GOVERNMENT OF Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G02021 0056411W Date: 02/02/2021 File No:IW/PIIB-SDS-14/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer-I, Lower Damodar Construction Division, Irrigation & Waterways Directorate

Subject:Administrative Approval for the Essential Maint works of functional and non-functional assets covering total length of 63.611 km. of Oraina nels in Blocks-, Bally-, Oomjur, , and MunjEBi orporation area, P.Ss-Sankrail, , Nischinda, Oomjur, Santragachi, Jagacha, Jagat~)1 ~l.Jrand Panchla, Oistrict-Howrah duirng 2020-21.

Scheme Id - IW/MR/1061 2020-21 Cc c·'c~~J

,Project 10:- IW202133724S000

'f€'. The undersigned is directed, by order of th1c~d8\firnor,to say that the Governor has been pleased to accord Administrative Approval for the Project Essential Maintenartlp~lw6'rksof functional and non-functional assets covering total length of 63.611 km. of Drainage Channels in Blocks-S .ail~*Bally-Jagacha,, Jagatballavpur, Panchla and Howrah Municipal Corporation area, P.Ss-Sankrail, Liluah, iiChinda, Domjur, Santragachi, Jagacha, Jagatballavpur and Panchla, District• Howrah duirng 2020-21. Scheme Id -IW/MRl106/ 2020-21

,the details of which has been given below. Name of the Project: Essential Maintenance works of functional and non-functional assets covering total length of 63.611 km. of Drainage Channels in Blocks-Sankrail, Bally-Jagacha, Domjur, Jagatballavpur, Panchla and Howrah Municipal Corporation area, P.Ss-Sankrail, Liluah, Nischinda, Domjur, Santragachi, Jagacha, Jagatballavpur and Panchla, District-Howrah duirng 2020-21. Scheme Id - IW/MRl106/2020-21

Project ID: IW202133724S000

Address: Blocks-Sankrail, Bally-Jagacha, Domjur, Jagatballavpur, Panchla and Howrah Municipal Corporation area, P.Ss-Sankrail, Liluah, Nischinda, Domjur, Santragachi, Jagacha, Administrative Approval: ~OOtPuX~~~It.~~ixlt¥'6Xfftrhousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme SI No. Financial Year Head Amount Type Name

Maintenance - - -- ~t::ltA nAVAlnnmAnt - c~1 T_o_ta_I ~ __ 9_5_6_4_00_0__ ~

Additional Conditions

Conditions Description 1 List of the part estimates (total 12 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divis' Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the mates and produce the relevant G.O. with Annex, with the part estimate duly marked.

'::\::+\yS;; This order is issued with the concurrence of FINANCIAL ADVISO '1~lllgation& Waterways) of this Department vide their 1 his U.O No. AA2021020740FAOODated 25/01/2021.

0iA.~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210056411W Date: 02/02/2021 Copy forwarded for information and nece sary action:

The Additional Chief Secretary 1 Secretary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(Audit)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N) C?rt~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department , , Enclosure to I&W D's AA GO No. G02021005641IW Dated 02.02.2021. I&WD's Main scheme ID: IW/MRJI06/2020-21

(Rs in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 1 [ClearingI and removmg of water hyacmth mcludmg cleanng of 7.96 0.24 jjungles along the slope of bank for the period of 15th March 2021 irom 2.00 km to 10.35 km of Burjola Khal under Howrah Drainage

[Sub-Division of Lower Darnodar Construction Division. i

2 IClearing and removing of water hyacinth, plastic thermocal and i 5.99 0.18

II' garbage etc. including clearing of jungles along the slope of banki .from ch. 390.00 m to ch. 3000.00 m in Baigachi Khal, from ch. 0.00 Ito ch. 750.00 m of Suti-I, from ch. 0.00 to ch. 490.00 m of Suti-II,

I from ch. 234.00 m to ch. 780.00 m ofSuti-I1I Khal & from ch. 0.00 m: I Ito ch. 825.00 m ch. 825.00 m (upto NH-6) of Sheorapota Khal for the:

I ~IPeriodupto 15th March 2021 under Howrah Drainage Sub-DivisionI 1,1 I of Lower Damodar Construction Division. I, ~

