Regional Drought Update 27 August 2019

Total Page:16

File Type:pdf, Size:1020Kb

Regional Drought Update 27 August 2019 Regional drought update 27 August 2019 waternsw.com.au Key customer messages • The BOM’s August to October climate outlook indicates a drier and warmer than average three months is likely for much of Australia, particularly along the NSW ranges. The Indian Ocean Dipole remains positive, typically associated with below average rainfall in southern Australia in winter-spring. The positive dipole is not likely to change until the monsoon season commences in the north in summer. • Drought conditions are deeply impacting town water supplies including major centres like Tamworth and Dubbo, but also many smaller centres are impacted; • The Southern valleys have improved with recent rainfall, improving catchment wetness, but rainfall for the year is still well below long term average and allocations and storage levels are low for this time of year. • Murrumbidgee has seen some improvement over the last month with general security irrigators receiving a 3% allocation in August. • Significant rainfall is required to break the drought in northern NSW and initial losses of 100- 150mm can be expected before significant runoff will occur in most catchments. Large shortfalls in reserves in all northern systems need to be captured in storage for high security deliverability before general security can receive any allocations. The BoM’s outlook indicates for August to October remains drier than average. • Water allocations in 2019/20 have been reduced for some high security, carryover water and conveyance licence holders due to reduced supplies and delivery constraints, while most inland systems have zero general security allocations on 1 July 2019. (see summary on back page) • A previously gazetted temporary pumping restriction remains in place in the Barwon Darling. The order limits extraction of the river flows to stock and domestic use, the environment and critical supplies including town water. The restriction will remain in place until 30 August 2019. Regional Weekly Drought Response Water Report 2 Weather Last week’s weather: During the past week, the southern parts of the state received negligible rainfall, apart from the Snowy Mountains region which received up to 50mm. The rest of the state remained dry. This week’s forecast: Daytime temperatures will be above average for the coming week, ranging from -3° in the south to 27° in the north. For the first part of the week, the coastal regions of the state should receive 1 to 10mm of rainfall. The rest of the state is forecast to remain dry. As the week progresses, the rainfall in the coastal regions is forecast to intensify, bringing rainfall across the central to eastern parts of the state of up to 100lmm. The western regions again are forecast to remain dry. Regional Weekly Drought Response Water Report 3 Longer-term outlook: The BoM’s three-month outlook indicates that • A drier than average spring is likely for most of NSW. The likelihood of drier conditions is stronger in October compared with September across the state. • Regional Weekly Drought Response Water Report 4 Water Quality Red algal alerts are currently in place at two WaterNSW regional monitoring sites within the state. These alerts are being seen at: • Burrendong Dam Station 1 • Lake Lyell Please visit https://maps.waternsw.com.au/AlgalAlerts/?mobileBreakPoint=300/index.html for more detailed information. Incident Response Guide Criticality Level Please visit https://www.industry.nsw.gov.au/water/allocations-availability/allocations/summary