Brief Summary

Total Page:16

File Type:pdf, Size:1020Kb

Brief Summary BRIEF SUMMARY FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION (ECONOMIC CORRIDOR – 3 STARTING FROM VANTDAU, IN BANASKANTHA DISTRICT TO RANMALPURA IN PATAN DISTRICT, APPROXIMATELY 124.6KM) Submitted by NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 1.1 Preamble Bharatmala is a new umbrella program for the infrastructure development mainly focuses on optimizing efficiency of transportation and passenger movement across the country by bridging critical infrastructure gaps through effective interventions of National Highway Authority of India (NHAI) and Ministry of Road Transport and Highways (MORTH). These projects involve the constructions or improvement of Economic Corridor, inter corridor and feeder routes, national highways/ newly declared National Highways with an aim to improve road connectivity to coastal/border areas, ports, backward areas, and religious and tourist sites. The project has identified 44 economic (freight) corridors, inter-corridors and feeder-routes for development. 1.2 Project Description The proposed project is a part of the Bharatmala Project which has been envisaged as an umbrella program under the Ministry of Road Transport and Highways. The project involves constructions or improvement of national highways/ newly declared National Highways with an aim to improve road connectivity to border areas, ports, backward areas, religious and tourist sites. The project has identified 44 economic (freight) corridors, inter-corridors and feeder-routes for development. Out of 8 packages in Package 3/Lot 4, there are 5 Economic Corridor, 1 Inter Corridor stretch & 2 Feeder Routes. The details are as follows: - - End) - Latitude Latiture - End - State Road Start Name Corridor Corridor Longitude Longitude Length(km) (Start (Start End Stretch name name Stretch Classification Start EC - Agra - Guna 24.620 24.685 Economic NH 46 MP 12 77.260778 77.34 Mumbai Bypass 215 399 Corridor Bhopal- EC - Kandla - Sanchi- 23.254 23.834 78.704 Economic NH 146 MP 173 77.514384 Sagar Vidisha- 28 541 3 Corridor Sagar 4 EC - - Sagar - Rewa 24.511 24.548 81.349 Economic NH 30 MP 19 81.229595 Varanasi Bypass 004 484 76 Corridor FR - Batera - MP SH Batera 23.201 23.097 78.337 Feeder MP 13 78.290739 Pathariya 15 Pathariya 266 521 03 Route Package 3/ Package Lot FR - Katni - Katni- 23.843 23.310 81.352 Feeder NH 43 MP 126 80.436801 Shahdol Shahdhol 626 245 65 Route NH 68/ EC - Sanchore- Amritsar - GJ SH 24.655 23.741 71.135 Economic GJ 124.6 Tharad- 71.741567 Jamnagar 127 / 542 177 92 Corridor Santalpur NH 27 EC - Kandla - Samkhyali 23.307 23.074 70.794 Economic NH 27 GJ 41 70.517008 Sagar -Khirai 6 168 16 Corridor ICR - Inter Kathlal - GJ SH Kathlal- 22.884 22.727 72.872 Corridor GJ 21 72.98089 Nadiad 59 Nadiad 81 39 32 Route The project corridor is proposed for development to 4-lane access-controlled roads depending upon traffic and the Right of Way available. In this regard, NHAI has been entrusted with the assignment of Development of Economic Corridors, Inter-Corridors, Feeder Routes and Coastal Roads primarily to improve freight movement in the Country. NHAI has invited proposal from Technical consultants for carrying out detailed project report. 1.3 Need and Importance of the Project Cities have concentrated educational infrastructures, employment opportunities, skilled work force, financial independence and the infrastructure to keep the demand-supply cycle intact. Thus, for a young developing nation, exposure of the youth to the industries and business opportunities in the cities plays a very important role in deciding the future and its demography. Transport infrastructure forms the backbone of a country’s economy and provides a vital linkage between the urban and the rural areas. The proposed Greenfield alignment new highway NH-754K is the Economic corridor which is the part of Amritsar Jamnagar Section EC-3. The improvement will especially speed up the freight movement and provide a better access to freight vehicles. Connectivity with the remote and sensitive areas will enhance, it will also ensure faster road vehicular and train movement and also reduce accidents. It also connects the rural areas to better prospects of medical support for humans as well as cattle. Apart from that, it promises to revive the agriculture, tourism, education in and around the district. Temporary employment generation. An important aspect which may not be always thought about is the frequency and impact of accidents. The Project will substantially reduce the existing transport bottleneck to trade and will foster regional economic cooperation. Thus, this will not only reduce travel time but also improve the district’s/state economic growth. The entire region will be benefitted from the Project, while the project area will gain through economic development and increased access to markets and social services. 