! -)- i~~::~:di:::~:gcl:::t~7:;:~~I:~;::~::~:~:~:'--5-.1-0---ti- 0.16 I i from ch. 0.00 m to ch. 1600.00 m for the period upto 15th March 2021 of Branch Channel-II of Howrah Drainage Channel under, Howrah Drainage Sub-Division of Lower Darnodar Construction: Division. • f-----4--+-C-Iearing1 and removing of water hyacinth, plastic thermocal'-an-d-i:--7-.2-5------I---0-.-22--- I garbage etc. including clearing of jungles along the slope of bank [from ch. 7200.00 m to ch. 12500.00 m for the period upto 15th I I March 2021 of Howrah Drainage Channel under Howrah Drainage I ---~ Su~-Dlvisio_l!_~f!-o~~rDarn()darConstruction Division. ------t ----t------J 5 [Clearing and removing of water hyacinth, plastic thermocal and 5.30 0.16 I

garbage etc. including clearing of jungles along the slope of bank II ,fromI ch. 1600.0 m to ch. 3400.0 m of Sheorapota Khal & 0.00 m tOI 1 1 i675.0 m of Nayanjuli Khal & 0.00 to 2000.0 m of Pijrarapole Khal I i for the period upto 15th March 2021 under Howrah Drainage Sub-. h-1~~~;_O~~O_:~~:i~f~~~:~;,~~~~~t~dingClearingor- -'1:24 i---0-.3-3--_J '_ Ijunglesalong the slope of bank for the period upto 15th March 2021 I from ch. 0.00 m to 5130.00 m of Mahishdhara Khal under Howrah I __!])rainage Sub-Division of Lower Damodar Construction Division.' i

1 7 ;Clearing and removing of water hyacinth including clearing of 11.45 0.34 ijungles along the slope of bank for the period upto 15th March 2021' Ifrom Khatir Pole to Satyen Bose road bridge of river South SaraswatiI

l_k~~:~~~;;ViS~~i_~age _ S~b-DiVi_SiO~__o~ _~o:er DaITlo_d~L __[_ __j

Sheet1 of2 .. I&WD's Main scheme ID: IW/MRl106/2020-21 (Rs.in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4

8 Clearing and removing of water hyacinth, plastic thermo cal and 1 8.72 0.26 i municipal garbage etc. including clearing of jungles along the slope: of bank from ch. 0.00 m to 2440.00 m upto 15th March 2021 of Branch Channel-III of Howrah Drainage Channel under Howrahi Drainage Sub-Division of Lower Damodar Construction Division. i 9 I Clearing and removing of water hyacinth including clearing of 5.78 0.17 Uungles along the slope of bank and removal of debris for the period: IUPlo 15th March 2021 from Bipannapara RCC bridge 10 Machiary RCC bridge of Saraswati River in Block & P.S Domjur, District IHowrah under Lower Damodar Construction Sub-Division No. IV of! Lower Damodar Construction Division. I 10 Clearing and removing of water hyacinth including clearing 0~1 9.98 0.30 jungles along the slope of bank and removal of debris for the period I upto 15.03.2021 from Chumukdaha sluice to Jabdapota Rajapur Main I Channel in Block & P.S Domjur, District Howrah under Lower Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. 11 I Clearing and removing of water hyacinth including clearing of! 7.07 0.21 Ijungles along the slope of bank and removal of debris for the period! [upto 15.03.2021 from Kanaidanga to Hatal RCC bridge of Rajapur I !Main Channel in Block & P.S JB Pur & Panchla, District Howrah [under Lower Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. 12 Clearing and removing of water hyacinth including clearing of 7.02 0.21

jungles along the slope of bank and removal of debris for the period 1 [upto 15.03.2021 from Hatal RCC bridge to RCC bridge of

Rajapur Main Channel in Block & P.S JB Pur & Panchla, District I Howrah under Lower Damodar Construction Sub-Division No. IV of: I Lower Damodar Construction Division. Total: 92.86 2.78

Estimated Cost of Main Estimate: ~ 95.64 Lakh

8-1)/ "1'1-t Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 2 of2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210056421W Date: 02/02/2021 File No:IW/P/IB-SDS-14/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer-I, Lower Damodar Construction Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Essential Maint works of functional and non-functional assets covering total length of 117.684 km. of Drain annels in Blocks- Domjur, - I and II, U.N. Pur, Debipur, Shyampur-I and II, and Howra ipal Corporation area, P.Ss - Domjur, Amta, Joypur, U.N. Pur, J.B. Pur, Shyampur, Debipur arden District-Howrah duirng 2020-21. Scheme id-IW/MR/107/2020-21 ,Project ID:- I , 799S000 The undersigned is directed, by order of the Govi'1'n9r, to say that the Governor has been pleased to accord Administrative Approval for the Project Essential Maintenance.iWdr1<~pf functional and non-functional assets covering total length of 117.684 km. of Drainage Channels in Blocks-':E!.0mjO( Amta- I and II, U.N. Pur, Debipur, Shyampur-I and II, and Howrah Municipal Corporation area, P.Ss - Domjur !~iiJoypur, U.N. Pur, J.B. Pur, Shyampur, Debipur and B Garden District- Howrah duirng 2020-21. ;; Scheme id-IW/MRl107/2020-21 ,the de· hich has been given below.

