Kampala Water Connections for the Poor Project

Total Page:16

File Type:pdf, Size:1020Kb

Kampala Water Connections for the Poor Project Public Disclosure Authorized Kampala Water Connections for the Poor Project Public Disclosure Authorized Public Disclosure Authorized Project Completion Report TF091510-UG June 2015 Public Disclosure Authorized © 2015 The Global Partnership on Output-Based Aid The World Bank 1818 H Street NW Washington DC 20433 Website: www.gpoba.org E-mail: [email protected] All rights reserved.This report was produced the Global Partnership on Output-Based Aid (GPOBA). The findings, interpretations, and conclusions expressed herein do not necessarily reflect the views of GPOBA or the Board of Executive Directors of the World Bank or the governments they represent. Neither GPOBA nor the World Bank guarantees the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of GPOBA or the World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Note: All currency amounts are in U.S. dollars unless otherwise noted. CURRENCY EQUIVALENTS (Exchange Rate Effective as of November 19, 2014) Currency Unit = = Ugandan Shilling (U Sh) US$1.00 = U Sh 2744.99 2 ABBREVIATIONS AND ACRONYMS CAS Country Assistance Strategy DO Development Objective ESMF Environmental and Social Management Framework GNI gross national income GPOBA Global Partnership for Output Based Aid IDA International Development Association IVA independent verification agent MDG Millennium Development Goals NGO nongovernmental organizations NWSC National Water and Sewerage Corporation OBA output-based aid OECD Organization for Economic Cooperation and Development DAC Development Assistance Committee PDO Project Development Objective PM prepaid meter PwC PricewaterhouseCoopers PWP public water points QEA quality at entry QSA Quality of Supervision UPPB Urban Pro-Poor Branch US$ United States Dollar YT yard tap 3 Table of Contents Data Sheets .................................................................................................................................. 6 A. Basic Information .................................................................................................................. 6 B. Key Dates .............................................................................................................................. 6 C. Analysis of Project Results .................................................................................................. 7 D. Project Performance Ratios in ISRs (ISRs were not required for small trust-funded projects) ......................................................................................................................................... 9 E. Project Restructuring .......................................................................................................... 10 F. Disbursement Profile .......................................................................................................... 11 1. PROJECT CONTEXT, DEVELOPMENT OBJECTIVE AND DESIGN ...................... 12 1.1 Context at Appraisal ..................................................................................................................... 12 1.2 Original Project Development Objectives and Key Indicators ............................................... 12 Revised PDO (as approved by original approving authority) and Key Indicators, and justification ........................................................................................................................................... 13 1.3 Project Design ........................................................................................................................... 13 1.4 Main Beneficiaries ..................................................................................................................... 14 1.5 Original Project Components .................................................................................................. 14 1.6 Revised Components ............................................................................................................... 15 1.7 Other Significant Changes ....................................................................................................... 15 2. KEY FACTORS THAT AFFECTED IMPLEMENTATION AND OUTCOME ................ 16 Affordability .......................................................................................................................................... 16 Practicability ......................................................................................................................................... 16 Absentee Landlords ............................................................................................................................ 16 Land for PWP ...................................................................................................................................... 16 Procurement ........................................................................................................................................ 16 Community Mobilization ..................................................................................................................... 17 OBA Subsidy Rates ............................................................................................................................ 17 Lack of Harmonized Approaches ..................................................................................................... 17 3. ACHIEVEMENT OF PROJECT DEVELOPMENT OBJECTIVE ................................. 17 3.1 Project Outcome ........................................................................................................................ 