Greenway Plan Master

Greenway Entry Identification: Option 1 The Greenway Entry Identification sign functions for both vehicles and pedestrians and is located at park entrances on through streets perpendicular to the Greenway. Option 1 is a more traditional Civic Park sign.

The sign is fabricated from tube steel and painted the signature paint color. The City logo is four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Lafitte Greenway logo (secondary) is masked and painted. Sign footing fastened to poured-in- place concrete footing.

PERSPECTIVE: Greenway I.D. Sign ELEVATION: Greenway I.D. Sign Scale: NTS Scale: 1”=1’-0”

86 | 5-Greenway Park Design Lafitte Greenway Master Plan | , Greenway Master Plan Greenway Plan Master

Greenway Entry Identification: Options 2 & 3 The Greenway Entry Identification sign functions for both vehicles and pedestrians and is located at park entrances on through streets perpendicular to the Greenway. Options 2 & 3 are more contemporary designs.

Option 2: Logo can be laser cut or routered from a raw steel plate.

Option 3: Logo can be router cut from steel and welded to Greenway fence in the open Orleans Relief Canal.

Note: Fence shown not actual.

Perspective: Lafitte Greenway Entry-Option 2 Not to Scale

Elevation: Lafitte Greenway Entry-Option 3 Not to Scale 5-Greenway Park Design | 87 Greenway Plan Master

Greenway Primary Trailhead Option 1 The Primary Trailhead is a multi-function, three-sided kiosk located at the highest trafficked entrances to the Greenway. It contains a map, rules and hours, and the Primary interpretive story panel.

The sign is fabricated from tube steel and painted the signature paint color. Map, interpretive panels and logo are four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Sign footing fastened to poured-in-place concrete footing. PLAN: Greenway Primary Trailhead Option 1 Scale: NTS

PERSPECTIVE: Greenway Primary Trailhead Option 1 ELEVATION: Greenway Primary Trailhead Option 1 Scale: NTS Scale: 1”=1’-0”

88 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Greenway Secondary Trailhead Option 1

The Secondary Trailhead is a multi-function, double-sided kiosk located at less-trafficked entrances to the Greenway. It contains a map, rules and hours.

The sign is fabricated from tube steel and painted the signature paint color. Map and logo are four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Sign footing fastened to poured in place concrete footing.

PERSPECTIVE: Greenway Secondary Trailhead Option 1 ELEVATION: Greenway Secondary Trailhead Option 1 Scale: NTS Scale: 1”=1’-0”

5-Greenway Park Design | 89 Greenway Plan Master

Greenway Trailhead Option 2 The Trailhead is a multi-function, double- sided kiosk located at the highest trafficked entrances to the Greenway. It contains a map, rules and hours.

The sign is fabricated from tube steel and painted the signature paint color. Vertical elements are cast concrete. Map and logo are four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Sign footing fastened to poured in place concrete footing.

Note: For this option, a three-sided Primary Trailhead kiosk can be considered.

PERSPECTIVE: Greenway Trailhead Option 2 ELEVATION: Greenway Trailhead Option 2 Scale: NTS Scale: 1”=1’-0”

90 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Greenway Trailhead Option 3

The Trailhead is a multi-function, double-sided kiosk located at the highest trafficked entrances to the Greenway. It contains a map, rules and hours.

The sign is fabricated from tube steel and painted the signature paint color. Vertical elements are cast concrete. Map and logo are four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Sign footing fastened to poured in place concrete footing.

Note: For this option, a three-sided Primary Trailhead kiosk can be considered.

PERSPECTIVE: Greenway Trailhead Option 3 ELEVATION: Greenway Trailhead Option 3 Scale: NTS Scale: 1”=1’-0”

5-Greenway Park Design | 91 Greenway Plan Master

Greenway Wayfinding Pedestrian Trailblazer Option 1

The Pedestrian Directional guides visitors to and from key destinations in and around the Greenway. Directional arms include internal destinations such as the Hike and Bike Trail, Greenway amenities and features, local streets, and other city destinations.

Each sign has a maximum of 12 double-sided message arms, three per side.

The sign is fabricated from tube steel and painted the signature paint color. The logos are four-color, high-resolution, high-pressure laminate panels mechanically fastened to post. Sign footing fastened to poured in place concrete footing.