Name of the Project: Essential intenance works of functional and non-functional assets covering total length of 117.684 km. of Drainage Channels in Blocks- Domjur, Amta- I and II, U.N. Pur, Debipur, Shyampur-I and II, and Howrah Municipal Corporation area, P.Ss - Domjur, Amta, Joypur, U.N. Pur, J.B. Pur, Shyampur, Debipur and B Garden District-Howrah duirng 2020-21. Scheme id-IW/MRl107/2020-21

Project ID: IW202133799S000

Address: Blocks- Domjur, Amta- I and II, U.N. Pur, Debipur, Shyampur-I and II, and Howrah Municipal Corporation area, P.Ss - Domjur, Amta, Joypur, U.N. Pur, J.B. Pur, Shyampur, Administrative Approval: Rs~~~'1elj~B(~e\yrsQWRq!~~itlety Seven Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme SI No. Financial Year Head Amount Type Name

Maintenance State Development 1 2020-21 32-2711-01-001-00-002-27 -OO-V Expenditure in Flood 9797000 Schemes Control Sector Total 9797000 Additional Conditions

Conditions Description 1 List of the part estimates (total 29 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021020741FAOODated 25/01/2021.

JOINTS~RY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210056421W Date: 02/02/2021 Copy forwarded for information and ne

The Additional Chief Secretary 1 Se tary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(Audit)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N) 0r1~- JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department - _. ------

Enclosure to I&W D's AA GO No. G02021005642IW Dated 02.02.2021. I&WD's Main scheme ID: IW/MR/I07/2020-21 (Rs.in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 1 Clearing and removing of water hyacinth, plastic, thermocol, garbage 5.10 0.15 I 1 , 'etc. including clearing of jungles along the slope of bank from ch. 0.00 m to 800.00 m of Branch Channel IV and from ch. 0.00 tol 5500.00 of Branch Channel V for the period upto 15th March 20211 under Howrah Drainage Sub-Division of Lower Damodar I Construction Division. I

2 I Clearing and removing of water hyacinth including clearing of' 7.75 0.23 i I I i!J• ungles aloang the slope of bank and removal of debris for the period,i [upto 15.03.2021 from Harer Pole to Bipannapara RCC bridge of

ISaraswati River in Block & P.S Domjur, District Howrah under 'I" lLower Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. I 3 Clearing and removing of water hyacinth, plastic, thermocol, garbageI 2.58 0.07 i etc. including clearing of jungles along the slope of bank from ch.! :0.00 m to 1400.00 m of Bultigri Khal for the period upto 15th March i 12021 under Howrah Drainage Sub-Division of Lower Damodar 1'lConstructionDivision. ; 4 Clearing and removing of water hyacinth, plastic, thermocol, garbageI 1.31 0.04 14 etc. including clearing of jungles along the slope of bank for the I 1 I period upto 15th March 2021 from outfall point of sluice (0.00 m to; Ii 1800.00m) of Samamoyee Khal under Howrah Drainage Sub-Division

I lof'Lower Damodar Construction Division. . i l--~------.---- .------.-.----.-.----.------....1------·-·---1-- .--..------5 Clearing and removing of water hyacinth for the period from Jun'201 4.11 0.12 to Oct'20 in between Beltala to syphon of Lower Rampur Khal for a length of 2.70 km under Lower Damodar Construction Sub-Division

_..__~:t'io._I_V_()fJ:-owerDamodar Construction Division. _ __ _ .L-- ._ I 6 IClearing and removing of water hyacinth for the period from Jun'20' 2.71 0.08 Ito Oct'20 in between syphon to Narit of Lower Rampur Khal for a, [length of 3.50 km under Lower Damodar Construction Sub-Division: INo.IV of Lower Damodar Construction Division. 7 IClearing and removing of water hyacinth for the period from Jun'20 2.94 0.09 Ito Oct'20 in between Ronjoyber to Beltala downstream of Lower [Rampur Khal for a length of 2.20 km under Lower Damodar] I , IConstruction Sub-Division No. IV of Lower Damodar Construction ~ IDivision. 18-t~I~~~:a:=::~~t;:~:~n:it!~::~~~:~:'~~1.83 0.05 I IKharibon Khal for a length of 2.00 Ian within erstwhile jurisdiction I I 10f T.D.D Sub-Division under Lower Damodar Construction Sub- i i Division No. IV of Lower Damodar Construction Division. !

