Rsc-Pb-Q4-2015
Total Page:16
File Type:pdf, Size:1020Kb
Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 2015 Participatory Budgeting Projects as of December 31, 2015 Percentage of work completion describes construction progress East only and is not related to project sign-off or invoice payment. Current % OU Development Name Scope of Work Summary Complete G Agnes McPhail 1 Screen door upgrade 20% (404-442 Lumsden Avenue) G Agnes McPhail 2 Lobby upgrade: new tiles, painting, 20% (444 Lumsden Avenue) LED lights, mail-box doors, new door handles, furniture G Finch/Brahms Recreation room upgrade: painting, 0% (2 Brahms Avenue) flooring, kitchen upgrade G Centennial Apartments Storm door upgrade 0% (5-11 Wakunda Place) G Victoria Park/Chester Le Exterior upgrade 0% G Flemington Park Walkway repair 0% (4 Vendome Place) G Leslie/Finch Fencing repair 0% (9 Field Sparroway) G Parkwoods/Rayoak Installation of fence lines 0% (51 Parkwood Village Drive) G Parma Court Tree pruning (project cancelled, as Cancelled (O'Connor Drive) work already underway) G Roywood Drive Exterior upgrades (development of a 20% (235, 239, 251, 257 Roywood Dr.) common space) G Victoria Park/Sheppard Exterior signage 0% (2739, 2743 Victoria Park Avenue) H Lawrence/Galloway Exterior improvements: extended 0% (4100, 4110 Lawrence Ave. East) rear garden add shed H Lawrence/Valia New patio doors 0% (30 Valia Road) H Sheppard/Birchmount 2 Back lobby renovation 20% (365 Bay Mills Road) H St. Clair/Birchmount 2 Mail box replacement 20% (3479 St. Clair Avenue East) Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 2 of 14 Current % OU Development Name Scope of Work Summary Complete H Kennedy/Dundalk Supply and install 6 metal benches, 2 20% (7 Glamorgan Avenue) picnic tables, 8 concrete pads H Markham/Ellesmere Create a community garden 20% (2180, 2190 Ellesmere Avenue) H Morningside/Ling Carpet removal in the hallway 0% (225 Morningside Avenue) H Morningside/Coronation Playground replacement 0% (101, 159, 160, 230 Danzig Street) H Kennedy/Glamorgan Exterior improvements: 3 BBQ pits, 2 20% (6 Glamorgan Avenue) picnic tables, 3 benches H Morningside Apartments Refresh lobby 20% (4205 Lawrence Avenue East) H 1201 Midland Avenue New wood fencing in back yard 0% H Village Apartments Painting of walls in common area and 0% (50 Tuxedo Court) stairs H Kingston/Galloway Hallway painting 0% (4301 Kingston Road) I McClain Park Apartments Outdoor upgrade 0% (10 Glen Everest Road) I 3190 Kingston Road Playground surface 0% I 410 McCowan Avenue Windows replacement 0% I Danforth Midland Community recreation room upgrade 0% (10 Gordonridge Place) I Woodland Acres (Firvalley) Outdoor common area upgrade 0% (40 Firvalley Avenue) Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 3 of 14 Percentage of work completion describes construction progress West only and is not related to project sign-off or invoice payment. Current % OU Development Name Scope of Work Summary Complete C Queen’s Plate Drive Painting of hallways 0% C Scarlett Manor Transfer craft room into 20% exercise room, remove kitchen area including counters, install treadmill, stair climber, rowing machine, TV mounted, FOB entry into exercise room C West Acres (14 buildings) Laundry room upgrades 0% C 2350 Finch Avenue West Remove existing carpet and 0% replace with new porcelain C Weston Towers Standard AC for recreation 0% room C Islington/St. Andrew Paint hallways and unit doors 0% (2067 Islington Avenue) including frames on all 6 floors and baseboards C Albion/Shendale Lobby upgrade 20% C 75 Tandridge Basketball court upgrade 0% D 2265 Jane Street Duct cleaning 50% D Jane/Falstaff Creation of a community 0% garden, new fencing, locking system, pathway, tool shed and garden plots D Jane/John Best New gazebo beside the existing 20% playground, new picnic benches & sitting benches D Edgeley Village (Driftwood Avenue) Duct cleaning 50% D Jane/Milo Renovate existing exercise 0% room and add fob access, paint walls, replace tiles, water cooler, wall mounted TV, reflective material on one wall, ceiling fans Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 4 of 14 Current % OU Development Name Scope of Work Summary Complete D 2585 Jane Street New flooring (porcelain tile) 0% within all common area hallways D Roding Park Place Painting of balcony railings at 0% all floors D Edgeley Village (Driftwood Court) Duct cleaning 20% D Jane/Yewtree Sealing windows and balcony 0% doors D Finch/Tobermory Replacement of flooring at the 20% first floor and common area painting D Edgeley Village (Shoreham) Duct cleaning 20% E Symington Place (Low-rise) Fencing