To Let It's Time for Business

Total Page:16

File Type:pdf, Size:1020Kb

To Let It's Time for Business GATEWAY CAMBRIDGE M11 / A14 IT’S TIME FOR BUSINESS New trade counter, manufacturing and logistics opportunities from 3,046 to 45,694 sq ft TO LET UNDER CONSTRUCTION AVAILABLE Q1 2022 gatewaycambridge.co.uk Library & Post Office Costa Coffee Next Kwik Fit BAR HILL Tesco Extra The Fox LOCAL OCCUPIERS Petrol Station INCLUDE: ADDER TECHNOLOGY Adder Technology ASL GROUP COSTA COFFEE CTD Tiles CAMBRIDGE FLUID SYSTEMS Domino Printing Sciences CONCEPT LIFE SCIENCES Oxford Archaeology CTD TILES DOMINO PRINTING SCIENCES Cambridge Fluid Systems ELLIOTTS Lumie HARRIS + HOOLE KWIK FIT Concept Life Sciences LUMIE MAX SPIELMANN Domino Printing Sciences NEXT CAMBRIDGE OXFORD ARCHAEOLOGY 8 MILES · 16 MINS RICO COURIERS CAMBRIDGE TESCO EXTRA A14 THE CAMBRIDGE BUILDING SOCIETY THE FOX HUNTINGDON URBAN CAR COMPANY LTD Indicative CGI 12 MILES · 17 MINS IN THE ZONE Gateway Cambridge Ideal for manufacturing, logistics With a significant local workforce and trade counter opportunities and and nearby amenities, including is an exciting new TIME FOR CHANGE EVERY SECOND COUNTS BUILDING TIME development set across adjacent to the A14/M11 Junction, Costa Coffee and Tesco Extra, Gateway Cambridge benefits from the development is high quality, LARGE LOCAL LOCATED ON THE A14/M11 PERFECTLY five acres in North West WORKFORCE PRIMED JUNCTION, CONNECTING YOU POSITIONED FOR LAST excellent and easy access to road, highly sustainable and designed to AND READY TO GO TO THE UK NETWORK MILE DELIVERY Cambridge. motorway and public transport promote productivity and wellbeing. networks. gatewaycambridge.co.uk Schedule of Accommodation (GIA): 30M BUILDING 2A Minimum 20 Car Charging BUILDING 1 - TRADE UNITS BUILDING 2B 8-10 Metre Points SQ M SQ FT SQ M SQ FT SQ M SQ FT Eaves Height UNIT 1A 429 4,618 Ground Floor 1,724 18,557 Ground Floor 2,156 23,208 UNIT 1B 238 3,046 First Floor Office 150 1,615 First Floor Office 215 2,314 UNIT 1C 427 4,596 TOTAL 1,874 20,172 TOTAL 2,371 25,522 UNDER OFFER UNIT 1D 429 4,618 36M LED Lighting Clear Height Minimum 10m Clear Height Minimum 10m TOTAL 1,568 16,878 GATEWAY Level Access 2 Level Access 3 CAMBRIDGE Yard Depth 20m Yard Depth 20m 30M Clear Height 8m Level Access 1 Car Parking Spaces 25 Car Parking Spaces 17 4 Yard Depth 13m Car Charging Spaces 3 Car Charging Spaces 2 Cycle Spaces 34 Cycle Spaces 26 Cycle Parking Car Parking Spaces UNIT 1A 6 UNIT 1B 3 BUILDING 3 BUILDING 4 UNIT 1C 6 SQ M SQ FT SQ M SQ FT UNIT 1D 5 Ground Floor 2,700 29.063 Ground Floor 1,080 11.625 First Floor Office 270 2,906 First Floor Office 108 1,163 32M Cycle Spaces 48M TOTAL 2,970 31,970 TOTAL 1,188 12,788 UNIT 1A 6 UNIT 1B 4 Clear Height Minimum 10m Clear Height Minimum 10m UNIT 1C 6 Level Access 3 Level Access 2 20M BUILDING 2A UNIT 1D 6 42.5M Yard Depth 32m Yard Depth 30m Car Parking Spaces 27 Car Parking Spaces 24 3 Car Charging Spaces 3 Car Charging Spaces 2 Cycle Spaces 40 Cycle Spaces 18 63.5M 2 AHEAD OF ITS TIME 36M Adaptable space, built to Grade-A market-leading specifications, to 13M BUILDING 2B stand the test of time 18M 12M 18M 18M 60M UNDER UNDER UNIT 1A UNIT 1B UNITOFFER 1C UNITOFFER 1D 24M 1 Shower and 50% Photovoltaic Up to 32m Targeting