Listed below are the designated areas for the planned maintenance work as for October, 2020:

Bil. Day & Date Time Location Work Description Affected Areas for Outages 9.00 am to 5.00 pm (For info, Department of Electrical Services will Tuesday 1 supply temporary electricity to the affected Stesen Elektrik UBD Sub-Intake Maintenance of Distribution Transformer Bangunan Pengajian UBD and the surrounding areas. 06th October 2020 areas through mobile generator services at the substation)

Wednesday 2 8.30 am to 4.30 pm Kg. Kapok Replacement of Overhead Lines Simpang 249, Kg. Kapok and the surrounding areas. 07th October 2020

Wednesday 3 8.30 am to 12.00 noon Kg. Manggis 1 Maintenance of Overhead Lines Cable Spg. 125, Kg. Manggis 1 and the surrounding areas. 07th October 2020

Wednesday 4 9.00 am to 12.00 noon Kg. Bengkurong Maintenance of Overhead Lines Cable Spg. 66-38-87, Kg. Bengkurong and the surrounding areas. 07th October 2020

Wednesday Spg. 1761-50, Bee Garden, Kg. Tanjong Nangka and the 5 9.00 am to 5.00 pm Sub-Station Bee Garden Replacement of Distribution Feeder Pillar 07th October 2020 surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Thursday 6 supply temporary electricity to the affected Sub-Station Pam Air JKR, Kampong Kasat Maintenance of Distribution Transformer Kampong Kasat and the surrounding areas. 08th October 2020 areas through mobile generator services at the substation)

Thursday 7 9.00 am to 12.00 noon Jalan Kasat Maintenance of Overhead Lines Cable Spg. 364, Jalan Kasat and the surrounding areas. 08th October 2020 Thursday Replacement of Low Voltage Bare Conductor Cable to Spg. 1958 hingga Spg. 1979, Kg. Junjungan dan kawasan 8 9.30 am to 4.30 pm Kg. Junjungan 08th October 2020 Aerial Bundle Conductor (ABC) Cable sekitarnya. Thursday 9 9.00 am to 3.30 pm Kg. Installation of New "Mini Feeder Pillar" Spg. 456, Kg. Beribi and the surrounding areas. 08th October 2020

9.00 am to 5.00 pm (For info, Department of Electrical Services will Friday Bangunan Pusat Kesihatan Sungai Asam and the 10 supply temporary electricity to the affected Sub-Station Pusat Kesihatan Sg Asam #1 Maintenance of Distribution Transformer 09th October 2020 surrounding areas. areas through mobile generator services at the substation)

Saturday Spg. 284-22, Jalan Pasir Berakas and the surrounding 11 9.00 am to 5.00 pm Sub-Station Spg. 284-22, Jln Pasir Berakas Replacement of Distribution Feeder Pillar 10th October 2020 areas.

Saturday Jalan Buang Tengkurok, Kg. Lumapas and the 12 9.00 am to 12.00 noon Kg. Lumapas Maintenance of Overhead Lines 10th October 2020 surrounding areas.

Saturday Simpang 469, Kg. Sungai Besar and the surrounding 13 8.30 am to 4.30 pm Kg. Sungai Besar Replacement of Overhead Lines 10th October 2020 areas.

Saturday Simpang 384-22, Kg. Lambak, Jalan Pasir Berakas and the 14 9.00 am to 4.00 pm Kg. Lambak Replacement of Mini Feeder Pillar 10th October 2020 surrounding areas.

Sunday 15 9.00 am to 5.00 pm Sub-Station Tungku Link Replacement of Distribution Feeder Pillar S/S Tungku Link and the surrounding areas. 11th October 2020

Monday Spg. 637-84-26-11, Kg. Lambak Kiri and the surrounding 16 9.00 am to 5.00 pm Sub-Station Spg. 637-84-26-11 Kg. Lambak Kiri Replacement of Distribution Feeder Pillar 12th October 2020 areas.

Monday 17 9.00 am to 3.00 pm Kg. Kota Batu Replacement of Aerial Bundle Cable (ABC) Spg. 325 Kg. Kota Batu and the surrounding areas. 12th October 2020

Tuesday Replacement of Low Voltage Bare Conductor Cable to Spg. 503 to Spg. 537 Kg. Lumapas and the surrounding 18 9.00 am to 3.00 pm Kg. Lumapas 13th October 2020 Aerial Bundle Conductor (ABC) Cable areas.