17 3.2 Project Development Objective Results ................................................................................ 18 4 4. SAFEGUARDS AND FIDUCIARY COMPLIANCE ........................................................ 19 5. POST-COMPLETION OPERATIONS/NEXT PHASE ................................................... 20 5.1 Operation and Maintenance ....................................................................................................... 20 5.2 Social Dislocation ......................................................................................................................... 20 5.3 Wastewater Drainage .................................................................................................................. 21 5.4 Replication of the Project ............................................................................................................ 21 6. ASSESSMENT OF PDO RELEVANCE .......................................................................... 21 7. LESSONS AND RECOMMENDATIONS ........................................................................ 21 Appendix A: PROJECT COSTS AND FINANCING .............................................................. 24 MAP: OBA FOR KAMPALA URBAN POOR PROJECT AREA .......................................... 25 5 Table of Contents DATA SHEETS A. Basic Information Country: Uganda Project Name GPOBA in Kampala – Water Connections for the Poor Project Project ID: P104943 L/C/TF Number(s): TF091510-UG Lending Instrument: Grant Grantee: National Water and Sewage Corporation (NWSC) Original Total US$2,527,100 Disbursed Amount: US$1,509,455.18 Commitment Revised Amount NA Environmental Category: B Implementing Agency: National Water and Sewage Corporation Users paid 10% of yard connection, NWSC contributed 30% and GPOBA 60% Equiv. US$2,527,100 B. Key Dates Process Date Process Original Date Revised/Actual date Concept March 14, 2007 Effectiveness April 30, 2008 Review Appraisal September 15, Restructuring Nov. 23, 2010 2007 Approval May 1, 2008 Mid-term August 2010 review Closing Dec. 31, 2011 Dec. 1, 2013 Note: The project was originally supposed to end on December 31, 2011 but was extended to December 1, 2013. The extension totaled 23 months, resulting in a 66% increase in project duration. 6 C. Analysis of Project Results Project Development Objectives (from Project Appraisal Document) The project’s objective was to provide poor households in Kampala slums with access to piped water services. Kampala is the capital of Uganda. Revised Project Development Objectives There was no revision to the PDO during implementation. However, Some PDO indicators were revised. (a) PDO Indicator(s) Indicator Baseline Original Target Formally Actual Value Value value (from Revised target achieved at approval value Completion or documents) Target Years Indicator 1: The number of yard taps and public water points made by NWSC using an output-based aid approach in the targeted areas Value 19,070 yard tap 6,000 yard tap 5,932 yard tap quantitative or connections connections connections qualitative 205 public water 200 PWPs with 200 PWPs with points (PWP) with ordinary meters ordinary meters ordinary meters 2,333 PWP 1,131 PWP with 615 PWP with with prepaid prepaid meters prepaid meters meters Date achieved Feb 2008 Nov. 2010 Dec. 2013 Comments The project achieved 99% of the revised target and 35% of the original (incl. % target. achievement) The achievement of PWP ordinary meters was 100% for revised target and 98% for the original target. The achievement for PWP prepaid meters reached 69.7% for the revised target and 265% of the original target. Indicator 2: The number of yard taps and PWPs still in use after 12 months of service provided by NWSC Value 0 19,070 yard tap 6000 yard tap 4,652
Recommended publications
  • Piloting of a Mobile Fecal Sludge Transfer Tank in Five Divisions of Kampala Martin Mawejje May, 2018
    Piloting of a Mobile Fecal Sludge Transfer Tank in Five Divisions of Kampala Martin Mawejje May, 2018 Photograph 1: Transfer tank in a slum within Makindye Division, Kampala Background Water For People in 2013 partnered with GIZ to increase access to sanitation coverage through promotion of sustainable sanitation technologies and scaling up the pit emptying business in three parishes: Bwaise I, Bwaise II and Nateete. Among the achievements of this engagement was the recruitment of six entrepreneurs, of which five are still active to-date, and development of business plans for the entrepreneurs. The entrepreneurs could empty over 400 pit latrines by the end of the project period. One of the challenges to the gulper entrepreneurs and clients during the 2013 project was the high costs of gulping. The business model implemented was deemed to be more expensive for some communities, particularly due to transportation costs that are factored into the cost per trip made to dumping site, and thus borne by the client. The project recommended the need to have a system that will ensure affordable collection costs incurred by the client. A pilot test of a small fixed transfer tank system in the fecal sludge management (FSM) chain (Figure 1) which would allow transport cost savings for manual pit latrine emptying businesses was initiated. However, the project failed due to land issues that are common in Kampala. Some land owners were not authentic. In other areas, the development plans would not allow permanent transfer tanks, while hiring private land or buying is not only expensive but unsustainable. It is with this background that an idea of mobile sludge transfer tanks was conceived.
