Hydraulic and Mechanical Equipment

Total Page:16

File Type:pdf, Size:1020Kb

Hydraulic and Mechanical Equipment Design Standards No. 6 Hydraulic and Mechanical Equipment Chapter 11: Heating, Ventilation, and Air-Conditioning Systems Phase 4 Final U.S. Department of the Interior Bureau of Reclamation August 2013 Mission Statements The U.S. Department of the Interior protects America’s natural resources and heritage, honors our cultures and tribal communities, and supplies the energy to power our future. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Design Standards Signature Sheet Design Standards No. 6 Hydraulic and Mechanical Equipment DS-6(11): Phase 4 Final August 2013 Chapter 11: Heating, Ventilation, and Air-Conditioning Systems Foreword Purpose The Bureau of Reclamation (Reclamation) design standards present technical requirements and processes to enable design professionals to prepare design documents and reports necessary to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Compliance with these design standards assists in the development and improvement of Reclamation facilities in a way that protects the public's health, safety, and welfare; recognizes needs of all stakeholders; and achieves lasting value and functionality necessary for Reclamation facilities. Responsible designers accomplish this goal through compliance with these design standards and all other applicable technical codes, as well as incorporation of the stakeholders’ vision and values, that are then reflected in the constructed facilities. Application of Design Standards Reclamation design activities, whether performed by Reclamation or by a non-Reclamation entity, must be performed in accordance with established Reclamation design criteria and standards, and approved national design standards, if applicable. Exceptions to this requirement shall be in accordance with provisions of Reclamation Manual Policy, Performing Design and Construction Activities, FAC P03. In addition to these design standards, designers shall integrate sound engineering judgment, applicable national codes and design standards, site-specific technical considerations, and project-specific considerations to ensure suitable designs are produced that protect the public's investment and safety. Designers shall use the most current edition of national codes and design standards consistent with Reclamation design standards. Reclamation design standards may include exceptions to requirements of national codes and design standards. Proposed Revisions Reclamation designers should inform the Technical Service Center (TSC), via Reclamation’s Design Standards Website notification procedure, of any recommended updates or changes to Reclamation design standards to meet current and/or improved design practices. Chapter Signature Sheet Bureau of Reclamation Technical Service Center Design Standards No. 6 Hydraulic and Mechanical Equipment Chapter 11: Heating, Ventilation, and Air-Conditioning Systems DS-6(11):1 Phase 4 Final August 2013 1 DS-6(11) refers to Design Standards No. 6, chapter 11. Prepa d by: chael Weems chanicai Engineer, echanical Equipment Group, 86-68410 k Dawson, Date hanical Engineer, Mechanical EquipmentGroup, 86-68410 Peer Review: William M traw, P.E. Date Manager, Mechanical Equipm nt Group, 86-68410 Security Review: David Hulse Mechanical Engineer, Hydraulic Equipment Group, 86-68420 Submitted: George Girgis, RE Date Chief, Infrastructure Services Division, 86-68400 Approved: / Tom Luebke, RE. Director, Technical Service Center Contents Page Chapter 11: Heating, Ventilation, and Air Conditioning Systems 11.1 Scope of Chapter............................................................................ 11-1 11.2 General Considerations.................................................................. 11-1 11.2.1 Codes and Standards...................................................... 11-1 11.3 Levels of Design ............................................................................ 11-3 11.3.1 Appraisal Level .............................................................. 11-4 11.3.1.1 General......................................................... 11-4 11.3.1.2 Equipment Sizing and Selection .................. 11-4 11.3.1.3 Construction Documents .............................. 11-4 11.3.2 Feasibility Level............................................................. 11-5 11.3.2.1 General......................................................... 11-5 11.3.2.2 Equipment Sizing and Selection .................. 11-5 11.3.2.3 Construction Documents .............................. 11-6 11.3.3 Final Design................................................................... 11-6 11.3.3.1 General......................................................... 11-6 11.3.3.2 Equipment Sizing and Selection .................. 11-6 11.3.3.3 Construction Documents .............................. 11-7 11.4 Submission Requirements .............................................................. 11-8 11.4.1 Drawings........................................................................ 11-8 11.4.1.1 Drawing Size................................................ 11-8 11.4.1.2 Drawing Lettering........................................ 11-8 11.4.1.3 Drawing Scale.............................................. 11-8 11.4.1.4 Computer-Aided Design Standards ............. 11-9 11.5 Design Criteria............................................................................... 11-9 11.5.1 Outdoor Design Criteria................................................. 