PERSPECTIVE: Internal Pedestrian Wayfinding Option 1 ELEVATION: Internal Pedestrian Wayfinding Option 1 Scale: NTS Scale: 1”=1’-0” 92 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Greenway Wayfinding Pedestrian Trailblazer Option 2

The Pedestrian Directional guides visitors to and from key destinations in and around the Greenway. Directional arms include internal destinations such as the Hike and Bike Trail, Greenway amenities and features, local streets, and other city destinations.

Each sign has a maximum of 12 double-sided message arms, three per side.

The sign is fabricated from tube steel and painted the signature paint color. The logos are four-color, high-resolution, high-pressure laminate panels mechanically fastened to post. Sign footing fastened to poured in place concrete footing.

PERSPECTIVE: Internal Pedestrian Wayfinding Option 2 ELEVATION: Internal Pedestrian Wayfinding Option 2 Scale: NTS Scale: 1”=1’-0”

5-Greenway Park Design | 93 Greenway Plan Master

Greenway Secondary Interpretive

The Secondary Interpretive stand is intended for Greenway locations where narratives are appropriate.

The sign is fabricated from tube steel and painted the signature paint color. Interpretive panels and logo are four-color, high-resolution, high-pressure laminate panels mechanically fastened to kiosk. Sign footing fastened to poured-in-place concrete footing.

PERSPECTIVE: Secondary Interpretive Sign ELEVATION: Secondary Interpretive Sign Scale: NTS Scale: 1”=1’-0”

94 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Greenway Hike and Bike Trail Mile Marker

The Mile Marker indicates incremental mileage on the Hike and Bike Trail within the Greenway. The sign also contains the Primary Lafitte logo and the Hike and Bike Symbols.

The sign is cast concrete with integral color. Logos, text and symbols are four-color, high- resolution, high-pressure laminate panels mechanically fastened to concrete pylon.

Sign is secured to a poured-in-place concrete footing.

MILE 0.5

2'-9"

5-1/2"

MILE 0.5

DETAIL: Greenway Trail Mile Marker ELEVATION: Greenway Trail Mile Marker Scale: 3”=1’-0” Scale: 1”=1’-0”

5-Greenway Park Design | 95 Greenway Plan Master

Greenway Park Dedication

The Park Dedication sign lists individuals and 1'-6" groups who helped made the Lafitte Greenway and Corridor Revitalization possible.

The sign is fabricated from tube steel and painted the signature paint color. Logo and text are screen printed or masked and painted on the face of a metal panel. Sign footing is fastened to poured-in-place concrete footing.

Note: If an appropriate area is determined, this sign can be mounted to a wall or fence. The Friends of Lafitte Corridor seeks to preserve and revitalize the Lafitte Corridor and adjacent neighborhoods from the French The Friends of Lafitte Corridor seeks to preserve and revitalize the Quarter to Canal Boulevard by advocating for and facilitating the Lafitte Corridor and adjacent neighborhoods from the to Canal Boulevard by advocating for and facilitating the creation of a greenway that encourages active living and economic creation of a greenway that encourages active living and economic development and links neighborhoods, cultural features, historic sites, retail areas and public spaces. development and links neighborhoods, cultural features, historic We recognize the following individuals and groups for helping make the Lafitte Greenway a reality:

THE CITY of NEW ORLEANS FRIENDS of LAFITTE BOARD sites, retail areas and public spaces. Mayor Mitch Landrieu Bart Everson, President Name Name Ryan Bordenave, Vice-President Name Name Jessica Knox, Chair Name Name Martha Landrum, Secretary Name Name Linda Landesberg, Treasurer Name Name Edgar Chase Lake Douglas PLANNING ADVISORY COMMITTEE Daniel Samuels Name Name Leonetta Terrell Name Name Jeff Schwartz We recognize the following individuals and groups for Name Name Erica Normand Name Name Mark Venczel Name Name Matt Rufo Name Name Vance Levesque

