14.1.1 रेले SOUTH EAST CENTRAL RAILWAY

20192019----2020 के िलए पƗरसंपिēयĪ कƙ खरीद , िनमाϕण और बदलाव Assets-Acquisition, Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आंकड़े हजार Đ . मĞ) पूंजी पूंजी िनिध मूआिन िविन संिन रारेसंको जोड़ िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL 11 New Lines (Construction) 31,20,00 ...... 31,20,00 14 Gauge Conversion 400,00,10 ...... 400,00,10 15 ह Doubling 12,00,00 ...... 12,00,00 16 Traffic Facilities-Yard 27,92,01 .. .. 1,20,00 .. 3,29,95 32,41,96 Remodelling & Others 17 Computerisation 1,21,00 .. 1,27,00 3,00 .. .. 2,51,00 21 Rolling Stock 3,25,91 .. .. 13,83 .. 2,54,29 5,94,03 22 Leased Assets - Payment 339,73,89 134,86,11 ...... 474,60,00 of Capital Component

29 Road Safety Works-Level ...... 26,44,06 26,44,06 Crossings. 30 Road Safety Works-Road ...... 173,25,21 173,25,21 Over/Under Bridges.

31 Track Renewals ...... 398,23,31 398,23,31 32 Bridge Works ...... 15,28,20 15,28,20 33 Signalling and 25,00,00 ...... 49,86,08 74,86,08 Telecommunication 36 Other Electrical Works 70,48,16 .. 98,43 81,86 .. 65,61 72,94,06 excl TRD 37 Traction Distribution 1,00,00 ...... 38,76,90 39,76,90 Works 41 Machinery & Plant 4,92,76 .. 2,18,36 99,00 .. 15,97,09 24,07,21 42 ह Workshops including 61,19,01 .. 2,00,00 1,94,02 .. 6,82,34 71,95,37 Production Units 51 Staff Quarters 4,08,00 .. 7,12,00 ...... 11,20,00 52 Amenities for Staff 3,00,00 .. 4,04,03 4,20,03 .. .. 11,24,06 53 Passenger Amenities 41,74,00 .. 12,50,00 22,50,00 .. 100,00,00 176,74,00 64 Other Specified Works 4,40,02 .. 2,00,00 3,41,01 .. 10,01,00 19,82,03 65 Training/HRD ...... 20,00 20,00 71 Stores Suspense 576,52,43 ...... 576,52,43 72 Manufacture Suspense 276,74,92 ...... 276,74,92 73 Miscellaneous Advances ...... कुल योग Total Gross 1884,42,21 134,86,11 32,09,82 35,22,75 .. 841,34,04 2927,94,93 जमा या वसूिलयां Credits or Recoveries (क) िविनमुϕŎ सामि=यĪ के िलए (a) For Released ...... 90,58,06 90,58,06 Materials (ख) अय जमा (b) Other Credits 2,00,00 ...... 2,00,00 (ग) भंडार उचंत (c) Stores Suspense 612,66,60 ...... 612,66,60 (ध) िनमाϕण उचंत (d) Manufacture Suspense 262,46,81 ...... 262,46,81

(ड) िविवध अि=म (e) Miscellaneous ...... Advances कुल जमा या वसूिलयां Total - Credits or 877,13,41 ...... 90,58,06 967,71,47 Recoveries योजना पƗरƆय (((शुŵशुŵशुŵ ))) Plan Outlay (Net) 1007,28,80 134,86,11 32,09,82 35,22,75 .. 750,75,98 1960,23,46 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

NEW LINES (CONSTRUCTION) A - Works in Progress 1 Dallirajahara-Jagdalpur (235 km) Cap. 452,30,00 1,94,21 .. .. Deposit 652,93,00 .. .. 500,00,00

2 Wadsa-Gadchiroli (49.5 km) Cap. 116,20,00 12,26,05 22,31,51 29,90,00 S.Fund 45,00,00 25,02,53 .. .. Deposit 116,20,00 .. .. 50,00,00

3 Raigarh (Mand Colliery) - Bhupdeopur (63 km) Deposit 379,08,00 .. .. 500,00,00

4 Gevra Road - Pendra Road (121.70 km) Deposit 838,02,00 .. .. 500,00,00

5# Barwadih - Chirmiri (182 km) Cap. 1137,00,00 10,00 .. 10,00 S.Fund 5,00,00 ...... Deposit 5,00,00 .. .. 10,00

6# Raipur - Jharsuguda (310 km) Cap. 2161,00,00 10,00 .. 10,00 S.Fund 5,00,00 ...... Deposit 5,00,00 .. .. 10,00

7# Dongargarh - Kharigarh -Kawardha -Bilaspur (270 km) Cap. 1249,99,00 ...... S.Fund 1,00 ...... Deposit 1250,00,00 .. .. 100,00,00

8# Dharamjaigarh - Korba (63 km) Cap. 576,99,00 ...... S.Fund 1,00 ...... Deposit 100,00,00 .. .. 200,00,00 EBR(IF) 577,00,00 ......

9# Chirimiri- Halt (11 km) Cap. 57,00,00 .. .. 1,00,00 Deposit 57,00,00 .. .. 1,00,00

TOTAL-WORKS IN PROGRESS Cap...... 31,10,00 Deposit ...... 1851,20,00 B - New Works 10Lumpsum Provision For New Works Cap...... 10,00

TOTAL-NEW WORKS Cap...... 10,00 TOTAL-New Lines (Construction) Cap...... 31,20,00 Deposit ...... 1851,20,00 GAUGE CONVERSION A - Works in Progress 11 Jabalpur- incl. Balaghat-Katangi (285 km) Cap. 863,49,63 924,26,22 131,69,00 125,00,00 C.Fund 164,50,37 ...... DRF 1 ...... S.Fund 323,90,00 291,91,76 .. .. EBR(IF) 10,00,00 170,32,23 10,00,00 ..

12 Chhindwara-Nagpur (149.522 km) Cap. 1001,16,00 779,51,08 103,31,17 125,00,00 S.Fund 250,00,00 220,33,02 .. .. EBR(IF) 10,00,00 157,85,58 .. ..

13 Chhindwara-Mandla Fort (182.25 km) Cap. 737,72,00 283,22,56 89,99,83 150,00,00 S.Fund 210,00,00 151,75,93 .. .. 14.1.2 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

GAUGE CONVERSION 14# Nagbhir - Nagpur (106 km) Cap. 401,00,00 50,00 .. 10 S.Fund 25,00,00 ......

TOTAL-WORKS IN PROGRESS Cap...... 400,00,10 TOTAL-Gauge Conversion Cap...... 400,00,10 DOUBLING A - Works in Progress 15 Bilaspur-Urkura (110 km) Cap. 244,57,71 278,25,27 .. .. C.Fund 22,73 22,73 .. .. Deposit 10,00 ...... Dep(RVN) 60,74,56 60,74,56 .. .. EBR(IF) 57,00,00 13,82,00 11,00 1

16 Salka Road-Khongsara - Patch doubling (26 km) Cap. 28,24,39 -4,98,00 .. .. Dep(RVN) 114,62,30 114,62,30 .. .. EBR(IF) 1,00,00 67,16,00 96,58,31 3,50,00

17 Khodri-Anuppur, with flyover at Bilaspur (61.6 km) Cap. 209,01,81 -8,32,93 .. 2,00,00 C.Fund 11,06,97 11,06,97 .. .. Dep(RVN) 164,45,22 164,45,22 .. .. EBR(IF) 1,00,00 70,04,00 10,00 ..

18 Raipur-Titlagarh (203 km), incl new line Mandir Hasaud-Naya Cap. 321,70,11 355,44,09 76,88,00 10,00,00 Raipur(20 km) and new material modification for conversion of Raipur (Kendri)-Dhamtari & Abhanpur-Rajim branch (67.20 km)

S.Fund 75,00,00 ...... Dep(RVN) 114,80,00 87,45,00 .. .. EBR 10,00,00 10,00,00 .. .. EBR(IF) 169,00,00 8,91,74 31 .. EBR(IRFC) 195,00,00 .. 195,00,00 72,00,00

19 Champa-Jharsuguda - 3rd line (165 km) Cap. 762,91,33 148,91,08 .. .. EBR 50,00,00 50,00,00 .. .. EBR(IF) 200,69,67 672,37,40 101,00,00 52,00,00

20 Durg-Rajnandgaon - 3rd line Cap. 138,96,00 104,97,96 .. .. EBR(IF) 14,03,00 149,34,06 7,21,90 5,80,00

21 Rajnandgaon-Nagpur - 3rd line (228 km) Cap. 7,00,00 32,74 .. .. EBR(IF) 1273,00,00 77,75,18 314,43,52 350,00,00

22 Jharsuguda - Bilaspur - 4th line (206 km) Cap. 10,00,00 25,41 .. .. EBR(IF) 2060,00,00 54,05,36 76,64,17 200,00,00

23 Pendra Road- Anuppur - 3rd line (50.10 km) Cap. 10,00,00 ...... EBR(IF) 1510,00,00 146,40,89 49,89,46 100,00,00

24 Anuppur - Katni - 3rd line (165.52 km) Cap. 10,00,00 23,07 .. .. EBR(IF) 1680,00,00 123,19,90 102,89,19 125,00,00

25#Gevra Road - Pendra Road (122 km) Cap. 10,00 ...... Deposit 10,00 .. .. 100,00,00 EBR(IF) 1220,00,00 ...... EBR(P) 230,00,00 ...... 14.1.3 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

DOUBLING 26 Jharsuguda - Bilaspur - Flyover / bypass (10 km) Cap. 10,00,00 ...... EBR(IF) 200,00,00 .. .. 2,00

TOTAL-WORKS IN PROGRESS Cap...... 12,00,00 Deposit ...... 100,00,00 EBR(IF) ...... 836,32,01 EBR(IRFC) ...... 72,00,00 TOTAL-Doubling Cap...... 12,00,00 Deposit ...... 100,00,00 EBR(IF) ...... 836,32,01 EBR(IRFC) ...... 72,00,00 TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 27 Rupaund - Addl common loop to serve new goods shed Cap. 4,21,39 2,92,44 .. 75,00

28 Mandhar - New goods terminal Cap. 3,18,05 5,23,72 27,60 5,00

29 Silyari - Addl loop DF(3) 2,64,23 1,29,38 .. .. RRSK 1,34,85 3,84,76 10 1,00

30 Bhupdeopur - Remodelling for dealing with new private sidings Cap. 9,60,74 4,89,74 98,60 1

EBR 4,00,00 ......

31 Durg - Development of goods shed by common loop (line No 10) Cap. 9,38,15 9,67,12 .. 51,00 and better unloading facilities 32 Bhilai - Addl. freight maintenance depot at coal empty yard with Cap. 31,20,63 24,08,56 .. 43,00 three examination lines and one shunting neck of full length

EBR 8,00,00 ......

33 Bhilai (Exchange Yard) - Remodelling with two addl lines by Cap. 8,17,94 8,60,90 1,78,22 2,46,94 extension of dead end 34 Saragbundia - Conversion of goods shed siding into up loop cum Cap. 3,65,00 2,35,58 6,75 25,00 down reception line 35 Bilaspur Division - Siding for stabling track machines (9 stations) DF(3) 6,83,00 4,60,25 .. ..