1.4 Project Benefits By upgrading the existing road and construction of new highway the project will substantially reduce the travel time. This route is important, as it also provide link between Rajasthan and Gujarat. Widening and construction of the Highways to 4 lanes will reduce the number of accidents caused, will reduce transport cost and will contribute to commercial and industrial development opportunities. The road connects the rural areas with limited educational facilities to the urban ones with plenty opportunities for higher education. As it is a part of Bharatmala Project the entire region will be benefitted through economic development and increased access to markets and social services. 1.5 Proposed Greenfield Alignment: Sanchore-Santalpur Section (Bharatmala EC 3) Proposed Greenfield Alignment (Bharatmala EC 3) is a New National Highway, which is situated in Banaskantha and Patan district and it is going to upgrade into National highway NH – 754K. The new alignment NH-754K starts from Vantdau village (Banaskantha) connecting sub districts Tharad, Vav, Suigam, Bhabhar, Santalpur and terminating near Ranmalpura Village (Patan).The latitude and longitude are 24°39'19.45"N latitude, 71°44'29.27"E longitude at Vantdau, Banaskantha district and 23°44'30.81"N latitude, 71° 8'11.02"E longitude at Ranmalpura in Patan district. The proposed Project (Chainage 6+000 to 129+636) is a greenfield proposal. Total length of project study corridor is 124.6 km. The proposed alignment is divided into two stretches i.e. Package - I (Design Chainage km 6+000 to km 75+000) and Package - II (Design Chainage km 75+000 to 129+636).In Package I, The proposed alignment connects Vantdau village to Mespura village via Tharad sub-district from km 6+000 to km 75+000 in Banaskantha District, in Gujarat. Total length of project road in Package I is 69 km. In Package II, The proposed alignment (EC-3) connects Jorawargadh village to Ranmalpura via Santalpur sub-district from km 75+000 to km 129+636 in Banaskantha and Patan District. The Project study corridor starts in Banaskantha district from near Vantdau village and ends near Ranmalpura Village in Patan district. Total length of package II is 54.6 km. This corridor is Greenfield alignment of length 124.646 out of which 20 km is existing alignment from 14+000 to 34+000 km, which will be upgraded and the construction of the new highway will lead to enhanced connectivity opportunity within district as well as the surrounding areas. The proposed project passes through 39 major villages (approx.), namely Vantdau, Vaghasan, Miyal, Mota Mesara, Nana Mesara, Piluda, Mangrol, Dudhva, Junadi, Budhanpur, Tharad, Vajegadh, Malupur, Nagala, Malsan, Morikha, Dethali, Savpura, Vasarda, Bhatasana, Radka, Chatara, Mespura, Jorawargadh, Uchosan, Morwada, Garambadi, Vaghpura, Soneth, Kilana, Varanosari, Jamvada, Patanka, Babra, Bavarda, Bakutra, Kalyanpura, Santalpur, Ranmalpura in Banaskantha and Patan district. .
Recommended publications
  • Kutch Basin Forms the North-Western Part of the Western Continental
    Basin Introduction :. Kutch basin forms the north-western part of the western continental margin of India and is situated at the southern edge of the Indus shelf at right angles to the southern Indus fossil rift (Zaigham and Mallick, 2000). It is bounded by the Nagar- Parkar fault in the North, Radhanpur-Barmer arch in the east and North Kathiawar fault towards the south. The basin extents between Latitude 22° 30' and 24° 30' N and Longitudes 68° and 72° E covering entire Kutch district and western part of Banaskantha (Santalpur Taluka) districts of Gujarat state. It is an east-west oriented pericratonic embayment opening and deepening towards the sea in the west towards the Arabian Sea. The total area of the basin is about 71,000 sq. km of which onland area is 43,000 sq.km and offshore area is 28,000 sq.km. upto 200 bathymetry. The basin is filled up with 1550 to 2500m of Mesozoic sediments and 550m of Tertiary sediments in onland region and upto 4500m of Tertiary sediments in offshore region (Well GKH-1). The sediment fill thickens from less than 500m in the north to over 4500m in the south and from 200m in the east to over 14,000m in the deep sea region towards western part of the basin indicating a palaeo-slope in the south-west. The western continental shelf of India, with average shelf break at about 200 m depth, is about 300 km wide off Mumbai coast and gradually narrows down to 160 km off Kutch in the north.