Tuesday Spg. 1011-17, Kg. Pengkalan Batu and the surrounding 19 9.00 am to 5.00 pm Sub-Station Spg. 1011-17 Kg. Pengkalan Batu Replacement of Distribution Feeder Pillar 13th October 2020 areas.

Tuesday Simpang 472, Kg. Sungai Hanching, Jalan Muara and the 20 9.00 am to 4.00 pm Kg. Sungai Hanching Replacement of Mini Feeder Pillar 13th October 2020 surrounding areas.

Tuesday Replacement of Low Voltage Bare Conductor Cable to Around Spg. 182, Jalan Limau Manis, Kg. Kuala Lurah and 21 9.30 am to 4.30 pm Kg. Kuala Lurah 13th October 2020 Aerial Bundle Conductor (ABC) Cable the surrounding areas.

Wednesday S/S Liang Toon Lama, Kg. , Tungku 22 9.00 am to 5.00 pm Sub-Station Liang Toon Lama, Tungku Link Replacement of Distribution Feeder Pillar 14th October 2020 Link and the surrounding areas.

Wednesday Replacement of Low Voltage Bare Conductor Cable to Spg. 503 to Spg. 537 Kg. Lumapas and the surrounding 23 9.00 am to 3.00 pm Kg. Lumapas 14th October 2020 Aerial Bundle Conductor (ABC) Cable areas.

Wednesday 24 8.15 am to 4.30 pm Kg. Kapok Replacement of Overhead Lines Simpang 301, Kg. Kapok and the surrounding areas. 14th October 2020

Wednesday 25 9.00 am to 3.00 pm Kg. Serdang Replacement of Aerial Bundle Cable (ABC) Spg. 766 Kg. Serdang and the surrounding areas. 14th October 2020

Wednesday Replacement of Low Voltage Bare Conductor Cable to 26 9.00 am to 3.00 pm Kg. Kota Batu Spg. 325 Kg. Kota Batu and the surrounding areas. 14th October 2020 Aerial Bundle Conductor (ABC) Cable

Page 1 Thursday Replacement of Low Voltage Bare Conductor Cable to Spg. 503 to Spg. 537 Kg. Lumapas and the surrounding 27 9.00 am to 3.00 pm Kg. Lumapas 15th October 2020 Aerial Bundle Conductor (ABC) Cable areas.

Thursday Simpang 465-21, Kg. Sungai Tilong, Jalan Muara and the 28 9.00 am to 4.00 pm Kg. Sungai Tilong Replacement of Mini Feeder Pillar 15th October 2020 surrounding areas.

Thursday Replacement of Low Voltage Bare Conductor Cable to 29 9.00 am to 3.00 pm Kg. Serdang Spg. 766 Kg. Serdang and the surrounding areas. 15th October 2020 Aerial Bundle Conductor (ABC) Cable

Thursday Spg. 284-22, Kg. Lambak Jalan Pasir Berakas and the 30 9.00 am to 2.00 pm Kg Lambak Pasir Berakas Replacement of Distribution Feeder Pillar 15th October 2020 surrounding areas.

Thursday Spg. 672 to Spg. 702, Kg. Sungai Besar and the 31 8.30 am to 2.30 pm Kg. Sungai Besar Transfering of Overhead Lines 15th October 2020 surrounding areas.

Saturday 32 9.00 am to 5.00 pm Sub-Station Spg. 134 Replacement of Distribution Feeder Pillar Spg. 134, Kg. Kiarong and the surrounding areas. 17th October 2020

Saturday Simpang 542-139, Kg. Sungai Hanching, Jalan Muara and 33 9.00 am to 4.00 pm Kg. Sungai Hanching Replacement of Mini Feeder Pillar 17th October 2020 the surrounding areas.

Saturday Replacement of Low Voltage Aerial Bundle Conductor 34 9.00 am to 3.00 pm Kg. Spg. 44 Kg. Menglait and the surrounding areas. 17th October 2020 (ABC) Cable

Saturday Spg. 221 to Spg. 223, Kg. Serasa and the surrounding 35 8.30 am to 4.30 pm Kg. Serasa Replacement of Overhead Lines 17th October 2020 areas.