RRSK 1,28,69 .. 5,00 5,00

36 Kamptee - Addl up loop Cap. 4,42,43 4,96,87 1,91 1

37 Baradaur - Addl up loop Cap. 5,99,00 4,40,48 26,00 1

38 Maroda - New exchange yard for addl traffic of Bhilai Steel Plant Cap. 14,81,85 10,68,20 2,29,42 1,00,00

39 Kotarlia - Conversion of up loop into common loop Cap. 2,73,25 2,71,37 .. 1

40 Bakal - Conversion of C-class station into B-class with 4 lines Cap. 11,36,51 10,14,49 53,50 35,00

41 Ib - Fly-over Cap. 30,89,53 2,94,38 6,52 10,00,00

42 Brajrajnagar & Belpahar - Connectivity with Belpahar Open Coal Cap. 19,15,00 16,07,16 40,33 2,55,00 Mines group sidings 14.1.4 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 43 Itwari - Addl loop lines (2 Nos) Cap. 8,65,69 8,95,00 2,82,17 1

44 Kalumna - Goods shed line Cap. 3,17,19 5,49,53 2,42 1 DF(3) 4,22,89 2,03,22 .. ..

45 Shahdol - Long loop line Cap. 3,19,51 .. .. 1 DF(3) 2,94,13 3,12,72 1,00 .. EBR(IF) 3,81,00 .. .. 3,81,00

46 Hathbandh - Long loop line Cap. 6,19,99 5,50,30 21,60 2,30,00 DF(3) 1,51,42 1,00 .. ..

47 Salwa - Long loop line Cap. 12,54,59 4,16,48 67,60 2,00 DF(3) 2,94,13 2,94,13 .. ..

48 Koka - Long loop line Cap. 1,26,99 5,37,41 1,24,97 50,00 DF(3) 2,95,01 2,94,13 .. ..

49 Bilaspur-Dadhapara-Belha - Automatic signalling (16 km) Cap. 17,09,95 1,71,61 4,88,62 2,00,00

50 Bilaspur-Uslapur-Ghutku - Automatic signalling Cap. 14,24,53 78,89 4,73,77 1,50,00

51 Bortalao-Paniajob - Intermediate block hut in both directions Cap. 2,54,84 93,69 50,00 6,00

52 Bilaspur-Gatora-Jairamnagar - Automatic signalling Cap. 16,66,31 1,81,21 4,00,00 2,00,00

53 Kalumna-Itwari - Connection of shunting neck with crossovers RRSK 5,95,57 40,38 .. 2,00,00

54 South East Central Railway - New works for doubling of bypass line, Cap. 243,00,00 .. 1,00,00 10,00 IBS, conversion to twin single line and running line, conversion to single block station, addl full length line and loop line with extension of bridge, extension of line with passenger platform, provision of shunt signal, automatic signalling, shifting & providing new goods shed DF(3) 37,00,00 .. 5,00 20,00

55 Estimated investment through EBR(Partnership) for private freight EBR(P) 100,00,00 .. 100,00,00 40,00,00 terminals 56Works costing below Rs.2.5 crore each Cap...... 1,00,00 DF(3) ...... 1,00,00 RRSK ...... 1,23,95

TOTAL-WORKS IN PROGRESS Cap...... 27,84,01 DF(3) ...... 1,20,00 RRSK ...... 3,29,95 EBR(IF) ...... 3,81,00 EBR(P) ...... 40,00,00 B - New Works 57Lumpsum Provision For New Works Cap...... 8,00

TOTAL-NEW WORKS Cap...... 8,00 TOTAL-Traffic Facilities-Yard Remodelling & Others Cap...... 27,92,01 DF(3) ...... 1,20,00 RRSK ...... 3,29,95 EBR(IF) ...... 3,81,00 EBR(P) ...... 40,00,00 14.1.5 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

COMPUTERISATION A - Works in Progress 58 South East Central Railway - Extension of automatic ticket vending Cap. 6,58,00 2,38,54 50,00 1,20,00 machines 59Works costing below Rs.2.5 crore each DRF ...... 27,00

TOTAL-WORKS IN PROGRESS Cap...... 1,20,00 DRF ...... 27,00 B - New Works 60Lumpsum Provision For New Works Cap...... 1,00 DRF ...... 1,00,00 DF(1) ...... 2,00 DF(3) ...... 1,00

TOTAL-NEW WORKS Cap...... 1,00 DRF ...... 1,00,00 DF(1) ...... 2,00 DF(3) ...... 1,00 TOTAL-Computerisation Cap...... 1,21,00 DRF ...... 1,27,00 DF(1) ...... 2,00 DF(3) ...... 1,00 LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 61 Leased Assets - Payment of Capital component of lease charges to Cap. 339,73,89 517,84,00 400,79,00 339,73,89 Indian Railway Finance Corporation C.Fund 134,86,11 128,35,00 .. 134,86,11

TOTAL-WORKS IN PROGRESS Cap...... 339,73,89 C.Fund ...... 134,86,11 TOTAL-Leased Assets - Payment of Capital Component Cap...... 339,73,89 C.Fund ...... 134,86,11 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 62 Bilaspur Division - Interlocking of level crossing gates outside station RRSK 9,04,87 .. 45,00 5,50,00 limits (7 Nos) 63 Bilaspur Division - Electrical lifting barrier gate in lieu of mechanical RRSK 14,23,69 .. 56,00 4,00,00 lifting barrier gate 64 - Upgradation of manned level crossings (30 Nos) RRSK 5,16,64 .. 5,00 4,50,00

65 Durg-Nagpur - Interlocking of C-class level crossings (tvu less than S.Fund 15,75,82 4,63,78 .. .. 20000) in connection with raising of speed to 160 kmph (19 Nos)

RRSK 11,75,82 3,93,07 3,54,00 3,00,00

66 Bilaspur - Nagpur - Interlocking of level crossing gates (12 Nos) S.Fund 9,55,00 9,94 .. ..

RRSK 9,35,00 .. 3,31,24 1,80,00

67 Raipur Division - Electric motor operated level crossing gate in lieu RRSK 4,00,42 61,35 90,00 2,00,00 of winch operated mechanical level crossing gates with mini integrated power supply (15 Nos) 14.1.6 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-LEVEL CROSSINGS. 68 Bijuri-Bhaitola - Closing of manned level crossing No.AB/17 by RRSK 2,65,93 .. 30,00 1,00,00 diverting road through LHS No.16 69Works costing below Rs.2.5 crore each RRSK ...... 3,89,06

TOTAL-WORKS IN PROGRESS RRSK ...... 25,69,06 B - New Works 70Lumpsum Provision For New Works RRSK ...... 75,00

TOTAL-NEW WORKS RRSK ...... 75,00 TOTAL-Road Safety Works-Level Crossings. RRSK ...... 26,44,06 ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. A - Works in Progress 71 Tumsar - Road over bridge in lieu of level crossing No 532 S.Fund 30,00 30,00 .. .. RRSK 17,84,00 3,87,23 4,00,00 6,10,00 EBR(Dep) 19,09,00

72 Champa-Naila - Road over bridge in lieu of level crossing No 342 S.Fund 6,36,81 5,00,41 .. .. (Khoksa level crossing) RRSK 4,55,70 2,18,16 2,00,00 1,00,00 EBR(Dep) 10,00,59

73 Champa Yard - Road over & under bridge in lieu of level crossing No S.Fund 74,16 74,16 15,00 .. 337 RRSK 6,55,51 .. 3,00,00 25,00 EBR(Dep) 10,21,48

74 Raipur-Baloda Bazar Road - Road over bridge at level crossing S.Fund 7,28,68 7,52,68 .. .. No.RV-5 RRSK 10,00 1,06,13 2,76,78 20,00 EBR(Dep) 14,06,59

75 Bilaspur-Gatora - Road over bridge in lieu of level crossing No.364 S.Fund 7,10,69 4,94,51 .. ..

RRSK 2,34,23 1,42,31 1,50,00 50,00 EBR(Dep) 11,13,75

76 Tilda-Simga - Road under & over bridge at level crossing No.397 S.Fund 7,07,08 7,04,80 .. .. near Tilda crossing (national highway No.37) RRSK 5,01,43 4,86,87 1,80,29 20,00 EBR(Dep) 13,08,51

77 Dadhapara-Belha - Road over & under bridge at level crossing S.Fund 12,57,72 12,69,86 .. .. No.370 RRSK 6,00 1,39,79 29,42 1 EBR(Dep) 11,39,63

78 Saraswati Nagar-Sarona - Limited height subway at level crossing S.Fund 1,81,05 1,27,83 .. .. No.420 RRSK 2,37,75 1,40,11 1,30,65 51

79 Bhilai-Durg - Limited height subway near level crossing No.443 S.Fund 4,08,42 2,08,60 .. .. (Nehru Nagar Gate) RRSK 5,57,51 70,88 2,35,49 1,50,00

80 Nainpur-Chhindwara - Limited height subways by open cut method S.Fund 10,73,52 10,76,07 2,00,00 .. at unmanned level crossings (20 Nos) RRSK 13,59,78 5,62,07 5,00,00 5,00,00 14.1.7 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 81 Chhindwara-Nagpur - Limited height subways by open cut method at S.Fund 21,45,95 23,79,92 2,00,00 .. unmanned level crossings (40 Nos) RRSK 26,74,05 12,67,01 5,00,00 5,00

82 Balaghat-Nainpur - Limited height subways by open cut method at S.Fund 14,75,86 15,04,90 2,00,00 .. unmanned level crossings (27 Nos) RRSK 17,95,64 5,53,35 4,90,00 8,00,00

83 Nainpur-Jabalpur - Limited height subways by open cut method at S.Fund 11,49,74 12,85,36 .. .. unmanned level crossings (13 Nos) RRSK 2,20,30 .. .. 2,00,00

84 Nainpur-Mandla Fort - Limited height subways by open cut method S.Fund 5,27,11 5,49,29 .. .. at unmanned level crossings (15 Nos) RRSK 12,99,94 5,91,11 1,00,00 5,00,00

85 Kanhan-Koradih - Limited height subways by open cut method at S.Fund 1,87,74 4,91 .. .. unmanned level crossings (5 Nos) RRSK 5,62,26 6,54,40 3,64,71 1,00

86 Durg-Dallirajhara - Road over & under bridge at level crossing S.Fund 8,93,08 7,54,74 2,00,00 .. No.DD-10 RRSK 7,88,46 7,05,73 2,00,00 1 EBR(Dep) 26,93,35

87 Bilaspur-Katni - Road over & under bridge / limited height subway in S.Fund 10,00 ...... lieu of level crossing No.BK-66 RRSK 14,77,94 .. .. 4,00,00 EBR(Dep) 18,17,14

88 Bilaspur Yard - Limited height subway on multi line section in lieu of S.Fund 1,70,14 1,61,73 .. .. Chuchiyapara level crossing gate No.365 RRSK 2,60,18 .. 4,47,18 43,64 EBR(Dep) 4,30,32

89 Raipur Naka - Limited height subway in lieu of level crossing No.444 S.Fund 2,12,10 1,62,10 .. ..

RRSK 1,58,45 3,34 66,55 1,55,00

90 Bilaspur Yard - Road over bridge in lieu of level crossing No.366 at S.Fund 17,37 9,76 .. .. Tarbahar Naka RRSK 15,44,46 .. .. 20,00 EBR(Dep) 15,61,83

91 Bhilai Nagar-Durg Link Block - Road over bridge in lieu of level S.Fund 5,08,63 13,07,63 2,00,00 .. crossing No.443 (Nehru Nagar) RRSK 6,40,58 1,98,96 5,00,00 2,00,00 EBR(Dep) 23,30,61

92 Bilaspur-Katni - Road over & under bridge in lieu of level crossing S.Fund 1,08,37 7,37 .. .. No.BK-37 near Gourela RRSK 11,79,73 10,10,47 3,13,33 1,00,00 EBR(Dep) 12,88,10

93 Bijuri Yard - Road over bridge in lieu of level crossing No.AB-18 S.Fund 1,15,42 14,42 1,09,53 ..

RRSK 23,80,12 6,67 3,00,00 5,00,00 14.1.8 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 94 Saraswatinagar-Sarona - Full height subway in lieu of level crossing S.Fund 15,54 16,80 .. .. No.421 (Dumartalab Gate) RRSK 3,35,01 .. 53,20 2,52,00 EBR(Dep) 3,50,54

95 Gunderdehi-Latabor - Road under bridge in lieu of level crossing S.Fund 1,10,79 10,06 .. .. No.DD-36 RRSK 2,46,14 1,40,32 2,05,72 8,00

96 Bhilai - Full height subway in lieu of level crosing No.439 (Sirsa Gate)S.Fund 1,57,37 7,86 .. ..

RRSK 5,03,16 15,59 63,30 1,80,50 EBR(Dep) 6,60,53

97 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing S.Fund 13,09 13,09 .. .. No.DD-59 RRSK 4,02,94 .. 1,00,00 1,20,00

98 Durg Yard - Full height subway in lieu of level crosing No.445 S.Fund 1,00,74 14,74 .. .. RRSK 2,66,20 10,25 54,55 1,82,00 EBR(Dep) 3,66,95

99 Bhilai Power House-Bhilainagar - Road over & under bridge in lieu of S.Fund 19,49 8,55 .. .. manned level crossing No.442 (Supela Gate) RRSK 14,21,06 .. 2,00 1,00 EBR(Dep) 26,44,03

100 Bilaspur-Durg - Limited height subway in lieu of level crossing near S.Fund 7,87 7,37 .. .. G-cabin RRSK 2,77,77 .. 61,34 1,01,00

101 Gondia-Nagbhir - Limited height subway in lieu of level crosings (9 S.Fund 4,00,00 83 .. .. Nos) RRSK 14,80,86 5,25,81 3,59,54 1,00,00

102 Parmalkasa-Rajnandgaon - Road under bridge in lieu of level S.Fund 97,64 3,11 .. .. crossing No.458 RRSK 1,81,44 1,77,05 1,23,75 1 EBR(Dep) 2,79,09

103 Sarona-Kumhari - Full height subway in lieu of level crosing No.429 S.Fund 15,24 14,74 .. ..

RRSK 4,23,65 .. 11,88 1,80,00 EBR(Dep) 4,38,89

104 Uchchabati - Road over bridge in lieu of level crossing No.293 RRSK 17,50,00 .. .. 50,00

EBR(Dep) 17,50,00

105 Bhatapara-Nipania- Road under bridge in lieu of manned level S.Fund 50,00 ...... crossing No. 383 RRSK 2,78,93 .. 50,56 1,80,00 EBR(Dep) 3,28,93

106 Gondia-Chandafort- Light Road over bridge in lieu of level crossing S.Fund 20,00 10,24 .. .. No. 20 RRSK 6,54,32 .. 2,02,50 2,00,00 14.1.9 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 107 Gondia-Chandafort- Light Road over bridge in lieu of level crossing S.Fund 20,00 ...... No. 134 RRSK 6,63,38 31 1,02,49 2,00,00