    [Show full text]
  • Kampala Cholera Situation Report
    Kampala Cholera Situation Report Date: Monday 4th February, 2019 1. Summary Statistics No Summary of cases Total Number Total Cholera suspects- Cummulative since start of 54 #1 outbreak on 2nd January 2019 1 New case(s) suspected 04 2 New cases(s) confirmed 54 Cummulative confirmed cases 22 New Deaths 01 #2 3 New deaths in Suspected 01 4 New deaths in Confirmed 00 5 Cumulative cases (Suspected & confirmed cases) 54 6 Cumulative deaths (Supected & confirmed cases) in Health Facilities 00 Community 03 7 Total number of cases on admission 00 8 Cummulative cases discharged 39 9 Cummulative Runaways from isolation (CTC) 07 #3 10 Number of contacts listed 93 11 Total contacts that completed 9 day follow-up 90 12 Contacts under follow-up 03 13 Total number of contacts followed up today 03 14 Current admissions of Health Care Workers 00 13 Cummulative cases of Health Care Workers 00 14 Cummulative deaths of Health Care Workers 00 15 Specimens collected and sent to CPHL today 04 16 Cumulative specimens collected 45 17 Cummulative cases with lab. confirmation (acute) 00 Cummulative cases with lab. confirmation (convalescent) 22 18 Date of admission of last confirmed case 01/02/2019 19 Date of discharge of last confirmed case 02/02/2019 20 Confirmed cases that have died 1 (Died from the community) #1 The identified areas are Kamwokya Central Division, Mutudwe Rubaga, Kitintale Zone 10 Nakawa, Naguru - Kasende Nakawa, Kasanga Makindye, Kalambi Bulaga Wakiso, Banda Zone B3, Luzira Kamwanyi, Ndeba-Kironde, Katagwe Kamila Subconty Luwero District,
    [Show full text]
  • Water Safety Plans for Utilities in Developing Countries - a Case Study from Kampala, Uganda
    Water Safety Plans for Utilities in Developing Countries - A case study from Kampala, Uganda Sam Godfrey, Charles Niwagaba, Guy Howard, Sarah Tibatemwa 1 Acknowledgements The editor would like to thank the following for their valuable contribution to this publication: Frank Kizito, Geographical Information Section (GIS), ONDEO Services, Kampala, Uganda Christopher Kanyesigye, Quality Control Manager National Water and Sewerage (NWSC), Kampala, Uganda Alex Gisagara, Planning and Capital Development Manager, National Water and Sewerage (NWSC), Kampala, Uganda Godfrey Arwata, Analyst Microbiology National Water and Sewerage (NWSC), Kampala, Uganda Maimuna Nalubega, Public Health and Environmental Engineering Laboratory, Department of Civil Engineering, Makerere University, Kampala, Uganda Rukia Haruna, Public Health and Environmental Engineering Laboratory, Department of Civil Engineering, Makerere University, Kampala, Uganda Steve Pedley, Robens Centre for Public and Environmental Health, University of Surrey, UK Kali Johal, Robens Centre for Public and Environmental Health, University of Surrey, UK Roger Few, Faculty of the Built Environment, South Bank University, London, UK The photograph on the front cover shows a water supply main crossing a low lying hazardous area in Kampala, Uganda (Source: Sam Godfrey) 2 TABLE OF CONTENTS: WATER SAFETY PLANS FOR UTILITIES IN DEVELOPING COUNTRIES.1 - A CASE STUDY FROM KAMPALA, UGANDA..................................................1 Acknowledgements.................................................................................................2
    [Show full text]
  • Uganda Workplace HIV/AIDS Prevention Project (WAPP)