for more detailed information. Regional Weekly Drought Response Water Report 5 Drought heat map Please visit https://edis.dpi.nsw.gov.au for more information Regional Weekly Drought Response Water Report 6 Rural Dam Levels: 23 August 2019 Cap- River Valley Current Status Comments Allocations for 2019/20 acity Likeli- Weekly Est hood Carr % of change y- active Active of fill High Gen. Storage Dam, Nearest Town (GL) (GL) Supply Issues over cap- (GL) and spill Security Security @ acity 1/7/ 19 Border Rivers Glenlyon Dam, C’over restricted to 50% <1 254 8% 21 -0 <20% 100% 0% Stanthorpe (Qld) Deliverability restricted % C’over restricted to 50% Pindari Dam, Inverell 312 5% 15 -0 <20% 100% 0% <1 Deliverability restricted % Gwydir Valley Copeton Dam, Inverell 1346 9% 119 -0 Deliverability restricted <5% 100% 0% 3% Namoi Valley Keepit Dam, 419 1% 4 -0 C’over restricted to 0% <20% 75% 0% 5% Split Rock Dam, Manilla 394 2% 8 -0 C’over restricted to 75% <5% 75% 0% 22 Chaffey Dam, 98 22% 22 -0 Deliverability restricted <50% 50% 0% N/ Macquarie Valley C’over restricted to 0% Burrendong Dam, 1154 <20% 70% 0% 0% Wellington 5% 55 -1 Deliverability restricted Windamere Dam, 367 32% 117 -0 Regulated releases. <5% 70% 0% 54 Lachlan Valley Wyangala Dam, 1216 25% 301 -4 C’over restricted to 57% <20% 87% 0% 15 Carcoar Dam, Carcoar 36 20% 7 0 Deliverability restricted 10% 100% 0% 38 Murrumbidgee Valley Burrinjuck Dam, Yass 1025 32% 329 3 Min Planned eWater 40% 95% 3% 8% Blowering Dam, Tumut 1604 49% 793 -2 Min Planned eWater <10% 95% 3% 8% Murray Dartmouth, Mitta Mitta 3837 59% 2235 -40 Transfers to Hume N/A N/A N/A N/ Hume Dam, Albury 2982 42% 1238 83 Env orders and L Vic <25% 97% 0% 18 Lower Darling Menindee Lakes, 1633 1% 14 -1 Restrictions in place N/A 30% 0% 19 B k Hill % Hunter Valley Glenbawn Dam, Scone 750 50% 373 -2 Regulated releases 20% 100% 95% 23 Glennies Ck Dam, 282 50% 142 -1 Regulated releases 20% 100% 95% 23 Lostock Dam, Gresford 20 76% 15 -0 Regulated releases 100% 100% 100% N/ Coastal Area Toonumbar Dam, 11 60% 7 -0 Regulated releases 100% 100% 100% N/ Brogo Dam, Bega 9 87% 8 -0 Regulated releases 100% 100% 40% N/ Total 17748 32.8% 5823 31 WaterNSW has water resources in Dartmouth, Hume and Glenlyon Dams. TWS = Town Water Supplies . 1 Gigalitre (GL) = 1,000 Megalitres (ML) 1 ML = 1,000,000 litre Regional Weekly Drought Response Water Report 7 Details – Valley Overview AWD Storage Weekly GS 26 August 2019 Releases Inflows Volume inflows Comment % ML/d Required (GL) (GL) AWD Valley Dams (GL) Pindari 15.3 0 13 Border Minimum releases from Pindari. 0 31 Glenlyon 21.1 0 0 Gwydir Copeton 119 0 25 Minimum releases from Copeton. 0 41 Current releases are for Upper Split Rock 8.1 0 34 Namoi needs. No further releases Namoi 0 95 Keepit 4.2 0 0 from Keepit into the Lower Namoi until inflows occur. Chaffey Dam releases for Peel Chaffey 22 0 30 Tamworth. Level 4 water restriction 0 N/A*** for Tamworth. Current releases from Burrendong Dam are for town and D&S demand. Burrendong 55 0 105 Macquarie 0 346 Windamere 118 0 36 Current release from Windamere Dam are for Cudgegong demand as the bulk water transfer has been deferred. Regional customer drought update 8 AWD Storage Weekly GS 26 August 2019 Releases Inflows Volume inflows Comment % ML/d Required (GL) (GL) AWD Valley Dams (GL) Current releases from Wyangala Dam are mainly for TWS and S&D replenishment. Wyangala 303 2.6 708 Current releases from Carcoar Lachlan 0 280 Carcoar 8 0 2 Dam are low. Due to drought conditions, the end of system daily environmental flow requirement have been