Indicative masterplan Locker Facilities Coverage Deep Yards EPC A+ Rating Indicative CGI of Building 1 Best-in-class building and design specifications, THE GATEWAY which include: TO SUCCESS INDUSTRY RATED Built with sustainability and longevity in mind • BREEAM: ‘Excellent’ • Targeting ‘Carbon Zero’ Carefully considered for energy With the ability to increase the • Targeting ‘EPC A+’ and water consumption, waste capacity of Photovoltaic arrays management and carbon reduction, and electric car charging bays, the the high-specification units at units have been developed with HIGHLY EFFICIENT Gateway Cambridge are designed advanced features that can be to optimise efficiencies and adapted to suit changing business • Internal and external high enable lower running costs, whilst and market needs. efficiency LED lighting, with protecting the natural environment. office motion detection and daylight saving controls • High efficiency office heating and cooling systems with heat recovery ventilation • 15% roof lights providing more natural light RENEWABLE • Approximately 50% Photovoltaic coverage with provision for additional capacity • 10% electric charging points • 90% passive electric charging points • Planet Mark accreditation • Discount off-grid power available from the landlord Indicative CGI of Building 2 WASTE MANAGEMENT • Water saving taps and dual flush WCs An environmentally sustainable • Highly insulated buildings design for modern occupiers. mitigate air leakage ACCESSIBLE • Bike shelters and showers encourage cycling to work • Excellent public transport links for sustainable access • Energy efficient lift (Building 3 only) • Shower and locker facilities Indicative buildings finishes from other Wrenbridge developments A1 (M) M6 YORK LEEDS AIRPORT M55 LEEDS PRESTON M65 BRADFORD A56 M62 M62 A1 M6 WAKEFIELD A19 M61 M180 M1 HUMBERSTONE AIRPORT M18 M62 A1 (M) LIVERPOOL MANCHESTER A61 SHEFFIELD LIVERPOOL M56 AIRPORT MANCHESTER M1 M53 AIRPORT M56 LINCOLN M6 CREWE A15 A16 A1 A16 A5 STOKE-ON-TRENT NOTTINGHAM A16 A52 A52 DERBY M1 A17 BURTON- EAST MIDLANDS A15 AIRPORT UPON-TRENT A46 A16 A6 A1 M6 CAMBRIDGE IN A16 A10 A47 NORWICH AIRPORT A42 A47 A47 NUMBERS: NORWICH A47 A5 Gateway Cambridge is positioned at the tip of SHREWSBURY A16 M42 WOLVERHAMPTON M54 A47 the Oxford-Cambridge Arc - a well-connected LEICESTER A47 A47 PETERBOROUGH A134 and strategically important area which is home A43 M69 to 3.7 million people and some of the UK’s most A6 A140 BIRMINGHAM CORBY A11 M1 A10 productive and innovative towns and cities. A143 M6 90%A5 A1 (M) BIRMINGHAM COVENTRY NVQ1 M5 INTERNATIONAL QUALIFIED KETTERING RIGHT PLACE, AIRPORT A14 A134 A143 M42 RUGBY A14 A46 A45 M42 A11 A140 COVENTRY M45 A43 RIGHT TIME A10 Only 8 miles away, Cambridge Local plans for Cambridge and AIRPORT A14 NORTHAMPTON has a renowned reputation for South Cambridgeshire propose A14 A14 A45 A6 research, science, technology and 33,500 new homes by 20312, A428 A12 innovation, and with a population meaning the potential labour CAMBRIDGE CAMBRIDGE AIRPORT M40 A5 A134 of 69,100 economically active supply will continue to grow WORCESTER A11 A14 1 M11 people , occupiers will have access in the coming years. IPSWICH BEDFORD A10 GREEN WALKWAYS to a strong, relevant and skilled