work 0% E 121 Humber Boulevard Painting of all stairwells and 20% garbage chute rooms E Cooper Mills Townhomes Replace and/or paint unit doors, 0% (4020 Dundas Street West) unit numbers on each door and paint all rails E Pelham Park Gardens Painting stairwells and garbage 0% chutes E 102 Tyndall Avenue Replace flooring within common 0% areas E Pelham Park Replacement of the playground 20% (35 Pelham Park Gardens) surface E Willowridge Painting of all hallways, doors, 0% (44 Willowridge Road) door frames, walls and ceilings E Symington Place (High-rise) Removal of all carpet in 0% hallways, all service rooms and lobby and replace with porcelain tiles (8 floors) E Dundas/Mabelle Painting of hallways, doors and 0% (5005 Dundas Street West) lobby F 145 Elmridge Drive Painting upgrade to include 0% painting of all hallways and garbage chute rooms, basement, lobby and front vestibule Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 5 of 14 Current % OU Development Name Scope of Work Summary Complete F Champlain Apartments Painting upgrade to include 0% (495 Wilson Avenue) painting of all hallways and garbage chute rooms, basement, lobby, front and side vestibules F Dufferin/Wilson Landscape upgrade includes 20% re-leveling all backyard patio stones to eliminate trip hazards F Faywood Place Children’s playground upgrade, 0% (2 Faywood Boulevard) one small play apparatus to junior swing, playground pole light, new bench and new picnic table F Lawrence Heights One picnic table and 2 benches 20% (10 Meadow Lane) with concrete pads, and dig out 3 concrete planters; TCHC to provide soil, lining and plants through another program F Neptune Drive Garden box to be reduced to 20% (134, 145, 155 Neptune Drive) half the size, 7 new benches, 2 benches to be repaired (new slats), planting allowance of $5,000, 1 picnic table with concrete pad F Northacres Painting upgrade to include 0% (Flemington Road) plaster and painting of all hallways, including doors, install bigger apartment numbers on each unit door F Northwood Apartments Recreation room upgrades: 50% (3680 Keele Street) computer lab/space (extension of glass enclosure), renovate stage (replace carpet), secure windows with safety latch, upgrade washroom (new fan, paint, wash counter, mirror) F Overbrook Apartments Remove and replace existing 0% (750 Wilson Heights Boulevard) hallway carpets with porcelain tile (floors 1 to 4) Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 6 of 14 Current % OU Development Name Scope of Work Summary Complete F Roselawn/Marlee Two flower boxes, one on either 20% (855 Roselawn Avenue) side of the front walkway to the building entrance, remove the bushes along the front of building and repair surrounding area, install an additional row of concrete pavers along the front of building to widen path F Shermount Flooring upgrade to include the 0% (650 Shermount Avenue West) replacement of existing VCT with new porcelain tile throughout the apartment, 14 units Item 15 – Q4-2015 Participatory Budget (PB) Program March 3, 2016 RSC Meeting Report: RSC:2016-12 Attachment 1 Page 7 of 14 Percentage of work completion describes construction progress Central only and is not related to project sign-off or invoice payment. Current % OU Development Name Scope of Work Summary Complete J 1 Church Street Furniture, entertainment and fitness 0% Equipment: 4 tables, 30 chairs, 1 sofa; fitness equipment (bike, treadmill, elliptical), karaoke machine, stereo system, DVD player J Crombie Park Replace all townhouse doorbells 0% J Senator D. Croll Apartments Air conditioning in laundry room 20% (341 Bloor Street West) (20,000 BTU) J 21 St. Joseph Street Install new mailboxes 50% J 15 Scadding Garden improvement 0% (Princess Street Townhouses) J 1400 Bathurst Street Painting of all common areas: doors, 20% laundry room, walkways and ceilings J 25 Bishop Tutu Boulevard New furniture and equipment for 20% recreation room and kitchen, re-tile floor in kitchen, install new countertops, re-finish wood floors in recreation room, paint recreation room and kitchen, upgrade lighting to LED, install new blinds in recreation room window and kitchen door J 150 Dan Leckie Way Fitness equipment for bike room/ 20% games room: treadmill, stationary bike, elliptical, rowing machine J 15 Scadding Avenue Sandblast and paint (black) all of the 0% wrought iron surrounding the two levels of the existing parking garage J 470 Melita Landscaping around building 0% perimeter, including raised garden beds J 670 Queens Quay West Create a garden edging for the 0% townhouses garden J Frankel/Lambert Townhouses Install two hibachis (BBQs)