    [Show full text]
  • J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J
    j j j j j j j j j j j j j j j DhananJa}arao Gadglillbrary j 111111111111 InlllIlll Illilllill DIIIIH GIPE-PUNE-IOI540 j j f '----- - j j j j j j j j j j j j j j j j j SELECTIONS FI10M THE RECORDS OF THE BOMBAY GOVERNMENT. ~ (IN Two PARTS.)-NEW SERIES. Y;-"'~Vtlf _____ PART I. REPORT~ ON THE RESOURCES, &0., OF THE • DISTRICTS OF NADIAD, ~IT~R, w)NDE~, JUJAPUR, DHOLKA. DHANDHUKA, AND GOGH( THE TAPPA OF NAPAD, AND THE . KASBA OF RANPUR, IN GUJARAT: . / ACCOMPANIED EY ERIEF NO~ RELATIVE TO THE OONDITION OF THAT PROVINCE PREVIOUS TO THE OLOSE OF THE LAST CENTURY. A • of': .. ~_. ~,..._~ __ .... __ ~ ____ ~ WI';['H MEMOIRS ON 'THE DISTRICT~_ O~ JHALAVAD: KaTHIAWAR PROPER, MACHU KAN"'tHA, NAVANAGAR • . GOHELVAD, PORBANDAR, SORATH, AND HALAR, IN KATEIAW AP :" _)._1 ACCOMPANIED BY MISCELLANEOU~ INFORMATION ,CONNECTED WJTH THAT PBOYINCE ~ By (THE LATE) COLONEL ALEXANDER WALKER PART. II., REPORTS OF THE , " MEASURES; tJOMMENCING WITH 'ra.~ YEA:& 180;), AD6PTED) IN CONCERT WITH THE GOVERNMENT, BY. -THE LA~E COLONEL-­ ALEXANDER WALKER; ANP SuBSEQUENTLY BYMlt r.-V:­ WILLOUGHBY, POLITICAL AGENT IN KATHIAWAR, AND BY HIS SUCCESSORS, FOR THE SUPPRESSION OF FEMALE INFANTI­ CIDE1N THAT PROVINCE . •C01'lPILED &r EDITED BY R. HUGHES TROnS. ASSISTANT SEORETARY, POLITICAL DEPARTMEl!T , ~.O'mbaJl! REPRINTED AT THE GOVER;NMENT CENTRAL PRESS. -1~93. ~B3TRACT -OF CONTENTS. PARTt fAG.e. Qt1lARA~-Reporta on the ResourCt>s, &c., uf.the j;lhtrll:ts of Nll.duld, Mdtar, Mahudha, BIJapur, Dholka, Dhl.llldhuka and GogN:, the T'lppa of Napa.r, and thE' Kasba of Ranpur In the Plovlnce of GujarMf.