M1 A1 AND CYCLE PATHS A43 IPSWICH AIRPORT labour pool. 82.7%A422 A12 ECONOMICALLY MILTON KEYNES A505 ACTIVE A6 A131 M50 A421 A43 A10 1 cambridgeinsight.org.uk A5 M1 2 South Cambridgeshire District Council STEVENAGE CAMBRIDGE A1 (M) CITY CENTRE A41 M5 A418 LUTON A130 16 MINUTE DRIVE INTERNATIONAL A12 M40 AIRPORT M11 OXFORD A41 A10 M25 A4010 A413 A130 COSTA COFFEE AND A10 TESCO EXTRA 69.5% M25 5 MINUTE WALK WORKING M40 A406 SOUTHEND AIRPORT M5 AGE POPULATION SWINDON M4 A40 LONDON M4 A13 2 BUSES M4 A14 READING M25 HEATHROW EVERY HOUR BRISTOL M4 AIRPORT A3 A23 BRISTOL A232 M20 AIRPORT M3 A3 M2 M25 M25 A22 A23 ACCESS TO FELIXSTOWE & BASINGSTOKE M20 33,500 SOUTH EAST PORTS NEW HOMES M23 BY 2031† HGV DRIVETIMES GATWICK M3 AIRPORT Indicative drivetime map 0 - 30 MINS 30 - 60 MINS 60 - 90 MINS SOUTHAMPTON LYDO AIRPORT AIRPORT SOUTHAMPTON A3 (M) ON TIME DELIVERY M27 Perfect last mile delivery location with PORTSMOUTH BOURNEMOUTH AIRPORT 708,059 unique addresses within a 30 minute drive BOURNEMOUTH Following a recent £1.5billion The A1 motorway and Stansted POOLE investment to upgrade the A14, Airport each lie within a 60-minute occupiers can now benefit from HGV drive time, whilst the A14 also excellent road connections, saving offers easy access to Felixstowe WEYMOUTH time and money when moving and DP World London Gateway sea BAR HILL RECREATION Source: goods to major cities across the ports, which can be reached in less GROUND nomisweb.co.uk Midlands and South East. than a 120-minute HGV drive time. 11 MINUTE WALK † South Cambridgeshire District Council TIME FOR TIME CHANGE WELL SPENT The Planet Mark is a sustainability certification which recognises continuous improvements, encourages action and builds an empowered community of like-minded individuals. Organisations across the UK and beyond are choosing The Planet Mark to accelerate their commitments and actions to contribute more to society and the environment. The Planet Mark mission is to enable Legal and General and Wrenbridge organisations and their people to have committed to achieve The positively transform society, the Planet Mark New Development environment and the economy. Certification for Gateway Cambridge Property and construction are at Bar Hill as they recognise the responsible for 39% of global responsibility of property developers, carbon emissions, with operational and the built environment emissions alone (from energy used community as a whole, to not only to heat, cool and light buildings) provide future-proofed low carbon accounting for up to 28%, so the and energy efficient buildings, they sector is a significant focus for can also create them in a way that An environment that prioritises staff health and the certification. adds value to society. The Planet wellbeing, with a range of lifestyle amenities on Mark believe that sustainable the doorstep buildings go beyond compliance; they make society better, add A good public transport network including frequent bus services value to the local community and means local employees can enjoy seamless travel to Gateway contribute to economic prosperity. Cambridge, whilst landscaped cycle and walking paths, on- site cycle parking and shower facilities promote an active daily Amenities on your doorstep commute.