11-9 11.5.2 Indoor Design Criteria ................................................... 11-9 11.5.2.1 Indoor Design Temperatures and Relative Humidity ................................................... 11-9 11.5.2.2 Limitation of Supply Air Temperature ...... 11-10 11.5.2.3 Indoor Air Quality...................................... 11-10 11.5.2.4 Occupancy Levels...................................... 11-10 11.5.2.5 Equipment Power Densities ....................... 11-11 11.5.2.6 Lighting Power Densities........................... 11-11 11.5.2.7 Acoustical Design Criteria......................... 11-11 11.5.3 HVAC Loads Calculations .......................................... 11-11 11.5.3.1 Energy Calculations................................... 11-12 11.5.3.2 Load Calculations and Weather Conditions ............................................... 11-13 11.5.4 HVAC System Controls ............................................... 11-13 11.5.4.1 General Considerations.............................. 11-13 11.5.4.2 Energy Management and Conservation ..... 11-13 DS-6(11) August 2013 11-i Contents (continued) Page 11.5.4.3 Heating....................................................... 11-14 11.5.4.4 Cooling....................................................... 11-15 11.5.4.5 Fan Economizer Systems ........................... 11-15 11.6 Building Types............................................................................. 11-15 11.6.1 Office Buildings........................................................... 11-15 11.6.1.1 Design Considerations ............................... 11-15 11.6.1.2 Building Automation System ..................... 11-15 11.6.1.3 Building Pressurization.............................. 11-15 11.6.1.4 Indoor Air Quality...................................... 11-16 11.6.1.5 Thermostatic Zoning Design Criteria ........ 11-16 11.6.2 Power Plants, Pumping Plants, and Water Treatment Plants......................................................................... 11-16 11.6.2.1 Design Considerations ............................... 11-16 11.6.2.2 Special Environmental Conditions ............ 11-16 11.6.2.3 Redundant Systems or Equipment ............. 11-17 11.6.2.4 Basic HVAC Scheme ................................. 11-17 11.6.3 Prefabricated Control Buildings .................................. 11-18 11.6.3.1 General....................................................... 11-18 11.6.4 Confined Spaces: Gate Chambers, Tunnels, Shafts, Vaults, and Underground Structures......................... 11-18 11.6.4.1 General....................................................... 11-18 11.6.4.2 Air Quality Standards ................................ 11-19 11.6.5 Enclosed Stairwells and Elevator Shafts...................... 11-19 11.6.5.1 Ventilation.................................................. 11-19 11.6.5.2 Pressurization............................................. 11-20 11.7 Smoke Exhaust ............................................................................. 11-20 11.8 Service Space Requirements ........................................................ 11-20 11.8.1 Service Access ............................................................. 11-20 11.8.2 Roof-Mounted Equipment ........................................... 11-21 11.8.3 Equipment Pads ........................................................... 11-21 11.9 Specific Space Criteria................................................................. 11-21 11.9.1 Mechanical Rooms....................................................... 11-21 11.9.2 Chiller Equipment Rooms ............................................ 11-22 11.9.3 Electrical Equipment Rooms ....................................... 11-22 11.9.4 Fire Pump Rooms ........................................................ 11-22 11.9.5 Communications Closets ............................................
Recommended publications
  • System 636 Flue Gas Venting Finds Home in HGTV Celebrity Scott Mcgillivray's New House
    The Mechanical Pipeline System 636® Flue Gas Venting Finds Home in HGTV Celebrity PROJECT SUMMARY Scott McGillivray’s New House • Approx. 10,000 sq.ft. house cott McGillivray fixes homes on • 3 furnaces TV in front of a ginormous McGillivray approached IPEX audience but he’s not just another • 1 combination heating/ S to provide piping, conduit celebrity. Scott makes a living from his domestic hot water boiler expertise in construction with more than and venting for his home • All natural gas equipment 10 years of contracting experience (plus because of IPEX’s reputation vented with System 636® some charm thrown in there). PVC and CPVC piping for having a broad range of Based on his building material knowledge, top-notch products. he also promotes the use of vinyl products for residential applications as a member of the Vinyl Council of Canada. are fundamental aspects of the home’s construction. At Home North of Toronto With this in mind, McGillivray approached Scott’s company, The McGillivray IPEX to provide piping, conduit and venting Group, created a new show, Moving for his home because of IPEX’s reputation the McGillivrays, which documents the for providing a broad range of high-quality construction of Scott’s new house located themoplastic products. on a large lot north of Toronto, Ontario. Built on 2 acres of land, this dwelling is closer to “We supplied anything we manufacture the size of a small commercial building than that his house needed,” said Steve Barker, the average home. senior account manager at IPEX HomeRite Products, the residential arm of IPEX Inc.