    Uganda Workplace HIV/AIDS Prevention Project (WAPP) Kyenjojo Mubende Kampala RTI International is implementing a 4-year (2003–2007) HIV prevention and impact mitigation project that seeks Masaka to stem HIV infections in Ugandan informal-sector workplaces. Funded by the U.S. Department of Labor, the program provides support for approaches that include ■ “ABC” (abstinence, being faithful, condom use) HIV prevention methods Accomplishments to date ■ Prevention of mother-to-child transmission During the past 2 years, RTI has reached nearly 530,000 ■ Reduction of HIV/AIDS-related stigma and people through project-supported programs. Informal- discrimination at the workplace sector workers reached include market vendors, boda ■ Mitigation of the impact of HIV/AIDS among informal- boda (motorcycle and bicycle) transporters, carpenters, sector workers and their families. fi shermen and fi sh processors, taxi operators, food vendors and attendants, bar and lodge attendants, shop attendants, Collaboration shoe shiners, and tea harvesters. Project-supported activities We collaborate closely with the government, national and include the following: international nongovernmental organizations (NGOs), and community- and faith-based organizations (CBOs and Group education on HIV/AIDS FBOs). Th e program strengthens the ability of CBOs and With its partner FBOs and CBOs, RTI has successfully FBOs to better implement HIV/AIDS activities locally. organized 850 HIV/AIDS education and awareness campaigns for informal-sector workers that include Operating in Kampala, Kyenjojo, Masaka, and Mubende/ health talks, drama, and testimonies from persons living Mityana districts, RTI’s approach is to reach a large number with HIV/AIDS, combined with dialogue sessions where of informal-sector workers with HIV prevention and participants are encouraged to ask questions and off er mitigation messages through cost-eff ective and effi cient their own perspectives on HIV prevention.
    [Show full text]
  • Planned Shutdown Web October 2020.Indd
    PLANNED SHUTDOWN FOR SEPTEMBER 2020 SYSTEM IMPROVEMENT AND ROUTINE MAINTENANCE REGION DAY DATE SUBSTATION FEEDER/PLANT PLANNED WORK DISTRICT AREAS & CUSTOMERS TO BE AFFECTED Kampala West Saturday 3rd October 2020 Mutundwe Kampala South 1 33kV Replacement of rotten vertical section at SAFARI gardens Najja Najja Non and completion of flying angle at MUKUTANO mutundwe. North Eastern Saturday 3rd October 2020 Tororo Main Mbale 1 33kV Create Two Tee-offs at Namicero Village MBALE Bubulo T/C, Bududa Tc Bulukyeke, Naisu, Bukigayi, Kufu, Bugobero, Bupoto Namisindwa, Magale, Namutembi Kampala West Sunday 4th October 2020 Kampala North 132/33kV 32/40MVA TX2 Routine Maintenance of 132/33kV 32/40MVA TX 2 Wandegeya Hilton Hotel, Nsooda Atc Mast, Kawempe Hariss International, Kawempe Town, Spencon,Kyadondo, Tula Rd, Ngondwe Feeds, Jinja Kawempe, Maganjo, Kagoma, Kidokolo, Kawempe Mbogo, Kalerwe, Elisa Zone, Kanyanya, Bahai, Kitala Taso, Kilokole, Namere, Lusanjja, Kitezi, Katalemwa Estates, Komamboga, Mambule Rd, Bwaise Tc, Kazo, Nabweru Rd, Lugoba Kazinga, Mawanda Rd, East Nsooba, Kyebando, Tilupati Industrial Park, Mulago Hill, Turfnel Drive, Tagole Cresent, Kamwokya, Kubiri Gayaza Rd, Katanga, Wandegeya Byashara Street, Wandegaya Tc, Bombo Rd, Makerere University, Veterans Mkt, Mulago Hospital, Makerere Kavule, Makerere Kikumikikumi, Makerere Kikoni, Mulago, Nalweuba Zone Kampala East Sunday 4th October 2020 Jinja Industrial Walukuba 11kV Feeder Jinja Industrial 11kV feeders upgrade JINJA Walukuba Village Area, Masese, National Water Kampala East
