIA racing yachts? – Warwick Hood email: [email protected] 37 Yacht design related safety issues and the 1998 Sydney to Hobart Yacht The deadline for the next edition of The Race – Andrew Dovell Australian Naval Architect (Vol. 3 No. 4, November 1999) is Friday 22 October 1999. 45 Some marine casualties - Exercises in Forensic Naval Architecture (Part 3) Opinions expressed in this journal are not – R J Herd necessarily those of the Institution. 50 The Internet 51 From the Archives The Australian Naval Architect ISSN 1441-0125 © Royal Institution of Naval Architects 1999 Past editions of the Editor in Chief: John Jeremy Technical Editor: Phil Helmore The Australian Naval Architect are on the Print Post Approved PP 606811/00009 World Wide Web Printed by B. E. E. Printmail Telephone (02) 9437 6917 www.rina.org.uk 3 struction of two 78,000 dwt crude oil carriers, and A NOTE FROM THE anybody who knows about the Shanghai summer will DIVISION PRESIDENT know that is a testing experience. From the little I’ve managed to see here, China in some An event of some interest to the Division and to naval ways is almost a shipbuilder’s dream. Shanghai alone architects in general in Australia which occurred some has a number of shipyards, and much of the country’s weeks ago was the release of the Cruising Yacht Club trade, local as well as import-export, is carried by ship. of Australia’s report on the 1998 Sydney Hobart yacht Hudong Shipyard, my present base, has a workforce race and tragic events relating thereto. I had been of over 10,000, and is a fully-integrated shipyard in- looking forward to the release of this report with some cluding a military section and an engine works. It is a interest, as I felt that it would provide some insights peculiar mixture of hi-tech and the primitive. For as to what might be done to reduce the likelihood of example hull design, drafting and lofting are done tragedies in this race in future. using the KCS Steerbear system, and plate parts are From the viewpoint of a practising naval architect I all cut using NC machines, yet most sections appear was a little disappointed. The Executive Summary of to be cut freehand, and sometimes not very well at the document reports that “There is no evidence that that. In my first few weeks here I saw a workman any particular style or design of boat fared better or marking out drainholes in bulkheads using a piece of worse in the conditions. The age of the yacht, age of string as a compass. He then proceeded to oxy-cut design, construction method, construction material, those drainholes - freehand of course! high or low stability, heavy or light displacement or There are those who say that China is the world’s next rig type were not determining factors.” The big shipbuilding nation. They may be right; after all Recommendations section includes some the Chinese yards certainly appear to offer the right recommendations re tightening-up on eligibility rules prices, they have the advantage offered by compara- from a stability viewpoint, and there is a tively low wages, and they have plenty of work. How- recommendation that the “design and construction ever they also face many challenges in various areas, requirements for decks, hatches and windows should particularly those of quality control and workforce be referred to the International Technical Committee skill and motivation. Their construction facilities also of the Ocean Racing Club.” Other than that it would appear to need significant upgrading before they will appear that from a design viewpoint there is little of be on a par with those of Japan and Korea. significance that can be done to improve the safety of Bryan Chapman ocean racing. The report is summarized elsewhere in this journal. A related disappointment was the adjournment of the EDITORIAL Coroner’s Inquest into the deaths arising from the race. The inquest opened in Sydney on 2 July and was al- Apart from the usual good news about recent deliveries most immediately adjourned to November. This and orders from the shipbuilders, most of this edition means that any Coroner’s recommendations will al- of The Australian Naval Architect is devoted to reports most certainly not be implemented before the 1999 and analyses of maritime incidents and disasters, race. including Part 3 of Bob Herd’s continuing series on An event of some interest will be the planned visit to Forensic Naval Architecture. Australia of the Chief Executive of the Institution, The tragic outcome of last year’s Sydney to Hobart Trevor Blakeley, in October. Trevor will be visiting Yacht Race has prompted a debate amongst yachts- Perth, Brisbane, Melbourne and Tasmania in the men and designers that is reminiscent of the ‘long/ course of his visit, and has expressed a particular in- thin – short/fat’ warship debate of some years ago. terest in meeting with the Sections. Arrangements Now it is the relative merits of ‘heavy/slower – light/ are already under way to facilitate this, and those af- faster’ designs that is the focus of attention. In this fected should hear from their Sections closer to the edition we present two papers addressing this debate time. If you have anything to say about the Institu- that were presented, by Warwick Hood and Andrew tion to somebody with the ability to do something Dovell, at the Workshop on the Safety of Ocean Rac- about it then this will be your chance! ing Yachts held at the University of New South Wales On a final note, this column comes to you from Shang- last March. hai, China, where I am presently located. I am toiling The fire in the engine room of HMAS Westralia in away as a member of a site team supervising the con- May last year, caused by the failure of a flexible hose, 4 was not an isolated incident. In June, the Marine Ac- cident and Investigation Unit’s report into a similar fire in Aurora Australis revealed similar failures in NEWS FROM THE SECTIONS technical procedures although, in this case, the hose failed due to old age. Victoria The Collins class submarines have also been under On 18 May 1999, Dr. Stephen Kennett of the Defence public scrutiny in recent weeks with the release of Science and Technology Organisation (DSTO) the McIntosh/Prescott report into the submarine presented a paper on Fire Modeling for Naval Vessels. project’s deficiencies. This has been a very ambitious Recent events such as the fires in Westralia and Au- and complex project and it is an unfortunate fact of rora Australis have highlighted the need for the RAN life that any public controversy over perceived diffi- to remain vigilant for the causes of fire. culties and failures will totally overshadow the con- siderable achievements and hard work of the partici- The fire task, Fire Modeling for Naval Vessels was pants. It is always much easier for the non-partici- set up to provide Navy with a smoke and fire modelling pants to be wise after the event. capability that will enable the prediction of fire Whilst the performance shortcomings of the combat behaviour and the solution of smoke transport system are obviously crucial to the value of the sub- problems to be found. To this end, fire risk surveys marines as a weapons system, we are not the first to are conducted on existing and proposed naval vessels encounter such difficulties when seeking ‘state of the and both computational models and analogue smoke art’ solutions. It is the other reported submarine defi- flow models are being developed. ciencies with hull noise and machinery problems that In his talk Stephen outlined some of the activities be- must prompt experienced practitioners to ask “How ing undertaken in the surface-vessel fire task, includ- could it happen?” ing: The report questions whether a fixed-price contract q The Westralia fire simulation was appropriate for such a large, complex and new q An outline of a fire risk assessment, recently project, notwithstanding the reasons for its adoption undertaken for HMAS Success and HMAS in the mid-1980s. The report states that in the later Tobruk stages, it can encourage the supplier to contest the q The training package, Phoenix specifications and their interpretation and to avoid On 21 April 1998 Mr. Martijn van Wijngaarden responsibility wherever possible to protect profit. presented a technical paper titled Marine Pipeline Conversely, it can encourage the buyer to incorpo- Installation and Floating Equipment Development. rate everything possible into the interpretation of the This paper was awarded the Pieter Bossen Memorial contract. Prize for 1998.