temporarily suspended. Minimum releases meeting 6.7 demand for: irrigation, planned Burrinjuck 329 470 environmental water (1,087ML/d Murrumbidgee 3 Blowering 793 1.8* 575 at Balranald and 50ML/day at Darlot) and held environmental water to Lowbidgee. Transfers from Hume for eWater and S.A. at higher rates as flows Murray Hume 1238 83** 4115 0 130 from Kiewa and Ovens Rivers reducing. Cease to flow - Bourke – no flow since 27 August 2018; CEWO water releases from Barwon-Darling N/A N/A Glenlyon reached Mogil Mogil N/A N/A and Copeton releases reached Warraweena. Warrego flow reached Wilcannia. Regional customer drought update 9 AWD Storage Weekly GS 26 August 2019 Releases Inflows Volume inflows Comment % ML/d Required (GL) (GL) AWD Valley Dams (GL) Four block banks have been constructed and filled, pipes closed. Lower-Darling Menindee 14.1 0 Negligible Releases from Lake Wetherell 0 N/A ceased on 12 Feb 2019. Supply to Broken Hill is being met from W2BH pipeline. * Includes inflows from Snowy Hydro, already budgeted. ** Includes inflows from Dartmouth and Snowy Hydro, already budgeted. *** The Department of Industry / Water monitors the resources regularly and the water allocation statement for the Peel regulated river is revised accordingly, depending on resource availability. More information Stay up-to-date with storage levels, system risks and climate conditions across NSW. You can also find valley-specific information about storage status, predicted release patterns and operating conditions. Subscribe to have the report emailed to you each week. Please visit our website at waternsw.com.au/subscribe for more information. For more information, visit our website at waternsw.com.au/drought or call us on 1300 662 077. Regional customer drought update 10 .
Recommended publications
  • Ewater SOFTWARE CONFERENCE 2017 MODELLING ENVIRONMENTAL WATER DEMAND in Ewater SOURCE
    eWATER SOFTWARE CONFERENCE 2017 MODELLING ENVIRONMENTAL WATER DEMAND IN eWATER SOURCE Authors: Mahmudul Haque, Golam Kibria & Mahes Maheswaran Presented by: Dr Mahmudul Haque, CPEng, NER Hydrologist, WaterNSW WaterNSW: We are Australia's largest water supplier We own and operate 42 large dams, pipelines and the state’s rivers We supply water to regional towns, irrigators, Sydney Water Corporation and local water utilities We develop infrastructure solutions for water supply security and reliability Website: http://www.waternsw.com.au/home 2 Outline: Macquarie Valley Environmental flow requirements Environmental flow rules Modelling in eWater Source Results 3 Macquarie Valley: Burrendong = Koala 74000 km2 4 ENVIRONMENTAL FLOW REQUIREMENTS Environmental Water/Flow (in a year): Two distinct types (Burrendong Dam): 1. Environmental Water Allowance (EWA)/Plan Water Total: 160 GL/year (not license, has GS characteristics) - 96 GL as translucent flow -If GS allocation is 28%, - 64 GL as active flow then EWA has same 28% allocation 2. Adaptive Environmental Water(AEW)/Held Environmental-It can also carryoverWater(HEW) water Total: 174.5 GL/year up to 100% as like GS - 48.5 GL as NSW purchase GS license - 126 GL Commonwealth Govt. purchase GS license 6 Environmental Water/Flow (in a year): Burrendong dam: (i) The Macquarie EFRG sought and received approval for changes to the apportionment between Active and Translucent components from 40%/60% to 60%/40% in the mid-2000s. The releases from the Active component and any other held environmental water are typically made as recommended by the EFRG . (ii) Releases from the Translucent sub-allowance are generally consistent with WSP triggers.
