I) Basic information S. No. Item Details 1 Name of the project/s M/s. Madhavaram Constructions. Residential Complex 2 S. No. in the schedule Project Activity – 8a Category B(B2) 3 Proposed capacity /area/ length/ S. Block No. of No .of Area tonnage to be No Details Floors Flats (Sq.Mts) handled/command area/lease 1 Block-A G+5 59 6822.50 area/ No of the well to be drilled 2 Block-B G+5 60 7237.20

3 Block-C G+5 108 13014.00 4 Block-D G+5 107 12936.52 5 Block-E G+5 48 6369.00 6 Ameniti G+5 -- 1472.21 es Block Total 382 47,851.43

Parking: Area in (Sq. Parking Mtrs) Cellar area 10,874.50 Sub- Cellar area 11,380.00 Total Parking 22254.5 Area ( In Square Meters) Total Area of the residential flats : 47,851.43 Total Parking Area : 22,254.50 Total Built-up area : 70,105.93

4 New/Expansion /Modernization New Project. 5 Existing capacity/Area etc… NA 6 Category of project A or B Category B ( ‘B2’) As Area is less than 1,50,000 Square Meters, the proposed project comes under category B2 7 Does it attract the general No condition? If yes please specify 8 Does it attract the specific No condition? If yes please specify 9 Location Plot/ survey /Khasra no Sy.No: 42, 43 & 44 Village (V), Tehsil/Mandal (M), District State Telangna 10 Nearest Railway station/Air port – 4.96 Kms along with the distance in kms Rajiv Gandhi International Air port – 16.0 KM M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), State

11 Nearest Town, City, District This is Part of City Headquarters along with distances in kms. 12 Village Panchayats Zilla Parishad Greater Hyderabad Municipal Corporation Municipal Corporation, Local body (complete postal Address with telephone no. to be given 13 Name of the applicant Mr. Madhavaram. Vallabha Rao 14 Registered address H.No. 153/c, Road No.17, Green park Colony, Saroor Nagar(M), Hyderabad – 500 035 15 Address of the correspondence Name Mr. Madhavaram. Vallabha Rao Designation /owner/partner/CEO Managing Patner Address Sy.No: 42, 43 & 44,Lingojiguda (V), Saroornagar (M),Ranga Reddy (D)

Pin code 500 035 E-mail [email protected] Telephone no 9849245353 16 Details of Alternative Sites No examined if any. Location of these sites Should be shown on a Topo sheet.

17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, No 1980? No (b) The Wild life (protection)Act, No 1972? (c) The C.R.Z notification, 1991? 22 Whether there is any Government No order/policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation No

PRIDHVI ENVIROTECH (P) LIMITED Page 1

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

pending against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information /Checklist Yes Details thereof (with approximate confirmation /No quantities /rates, wherever possible ) with sources of information data 1.1 Permanent or temporary change Yes The proposed project activity is in land use, land cover or construction of Residential Complex. topography including increase in The site area is located in GHMC area. intensity of land use (with respect This area is earmarked as residential to local land use plan) zone as per the Master plan of Hyderabad Urban Development Authority. 1.2 Clearance of existing land, No There is no vegetation in the project site vegetation and buildings? requiring clearance. 1.3 Creation of new land uses? Yes The purpose of proposed project is construction of Residential Complex hence there will not be any change in land use 1.4 Pre-construction investigations Yes Soil bearing tests were conducted e.g. bore holes, soil testing? before construction 1.5 Construction works? Yes The project is residential complex. 1.6 Demolition Works? No There are no structures in the proposed area, hence there are no demolition works. 1.7 Temporary sites used for No Temporary shelters for construction construction works or housing of workers are not required as labor will be construction works? hired from the surrounding locations 1.8 Above ground buildings, No The proposed development is structures or earthworks including Construction of Residential Complex. linear structures, cut and fill or Cut and fill activity will be there for excavations basement and foundations 1.9 Underground works including No Not Applicable as this is a Construction mining or tunneling? of Residential Complex. 1.10 Reclamation Works? No Not Applicable 1.11 Dredging? No Not Applicable as this is a Construction of Residential Complex.