Recommended publications
  • Willingham Primary School Wins Challenge
    A V 21' «\r V ;» COMMUNITY COMMUNITY I' \ I .( Amgdggfio'" Axfigriszgfiofl w. Mummy; 1 ' \ , \' fl , v. April 2012 Willingham Primary School wins challenge A creative buzz was in the air as pupils from Year 5 at Willingham Primary School joined students from Cottenham Village College and the other two feeder primary schools — Waterbeach and Cottenham. They were set a series of writing, drama and art challenges on Roald Dahl's classic tale Danny: The Champion of the World. The pupils were invited to make storyboards for a book sequel, act out snippets and write a newspaper story on some of its themes, as well as other challenges. Willingham won the challenge which was thoroughly enjoyed by all who took part. Most of the preparation for the challenge round was done by James Singleterry, Deputy Head at Willingham Primary. Signs of spring: Pictures from a Willingham garden taken by a member of Willingham Photo Club. Goldvincher Blue tit Hellehomr plum THE PLOUGHMAN HALL WEST PEN ROAD, WILLINGHAM TERRYS fISl-I I'lCCCl a VCHUC £0!" 901.1!" AND CHIPS Wedding Reception? Children's Party? TRADITIONAL Private l:u nction'? fISl-l AND CHIPS Pla or Musical Concert? Clulg or Society Meetings? AND MUCH MORE The Ploughman Hall otters EVERY THURSDAY a large Main Hall a separate Meeting Room 4-30 to 8-30 bar tacilities (sutject to licence) tullg equip ecl Kitchen a portaEle stage WEST fEN ROAD For details ot our COMPETITIVE RATES and bookin 5, please contact 07973-908045 the Parish 0 ice: 01954- 261027 eeeeeeexeeeeeeeeeeee If you have children or property A i ...you need to make a Will - run we can make it r Because LAWS is a family business easy.
    [Show full text]
  • Notice of an Extraordinary Meeting of the Lolworth Village Meeting
    1 MINUTES OF LOLWORTH PARISH MEETING held in Robinson Hall, Lolworth on Thursday 11th April 2013, at 8.00 pm. Chairman: G. Corbett Clerk: J.E.F. Houlton Also present: District Councillors Bunty Waters and Roger Hall; County Councillor John Reynolds. 23 parishioners 1. Apologies Paul and Diana Jones, Helen Lavey, Fiona Corbett, David Chivers, Dorothy Fisher, Eric & Jen Wakefield, Frances Bache, Luanne Hill, Tom Rix, Pat & Ray Hampton 2. Welcome to Newcomers Rhianne Chamberlain 3. Election of Chairman and Vice Chairman Chairman; Ged Corbett Vice Chairman; Steph Chamberlain Proposed by Louise Milbourn Seconded by Carol Churcher Unanimously elected 4. Minutes of the previous Meeting held on 13th November 2012 The minutes of the meeting held on 13th Novemberl 2012 were signed as a true record. 5. Matters arising a) Village Sign The completed sign was viewed by the meeting. Thanks were expressed to Tom Rix who had donated the unpainted sign and who has offered to provide a substantial post on which to mount it. It is hoped to unveil it officially at the village show on August 3rd. b) Second seat on the village green The previously purchased seat proved to be unsuitable for renovation. The cost of its purchase was refunded and a recycled plastic bench had been obtained for £84. Thanks were expressed to Ged Corbett for organising this and for cementing it in place adjacent to the play area. 2 c) Parish Plan The Clerk reported he had constructed a questionnaire as the first part of the Parish Plan. The next stage would be for cross section of the village to form a small group to progress the plan.
    [Show full text]
  • A14 Cambridge to Huntingdon, Cambridgeshire: Major Improvements Construction Work on the New A14 Cambridge to Huntingdon Scheme Is Underway
    A14 Cambridge to Huntingdon, Cambridgeshire: major improvements Construction work on the new A14 Cambridge to Huntingdon scheme is underway. We are currently carrying out a variety of tasks for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures. For this week, the planned closures are: Full closures Monday 15 8am to Saturday 27 7pm • A1307 between Bar Hill /Longstanton junction and Oakington roundabout Vehicles will be diverted via Oakington, Cottenham, Rampton, Willingham and Longstanton. Travel between Swavesey and Bar Hill remains, as does Dry Drayton to Oakington on weekdays only. Please check the weekend closure for some changes. Monday 15 to Friday 19 (five nights) • A1 northbound Brampton Hut exit slip Vehicles will be diverted north to Alconbury to then use A1 southbound and either continue or exit for access to Brampton Hut roundabout • A1 northbound Brampton Hut entry slip Vehicles will be diverted east along A141 and then north at Spittals roundabout to the spur road to re-join the A1 northbound at Alconbury • A141 eastbound link between New Ellington junction 21 and Brampton Hut roundabout Vehicles will be diverted east on the A605 at junction 13 then south on the A1(M) to the A605 to re-join the A14 at junction 21 • A10 northbound from Milton junction 33 and A10 southbound approach to Milton junction 33 Vehicles will be diverted via Butt Lane, Milton Road, Burgoynes Road, Impington Lane and B1049 Bridge Road to access Cambridge or the A14 • A1307 westbound between Cambridge and A14 westbound Girton junction 31 Vehicles will be diverted to join the A14 at Histon junction 32 and travel west.
