Annexure-Form
Total Page:16
File Type:pdf, Size:1020Kb
SHREE SOMNATH TRUST Form 1 and Form 1(A) for Project “Development of Promenade with a retaining wall to prevent sea erosion & a public walkway along the sea front” at Somnath Temple, Town Prabhas Patan, District Gir-Somnath, Gujarat. APRIL 2017 Kadam Environmental Consultants www.kadamenviro.com Environment for Development FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT QUALITY CONTROL SHREE SOMNATH TRUST Development of Promenade with a Retaining Wall to prevent Sea Erosion & a Public Walkway along the Sea Front at Somnath Temple, Town Prabhas Patan, District: Gir-Somnath, Gujarat © Kadam Environmental Consultants (‘Kadam’), April 2017 This report is released for the use of the Shree Somnath Trust, Gujarat, Regulators and relevant stakeholders solely as part of the subject project’s Environmental Clearance process. Information provided (unless attributed to referenced third parties) is otherwise copyrighted and shall not be used for any other purpose without the written consent of Kadam. QUALITY CONTROL Form 1 and Form 1(A) for Development of Promenade with a Retaining Wall to prevent Sea Name of Erosion & a Public Walkway along the Sea Front at Somnath Temple, Town Prabhas Patan, Publication District: Gir-Somnath, Gujarat Project 1727718112 Report No. 1 Version 1 Released April 2017 Number Prepared By Prachi Shah & Ankita Prajapati, Team Member Reviewed By K. K. Antani, Project Coordinator Released By Sheetal Kadam, EIA Coordinator & Director DISCLAIMER Kadam has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. Kadam also believes that the facts presented in the report are accurate as on the date it was written. However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Kadam therefore specifically disclaims any liability resulting from the use or application of the information contained in this report. The information is not intended to serve as legal advice related to the individual situation. KADAM ENVIRONMENTAL CONSULTANTS | APRIL 2017 1 FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT TABLE OF CONTENTS CONTENTS 1 SCOPING ................................................................................................... 2 1.1 FORM – 1 ............................................................................................... 2 1.2 FORM – 1(A).......................................................................................... 15 KADAM ENVIRONMENTAL CONSULTANTS | APRIL 2017 1 FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT TABLE OF CONTENTS LIST OF ANNEXURES Annexure 1: Site Location Map ..................................................................................................... 26 Annexure 2: Toposheet (Open Source Map) .................................................................................. 27 Annexure 3: Site Location Map – Satellite Image ........................................................................... 28 Annexure 4: Landuse Map ........................................................................................................... 29 Annexure 5: Design of Proposed Development .............................................................................. 30 Annexure 6: Site Photographs ...................................................................................................... 31 Annexure 7: Land onership documents ......................................................................................... 32 Annexure 8: Contour Map ............................................................................................................ 33 Annexure 9: Water Balance ........................................................................................................ 34 Annexure 10: Environmental Management Plan……………………………………………………………….………….35 KADAM ENVIRONMENTAL CONSULTANTS | APRIL 2017 2 FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT ABBREVIATIONS ABBREVIATIONS AAQM : Ambient Air Quality Monitoring EMP : Environmental Management Plan KEC : Kadam Environmental Consultants KLD : Kilo Liter per Day MoEF : Ministry of Environment and Forests PPE : Personal Protective Equipment RCC : Reinforced Cement Concrete GPCB : Gujarat Pollution Control Board SEIAA : State Environmental Impact Assessment Authority SEAC : State Expert Appraisal Committee KADAM ENVIRONMENTAL CONSULTANTS | APRIL 2017 1 FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT FORM I(A) 1.2 FORM – 1(A) (Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. Land Environment S. No. Item Details Will the existing land use get significantly altered from the project that is not consistent Yes, the existing Land use will get altered as the with the surroundings? (Proposed land use site will be developed as promenade and walkway. must conform to the approved Master Plan / Development Plan of the area. Change of land Site location plan and toposheet are provided in use if any and the statutory approval from the Annexure 1, Annexure 2 & Annexure 3. 1.1 competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding Contour map is provided in Annexure 8. features of the proposed site (within 500 meters) and (iii) the site (indicating levels & A detailed 500m Land use map is provided in contours) to appropriate scales. If not available Annexure 4. attach only conceptual plans. Design of proposed development is provided in Annexure 5. Major requirements are Length of Seawall – 1500 mt. Area to be covered by Tetrapod Plot Area – 24,000 sqm Area of Promenade – 54,000 sqm Built up area 54,765 sqm List out all the major project requirements in Construction phase terms of the land area, built up area, water 1.2 Requirement: Approx. 100 KvA consumption, power requirement, connectivity, Source: Paschim Gujarat Vij community facilities, parking needs etc. Company Limited (PGVCL) Power requirement Operation phase Requirement: 38212 units Source: Paschim Gujarat Vij Company Limited (PGVCL) Construction phase Water Source: existing water consumption supply scheme KADAM ENVIRONMENTAL CONSULTANTS | APRIL 2017 15 FORM I, I (A) FOR THE PROJECT “DEVELOPMENT OF PROMENADE WITH A RETAINING WALL TO PREVENT SEA EROSION & A PUBLIC WALKWAY ALONG THE SEA FRONT” AT SOMNATH TEMPLE, TOWN PRABHAS PATAN, DISTRICT GIR- SHREE SOMNATH TRUST SOMNATH, GUJARAT FORM I(A) S. No. Item Details Requirement: 50 KLD Operation Phase Source: existing water supply scheme Requirement : Approx. 163 kld (Refer Annexure 9 water Balance) ~1.18 km in NNE direction with Connectivity NH-8D connecting Somnath - Jetpur What are the likely impacts of the proposed About 54,000 m2 area will be developed as activity on the existing facilities adjacent to the promenade. About 200 potted plants will be planted 1.3 proposed site? (Such as open spaces, on the Promenade. community facilities, details of the existing land Care will be taken to minimize the disturbance to use, disturbance to the local ecology) the local ecology. There will be no land disturbance due to the Will there be any significant land disturbance project. resulting in erosion, subsidence & instability? The Project area is categorized in the seismic zone 1.4 (Details of soil type, slope analysis, vulnerability III as per IS 1893:2002. The structure Design of the to subsidence, seismicity etc may be given). building will be as per Codes to negate the threat of environmental and other damages. Natural drainage will not be disturbed by proposed Will the proposal involve alteration of natural development. drainage systems? (Give details on a contour 1.5 Based on the contour survey, natural gradient shall map showing the natural drainage near the be identified. Based on gradient of the site few proposed project site) culverts will be provided under RCC box. What are the quantities of earthwork involved There will be construction of promenade with in the construction activity -cutting, filling, retaining wall and very less soil will be excavated 1.6 reclamation etc. (Give details of the quantities for the same which will be utilized on site for of earthwork involved, transport of fill materials leveling and footing. from outside the site etc.) Water requirement during construction phase will be supplied form existing water supply source. Give details regarding water supply, waste Solid waste will be segregated into biodegradable 1.7 handling etc during the