NIRB Uuktuutinga Ihivriuqhikhamut #125358 Alagalak Gold Project

Uuktuutinga Qanurittuq: New Havaap Qanurittunia: Mineral Exploration Uuktuutinga Ublua: 6/19/2018 2:18:15 PM Period of operation: from 0001-01-01 to 0001-01-01 Piumayaat Angirutinga: from 0001-01-01 to 0001-01-01 Havauhikhaq Ikayuqtinga: Larry Alagalak P9 Box 274 X0C 0E0 Canada Hivayautit Nampanga:: 2049158091, Kayumiktukkut Nampanga:: QANURITTUT Tukihiannaqtunik havaariyauyumayumik uqauhiuyun Qablunaatitut: To obtain authorization to stake, prospect and explore within Kivalliq Region, mainly for precious metals/base metals. Requesting for a two year activity consisting of prospection, mapping, grab sampling and bulk sampling if encouraging results retrieved. The area to prospect is within KIA surface ground.First prospecting activities at MacInnes (63 km’s south of Whale Cove) would start on July 14 to 18, 2018 It will consist of myself and a helper for a total of 15 man days within these prospection target. Travel to location will be by boat and outboard motor. To retrieve approximately 50 grab samples at the prospection target for a total of 50 grab samples. Send samples to assay lab and to provide Progress Report at end of prospection. Uiviititut: as per english Inuktitut: ᐱᓕᕆᐊᒃᓴᒥᑦ ᓇᓗᓇᐃᔭᐃᔪᖅᕿᓄᔪᑕᐅᔪᖅ ᓇᒪᒋᔭᐅᔪᒪᑉᓗᖓ ᕿᔪᖕᓂ ᓇᐸᖅᑎᕆᓂᕐᒥᒃ, ᑭᓂᕐᓂᕐᒥᒃ ᐅᔭᖃᓂᒃ ᖃᐅᔨᓴᕈᑎᒃᓴᓂᒃ ᐅᔭᕋᖅᑕᕆᐊᕐᓂᕐᒧᑦ, ᑭᕙᓕᐅᑉ ᐃᓗᐊᓂᕿᓄᕗᖓ ᐅᑭᐅᓄᑦ ᒪᕈᖕᓄᑦ ᐱᓕᕆᐊᕆᓂᐊᕐᓗᒍ ᕿᓂᕐᓂᕐᒥᒃ ᐅᔭᖃᓂᒃ, ᓄᓇᖑᐊᕐᒧᑦ ᓇᓗᓇᐃᔭᐃᓗᖓ, ᑲᑎᖅᓱᐃᓗᖓ ᖃᐅᔨᓴᖅᑕᐅᒐᔭᖅᑐᓂᒃ ᐅᔭᖃᓂᒃ, ᐊᒥᓱᑲᓐᓂᕐᓂᒃ ᑲᑎᖅᓱᐃᑲᓂᕐᓗᙵ ᐱᔪᒥᓇᖅᐸᑕ ᑲᑎᖅᓱᖃᓚᐅᑕᑲ ᐅᔭᖃᑦ ᖃᐅᔨᓴᖅᑕᐅᒐᓂᖕᓂᖏᑦᓄᓇ ᓇᓗᓇᐃᖅᓯᒪᔭᕋ ᑭᕙᓕᖅ ᐃᓄᐃᑦ ᑲᑐᔨᖃᑎᒌᖏᑕ ᓇᓗᓇᐃᖅᓯᒪᔭᖓᓂᑕ ᖃᖓᓂᑐᖅ ᓄᓇᐅᑉ. ᓯᕗᓕᖅᐸᒥ ᕿᓂᕐᓂᕐᒧᑦ ᐅᔭᖃᓂᒃ ᐱᓕᕆᐊᒃᓴᒧᑦ ᕿᑭᖅᑕᔪᐊᑉ ᖃᓂᒋᔭᖓᓂᑦᑐᖅ ᐊᑎᖃᖅᑐᖅ ᑎᑭᕋᕐᔪᐊᑉ ᑭᕙᑕᓂᖢᓂ 63ᑭᓚᒥᑐᒥᒃ. ᔪᓚᐃ 14ᒥ 18ᒧᑦ, 2018ᒥ ᐱᓕᕆᐊᕆᒐᔭᖅᑕᕋᐱᓕᕆᐊᕆᒐᔭᖅᑕᕋ ᐃᑲᔪᖅᑎᖃᕐᓗᖓ ᐅᑉᓗᓄᑦ 15ᓂᒃ ᑕᒡᕙᓂ ᓇᓗᓇᐃᖅᓯᒪᔪᑉ ᓄᓇᐅᑉ ᐃᓗᐊᓂ ᐅᒥᐊᑯᑦ ᐃᑯᒪᓕᒃᑯᑦ ᐅᕐᓂᒐᔭᖅᑕᕋ50ᓂᒃ ᐴᓯᒪᔪᓂᒃ ᐅᔭᖃᓂᒃ ᑲᑎᖅᓱᐃᕕᒋᒐᔭᖅᑕᕋ ᖃᐅᔨᓴᖅᑕᐅᔪᒃᓴᓂᒃ ᐅᔭᕋᒃᑕᕆᐊᒐᒃᓴᐅᖕᒪᖓᑦ ᓄᓇ ᐊᐅᓚᖅᑎᓗᒋᑦ ᖃᐅᔨᓴᖅᑕᐅᕕᖕᒧᑦᑎᑎᖃᒥᒃ ᐱᕙᓕᐊᓂᑉᑎᑦᓂᒃ ᐅᓂᑳᖅᑐᓂᒃ ᐊᕿᒃᓯᒐᔭᑐᖓ ᑭᖑᓂᖓᒍᑦ ᐱᓕᕆᐊᕆᓂᑯᑉᑎᓂ