PRIDHVI ENVIROTECH (P) LIMITED Page 2

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

1.12 Offshore structures? No Not Applicable as this is a Construction of Residential Complex. 1.13 Production and manufacturing No No manufacturing activity. processes? Activity is Construction of Residential Complex. 1.14 Facilities for storage of goods or Yes Storage space of building materials will materials? be earmarked onsite. 1.15 Facilities for treatment or disposal Yes Solid waste generated from the of solid waste or liquid effluents? construction includes rubble, used up cement, broken bricks etc, which will be used for filling up low lying areas during developmental stage. Treated liquid effluents from domestic waste water will be used for flushing and gardening and rest would be sent to municipal drains. STP Sludge will be used as manure in green belt development 1.16 Facilities for long term housing of No Manpower requirement of operational operational workers? workers is nominal and will be recruited from surroundings therefore no long term housing facilities are envisaged.

1.17 New road, rail or sea traffic during No Existing facilities will be used for the construction or operation? proposed project. 1.18 New road, rail, air waterborne or No Not envisaged other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No No diversions or pipelines? 1.21 Impoundment, damming, No The proposed development will not culverting, realignment or other disturb the natural terrain of the area changes to the hydrology of and will not disturb the water courses in watercourses or aquifers? any ways i.e. no drain flows through the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? No There are no stream crossings the proposed site. 1.23 Abstraction or transfers of water Yes Water requirement of the project will be from ground or surface waters? met from Bore well and Municipal

PRIDHVI ENVIROTECH (P) LIMITED Page 3

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

Supply 1.24 Changes in water bodies or the No The development will be carried out land surface affecting drainage with no disturbance to major water or or run-off? the land surface, affecting drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel or material materials for construction, will be by trucks on road operation or decommissioning? 1.26 Long-term dismantling or No Not envisaged decommissioning which could have an impact on the environment? 1.27 Ongoing activity during No Not envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Total of 382 flats are proposed. The either temporarily or local area is developing at a faster permanently? pace due to development in the surrounding areas. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic No Not envisaged diversity? 1.31 Any other actions? No Nil 2.0 USE OF NATURAL RESOURCES for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S.No. Information /Checklist Yes Details thereof (with approximate confirmation /No quantities /rates, wherever possible) with sources of information data 2.1 Land especially undeveloped or No Total land available for the project is agricultural land (ha) 15,857.06 Sq. Mtrs 2.2 Water (expected source & Yes Water Requirement : 268 KLD competing users) Unit : KLD Fresh water requirement – 183 KLD Source: Borewell & Municipal Supply Recycled water –85 KLD Source : S.T.P 2.3 Minerals (MT) Yes Not Applicable as this is a construction project. 2.4 Construction material – stone, Yes Construction materials like coarse aggregates, and / soil (expected aggregate, fine aggregate, granite. source- MT) Kota stone, Dolhpur stone, Marble, bricks, sand, cement, steel will be used. The raw materials will be sourced from local dealers & traders.

PRIDHVI ENVIROTECH (P) LIMITED Page 4

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

2.5 Forests and timber (source – MT) Yes Wood will be used only for preparing window and door frames. The required timber will be procured from local authorized timer dipo

2.6 Energy including electricity and Yes Power Required : 2000 KVA fuels (source, competing users) Source: Central Power Distribution Unit: fuel (MT), energy (MW) Company Limited (TSCPDCL). Back-up power: 1 x 500KVA DG sets for emergency during power failures.