Sunday Kg. Pekan Lama, Kg. Sungai Pandan, Kg. Pandai Besi, Kg. 36 9.00 am to 5.00 pm Sub-Station Pekan Lama Kg. Ayer Replacement of Distribution Feeder Pillar 18th October 2020 Bakut Berumput and the surrounding areas.

Monday Jalan Rambutan, Kg. Burung Pingai Berakas and the 37 9.00 am to 5.00 pm Sub-Station Jln Rambutan Kg. Burung Pingai Replacement of Distribution Feeder Pillar 19th October 2020 surrounding areas.

Monday 38 9.00 am to 5.00 pm Sub-Station Ban 3A Kg. Mulaut Replacement of Distribution Feeder Pillar S/S Ban 3A, Kg. Mulaut and the surrounding areas. 19th October 2020

Tuesday Simpang 93-4, Jalan 31, RPN Lambak Kanan and the 39 9.00 am to 4.00 pm RPN Lambak Kanan Replacement of Mini Feeder Pillar 20th October 2020 surrounding areas.

Wednesday S/S Spg. 160-26, Jln Pasir Berakas, Kg. Lambak and the 40 9.00 am to 5.00 pm Sub-Station Spg. 160-26 Jln Pasir Berakas Maintenance of Distribution Feeder Pillar 21th October 2020 surrounding areas.

Wednesday 41 8.30 am to 4.30 pm Kg. Sungai Besar Replacement of Overhead Lines Spg. 582, Kg. Sungai Besar and the surrounding areas. 21th October 2020

Wednesday Replacement of Low Voltage Bare Conductor Cable to 42 9.00 am to 4.00 pm Kg. Saba Darat A & B Kg. Saba Darat A & B and the surrounding areas. 21th October 2020 Aerial Bundle Conductor (ABC) Cable

Wednesday Simpang 930, Jalan Tanah Jambu 1 and the surrounding 43 8.30 am to 12.00 noon Jalan Tanah Jambu 1 Installation of Scafolding around Overhead Lines 21th October 2020 areas.

Thursday Spg. 59-74, Kg. Tanjung Bunut Kanan and the surrounding 44 9.00 am to 5.00 pm Sub-Station Spg. 59-74 Kg. Tanjung Bunut Kanan Maintenance of Distribution Feeder Pillar 22nd October 2020 areas.

Thursday Simpang 490, Jalan Kebangsaan Lama and the 45 9.00 am to 4.00 pm Jalan Kebangsaan Lama Replacement of Mini Feeder Pillar 22nd October 2020 surrounding areas.

Thursday Kg. Tagap, Jalan Selayun/Jerudong Spg. 80 & Spg 209 and 46 9.00 am to 5.00 pm Kg. Tagap Replacement of Old Aerial 22nd October 2020 the surrounding areas.

Saturday 47 9.00 am to 5.00 pm Sub-Station Spg. 709 Jln Jerudong Maintenance of Distribution Feeder Pillar S/S Spg. 709, Jalan Jerudong and the surrounding areas. 24th October 2020

Saturday 48 8.30 am to 4.30 pm Kg. Kapok Replacement of Overhead Lines Spg. 318, Kg. Kapok and the surrounding areas. 24th October 2020

Saturday S/S Bangunan Dato Marshal, Kg Telanai and the 49 9.00 am to 5.00 pm Sub-Station Bangunan Dato Marshal, Telanai Maintenance of Distribution Feeder Pillar 24th October 2020 surrounding areas.

Sunday S/S Masjid Sufri Bolkiah, Kg. Burung Pingai and the 50 9.00 am to 5.00 pm Sub-Station Masjid Sufri Bolkiah, Kg. Burung Pingai Maintenance of Distribution Feeder Pillar 25th October 2020 surrounding areas.

Monday Spg. 1626, Mawar Desa Villa, Kg. Tanjong Nangka and the 51 9.00 am to 5.00 pm Sub-Station Mawar Desa Villa Replacement of Distribution Feeder Pillar 26th October 2020 surrounding areas.