helping make the Lafitte Greenway a reality: STEERING ADVISORY COMMITTEE PROJECT TEAM Daniel Samuels, Chair FOLC Design Workshop Edgar Chase III, Applied Ecological Services Vice-Chair Councilmember at Large Jackie Clarkson Gandolfo Kuhn Dana Eness, Secretary FOLC Bright Moments Lake Douglas, PhD, Julien Engineering ASLA Councilmember District A Shelley Midura Threefold Engineering THE CITY of NEW ORLEANS FRIENDS of LAFITTE BOARD Naydja Bynum, Councilmember at Large Arnie Fielkow Eskew+Dumez+Ripple Emelda Paul, Councilmember District C James Carter Michael Willis Architects Bart Everson, Councilmember District B Stacy Head Elkins, P.I.C. Mayor Mitch Landrieu Bart Everson, President Nolan Rollins, Office of the Mayor GreenPlay Leonetta Terrell, FOLC RCLCO Walter Kulash Name Name Ryan Bordenave, Vice-President Chris Davala Name Name Jessica Knox, Chair Name Name Martha Landrum, Secretary 2'-0" Name Name Linda Landesberg, Treasurer Name Name Edgar Chase Lake Douglas PLANNING ADVISORY COMMITTEE Daniel Samuels Name Name Leonetta Terrell Name Name Jeff Schwartz Name Name Erica Normand 6'-0" Name Name Mark Venczel Name Name Matt Rufo Name Name Vance Levesque

STEERING ADVISORY COMMITTEE PROJECT TEAM Daniel Samuels, Chair FOLC Design Workshop Edgar Chase III, Applied Ecological Services Vice-Chair Councilmember at Large Jackie Clarkson Gandolfo Kuhn Dana Eness, Secretary FOLC Bright Moments Lake Douglas, PhD, Julien Engineering ASLA Councilmember District A Shelley Midura Threefold Engineering Naydja Bynum, Councilmember at Large Arnie Fielkow Eskew+Dumez+Ripple Emelda Paul, Councilmember District C James Carter Michael Willis Architects Bart Everson, Councilmember District B Stacy Head Elkins, P.I.C. Nolan Rollins, Office of the Mayor GreenPlay Leonetta Terrell, FOLC RCLCO Walter Kulash Chris Davala

DETAIL: Greenway Dedication Plaque Scale: 3”=1’-0”

ELEVATION: Freestanding Greenway Dedication 96 | 5-Greenway Park Design Scale: 1”=1’-0” Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Greenway Park Hours and Rules

1'-6" The Park Hours and Rules sign is intended to be posted at entrances to the Greenway where a Trailhead Kiosk is not required.

The sign is fabricated from tube steel and painted the signature paint color. Logo and text are screen printed or masked and painted on the face of a metal panel. Sign footing is fastened to poured-in-place concrete footing.

Note: If an appropriate area is determined, this sign can be mounted to a wall or fence. PARK HOURS OF OPERATION FOR ALL CITY PARKS ARE

6:00 A.M. TO 11:00 P.M. PARK HOURS OF OPERATION FOR ALL CITY PARKS ARE 6:00 A.M. TO 11:00 P.M.

Glass bottles and glass containers are prohibited. Glass bottles and glass containers are prohibited. Camping in city parks is prohibited. No motorized vehicles may be driven on turf areas.

Molesting, injuring, etc., animals, fowl or fish is prohibited. Camping in city parks is prohibited. Erecting structures, bill posting, etc. is prohibited. Walking, sitting or standing on any border or flower bed is prohibited. No motorized vehicles may be driven on turf areas. No hunting or use of firearms is permitted in City parks. Alcoholic beverages are prohibited in City parks.

All animals must be on a leash and under the direct control of its owner outside of the designated area. Molesting, injuring, etc., animals, fowl or fish is prohibited. Owners must pick up after their dogs. The selling of food, drink or any other commodity on park property is prohibited.

Littering is prohibited. Please take care to dispose of your litter. Erecting structures, bill posting, etc. is prohibited. Keep our green spaces clean. 2'-0" Walking, sitting or standing on any border or flower bed is prohibited. No hunting or use of firearms is permitted in City parks. 6'-0" Alcoholic beverages are prohibited in City parks. All animals must be on a leash and under the direct control of its owner outside of the designated area. Owners must pick up after their dogs. The selling of food, drink or any other commodity on park property is prohibited. Littering is prohibited. Please take care to dispose of your litter. Keep our green spaces clean.