    [Show full text]
  • 1 Cameron Road
    Lolworth Service Station A14, Lolworth Cambridgeshire, CB23 8DR A14 Cambridge to Huntingdon Improvement Scheme Comments on Responses to ExA’s First Written Questions Prepared on behalf of MRH (GB) Ltd (Ref: A14-AFP350) Deadline 4 – 07 July 2015 Transport Traffic Highway www.mdjandassociates.co.uk Lolworth Service Station – MRH (GB) Ltd MDJ & Associates Comments on Responses to ExA’s First Written Questions __________________________________________________________________________________________________________________ A14 Cambridge to Huntingdon Improvement Scheme Comments on Responses to ExA’s First Written Questions (Deadline 4 – 07 July 2015) Prepared on behalf of MRH (GB) Ltd (Ref: A14-AFP350) MDJ & Associates Wimblehurst House 18 Thatchers Close Horsham West Sussex, RH12 5TL T: 01403 255869 E: [email protected] W: www.mdjandassociates.co.uk © Copyright MDJ & Associates. All Rights Reserved. No part of this publication may be reproduced by any means without prior permission. __________________________________________________________________________________________________________________ MDJ/FJ/14119 i Lolworth Service Station – MRH (GB) Ltd MDJ & Associates Comments on Responses to ExA’s First Written Questions __________________________________________________________________________________________________________________ CONTENTS 1 INTRODUCTION .............................................................................................................. 1 2 ACCESS TO THE STRATEGIC ROAD NETWORK ......................................................
    [Show full text]
  • Cambridgeshire Football Association
    Cambridgeshire Football Association Chief Executive Report 2016-17 Season Welcome Welcome to the 2017 Annual Report. Once again I reflect on another busy season, with many notable successes. My thanks go to all of the club and league officials, as well as our CountyA F workforce (staff and volunteers), for all of their committment and dedication this season. At Executive level, I am proud of the work done over the last 3 years by our Chairman, Roger Pawley, and Vice-Chairman, Phil Hill. It has not been easy, but the Association has responded well to the challenges the game faces, and this is to a large extent due to their leadership and support. Our Council in particular has responded brilliantly, with committee work and meetings fully focussed and aligned to current priority projects to deliver our targets. The Council Review group has driven change, which now provides the opportunity to open our doors to new, enthusiastic and independent members to have a say and, crucially, a stake in all aspects of the game in our area. There have been important changes in personnel. We have a new President in Rex Mallett, who has taken on the role expertly. Within the staff team, Martha Sutherland joined us as Marketing & Oper- ations Officer and Hayley Elphee as Disability Workforce Officer (in partnership with Huntingdonshire FA). More recently we appointed Martin Hegley to be our Co-ordiantor at the new Bottisham Village College 3G pitch. This is a particularly exciting development for us, as it represents the first venue in which we have a genuine stake, forming an excellent partnership with the Anglian Learning Trust.
