Construction Notification Brisbane Road River Esplanade Potholing
Total Page:16
File Type:pdf, Size:1020Kb
Construction Notification 18 September 2020 Mooloolaba Transport Corridor Project number: H3747 Upgrade (MTCU) Project Stage 2 – Brisbane Road, Mooloolaba Potholing – Monday 21 September 9am - 2pm Brisbane Road, Mooloolaba (weather & site conditions permitting) Planning for future stages Another pothole will be excavated in River As part of the Mooloolaba Transport Corridor Esplanade, also in the road verge. Upgrade (MTCU) and the road widening of Brisbane Road, it is necessary to accurately To minimise inconvenience to the community, locate and map all underground services. works have been scheduled during the Queensland School Holidays and the beginning This is done by a technique called potholing. of the week. Potholing involves drilling exploratory holes to confirm the location of underground services in a Brisbane Road and River Esplanade will remain defined construction area. open to vehicle traffic during these works. Potholing is being undertaken in preparation for Pedestrian pathways will remain open. Stage 2 Construction. Stage 2 includes the Please see the diagram on page 2 for the section on Brisbane Road from 42 Brisbane location of these works. Road through to Kyamba Court including the new Mayes Canal Bridge and features: What to expect during construction upgrading the intersection of Brisbane works Road/ Foote Street/ Tarcoola Avenue to a new, signalised intersection Intermittent noise impacts can be expected. A large vacuum truck will be used. construction of the new Mayes Canal Bridge with four traffic lanes and provision for mass transit, cyclists and Register to receive project updates pedestrians To receive regular project updates throughout on-road cycle lanes the construction period, please register your retaining the existing bus stops on contact details by emailing your details to Brisbane Road mooloolabatransportcorridorupgrade@sunshinec oast.qld.gov.au Stage 2 construction will take place in 2021 and Contact the project team 2022 calendar years. For further information, you can contact the project team on 1800 531 597 (during office Potholing investigations hours, Monday to Friday 8.30am – 5pm) or email Monday 21 September 9am – 2pm mooloolabatransportcorridorupgrade@sunshinec oast.qld.gov.au Small holes will be drilled into the northbound (to Mooloolaba), western side footpath of Brisbane Road, near the intersection to Kyamba Court. The footpath will then be reinstated. Brisbane Rd [Grab your River Esp. Kyamba Ct Figure 1 Location of potholing works Brisbane Road. Monday 21 September, 9am – 2pm Borehole locations .