    [Show full text]
  • 14010000 May 23 2019 MARITAL STATUS LETTER of This Is To
    Submitted on: 23/05/2019 12:44:54 , Application No: T190523-0299 NMRS-MSLJ-1- 19/00300 RG 4 Registry No: 14010000 May 23 2019 TO WHOM IT MAY CONCERN MARITAL STATUS LETTER OF This is to confirm to you that according to the records availed to us which include; LC1 Letter from WAMPAMBA ZONE, KANYANYA, KAMPALA, KAWEMPE DIVISION NORTH, KAWEMPE DIVISION, Uganda statutory declarations sworn by and , was born on the 3rd day of May 1985 to and Further a search was made in our Marriage Register and no record was found of her ever contracting any marriage under any law, custom or otherwise in Uganda. Given under any hand this 23 day of May 2019. 23 May 2019 KISAALU LEAH AGNES REGISTRAR OF MARRIAGES Submitted on: 10/06/2019 09:18:37 , Application No: T190610-0726 NMRS-SLFD-8-19/00654 Republic of Uganda Form D. SPECIAL LICENCE Registry No: 130 89 WHEREAS and desire to marry and sufficient cause has been shown to me why the preliminaries required by the Marriage Act should be dispensed with; NOW THEREFORE, pursuant of that Act, I issue the License thereby prescribed and do hereby authorize any Registrar of Marriages, or recognized Minister of some religious denomination or body to celebrate the marriage between: and on the 14 day of June 2019 at KAMPALA URSB office The marriage may be celebrated by the Registrar of Marriages of KAMPALA URSB office between the hours of ten o¶clock in the forenoon and four o¶clock in the afternoon. Given under my hand this ......
    [Show full text]
  • Acknowledgement: the Authors Are Grateful for Financial Support from the Netherlands Ministry of Agriculture, Nature and Food Qu
    PARTNERSHIPS FOR HEALTHY DIETS AND NUTRITION IN URBAN AFRICAN FOOD SYSTEMS – EVIDENCE AND STRATEGIES “THE KANYANYA FOOD CHALLENGE – FOOD SYSTEMS MAPPING” PROGRESS REPORT DELIVERABLE WP1: NOURICITY - KAMPALA Vincent Linderhof, Youri Dijkxhoorn (both Wageningen Economic Research), Joel Onyango (BoP innovation centre), Andrea Fongar (Bioversity International), and Martha Nalweyiso Date of the report 31-12-2019 Acknowledgement: The authors are grateful for financial support from the Netherlands Ministry of Agriculture, Nature and Food Quality (grant number BO-43-003.02-009 as part of LEAP-Agri program), and the flagship program Food Systems for Healthier Diets of the CGIAR program Agriculture for Nutrition and Health (A4NH). 1 | The Kanyanya food challenge Contents Glossary ............................................................................................................................ 3 List of figures ..................................................................................................................... 5 List of tables ...................................................................................................................... 6 1 Introduction ................................................................................................................. 7 2 Desk study ................................................................................................................... 8 1.1 2.1 Description of Kampala .................................................................................... 8
    [Show full text]
  • (Ursb): Notice to the Public on Marriage Registration