Tuesday Simpang 602, Kg. Sungai Hanching and the surrounding 52 9.00 am to 4.00 pm Kg. Sungai Hanching Replacement of Mini Feeder Pillar 27th October 2020 areas.

Tuesday 53 8.30 am to 4.30 pm Kampong Batu Marang Installation of Distribution Feeder Pillar Kampong Batu Marang and the surrounding areas. 27th October 2020

Wednesday 54 9.00 am to 5.00 pm Sub-Station Spg. 29 Ban 5 Maintenance of Distribution Feeder Pillar S/S Spg. 29, Ban 5 Kg. Kilanas and the surrounding areas. 28th October 2020

Wednesday 55 8.30 am to 4.30 pm Kg. Tanah Jambu Replacement of Overhead Lines Spg. 930-58, Kg. Tanah Jambu and the surrounding areas. 28th October 2020

Spg. 5 and Spg. 6, Jalan Batu Marang, Kg. Sungai Buluh Saturday 56 8.30 am to 4.30 pm Kg. Sungai Buluh Installation of Distribution Feeder Pillar and Spg. 57 and Spg. 67 Kg. Sungai Buluh and the 31st October 2020 surrounding areas.

Listed below are the designated areas for the planned maintenance work as for November, 2020:

Page 2 Bil. Day & Date Time Location Work Description Affected Areas for Outages

Sunday S/S Industri Beribi 10, Industri Beribi and the surrounding 1 9.00 am to 5.00 pm Sub-Station Industri Beribi 10 Maintenance of Distribution Feeder Pillar 01st November 2020 areas.

Page 3 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Oktober, 2020:

Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik 9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Selasa sementara bekalan tenaga elektrik ke kawasan 1 Stesen Elektrik UBD Sub-Intake Pemeliharaan "Distribution Transformer" Bangunan Pengajian UBD dan kawasan sekitarnya. 06hb Oktober 2020 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Rabu 2 8.30 pagi hingga 4.30 petang Kg. Kapok Penggantian Talian Kawat Atas Simpang 249, Kg. Kapok dan kawasan sekitarnya. 07hb Okotober 2020

Hari Rabu 3 8.30 pagi hingga 12.00 tengah hari Kg. Manggis 1 Pemeliharaan Kabel Kawat Atas Spg. 125, Kg. Manggis 1 dan kawasan sekitarnya. 07hb Okotober 2020

Hari Rabu 4 9.00 pagi hingga 12.00 tengah hari Kg. Bengkurong Pemeliharaan Kabel Kawat Atas Spg. 66-38-87, Kg. Bengkurong dan kawasan sekitarnya. 07hb Okotober 2020

Hari Rabu Spg. 1761-50, Bee Garden, Kg. Tanjong Nangka dan 5 9.00 pagi hingga 5.00 petang Stesen Elektrik Bee Garden Penggantian "Distribution Feeder Pillar" 07hb Okotober 2020 kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Khamis sementara bekalan tenaga elektrik ke kawasan 6 Stesen Elektrik Pam Air JKR, Kampong Kasat Pemeliharaan "Distribution Transformer" Kampong Kasat dan kawasan sekitarnya. 08hb Oktober 2020 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Khamis 7 9.00 pagi hingga 12.00 tengah hari Jalan Kasat Pemeliharaan Kabel Kawat Atas Spg. 364, Jalan Kasat dan kawasan sekitarnya. 08hb Oktober 2020

Hari Khamis Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan Spg. 1958 hingga Spg. 1979, Kg. Junjungan dan kawasan 8 9.30 pagi hingga 4.30 petang Kg. Junjungan 08hb Oktober 2020 Rendah sekitarnya.

Hari Khamis 9 9.00 pagi hingga 3.30 petang Kg. Beribi Pemasangan "Mini Feeder Pillar" Baru Spg. 456, Kg. Beribi dan kawasan sekitarnya. 08hb Oktober 2020

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Jumaat sementara bekalan tenaga elektrik ke kawasan Bangunan Pusat Kesihatan Sungai Asam dan kawasan 10 Stesen Elektrik Pusat Kesihatan Sg Asam #1 Pemeliharaan "Distribution Transformer" 09hb Oktober 2020 yang terlibat melalui Perkhidmatan Janakuasa sekitarnya. Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Sabtu 11 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 284-22, Jln Pasir Berakas Penggantian "Distribution Feeder Pillar" Spg. 284-22, Jalan Pasir Berakas dan kawasan sekitarnya. 10hb Oktober 2020

Hari Sabtu Jalan Buang Tengkurok, Kg. Lumapas dan kawasan 12 9.00 pagi hingga 12.00 tengah hari Kg. Lumapas Pemeliharaan Kawat Atas 10hb Oktober 2020 sekitarnya.