    [Show full text]
  • Fisheries Management (Authority to Fish Silver Perch) Order 2007
    Fisheries Management (Authority to Fish Silver Perch) Order 2007 As at 18 January 2008 I, the Minister for Primary Industries, make the following Order under section 221IA of the Fisheries Management Act 1994. Dated, this 17th day of December 2007. Minister for Primary Industries Explanatory note The silver perch is listed as a vulnerable species (which is a category of threatened species) under the Fisheries Management Act 1994. The Act enables the Minister for Primary Industries to make an order authorising a class of persons to carry out an activity that may result in harm to a threatened species, population or ecological community or damage to its habitat, subject to the Minister's compliance with the requirements of Subdivision 1A of Division 6 of Part 7A of the Act. The object of this Order is to authorise recreational fishers to fish for silver perch in specified waters, subject to compliance with any applicable fishing regulatory controls. This Order is made under section 221IA of the Fisheries Management Act 1994. 1 Name of Order This Order is the Fisheries Management (Authority to Fish Silver Perch) Order 2007. 2 Commencement This Order takes effect on the day that it is published in the Gazette. 3 Activities authorised by this Order (1) Recreational fishers may take silver perch, or possess silver perch taken, from the following bodies of water, or carry out any routine activity in that connection, subject to compliance with any applicable fishing regulatory controls: Ben Chifley Dam Jounama Pondage Blowering Dam Keepit Dam Burrendong Dam Lake Albert Burrinjuck Dam Lake Wyangan Chaffey Dam Pindari Dam Copeton Dam Split Rock Dam Glenbawn Dam Windamere Dam Glennies Creek Wyangla Dam Dam Googong Dam Yass Weir (2) In this clause, "fishing regulatory controls" has the same meaning as in Division 5 of Part 5 of the Environmental Planning and Assessment Act 1979.
    [Show full text]
  • Regional Water Availability Report
    Regional water availability report Weekly edition 7 January 2019 waternsw.com.au Contents 1. Overview ................................................................................................................................................. 3 2. System risks ............................................................................................................................................. 3 3. Climatic Conditions ............................................................................................................................... 4 4. Southern valley based operational activities ..................................................................................... 6 4.1 Murray valley .................................................................................................................................................... 6 4.2 Lower darling valley ........................................................................................................................................ 9 4.3 Murrumbidgee valley ...................................................................................................................................... 9 5. Central valley based operational activities ..................................................................................... 14 5.1 Lachlan valley ................................................................................................................................................ 14 5.2 Macquarie valley ..........................................................................................................................................
    [Show full text]
  • Government Gazette of the STATE of NEW SOUTH WALES Number 112 Monday, 3 September 2007 Published Under Authority by Government Advertising
    6835 Government Gazette OF THE STATE OF NEW SOUTH WALES Number 112 Monday, 3 September 2007 Published under authority by Government Advertising SPECIAL SUPPLEMENT EXOTIC DISEASES OF ANIMALS ACT 1991 ORDER - Section 15 Declaration of Restricted Areas – Hunter Valley and Tamworth I, IAN JAMES ROTH, Deputy Chief Veterinary Offi cer, with the powers the Minister has delegated to me under section 67 of the Exotic Diseases of Animals Act 1991 (“the Act”) and pursuant to section 15 of the Act: 1. revoke each of the orders declared under section 15 of the Act that are listed in Schedule 1 below (“the Orders”); 2. declare the area specifi ed in Schedule 2 to be a restricted area; and 3. declare that the classes of animals, animal products, fodder, fi ttings or vehicles to which this order applies are those described in Schedule 3. SCHEDULE 1 Title of Order Date of Order Declaration of Restricted Area – Moonbi 27 August 2007 Declaration of Restricted Area – Woonooka Road Moonbi 29 August 2007 Declaration of Restricted Area – Anambah 29 August 2007 Declaration of Restricted Area – Muswellbrook 29 August 2007 Declaration of Restricted Area – Aberdeen 29 August 2007 Declaration of Restricted Area – East Maitland 29 August 2007 Declaration of Restricted Area – Timbumburi 29 August 2007 Declaration of Restricted Area – McCullys Gap 30 August 2007 Declaration of Restricted Area – Bunnan 31 August 2007 Declaration of Restricted Area - Gloucester 31 August 2007 Declaration of Restricted Area – Eagleton 29 August 2007 SCHEDULE 2 The area shown in the map below and within the local government areas administered by the following councils: Cessnock City Council Dungog Shire Council Gloucester Shire Council Great Lakes Council Liverpool Plains Shire Council 6836 SPECIAL SUPPLEMENT 3 September 2007 Maitland City Council Muswellbrook Shire Council Newcastle City Council Port Stephens Council Singleton Shire Council Tamworth City Council Upper Hunter Shire Council NEW SOUTH WALES GOVERNMENT GAZETTE No.