    [Show full text]
  • Mechanical General Requirements
    UNIVERSITY OF WASHINGTON Mechanical Facilities Services Design Guide General Requirements Basis of Design This section applies to the general mechanical requirements for all Division 15 work. Background This section is intended to assist the Mechanical Engineer and other design team members during the design process by answering questions about how the University builds, operates, and maintains mechanical systems in buildings. If there are questions about this information or proposals of alternate solutions, discuss them with the Project Manager and Engineering Services. Programming Design facilities to minimize annual operating costs and future repair and replacement costs. This document is written primarily for the Seattle campus. Facility design standards can vary for the Tacoma campus, Bothell campus and off-site facilities. Review each project with the Project Manager and Engineering Services to determine exceptions to the Facilities Services Design Guide as appropriate. State these exceptions clearly in the Technical Program. The Central Power Plant (CPP) and West Campus Utility Plant (WCUP) provide utilities to the buildings adjacent to the utility tunnel system. This includes all buildings on the central, south, and southwest campuses and most of the buildings on the east campus and along Campus Parkway. Mechanical utilities from the CPP include steam, condensate return, central cooling water and compressed air. Mechanical utilities from the WCUP include central cooling water. Due to the capacity and hydraulics limitations of these system, verify the addition of new loads onto these systems with Engineering Services. Mechanical rooms need to be large enough to house the equipment and provide adequately sized access pathways for the repair, maintenance, and eventual replacement of the equipment.
    [Show full text]
  • The Impact of Air Well Geometry in a Malaysian Single Storey Terraced House
    sustainability Article The Impact of Air Well Geometry in a Malaysian Single Storey Terraced House Pau Chung Leng 1, Mohd Hamdan Ahmad 1,*, Dilshan Remaz Ossen 2, Gabriel H.T. Ling 1,* , Samsiah Abdullah 1, Eeydzah Aminudin 3, Wai Loan Liew 4 and Weng Howe Chan 5 1 Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, Johor 81300, Malaysia; [email protected] (P.C.L.); [email protected] (S.A.) 2 Department of Architecture Engineering, Kingdom University, Riffa 40434, Bahrain; [email protected] 3 School of Civil Engineering, Faculty of Engineering, Universiti Teknologi Malaysia, Johor 81300, Malaysia; [email protected] 4 School of Professional and Continuing Education, Faculty of Engineering, Universiti Teknologi Malaysia, Johor 81300, Malaysia; [email protected] 5 School of Computing, Faculty of Engineering, Universiti Teknologi Malaysia, Johor 81300, Malaysia; [email protected] * Correspondence: [email protected] (M.H.A.); [email protected] (G.H.T.L.); Tel.: +60-19-731-5756 (M.H.A.); +60-14-619-9363 (G.H.T.L.) Received: 3 September 2019; Accepted: 24 September 2019; Published: 16 October 2019 Abstract: In Malaysia, terraced housing hardly provides thermal comfort to the occupants. More often than not, mechanical cooling, which is an energy consuming component, contributes to outdoor heat dissipation that leads to an urban heat island effect. Alternatively, encouraging natural ventilation can eliminate heat from the indoor environment. Unfortunately, with static outdoor air conditioning and lack of windows in terraced houses, the conventional ventilation technique does not work well, even for houses with an air well. Hence, this research investigated ways to maximize natural ventilation in terraced housing by exploring the air well configurations.