Hari Sabtu 13 8.30 pagi hingga 4.30 petang Kg. Sungai Besar Penggantian Talian Kawat Atas Simpang 469, Kg. Sungai Besar dan kawasan sekitarnya. 10hb Oktober 2020

Hari Sabtu Simpang 384-22, Kg. Lambak, Jalan Pasir Berakas dan 14 9.00 pagi hingga 4.00 petang Kg. Lambak Penggantian "Mini Feeder Pillar" 10hb Oktober 2020 kawasan sekitarnya.

Hari Ahad 15 9.00 pagi hingga 5.00 petang Stesen Elektrik Tungku Link Penggantian "Distribution Feeder Pillar" S/S Tungku Link dan kawasan sekitarnya. 11hb Oktober 2020

Hari Isnin Spg. 637-84-26-11, Kg. Lambak Kiri dan kawasan 16 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 637-84-26-11 Kg. Lambak Kiri Penggantian "Distribution Feeder Pillar" 12hb Oktober 2020 sekitarnya.

Hari Isnin 17 9.00 pagi hingga 3.00 petang Kg. Kota Batu Penggantian "Aerial Bundle Cable (ABC)" Spg. 325 Kg. Kota Batu dan kawasan sekitarnya. 12hb Oktober 2020

Hari Selasa Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan Spg. 503 hingga Spg. 537 Kg. Lumapas dan kawasan 18 9.00 pagi hingga 3.00 petang Kg. Lumapas 13hb Oktober 2020 Rendah sekitarnya.

Hari Selasa 19 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 1011-17 Kg. Pengkalan Batu Penggantian "Distribution Feeder Pillar" Spg. 1011-17, Kg. Pengkalan Batu dan kawasan sekitarnya. 13hb Oktober 2020

Hari Selasa Simpang 472, Kg. Sungai Hanching, Jalan Muara dan 20 9.00 pagi hingga 4.00 petang Kg. Sungai Hanching Penggantian "Mini Feeder Pillar" 13hb Oktober 2020 kawasan sekitarnya.

Hari Selasa Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan Disekitar Spg. 182, Jalan Limau Manis, Kg. Kuala Lurah 21 9.30 pagi hingga 4.30 petang Kg. Kuala Lurah 13hb Oktober 2020 Rendah dan kawasan sekitarnya.

Hari Rabu S/S Liang Toon Lama, Kg. Pengkalan Gadong, Tungku 22 9.00 pagi hingga 5.00 petang Stesen Elektrik Liang Toon Lama, Tungku Link Penggantian "Distribution Feeder Pillar" 14hb Oktober 2020 Link dan kawasan sekitarnya.

Hari Rabu Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan Spg. 503 hingga Spg. 537 Kg. Lumapas dan kawasan 23 9.00 pagi hingga 3.00 petang Kg. Lumapas 14hb Oktober 2020 Rendah sekitarnya.

Hari Rabu 24 8.15 pagi hingga 4.30 petang Kg. Kapok Penggantian Talian Kawat Atas Simpang 301, Kg. Kapok dan kawasan sekitarnya. 14hb Oktober 2020

Page 4 Hari Rabu 25 9.00 pagi hingga 3.00 petang Kg. Serdang Penggantian "Aerial Bundle Cable (ABC)" Spg. 766 Kg. Serdang dan kawasan sekitarnya. 14hb Oktober 2020

Hari Rabu Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan 26 9.00 pagi hingga 3.00 petang Kg. Kota Batu Spg. 325 Kg. Kota Batu dan kawasan sekitarnya. 14hb Oktober 2020 Rendah

Hari Khamis Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan Spg. 503 hingga Spg. 537 Kg. Lumapas dan kawasan 27 9.00 pagi hingga 3.00 petang Kg. Lumapas 15hb Oktober 2020 Rendah sekitarnya.