    [Show full text]
  • Regional Water Availability Report
    Regional water availability report Weekly edition 16 November 2020 1 Contents 1. Overview ................................................................................................................................................. 3 2. System risks ............................................................................................................................................. 3 3. Climatic Conditions ............................................................................................................................... 4 4. Southern valley based operational activities ..................................................................................... 7 4.1 Murray valley ............................................................................................................................................... 7 4.2 Lower Darling valley ................................................................................................................................... 9 4.3 Murrumbidgee valley ............................................................................................................................... 10 5. Central valley based operational activities ..................................................................................... 12 5.1 Lachlan valley ........................................................................................................................................... 13 5.2 Macquarie valley ....................................................................................................................................
    [Show full text]
  • Windamere Dam FACT SHEET
    Windamere Dam FACT SHEET FACTS AND FIGURES • Construction on Windamere Dam began in 1974 and was DID YOU KNOW? completed in 1984 to meet irrigation and stock and domestic needs in the Cudgegong Valley. Up-to-date dam • The dam is named after a property called ‘Windamere’, upon which information is available it was built. at waternsw.com.au • The dam has a storage capacity of 368,120 ML, which is more than half the size of Sydney Harbour. • Windamere Dam has a 55 m high control tower with variable level inlets which allows for the control of the quality and temperature of Height: 67 m water released from the dam. Length: 825 m • The dam supplies water to the Mid-Western Regional Council for Water depth: 58 m town supplies, river flows, stock and domestic needs, irrigated Full supply level: 552 m above agriculture, industry, flood mitigation and environmental flows. sea level • Windamere Dam operates in conjunction with Burrendong Dam to Storage capacity: 368,120 ML supply water to the Cudgegong and Macquarie valleys. Surface area: 2,030 ha • The Cudgegong Valley is renowned for its agricultural production Catchment area: 1,070 km2 and water from Windamere Dam is used to irrigate grapes, fruit, Spillway capacity: 430,000 ML vegetables, maize, honey, grains and lucerne. per day WaterNSW is the bulk water supplier and system operator in NSW. With more than 40 dams across the state, we supply two-thirds of water used in NSW to regional towns, irrigators, Sydney Water Corporation and local water utilities. Visit Windamere Dam Windamere Dam is situated on the Cudgegong River 30 km upstream from Mudgee and 19 km south-west of Rylstone on the NSW Central Tablelands.