    NOTICE TO THE PUBLIC ON MARRIAGE REGISTRATION Uganda Registration Services Bureau (URSB) wishes to inform the general public that all marriages conducted in Uganda MUST be filed with the Registrar of Marriages. The public is reminded that only church marriages conducted in Licensed and Gazetted places of worship are registrable and it is the duty of the licensed churches to file a record of the celebrated marriages with the Registrar of Marriages by the 10th day of every month, the marriages conducted under the Islamic Faith and the Hindu faith must be registered within three months from the date of the marriage and the Customary marriages must be registered at the Sub-County or Town council where the marriage took place within six months from the date of the marriage. Wilful failure to register marriages celebrated by the Marriage Celebrants violates the provisions of the Marriage Act and criminal proceedings may be instituted against them for failure to perform their statutory duties. The Bureau takes this opportunity to appreciate all Marriage Celebrants who are compliant. The public is hereby informed of the compliance status of Faith Based Organizations as at January 2021. MERCY K. KAINOBWISHO REGISTRAR GENERAL BORN AGAIN CHURCHES ELIM PENTECOSTAL CHURCH 01/30/2020 KYABAKUZA FULLGOSPEL CHURCH MASAKA 01/06/2020 PEARL HAVEN CHRISTIAN CENTER CHURCH 03/03/2020 UNITED CHRISTIAN CENTRE-MUKONO 11/19/2019 FAITH BASED ORGANIZATION DATE OF ELIM PENTECOSTAL CHURCH KAMPALA 08/27/2020 KYAMULIBWA WORSHIP CENTRE 09/11/2018 PEARL HEAVEN CHRISTIAN
    [Show full text]
  • Ursb Tm Journal Issue 12
    UGANDA REGISTRATION SERVICES BUREAU JOURNAL NO: URSB.IP.2021.012 DATE: FRIDAY 30TH OF JULY 2021 PUBLISHED BY: UGANDA REGISTRATION SERVICES BUREAU PURSUANT TO THE TRADEMARKS ACT, 2010 AND THE TRADEMARKS REGULATIONS OF 2012 AS AMENDED BY THE TRADEMARKS (AMENDMENT) REGULATIONS 2021 1 DATA IDENTIFICATION CODES INTRODUCTION The data identification codes appearing in the next tables are WIPO Standards. The first three of these tables contain codes universally known as Internationally recognized Numbers for the Identification of Data (INID) codes. These standards are namely, WIPO Standard ST. 60 (Recommendation concerning bibliographic data relating to marks) and Standard ST. 3 (Recommended standard on two-letter codes for the representation of states, other entities and intergovernmental organizations). INID CODES FOR MARKS Code Interpretation (210) Application number (220) Filing date (310) Priority number (320) Priority date (330) Convention country (510) List of Goods and/or Services (511) Nice class (526) Disclaimer (550) Series mark (591) Colour limitation (646) Associations (731) Name and address of Applicant (740) Name and address of the representative (750) Address for Service 2 READERS’ NOTICES ADVERTISEMENT PROCEDURES AND RATES Statutory and Unofficial Notices Every notice or advertisement required to be advertised in this Journal must first be approved by the Registrar of Trademarks, and all advertising charges therefore are payable to Uganda Revenue Authority through their portal prior to issuing the receipt to the advertiser. Frequency of the Journal The URSB Journal: Official Journal of Trademarks for Uganda Registration Services Bureau is published weekly. Editorial Office and Mission The Journal is published in pursuance of provisions of the Trademarks Act, 2010, the Trademarks Regulations 2012 and The Trademarks (Amendment) Regulations 2021, of the Laws of Uganda.