DETAIL: Greenway Hours and Rules Scale: 3”=1’-0”

ELEVATION: Freestanding Greenway Hours and Rules Scale: 1”=1’-0” 5-Greenway Park Design | 97 Greenway Plan Master

Greenway Trail Regulatory

Greenway Trail Regulatory signs are intended to be additive discs that warn pedestrians and bicyclists of specific park rules.

Signs are one-eighth-inch-thick aluminum or steel plate, painted. The background is white reflective adhesive vinyl. Graphics are screen printed or digitally printed on the face.

Signs are intended to be mounted to existing posts or fencing. Limit one or two signs per post.

Additional sign layouts may be required.

Note: Sign shown is mounted to an existing sign or post element. 1' 0"

DETAIL: Greenway Trail Regulatory NTS

MUST 5' 0" S BE HARE G O S O N D

L

E S A E T S L H M H I TI AT ALL E T R A

ELEVATION: Greenway Pedestrian Wayfinding w/ Trail Regulatory Scale: 1”=1’-0” 98 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana 14" Greenway Plan Master

Greenway Trail Path Regulatory

The Trail Path regulatory sign warns pedestrians to stay on designated paths in order to preserve nature areas off the trail. Additional messages can be considered for this sign type such as plant Protect the Plants types and other information relating to the 6" planted areas.

Signs are one-eighth-inch-thick aluminum Stay on the Path or steel plate welded to steel tube, painted signature element color. Text is screen printed or masked and painted white.

ELEVATION: Path Regulatory Scale: 1/2 Full Size

Height varies based on plantings

SIDE ELEVATION: Path Regulatory Scale: 1/2 Full Size

5-Greenway Park Design | 99 Greenway Plan Master

Standard Street Identification Sign

The Standard City of New Orleans Street Sign is intended for vehicular streets in the Revitalization Corridor and the through streets that are perpendicular to the Greenway. For mounting Street Name and Traffic Control signs: Posts are 16 gauge, .065 wall and galvanized for extended life.

100 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Street Name Tiles

5-Greenway Park Design | 101 . tREME cEntER y cIty PaRK KW . t Greenway Plan Master . VIS P . t t VE. . S VE S . Da t . t a . . E a t . . IS S t . . S t on . t t . n t . on t S BL t S t . o S t R S no t n t a S on o User Experiences R S E D S on S S I S ED E S an u D IB c t o S I LVEZ S RGE M BER PRE S oa n L PEZ S a h IR a ayo o u o a ont o EFFERS ohn R G J PRIE Ro M cL J t RE S L G D W BR D Roch DELGaDo coMMunIty coLLEGE

It is anticipated that various sections along tEnnIS couRtS LEMann PooL BIKE Path coMMunIty GathERInG SPacE SPLaSh PaD caRonDELEt WaLK the Greenway will offer different experiences PLayGRounD thE ShacK SoJouRnER tRuth MaSSEy’S hoME DEPot Bayou based upon the program and the width of the St. John EaSton PaRK BaSKEtBaLL couRtS

. REFuELInG StatIon VE. . . .

a coMMunIty GaRDEn RhIno FIELD . E St

Greenway as it narrows from to . . y St K St St . . ton . ott GE DER St coMMunIty PaVILLIon: DoG PaRK a St

on LL RI c St D . St t RK aVE. LaFIttE S o ESSE EZ St n an touLouSE St. RESTROOMS, cONcESSIONS,

V at t na

ER o M Canal Boulevard. Each illustrative highlights Ic MPI R R

MEMP L RR nn VID St y

. Pat cOMMuNITY ROOM, KSB a ty Pa touLouSE St. ER a L DI cott St oL B D S co hE Mu aLEX cI So ca EquIPMENT STROAGE u h RG St a IS St the key elements that users of the Greenway Z S t will experience as they travel the length of the . . . St. LouIS St. coMMunIty GathERInG SPacE Greenway trail. cana

L BLVD. PEcan oRchaRD . .

coMMunIty GaRDEn FREE ShoW LaWn . t t St

coMMunIty GaRDEn chaRGER FIELD .