Sheet 1 of 4 I&WD's Main scheme ID: IWIMRJI07/2020-21 (Rs in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 9 Clearing and removing of water hyacinth for the period from Jun'20 2.62 0.08 to Oct'20 in between Gumgar to Ranjoyber of Maja Damodar for al , length of 3.00 km under Lower Damodar Construction Sub-Division I , No. IV of Lower Damodar Construction Division. -" _.'._----- Clearing and removing of water hyacinth for the period from Jun'20 , 3.11 0.09 ,to ~ct'20 in between Mahishamuri Bansbagan to SPIC sluice ofl [Mahishamur Khal for a length of 4.00 km under Lower Damodarl

i Construction Sub-Division No. IV of Lower Damodar Construction] ID··· . I I rvisron. i L--f----~-·------·------i--- 11 [Clearing and removing of water hyacinth for the period from Jun'20, 0.04 Ito Oct'20 in between Kansona sluice to Kharibon sluice of Kharibon] IKhal for a length of 1.70 km within erstwhile jurisdiction of T.D.DI I Sub-Division under Lower Damodar Construction Sub-Division No. IIVof Lower Damodar Construction Division.

12 i Clearing and removing of water hyacinth for ther period from Jun'20 I 3.35 0.10

ito Oct'20 in between Someswar to Chardaha of Someswar Khal for al,

! ilength of 3.50 km under Lower Damodar Construction Sub-Division I r---tl iNo.---IV-----~------~-of Lower Damodar Construction------Division. ---- : 4J---t-I : 13 :Clearing and removing of water hyacinth for the period from June--r 4.47 0.13

I 12020 to 31st October 2020 from Paliara to Kamaria sluice gate of I IKamaria Khal for a length of 4.00 km under Lower Damodar]

I iC?~s~ructionSub-Division No. IV of Lower Damodar Construction

! I DIvIsIon. __

14 ['Clearingand removing of water hyacinth for the period from June I 4.50 0.13 2020 to 31st October 2020 from Dihibhursut Maja Damodar offtakeI

1 point to Pratapchak wooden bridge of Maja Damodar river for a I !length of 5.50 km under Lower Damodar Construction Sub-Division! ii5·I~~~;~~:::;~i;::~~~~£~~~!I!~~~d~~::::~!~:---3.94---+ 0.12 i IGhat bridge of Maja Damodar river for a length of 4.30 km under Ii

I ILower Damodar Construction Sub-Division No. IV of Lower

1161~=:~1n~~~~-~-W~!:;hyaciD"ili for the period oTJ~ne-2-0-2-0-f---4-.-0-3--t---0-.-1-2-- ito 31st October 2020 from Shibanipur Roypara bridge to Purpat I IPrimary School of Maja Damodar river for a length of 4.40 km under ILower Damodar Construction Sub-Division No. IV of Lower! iDamodar Construction Division. . 17 IClearing and removing of water hyacinth for the period of June 2020 3.29 0.10 to 31st October 2020 from Sonatala Raja Ghat bridge to Gumgar I ' [Wooden bridge of Maja Damodar river for a length of 3.40 km under' !Lower Damodar Construction Sub-Division No. IV of Lower

, I iDamodar Construction Division. I L____,_____L_ _....._ . ~ ~_. .._,. ______L ~~_ ~

Sheet2 of 4 I&WD's Main scheme ID: IWIMRl107/2020-21

(Rs. In. Lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 I I 18 IClearing and removing of water hyacinth for the period of June 2020 4.21 0.13 I Ito 31st October 2020 from Pratapchak Wooden bridge to Shibanipur]

! Roypara RCC bridge of Maja Damodar river for a length of 4.60 km I under Lower Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. I i Clearing and removing of water hyacinth for the period of June 2020 4.35 0.13 ito 31st October 2020 from Rampur to Harali sluice gate of Tuker ! ~~l ~or a length of 8.00 km under Lower D~odar. ~o~struction Subj

I ,DIvIsIOnNo. IV of Lower Damodar Construction Division, i ~------!

I 20 i Clearing and removing of water hyacinth of Gouriganga Khal for a, 2.44 0.07 i [length of 4.5 km from June 2020 to 31st October 2020 in Block &i L...I;i~i~o~~~DI~~~:~,::~L~:;~!ca;~Q~~:s:,u~O~SUbi I 21 Clearing and removing of water hyacinth of Kousiki River fo~-a+-!--3-.-12 0.09