108 Katora-Surajpur- Re-Construction of Road over bridge in lieu of level S.Fund 10,00 ...... crossing No. 205 RRSK 3,22,29 48,56 80,21 25,00

109 Bilaspur-Durg- Road over bridge & Road under bridge in lieu of level S.Fund 1 ...... crossing No. 391 RRSK 21,30,60 .. .. 1,00 EBR(Dep) 24,06,53

110 Gondia-Chandafort- Light Road over bridge in lieu of level crossing S.Fund 20,00 26 .. .. No. 88 RRSK 6,24,35 31 1,02,32 2,00,00

111 Tumsar-Tirodi- Light Road over bridge in lieu of level crossing No. 2 RRSK 4,65,27 95,53 1,38,36 1,00,00

112 Nagpur-Durg- subways manned in lieu of level crossing No. 526 & S.Fund 50,30 42 .. .. 530 (2 Nos) RRSK 7,22,70 .. 1,00,52 1,04,80

113 Subways in lieu of level crossings Nos 63,52,23,64 & 68 on Nainpur S.Fund 5,00 ...... subdivision (5 Nos) RRSK 9,50,77 3,58,91 74,51 2,00,00

114 Raipur-Durg- Road under bridge in lieu of level crossing No. 438 S.Fund 50 ...... near D-Cabin RRSK 9,61,63 .. 30,50 1,84,80

115 Tarbahar Bilaspur- subway in lieu of level crossing No. 366B under RRSK 7,94,44 .. .. 1,00,00 bypass line & up lead line to BCN Depot 116 Nagpur-Chhindwara- subways in lieu of level crossing No. 9, 12, 45, S.Fund 5,00 ...... 47 , 53 & 103 (6 Nos) RRSK 9,89,44 9,00,00 2,30,49 2,00

117 Bhilai-Bhilai Nagar- Road under bridge in lieu of manned level S.Fund 20,00 ...... crossing No. 441 (Bhilai Power House) RRSK 3,49,21 1,65 66,20 2,10,00 EBR(Dep) 3,69,21

118 Bilaspur-Raipur- Road under bridge in lieu of manned level crossing S.Fund 14,56 1,56 .. .. No. 385 RRSK 5,07,46 4,80 15,13 1,85,04

119 Nagpur-Durg- subways in lieu of level crossing No. 565 & 566 (2 S.Fund 50,30 57 .. .. Nos) RRSK 7,62,70 .. 1,11,27 1,02,00

120 Kumhari- C Cabin- Subway in lieu of level crossing No.432 S.Fund 90,77 90 .. .. RRSK 4,95,51 1,51,83 1,30,38 1,80,25

121 Tumsar Road-Gondia- Subways in lieu of level crossing No. 531 & S.Fund 24,00 9 .. .. 525 RRSK 6,76,65 1,58 58,18 30,00

122 Chhada-Singhpur- Light Road over bridge in lieu of level crossing S.Fund 5,00 ...... No.BK-70 RRSK 7,85,52 .. 1,20,00 3,50,00 14.1.10 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 123 Kanhan-Ramtek - Light Road over bridge (Br.No. 28-A) in lieu of S.Fund 95,00 17 .. .. level crossing No.KR-12 RRSK 1,71,22 53,47 1,00,00 50,00 EBR(Dep) 2,66,22

124 Kanhan-Ramtek - Light Road over bridge (Br.No. 8-B) in lieu of level S.Fund 95,00 17 .. .. crossing No.KR-6 RRSK 4,51,09 1,36,53 3,67,14 1,10,00

125 Kanhan-Ramtek - Light Road over bridge in lieu of level crossing S.Fund 95,00 17 .. .. No.KR-3 & KR-8 (2 Nos.) RRSK 8,26,37 67,64 1,97,05 40,00

126 Kanhan-Ramtek - Light Road over bridge (Br.No. 27-A) in lieu of S.Fund 80,00 17 .. .. level crossing No.KR-11 RRSK 4,07,33 50,80 1,00,53 62,00

127 Balod-Kusumkasa- Light Road over bridge in lieu of level crossing S.Fund 50,97 97 .. .. No. DD-55 RRSK 2,37,76 1,06,74 88,36 40,00

128 Urkura-Sarona- Road over bridge in lieu of level crossing No.425 S.Fund 5,00 ...... with subway RRSK 22,37,83 .. .. 5,00,00 EBR(Dep) 30,48,44

129 Kalumna-Nagpur- Subways in lieu of level crossing No. 568 & 569 S.Fund 7,00 27 .. ..

RRSK 7,55,36 53,95 1,50,43 1,15,58

130 Bilaspur-Durg- Subway in lieu of level crossing No.431 UP Urla level S.Fund 40,50 ...... crossing RRSK 3,42,50 58,80 1,57,01 1,10,27

131 Bilaspur-Durg- Subway in lieu of level crossing No. 417 (Khamtrai) S.Fund 50 ......

RRSK 5,30,96 .. 1,00 1,10,00

132 Kamptee-Kanhan- Subway in lieu of level crossing No. 560 & 561 S.Fund 40,30 27 .. .. (01 No.) RRSK 5,93,43 6,24 2,57,26 2,53,50

133 Salwa-Chacher- Subway in lieu of level crossing No. 556 S.Fund 20,00 ...... RRSK 3,10,15 5,83 15,97 4,00

134 Raipur-Mandirhasaud - Road under bridge in lieu of level crossing RRSK 5,85,57 .. 1,00 2,00,00 No. RV-1 at Waltair Gate EBR(Dep) 5,85,57

135 Durg-Dallirajhara- Subway in lieu of level crossing No. DD-34 S.Fund 40,18 18 .. ..

RRSK 2,51,61 1,40,18 1,03,11 5,00

136 Bilaspur-Raipur- Road under bridge in lieu of level crossing No. 384 S.Fund 50,00 ...... in Bhatapara Yard RRSK 4,90,51 2,58 41,00 1,21,25 EBR(Dep) 5,40,52

137 Raipur-Durg- Subway in lieu of level crossings No.433 & 434 (1 No.) S.Fund 5,61 ......

RRSK 5,35,45 1,63 2,07,18 1,00,20 14.1.11 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 138 Champa-Bilaspur-Anuppur- Subways in lieu of level crossings (25 S.Fund 10,00 ...... Nos.) RRSK 101,49,80 .. 5,00,00 10,00,00

139 Naila Yard - Closure of level crossing No.345 by road over & under RRSK 33,49,02 .. .. 50,00 bridge EBR(Dep) 33,49,02

140 Durg-Dallirajhara - Closure of manned level crossing No.DD-4 by RRSK 18,14,00 15,00,00 .. 5,00,00 road over bridge with limited height subway EBR(Dep) 24,35,00

141 Tharsa-Chacher - Road over bridge at level crossing No.554 RRSK 19,95,00 .. 50,00 2,00,00 EBR(Dep) 19,95,00

142 Balaghat Yard - Road over bridge at level crossing No.GJ-36 at RRSK 23,18,66 .. 50,00 2,00,00 Gondia end EBR(Dep) 23,18,67

143 Latabor Yard - Closure of manned level No.DD-45 by road under RRSK 4,25,00 46 1,39,15 1,53,03 bridge 144 Urkura-Sarona - Road under bridge in lieu of manned level crossing RRSK 3,62,00 .. 80,00 1,50,00 No.424 (Gondwara Gate) EBR(Dep) 3,62,00

145 Dongargarh-Paniajob - Limited height subway in lieu of level RRSK 9,98,00 76 5,00,28 4,00,00 crossing No.474 EBR(Dep) 9,98,00

146 Anuppur-Ambikapur - Elimination of manned level crossings by full RRSK 10,87,00 .. 1,00,00 2,00,00 height/limited height subways/road under bridges (4 Nos)

147 Estimated investment through EBR(Partnership) for works on Indian EBR(P) 130,00,00 .. 130,00,00 65,00,00 Railways on cost share basis incl deposit from State Government etc

148 Durg-Nagpur - Road over bridge at level crossing no.548 RRSK 26,29,30 .. 1,00,00 5,00,00 (PB#157/2018-19/SECR) EBR(P) 26,29,30 ......

149 Salwa-Kanhan - Road over bridge at level crossing no.559 RRSK 15,65,32 .. .. 4,00,00 (PB#157/2018-19/SECR) EBR(P) 15,65,32 ......

150 Bilaspur-Raipur - Elimination of level crossing No.398 in Tilda Yard RRSK 30,42,00 .. 3 1,00 by provision of road over bridge & road under bridge (Supl.No.2/December 2018) EBR(P) 44,39,00 ......

151 Mandhar-Urkura - Elimination of level crossing No.414 in Urkura RRSK 31,68,00 .. .. 1,00 Yard by provision of road over bridge & road under bridge (Supl.No.3/December 2018) EBR(P) 45,86,00 ......

152 Pendra Road-Harri - Construction of road over & road under bridges RRSK 22,66,00 .. 3 1,00 for closure of manned level crossing No.BK-38 (Supl.No.4/December 2018) EBR(P) 22,66,00 ...... 14.1.12 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 153 Bilaspur-Uslapur - Construction of road under bridge for closure of RRSK 4,73,00 .. 3 1,00 manned level crossing No.BK-03 (Supl.No.5/December 2018)

EBR(P) 4,73,00 ......

154 Champa-Bilaspur - Road over bridge at level crossing No.360 on RRSK 19,86,00 .. 3 1,00 Jairam Nagar Yard (Supl.No.6/December 2018) EBR(P) 19,86,00 ......

155 Raipur Division - Road under bridge in lieu of level crossing No.373 RRSK 8,19,00 .. 3 1,00 at Belha Yard (Supl.No.7/December 2018) EBR(P) 8,19,00 ......

156 Kotarlia-Raigarh - Road over bridge with subway in lieu of level RRSK 15,11,00 .. 3 1,00 crossing No.287 (Supl.No.8/December 2018) EBR(P) 15,11,00 ......

157 Bhupdeopur-Robertson - Elimination of level crossing No.301 RRSK 11,30,00 .. 3 1,00 (Naharpali) by construction of road over bridge (Supl.No.9/December 2018) EBR(P) 11,30,00 ......

158 Bhupdeopur-Robertson - Elimination of level crossing No.303 by RRSK 13,60,00 .. 3 1,00 construction of road over bridge with subway (Supl.No.10/December 2018) EBR(P) 13,60,00 ......

159 Champa-Gevra Road - Elimination of level crossing No.CG-20 in RRSK 14,46,00 .. 3 1,00 Urga Yard by provision of road over bridge with subway (Supl.No.11/December 2018) EBR(P) 14,46,00 ......

160 Champa-Gevra Road - Elimination of level crossing No.CG-26 RRSK 8,97,00 .. 3 1,00 between Korba-Urga Yard by provision of road over bridge with subway (Supl.No.12/December 2018) EBR(P) 8,97,00 ......

161 Champa-Gevra Road - Elimination of level crossing No.CG-28 by RRSK 13,02,00 .. 3 1,00 provision of road over bridge with subway (Supl.No.13/December 2018) EBR(P) 13,02,00 ......

162 Raigarh-Kirodimalnagar - Elimination of level crossing No.289 RRSK 20,41,00 .. 3 1,00 (Kotara Gate) by construction of road over bridge with subway (Supl.No.14/December 2018) EBR(P) 20,41,00 ......

163 Champa-Jharsuguda - Elimination of level crossing No.320 (Temar RRSK 15,56,00 .. 3 1,00 Gate) by provision of road over bridge with subway (Supl.No.15/December 2018) EBR(P) 15,56,00 ......

164 Champa-Jharsuguda - Elimination of level crossing No.313 in RRSK 16,06,00 .. 3 1,00 Kharsia Yard/West End by provision of road over bridge and subway (Supl.No.16/December 2018) EBR(P) 16,06,00 ......

165 Gondia-Amgaon - Subway in lieu of manned level crossing No.497 RRSK 4,57,46 .. .. 2,00,00 (PB#157/2018-19/SECR) 14.1.13 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 166 Rasmara-Durg - Road under bridge in lieu of level crossing No.450 RRSK 6,56,00 .. 3 1,00 (Supl.No.1/December 2018) EBR(P) 6,56,00 ......