    [Show full text]
  • Boiler Replacement Project Drawings
    GENERAL NOTES OFFSET PIPING WHERE REQUIRED TO ALLOW CLEARANCE OF DUCTS, ELECTRICAL CONDUIT, OUTLET BOXES, BEAMS, ETC. TO AVOID INTERFERENCE WITH THE WORK OF OTHER TRADES. TO INCREASE HEAD ROOM UNDER PIPING OR TO IMPROVE THE APPEARANCE OF PIPE WORK, THIS CONTRACTOR SHALL OFFSET ANY PIPING AS DIRECTED BY THE ARCHITECT/ENGINEER AND SHALL PROPERLY DRAIN OF VENT SAME WHERE NECESSARY. MAKE ALLOWANCES IN THE BID THERETO. 02/04/2020 THIS CONTRACTOR SHALL FIELD VERIFY LOCATIONS FOR ALL DUCTWORK AND PIPING FOR DATE THE INSTALLATION PRIOR TO FABRICATION. THIS CONTRACTOR SHALL COORDINATE HIS WORK WITH THE OTHER CONTRACTORS ON THE PROJECT AND INSTALL MECHANICAL SYSTEMS IN A MANNER WHICH WILL CONFORM TO STRUCTURE, KEEP PASSAGEWAYS AND OPENINGS CLEAR, PRESERVE HEAD ROOM, CLEAR LIGHT FIXTURES AND NOT COVER UP JUNCTION BOXES. THIS CONTRACTOR SHALL MAKE OFFSETS BKB RJA 19590 IN PIPING OR DUCTWORK TO AVOID INTERFERENCE WITH OTHER TRADES, AT NO ADDITIONAL COST TO THE OWNER, WHEN SO DIRECTED BY THE ARCHITECT/ENGINEER. WHERE PIPING IS CONNECTED TO EQUIPMENT OR PLUMBING FIXTURES THAT ARE BEING BOILER REPLACEMENT REMOVED, THE PIPING SHALL BE REMOVED COMPLETELY (UNLESS NOTED OTHERWISE) FROM THE REMODELED SPACE AND CAPPED AT OR NEAR THE MAINS. PLUMBING PIPING THAT IS LOCATED IN A WALL TO BE REMOVED SHALL BE REMOVED (IF NOT ACTIVE) AND CAPPED AT NORTH DAKOTA DEPARTMENT OF TRANSPORTATION THE MAIN LINE OR OUT OF THE REMODELED SPACE. BISMARCK, NORTH DAKOTA PIPING VALVE & STANDARD ACCESSORY LEGEND ABBREVIATIONS DRAWN BY BY CHECKED JOBNO. BALL VALVE AD - ACCESS DOOR AFF - ABOVE FINISHED FLOOR BALL VALVE INDICATOR AFG - ABOVE FINISHED GRADE DESIGN TEAM DRAWING SHEETS BUTTERFLY VALVE ATC - AUTOMATIC TEMPERATURE GATE VALVE CONTROLS BDD - BACKDRAFT DAMPER PRAIRIE ENGINEERING, P.C.
    [Show full text]
  • 2.8 Mechanical Systems 2.8.1 General Considerations General
    2.8 Mechanical Systems 2.8.1 General Considerations General Guidelines Intent This section explains the university's expectations regarding the design of effective mechanical systems. Daily operation of the building depends on durable and efficient mechanical systems. Resources Resources available to designers are the following: NC Building Code ASHRAE and SMACNA Guidebooks NC State Construction Manual Vendor's literature On-campus Facilities Design and Operations personnel Documentation Sufficient information must be included on the plans and specifications not only to construct the project with few or no change orders, but to allow future troubleshooting and expansion of design work. Paths of access to equipment should be shown on the drawings. Where two or more services are to occupy the same mechanical room, proper coordination is necessary. Designers are expected to field-verify all existing conditions, and not to rely on available prints. Design Criteria General Characteristics Designers engaged in providing the design of mechanical systems for campus buildings and grounds should plan energy efficient systems which are long-lived and easy to operate and maintain. The scope of new projects shall include any necessary campus utility extensions and relocations to serve the building being designed. When extensions and/or connections are made to the building, the designer should concentrate and run such utility lines under sidewalks or parallel to roads where they can be accessed in all weather conditions. All efforts should be made to avoid disturbance of any area within the drip line of trees when routing underground lines. Planning to Reduce Site Clutter The designer must take every effort to consolidate mechanical and electrical equipment on the building site.