tWo 440 MEtER tRacK LanES t contI St. PEcan oRchaRD IS S n S VoLLEyBaLL couRtS a R Section 1: Basin Street to N. Claiborne Avenue WaRREn EaSton FootBaLL FIELD RED BuLL SKatE BaRGE SI nthony ILLERE S ILLERE V Ma Ba a actIVE RaIL LInE MID cIty MaRKEt RouSES GRaSS aMPhIthEatER WaRREn EaSton tRacK: EXPanDED SKatE PaRK StaGE LONG juMP, HIGH juMP,

. SHOT PuT, POLE VAuLT contEMPLEtIVE SPacE y At the southwest end of the Greenway trailhead KW VIS P

is Basin Street, where the Greenway meets the Da on

French Quarter and downtown New Orleans. EFFERS WaRREn EaSton hIGh SchooL J connEctIon to Most users will enter this part of the Greenway BIo InnoVatIon cEntER to access the Greenway park, attend a cultural or music festival, link to their home or business, or access City Park and other parks and open ITEM ITEM ITEM ITEM

NEW ORLEANS, LOuISIANA GREENWAY MASTER PLAN ALTERNATIVE 2 | SHEET 1 NEW ORLEANS, LOuISIANA GREENWAY MASTER PLAN ALTERNATIVE 2 | SHEET 2 0 50 100 200 spaces in the Corridor. Places of historic or NOVEMBER 2011 NOVEMBER 2011 cultural interest include Congo Square and Mitchell J. Landrieu, Mayor Mitchell J. Landrieu, Mayor Louis Armstrong Park. While accessible to the

streetcar, Basin Street Station provides other Mitchell J. Landrieu, Mayor Mitchell J. Landrieu, Mayor transportation connections around the city. Greenway users will take one of two paths, either the 12-foot-wide bicycle and pedestrian trail along Toulouse Street or the five-foot Carondelet Walk along Lafitte Street.

Section 2: N. Claiborne Avenue to N. Broad Street

The most active recreational uses are planned for the this part of the Greenway and incorporate Lemann Pool, Lemann Playgrounds and Sojourner Truth Community Center. Programs planned for areas around these activity centers include organized and informal games of soccer, baseball and football. Active sports planned near and associated with the Sojourner Truth Community Center include basketball and tennis. The bike trail bisects this area and travels through pecan orchards and community gardens and terminates at the skate park and nearby Refueling Station.

A strong connection between this portion of the Greenway and the future UMC and VA GREEnway iMaGERy sites located southeast along N. Galvez Street is nEw ORlEans, lOuisiana 0 100 200 400 anticipated. nOVEMBER 2011

102 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana . tREME cEntER y cIty PaRK KW Greenway Master Plan Greenway Plan Master . t . VIS P . t t VE. . S VE S . Da t . t a . . E a t . . IS S t . . S t on . t t . n t on . t S BL t S t . o S t R S no t n t a S on o R S E D S on S S I S ED E S an u D IB c t o S I RGE LVEZ S M BER PRE S oa n L PEZ S a h IR a ayo o u o a ont o EFFERS ohn G J PRIE Ro R M RE cL J S t D G L D W BR Roch DELGaDo coMMunIty coLLEGE

tEnnIS couRtS LEMann PooL BIKE Path Section 3: N. Broad Street to N. Jefferson Davis coMMunIty GathERInG SPacE SPLaSh PaD caRonDELEt WaLK PLayGRounD thE ShacK Parkway SoJouRnER tRuth MaSSEy’S hoME DEPot Bayou St. John EaSton PaRK BaSKEtBaLL couRtS

. REFuELInG StatIon VE. . . .

a coMMunIty GaRDEn RhIno FIELD .

E St As the Greenway narrows and crosses N. Broad . . y St K St St . . ton . ott GE DER St coMMunIty PaVILLIon: DoG PaRK a St

on LL RI c St D . St t RK aVE. LaFIttE S o ESSE EZ St n an touLouSE St. RESTROOMS, cONcESSIONS,

V at t na

ER o M Street, programmed uses become less formal Ic MPI R R

MEMP L RR nn VID St y

. Pat cOMMuNITY ROOM, KSB a ty Pa touLouSE St. ER a L DI cott B St oL Mu aLEX hE D S co cI So ca EquIPMENT STROAGE u h RG St a IS St Z S and more passive including areas for a dog park, t . . . community gardens and contemplative space