    [Show full text]
  • Draft Proposal
    DISTRICT PRIMARY EDUCATION PROGRAMME II BANASKANTHA GUJARAT DRAFT PROPOSAL 1996-2003 NOVEMBER 1995 UORARY & DOCUfAEf^TATlCN National lostituu oi Educat PlanQing and Admini*tratio- . 17-B, Sri Aurobindo Marj, D»te.................. CONTENTS EXECUTIVE SUMMARY 2 1. INTRODUCTION: PROFILE AND BACKGROUND 4 2. PRESENT STATUS OF PRIMARY EDUCATION 14 3. PROGRAMME OBJECTIVE, APPROACH AND STRATEGIES 36 4. PROGRAMME COMPONENTS 42 5. FINANCIAL ESTIMATES 60 6. MANAGEMENT STRUCTURES AND MONITORING PROCEDURES 77 ANNEXURE 1 81 ANNEXURE 2 89 DISTRICT PRIMARY EDUCATION PROGRAMME II BANASKANTHA DISTRICT (GUJARAT) DRAFT PROPOSAL (1996-2003) This proposal has been drawn up after a series of consulta­ tions at the district level with elected panchayat representa­ tives, administrators, school teachers, inspectors, non-govern- mental organizations, educationists and others interested in education. Various core groups, constituted for the purpose, discussed different aspects of educational development like improving access, promoting retention and achievement, civil works, teacher training etc. Details about the workshops conduct­ ed as part of the planning process and the composition of the core groups are presented in Annexure 1. (This draft is to be treated as tentative, pending the incorporation of the benchmark surveys on minimum levels of learning, and social assessment studies. These exercises are expected to be completed shortly.) Keeping in mind the suggestions regarding the components of the plan (DPEP Guidelines, pg. 24), this draft plan document is divided into the following sections: 1. Introduction: profile and background of Banaskantha. 2. Present status of primary education. 3. Programme objectives and gaps to be bridged; approach to, and strategies for, primary education planning. 4. Programme components and phasing.
    [Show full text]
  • Our Community Outreach Partners Covid-19 Relief May 1, 2020
    Our Community Outreach Partners Covid-19 Relief May 1, 2020 18 9 Partners States 20,000 Ration Kits 7.6 LaC+ to support Cooked Meals 1 lac+ individuals Nature Organisation Locations Supported WEbsite of Relief Lucknow Noida Cooked Meals The Akshaya Patra Thane https://www.akshayapatra.org/ Foundation 7,50,000 meals Pune Mumbai Mumbai Ration Kits Apnalaya https://apnalaya.org/ Shivaji Nagar, Govandi 2,000 families Mumbai Bhandup (E) Ration Kits CORO for Literacy http://coroindia.org/ Thane 1,500 families Ulhasnagar Delhi Azadpur, Rohini, Paschim Vihar, Narela, Baprola, Savda Ghevra, Shahadara, Seelampur Ration Kits Hunger Heroes https://www.feedingindia.org/ 5,000 families Hyderabad Bollaram, Habsiguda, Film Nagar Basti Palghar District Navli Phatak, Boisar, Bhogole Pada, Thembhode Road, Bidco, Nandore Jan Sahas Ration Kits Social Development Noida https://jansahasindia.org/ Society Sector 5, 8, 14, 43, 49, 67, 70, 107 1,100 families Gurugram Sector 35 & 38 Ahmedabad Ration Kits Janvikas CTM, Thaltej, Bapunagar, Madhav Mill compound http://janvikas.in/ 750 families Mumbai Ration Kits Jeevan Dhara https://www.jeevandharaonline.in Reay Road, Kaula Bunder 300 families Pune Aundh, Bhawani Peth, Dandekar Pul, Hadapsar, Kothrud, Mangalwar Peth, Taljai, Yerwada, Nagar Road Ration Kits Kashtakari Panchayat https://kashtakaripanchayat.org 1,000 families Pimpri-Chinchwad Akurdi, Nigdi, Bhosari Jodhpur Ration Kits Mahila Housing Ashok Colony, Ambedkar Colony, Pak Vistapith, https://www.mahilahousingtrust. SEWA Trust org/ Bherunath Jalecha, Masuriya
    [Show full text]
  • Gujarat State
    CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENEATION GOVERNMENT OF INDIA GROUNDWATER YEAR BOOK – 2018 - 19 GUJARAT STATE REGIONAL OFFICE DATA CENTRE CENTRAL GROUND WATER BOARD WEST CENTRAL REGION AHMEDABAD May - 2020 CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENEATION GOVERNMENT OF INDIA GROUNDWATER YEAR BOOK – 2018 -19 GUJARAT STATE Compiled by Dr.K.M.Nayak Astt Hydrogeologist REGIONAL OFFICE DATA CENTRE CENTRAL GROUND WATER BOARD WEST CENTRAL REGION AHMEDABAD May - 2020 i FOREWORD Central Ground Water Board, West Central Region, has been issuing Ground Water Year Book annually for Gujarat state by compiling the hydrogeological, hydrochemical and groundwater level data collected from the Groundwater Monitoring Wells established by the Board in Gujarat State. Monitoring of groundwater level and chemical quality furnish valuable information on the ground water regime characteristics of the different hydrogeological units moreover, analysis of these valuable data collected from existing observation wells during May, August, November and January in each ground water year (June to May) indicate the pattern of ground water movement, changes in recharge-discharge relationship, behavior of water level and qualitative & quantitative changes of ground water regime in time and space. It also helps in identifying and delineating areas prone to decline of water table and piezometric surface due to large scale withdrawal of ground water for industrial, agricultural and urban water supply requirement. Further water logging prone areas can also be identified with historical water level data analysis. This year book contains the data and analysis of ground water regime monitoring for the year 2018-19.