167Works costing below Rs.2.5 crore each RRSK ...... 24,04,81

TOTAL-WORKS IN PROGRESS RRSK ...... 163,25,21 EBR(P) ...... 65,00,00 B - New Works 168Lumpsum Provision For New Works RRSK ...... 10,00,00

TOTAL-NEW WORKS RRSK ...... 10,00,00 TOTAL-Road Safety Works-Road Over/Under Bridges. RRSK ...... 173,25,21 EBR(P) ...... 65,00,00 TRACK RENEWALS A - Works in Progress 169Durg-Nagpur (DN) - TRR(P) - 5.00 km RRSK 4,94,39 .. 41,59 2,00,00

170 Anuppur-Ambikapur - TSR(P) (Without Ballast) – 27.903 km RRSK 18,06,20 .. 40,00 2,00,00

171 Anuppur-Ambikapur (SL) - TWR - 29.00 km RRSK 7,07,75 .. 40,00 1,50,00

172 Anuppur-Katni - TBR – 60.049 km RRSK 15,71,94 .. 4,00,00 5,00,00 R. 7,39,58

173 Anuppur-Ambikapur(DN) & Boridand-Daritola-Chirimiri(SL) - TBR – RRSK 4,91,28 .. 40,00 2,00,00 18.767 km R. 2,31,14

174 Durg-Nagpur - Glued Joints - 800 sets (60 kg) RRSK 5,46,88 .. 20,00 5,00

175 Durg-Nagpur - TFTR - 27.23 km RRSK 19,88,59 .. 2,00,59 50,00

176 Anuppur-Ambikapur & Anuppur-Katni - Improvement to track RRSK 4,45,95 .. 40,00 1,00,00 drainage in yards & water logging locations - 622.60 km 177 Nagpur-Durg - TFTR-28.76 Km DRF 20,79,71 ...... RRSK 20,69,71 85,42 1,01,40 50,00

178 Jharsuguda - Bilaspur & Champa - Gevra road - TFR - 81.448 KM. DRF 7,99,42 1,32,50 .. ..

RRSK 7,89,42 18,95 1,00,78 1,00,00

179 Jharsuguda - Champa & Champa - Gevra Road - TRR(P) - 33.312 RRSK 31,48,01 .. 80,00 2,00,00 km & TWR - 4.054 km 180 Jharsuguda - Champa - TBR - 51.689 km RRSK 18,46,32 .. 90,00 2,00,00

181 Jharsuguda - Champa - CTR (P) - 2.273 km RRSK 3,36,73 14,88 80,00 1,50,00 R. 25,08

182 Durg - Dallirajhara - TRR(P) -13.075 km RRSK 11,98,32 24,32 2,08,54 4,00,00

Complete Track Renewal 183 Bilaspur-Raipur Jn.(MID) - CTR(P) – 1.912 km RRSK 2,67,25 .. 50,22 1,00,00

184 Bilaspur & Pendra yard - CTR (S) - 5.059 km RRSK 6,68,15 .. 40,00 2,00,00 R. 40,38 14.1.14 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 185 Jharsuguda-Champa - Gevra Road (loop lines in Yard) - CTR(S) - RRSK 23,71,20 .. 40,00 2,00,00 17.954 km R. 1,43,30

186 Bilaspur Division - Anuppur-Katni - CTR(S) - 8.825 Km on Loop RRSK 10,99,93 .. 3,00,00 2,00,00 lines in Yard. R. 60,03

187 Bhilai Marshalling Yard - CTR(S) -14.033 km RRSK 17,49,05 .. 50,56 1,20,00 R. 95,46

188 Maroda, Balod & Kusumkasa Yard - CTR(S) - 2.643 km RRSK 3,29,42 .. 50,00 1,00,00 R. 17,98

189 Nagpur Division - CTR(S) -15.28 km & TTR (CMS) - 9 sets RRSK 18,83,82 .. 3,00,24 1,00,00

190 Raipur Division:- RSD Yard - CTR(S) -10.062 Km DRF 13,07,26 76,94 .. .. S.Fund 2,00,00 39,09 .. .. RRSK 9,82,76 23,87 6,06,51 2,00,00 R. 47,56

191Bilaspur division - CTR(S) - 7.80Km DRF 10,13,38 4,26 .. .. RRSK 8,76,51 8,70,17 42,95 1 R. 36,87

192 Jharsuguda-Champa - CTR (P) - 5.305 KM. DRF 5,92,49 ...... S.Fund 3,00,00 3,00,00 .. .. RRSK 5,33,51 2,34,36 2,11,78 40,00 R. 48,98

193Raipur-Dhamtari - CTR(S) -17.78 Km DRF 11,85,49 27 .. .. S.Fund 40,00 14 .. .. RRSK 11,36,94 1,50,87 1,60,63 2,00,00 R. 38,55

194 Bilaspur-Durg -CTR(P) -13.99 km DRF 16,53,60 ...... S.Fund 7,00,00 1,09 .. .. RRSK 15,14,44 19,13 2,53,77 3,00,00 R. 1,29,16

195 Bilaspur Yard - CTR(P) 7.911 km (for 160 kmph) RRSK 5,67,33 .. 1,50,00 80,00 R. 87,28

196 Bilaspur - Durg - CTR(P) - 6.494 km RRSK 9,62,05 20,78 1,56,05 2,00,00 R. 71,65

197 Durg - Dallirajhara- CTR (P) - 1.989 km RRSK 2,94,66 8,50 64,84 1,50,00 R. 21,94

198 Bamiana - Raipur- CTR(S) - 10.41 km RRSK 12,15,19 75,31 1,76,95 2,00,00 R. 57,55

Through Rail Renewal 199 Champa-Bilaspur & Bilaspur-Anuppur - TRR(P) - 41.066 km RRSK 40,60,50 .. 40,00 4,00,00

200 Champa-Bilaspur & Bilaspur-Anuppur - TRR(P) - 3.785 km (Bridge RRSK 3,74,25 .. 40,00 1,50,00 approaches) 14.1.15 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 201 Jharsuguda-Champa-Gevra Road - TRR (P) - 34.00 km RRSK 33,61,83 .. 40,00 4,00,00

202Anuppur-Katni - TRR(P) - 10.556 km RRSK 10,43,75 .. 4,00,00 4,00,00

203 Bilaspur-Durg - TRR(P) - 15.664Km & Urkura-Sarona - TRR(P) - RRSK 21,22,78 .. 58,11 2,50,00 8.10 km 204Durg-Nagpur(UP) - TRR(P) - 5.064 km RRSK 5,00,72 .. 50,21 75,00

205 Durg-Nagpur(DN) - TRR(P) - 11.00 km RRSK 10,87,65 .. 23,38 4,00,00

206 Durg-Nagpur - TRR(P) - 3.38 km (Girder bridges) RRSK 3,34,21 .. 5,00 2,01,30

207 Bhilai Marshallaing Yard - TRR(S) - 13.657 km DRF 7,44,70 2,84,29 .. .. RRSK 4,58,75 2,99,10 1,57,07 1,00

208 Bilaspur - Anuppur - TRR(P) - 21 km DRF 21,60,60 23,19 .. .. S.Fund 3,00,00 3,00,00 .. .. RRSK 20,87,41 19,37,48 3,94,46 1

209 Raipur Division :- TRR(S) in Raipur-Dhamtari NG section for DRF 4,82,02 66 .. .. 9.95Kms. S.Fund 1,50,00 20,54 .. .. RRSK 4,71,36 4,40,91 34,91 10

210 Jharsuguda - Champa & Champa - Gevara Road -TRR(P) - 14.145 DRF 15,20,79 2,97,72 .. .. km RRSK 14,70,79 7,45,95 -41,40 1

211 Anuppur-Katni - TRR(P) - 14.2 km DRF 15,27,02 40,70 .. .. RRSK 14,77,02 13,79 14,00,00 2,14,31

212 Champa - Bilaspur & Bilaspur -Anuppur - TRR(P) - 21.231Km DRF 22,82,63 ......

S.Fund 15,00,00 15,00,00 .. .. RRSK 22,72,63 20,12,86 2,61,43 1

213 Jharsuguda - Champa & Champa - Gevera roard - 54.487km DRF 58,58,13 3,03,78 .. .. RRSK 57,58,13 28,05,81 4,50,66 71,00

214 Bilaspur-Durg - TRR(P) 24.924Km. DRF 26,79,68 9,67,81 .. .. S.Fund 8,00,00 1,15,65 .. .. RRSK 16,61,87 4,77,34 1,99,89 2,00,00

215 Jharsuguda-Champa & Champa-Gevra Road-TRR(P) 31.441 KM. DRF 10,56,46 ......

S.Fund 20,00,00 10,50,00 .. .. RRSK 20,46,46 13,15,79 5,06,36 6,00

216Anuppur - Katni - TRR(P) - 47.09 Km DRF 10,72,17 ...... S.Fund 35,00,00 20,59,73 .. .. RRSK 25,62,17 14,61,11 6,40,43 5,00,00

217 Tumsar Road -Tirodi & Kanhan -Ramtek-TRR(S) -41.204 Kms DRF 28,38,65 16 .. ..

RRSK 28,28,65 3,03,54 3,29,83 50,00

218 Champa-Bilaspur-Anuppur -TRR(P) -36.035 Km DRF 17,02,17 ...... S.Fund 20,00,00 10,90,00 .. .. RRSK 26,92,17 3,26 16,47,42 4,00,00 14.1.16 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 219 Anuppur bye pass line & between Anuppur- Ambikapur -TRR(P) - DRF 3,91,35 ...... 8.15 Km S.Fund 4,00,00 2,00,00 .. .. RRSK 5,81,35 3,25 1,25,00 2,50,00

220 Anuppur - Katni - TRR(P) - 61.09 km RRSK 60,21,97 .. 30,00,00 18,00,00

221 Champa - Bilaspur-Anuppur - TRR(P) - 18.204 km RRSK 16,68,39 41,08 10,16,56 4,00,00

222 Anuppur - Ambikapur - TRR(P) - 14 km & TWR - 8.94 km RRSK 15,89,43 .. 3,26,58 4,00,00

223 Durg - Nagpur-TRR(P) - 18.790 km RRSK 18,52,14 2,72,29 15,15,87 50,00

224 Durg - Nagpur - TRR(P) - 4.44 km RRSK 4,37,65 3,41,38 57,16 50,00

225 Bilaspur - Durg - TRR(P) - 12.05 km RRSK 11,04,38 1,70,25 2,12,73 2,50,00

226 Jharsuguda - Champa - Gevra Road & Bilaspur - Anuppur - TRR(P) - RRSK 2,84,11 .. 1,09,03 2,00,00 3.10 tkm Through Sleeper Renewal 227 Champa-Bilaspur & Bilaspur-Anuppur - TSR(P) - 13.35 km RRSK 9,85,52 .. 40,00 2,50,00 R. 99,76

228 Jharsuguda-Bilasdpur & Champa-Gevra Road - TSR(P) - 28.429 km RRSK 18,40,25 .. 40,00 3,00,00

229 Anuppur-Katni - TSR(P) (Without Ballast) – 10.10 km RRSK 6,53,79 .. 3,00,00 2,20,00

230 Boridand-Chirimiri(SL) - TSR(P) – 2.724 km RRSK 2,17,14 .. 40,00 1,00,00 R. 33,55

231Bilaspur-Durg - TSR(P) - 85.889 km RRSK 48,10,45 .. 50,00 2,50,00

232 Durg-Dallirajahara(SL) - TSR(P) - 5.50 km & Raipur-Lakholi(SL) - RRSK 3,64,05 .. 50,00 1,00,00 TSR (P) - 1.00 km 233 Bilaspur-Baraduar & Khodri-Bhanwar Tonk - TSR(P) - 21.95 km DRF 13,78,59 10,84,12 .. ..

S.Fund 50,00 49,28 .. .. RRSK 5,66,95 .. 1,41,43 1 R. 1,17,92

234 Champa-Gevra Road - TSR(P) - 8.5 km DRF 5,26,65 1,13,03 .. .. RRSK 3,62,96 5,26 7,42 1 R. 45,66

235 Bilaspur-Durg -TRR(P) - 4.161 Km DRF 4,03 ...... S.Fund 4,00,00 11,71 .. .. RRSK 10,00 5,26 80,47 1,00,00

236 Bilaspur - Durg - TSR(P) -31.56 Km DRF 25,81,00 16,90 .. .. RRSK 22,79,63 1,63,94 1,80,90 2,00,00 R. 2,91,37

237 Boridand - Ambikapur - TSR(P)- 18 km DRF 14,72,05 47,48 .. .. RRSK 12,95,87 2,31,44 4,88,12 2,00,00 R. 1,66,18

238 Bilaspur - Champa - TSR(P) 7.479 km RRSK 5,36,35 .. 1,13,28 1,00,00 R. 82,51 14.1.17 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 239 Anuppur - Ambikapur & Darritola-Tiger Hill - TSR(P) - 33.43 km RRSK 19,74,85 39,65 7,62,78 2,00,00

240 Bilaspur - Durg - TSR(P) - 7.542 km RRSK 5,40,87 1,92 80,00 1,50,00 R. 83,21

241 Durg--Dallirajhara - TSR(P) - 9.195 km RRSK 6,59,41 13,20 1,46,34 1,50,00 R. 1,01,45

242 Jharsuguda - Champa-Gevra Road - TSR (P) - 10.998 km RRSK 7,88,71 58,79 3,55,54 1,00,00 R. 1,21,34

Ballast 243 Champa-Bilaspur & Bilaspur-Anuppur - TBR - 72.559 km RRSK 18,99,42 .. 50,00 2,00,00 R. 8,93,66