    [Show full text]
  • Green Mechanical Contractor Spring 2011
    Cover Story By Dave Yates Holy Energy Conservation! offi ces and lounge were noisy, ineffi cient, and several were A steam boiler that runs 24/7 no longer operational. e 16 one-ton through-the-wall A/C units in the sanc- until somebody turns off its tuary incorporated a hot water coil for heating and, over time, the committee had learned to cover the exterior grills power is just one of the energy with cardboard during winter to avoid messy and costly freeze-damage from split coils. With another hot sum- hogs at this comprehensive mer approaching, and several non-functioning TTW A/C units, they were feeling the heat from the congregation to church retrofit project. fi nalize plans. During their three-year journey, they had met with several ome would classify the following story as green mechanical contractors and knew the church needed a sys- or combating global warming or even as saving tem-wide renovation. And that’s where you and I begin our the planet. I would simply call it a common-sense trip through this process. e property committee requested approach to energy conservation while designing a proposal to replace their systems. During our initial visit, an HVAC system’s replacement to take advantage we’ll discover the following: Sof today’s effi cient and reliable equipment. is one garners no Federal tax credit because it involves a church. Come A 1964 STEAM BOILER along for a trip through this process — from inception to e steam boiler, replaced in 1964, is fi ring at 1.8 million- delivery — and I’ll share with you the process I use and some Btuh.
    [Show full text]
  • Mechanical Equipment Rooms Safety and Best Practices
    Mechanical Equipment Rooms Safety and Best Practices Because every life has a purpose... Mechanical Equipment Rooms Importance of monitoring refrigerant and combustible gases within Mechanical Rooms A building’s mechanical room is the hub of its heating, ventilation and air conditioning system. This can include central utility plants, boiler and chiller rooms, mechanical and electrical rooms and fuel rooms. The equipment within these rooms has the potential to leak harmful combustible or toxic gases, including costly and environmentally harmful refrigerant gases. Refrigerant gas is considered a toxic gas and although refrigerants have low toxicity, at high concentrations they can displace oxygen. Oxygen deficiency can cause serious injury or death to workers. Furthermore, these chemicals are controlled substances by the Environmental Protection Agency, which means not only are they dangerous to worker health and safety, but they are harmful to the environment. Many of these refrigerants are categorized as ozone depleting substances and are highly monitored. Gas monitors satisfy the requirements for equipment room emissions included in EPA regulations. In addition to the Environmental Protection Agency, there are specific requirements of ASHRAE standard 15 and applicable local building codes. ASHRAE 15 states: • Each machinery room shall contain a detector located where a refrigerant leak would concentrate. • The detector shall trigger an audible and visual alarm both inside and outside the mechanical room and activate mechanical ventilation. For economic reasons refrigerant leak detection is encouraged due to costs associated with refrigerant leaks. The Complete Solution The Chillgard® 5000 is the most selective and sensitive refrigerant leak detector on the market. With the ability to read down Sample line to 1 ppm, this monitor provides the earliest Relay wiring response to leaks.
    [Show full text]
  • A Complete Radiant Mechanical Room Designed in a Compact, Preassembled, Easy-To-Install Panel Ii Radiant Ready 30ETM Installation Guide
    Radiant FlooR Heating Sy StemS Radiant Ready 30e tM installation guide A complete radiant mechanical room designed in a compact, preassembled, easy-to-install panel ii www.uponorpro.com Radiant Ready 30ETM Installation Guide table of Contents section 1: overview. 1 section 2: installation Requirements. 3 Required Components . 3 main Power Supply Wiring . 3 Ratings and Specifications at 240VaC (single phase) . 3 low-voltage Wiring . 3 section 3: Mounting. 5 Package Contents . 5 Required tools . 5 Hanging Requirements . 5 orientation . 5 mounting options . 5 section 4: electrical Power Connections . 7 Required tools . 7 Wiring . 7 Ratings and Specifications at 240VaC (single phase) . 7 Wiring diagram . 8 section 5: Piping Connections . 9 tubing types . 9 Fitting types . 9 System Fluid . 10 Required tools . 10 Connecting tubing to the manifold . 10 general tips . 10 section 6: Filling and Purging . 11 Required equipment . 11 Filling and Purging Procedure . 11 section 7: system startup . 15 Boiler Setpoint . 15 Pump Setting . 15 Pump Curve . 15 Startup Sequence . 15 section 8: Basic operation and Maintenance . 17 Basic operation and maintenance (Homeowner) . 17 Startup . 17 Shutdown . 17 exercise Pump . 17 glycol maintenance . 17 Radiant Ready 30e installation guide iii maintenance guidelines (Contractor) . 17 glycol maintenance . 17 Replacing Pump or Pump Cartridge assembly . 18 Replacing the expansion tank . 18 Replacing Fuses inside the Unit . 19 Replacing elements . 19 section 9: Boiler Control settings . 21 Fixed Setpoint mode (outdoor Sensor not installed) . 21 outdoor Reset mode (outdoor Sensor installed) . 21 Boiler Control display . 21 Control operation . 22 adjustment Procedure . 22 target temperature Fine adjustments . 22 Boost System operation . 22 Cancelling Boost .