    [Show full text]
  • List of Kaushalya Vardhan Kendra with Attach ITI
    List of Kaushalya Vardhan Kendra with attach ITI No. District Taluka Name of KVK Attached ITI 1 Ahmedabad Ahmedabad City Ghatlodiya (P.H) Kubernagar 2 Ahmedabad Ahmedabad City Vastrapur (P.H) Saraspur 3 Ahmedabad Bavala Bagodara Bavala 4 Ahmedabad Bavala Durgi Bavala 5 Ahmedabad Bavala Kavitha Bavala 6 Ahmedabad Bavala Shiyal Bavala 7 Ahmedabad Daskroi Bareja Saraspur 8 Ahmedabad Daskroi Bopal (Godhavi) Sarkhej 9 Ahmedabad Daskroi Kuha Maninagr 10 Ahmedabad Detroj DetrojRampura Rampura Detroj DetrojRampura 11 Ahmedabad Dhandhuka Rojka Dhandhuka 12 Ahmedabad Dholka Badarkha Dholka 13 Ahmedabad Dholka Koth Thaltej (Women) 14 Ahmedabad Mandal Trent Mandal 15 Ahmedabad Sanad Mankol Sanad 16 Ahmedabad Sanad Virochannagar Sanad 17 Ahmedabad Viramgam Shahpur Viramgam 18 Aravali Bayad Ambaliyara Bayad 19 Aravali Bayad Demai Bayad 20 Aravali Bhiloda Kishan gadh Bhiloda 21 Aravali Bhiloda Torada Bhiloda 22 Aravali Dhansura Akrund vadagam 23 Aravali Malpur Aniyor Malpur 24 Aravali Malpur Ubharan Malpur 25 Aravali Meghraj Panchal Meghraj 1 No. District Taluka Name of KVK Attached ITI 26 Aravali Modasa Limbhoi Modasa 27 Aravali Modasa Sardoi Modasa 28 Banaskantha Amirgadh Iqbalgadh Amirgadh 29 Banaskantha Amirgadh virampur Amirgadh 30 Banaskantha Bhabhar Kuvala Bhabhar 31 Banaskantha Bhabhar Mitha Bhabhar 32 Banaskantha Danta Danta Kumbhariya 33 Banaskantha Danta Hadad Kumbhariya 34 Banaskantha Danta Navavas Kumbhariya 35 Banaskantha Dantiwada Panthawada Dantiwada 36 Banaskantha Deesa Agthala Deesa 37 Banaskantha Deesa Bhadath Deesa 38 Banaskantha
    [Show full text]
  • List Fo Gram Panchayats
    List fo Gram Panchayats - Phase I Name of District Name of Block Name of GP AMRELI LATHI ADATALA AMRELI LATHI AKALA AMRELI LATHI ALI UDEPUR AMRELI LATHI AMBARDI AMRELI LATHI ASODRA AMRELI LATHI BHALVA AMRELI LATHI BHATTVADAR AMRELI LATHI BHINGADH AMRELI LATHI BHURAKIA AMRELI LATHI CHAVANA AMRELI LATHI CHHBHADIA AMRELI LATHI DERDI JANBAI AMRELI LATHI DHAMEL AMRELI LATHI DHINTARA AMRELI LATHI DHRUFANIA AMRELI LATHI DUDALA(LATHI) AMRELI LATHI DUDHALA BAI AMRELI LATHI HAJIRADHAR HARSURPUR AMRELI LATHI DEVALYA+PUNJAPAR AMRELI LATHI HAVTED AMRELI LATHI HIRANA AMRELI LATHI INGORALA JAGAN AMRELI LATHI KANCHARDI AMRELI LATHI KARKOLIA AMRELI LATHI KERIYA AMRELI LATHI KERLA AMRELI LATHI KRISHNA GADH AMRELI LATHI LATHI BLOCK