St. LouIS St. coMMunIty GathERInG SPacE cana with a labyrinth and memorial. Practice fields

L BLVD. PEcan oRchaRD . .

coMMunIty GaRDEn FREE ShoW LaWn . for students of Warren Easton High School will t t St

coMMunIty GaRDEn chaRGER FIELD .

tWo 440 MEtER tRacK LanES t contI St. PEcan oRchaRD IS S n S VoLLEyBaLL couRtS a R WaRREn EaSton FootBaLL FIELD RED BuLL SKatE BaRGE SI incorporate track and field uses and a football nthony ILLERE S ILLERE V Ma Ba a actIVE RaIL LInE MID cIty MaRKEt RouSES GRaSS aMPhIthEatER WaRREn EaSton tRacK: EXPanDED SKatE PaRK StaGE LONG juMP, HIGH juMP, field. A community pavilion is planned as an

. SHOT PuT, POLE VAuLT contEMPLEtIVE SPacE y KW adaptive re-use of the Brake Tag Station that VIS P

Da offers restrooms, concessions and storage. The on historic pump house facility, Bayou St. John EFFERS WaRREn EaSton hIGh SchooL J connEctIon to BIo InnoVatIon cEntER and the existing open Orleans Relief Canal provide special points of interest and educational components for trail users. ITEM ITEM ITEM ITEM

GREENWAY MASTER PLAN ALTERNATIVE 2 | SHEET 1 GREENWAY MASTER PLAN ALTERNATIVE 2 | SHEET 2 0 50 100 200 NEW ORLEANS, LOuISIANA NEW ORLEANS, LOuISIANA Section 4: N. Jefferson Davis Parkway to NOVEMBER 2011 NOVEMBER 2011 Mitchell J. Landrieu, Mayor Mitchell J. Landrieu, Mayor Canal Boulevard

This section of the Greenway will be used Mitchell J. Landrieu, Mayor Mitchell J. Landrieu, Mayor primarily for bicycle and pedestrian trail users. At the northeast end of the trail is Delgado Community College, City Park and access to the city bike network. Portions of this section of the Greenway have an active railroad adjacent to the trail, with some sections converting to a sharrow with automobile traffic from Lafitte Street.

Main access points to this portion of the trail are at City Park, the streetcar stop on N. Carrollton Avenue, and Bayou St. John. This section of the Greenway is bordered by industrial and commercial uses that will change the look and feel of the experience of the trail from Bayou St. John to Canal Boulevard.

GREEnway iMaGERy nEw ORlEans, lOuisiana 0 100 200 400 nOVEMBER 2011

5-Greenway Park Design | 103 Greenway Plan Master Trail User Type and Count

Potential trail users of the Lafitte Greenway will Trail User Count be local residents or visitors attracted to different program elements planned for the Greenway. There are various methods for projecting trail These elements include organized league play, user counts for the Greenway. For the purposes arts and culture, schools, community facilities, of this document, two types of calculations festivals, recreation, and transportation. were used based off Urban Trail Traffic Count Models15. The first is a comparative study of When designing the Greenway, multiple modes similar Greenway trail user counts, and the of transportation and users were accounted for: second is based on census data of the potential capture area. • Walkers • Joggers The study based on census data proved more • Bicyclists valuable for the Lafitte Greenway, as it is unique • Skateboarders in that it spans 3.1 miles. Similar studies for • Inline Skaters rails-to-trails Greenways such as the Monon • Wheelchairs Trail in Indiana connects multiple cities and • Equestrian spans 16.7 miles16. However, as a base to • Scooters compare the Greenway, the Monon Trail is used • Non-road Motorized by about 2,500-1,500 people each day17.

