FORM -1 M

(I) Basic Information

S.NO. Item Details (i) Name of the Mining Lease M/s.Harshad Granites, Site Irapuram Village, Kunnathundu Taluk, District (ii) Location/site Topo sheet No : 58/B12 (GPS Co-ordinate) Latitude 10°02’06.7”N To 10°02’12.6N” Longitude 76°29’32.6” E To 76°29’37.4”E

(iii) Type of Lease Individual Area Size of the Mining Lease(in 1.62.52 ha. ha.) (iv) Capacity of the Mining 60,000 Lease (TPA) (v) Period of Mining Lease 12 Years ( Valid Up to : 20.07.2022) (vi) Expected cost of the project 75 (vii) Have you hired Consultant/Registered Qualified person (RQP) for Yes preparing document? Accreditation No. RQP /MAS/045/88/A Name of Consultant/RQP CJ Thanigaivel Address 1 Meiyammai Street Extension,Block-2 Door No F4,Porur,Chennai-600116 Mobile No. 9444039680 Landline No. 2577123 Email Id [email protected]

4

(II)Environmental Sensitivity

S.No Areas Distance in kilometer/Details 1. (i) Nearest rail or road bridge over the Railway Station - 21.0 km, concerned river,rivulet,nallah etc. in kms. river -7.1 km Nearest Canal – 0.600 km 2. (ii) Nearest Infrastructural along with Sree Bhadra Jyothishalayam distance in Kms Temple - 0.300 km (iii) Nearest Railway line along with To Ernakulam Railway distance in Kms Line - 18.0 km

(iv) Nearest National Highway along with Cochi – Road 12.7 km distance in Kms (v) Nearest State Highway along with Ernakulam – Thekkady Road- distance in Kms (NH85)- 2.6km

(vi) Nearest Major District Road along –(SH-1)6.0 km with distance in Kms (vii) Nearest Any other road along with Cheenikkuzhy – Kilikulam Road - distance in Kms .250 km (viii) Nearest Electric transmission line .110 km pole or tower distance in kms (ix) Nearest canal or check dam or Muvattupuzha river -7.1 km reservoirs or lake or ponds distance in Nearest Canal – 0.600 km Kms (x) Nearest In-take for drinking water pump house distance in Kms 0.550 km (xi) Nearest In-take for Irrigation canal pumps distance in Kms 0.600 km 3. Areas protected under international conventions ,national or local legislation Nil for their ecological ,landscape, cultural or other related value

5

4. Areas which are important or sensitive for ecological reasons wetlands,watercourses or other water bodies,coastal Nil zone,biospheres,mountains,forests.

5. Areas used by protected, important or sensitive species of flora or fauna for Nil breeding,nesting,foraging,resting,over wintering,migration 6. Inland, coastal, marine or underground Nil waters 7. State,National boundaries Nil 8. Routes or facilities used by the public for access to recreation or other Nil tourist,pilgrim areas 9. Defence installations Nil 10. Densely populated or built-up village -3.0 km area,distance from nearest human habitation 11. Areas occupied by sensitive man-made land uses (Hospitals,schools,places of CET College – 1.5 Km, worship,community facilities) 12. Areas containing important, high quality or scarce resources.(ground water Nil resources,surface resources,forestry,agriculture,fisheries,tou rism,minerals) 13. Areas already subjected to pollution or environmental damage. (those where Nil existing legal environmental standards are exceeded).

6

14. Areas susceptible to natural hazard which could cause the project to present Nil environmental problems (earthquakes, subsidence, landslides, erosion,flooding or extreme or adverse climatic conditions) 15. Is proposed mining site located over or No near fissure /fracture for ground water 16. Whether the proposal involves approval or clearance under the following Regulations or Acts namely ? (a). The forest (conservation) Act,1980 ? No

(b). The wildlife (Protection) Acts, 1972 ? No

(c). The coastal Regulation Zone (C.R.Z) No 17. Is forest land involved (ha) ? No 18. Whether there is any litigation pending No against the project and/or land in which the project is proposed to be set up ?

Details of State of the project :-

S.No State Name District Name Tehsil Name (1.) Ernakulam Kunnathunadu

7

(IV). Proposed Terms of Reference for EIA studies

“ I hereby given undertaking that the data and information given in

the application and enclosures are true to the best of my knowledge and belief

and I am aware that if any part of the data and information submitted is found

to be false or misleading at any stage, the project will be rejected and

clearance given, if any to the project will be revoked at our risk and cost.

S.GOPINATHAN

Owner

Date: 30.12.2016