244 Jharsuguda-Bilaspur & Champa-Gevra Road - TBR - 37.067 km RRSK 9,70,33 .. 40,00 2,50,00

R. 4,56,53

245 Bilaspur-Durg -TBR - 18.025 km RRSK 4,71,85 .. 53,05 75,00 R. 2,22,00

246 Nagpur-Durg - TBR - 88.556 km RRSK 23,18,18 .. 2,00,00 1,00,00 R. 10,90,68

247 Bilaspur-Anuppur- Katni - TBR - 49.25 km DRF 5,32,36 4,52,16 .. .. RRSK 94,60 .. 10,72 1

248 Gondia-Chanda Fort - TBR - 70.875 km DRF 12,68,30 6,82,09 .. .. RRSK 7,36,33 1,56,09 1,12,11 1,00,00 R. 2,71,95

249 Bilaspur Division - Jharsuguda-Champa - TBR - 55.983 Km. DRF 15,63,43 11,73 .. .. RRSK 9,49,14 3,17,55 3,39,79 1,00,00 R. 5,14,29

250 Raipur Division:- Urkura- Sarona - TBR- 14 Km DRF 3,90,98 56,01 .. .. S.Fund 1,30,00 1,30,00 .. .. RRSK 1,50,07 1,02,53 .. 1 R. 1,28,61

251 Bilaspur Division:- Anuppur-Katni TBR 71.505 km. DRF 19,96,91 25,91 .. .. RRSK 12,90,03 1,19,30 9,12,20 2,00,00 R. 6,56,88

252 Nagpur Divn:TBR - Balaghat-Nainpur -27.5Km & Chhindwara - DRF 17,43,89 ...... Nainpur-43.7Km RRSK 12,76,68 .. .. 1 R. 4,67,20

253 Nagpur Divn:- Durg - Nagpur - TBR - 110.987 KM DRF 30,99,52 72 .. .. RRSK 20,79,93 6,78,02 6,24,73 1 R. 10,19,58

254 Bilaspur Division - TBR - 66.561 Km (Champa - Bilaspur - 40.196Km DRF 18,58,84 34,94 .. .. & Bilaspur - Anuppur -26.365) RRSK 11,47,38 3,42,02 2,57,53 1,50,00 R. 6,11,46 14.1.18 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 255 Raipur Division:- Bilaspur-Durg Section - TBR - (124.69 Kms) DRF 34,82,20 3,31,36 .. ..

S.Fund 2,10,00 2,10,00 .. .. RRSK 18,52,19 8,67,74 2,48,80 1,00,00 R. 11,45,46

256 Bilaspur Division - Annupur - Ambikapur - TBR - 32 Km DRF 8,93,66 12,57 .. .. RRSK 5,49,69 1,09,83 3,94,44 1,50,00 R. 2,93,97

257 Bilaspur-Durg - TBR -26.34 Km DRF 7,05,90 ...... S.Fund 40,00 ...... RRSK 4,51,92 5,20 55,00 1,50,00 R. 2,43,17

258 Champa-Bilaspur - TBR 38.39 Km DRF 10,86,08 ...... RRSK 7,21,62 51,15 1,18,65 1,00,00 R. 3,54,46

259 Anuppur - Ambikapur - TBR - 16.59 km RRSK 5,92,52 .. 1,21,13 1,00,00

260 Champa - Bilaspur - Anuppur - TBR 51.618 km RRSK 18,43,78 11,45 1,25,97 1,00,00

261 Gondia-Balaghat - TBR- 40.80 km RRSK 14,57,37 94,80 2,45,64 60,00

262 Bilaspur-Durg-TBR - 33.93 km RRSK 12,11,97 2,08 50,00 1,50,00

263 Durg- Nagpur - TBR - 42.96 km RRSK 15,34,52 16,90 2,25,78 1

264 Anuppur - Katni TBR - 51.95 km RRSK 18,55,72 .. 5,26,27 2,00,00

Points & Crossings 265 Bilaspur Division - TTR (FS+CS+CMSC) - 18 sets & TTR RRSK 8,60,28 .. 40,00 1,60,00 (FS+TWS+WCMSC) - 3 sets R. 17,54

266 Bilaspur Division - TTR (CS+CMSC) - 104 sets & TTR RRSK 48,84,38 .. 40,00 4,00,00 (TWS+CMSC) - 87 sets 267 Bilaspur-Durg - TTR (FS TWS WCMSC) - 80 sets RRSK 29,75,64 .. 50,00 95,00

268 Durg-Nagpur - TTR (FS CS CMSC) - 37 sets RRSK 6,23,72 .. .. 20,30

269 Jharsuguda - Bilaspur - TTR - 81 sets DRF 13,81,68 2,86,37 .. .. RRSK 11,01,78 58 1,41,68 1,00,00

270 Bilaspur- Durg - TTR - 100 sets DRF 17,06,01 9,72,24 .. .. S.Fund 2,10,00 2,10,00 .. .. RRSK 11,12,95 50,00 9,29,67 10,00

271 Champa-Gevera Road - TTR- 62 sets DRF 9,81,56 3,96,30 .. .. RRSK 6,01,27 .. 1,25,00 1,00,00

272 Bilaspur Division - TTR (77 sets) DRF 4,68,89 33,89 .. .. RRSK 4,31,18 1,12,37 2,48,20 25,00 R. 6,87

273 Durg-Dallirajhara - TTR (15 sets) DRF 3,83,44 83,48 .. .. S.Fund 50,00 50,00 .. .. RRSK 2,55,12 1,11,56 82,70 50,00 14.1.19 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 274 Bilaspur-Durg - TTR (46 sets) DRF 11,12,79 3,03,93 .. .. S.Fund 70,00 65,74 .. .. RRSK 7,33,09 2,55,13 2,85,32 1,00,00

275 Bilaspur-Katni & Anuppur-Ambikapur - TTR (90 sets) DRF 13,94,05 5,05,59 .. .. S.Fund 70,00 70,00 .. .. RRSK 10,11,37 1,10,85 5,22,66 1,00,00

276 Bilaspur-Jharsuguda - TTR (107 sets) DRF 16,62,74 4,91,82 .. .. RRSK 12,11,68 50,19 7,00,00 2,00,00

277 Bilaspur-Durg - TTR (40 sets) DRF 6,65,94 1,32,55 .. .. S.Fund 1,40,00 94,47 .. .. RRSK 4,31,70 1,82,79 2,44,44 10,00 R. 1,69

278 Durg-Nagpur - TTR (78 sets) DRF 19,36,80 1,71,53 .. .. RRSK 18,07,73 1,59,33 1,20,03 50,00

279 Raipur Division :- TTR 1 in 8.5. (FS CS CMSC) in RSD yard for 24 DRF 7,80,77 36,88 .. .. Nos. S.Fund 20,00 30,55 .. .. RRSK 7,21,08 1,22,79 70,34 1,00,00 R. 9,69

280 Bilaspur division - TTR without Sleepers 184 Sets (TWS+WCMSC) DRF 60,42,38 20,55 .. ..

RRSK 60,41,38 5,71,70 5,23,87 1,00,00

281 Durg-Nagpur - TTR (TWS+WCMSC)- Total 112 Nos. DRF 36,11,47 3,57 .. .. RRSK 36,01,47 10,83,64 3,67,95 50,00

282 TTR (FS+CS+CMSC) 1 in 8.5. in BMY yard for 22 Nos. DRF 7,15,70 3,55,59 .. .. RRSK 3,47,84 1,45,05 1,15,47 1,00,00 R. 8,88

283 Bilaspur-Durg - TTR(FS+CS+CMSC) -15 set & TTR(DS) - 1 set DRF 4,48,61 6,55 .. ..

RRSK 3,67,78 4,44 1,50,07 1,50,00 R. 5,83

284 Bilaspur-Durg - TTR -159 sets (TWS+WCMSC) (4 set-1 in 16, 148 DRF 53,14,22 3,31,84 .. .. set-1 in 12 & 7 set 1 in 8.5 ) RRSK 51,83,44 2,10,32 2,26,71 2,00,00

285 Nagpur division -Motibagh yard-TTR - 32 Sets DRF 9,83,75 1,03,06 .. .. RRSK 8,67,76 1,31,19 1,05,04 50,00 R. 12,92

286 Bilaspur Division - TTR(DS)- 8 sets & TTR(CS CMSC)- 6 sets DRF 1,67,55 ......

S.Fund 1,00,00 58,48 .. .. RRSK 2,04,12 4,74 80,00 1,00,00 R. 3,43

287 Durg-Dallirajahara and Raipur-Titlagarh:- TTR(TWS WCMSC)- 9 DRF 4,42,20 ...... sets & TTR(CS CMSC)-13 sets. S.Fund 1,00,00 ...... RRSK 4,32,20 9,92 51,10 1,00,00 14.1.20 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 288 Bilaspur-Raipur - TTR(CS CSMC)- 9 sets, TTR(FS CS CMSC)-2 DRF 1,21,58 ...... sets & TTR(TWS WCMSC)-5 sets S.Fund 3,00,00 51,46 .. .. RRSK 3,59,14 2,29 73,09 1,00,00 R. 2,44

289 Bilaspur Division - TTR(TWS WCMSC)-127 Sets & TTR(CS CMSC)- DRF 54,44,00 ...... 119 sets S.Fund 2,00,00 10,00 .. .. RRSK 56,24,00 33,48 4,87,29 1,40,00

290 Bhilai Marshaling Yard - TTR - 90 sets. DRF 26,45,02 ...... S.Fund 1,00,00 2,37 .. .. RRSK 25,99,52 47,59 .. 1 R. 35,50

291 Durg-Nagpur - TTR (TWS WCMSC) -14 Sets DRF 3,55,27 ...... S.Fund 1,00,00 2,90 .. .. RRSK 4,35,27 .. 20,00 50,00

292 Bilaspur - Durg - TTR - 41 set RRSK 13,73,30 22,43 46,46 2,00,00

293 Durg - Dallirajhara - TTR -15 set RRSK 2,67,18 1,72 30,16 1,50,00

294 Bilaspur Division - TTR - 109 set RRSK 35,47,66 .. 3,73,09 2,00,00

Others 295Raipur-Lakholi(SL) - TWR -14.717 km RRSK 4,03,30 .. 30,58 1,00,00

296 Gondia-Chandafort(SL) - TWR - 35.90 km RRSK 7,60,81 .. 13 50,00

297 Champa-Bilaspur & Bilaspur-Anuppur - TFR - 86.242 km RRSK 7,14,87 .. 50,00 2,00,00

298 Jharsuduga-Bilaspur & Champa-Gevra Road - TFR - 35.73 km RRSK 2,72,95 .. 39,00 1,50,00

299 Anuppur-Katni - TFR – 45.021 km RRSK 2,62,25 .. 50,00 1,60,00

300 Durg-Nagpur - TFR - 195.947 km RRSK 12,78,13 .. 25,16 50,00

301 Bilaspur Division - Glued Joints - 572 sets RRSK 3,89,94 .. 20,00 90,00

302 Bilaspur-Durg - Glued Joints - 500 sets (60 kg) & Glued Joints - 50 RRSK 3,72,98 .. 30,00 1,00,00 sets (52 kg) 303 Bilaspur Division - SEJ - 183 sets RRSK 8,03,70 .. .. 1

304 Durg-Nagpur - SEJ - 103 sets RRSK 4,65,07 .. 25,00 50,00

305 Gondia-Chandafort (SL) - TFTR - 35.71 km RRSK 26,07,87 .. .. 50,00

306 Nagpur-Durg - Improvement to curves including increasing in RRSK 9,75,39 .. 30,24 50,00 transition length, super elevation etc. - 45.91 km 307 Nagpur-Durg - Widening of Embankment & cutting - 80.55 km RRSK 14,98,65 .. 1,00,59 50,00

308 Bilaspur-Durg - TWR - 73 km DRF 12,77,00 1,58,83 .. .. RRSK 11,32,88 1,43,86 2,30,00 2,00,00

309 Jharsuguda-Bilaspur - SEJ - 100 Ssets. (60 kg. 85 sets. & 52 kg. 15 DRF 3,84,17 22,36 .. .. sets.) RRSK 3,16,80 13 80,00 50,00 14.1.21 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 310 Durg - Nagpur - Through renewal of guled joints - 500 sets DRF 6,37,59 2,49,05 .. .. RRSK 3,38,54 6 .. 1

311 Bilaspur-Durg - TWR - 34 km DRF 4,04,95 45,69 .. .. S.Fund 50,00 50,00 .. .. RRSK 3,59,43 9,60 1,54,41 2,00,00

312 Gondia-Chanda Fort - TFR - 93.4 km DRF 5,96,92 2,16,57 .. .. RRSK 3,62,87 12,41 59,58 1,00,00

313 Bilaspur Division - SEJs (200 Nos) DRF 7,67,57 1,22,31 .. .. RRSK 5,56,35 30,00 6,20,54 1

314 Bilaspur-Durg - TFR - 130.005 km DRF 9,59,08 42,39 .. .. S.Fund 1,00,00 1,12,18 .. .. RRSK 9,32,46 32,76 59,57 1,00,00

315 Bilaspur-Durg - Glued joints (2400 sets) DRF 13,61,09 79,02 .. .. S.Fund 60,00 60,00 .. .. RRSK 13,22,48 6,41,50 1,55,79 1,50,00