The variety of users on the trails has increased The capture area was calculated with a one- dramatically over recent years. Devices such quarter-mile and a two-mile radius of the as kick scooters, inline skates, hand cycles and Greenway. The one-quarter-mile capture area recumbent bicycles that were rarely seen on is a population of 13,508 and the two-mile shared-use paths as recently as 10 years ago are population is 97,090. Trail users projections now common. Among the reasons for this shift were then calculated based on the percentages of are the development of new technologies and the population who used public transportation, changing demographics. For example, electric rode their bike, or walked to work.18 The two personal transporter devices (e.g., the Segway®) radii yielded a range of potentially 800-9,000 are new technologies that are appearing on trail users per day. While the projection of paths and roadways around the country. 9,000 trail users per day is very high based on Additionally, coincident with the aging of the comparative studies, the projection is more American population, the number of people likely to range between 500-3,000 users per using mobility-assistive devices (such as manual day, and an average daily use of between 500- wheelchairs, powered wheelchairs and powered 800 people. scooters) is increasing. Averages vary based on several factors. Weekend Mopeds and small motorcycles (scooters) are average daily use is typically higher than used on roads and in some places on shared-use weekday average daily use by about half. In paths. However, these vehicles have been in addition, the time of day affects the amount of use on public rights of way for a long time and trail users, with peak hours near midday. most states and cities specifically regulate them as motorized vehicles and therefore prohibited from trails. 15 Patrick Lindsey and Greg Lindsey. “Using Pedestrian Count Models to Estimate Urban Trail Traffic,” The Journal of Regional Analysis & Policy (2004): 34:1. 16 Carmel Clay Parks & Recreation. “Monon Greenway Trail Guide,” 1 January 2011, (13 March 2012). 17 Lindsey, “Counting Pedestrians and Cyclists on Multiuse Trails and Other Facilities [Powerpoint],” Humphrey School of Public Affairs, University of Minnesota.

18 U.S. Bureau of the Census. “2000 Census of Population and All photo credits: Design Workshop Housing, ESRI forecasts for 2010 and 2015.” ESRI (July 2011). Friends of Lafitte Corridor Hike, 2011

104 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana Urban Wildlife Greenway Plan Master

The creation of a new Greenway through the initial list of native trees targeted for use in recommendations for improving hummingbird heart of New Orleans can have many benefits. the design was further reviewed with habitat habitat. Based upon the recommendations Not the least of these is a general improvement values in mind. The selection of plant species of Mr. Muth and his fellow hummingbird of the urban environment including improved was in turn balanced against maintenance enthusiasts, the list of trees and ground plane water and air quality, stormwater management, concerns and issues of crime prevention through plantings was reviewed in an effort to increase reduction of the the urban heat island, and environmental design. Some species, such habitat for hummingbirds. enhanced habitat for wildlife. Urban wildlife, as Wax Myrtle or Beauty bush for example, including birds, butterflies and squirrels, offer while offering great wildlife value, provide Another group with an interest in the wildlife the potential to enhance the user experience maintenance challenges (such as the need for potential of the Greenway is the New Orleans of the park and to provide educational frequent pruning) or security concerns because Butterfly Society. An annual inventory of opportunities for areas schools and other of their dense, low-growing growth habit. A the butterfly species found within the city is wildlife enthusiasts. There are currently balance was therefore struck between concerns conducted, with 51 species commonly being organized and active groups within the city for shade, maintenance, security, aesthetics and found. The leader of this group, Mrs. Frances who regularly study and inventory the city’s habitat. Based upon the targeted tree canopy Welden, also reviewed the proposed tree and population of birds and butterflies. These groups and use of diverse native tree species, a goal ground plane planting list for opportunities to offer wonderful potential to build support for was set of increasing the variety of bird species improve wildlife habitat. the Greenway and add to the variety of uses found within the Greenway by 10 percent upon within the park. completion of the Greenway. One management strategy that might be considered in the near-term development A simple bio blitz (a site walk during which Additional techniques, such as the creation of the Greenway would be to allow those species variety and wildlife populations are of wetlands along the borders to Bayou St. portions of the Greenway, which are not recorded) of the Lafitte Greenway site was John, should be implemented over time and slated for active recreational use to grow to a conducted in order to make a simply inventory could further increase this number as habitat height of 24-36 inches was a native grass and of the animal species found within the site. for water birds is currently not found within wildflower meadow. The cost of maintenance As one might expect given the relatively low the Greenway. Similarly the ideal locations for of the Greenway would be reduced and the volume of tree cover and vegetation little birding within the city at this time are often opportunity for including within the design the wildlife was found. A further inventory of overgrown vacant lots where there is a wide vast variety of native wildflowers found within existing bird species found within the Greenway diversity of native grasses, wildflowers and Louisiana. These wildflower meadows would was conducted by Jared Zerinque, a student at other shrubby species. Balancing the character provide wonderful opportunities for bird and the University of New Orleans, working under of this habitat with the aesthetic desires of local butterfly habitat. direction of Peter Yaukey of the UNO faculty. residents is also an issue. However, as much Zerinque’s inventory identified 30 birds/km of the Greenway is anticipated to be mowed at N. Jefferson Davis Parkway, 12 birds/km at only seasonally, and with the exception of Canal/Wieblen, and 42 birds/km at City Park mowed sports fields, all of the ground plane Avenue19, roughly 10 percent of the number of the Greenway will utilize native grass and typically found within the city of New Orleans wildflower species, habitat for birds should be during the annual bird census of the city. further increased beyond that provided by tree cover. To be well received by the community, Through conversations with Professor Yaukey such meadows should be contained within a and Mr. Zerinque, it was determined that mowed boundary and provided with a robust the most effective way to increase both the interpretive program. Signs which allow for the number and variety of birds present within identification of wildflowers and other plant the Greenway was by increasing the vegetative species could provide a living laboratory for volume on the site and the tree canopy. A tree local students and a place of enjoyment for all canopy target of 60 percent was established in residents of New Orleans. part to provide shade for users of the Greenway and improve stormwater management but In a similar way, David Muth of the National also to provide increased wildlife habitat. The Wildlife Federation and an avid hummingbird enthusiast was consulted regarding