Hari Khamis Simpang 465-21, Kg. Sungai Tilong, Jalan Muara dan 28 9.00 pagi hingga 4.00 petang Kg. Sungai Tilong Penggantian "Mini Feeder Pillar" 15hb Oktober 2020 kawasan sekitarnya.

Hari Khamis Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan 29 9.00 pagi hingga 3.00 petang Kg. Serdang Spg. 766 Kg. Serdang dan kawasan sekitarnya. 15hb Oktober 2020 Rendah

Hari Khamis Spg. 284-22, Kg. Lambak Jalan Pasir Berakas dan kawasan 30 9.00 pagi hingga 2.00 petang Kg Lambak Pasir Berakas Penggantian "Distribution Feeder Pillar" 15hb Oktober 2020 sekitarnya.

Hari Khamis Spg. 672 hingga Spg. 702, Kg. Sungai Besar dan kawasan 31 8.30 pagi hingga 2.30 petang Kg. Sungai Besar Pemindahan Talian Kawat Atas 15hb Oktober 2020 sekitarnya.

Hari Sabtu 32 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 134 Kiarong Penggantian "Distribution Feeder Pillar" Spg. 134, Kg. Kiarong dan kawasan sekitarnya. 17hb Oktober 2020

Hari Sabtu Simpang 542-139, Kg. Sungai Hanching, Jalan Muara dan 33 9.00 pagi hingga 4.00 petang Kg. Sungai Hanching Penggantian "Mini Feeder Pillar" 17hb Oktober 2020 kawasan sekitarnya.

Hari Sabtu 34 9.00 pagi hingga 3.00 petang Kg. Menglait Penggantian Kabel Kawat Atas ABC Voltan Rendah Spg. 44 Kg. Menglait dan kawasan sekitarnya. 17hb Oktober 2020

Hari Sabtu Spg. 221 hingga Spg. 223, Kg. Serasa dan kawasan 35 8.30 pagi hingga 4.30 petang Kg. Serasa Penggantian Talian Kawat Atas 17hb Oktober 2020 sekitarnya.

Hari Ahad Kg. Pekan Lama, Kg. Sungai Pandan, Kg. Pandai Besi, Kg. 36 9.00 pagi hingga 5.00 petang Stesen Elektrik Pekan Lama Kg. Ayer Penggantian "Distribution Feeder Pillar" 18hb Oktober 2020 Bakut Berumput dan kawasan sekitarnya.

Hari Isnin Jalan Rambutan, Kg. Burung Pingai Berakas dan kawasan 37 9.00 pagi hingga 5.00 petang Stesen Elektrik Jln Rambutan Kg. Burung Pingai Penggantian "Distribution Feeder Pillar" 19hb Oktober 2020 sekitarnya.

Hari Isnin 38 9.00 pagi hingga 5.00 petang Stesen Elektrik Ban 3A Kg. Mulaut Penggantian "Distribution Feeder Pillar" S/S Ban 3A, Kg. Mulaut dan kawasan sekitarnya. 19hb Oktober 2020

Hari Selasa Simpang 93-4, Jalan 31, RPN Lambak Kanan dan kawasan 39 9.00 pagi hingga 4.00 petang RPN Lambak Kanan Penggantian "Mini Feeder Pillar" 20hb Oktober 2020 sekitarnya.

Hari Rabu S/S Spg. 160-26, Jln Pasir Berakas, Kg. Lambak dan 40 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 160-26 Jln Pasir Berakas Pemeliharaan "Distribution Feeder Pillar" 21hb Oktober 2020 kawasan sekitarnya.

Hari Rabu 41 8.30 pagi hingga 4.30 petang Kg. Sungai Besar Penggantian Talian Kawat Atas Spg. 582, Kg. Sungai Besar dan kawasan sekitarnya. 21hb Oktober 2020

Hari Rabu Penggantian Kabel Kawat Atas Ke Kabel ABC Voltan 42 9.00 pagi hingga 4.00 petang Kg. Saba Darat A & B Kg. Saba Darat A & B dan kawasan sekitarnya. 21hb Oktober 2020 Rendah

Hari Rabu Simpang 930, Jalan Tanah Jambu 1 and the surrounding 43 8.30 pagi hingga 12.00 tengah hari Jalan Tanah Jambu 1 Mendirikan "Scafolding" sekitar Talian Kawat Atas 21hb Oktober 2020 areas.