Personnel Personnel on site: 3 Days on site: 7 Total Person days: 21 Operations Phase: from 2018-07-20 to 2018-07-30 Hulilukaarutit Inigiya Hulilukaarut Nunannga Initurlinga Initurlinga Qanitqiyauyuq Qanurittuq Qanurittaakhaanik qanuritpa utuqqarnitat qanitqiamut unaluuniit nunallaat Ingilraaqnitat kitulluuniit Uyarannguqtut ahiruqtailiyainnit akhuurninnga nuna Alagalak Mineral Inuit Owned Surface inuit owned unknown 55 miles north of Gold Project Exploration Lands surface lands, Arviat, Nunavut #1 federal government owned sub surface

Nunaliin Ilauyun, Aviktuqhimayuniitunullu Ikayuuhiarunguyun Nunauyuq Atia Timiuyuq Upluani Uqaqatigiyaungmata Arviat MLA Arviat South 2018-06-20 Angiuttauvaktunik Naunaiqlugu nunanga talvani havauhikhaq ittuq: Kivalliq

Angiuttauvaktunik Munariniqmut Angirutinga Tadja Ublua Umikvikhaa Ublua Ayuittiaqtuq Qanurittuq Qanurittaakhaanik Tuniyauyuq/Uuktuqtuq Kivalliq Inuit requesting licence to Applied, Decision Katimayiit prospect and take Pending samples Alaanut Nunavut Planning Applied, Decision Commision, Pending requesting licence to prospect and take samples

Project transportation types Transportation Qanuq Atuqtauniarmangaa Length of Use Type Water i will be taking a boat to the location Land i will be using an atv at the location

Project accomodation types Temporary Camp Alaanut, Ihuaqutivaluin Atuqtauyukhan Hanalrutit atuqtaunahuat (ukuallu ikuutat, pampiutainnik, tingmitinik, akhaluutinik, hunaluuniit) Hanalrutit Qanurittuq Qaffiuyut Aktikkulaanga – Qanuq Atuqtauniarmangaa Qanurittullu Boat 1 18' boat to go to the location and return home ATV 1 5' travel on area to be staked and prospected

Qanurittuq Urhuqyuaq unalu Qayangnaqtut Hunavaluit Aturninnga Qanurittuq Urhuqyuaq Qaffiuyut Qattaryuk Atauttimut Ilanga Qanuq urhuqyuaq Qanurittuq qattaryut Aktikkulaanga Qaffiuyut Atuqtauniarmangaa hunavaluit aturninnga: Gasoline fuel 12 23 276 Liters for use in boat and ATV

Imaqmik Aturninnga Ubluq qanuraaluk (m3) Aturumayain imavaluin Atulirumayain imavaluin utiqtittagaani qanuq utiqtittagani humi 0 water will be used for cooking only will bring water from Arviat Iqqakuq Ikkakunik Munakgiyauyunik Havauhikhaq Qanurittuq Ihumagiyauyuq Qanuq Halummaqtirarnirutikhan Hulilukaarut Iqqakut Qanuraaluktut Iqqakuurniarmangaa piyutin Atuqtait Mineral Exploration Anaagun (inuin .5 cubic meter burn or take home will take all waste home anaaguin)

Avatiliriniqmut Ayurhautingit: the environmental impacts will be minimal , all waste from project will be either burned (human waste) or taken back to Arviat and thrown in trash Additional Information SECTION A1: Project Info

SECTION A2: Allweather Road

SECTION A3: Winter Road

SECTION B1: Project Info

SECTION B2: Exploration Activity

SECTION B3: Geosciences

SECTION B4: Drilling

SECTION B5: Stripping

SECTION B6: Underground Activity

SECTION B7: Waste Rock

SECTION B8: Stockpiles

SECTION B9: Mine Development

SECTION B10: Geology

SECTION B11: Mine

SECTION B12: Mill

SECTION C1: Pits

SECTION D1: Facility

SECTION D2: Facility Construction

SECTION D3: Facility Operation

SECTION D4: Vessel Use

SECTION E1: Offshore Survey

SECTION E2: Nearshore Survey

SECTION E3: Vessel Use SECTION F1: Site Cleanup

SECTION G1: Well Authorization

SECTION G2: Onland Exploration

SECTION G3: Offshore Exploration

SECTION G4: Rig

SECTION H1: Vessel Use

SECTION H2: Disposal At Sea

SECTION I1: Municipal Development

Qanurittuq Ittunik Avatinga: Avatingalluanga

Qanurittuq Ittunik Avatinga: Inuuhimayunut Avatinga

Qanurittuq Ittunik Avatinga: Inungit-maniliurutingit Avatinga

Miscellaneous Project Information

Naunaiyainiq ukuninnga Ayurhautingit unalu Piumayaat Ikikliyuumiutinahuarutit

Tamatkiumayunik Ihuikgutivaktunik Impacts Ilitariyauniq Avatiliriniqmut Ayurhautingit

Havakvinga ------Aulapkaininnga Mineral ------P - - - - Exploration Piiqtauniq ------(P = Nakuuyuq, N = Nakuungittut unalu mikhilimaittuq, M = Nakuungittut unalu mikhittaaqtuq, U = Naluyauyuq) PROJECT MAP

LIST OF PROJECT GEOMETRIES: 1 point Alagalak Gold Project #1 2 point Alagalak Gold Project # 2 3 point Alagalak Gold Project # 3 4 point Alagalak Gold Project # 4