AMRELI LATHI LUVARIA AMRELI LATHI MALVIYA PIPARIYA AMRELI LATHI MATRILA AMRELI LATHI MULIPAT AMRELI LATHI NANA RAJKOT AMRELI LATHI NANA RAJKOT AMRELI LATHI NANAKANKOT AMRELI LATHI NARANGADH+MEMDA AMRELI LATHI PADAR SINGHA AMRELI LATHI PIPALAVA AMRELI LATHI PRATAPGADH AMRELI LATHI RABDHA AMRELI LATHI RAMPUR AMRELI LATHI SAKHPUR AMRELI LATHI SEKHPIPARIA AMRELI LATHI SUVAGADH AMRELI LATHI TAJPAR AMRELI LATHI THANSA AMRELI LATHI TODA AMRELI LATHI VIRPUR AMRELI LATHI ZARAKIA AMRELI AMRELI AMRELI BLOCK AMRELI AMRELI BARVALA BAVISHI AMRELI AMRELI BOXIPUR AMRELI AMRELI CHAKHAV JADH AMRELI AMRELI CHANDGADH AMRELI AMRELI CHAPTHAL AMRELI AMRELI CHIYADIYA AMRELI AMRELI DAHIR AMRELI AMRELI DEBALIYA AMRELI AMRELI DEVARAJIA AMRELI AMRELI DURAJA AMRELI AMRELI FATENPUR AMRELI AMRELI GAVDAGA AMRELI AMRELI GIRIYA AMRELI AMRELI HARIPUR AMRELI AMRELI
    [Show full text]
  • Gujarat 1989-74 Draft
    EAR P U R ,Vf.RNMENT OF GUJARAT 1989-74 DRAFT I. /' Uk ^1*^’ ■Mix GOVERNMENT OF GUJARAT General Administratioii D^srtmeBt ( Planning ) FOURTH FIVE YEAR PLAN ( 1969- 74) DRAFT AUGUST 1969 Sub. Katicrsal Systems Unit, K ^ion ^ Insti";ite of Educational Pkniiu-^ I'. i ministration 17.B.SiiAurbiEdo Marg,NewDelhi-110016 m e . N o ........... .............. ............. D a te . PREFACE Ifl the twenty-fourth meeting of the National Development Council held on December, 1st: and 2nd, 1967, it was decided that the Fourth Five Year Plan should covp the period 19^9-70 to 1973-74 and the three year period 1966-67 to 1968-69 should be treated as Anmual Plans period. Accordingly, the proposals for the State’s Fourth Five Year Plan 1969*74 were formulated by the State Government and discussed with the Planning Commis­ sion in December, 1968.. The Fourth Plan is being as a broad frame-work, and the operative Plans will be the Annual Plans widriii the frame-work of the Fourth Plan, The outlay for the Staite’s Draft Fourth PkBl as finalised after discussion with the Planning Commission is placed at Rs. 450^3^ crores. A broad frame-work of the Draft Fourth Plan is given in the following piflges. Sachivalaya, Ahmedabad, > L. R. DALAL, 1st, August 1%9. Qhief Secretary. TABLE OF C0HTENTS I tb m s D b so r Cp tio ^ Paob Noe, CHAPTERS I Introduction .. n Eighteen Years of Planning in Development in Districts .. 21 IV Third Five Year Plan and Annual Plans — A broad review of selected 39 V Approach to the Fourth Plan , .