    [Show full text]
  • HIGH-EFFICIENCY FURNACE INSTALLATION GUIDE for EXISTING HOUSES Important Considerations for Contractors and Homeowners
    HIGH-EFFICIENCY FURNACE INSTALLATION GUIDE FOR EXISTING HOUSES Important Considerations for Contractors and Homeowners This Guide was developed to provide contractors and homeowners with general information on best practice approaches to installing high- efficiency (replacement) furnaces in existing residential and small commercial buildings. DRAFT Table of Contents FOREWORD . 3 OVERVIEW . 4 HOMEOWNER SECTION . 5 House as a system . 5 Hints and tips . 6 identifying quality installations . 7 example quotation sheet . 8 CONTRACTOR SECTION . 9 steps to a better installation . 9 Pre-changeout. 11 Installation. 13 commissioning. 16 education and maintenance . 17 challenges and solutions . 18 example quotation sheet . 26 ADDITIONAL RESOURCES . 27 APPENDIX A . 28 hvac venting and condensate management bulletin . 29 2 | HIGH-EFFICIENCY FURNACE INSTALLATION GUIDE FOR EXISTING HOUSES Foreword This Guide provides homeowners and HVAC contractors with general information on completing high- efficiency furnace retrofits. It provides an overview of key steps involved in the furnace retrofit process including pre-changeout, installation, commissioning, and education and maintenance. Additionally, common challenges encountered by HVAC contractors during furnace installation are covered with suggested solutions for overcoming these barriers discussed. This publication is not intended to replace residential furnace installation training materials developed for HVAC contractors. Acknowledgements This publication was developed through consultation with many individuals and organizations involved in the residential furnace industry. This Guide would not have been possible without the support and guidance of FortisBC, the Province of British Columbia, the Thermal Environmental Comfort Association (TECA), the Heating, Refrigeration, and Air Conditioning Institute of Canada (HRAI), and Energy Star®. This Guide was prepared by RDH Building Science Inc.
    [Show full text]
  • Mechanical January 2019
    White Bear Lake Area Department of Inspections 4701 Highway 61, White Bear Lake, MN 55110 Phone: 651-429-8518 / Fax: 651-429-8503 www.whitebearlake.org Mechanical January 2019 This handout is a summary of the permit & inspection process as well as standard requirements based on State Building Code regarding Mechanical work. Information contained herein does not contain all of the specific codes for construction, and shall only be used as a guide. Mechanical Contractors are required to obtain a White Bear Lake Class II Mechanical License. The contractor must retain a mechanical bond with the State of Minnesota, complete the White Bear Lake application and submit a current certificate of insurance with White Bear Lake listed as the certificate holder. White Bear Lake Class II Mechanical Licenses are good from January 1st through December 31st annually. The fee is $45.00 per year and prorated to $35.00 if is license obtained after July 1st. Permit Submission Requirements: Completed Mechanical Permit Application, including valuation (materials & labor costs). Contractor must be licensed in The City of White Bear Lake (Class II Mechanical License). Two copies of Mechanical Plans for Commercial projects. Mechanical Permit Fees: See the White Bear Lake Fee Schedule at www.whitebearlake.org Licensing Requirements: Mechanical contractors are required to have a Mechanical Bond with the State of Minnesota and obtain a Class II Mechanical License in the White Bear Lake or Mahtomedi, pending where the job is located. City of White Bear Lake (valid January 1st – December 31st, $45.00 and prorated to $35 after July 1st).
