Pre-Feasibility Report
Total Page:16
File Type:pdf, Size:1020Kb
PRE-FEASIBILITY REPORT FOR ORDINARY EARTH EXCAVATION PROJECT (Extracting Ordinary Earth from 0.4725 Ha of property out of the total extends 0.6033Ha. ) At Mulanthuruthy Village Block 24, Re- Survey No.321/9 Panchayath : Mulanthuruthy Taluk : Kanayannoor District : Ernakulam OF Mr. Paulose P M Pathappilil House, Pulickamaly P. O, Mulanthuruthy-682314 Prepared By: Nazer Ahamed K. V (RQP) NAZAR AHAMED K.V MANAGING DIRECTOR N SQUARE MINING &ENVIORMENTAL SOLUTIONS LLP. RQP NO: DMG/KERALA/RQP/7/2016. Paulose P M (Applicant): INDEX Contents 1. Executive Summary 2. Introduction of the Project / Background Information 3. Project Description 4. Site Analysis 5. Planning Brief 6. Proposed Infrastructure 7. Rehabilitation and Resettlement (R & R) Plan 8. Project Schedule & Cost Estimates 9. Analysis of Proposal FORM - IM (I) Basic Information S.No. Item Details 1 Name of the Mining Lease site Pathappilil site in MulanthuruthyVillage 2 Location/Site (GPS Coordinates) S.No. Latitude Longitude 1 9°53'53.52"N 76°24'56.37"E 2 9°53'53.56"N 76°24'53.85"E 3 9°53'57.34"N 76°24'55.93"E 4 9°53'56.62"N 76°24'54.64"E Sri.P M Paulose Pathappilil House Pulickamaly p. O Mulanthuruthy 3 Size of the Mining Lease Area – 0.4725 Ha. 4 Capacity of Mining lease (t) 8000 M3 5 Period of mining lease 1 Years 6 Expected Cost of the Project Rs.10 Lakhs 7 Contact Information Sri.P M Paulose Pathappilil House Pulickamaly p. O Mulanthuruthy (II) Environmental Sensitivity Areas Distance in Kilometers Details S.No. 1 Distance of project site from nearest rail or The nearest Railway Line is Ernakulam- Kottaya m road bridge over the concerned River, is at a distance of 3 Km from the site Rivulet, Nallah etc. 2 Distance from the infrastructural Facilities 1.National Highway NH-85-20 K M 2.State Highway SH 41 -15 K M Kakkanad- Mulanthuruthy& Ernakulam- Pravom Road- 3.Major District Road 2 Km respectevely 4.Any Other Road Karikode- Pilickamaly Road. 4. Electric Transmission line pole or Tower Mulanthuruthy 5.Canal or check dams or reservoirs Nadakavu around 5km away from proposed site or lake or ponds 6.Intake for drinking water pump Required water for drinking purpose is being house provided form the wells drilled at least area. 7.Intake for irrigation canal pumps Nearby wells and ponds from surrounding lands. 3 Areas protected under international No such important or sensitive for ecological reason conventions, national or local legislation for within 10km from the lease area. their ecological, landscape, cultural or other related value 4 Areas which are important or No such important or sensitive for ecological sensitive for ecological reasons - reason within 10km from the lease area. Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 5 Areas used by protected, important or No such important or sensitive for ecological reason sensitive species of flora or fauna for within 10km from the lease area. breeding, nesting, foraging, resting, over wintering, migration 6 Inland, coastal, marine or There are no marine and underground waters are underground waters occurred in the mine area 7 State, National boundaries There is no state / National boundaries are near by the mine area. 8 Routes or facilities used by the public for No routes or facilities are available in the lease area access to recreation or other tourist, pilgrim which is used for recreation or other tourist, pilgrim areas areas. 9 Defense installations The area is not located close to any of the defense installation. 10 Densely populated or built-up area, distance The nearest city Mulanthuruthy which is situated 3.0 Km from nearest human habitation from Proposed Site . 11 Areas occupied by sensitive man- The city Mulanthuruthy is nearest made land uses (hospitals, area for all infrastructure facilities like, schools, places of worship, Schools, Primary Health Centers, Post office community facilities) etc. 12 Areas containing important, high quality or scarce resources (ground water resources, No river is flowing through the lease. Hence no impact is surface resources, forestry, agriculture, anticipated. fisheries, tourism, minerals) 13 Areas already subjected to pollution or environmental damage. (those where None existing legal environmental standards are exceeded) 14 Areas susceptible to natural hazard which could cause the project to present environmental problems(earthquakes, subsidence, None landslides, erosion, flooding or extreme or adverse climatic conditions) 15 Is proposed mining site located over or near None fissure / fracture for ground qwater 16 Whether the proposal involves approval/clearance under: if yes, details of the same and their status No to be given. i. The Forest (Conservation) Act, 1980. ii. The Wildlife (Protection) Act, 1972. iii. The C.R.Z. Notification, 1991 17 Forest land involved No 18 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project 1. EXECUTIVE