Pile Testing

Parallel Roads Business Bay,

PROJECT SUMMARY

NAME: Parallel Roads - Business Bay, Dubai

YEAR: 2009

CLIENT: Dubai Roads & Transport Authority (RTA)

CONTRACTOR: Sungwon

SPECIALIST SUB-CONTRACTOR: Chris Spalton CONSULTANT: Chris Spalton

OVERVIEW MONITORING PRODUCTS USED The project comprises two parallel roads, A series of vibrating wire strain gauges VWS-2100 VW embedment strain each 64km long, stretching between were installed to validate the design of gauges Sheik Rashid Road (near ) the piles. Installed to monitor and verify load and the outskirts of Abu Dhabi in the transfer within the pile. Four arrays of strain gauges were United Arab . installed in up to eight different These roads will ease traffic flow VW 2106 readout elevations depending on the pile length. on Sheik Zayed road and provide Measures all types of vibrating wire Pile load and head displacement were easy connections between various instruments. measured and connected to a ‘real time’ communities and developing residential data logger. and commercial areas between the two Data logger highways. The strain gauges were also connected Provides automatic data acquisition to a data logger which provided of all types of sensors. Can also have They consist of three-lane roads in each background information which was modem for remote accessing. direction with a number of flyovers and correlated to the ‘real time’ data. interchanges. As part of the elevated sections a significant amount of 800mm bored cast in-situ piles were constructed as part of the bridge piers. The total capacity of the two roads will be 18,000 vehicles per hour and the project is divided into nine phases.

Geosense Ltd, Nova House, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND, England www.geosense.co.uk e [email protected] t +44(0)1359 270457 V1.2 01/2021