    [Show full text]
  • IEE: India: Gujarat Solar Power Transmission Project
    Initial Environmental Examination September 2011 IND: Gujarat Solar Power Transmission Project Prepared by Gujarat Energy Transmission Corporation (GETCO) for the Asian Development Bank. ASIAN DEVELOPMENT BANK Project No. 44431 Gujarat Solar Power Transmission Project Initial Environmental Examination Gujarat, India Initial Environmental Examination Report Prepared by Gujarat Energy Transmission Corporation (GETCO) 15 March 2011 The Initial Environmental Examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or Staff, and may be preliminary in nature. Table of Contents ABBREVIATIONS WEIGHTS AND MEASURES 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Project Presentation 2 1.3 Scope of Work and Methodology Adopted 2 1.4 Applicable Environmental Policies and other Legislations 3 2.0 DESCRIPTION OF THE PROJECT 5 2.1 The Project 5 2.2 Transmission Lines Route and Towers Details 6 2.3 Justification of the Project 7 2.4 Location 7 2.5 Project Components 16 2.6 Implementation Plan 17 3.0 DESCRIPTION OF THE ENVIRONMENT 19 3.1 Physical Resources 19 3.2 Economic Development 25 3.3 Social and Cultural Development 28 4.0 SCREENING OF POTENTIAL ENVIRONMENTAL IMPACT AND MITIGATION MEASURES 30 4.1 Route Selection 30 4.2 Environment Impacts and Mitigation Measures 33 4.3 Environmental Management Plan 40 5.0 INSTITUTIONAL REQUIREMENTS AND ENVIRONMENTAL MONITORING PROGRAMME 44 5.1 Institutional Arrangements 44 5.2 Environmental Monitoring Plan 45 5.3 Critical Environmental
    [Show full text]
  • School List for Primary Gyankunj.Xlsx
    List of Schools for implementation of Primary Level S.No. District Block Cluster Code Cluster Village School Code School Name 1 KACHCHH BHACHAU 2401030022 NER KADOL 24010301403 KADOL PRI. SHALA NO 2 2 KACHCHH BHACHAU 2401030002 JUNA KATARIYA KATARIYA JUNA 24010306201 JUNA KATARIYA PRIMARY SHALA 3 KACHCHH ANJAR 2401040020 ANJAR ANJAR 24010407405 ANJAR NAGARPALIKA SHALA NO.5 4 KACHCHH ANJAR 2401040020 ANJAR ANJAR 24010407409 ABDUL KALAM N.P. SHALA NO.9 5 KACHCHH BHUJ 2401050051 LUDIYA KHAVADA 24010500510 KOLIVAS-KHAVADA PRI.SHALA 6 KACHCHH BHUJ 2401050020 KHAVDA JUNA 24010501102 NAVA VAAS PRIMARY SHALA 7 KACHCHH BHUJ 2401050011 MADHAPAR MADHAPAR 24010515909 RAMNAGARI PRI. SCHOOL 8 KACHCHH BHUJ 2401050011 MADHAPAR MADHAPAR 24010515915 SONAPURI PRI SCHOOL 9 KACHCHH BHUJ 2401050028 BHUJ SHALA GROUP-3 BHUJ(OTHER SCHOOLS) 24010520031 SHIVRA MANDAP PRI SHALA 10 KACHCHH BHUJ 2401050028 BHUJ SHALA GROUP-3 BHUJ(OTHER SCHOOLS) 24010520032 RAMNAGARI PANCH. PRI SHALA 11 KACHCHH BHUJ 2401050028 BHUJ SHALA GROUP-3 BHUJ(OTHER SCHOOLS) 24010520033 AZADNAGAR SHALA NO.19 12 KACHCHH BHUJ 2401050028 BHUJ SHALA GROUP-3 BHUJ(OTHER SCHOOLS) 24010520036 PANCH. PRI SHALA NO.18 BHUJ 13 KACHCHH ABDASA 2401070005 DUMRA KUMAR DUMRA 24010714902 DUMRA KANYA SHALA 14 KACHCHH MANDVI 2401080010 GADHSHISHA GADHSISA 24010801308 GADHSHISA MAFATNAGAR PRI. SCHOOL 15 KACHCHH MUNDRA 2401090012 BHUJPUR MOTI BHUJPAR 24010904103 BHUJPUR PRIMARY SHALA - 1 16 KACHCHH MUNDRA 2401090012 BHUJPUR MOTI BHUJPAR 24010904107 KHAKHARAVAS PRI SHALA 17 KACHCHH GANDHIDHAM 2401100012 MAHESHWARINAGAR GANDHIDHAM 24011001017 AHIRVAS PRIMARY SHALA 18 BANAS KANTHA AMIRGADH 2402010012 KIDOTAR ISVANI 24020100301 ISVANI PRI. SCH. 19 BANAS KANTHA AMIRGADH 2402010001 AMIRGADH KHUNIYA 24020101202 DABHIFALI PRIMARY SCHOOL 20 BANAS KANTHA AMIRGADH 2402010001 AMIRGADH NICHLOBANDH 24020101301 NICHLO BANDH PRI.