SUMMARY : Location: Ordinary Earth Excavation site of Mulamthuruthy Village- Pathappillil Poulose P M site is located near Pulickamaly- Karicode and 200 mtr away from Pampra Mahadeva Temple (west) in Mulanthuruthy Village, Kanayannoor Taluk, Ernakulam Dist. It is about 15 km away from District Headquarter Ernakulam. Site is well connected to Kakkanad- Mulanthurithy and ernakulam Piravom Road which connects district headquarters at Ernakulam. Project site is about 3 Km from Mulanthuruthy Railway Station. Drainage system in the region is dendritic. Surface runoff water in the region will be discharged to the natural drainage course. General Details: General Details: Extracting ordinary Earth from 0.4725 Ha of property out of the Total extend 0.6033 Ha of property under the possession of the Applicant, Comprised in Block 24, re-survey no.321/9, in Mulanthuruthy Village, Kannayannoor Taluk. The subject area is away from public properties and there is no objection of the public (consent from adjacent land owners is also encloses with additional attachments) or any litigation also keeping the lateral support from adjacent properties and maintain the bench formation will be done while excavations of ordinary earth. Owing to its massive nature, durability, ease of handling, availability in close proximity to construction sites and low cost, the ordinary earth are in demand for several construction purposes. Ordinary earth are used in almost any type of construction activity. It is also the most important input in domestic activity. Further they are also required by railway projects for track laying and other construction activities. Thus in current times, where the focus of the governments is on improvement of basic infrastructure like roads, railways, dams and other social infrastructure – both in rural and urban areas , there is a constant need for ensuring regular supply of these minor minerals. As per Environmental Impact Assessment Notification dated 14th September, 2006, and subsequent amendments thereof, this project falls under Category “B2” of the list of the Project or activities requiring environmental Clearance prior to operation of quarry/mines from the from the District Environmental Impact Assessment Authority, Ernakulam. Considering the cost of the project, cost towards production, sale value etc, the project is viable and bring some positive benefit directly or indirectly to the nearby locality. Excavated ordinary earth will be utilized for job of laying12” OD pipeline of Kochi Salem LPG pipeline project of M/s. KSPPL. Manufacturing & Production Production Production Capacity 3 Excavation of Ordinary Earth 8000 M This is an Ordinary earth excavation project. Excavated ordinary earth will be utilized for job of laying12” OD pipeline of Kochi Salem LPG pipeline project of M/s. KSPPL. Pollution Control Measures: The major sources of pollution in proposed earth excavation activity will be Particulate Matter (Fugitive emission) generated due to excavation of earth. The surrounding of project area is agricultural in nature with good greenery all around. This will minimize the fugitive emissions. However, during dry season, excavation operation will be carried out after water sprinkling to avoid generation of fugitive dust emissions. No effluent will be generated due to proposed ordinary earth Excavation unit as the water will be used for domestic purposes only. Solid Waste Management: No solid wastes will be generated due to proposed ordinary earth Excavation operation. Project Cost : Total cost of ordinary earth excavation project is approx. Rs. 10,000,00/=. PROJECT DETAILS 2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION : (i) Identification of Project Location of the Project: Ordinary Earth Excavation site of Mulamthuruthy Village- Pathappillil Poulose P M site is located near Pulickamaly- Karicode and 200 mtr away from Pampra Mahadeva Temple (west) in Mulanthuruthy Village, Kanayannoor Taluk, Ernakulam Dist. It is about 15 km away from District Headquarter Ernakulam. Site is well connected to Kakkanad- Mulanthurithy and Ernakulam Piravom Road which connects district headquarters at Ernakulam. Project site is about 3 Km from Mulanthuruthy Railway Station. Site Location Geo Coordinates of the Project site is as under Geo Coordinates of Ordinary Earth Excavation Area. S.No. Latitude Longitude 1 9°53'53.52"N 76°24'56.37"E 2 9°53'53.56"N 76°24'53.85"E 3 9°53'57.34"N 76°24'55.93"E 4 9°53'56.62"N 76°24'54.64"E Location Pic 1 (ii) Brief description of nature of project : This is an ordinary earth excavation project. The proposed ordinary earth excavation does not involve any blasting or rock mining. Mechanized method is used for excavation of ordinary earth and excavation will be carried out using excavators and transportation of material using tippers. The quantity of earth excavated will be 8000 cum.There is no environmental hazard involved in this process.