Via Electronic Filing July 9, 2019 Kimberly D. Bose, Secretary
Appalachian Power Company P. O. Box 2021 Roanoke, VA 24022-2121 aep.com Via Electronic Filing July 9, 2019 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Subject: Niagara Hydroelectric Project (FERC No. 2466-034) Filing of Proposed Study Plan for Relicensing Studies Dear Secretary Bose: Appalachian Power Company (Appalachian or Applicant), a unit of American Electric Power (AEP) is the Licensee, owner, and operator of the run-of-river 2.4 megawatt (MW) Niagara Hydroelectric Project (Project No. 2466-034) (Project or Niagara Project), located on the Roanoke River in Roanoke, Virginia. The Project is located at approximate river mile 355 on the Roanoke River, approximately 6 miles southeast of the City of Roanoke, Roanoke County, Virginia. The reservoir formed by the Project is approximately 2 miles long and includes the confluence with Tinker Creek. The existing license for the Project was issued by the Federal Energy Regulatory Commission (FERC or Commission) for a 30-year term, with an effective date of April 4, 1994 and expires February 29, 2024. Accordingly, Appalachian is pursuing a new license for the Project pursuant to the Commission’s Integrated Licensing Process (ILP), as described at 18 Code of Federal Regulations (CFR) Part 5. In accordance with 18 CFR §5.11 of the Commission’s regulations, Appalachian is filing the Proposed Study Plan (PSP) describing the studies that the Licensee is proposing to conduct in support of relicensing the Project. Appalachian filed a Pre-Application Document (PAD) and associated Notice of Intent (NOI) with the Commission on January 28, 2019, to initiate the ILP.
[Show full text]