316 Champa-Gevra Road - TFR - 38.2 km DRF 2,62,53 50,96 .. .. S.Fund 10,00 10,00 .. .. RRSK 2,11,56 29,97 83,80 42,00

317Jharsuguda-Champa - TFR - 55 km DRF 3,77,52 36,38 .. .. S.Fund 1,00,00 1,00,00 .. .. RRSK 3,47,51 1,19,27 1,45,50 6,00

318 Raipur Division:-Bilaspur-Durg - SEJ 142 set DRF 6,24,56 15,52 .. .. S.Fund 50,00 2,70 .. .. RRSK 5,99,04 37,98 1,51,38 1,50,00

319 Nagpur division - Through Fitting Renewal - 197.214 Km. DRF 13,10,10 17,68 .. .. RRSK 12,35,10 4,57,08 81,15 80,00

320 Nagpur divn: Gondia-Balaghat & Kalumna-koradi - TFR - 49.95km DRF 4,01,36 6 .. ..

RRSK 3,26,36 56,14 83,15 40,00

321 Bilaspur Division :- Anuppur-Katni TFR 110.82 Km. DRF 9,11,30 ...... S.Fund 7,00,00 5,00,00 .. .. RRSK 11,01,30 4,32,50 2,66,79 2,00,00

322 Raipur Division :- Durg-Dallirajhara section TFR for 57.2 Kms. DRF 4,27,66 21,41 .. ..

S.Fund 1,00,00 ...... RRSK 4,14,41 5,57 50,00 80,00

323 Bilaspur Division :Renewal of Improved SEJ (218 sets) 60 Kg/52Kg DRF 10,22,04 ......

RRSK 9,22,04 .. 3,07,06 2,00,00

324 Bilaspur division - Annupur - Ambikapur - Chirimiri - TFR - 126.54 KMDRF 11,06,84 ......

S.Fund 7,50,00 3,50,00 .. .. RRSK 14,96,84 13,62,95 1,07,43 20,00 14.1.22 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 325 Bilaspur Division: Renewal of Buffer Rail with modified SEJ - 55 Nos.DRF 2,56,81 1,56 .. ..

RRSK 2,06,81 2,38 1,31,39 60,00

326 Raipur Division:- Bilaspur-Durg :- Glued joint -450 set. (60Kg-400 DRF 3,47,52 87 .. .. set & 52Kg-50 set) S.Fund 50,00 40,83 .. .. RRSK 3,36,65 17,95 1,52,66 10,00

327 Nagpur - Durg - TWR - 140.850 Km DRF 28,86,65 4,07,90 .. .. RRSK 24,80,35 90,87 4,12,58 2,00,00

328 Raipur Division:- Bilaspur-Durg section :- TFR- 44.668 Kms. DRF 3,03,91 49 .. .. RRSK 2,18,91 11,19 1,32,02 50,00

329 Nagpur - Durg -SEJ - 157 Sets and Buffer Rails - 16 Nos. DRF 8,11,80 1,00,35 .. .. RRSK 7,06,64 1,16,00 2,41,16 1,00,00

330 Bilaspur Division :- Renewal of Glued joints, 60 Kg -1205 sets. DRF 9,40,86 ......

RRSK 8,90,86 .. 3,40,20 2,00,00

331 Bilaspur Division - Jharsuguda - Champa - Gevra - TFR - 62.87 DRF 3,43,36 ...... KM.(JSG-CPH=43.57Km & CPH-GAD=19.3Km). S.Fund 3,00,00 2,00,00 .. .. RRSK 3,93,36 43,86 3,07,64 1,90,00

332 Raipur Division:- Bilaspur-Durg section - TWR - 48.217 kms. DRF 9,88,18 32,75 .. .. S.Fund 60,00 ...... RRSK 9,85,52 1,62,62 89,57 1,50,00

333 Bilaspur-Durg - TWR -44.59 Km DRF 9,32,99 ...... S.Fund 40,00 3,52 .. .. RRSK 9,22,99 65,17 68,03 2,00,00

334 Bilaspur-Durg - TFTR-47.55 Kms DRF 27,31,21 ...... S.Fund 40,00 ...... RRSK 27,56,21 .. 50,00 1,50,00

335 Bilaspur--Katni - Renewal of SEJ -115 sets DRF 5,39,43 ...... RRSK 5,29,43 2,95 1,00,00 1,00,00

336 Bilaspur-Durg - Renewal of SEJ-93 sets DRF 3,67,79 ...... S.Fund 40,00 ...... RRSK 3,57,79 .. 71,80 1,00,00

337 Champa-Bilaspur - TFTR -8.70 KM DRF 9,22,42 ...... RRSK 9,12,42 .. 75,00 1,00,00

338 Bilaspur - Durg & Urkura - Sarona - TFR - 68.48 km (Bilaspur-Durg - RRSK 5,54,74 54,30 50,00 1,00,00 58.48 km & Urkura - Sarona - 10 km) 339 Bilaspur - Durg - SEJ - 133 set RRSK 5,43,68 1,17 40,00 1,50,00

340 Raipur Division - TFR - 33.26 km RRSK 2,69,41 1,85 30,00 80,00

341 Bilaspur Division - Glued joints - 600 set RRSK 4,20,14 .. 84,48 1,00,00

342 Bilaspur Division - Improved SEJ - 183 set RRSK 7,98,19 .. 1,36,75 1,50,00 14.1.23 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACK RENEWALS 343 Jharsuguda - Bilaspur-Anuppur & Champa-Gevra Road - TFR - RRSK 3,43,30 .. 1,28,74 1,25,00 42.378 km 344 Bilaspur Division - Channel sleeper - 2065 set RRSK 4,87,96 .. 60,00 1,00,00

345 Bilaspur - Durg - TFTR - 36.74 km RRSK 22,37,18 .. 30,00 1,50,00

346Works costing below Rs.2.5 crore each RRSK ...... 54,11,15

TOTAL-WORKS IN PROGRESS RRSK ...... 306,23,31 B - New Works 347Lumpsum Provision For New Works RRSK ...... 92,00,00

TOTAL-NEW WORKS RRSK ...... 92,00,00 TOTAL-Track Renewals RRSK ...... 398,23,31 BRIDGE WORKS A - Works in Progress 348 Bilaspur Division - Const. by pushing & cast in-situ method (Bridge RRSK 12,15,70 .. .. 50,00 No.124/A & 131/A) 349 Silyari-Mandhar - Jacketting (Bridge No.401/up & 401/mid) RRSK 4,49,87 .. .. 50,00

350 Nagpur Division - Jacketing of bridge No.319, 201, 306 & 336 RRSK 2,67,40 .. 40,21 50,00

351 Bilaspur-Durg - Strengthening of bridges for 25 ton axle load DRF 6,00,00 6,79,76 .. .. RRSK 10,00 1,03,21 .. 10

352 Bilaspur - Repl of flat bearing with centralised bearing (32 bridges) DRF 4,16,93 1,76,73 .. ..

RRSK 2,40,20 .. .. 5,00

353 Chirimiri Yard - Conversion of skew girders to multiple box (bridge DF(4) 4,75,64 2,87,17 .. .. No.171) (6 lines) RRSK 1,78,47 23,24 10,00 10,00

354 South East Central Railway - Repl. of steel girders with pre-stressed DRF 2,96,71 78,39 .. .. concrete slabs (22 bridges) RRSK 2,18,32 .. .. 5,00

355 Balaghat-Katangi - Protection work of bank & abutments (bridge DF(4) 2,66,18 2,45,35 .. .. No.66) and leaning abutment (bridge No.12) RRSK 10,44 50,57 4,62 2,00

356 Bhandara-Koka - Strengthening for running 25 t axle load (bridge DF(4) 2,94,00 31,28 .. .. No.93/down) & Mundikota- (bridge No.125/down)

RRSK 2,36,87 1,22,70 1,11,33 50

357 Amgaon-Dhanoli - Jacketing for running 25 t axle load (bridge DF(4) 3,12,08 11,41 .. .. No.212/down) RRSK 2,12,01 1,84,81 1,01,42 20

358 Champa-Jharsuguda - Rebuilding (Bridge No.130, 142/down & DRF 7,17,28 ...... 138/up) RRSK 7,07,28 .. 5,00 50,00

359 Tumsar-Tirodi - Repl of rail/sleeper opening type crossed drain with DRF 4,87,09 23 .. .. RCC box type bridges (38 bridges) RRSK 4,37,09 73,79 4,12,77 1,00,00 14.1.24 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

BRIDGE WORKS 360 Jharsuguda-Champa - Elimination of rail opening of bridges by RCC DRF 3,12,79 ...... box & drain (9 bridge) RRSK 3,02,79 .. 5,00 50,00

361 Nagpur-Durg - Rebuilding of distressed bridges (8 Nos) ORN (3 DF(4) 4,00,00 14 .. .. bridges) by RCC box type bridges RRSK 3,50,00 64,11 2,45,06 20,00

362 Bilaspur-Raipur - Jacketting for running 25 t axle load (8 bridges) DRF 8,89,43 5,07 .. ..

RRSK 8,74,43 3,21,19 1,12,72 10,00

363 Anuppur-Ambikapur - Jacketing (Bridge No.1/up, 4/up & 8/down) RRSK 2,54,16 .. 40,00 50,00

364 Anuppur-Ambikapur - Repl (9 small bridges) RRSK 3,14,33 .. 10,00 50,00

365 Ib-Jharsuguda - Strengthening by jacketting & lifting of abutment & RRSK 21,83,92 .. .. 20,00 regradation of existing track (Bridge No.184/up & down)

366Works costing below Rs.2.5 crore each RRSK ...... 9,05,40

TOTAL-WORKS IN PROGRESS RRSK ...... 14,28,20 B - New Works 367Lumpsum Provision For New Works RRSK ...... 1,00,00

TOTAL-NEW WORKS RRSK ...... 1,00,00 TOTAL-Bridge Works RRSK ...... 15,28,20 SIGNALLING AND TELECOMMUNICATION A - Works in Progress 368 Bilaspur Division - Repl. of analog axle counter with digital axle RRSK 14,59,61 .. 1,50,00 10,00,00 counter 369 Nagpur Division - Repl. of analog axle counter by multi section digital RRSK 7,99,96 .. .. 4,00,00 axle counter of 'A' route 370 Anuppur-Bishrampur - Optic fibre cable with 6-quad underground DRF 17,06,97 4,39,21 .. .. cable etc. (196 rkm) RRSK 12,29,54 46,86 40,00 10,00

371 Durg-Gondia - Automatic signalling Cap. 76,05,72 23,21,28 7,00,00 25,00,00

372 Bhilai Marshalling Yard - Repl. of signalling & ground gears by route DRF 19,14,71 18,12,29 .. .. relay interlocking (K & M cabins) RRSK 2,42 1,70,60 1,00,00 15,00

373 Ramtek, Gobarwahi, Dongri Buzurg & Tirodi - Repl of signalling & DRF 6,73,06 8,15,85 .. .. ground gears RRSK 1,00,00 34,30 95,00 10,00

374 Anuppur-Katni - Second distant signal DF(3) 12,38,28 11,91,30 .. .. RRSK 3,93,30 2,06,79 .. 2,00,00

375 South East Central Railway - Isolation and alteration of signalling (7 DF(4) 10,98,87 12,50,36 .. .. stations) RRSK 50,00 63,09 1,00,00 10,00

376 Bilaspur-Anuppur & Champa-Gevra Road - 2nd distant signals DF(3) 5,49,18 4,91,27 .. ..

RRSK 43,49 1,63,80 21,00 15,00 14.1.25 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

SIGNALLING AND TELECOMMUNICATION 377 Kanhan-Ramtek - Optic fibre cable link (23 km) and Tumsar Road- DF(3) 3,54,00 1,48,61 .. .. Tirodi (47 km) RRSK 1,03,26 1,06,23 21,00 20,00

378 Nagpur-Gondia - Stand-by multi-section digital axle counters for auto DF(3) 24,63,00 7,03,97 .. .. signalling section (A-route) (11 sections) RRSK 17,82,00 7,63,89 1,00,00 3,00,00

379 Bhilai Marshilling Yard (I, J & F-Cabins) - Repl. of signaling gears of DRF 13,28,23 1,32,09 .. .. by route relay interlocking RRSK 12,82,93 .. 7,55,07 5,00,00

380 Gondia-Durg - Stand-by single section digital axle counters (13 DF(3) 3,20,93 ...... sections) RRSK 3,19,93 30,73 70,00 1

381 South East Central Railway- Galvanic Isolation Modules (GIM), DF(3) 8,57,39 ...... Comm. PCB and segregated power supply for 26 EIs RRSK 8,45,39 2,20,52 3,52,62 80,00

382 South East Central Railway - Standby single section digital axle RRSK 3,49,77 .. 3,06,17 80,00 counters (52 Nos) 383 Bilaspur Yard - Repl of route relay interlocking with electronic RRSK 51,74,76 43,67 11,73,00 15,00,00 interlocking 384Works costing below Rs.2.5 crore each RRSK ...... 6,96,07