    [Show full text]
  • Solar Project Checklist 07-2021.1.Xlsx
    Solar Project Checklist PROJECT INFORMATION: Heating Representative, or Project Facilitator: Solar Project Details: Name: Address: Company: City: City: State/Prov: State/Prov: Zip/Postal Code: Tel.: Closest major city: Email: *Proposed budget for the solar project (materials + installation) $ New Construction Retrofit General sizing guidelines for domestic hot water preheat systems including estimated solar material costs 1-2 people = 1x Vitosol 200-FM collector + 160L Vitocell preheat tank ≈ $5,700 - $6,700 CAD 3 people = 2x Vitosol 200-FM collectors + 300L Vitocell preheat tank ≈ $8,700 - $10,200 CAD *Estimated Cost* 4-5 people = 3x Vitosol 200-FM collectors + 300L Vitocell preheat tank ≈ $11,700 - $13,750 CAD Based on List Pricing 6-7 people = 4x Vitosol 200-FM collectors + 450L Vitocell preheat tank ≈ $14,700 - $17,250 CAD *Installation must be completed by a certified contractor at additional costs. Viessmann does not offer installation services. PROJECT SUPPORT REQUEST TYPE: Solar Thermal Simulation Sample Piping Layout Drawing Material Quotation SOLAR LOAD TYPE: DHW Pre-Heating Swimming Pool Heating Space Heating Support (Spring and Fall) COLLECTOR INSTALLATION AREA DATA: Solar installation location: Sloped Roof (angles between: 10° and 80°) Flat roof (angles between: 25° and 80°) Wall mount (angles between: 45° and 80°) Ground mount (angles between: 25° and 80°) Installation deviation from due South: West South-West South South-East East 90° 75° 60° 45° 30° 15° 0° 15° 30° 45° 60° 75° 90° Desired collector installation angle (from the horizontal plane): 10° 15° 20° 25° 30° 35° 40° 45° 50° 55° 60° 65° 70° 75° 80° Sloped Roof Pitch 1/12 (4.8°) 2/12 (9.5°) 3/12 (14°) 4/12 (18.4°) 5/12 (22.6°) 6/12 (26.6°) 7/12 (30.3°) 8/12 (33.7°) 9/12 (36.9°) 10/12 (39.8°) 11/12 (42.5°) 12/12 (45°) Available Roof Surface Area: Length (East-West): ft m Width (North-South): ft m • Please provide drawings of area showing overall dimensions, building orientation, any roof obstructions (e.g.
    [Show full text]
  • Mechanical Room Equipment Prospecting Guide Uncover Table of Opportunities Contents
    Mechanical Room Equipment Prospecting Guide Uncover Table of opportunities contents Overview: What’s in a mechanical room This prospecting guide is designed to help 04 05 Why is it important to the customer you identify air compressor and vacuum 05 Why is it important to you replacement product opportunities. Review 06 Identifying the opportunity the guide to help you understand the unique 06 Situation Assessment needs of the dental practice when it comes 08 Discovery questions to mechanical room equipment and how you 14 Next steps can position yourself as a business partner and 15 Solution Dry Vacuums increase your sales. 16 24 Wet Vacuums 28 Air Compressors 32 Resources 2 3 Overview: What’s in a mechanical WHY IS IT IMPORTANT TO THE CUSTOMER? It’s out of sight and out of mind; however, the mechanical room? room holds the heart and lungs of the dental office. Proper maintenance is essential, because if the vacuum or compressor fails, the practice is brought to a standstill. VACUUM Essential in helping to keep the oral If the mechanicals aren’t working, the practice isn’t cavity clean during dental procedures. working The vacuum also contributes to • Patients turned away patient comfort by powering tools • Staff non-productive that evacuate saliva and other liquids • Expensive to repair or replace from the patient’s mouth. • Overall loss of patients due to negative experience COMPRESSOR WHY IS IT IMPORTANT TO YOU? Compresses, cleans, dries and stores • $100,000 sales opportunity air so that handpieces, dental units • By identifying issues before they impact the practice, you and syringes operate effectively.
    [Show full text]