I [length of 7.5 km from June 2020 to 31st October 2020 in Block &: jP.S JB Pur, District Howrah under Lower Damodar Construction Sub; I I iDivision No. IV of Lower Damodar Construction Division. ~-__-~-r-----+------< I 22 i Clearing and removing of water hyacinth of Kamarnala Khal for a 2.26 0.07 i [length of 4.5 km from June 2020 to 31st October 2020 in Block & I Ip·s Domjur, District Howrah under Lower Damodar Construction l J~~~~1:)2~_i~!_0~_~~~~Vof~~\¥er Damodar Const~cti~n Divis~on. _.. ~ J _j 23 i Clearing and removing of water hyacinth of Saraswati Link Channel 2.36 0.07 :and link canal near Delhi Public School for a length of 3.50 km from June 2020 to 31st October 2020 in Block & P.S Domjur, District! Howrah under Lower Damodar Construction Sub-Division No. IV ofl Lower Damodar Construction Division. I 24 Clearing and removing of water hyacinth of Patkelghata Main Khall 2.20 0.07 and its sub khal Baitara Khal and Donghata Mahimpur Khal for a total length of 6.50 km from June 2020 to 31st October 2020 in Block: Shaympur-I, P.S Shyampur, District Howrah under Lower Damodar'I' Construction Sub-Division No. IV of Lower Damodar Construction Division.

25 I Clearing and removing of water hyacinth of Dewantala Khal and 2.01 0.06 IGarchumuk Khal for total length of 6.50 km from June 2020 to 31st I I i IOctober 2020 in Block Shaympur-I, P.S Shyampur, District Howrah I I iunder Lower Damodar Construction Sub-Division No. IV of Lower! Ji

IDamodar Construction Division. Ii 26 [~i~~:go~~~~;~~g~;~~!~in:~~-!~d::r:d;!::~~~-~-+1--3-.2-6--+---0-.-1 0-- Ibridge of Kana Damodar River for a length of 3.90 km in Block &, IP,S Jagatballavpur, District Howrah under Lower Damodar ! Construction Sub-Division No. IV of Lower Damodar Construction l__J!?_i_visioE-. . . . .__ .. ._.. L- -~------j Sheet 3 of 4 ·. I&WD's Main scheme ID: IWIMRlI07/2020-21

(RS. In. lakh) SI. Contingency @ Tendered No. Name of sub-estimates as per tender 3% of amount amount put to tender 1 2 3 4 27 ,Clearing and removing of water hyacinth for the period of June 2020 3.49 0.10 ! I to 31st October 2020 from Munshirhat PWD RCC bndge to ! .Ichanogri RCC bridge of Kana Damodar River for a length of 4.20' I ikm in Block & P.S Jagatballavpur, District Howrah under Lower: Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. Clearing and removing of water hyacinth for the period of June 2020 3.34 0.10 i I to 31st October 2020 from Nilkuti cross regulator gate to Muhsiirhat I

i PWD RCC bridge of Kana Damodar River for a length of 4.00 km in

IBlock & P.S Jagatballavpur, District Howrah under Lower Damodarl

II Construction Sub-Division No. IV of Lower Damodar Construction [Division. 29 I Clearing and removing of water ~yacinth for t~e period o~Jun~ 2020 3.18 0.09

! to 31st October 2020 from Gobindopur Khotirpole to Nilkuti cross regulator gate of Kana Damodar River for a length of 3.80 km in .Block & P.S Jagatballavpur, District Howrah under Lower Damodar I ' i iC?nstruction Sub-Division No. IV of Lower Damodar ConstructionI l__ IDlVlslOn. Total: 95.15 2.82

Estimated Cost of Main Estimate: ~ 97.97 Lakh

~ Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 4 of4 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

~mo No:G020210056451W a No:IW/P/IB-SDS-14/2020-21 Date: 02/02/2021

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer-I, Lower Damodar Const. Division, Irrigati Waterways Directorate

,ubjectAdministrative Approval for the Essential Maint works of functional and non-functional issets covering total length of 57.06 km. of Orainag ", els and 66.367 km flood embankments in 3locks- Jagatballavpur, Panchla, Shyampur-I, Ulu .N.Pur, Amta-I and II, 8ally- Jagacha, Chanakul-I P.Ss-Liluah, Jagatballavpur, Panch I pur, , Joypur, Amta, U.N.Pur Oistrict- {owrah and Hooghly duirng 2020-21. scheme Id - IW/MRl1 08/2020-21

Project 10:- IW202133800S000 ,,"' i' 'he undersigned is directed, by order of the Go~~rnor,to say that the Governor has been pleased to accord Administrative .pprovalfor the Project Essential Mainten ~ks of functional and non-functional assets covering total length of 57.06 trn. of Drainage Channels and 66.367 embankments in Blocks- Jagatballavpur, Panchla, Shyampur-I, Uluberia-I, I.N.Pur, Amta-I and II, Bally- Jagacha, ul-1P.Ss-Liluah, Jagatballavpur, Panchla, Shyampur, Uluberia, Joypur, Amta, J.N.Pur District-Howrah and Hooghly dui 2020-21. ,cheme Id - IW/MRl1081 2020-21

the details of which has been given below. Name of the Project: Essential Maintenance works of functional and non-functional assets covering total length of 57.06 km. of Drainage Channels and 66.367 km flood embankments in Blocks• Jagatballavpur, Panchla, Shyampur-I, Uluberia-I, U.N.Pur, Amta-I and II, Bally- Jagacha, Khanakul-I P.Ss-Liluah, Jagatballavpur, Panchla, Shyampur, Uluberia, Joypur, Amta, U.N.Pur District-Howrah and Hooghly duirng 2020-21. Scheme Id - IW/MRl108/2020-21