TOTAL-WORKS IN PROGRESS Cap...... 25,00,00 RRSK ...... 48,36,08 B - New Works 385Lumpsum Provision For New Works RRSK ...... 1,50,00

TOTAL-NEW WORKS RRSK ...... 1,50,00 TOTAL-Signalling and Telecommunication Cap...... 25,00,00 RRSK ...... 49,86,08 OTHER ELECTRICAL WORKS EXCL TRD A - Works in Progress 386 South East Central Railway - Direct power supply from central Cap. 230,28,00 20,50,01 31,00 69,29,83 generating agencies 387 Raipur - Repl. of T-5, 40w tube light & metal halide light fittings with DRF 3,35,28 88,66 1,00 2,83 LED lights 388 Raipur & Nagpur Divisions - Repl. of old underground cables & DRF 3,83,65 34,03 23,98 5,70 overhead conductors 389 Bilaspur Division - LED light fittings in all stations, service buildings, Cap. 2,83,70 .. .. 1 circulating area, yards, colony street lighting 390 Estimated investment through EBR(Partnership) for works of solar EBR(P) 62,50,00 .. 62,50,00 50,00,00 power 391Works costing below Rs.2.5 crore each Cap...... 18,32 DRF ...... 39,90 DF(2) ...... 1,50 DF(3) ...... 70,36 RRSK ...... 15,61 14.1.26 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TOTAL-WORKS IN PROGRESS Cap...... 69,48,16 DRF ...... 48,43 DF(2) ...... 1,50 DF(3) ...... 70,36 RRSK ...... 15,61 EBR(P) ...... 50,00,00 B - New Works 392Lumpsum Provision For New Works Cap...... 1,00,00 DRF ...... 50,00 DF(3) ...... 10,00 RRSK ...... 50,00

TOTAL-NEW WORKS Cap...... 1,00,00 DRF ...... 50,00 DF(3) ...... 10,00 RRSK ...... 50,00 TOTAL-Other Electrical Works excl TRD Cap...... 70,48,16 DRF ...... 98,43 DF(2) ...... 1,50 DF(3) ...... 80,36 RRSK ...... 65,61 EBR(P) ...... 50,00,00 TRACTION DISTRIBUTION WORKS A - Works in Progress 393 Belpahar - New traction substation & associated 132 kv transmission DF(3) 18,26,75 2,09,30 .. .. line from Orissa State Electricity Board RRSK 14,89,70 3,82,94 2,45,00 6,10

394 Bilaspur Division - Repl of Scada system with updated system DRF 3,62,65 2,89,12 .. ..

RRSK 94,13 .. 10 1

395 Bilaspur Division - Modification of overhead equipment over main lineDF(3) 27,91,72 ......

RRSK 27,91,71 .. 33,30 61,00

396 Bilaspur Division - Repl. of electrical equipment and dilapidated DRF 18,40,79 ...... control buildings (5 traction stations) & SSPs (5 Nos)

RRSK 18,40,69 .. 10 96,17

397 Paniajob - 3rd bay at traction sub station with 30 mva transformer DF(3) 4,03,72 54,78 .. ..

RRSK 3,30,98 50,46 2,76,03 6,10

398 Bilaspur-Durg-Raipur Division- Repl. of PSI equipments and worn DRF 4,46,18 42,88 .. .. out contact wire of Electrical -TRD (Phase-I) RRSK 4,36,18 99,47 1,86,90 1,60,25

399 Durg-Nagpur-Nagpur Division - Reliability Improvement work of TRD DF(3) 6,79,93 18,93 .. .. Assets RRSK 6,53,80 4,83,42 1,50,00 1

400 Raipur Division - Improvement of reliability of overhead equipment RRSK 2,87,05 55,93 1,00,00 73,88

401 Raipur Division - Repl. of insulators (stay arm, bracket & 9 tonne) RRSK 2,99,56 .. 1,00 1,49,58

402 Bilaspur Division - Improvement of reliability of overhead equipment RRSK 2,99,40 1,72,47 10,00 38,64 14.1.27 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TRACTION DISTRIBUTION WORKS 403 Bilaspur Division - Repl. of insulators (stay arm, bracket & 9 tonne) RRSK 2,74,96 .. 1,00 1,03,64

404 South East Central Railway - Upgradation & modification of power RRSK 9,74,24 .. 10 2,44,00 supply installations for traction distribution (PB#532/2018-19/ECOR)

405 South East Central Railway - Replacement of overaged traction RRSK 43,53,55 .. 25,00 12,69,03 distribution assets (PB#522/2018-19/SECR) 406 South East Central Railway - Removal of infringements to schedule RRSK 4,62,40 .. 10 2,30,80 of dimension by overhead equipment (PB#622/2018-19/WR)

407 South East Central Railway - IT infrastructure works for traction RRSK 5,50,00 .. .. 1,83,00 distribution network (PB#1057/2018-19/SR) 408 South East Central Railway - Conversion of unregulated overaged RRSK 15,82,00 .. 25,00 1,54,47 OHE equipment to regulated OHE and improvement of OHE flexibility & sectioning (PB#622/2018-19/SCR)

409Works costing below Rs.2.5 crore each RRSK ...... 9,00,22

TOTAL-WORKS IN PROGRESS RRSK ...... 36,76,90 B - New Works 410Lumpsum Provision For New Works Cap...... 1,00,00 RRSK ...... 2,00,00

TOTAL-NEW WORKS Cap...... 1,00,00 RRSK ...... 2,00,00 TOTAL-Traction Distribution Works Cap...... 1,00,00 RRSK ...... 38,76,90 WORKSHOPS INCLUDING PRODUCTION UNITS A - Works in Progress 411 Bilaspur Division - Renovation & relocation of BCN yard DRF 18,04,77 .. .. 1,00,00

412 Bilaspur - New electric loco shed with holding capacity of 100 locos Cap. 52,37,12 48,73,05 6,69,26 3,30,00

413 Nagpur Workshop - Setting up of broad gauge coach periodical Cap. 73,36,12 9,91,55 10,81,16 20,00,00 overhauling shed for 27 non airconditioned coaches

414 Bhilai - Augmentation of facilities in main line electrical multiple shed DF(3) 4,28,70 39,40 .. .. (Phase-III) RRSK 4,00,00 2,32,44 1,12,70 50,00

415 Raipur Division - Expansion of WDG4 (EMD) loco shed from 50 to Cap. 52,65,00 .. .. 1 150 locos 416 Bilaspur - Creation of facilities for LHB rake examination and Cap. 35,07,16 69 1,31,24 1,27,50 maintenance 417 Bhilai (Electric loco shed) - Augmentation of homing capacity from DF(3) 23,06,32 79 32 .. 175 to 200 locos RRSK 1,50,00 .. 5,85,87 1,45,30 EBR(IF) 10,00 ......

418 Gondia- Augumentation of facilities for Development of DEMU Shed Cap. 4,96,00 1,14,45 1,58,60 1,00 Gondia (Phase-III) 14.1.28 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

WORKSHOPS INCLUDING PRODUCTION UNITS 419 Raipur-Augmentation of Wagon POH capacity from 400 to 500 Cap. 96,38,83 .. 1 30,00,00 wagons EBR(IF) 1,00,00 ......

420 Durg- Upgradation of Coaching Depot Durg Phase IV DF(3) 5,09,73 .. 10,21 .. RRSK 80,00 12,61 10,07 1,05,00

421 Bhilai Marshalling Yard - Improvement of freight examination and DF(3) 3,70,40 .. 78,35 .. maintenance facility RRSK 80,00 1,36,41 1,81,65 55,00

422 Bilaspur- Construction of covered shed with EOT crane facilities in Cap. 6,98,44 1,26 2,37,24 4,00,00 major sick line 423 Bhilai- Improvement of sickline examination and repair facility at PP DF(3) 10,00,00 .. 8,83 .. Yard Bhilai RRSK 80,00 11,82 12,65 60,00

424 Bhilai- Augmentation of End Unloadable Rail Rake (EUR) 52nos Cap. 26,62,58 .. 1 1,50,00 maintenance facility at Exchange Yard Bhilai EBR(IF) 1,00,00 ......

425 South East Central Railway - Upgradation of upto 4 coaching pit RRSK 11,00,00 .. .. 1,00 lines (PB#1002/2018-19/NR) 426 South East Central Railway - Upgradation of freight / routine RRSK 11,76,00 .. .. 1,00 overhauling depots, train examination facilities, examination yards (PB#1001/2018-19/NR) 427Works costing below Rs.2.5 crore each Cap...... 10,50 DF(3) ...... 1,94,02 RRSK ...... 2,65,04

TOTAL-WORKS IN PROGRESS Cap...... 60,19,01 DRF ...... 1,00,00 DF(3) ...... 1,94,02 RRSK ...... 6,82,34 B - New Works 428Lumpsum Provision For New Works Cap...... 1,00,00 DRF ...... 1,00,00

TOTAL-NEW WORKS Cap...... 1,00,00 DRF ...... 1,00,00 TOTAL-Workshops including Production Units Cap...... 61,19,01 DRF ...... 2,00,00 DF(3) ...... 1,94,02 RRSK ...... 6,82,34 STAFF QUARTERS A - Works in Progress 429 Bilaspur - Repl.of quarters, type-I - 401 units DRF 21,09,41 11,21,30 1,67,08 1,30,00

430 Raipur - Repl of quarters, type-I - 64 units with type-II - 64 & type-IV - DRF 4,42,14 4,84,77 31,15 36,00 1 unit at Durg colony 431 Bilaspur Division - Repl. of quarters, type-III - 50 units DRF 5,57,03 4,57,20 .. 1,00 14.1.29 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

STAFF QUARTERS 432 Bilaspur - Repl of quarters, type-V - 24 units DRF 5,80,00 5,15,01 30,00 92,00

433 Brajrajnagar - Type-II & III - 15 units each & type-IV - 1 unit Cap. 3,43,16 1,20,19 1,50,00 4,00

434 Brajrajnagar - Type-II - 70, type-III - 10 & typeIV - 4 units Cap. 9,50,43 5,42,50 2,82,54 1

435 Korba - Type-II - 30, type-III - 10 & type-IV - 5 units Cap. 4,76,64 5,49,43 .. 1

436 Raipur - Type-II - 20, type-III - 30 & type-IV - 6 units Cap. 11,21,45 12,03,12 23,57 3,00

437 Champa - Repl. of quarters, type-II - 26 units & Korba - type-II - 4 DRF 4,45,23 54,71 70,00 39,00 units 438 Champa-Jharsuguda - Conversion of type-I quarters to type-II (19 DRF 3,96,13 82,89 99,59 38,00 stations) 439 Bilaspur Settlement - Repl. of quarter, by type-II (173 units) DRF 23,72,00 49 1,68,40 1,32,00

440 Raipur Division - Conversion of type-I - 856 quarters to type-II - 428 DRF 5,77,46 .. 30,00 91,00 units 441 Dallirajhara - Repl of quarters, type-I with type-II - 35 units DRF 4,73,96 1,12 63,00 70,00

442 Brajrajnagar - Type-II-12 & type-III-44 units Cap. 9,00,00 .. 10,00 2,26,98

443 South East Central Railway - Replacement of old/dilapidated DRF 5,00,00 .. .. 10,00 quarters at various locations (PB#1107/2018-19/SR)

444Works costing below Rs.2.5 crore each Cap...... 1,24,00 DRF ...... 23,00

TOTAL-WORKS IN PROGRESS Cap...... 3,58,00 DRF ...... 6,62,00 B - New Works 445Lumpsum Provision For New Works Cap...... 50,00 DRF ...... 50,00

TOTAL-NEW WORKS Cap...... 50,00 DRF ...... 50,00 TOTAL-Staff Quarters Cap...... 4,08,00 DRF ...... 7,12,00 AMENITIES FOR STAFF A - Works in Progress 446 Bhilai Marshaling Yard & Bhilai - Improvement of staff quarters & DF(2) 4,58,71 3,18,38 3,07 1 colonies (Phase-I) 447 Bilaspur Division - Improvement of staff quarters (Phase-III) DRF 3,11,30 3,38,16 5,00 1

448 Bilaspur (Central Hospital) - Repl/renovation of wards, labour room, DRF 3,78,13 3,30,98 .. 1 out patients' department, radiology & physiotherapy units and miscellaneous works 449 Bhilai Marshaling Yard - Repl of pipeline (18 inch dia) and pump DRF 5,55,83 6,79,65 .. 1

450 Bilaspur - Repl. of foot over bridge connecting Loco colony to the DF(1) 2,96,99 59,89 58,33 63,00 other side due to safety consideration 451 Bilaspur Division - Repl of asbestos cement sheets of staff quarters DRF 16,86,75 .. 3,60,00 1,72,00 & provision of false ceiling DF(2) 4,78,40 .. 60,00 97,00 14.1.30 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

AMENITIES FOR STAFF 452 South East Central Railway - Improvement to various staff amenities DRF 9,00,00 .. .. 1,00,00 like water supply arrangement / medical facilities in various hospitals / electric wiring in staff quarters etc (PB#719/18-19/CR)