    [Show full text]
  • LEAGT'e of NATIONS Communicated to the Council And
    LEAGT'E OF NATIONS Communicated to the C.11.M.11.1946.XI. Council and the Members (0.C/A.K.1942/57) of the League. ANNEX (Issued in English only). Geneva, January 22nd, 1946. TRAFFIC IN OPIUM AND OTHER DANGEROUS DRUGS. ANNUAL REPORTS BY GOVERNMENTS FOR 1942. INDIAN STATES. Communicated by the Government of India. Note by the Acting,. Secretary-General. In accordance with Article 21 of. the Convention of 1931 for limiting the Manufacture and regulating the Distribution of Narcotic Drugs, the Acting Secretary-General has the honour to communicate the above-mentioned report to the parties to the Convention. The report is also communicated to other States and to the Advisory Committee on Traffic in Opium and other Dangerous Drugs. (For the form of annual reports, see document.0.C .1600). NOTE ON PRODUCTION, CONSUMPTION, IMPORT AND EXPORT, ETC. OF OPIUM AND OTHER DANGEROUS DRUGS IN INDIAN STATES RELATING TO THE YEAR 1942.. NOTE.- Wherever figures for the calendar year‘-1942 are not available they have been given for the Hindi Sammat 1999 which corresponds closely to the British Indian financial year 1942-43. In certain cases they have.also been given for the State financial year 1941-42 which generally began either from October 1st or November 1 st, 1941. 1. General position regarding use., manufacture and sale of each drug separately.- The position during the year under report was practically the same as reported in the ’Note' for the previous year. The States are now fully conscious of the evil effects of drug addiction and the measures which they have adopted to suppress this pernicious habit have been-satisfactory.
    [Show full text]
  • Flood Risk Management & Mechanism of Early
    Concept Note For Webinar On FLOOD RISK MANAGEMENT & MECHANISM OF EARLY WARNING SYSTEMS Dated: 28th October, 2020 15:00-17:00 Hours Gujarat Institute of Disaster Management B/H, PDPU, Koba-Gandhinagar Highway, Village-Raisan, District Gandhinagar Ph. 079-23275804/ www.gidm.gujarat.gov.in 1. INTRODUCTION Human beings have been at the mercy of natural hazards since the beginning of life on this planet. Floods, fires, earthquakes and tremors, mudslides, volcanic eruptions, hurricanes, tornadoes, tsunami, tropical storms, ice storms, landslides, droughts and famine consistently remind us of how vulnerable we are. Disasters occurring at present are much more in magnitude and frequency as compared to earlier times. In addition, the specific and varying characteristics of every event prohibit us to take one size fit all approach. Although disasters cannot be prevented fully, however, their impact can be reduced with better DRR strategies aided by latest technological development. Failure of levees and dams and inadequate drainage in urban areas can also result in flooding. Although loss of life to floods during the past half-century has declined, mostly because of improved warning systems and awareness among the masses economic losses have continued to rise due to increased urbanization and development. Following are the target audience for the training programme: Senior officers/ engineers from District administration and from State government departments of Narmada and Water Resources, Water Supply and Kalpsar Department, Government of Gujarat in c losses. 2. AIM & OBJECTIVES The webinar is designed with the following objectives in the field of Flood Risk Early Warning are as follows:- 1. Discuss various existing technologies in flood risk mitigation, 2.
    [Show full text]