Project ID: IW202133800S000

Address: locks- Jagatballavpur, Panchla, Shyampur-I, Uluberia-I, U.N.Pur, Amta-I and I~,Bally• Jagacha, Khanakul-I P.Ss-Liluah, Jagatballavpur, Panchla, Shyampur, Ulubena, Joypur, Administrative Approval: ~~§926~Bur(RlRa-fyt~~[~r\I~Rf¥l§I* Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance ~t::ltA nAVAlnnmAnt -- - . -.- Total ------. __ ~~~--~ 9926000

Mdi.tloruU Conditions

Conditions Description 1 List of the part estimates (total 34 numbers) of the main scheme is attached as Annex, which is an offline documentand authenticated by the undersigned.The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divis' Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the mates and produce the relevant G.O. with Annex, with the part estimateJ:fyly rncu1

his order is issued with the concurrence of FINANCIAL ADVIS 'gation & Waterways) of this Department vide their / is U.O No. AA2021020742FAOODated 25/01/2021.

0-1k JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department ~ .erno No: G020210056451W ~ Date: 02/02/2021

Copy forwarded for information and ne.l.ary action:

The Additional Chief Secretary 1 Secretary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(Audit)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N) G--1'- JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005645IW Dated 02.02.2021. I&WD's Main scheme ID: IW/MRJIOS/2020-21

(Rs. in lakh) Sl. Contingency @ No. Name of sub-estimates as per tender Tendered amount 3% of amount put to tender 1 2 3 1 4 I ! Clearing & removing of water hyacinth for the period of June 2020 to I 3.35 0.10 i ,31st October 2020 from Manikpir to Nada cross regulator of Kana I [Damodar River for a length of 4.00 km in Block & P.S I IJagatb~ll.a:pur,District Howrah under Lower Damodar Construction! L_J~ub-DlvlSlon No. IV of Lower Damodar Construction Division. I 2 I Clearing & removing of wate~h~acinth for the period of June 2020 to 2.95 0.09 131stOctober 2020 from Manikpir to Budul RCC bridge to Manikpir [of Kana Damodar River for a length of 3.90 km in Block & P.S

Panchla, District Howrah under Lower Damodar Construction Sub- I Division No. IV of Lower Damodar Construction Division. ' Clearing & removing of water hyacinth and other congestion from 1.96 0.06 June 2020 to 31st October 2020 from Amta channel for a length of 300 m in upstream of 58-vented Ulughata sluice in Block Shyampur• I, P.S Shyampur under Lower Damodar Construction Sub-Division , No. IV of Lower Damodar Construction Division. r- -.-- -t ------.: ._-- --.\--. ----.-----.----_

I j 4 :Clearing & removing of water hyacinth and other congestion upto: 1.68 , 0.05 , , I

i 31st October 2020 from Sankhabhanga Khal for a length of 4.88 km ! in Block Uluberia-I, P.S Uluberia under Lower Damodar , lConstruction Sub-Division No. IV of Lower Damodar Construction I , ! Division. -.---- -..-.-r------____j f------·------·-----·-----·------.--.-.------0.96: 0.03 : : 5 I Clearing & removing of water hyacinth and other congestion from June 2020 upto 31st October 2020 from Kantakhali Khal for a length of 2.44 km and from Dowaripara Khal (Tiorpara) for a length of 950 I 1m in Block Uluberia-I, P.S Uluberia under Lower Damodar I \Construction Sub-Division No. IV of Lower Damodar Construction ! I \ ------··----i-·------~ !.- JQi~i~~n.------. -- -; 4.95 : 0.15 • I 6 i Clearing & removing of water hyacinth from Ranjoybar Gholdipa to, Talghugi of branch channel of Maja Damodar for a length of 4.50 km: for the period from June 2020 upto 31st October 2020 under Loweri Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. 0.08 7 Clearing & removing of water hyacinth from Barboun (Tantighata] 2.74 Channel) to Konchawki of a link channel of Maja Damodar fo a! length of 2.50 km for the period from June 2020 upto 31st October' \i 12020under Lower Damodar Construction Sub-Division No. IV of: , ILower Damodar Construction Division. .. . .~f-!----+------t 8 \cl~arini-&--~e-;~vi~g- of-;~te~-hy;~inili-from-A~~i;g~;i to\ 2.45 0.07 iMakhaldaha RCC bridge of a link channel of Maja Damodar for al I I ! length of 2.00 km for the period from June 2020 upto 31st October! 12020under Lower Damodar Construction Sub-Division No. IV of' ______JI _ '__ LiLowerDamodar· Construction_ Division. Sheet1 of5 I&WD's Main scheme ID: IW/MRJI0S/2020-21