    [Show full text]
  • Directory of Development Organizations
    EDITION 2010 VOLUME I.B / AFRICA DIRECTORY OF DEVELOPMENT ORGANIZATIONS GUIDE TO INTERNATIONAL ORGANIZATIONS, GOVERNMENTS, PRIVATE SECTOR DEVELOPMENT AGENCIES, CIVIL SOCIETY, UNIVERSITIES, GRANTMAKERS, BANKS, MICROFINANCE INSTITUTIONS AND DEVELOPMENT CONSULTING FIRMS Resource Guide to Development Organizations and the Internet Introduction Welcome to the directory of development organizations 2010, Volume I: Africa The directory of development organizations, listing 63.350 development organizations, has been prepared to facilitate international cooperation and knowledge sharing in development work, both among civil society organizations, research institutions, governments and the private sector. The directory aims to promote interaction and active partnerships among key development organisations in civil society, including NGOs, trade unions, faith-based organizations, indigenous peoples movements, foundations and research centres. In creating opportunities for dialogue with governments and private sector, civil society organizations are helping to amplify the voices of the poorest people in the decisions that affect their lives, improve development effectiveness and sustainability and hold governments and policymakers publicly accountable. In particular, the directory is intended to provide a comprehensive source of reference for development practitioners, researchers, donor employees, and policymakers who are committed to good governance, sustainable development and poverty reduction, through: the financial sector and microfinance,
    [Show full text]
  • Kanyanya Pioneer Hiv/Aids Prevention Center (Kphapc)
    KANYANYA PIONEER HIV/AIDS PREVENTION CENTER (KPHAPC) TEL:0782524246/0772428493 [email protected] Reg: KAW/236 Kimbugwe lane Lutunda Zone Kanyanya Parish Kawempe Division Kampala District KPHAPC was started up in December 2002 with an overall goal of fully participating in the prevention of HIV/AIDS and uplifting the living standards of both infected and affected persons through knowledge availance and substantial assistance. Kanyanya Pioneer operates in 12 throughout the 22 parishes of Kawempe division in Kampala district. SPECIFIC OBJECTIVES. To foster and promote HIV/AIDS prevention awareness campaign strategies To educate the masses on how to care and treat the affected and infected children, youth, elderly and people with disabilities. To educate the masses about their rights and responsibilities as children, youth, elderly and people living with HIV/AIDS To actively involve persons living with PHAs to participate in IGA’s To secure and encourage the masses to freely interact, share and love PHA’s ie prevent stigma and discrimination To encourage PHA’s as youth, women and elderly to open about their status in order to seek necessary assistance. To secure and provide basic necessities o the children, youth, women and people with disabilities from willing and able organizations. To provide education opportunities to orphans and vulnerable children and availing them with life basic needs from willing and concerned organizations or personalities MAJOR ACHIEVEMENTS Successful compilation of an OVC register comprising of 500 affected and infected needy children of whom 50 have been offered education opportunities in the last 2 operation years Mobilization and sensitization of masses about HIV counseling and testing services this has yielded to over 530 clients with in a period of 9 months.
    [Show full text]
  • Availability and Quality of Parks in Kampala! ! !
    THE NONCOMMUNICABLE DISEASES INFORMATION AND CONTROL CENTRE! Move for Health ! Availability And Quality Of Parks In Kampala! ! ! P.O. Box 8831 Kampala, Uganda • telephone: 256 77 2200572 • [email protected] Table of Contents Acknowledgements 3 1. Introduc:on 4 1.1 Context 4 1.2 Study problem and jus:fica:on 5 1.3 Study objec:ves 6 1.4 Study methods 6 1.4.1 Observaon ............................................................................................................................. 6 1.4.2 Survey ..................................................................................................................................... 6 2. FIndIngs 7 2.1 AvailabIlIty of publIc parks In Kampala 7 2.1.1 Number of parks/open spaces ............................................................................................... 7 2.2 Park QualIty 10 2.2.1 Park Ac:vI:es ....................................................................................................................... 10 2.2.2 AQrac:veness, sounds, lIQer and trash ................................................................................ 10 2.2.3 Graffi:, sIng areas, toIlets ................................................................................................. 11 2.2.4 Food Items, water taps, monuments, securIty/workers, first aid ......................................... 11 2.2.5 Green spaces ......................................................................................................................... 12 2.2.6 Paths ....................................................................................................................................
    [Show full text]