    [Show full text]
  • Green Belt Study 2002
    South Cambridgeshire District Council South Cambridgeshire Hall 9-11 Hills Road Cambridge CB2 1PB CAMBRIDGE GREEN BELT STUDY A Vision of the Future for Cambridge in its Green Belt Setting FINAL REPORT Landscape Design Associates 17 Minster Precincts Peterborough PE1 1XX Tel: 01733 310471 Fax: 01733 553661 Email: [email protected] September 2002 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 CONTENTS CONTENTS SUMMARY 1.0 INTRODUCTION 2.0 CAMBRIDGE GREEN BELT: PLANNING CONTEXT 3.0 METHODOLOGY 4.0 BASELINE STUDIES Drawings: 1641LP/01 Policy Context: Environmental Designations 1641LP/02 Policy Context: Cultural and Access Designations 1641LP/03 Topography 1641LP/04 Townscape Character 1641LP/05 Landscape Character 1641LP/06 Visual Assessment 5.0 SETTING AND SPECIAL CHARACTER Drawings: 1641LP/07 Townscape and Landscape Analysis 1641LP/08 Townscape and Landscape Role and Function 6.0 QUALITIES TO BE SAFEGUARDED AND A VISION OF THE CITY Drawings: 1641LP/09 Special Qualities to be Safeguarded 1641LP/10 A Vision of Cambridge 7.0 DETAILED APPRAISAL EAST OF CAMBRIDGE Drawings: 1641LP/11 Environment 1641LP/12 Townscape and Landscape Character 1641LP/13 Analysis 1641LP/14 Special Qualities to be Safeguarded 1641LP/15 A Vision of East Cambridge 8.0 CONCLUSIONS Cover: The background illustration is from the Cambridgeshire Collection, Cambridge City Library. The top illustration is the prospect of Cambridge from the east and the bottom illustration is the prospect from the west in 1688. 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 SUMMARY SUMMARY Appointment and Brief South Cambridgeshire District Council appointed Landscape Design Associates to undertake this study to assess the contribution that the eastern sector of the Green Belt makes to the overall purposes of the Cambridge Green Belt.
    [Show full text]
  • Annual Report 2018
    Red RGB:165-29-47 CMYK: 20-99-82-21 Gold RGB: 226-181-116 CMYK: 16-46-91-1 Blue RGB: 39-47-146 CMYK: 92-86-1-0 Annual Report 2018 Published 12 June 2019 Ely Diocesan Board of Finance We pray to be generous and visible people of Jesus Christ. Nurture a confident people of God Develop healthy churches Serve the community Re-imagine our buildings Target support to key areas TO ENGAGE FULLY AND COURAGEOUSLY WITH THE NEEDS OF OUR COMMUNITIES, LOCALLY AND GLOBALLY TO GROW GOD’S CHURCH BY FINDING DISCIPLES AND NURTURING LEADERS TO DEEPEN OUR COMMITMENT TO GOD THROUGH WORD, WORSHIP AND PRAYER. ENGAGE • GROW • DEEPEN | 3 Contents 04 Foreword from Bishop Stephen 05 Ely2025 – A Review 06 Safeguarding 09 Ministry 11 Mothers' Union 12 Mission 15 Retreat Centre 16 Church Buildings and Pastoral Department 20 Secretariat 21 Programme Management Office 23 Changing Market Towns 24 Parish Giving Scheme 25 Contactless Giving (Card Readers) 26 Communications and Database 29 Education 32 Finance 34 Houses Sub-Committee 35 Diocesan Assets Sub-Committee 37 Ministry Share Tables 4 | ENGAGE • GROW • DEEPEN Foreword from Bishop Stephen As a Diocese we are seeking to be People Fully Alive, as we One of the most important ways in which we serve our pray to be generous and visible people of Jesus Christ. We communities is through the Diocesan family of schools, as we are seeking to do this as we engage with our communities educate over 15,000 children. These are challenging times for locally and globally, as we grow in faith, and as we deepen in the education sector and especially for small and rural schools.
    [Show full text]
  • Executive Summary
    2012 Air Quality Updating and Screening Assessment for South Cambridgeshire District Council In fulfillment of Part IV of the Environment Act 1995 Local Air Quality Management April 2012 South Cambridgeshire District Council Local Authority Officer Susan Walford Department Health and Environmental Services Address South Cambridgeshire District Council South Cambridgeshire Hall Cambourne Business Park Cambourne Cambridge CB23 6EA Telephone 01954 713124 e-mail [email protected] Report AEAT/ENV/R/3285 Reference number Date 30th April 2012 USA2012 ii South Cambridgeshire District Council Customer: Contact: South Cambridgeshire District Council Andy Lewin . Customer reference: Gemini Building, Harwell, Didcot, OX11 0QR . t: 0870 190 6355 e: [email protected] Confidentiality, copyright & reproduction: . This report is the Copyright of South AEA is certificated to ISO9001 and ISO14001 Cambridgeshire District Council and has been prepared by AEA Technology plc under Author: contract to South Cambridgeshire District Council dated 30/04/2012. The contents of Andrew Lewin this report may not be reproduced in whole or in part, nor passed to any organisation or Approved By: person without the specific prior written Scott Hamilton permission of South Cambridgeshire District Council . AEA Technology plc accepts no liability whatsoever to any third party for any Date: loss or damage arising from any 30 April 2012 interpretation or use of the information contained in this report, or reliance on any Signed: views expressed therein. AEA reference: Ref: ED57938003- Final USA2012 iii South Cambridgeshire District Council Executive Summary This report fulfils the requirements of the Local Air Quality Management process as set out in Part IV of the Environment Act (1995), the Air Quality Strategy for England, Scotland, Wales and Northern Ireland 2007 and the relevant Policy and Technical Guidance documents.