DF(2) 7,00,00 .. .. 1,00,00

453Works costing below Rs.2.5 crore each Cap...... 2,00,00 DRF ...... 92,00 DF(1) ...... 1 DF(2) ...... 1,03,00 DF(3) ...... 17,00

TOTAL-WORKS IN PROGRESS Cap...... 2,00,00 DRF ...... 3,64,03 DF(1) ...... 63,01 DF(2) ...... 3,00,01 DF(3) ...... 17,00 B - New Works 454Lumpsum Provision For New Works Cap...... 1,00,00 DRF ...... 40,00 DF(1) ...... 1 DF(2) ...... 30,00 DF(3) ...... 10,00

TOTAL-NEW WORKS Cap...... 1,00,00 DRF ...... 40,00 DF(1) ...... 1 DF(2) ...... 30,00 DF(3) ...... 10,00 TOTAL-Amenities for Staff Cap...... 3,00,00 DRF ...... 4,04,03 DF(1) ...... 63,02 DF(2) ...... 3,30,01 DF(3) ...... 27,00 PASSENGER AMENITIES A - Works in Progress 455 Rajnandgaon - Conversion of existing goods shed into passenger DF(1) 12,96,64 .. 13,34 1,00,00 platform & shifting of goods shed 456 Dongargarh - Construction of new platform, extension of foot over DF(1) 6,00,32 .. 30 10,00 bridge & other passenger amenity works RRSK 5,00,00 .. .. 5,00,00

457 Bhatapara, Tilda, Raipur & Bhilai Power House - Extension of DF(1) 4,49,79 1,39,37 .. 1 platform for 24 coach trains 458 Bhilai (G & H Cabin), Bhilai Nagar, Belha & Hathband - Extention & DF(1) 4,12,19 4,23,60 .. .. raising of platforms RRSK 1,00,00 .. .. 1,00

459 Bilaspur-Durg - Raising of platforms (9 stations) (A-route) DF(1) 3,13,90 3,13,90 .. .. RRSK 31,70 .. 35,00 1,00 14.1.31 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

PASSENGER AMENITIES 460 Raipur - Development of circulating area at Gudiyari side DF(1) 3,67,12 3,50,80 .. 1

461 Itwari - Development of circulating area with booking office & DF(1) 2,63,60 2,98,05 .. .. entrance; extension of foot over bridge and provision of catering stall & parking stand RRSK 1,00,00 .. .. 30,00

462 South East Central Railway - Escalators at various stations (4 Nos) DF(1) 2,52,00 3,05,53 48,00 10,00 (2 stations) RRSK 1,00,00 .. 68,00 10,00

463 South East Central Railway - Escalators at important stations (6 DF(1) 90,20 1,73,26 .. .. Nos) (PB#855/1415/NR) RRSK 3,59,80 .. 15,00 10,00

464 Kalumna - Extension of foot over bridge & Kanhan - provision of foot DF(1) 1,35,43 2,06,42 1,50 .. over bridge in lieu of existing one RRSK 1,22,75 .. .. 1,00

465 Raigarh - Katni - Raising of platform (15 stations) DF(1) 10,60,44 ...... RRSK 10,60,44 .. 3,20,00 2,00,00

466 Uslapur-Katni - Extn of platform length for 24-coach trains DF(1) 2,68,91 .. 17,00 50,00

467 South East Central Railway - Soft upgrades improvements at stationsCap. 100,00,00 .. 27,00,00 40,00,00

468 South East Central Railway - Provision of foot over bridges and/or RRSK 325,00,00 .. 30,00,00 85,00,00 high level platforms at stations as per requirement 469 South East Central Railway - Provision of washable aprons over DF(1) 10,00,00 .. .. 50,00 Indian Railways (PB#1106/2018-19/NR) 470Works costing below Rs.2.5 crore each Cap...... 1,00,00 DRF ...... 12,00,00 DF(1) ...... 17,50,00 RRSK ...... 7,00,00

TOTAL-WORKS IN PROGRESS Cap...... 41,00,00 DRF ...... 12,00,00 DF(1) ...... 19,70,02 RRSK ...... 99,53,00 B - New Works 471Lumpsum Provision For New Works Cap...... 74,00 DRF ...... 50,00 DF(1) ...... 2,79,98 RRSK ...... 47,00

TOTAL-NEW WORKS Cap...... 74,00 DRF ...... 50,00 DF(1) ...... 2,79,98 RRSK ...... 47,00 TOTAL-Passenger Amenities Cap...... 41,74,00 DRF ...... 12,50,00 DF(1) ...... 22,50,00 RRSK ...... 100,00,00 14.1.32 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

OTHER SPECIFIED WORKS A - Works in Progress 472 Nagpur Division - Construction of RPF post (5 stations) & RPF DF(2) 6,01,79 .. 15,35 6,00 barracks for female (4 stations) 473 Bilaspur - Creation of new railway zone Cap. 6,30,20 56 1 1 DF(3) 109,94,07 107,08,56 1 1

474 South East Central Railway - Integrated security system (3 stations) Cap. 7,35,63 5,57,04 84,00 1,28,00

475 Raipur (General Stores Depot) - Extension of godown DF(3) 4,40,30 3,17,28 1 1,00

476 Raipur - Construction of officers' rest house Cap. 6,71,33 4,95,66 7,76 1

477 Bilaspur-Durg- Fencing/barricading on either side of track in DF(3) 16,35,50 88,45 42,00 1,18,00 connection with raising of speed to 160 kmph (80 Kms) 478 Gudum - Construction of barracks in connection with Dallirajhara- DF(2) 5,30,99 .. 3,00 1,18,00 Rowghat new broad gauge rail line project 479 Construction of boundary wall along Railway track at vulnerable RRSK 60,00,00 .. .. 1,00 locations (Phase-2) (Suppl.No.16/2018-19/July 2018)

480 Construction of boundary wall / compound wall at vulnerable RRSK 450,00,00 .. 3 8,00,00 locations on Golden Quadrilateral / Diagonals / High Density Routes and on approaches of major cities vulnerable for encroachment / trespassing on South East Central & West Central Railways (Supl.No.29/December 2018) 481Works costing below Rs.2.5 crore each Cap...... 1,12,00 DRF ...... 50,00 DF(2) ...... 6,00 DF(3) ...... 12,00 DF(4) ...... 30,00 RRSK ...... 1,00,00

TOTAL-WORKS IN PROGRESS Cap...... 2,40,02 DRF ...... 50,00 DF(2) ...... 1,30,00 DF(3) ...... 1,31,01 DF(4) ...... 30,00 RRSK ...... 9,01,00 B - New Works 482Lumpsum Provision For New Works Cap...... 2,00,00 DRF ...... 1,50,00 DF(3) ...... 20,00 DF(4) ...... 30,00 RRSK ...... 1,00,00

TOTAL-NEW WORKS Cap...... 2,00,00 DRF ...... 1,50,00 DF(3) ...... 20,00 DF(4) ...... 30,00 RRSK ...... 1,00,00 14.1.33 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TOTAL-Other Specified Works Cap...... 4,40,02 DRF ...... 2,00,00 DF(2) ...... 1,30,00 DF(3) ...... 1,51,01 DF(4) ...... 60,00 RRSK ...... 10,01,00 TRAINING/HRD A - Works in Progress 483 South East Central Railway - Augmentation of training facilities RRSK 5,00,00 .. .. 5,00 (PB#1154/2018-19/NR) 484Works costing below Rs.2.5 crore each RRSK ...... 10,00

TOTAL-WORKS IN PROGRESS RRSK ...... 15,00 B - New Works 485Lumpsum Provision For New Works RRSK ...... 5,00

TOTAL-NEW WORKS RRSK ...... 5,00 TOTAL-Training/HRD RRSK ...... 20,00 TOTAL-WORKS IN PROGRESS Cap...... 1015,53,19 C.Fund ...... 134,86,11 DRF ...... 24,51,46 DF(1) ...... 20,33,03 DF(2) ...... 4,31,51 DF(3) ...... 5,32,39 DF(4) ...... 30,00 RRSK ...... 713,55,66 Deposit ...... 1951,20,00 EBR(IF) ...... 840,13,01 EBR(P) ...... 155,00,00 EBR(IRFC) ...... 72,00,00 TOTAL - NEW WORKS Cap...... 7,43,00 DRF ...... 5,40,00 DF(1) ...... 2,81,99 DF(2) ...... 30,00 DF(3) ...... 41,00 DF(4) ...... 30,00 RRSK ...... 109,27,00 GRAND TOTAL Cap...... 1022,96,19 C.Fund ...... 134,86,11 DRF ...... 29,91,46 DF(1) ...... 23,15,02 DF(2) ...... 4,61,51 DF(3) ...... 5,73,39 DF(4) ...... 60,00 RRSK ...... 822,82,66 Deposit ...... 1951,20,00 EBR(IF) ...... 840,13,01 EBR(P) ...... 155,00,00 EBR(IRFC ...... 72,00,00 14.2.1 SOUTH EAST CENTRAL RAILWAY MACHINERY AND PLANT PROGRAM FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

A - PROGRAMMED DELIVERIES

486 System of online monitoring of rolling stock (OMRS) (6 Nos) DF(3) 23,10,00 ...... RRSK 23,09,99 .. 1 7,70,00

487 Gondia DEMU Shed - CNC Underfloor Wheel Lathe BG with all Cap. 8,34,00 ...... necessary works RRSK 8,33,99 .. 4,64,11 1,16,02

488 Motibagh workshop- Traverser 80T 2 track DRF 3,10,70 ...... RRSK 3,10,69 .. 1 1

489 Nagpur Workshop-CNC Surface wheel lathe with AMC DRF 7,58,19 8,46 .. .. RRSK 7,58,18 5,97,07 1 1

490 Bhilai Marshalling Yard - Wheel Lathe Underfloor BG with works for Cap. 8,30,47 .. 4,12,15 1,03,04 MEMU motor coaches and trailer coaches of MEMU car shed

491 Raipur Workshop- CNC Surface Wheel Lathe RRSK 7,82,89 .. 1 4,28,31

492 Railpur workshop- CNC Vertical Turning lathe RRSK 2,97,97 .. 1 1,37,64

493 Southeast Central Railway - Simulation, equipment and application RRSK 21,87,50 .. .. 1 for crew (PB#1177/2018-19/NR) 494Works costing below Rs.2.5 crore each Cap...... 3,64,24 DRF ...... 2,06,36 DF(2) ...... 69,00 DF(3) ...... 25,53 DF(4) ...... 94 RRSK ...... 1,31,86

TOTAL-PROGRAMMED DELIVERIES Cap...... 4,67,28 DRF ...... 2,06,36 DF(2) ...... 69,00 DF(3) ...... 25,53 DF(4) ...... 94 RRSK ...... 15,83,86 B - NEW ACQUISITION

495Lumpsum Provision For New Works Cap...... 25,48 DRF ...... 12,00 DF(2) ...... 3,51 DF(3) ...... 1 DF(4) ...... 1 RRSK ...... 13,23

TOTAL-NEW ACQUISITION Cap...... 25,48 DRF ...... 12,00 DF(2) ...... 3,51 DF(3) ...... 1 DF(4) ...... 1 RRSK ...... 13,23 14.2.2 SOUTH EAST CENTRAL RAILWAY MACHINERY AND PLANT PROGRAM FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

TOTAL-Machinery & Plant Cap...... 4,92,76 DRF ...... 2,18,36 DF(2) ...... 72,51 DF(3) ...... 25,54 DF(4) ...... 95 RRSK ...... 15,97,09 14.3.1 SOUTH EAST CENTRAL RAILWAY ROLLING STOCK PROGRAMME FOR 2019-20 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay No. -tion Cost end of Outlay 2018- Proposed for March 2018 19 2019-20

A - PROGRAMMED DELIVERIES

Locomotives 496 Works costing below Rs.2.5 crore each - Locomotives Cap...... 2,99,32 DF(3) ...... 13,81 RRSK ...... 1,04,42

TOTAL-Locomotives Cap...... 2,99,32 DF(3) ...... 13,81 RRSK ...... 1,04,42 Carriages 497 Works costing below Rs.2.5 crore each - Carriages Cap...... 25,38 DF(3) ...... 2 RRSK ...... 7,73

TOTAL-Carriages Cap...... 25,38 DF(3) ...... 2 RRSK ...... 7,73 TOTAL-PROGRAMMED DELIVERIES Cap...... 3,24,70 DF(3) ...... 13,83 RRSK ...... 1,12,15 B - NEW ACQUISITION

Locomotives 498 Lumpsum Provision For New Works - Locomotives Cap...... 1,21 RRSK ...... 43,04

TOTAL-Locomotives Cap...... 1,21 RRSK ...... 43,04 Carriages 499 Lumpsum Provision For New Works - Carriages RRSK ...... 99,10

TOTAL-Carriages RRSK ...... 99,10 TOTAL-NEW ACQUISITION Cap...... 1,21 RRSK ...... 1,42,14 TOTAL-Rolling Stock Cap...... 3,25,91 DF(3) ...... 13,83 RRSK ...... 2,54,29