    [Show full text]
  • Translucency Rules in NSW Inland Rivers
    SCOPING REVIEW Translucency rules in NSW inland rivers Effectiveness and alternative scenario review Department of Industry—Water | water.nsw.gov.au Review of translucency rules in NSW inland rivers Published by the NSW Department of Industry—Water Review of translucency rules in NSW inland rivers. Effectiveness and alternative scenario review First published: February 2018 More information Department of Industry—Water. water.nsw.gov.au Acknowledgments Cover image: Wyangala 103% 5th March 2012 – Casey Proctor, Lachlan Land Services. INT17/48024 © State of New South Wales through the Department of Industry, 2016. You may copy, distribute and otherwise freely deal with this publication for any purpose, provided that you attribute the NSW Department of Industry as the owner. Disclaimer: The information contained in this publication is based on knowledge and understanding at the time of writing (July 2016). However, because of advances in knowledge, users are reminded of the need to ensure that information upon which they rely is up to date and to check currency of the information with the appropriate officer of the Department of Primary Industries or the user’s independent adviser. 2 Review of translucency rules in NSW inland rivers Contents Summary ..................................................................................................................................................6 1. Introduction ........................................................................................................................................10
    [Show full text]
  • NSW Recreational Freshwater Fishing Guide 2020-21
    NSW Recreational Freshwater Fishing Guide 2020–21 www.dpi.nsw.gov.au Report illegal fishing 1800 043 536 Check out the app:FishSmart NSW DPI has created an app Some data on this site is sourced from the Bureau of Meteorology. that provides recreational fishers with 24/7 access to essential information they need to know to fish in NSW, such as: ▢ a pictorial guide of common recreational species, bag & size limits, closed seasons and fishing gear rules ▢ record and keep your own catch log and opt to have your best fish pictures selected to feature in our in-app gallery ▢ real-time maps to locate nearest FADs (Fish Aggregation Devices), artificial reefs, Recreational Fishing Havens and Marine Park Zones ▢ DPI contact for reporting illegal fishing, fish kills, ▢ local weather, tide, moon phase and barometric pressure to help choose best time to fish pest species etc. and local Fisheries Offices ▢ guides on spearfishing, fishing safely, trout fishing, regional fishing ▢ DPI Facebook news. Welcome to FishSmart! See your location in Store all your Contact Fisheries – relation to FADs, Check the bag and size See featured fishing catches in your very Report illegal Marine Park Zones, limits for popular species photos RFHs & more own Catch Log fishing & more Contents i ■ NSW Recreational Fishing Fee . 1 ■ Where do my fishing fees go? .. 3 ■ Working with fishers . 7 ■ Fish hatcheries and fish stocking . 9 ■ Responsible fishing . 11 ■ Angler access . 14 ■ Converting fish lengths to weights. 15 ■ Fishing safely/safe boating . 17 ■ Food safety . 18 ■ Knots and rigs . 20 ■ Fish identification and measurement . 27 ■ Fish bag limits, size limits and closed seasons .
    [Show full text]
  • Water Quality Technical Report for Border Rivers Surface Water Area
    THE BASIN PLAN Water quality technical report for the Border Rivers surface water resource plan area (SW16) NSW Department of Planning, Industry and Environment | dpie.nsw.gov.au Published by NSW Department of Planning, Industry and Environment dpie.nsw.gov.au Title: Water quality technical report for the Border Rivers surface water resource plan area (SW16) First published: February 2020 Department reference number: INT18/12429 Acknowledgments The soils maps in this report contain data sourced from the NSW Office of Environment and Heritage. © State of New South Wales through Department of Planning, Industry and Environment [2020]. You may copy, distribute, display, download and otherwise freely deal with this publication for any purpose, provided that you attribute the Department of Planning, Industry and Environment as the owner. However, you must obtain permission if you wish to charge others for access to the publication (other than at cost); include the publication in advertising or a product for sale; modify the publication; or republish the publication on a website. You may freely link to the publication on a departmental website. Disclaimer: The information contained in this publication is based on knowledge and understanding at the time of writing (October 2018) and may not be accurate, current or complete. The State of New South Wales (including the NSW Department of Planning, Industry and Environment), the author and the publisher take no responsibility, and will accept no liability, for the accuracy, currency, reliability or correctness of any information included in the document (including material provided by third parties). Readers should make their own inquiries and rely on their own advice when making decisions related to material contained in this publication.