Hari Khamis Stesen Elektrik Spg. 59-74 Kg. Tanjung Bunut Spg. 59-74, Kg. Tanjung Bunut Kanan dan kawasan 44 9.00 pagi hingga 5.00 petang Pemeliharaan "Distribution Feeder Pillar" 22hb Oktober 2020 Kanan sekitarnya.

Hari Khamis Simpang 490, Jalan Kebangsaan Lama dan kawasan 45 9.00 pagi hingga 4.00 petang Jalan Kebangsaan Lama Penggantian "Mini Feeder Pillar" 22hb Oktober 2020 sekitarnya.

Hari Khamis Kg. Tagap, Jalan Selayun/Jerudong Spg. 80 & Spg 209 dan 46 9.00 pagi hingga 5.00 petang Kg. Tagap Mengganti Aerial yang Lama 22hb Oktober 2020 kawasan sekitarnya.

Hari Sabtu 47 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 709 Jln Jerudong Pemeliharaan "Distribution Feeder Pillar" S/S Spg. 709, Jalan Jerudong dan kawasan sekitarnya. 24hb Oktober 2020

Hari Sabtu 48 8.30 pagi hingga 4.30 petang Kg. Kapok Penggantian Talian Kawat Atas Spg. 318, Kg. Kapok dan kawasan sekitarnya. 24hb Oktober 2020

Hari Sabtu S/S Bangunan Dato Marshal, Kg Telanai dan kawasan 49 9.00 pagi hingga 5.00 petang Stesen Elektrik Bangunan Dato Marshal, Telanai Pemeliharaan "Distribution Feeder Pillar" 24hb Oktober 2020 sekitarnya.

Hari Ahad Stesen Elektrik Masjid Sufri Bolkiah, Kg. Burung S/S Masjid Sufri Bolkiah, Kg. Burung Pingai dan kawasan 50 9.00 pagi hingga 5.00 petang Pemeliharaan "Distribution Feeder Pillar" 25hb Oktober 2020 Pingai sekitarnya.

Hari Isnin Spg. 1626, Mawar Desa Villa, Kg. Tanjong Nangka dan 51 9.00 pagi hingga 5.00 petang Stesen Elektrik Mawar Desa Villa Penggantian "Distribution Feeder Pillar" 26hb Oktober 2020 kawasan sekitarnya.

Hari Selasa Simpang 602, Kg. Sungai Hanching dan kawasan 52 9.00 pagi hingga 4.00 petang Kg. Sungai Hanching Penggantian "Mini Feeder Pillar" 27hb Oktober 2020 sekitarnya.

Hari Selasa 53 8.30 pagi hingga 4.30 petang Kampong Batu Marang Pemasangan "Distribution Feeder Pillar" Kampong Batu Marang dan kawasan sekitarnya. 27hb Oktober 2020

Page 5 Hari Rabu 54 9.00 pagi hingga 5.00 petang Stesen Elektrik Spg. 29 Ban 5 Pemeliharaan "Distribution Feeder Pillar" S/S Spg. 29, Ban 5 Kg. Kilanas dan kawasan sekitarnya. 28hb Oktober 2020

Hari Rabu 55 8.30 pagi hingga 4.30 petang Kg. Tanah Jambu Penggantian Talian Kawat Atas Spg. 930-58, Kg. Tanah Jambu dan kawasan sekitarnya. 28hb Oktober 2020

Spg. 5 dan Spg. 6, Jalan Batu Marang, Kg. Sungai Buluh Hari Sabtu 56 8.30 pagi hingga 4.30 petang Kg. Sungai Buluh Pemasangan "Distribution Feeder Pillar" dan Spg. 57 dan Spg. 67 Kg. Sungai Buluh dan kawasan 31hb Oktober 2020 sekitarnya.

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan November, 2020:

Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik

Hari Ahad S/S Industri Beribi 10, Industri Beribi dan kawasan 1 9.00 pagi hingga 5.00 petang Stesen Elektrik Industri Beribi 10 Pemeliharaan "Distribution Feeder Pillar" 01hb November 2020 sekitarnya.

Page 6