Fuel: HSD required @300 Liters, will be sourced from local traders 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3.0 Use, storage, transport, handling or production of substances or materials which could be harmful to human health or THE ENVIRONMENT or raise concerns about actual or perceived RISKS TO HUMAN HEALTH. S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 3.1 Use of substance or materials, No Only HSD in small quantities will be used which are hazardous (as per for backup power DG sets. Paints are MSIHC rules) to human health or used during construction the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No Not envisaged disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare or people e.g. Yes Good quality housing is proposed with by changing living conditions? good living environment for 382 families 3.4 Vulnerable groups of people No -- who could be affected by the project e.g. hospital patient’s children, the elderly etc.,

3.5 Any other causes No --

4.0 Production of SOLID WASTES during construction or operation or decommissioning (MT/ month) S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 4.1 Soil, overburden or mine wastes No There are no overburden or mine waste PRIDHVI ENVIROTECH (P) LIMITED Page 5

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

4.2 Municipal waste (domestic and Yes Garbage – 990 kgs/day disposed to or commercial wastes) GHMC 4.3 Hazardous wastes (as per No Used Oils from – 100 LPA Hazardous Waste Management Used Batteries – 2 no’s/year Rules) Transformer Oil – 40 LPA 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes Sewage Sludge @ 30 kgs/day will be from effluent treatment used as manure for green belt development. 4.7 Construction or demolition Yes During construction some amount of wastes construction debris may be generated which will be segregated and whatever re-saleable will be sold to supplier and rest waste will be used for filling up of low lying areas and development of internal roads and boundary walls etc 4.8 Redundant machinery or No Most of the equipment used for the equipment construction will be hired.

4.9 Contaminated soils or other No No soil contamination is anticipated as materials the proposed project is a construction project all the waste generated will be in the form of solid waste of reusable nature. 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No -- 5.0 Release of pollutants or any hazardous, toxic or noxious substances to AIR (Kg/hr) S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 5.1 Emissions from combustion of Yes Emissions will be mainly from vehicles fossil fuels from stationary or moving at the project site during mobile sources construction and operation period and secondly from the 1 x 500 KVA DG sets used for backup power source operated only during power failures only for a short duration. As HSD will be used for the DG sets, the main emissions will be SO2 and NOx. For Proper dispersion of pollutants, the stack height meeting CPCB Norms will be maintained. 5.2 Emissions from production NO This is not an industry to have emissions

PRIDHVI ENVIROTECH (P) LIMITED Page 6

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

processes from production process 5.3 Emissions from materials handling Yes Vehicular emissions are anticipated including storage or transport both during construction and during operation. 5.4 Emissions from construction Yes Fugitive emissions are likely during activities including plant and construction activities from the equipment materials. These are temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fossil fuels and from vehicles. 5.5 Dust or odors from handling of Yes The particulate matter will be mainly materials including construction generated from loading and unloading materials, sewage and waste. of the material at the site. Other municipal solid waste will be disposed off to the Municipal solid waste dump yard. The construction material will be handled carefully to prevent any spill over or wastage. Construction labor will be provided with proper sanitation to avoid any unhygienic conditions. Therefore no odor generation is expected 5.6 Emissions from incineration of No Not envisaged waste 5.7 Emissions from burning of waste No Not envisaged in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not envisaged

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 6.1 From operation of equipment Yes Noise is anticipated during construction e.g. engines, ventilation plant, activities, movement of construction crushers material and use of machinery. These are temporary in nature and will be minimized by adopting proper maintenance such as greasing, oiling and insulations (acoustic enclosures) for DG Set.

PRIDHVI ENVIROTECH (P) LIMITED Page 7

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

6.2 From industrials or similar No Not applicable processes 6.3 From construction or demolition No The noise and vibrations are only during the construction phase and proper precautions are taken to ensure that the decibel levels are below the standards and the equipment utilized for constructions are properly serviced and maintained for reducing vibration and noise levels 6.4 From blasting or piling No Not envisaged 6.5 From construction or operational Yes Noise levels of 55dB (A) are anticipated traffic. during daytime due to the vehicular movement and construction activities, but it will be of temporary nature

6.6 From lighting or cooling systems No The lighting systems have a major component of LED to save an energy for the whole project 6.7 From any other sources No --

