PROJECT: GIRIJA MANGANESE MINES PRE-FEASIBILITY REPORT 2014 PRE-FEASIBILTY REPORT (TOWARDS GETTING TOR) OF GIRIJA MANGANESE MINES (CHINTALAVALASA) CHINTALAVALASA (V), RAMABHADRAPUAM (M) VIZIANAGARAM DISTRICT, A.P FOR SRI Y.P. RAMARAO PREPARED BY H.O: Block-B, B-1, IDA, Autonagar -12, Visakhapatnam – 530 018 Ph: 0891-6464928, Tel/Fax: 0891-2797377, E-mail:
[email protected] B.O: 2-53, Mahipala St., Yanam–533 464, Ph: 0884-2321528, Ph: 9440338628 QCI NABET Accredired & Recognized by MOE&F, New Delhi. PROJECT: GIRIJA MANGANESE MINES PRE-FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Y.P. Rama Rao proposes to mine Manganese ore from an approved Mining Lease area extending over 29.48 hectares (already broken uop Reserve Forest Land) which is located in Survey No: Poram Reserve Forest- Block II at Chintalavalasa Village, Ramabhadrapurm Mandal, and Vizianagaram District of A.P. The proposed capacity during the ensuing mining scheme period is 26,967 TPA. The area is situated at a distance of 1 km from Enabaruvu and Chintalavalasa Villages at North and North Eastern side respectively. The proposed mining project falls under Category ‘B’ as per EIA notification 2006 of Ministry of Environment and Forests, New Delhi. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/3 bearing following Toposheet details: Toposheet No. : 65 N/3 Latitude : 180 25’ 09.4” N to 180 25’ 06.6” N Longitude : 830 13’ 45.1” E to 830 13’ 55.6” E Vizianagram, the district headquarter is 40 km away from the area.