(Rs.m. lakh) Sl. Contingency @ Tendered No. Name of sub-estimates as per tender 3% of amount amount put to tender 1 2 3 4 9 Clearing & removing of water hyacinth from Ranjoybar (Rampur 4.74 0.14 Khal) to Paikbasa RCC bridge (Harinamtala) of Maja Damodar for a, I length of 3.00 km for the period from June 2020 upto 31st October' i 2020 under Lower Damodar Construction Sub-Division No. IV of :Lower Damodar Construction Division. 10 Clearing & removing of water hyacinth from Paikbasa RCC bridge 4.50 0.13 (Harinamtala) to Kamarkhola of Maja Damodar for a length of 7.00 km for the period from June 2020 upto 31st October 2020 under Lower Damodar Construction Sub-Division No. IV of Lower! L_j.I:)~odll!"_C:?ll.~!r~£ti_oI1!?iv~~ion. _'_ __ _ _ - , 11 [Clearing & removing of water hyacinth from Chingra (Nazrul 3.50 0.10 I School) to Palashpai Routhpara of a link channel of Maja Damodar Ifor a length of 3.50 km for the period from June 2020 upto 31st IOctober 2020 under Lower Damodar Construction Sub-Division No.

I ! IV of Lower Damodar Construction Division. ! I !----~, ------j_---,-~- , 12 .Clcaring & removing of water hyacinth and other congestion from i 1.31 0.04 lJune 2020 upto 31st October 2020 of Dhopakhali Khal for a length of 15.70 km at Block Shyampur-I, P.S Shyampur under Lower Damodar] IConstruction Sub-Division No. IV of Lower Damodar Construction I Division. 13 Clearing & removing of water hyacinth and other congestion from 1.15 0.03

June 2020 upto 31st October 2020 of Mithakundu Khal for a length I .of 4.27 km & Madhabpur Khal for a length of 0.73 km at Block iShyampur-I, P.S Shyampur under Lower Damodar Construction Sub- ~--+I_Division No. IV of Lower Damodar ~~~stru~t~~~?ivi~ion:_ _ 14 IClearing & removing of water hyacinth and other congestion from 1.48 0.04 -I

'I! June 2020 upto 31st October 2020 of Khal for a length of 6.40 I km at Block Shyampur-I, P.S Shyampur under Lower Damodar] i Construction Sub-Division No. IV of Lower Damodar Construction ,I I

I iDivision. L-~--i---,-,------I 15 I Clearing & removing of water hyacinth for the period of June 2020 to 3.34 0.10 i '131st October 2020 from NaIda cross regulator to Gobindopur Kkhotirpole of Kana Damodar River for a length of 4.00 km in Block 1& P.S Jagatballavpur under Lower Damodar Construction Sub-: Division No. IV of Lower Damodar Construction Division. _ _(_'------+----:--::-=------1 16 [Clearing & removing solid/semisolid mass formed due to water: 2.89 0.09

ihyacinth, from ch. 3200.0 m to 5170.00 of Baigachi Khal under: I IJagadishpur G.P of Bally-Jagacha Blo~k un~e: ~owrah Drainage Subj

IDivision of Lower Damodar ConstructIOn DIvIsIon. ______L ___j___ ~

Sheet 2 of5 ------~------

I&WD's Main scheme ID: IWIMRl10S/2020-21 (Rs in lakh) Contingency @ SI. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 17 Flood Precautionery Measures (F.P.M) to Damodar left embankment, 1.47 0.04 from Paliara Swasan to Joynagar Bridge and from Simchak to i I Balichal sluice for a total length of 2.00 km in Block & P.S ! I , District Howrah durmg monsoon of 2020 underiI Lower Damodar Construction Sub-Division No. IV of Lower! iDamodar Construction Division. I ~~18 iFlood Precautionery Measures -(F.P.M) to Damod~ar--r-ig~h-tt-I--4-.-9-1----+---0-.-15---1