    [Show full text]
  • Visitors Guide to Travelling to the University of Cambridge New Museums Site
    David Attenborough Building, Visitors guide to travelling to the University of Cambridge New Museums Site St Ives Busway A, B, C 6 mins Roads 0.3 miles Willingham & Swavesey Milton P&R Pedestrian routes Newmarket Rd P&R Bus Station Drummet Str Madingley Rd P&R Bar Hill CB24 6DQ CB5 8AA Bus stops eet CB3 0EX Busway A, C eet Girton & Oakington Cambourne Emmanuel eet Par Street ker Str Emmanuel Str Citi 6 arade St Andrews eet Citi 5 Wheeler Str C Street 4 mins P&R 77 Kings or n Ex 0.2 miles ings P eet 4 mins College K ’t Str P&R 77 Bene change Str 0.2 miles Busway B West Cambridge site New eet Saint Andr Emmanuel College Citi 4 Museums The 77 P&R is not scheduled to Site stop here, but after 18:30 it will pick up from any stop on route Bus Station/ e New Square ws Str Emmanuel St David Attenborough St Catherine’s eet 99 eet College Building David Attenborough wning Str Corpus Christi Do D Busway A, C o Building, New College wning P Museums site Silver Street lace Citi 1,3 ,7, 8 eet Silver Str Downing site Sliver Street/ Rail Station Mill Lane site Uni 4 4 mins Parkers Piece 0.2 miles T Mill Lane ennis C Nr Pembroke R 7 mins Brooklands Avenue Opp Pembroke egent Str street 0.4 miles street our T t R rumpingt Pembroke College ’s Lane oad eet ary Opp Dowing Cambridge Little St M on Str Downing College College Biomedical Campus 88 eet Dowing College 100m Trumpington P&R Train + Bus CB2 9FT Babraham P&R For timetables visit www.nationalrail.co.uk To make interchanging between train and bus easier, CB22 3AB purchase a PLUSBUS ticket online when you buy There are fast trains from London King’s Cross your train ticket.
    [Show full text]
  • Bar Hill Ÿ Longstanton Ÿ Willingham Ÿ Over Ÿ Swavesey 5 | 5A
    Bar Hill Longstanton Willingham Over Swavesey 5 | 5A MONDAYS TO FRIDAYS (excluding Bank Holidays) 5A 5A 5A 5A 5A Over City Centre Emmanuel Street E4 - 0930 1130 1330 1510 Willingham Girton Corner - 0942 1142 1342 1522 Bar Hill Shopping Centre - 0954 1154 1354 1544 interchange point Trn Trn Trn Trn Bar Hill Shopping Centre - 1005 1205 1405 1605 Longstanton Church - 1012 1212 1412 1612 Longstanton Park & Ride - 1018 1218 1418 1618 Longstanton Swavesey Willingham Willford Furlong - 1025 1225 1425 1625 Park & Ride Over Green - 1035 1235 1435 1635 Swavesey Middle Watch 0841 1042 1242 1442 1642 Longstanton Park & Ride 0849 1051 1251 1451 1651 Longstanton Church 0852 1054 1254 1454 1654 Longstanton Bar Hill Shopping Centre 0859 1101 1301 1501 1701 interchange point Trn Trn Trn Trn Trn Bar Hill Shopping Centre 0915 1115 1315 1525 1705 Bar Hill Bar Hill Appletrees 0921 1121 1321 1533 1711 Girton Corner 0930 1130 1330 1543 1721 City Centre Emmanuel Street E4 0946 1146 1346 1604 1744 SATURDAYS (excluding Bank Holidays) 5A 5A 5A 5A 5A City Centre Emmanuel Street E4 - 0930 1120 1320 1520 Girton Corner - 0944 1134 1334 1534 Bar Hill Shopping Centre - 0954 1149 1349 1549 interchange point Trn Trn Trn Trn Bar Hill Shopping Centre - 1005 1205 1405 1605 Longstanton Church - 1012 1212 1412 1612 Longstanton Park & Ride - 1018 1218 1418 1618 Willingham Willford Furlong - 1025 1225 1425 1625 Over Green - 1035 1235 1435 1635 Swavesey Middle Watch 0826 1042 1242 1442 1642 Longstanton Park & Ride 0834 1051 1251 1451 1651 Longstanton Church 0837 1054 1254 1454 1654 Bar Hill Shopping Centre 0844 1101 1301 1501 1701 interchange point Trn Trn Trn Trn Trn Bar Hill Shopping Centre 0855 1115 1315 1515 1715 KEY Bar Hill Appletrees 0900 1120 1320 1520 1720 Transfer at Bar Hill for all journeys to and Girton Corner 0910 1130 1330 1530 1730 Trn from Cambridge.