    [Show full text]
  • Regional Water Availability Report
    Regional water availability report Weekly edition 29 March 2021 WaterInsights now presents most of the content from this report and is updated in real time. This report will be phased out over coming weeks. To assist this transition to WaterInsights this report includes links to the relevant sections on WaterInsights. 1 Contents 1. Overview ................................................................................................................................................. 3 2. System risks ............................................................................................................................................. 3 3. Climatic Conditions ............................................................................................................................... 4 4. Southern valley based operational activities ..................................................................................... 6 4.1 Murray Valley .............................................................................................................................................. 6 4.2 Lower Darling valley ................................................................................................................................... 8 4.3 Murrumbidgee valley ............................................................................................................................... 10 5. Central valley based operational activities ..................................................................................... 13 5.1 Lachlan
    [Show full text]
  • Water Management Plan 2020-21: Chapter
    Commonwealth Environmental Water Office Water Management Plan Chapter 3.6 – Macquarie River 2020–21 This document represents a sub-chapter of ‘Commonwealth Environmental Water Office Water Management Plan 2020-21, Commonwealth of Australia, 2020’. Please visit: https://www.environment.gov.au/water/cewo/publications/water-management-plan-2020-21 for links to the main document. Acknowledgement of the Traditional Owners of the Murray–Darling Basin The Commonwealth Environmental Water Office respectfully acknowledges the Traditional Owners, their Elders past and present, their Nations of the Murray–Darling Basin, and their cultural, social, environmental, spiritual and economic connection to their lands and waters. © Copyright Commonwealth of Australia, 2020. Commonwealth Environmental Water Office Water Management Plan 2020-21 is licensed by the Commonwealth of Australia for use under a Creative Commons Attribution 4.0 International licence with the exception of the Coat of Arms of the Commonwealth of Australia, the logo of the agency responsible for publishing the report, content supplied by third parties, and any images depicting people. For licence conditions see: https://creativecommons.org/licenses/by/4.0/ This report should be attributed as ‘Commonwealth Environmental Water Office Water Management Plan 2020-21, Commonwealth of Australia, 2020’. The Commonwealth of Australia has made all reasonable efforts to identify content supplied by third parties using the following format ‘© Copyright’ noting the third party. The views and opinions expressed in this publication are those of the authors and do not necessarily reflect those of the Australian Government or the Minister for the Environment. While reasonable efforts have been made to ensure that the contents of this publication are factually correct, the Commonwealth does not accept responsibility for the accuracy or completeness of the contents and shall not be liable for any loss or damage that may be occasioned directly or indirectly by, or reliance on, the contents of this publication.
    [Show full text]
  • Operations Update Border Rivers – Pindari Block Release
    Operations Update Border Rivers – Pindari Block Release 23 December 2020 Under the single block release strategy for the Border Rivers, releases from Pindari Dam commenced on 17 Dec 2020. The releases were brought forward by a few days to ensure water needs will be met. These releases from Pindari Dam will see flows through to the end of the system at Mungindi. Expected flow arrival dates are outlined below: Pindari Dam to Mungindi Goondiwindi Water Arrived 23 December Terrawah 25 Dec 2020 Boomi 27 Dec 2020 Kanowna 30 Dec 2020 Mungindi 4 Jan 2021 Glenlyon Dam to the Junction Delivery of account water will be made using tributary flows where possible and not from dam releases. To assist in implementing the Pindari block release strategy: water orders must be placed by 23 December 2020 and, Customers are requested to place orders earlier than the required lead days. For placing water orders, Customers are encouraged to utilise iWAS. Please note that orders are able to be cancelled if it is done so outside of the required lead days. Further information about the Block Release from Pindari Dam: Date when releases from Pindari Dam started 17 Dec 2020 Approximate duration of releases 16 to 18 days Approximate total volume of releases 28,000 ML to 30,000 ML Range of daily releases from Pindari Dam Up to 2,100 ML per day Anticipated usage by general security licences Approximately 15,000 ML Anticipated usage – Town water, high security, Approximately 3,500 to 4,500 ML stock, domestic and replenishment flows WaterNSW ABN 21 147 934 787 169 Macquarie Street Parramatta NSW 2150 PO Box 398, Parramatta NSW 2124 T 1300 662 077 E [email protected] waternsw.com.au Anyone wishing to take water that would require dam releases outside of the scheduled block release period should contact WaterNSW immediately to discuss possible alternate delivery options.
    [Show full text]