I embankment from Kumarchak to Joynagar for a length of2.50 km in! IBlock & P.S Udaynarayanpur, District Howrah during monsoon of! I 12020under Lower Damodar Construction Sub-Division No. IV of: ILower Damodar Construction Division. ' 19 Flood Precautionery Measures (F.P.M) to Damodar right 4.82 0.14 embankment from Joynagar to Shibanipur for a length of 2.50 km in Block & P.S Udaynarayanpur, District Howrah during monsoon of! '2020 under Lower Damodar Construction Sub-Division No. IV of! I Lower Damodar Construction Division. r---w- Flood--P~e~a{rt~;~ry--Mea;~es-- -(F.P.M) to Damodar right;- - - 4.69 0.14 [embankment from Shibanipur to Gangadevitala for a length of 2.501 I km in Block & P.S Udaynarayanpur, District Howrah duringI [monsoonI of 2020 under Lower Damodar Construction Sub-DivisionI

:No. IV of Lower Damodar Construction Division. I 1- 2i-rFl~~d----Pr~cautionery- Me-asures (F.P.M) - to Damodar right 4.65 0.14 I [embankment from Gangadevitala to Hariharpur Jora Pole for a length! I lof 2.50 km in Block & P.S Udaynarayanpur, District Howrah during: monsoon of 2020 under Lower Damodar Construction Sub-Divisionl No. IV of Lower Damodar Construction Division. 1 22 Flood Precautionery Measures (F.P.M) to Damodar right I 4.68 0.14 embankment from Hariharpur Jora Pole to Ghola Maity Para for a length of 2.50 km in Block & P.S Udaynarayanpur, District Howrah during monsoon of 2020 under Lower Damodar Construction Sub-]

Division No. IV of Lower Damodar Construction Division. I 23 Flood Precautionery Measures (F.P.M) to Damodar n-·g-h-itl--4-.-4-7--+----0-.1-3---I

I embankment from Ghola Maity Para to Dihibhursut for a length of!

I , !2.50I km in Block & P.S Udaynarayanpur, District Howrah during I lrnonsoon of 2020 under Lower Damodar Construction Sub-Division 1241~~~!a'J-~~~:i°~~::;ruif;:~iV~O';;pper--R.;;"p~left:--2.23 -I .- 0.07----, I Iembankment from Rampur Zero Point to ch. 10050 m (968 m I lupstream of Pancharul embankment) and from ch. 11980 m (962 m, I [upstream of Pancharul embankment) to Chabbispur for a total length: I I 'of 11.57 km in Block Khanakul-I & Udaynaraanpur, P.Ss Khanakul !& Udaynarayanpur, District Hooghly during monsoon of 2020 of' I ,

[Lower Damodar Construction Sub-Division No. IV under Lower I! IDamodar Construction Division. , I ' Sheet 30f5 I&WD's Main scheme ID: IWIMRl108/2020-21

(Rs in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 25 Flood Precautionery Measures (F.P .M) to Damodar left embankment i 2.24 0.07 I from Bagua to Balichak High School for a length of2.50 km in Block: I , Arnta-I, P.S Arnta, District Howrah during... monsoon of 2020 under I i Lower Damodar Construction Sub-Division No. IV of Lower; i .Damodar Construction Division. ' 26 Flood Precautionery Measures (F.P.M) to Damodar right! 2.36 0.07 embankment from Kultagary to Kumarchak for a length of 4.10 km inl Blocks Amta-Il & Udaynarayanpur, P.Ss Joypur & Udaynarayanpur, District Howrah during monsoon of 2020 under Lower Damodar] Construction Sub-Division No. IV of Lower Damodar Construction! Division. ' 0.07

0.04

0.06

------,i 0.04 :

0.05

32 Flood Precautionery Measures (F.P.M) to Damodar left embankment 1.91 0.06 [from Dayar Manasatala to Bagua Sitala Mandir for a length of 3.50 I

[km in Block Ammta-I, P.S Amta, District Howrah during monsoon of , :2020 under Lower Damodar Construction Sub-Division No. IV of I

: l~()~er Damodar Construction Division. _L _

Sheet 4 of5 I&WD's Main scheme ID: IWIMRl108/2020-21

(Rs in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount No. amount put to tender 1 2 3 4 33 Flood Precautionery Measures (F.P.M) to Damodar left embankment, 2.44 0.07 from College More to Fatepur for a length of 6.00 km in Block Ammta-I, P.S Amta, District Howrah during monsoon of 2020 under Lower Damodar Construction Sub-Division No. IV of Lower Damodar Construction Division. 34 Flood Precautionery Measures (F.P.M) to Damodar left embankment 2.60 0.08 from Madaria Bridge to Dayer Manasatala for a length of 5.00 km in Block Ammta-I, P.S Amta, District Howrah during monsoon of2020 under Lower Damodar Construction Sub-Division No. IV of Lower l_ Damodar Construction Division. Total: 96.40 2.86

Estimated Cost of Main Estimate: f 99.26 Lakh

C?J1)~v{ vi"{ Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 5 of5