    [Show full text]
  • A14 Cambridge to Huntingdon Improvement Scheme Closure of the A14 at Bar Hill (Junction 29)
    A14 Cambridge to Huntingdon improvement scheme Closure of the A14 at Bar Hill (junction 29) Friday 14 September (9pm) to Monday 17 September (6am) What are we doing? We’re installing two new bridges as part of the new junction at Bar Hill. These bridges will eventually form part of the new roundabout and improved Bar Hill junction. Each of the bridge decks is 44 metres long and weighs 1,000 tonnes. We will bring the steel and concrete bridge decks along the A14 from their fabrication yard next to the junction (where they have been assembled). We will then lift them into place on their new piers using a special transporter. There is no space to safely watch the work taking place, but we will live-stream the work and share a time-lapse video soon afterwards. A link to the live-stream will be shared on our website and social media pages. To prepare for this very special operation, which is the quickest way to install the two new bridges, we need to close the A14 and make some temporary changes to the slip roads at Bar Hill. The closure is essential for the construction of the new Bar Hill junction. We apologise for the inconvenience that this will cause. How will this affect your journey? BAR HILLBar JUNCTION Hill slip 29 road closure and diversion route 14-09-18 to 16-09-18 BAR HILL JUNCTION 29 TOWARDS 14-09-18 to 16-09-18 Road closed LONGSTANTON Into Bar hill You will not be able to travel Out of Bar Hill TOWARDS Road closed LONGSTANTON through the Bar Hill junction Into Bar hill along the A14 in either TOWARDS Out of Bar Hill CAMBRIDGE direction.
    [Show full text]
  • Diocese of Ely Directory
    Diocese of Ely Directory Published: 12 February 2021 For comments, corrections or suggestions please email Jackie Williamson on [email protected] Introduction This directory has been ordered alphabetically by Archdeaconry > Deanery > Benefice - and then Church/Parish. For each Church/Parish, the names and contact details (email and telephone) have been included for the Licensed Clergy and Churchwardens. Where known a website and “A Church Near You” link have also been included. Towards the back of the directory, details have also been included that include, where known, the following contact details: • Rural Deans (name, number and email) • Clergy (name, number and email) • Clergy with Permission to Officiate (name, number and email) • General Synod Members from the Diocese of Ely - (name only) • Bishops Council (name only) • Diocesan Synod Members (Ely) (name only) • Assistant Bishops (name only) • Surrogates (name only) • Bishop’s and Archdeacons Office, Ely Diocesan Board of Finance staff, Cathedral Staff How to update or amend details If your details are inaccurate, or you would prefer a change to what is included, please direct your query as follows: • Licensed Clergy: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Clergy with PTO: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Churchwardens: Please contact the Archdeacon’s Office (https://www.elydiocese.org/about/contact-us/) • PCC Roles: [email protected] • Deanery/Benefice/Parish/Church names: DAC Office on [email protected] Data Protection The Ely Diocesan Board of Finance considers there to be a legitimate justification for publishing the contact details for Licensed Clergy (including those with PTO), Churchwardens and Diocesan staff (including those in the Archdeacons’ and Bishops’ offices) and key staff in Ely Cathedral in this Directory and on occasion the Diocesan website.
    [Show full text]