7.0 Risks of CONTAMINATION OF LAND OR WATER from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 7.1 From handling, storage, use or No Used batteries and waste oil shall be spillage of hazardous materials stored separately and shall not lead to contamination of land during normal operation. 7.2 From discharge of sewage or No The sewage shall be treated to achieve other effluents to water or the the standards prescribed by MoE&F land (expected mode and during operation phase. While the place of discharge ) discharges from temporary toilets during construction shall be sent to septic tank followed by municipal sewer lines. 7.3 By deposition of pollutants No No pollutants are emitted in to air. emitted to air into the land or Hence no deposition of pollutants into into water land or water. 7.4 From any other sources No -- 7.5 Is there a risk of long term build No Proper Environmental management up of pollutants in the plan will be followed for air, water, noise environment from these sources? and solid waste. Hence no long term impacts are envisaged.

PRIDHVI ENVIROTECH (P) LIMITED Page 8

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

8.0 Risk of accidents during construction or operation of the Project, which could affect human or the environment S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 8.1 From explosions, spillages, fires No Fire hydrant and Fire fighting systems will etc from storage, handling, use be installed and safety precautions will or production of hazardous be followed as per the safety rules. substances Only Diesel in small quantity and paints during construction phase will be flammable material used and stored. 8.2 From any other causes No Not Applicable 8.3 Could the project be affected No The project site is located at a higher by natural disasters causing elevation and the seismic zone for the environmental damage (e.g. project area is Zone-II, which is floods, earthquakes, landslides, considered safe. cloudburst etc)? 9.0 Factors which should be considered (such as consequential DEVELOPMENT) which could lead to ENVIRONMENTAL EFFECTS or the potential for cumulative impacts with other existing or planned activates in the locality S. No. Information /Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible ) with sources of information data 9.1 Lead to development of Yes The proposed project is a supporting. utilities, ancillary construction of Residential Complex. development or development So it leads to development of stimulated by the project which supporting facilities and ancillary & could have impact on the Yes related activities. environment e.g.:  Supporting infrastructure (roads, power supply, Yes waste or waste water treatment, etc.) No  Housing development  Extractive industries No  Supply industries No  Other

9.2 Lead to after use of the site, No -- which could have impact on the environment

9.3 Set a precedent for later Yes The area is developed residential

PRIDHVI ENVIROTECH (P) LIMITED Page 9

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

developments and commercial area. 9.4 Have cumulative effects due to No -- proximity to other existing or planned project as with similar effects ) (III) Environment Sensitivity S. No. Areas Name/ Aerial distances (within 15 km.) Identity Proposed project location boundary 1. Areas protected under No There are no ecological sensitive international conventions, areas. national or local legislation for their ecological, landscape, cultural or other related values 2. Areas which are important or Yes Saroornagar tankbund – 0.9 KM sensitive for ecological reasons – Chandana cheruvu - 1.5km, Wetlands, water courses or other Palle Cheruvu -9.1km, water bodies, coastal zone, Salkam Cheruvu - 7.5km, , biospheres. Mountains, forests Umda sagar - 9.5km, Kappala cheruvu - 4.9km, Kummari Kunta LAKE - 6.6km, Bhatula cheruvu - 7.36km, Mir Alam Cheruvu - 9km 3. Areas and by protected, Yes Mansorabad RF 3.5km important or sensitive species of Sahibanagar RF 3.5 KM flora or fauna for breeding, Kurbullapur RF 8.7 KM nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or No underground waters 5. State, National boundaries No - 6. Routes or facilities used by the No public for access to recreation or other tourist, pilgrim areas 7. Defense installations No None

8. Densely populated or built-up Yes The area is developing into a densely area populated area. 9. Areas occupied by sensitive Yes man-made land uses (hospitals, schools, places of worship, community facilities )

PRIDHVI ENVIROTECH (P) LIMITED Page 10

M/s. Madhavaram Constructions.- SY.NO’S. 42, 43 & 45, Lingojiguda (V) Saroornagar(M) Ranga Reddy (Dist), Telangana State

10. Areas containing important, high No - quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11. Areas susceptible to natural No -- hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) IV. Proposed Terms of Reference for B-2 Category Project EIA Studies

PRIDHVI ENVIROTECH (P) LIMITED Page 11