All photo credits: Design Workshop 19 Jared Zerinque. “Wildlife Use of a Proposed Urban Greenway in The introduction of tree species in the Greenway will increase urban wildlife populations. New Orleans (Poster),” 2011.

5-Greenway Park Design | 105 Greenway Plan Master

This page intentionally left blank.

106 | 5-Greenway Park Design Lafitte Greenway Master Plan | New Orleans, Louisiana CHAPTER TITLE SUBTITLE 6 Implementation

Opinion of Probable Costs Building Partnerships Identifying Funding Operations and Maintenance

The Implementation Chapter includes an opinion of probable costs for the planning and design of the Greenway.

The purpose of this chapter is to outline the costs, partners and potential funding sources for each of the recommended projects.

6-Implementation | 107 Greenway Plan Master Opinion of Probable Costs at Full Build-Out

Full Build-Out Cost Estimate Table 8: Site Protection and Demolition Table 9: Proposed Improvements The vision for the Lafitte Greenway provides a Item Preliminary cost Item Preliminary cost Item Preliminary cost long-term plan for the proposed elements of the Erosion Control and Site Protection $ 120,000 Site Grading and Drainage $ 946,500 Outdoor Stage $ 150,000 Greenway. The following four pages detail the Site Demolition - Structures $ 288,000 Green Stormwater Management $2,000,000 Fishing Docks $ 75,000 opinion of probable costs for the Greenway at full build-out (the vision) and within the initial Site Clearing and Grubbing $1,858,250 Paved Bike Trail (Pervious Concrete) $ 859,000 Trail Intersection Water Feature $ 525,000 improvements budget. Each corresponding plan Environmental Mitigation $2,399,750 Concrete Sidewalk $1,220,000 Water Feature/Water Basin $2,200,000 is shown with the estimated cost below. Subtotal $4,666,000 Concrete Paving $ 200,000 Splash Pad $ 400,000 Soft Surface Carondelet Path $ 153,000 Learning Feature $ 50,000 Soft Surface Paving Areas $ 325,000 Contemplative Space $ 100,000 Signalized Intersections and Improvements $ 569,000 Community Gardens $3,125,000 Crosswalk Pavement Markings $ 115,500 Orleans Relief Canal Crossings $ 900,000 Safety Call Boxes $ 150,000 Dog Park $ 125,000 Trail Lighting $1,405,000 Skate Park $ 300,000 Signage $ 500,000 Skate Stops $ 50,000 EMS Station $ 225,000 Basketball Courts $ 175,000 NOPD Sub-Station $ 225,000 Tennis Courts $ 150,000 Bathrooms $ 145,000 Bocce Courts $ 24,000 Restaurant $ 900,000 Horseshoe Pits $ 12,000 Pavilion (Former Tag Station) $ 485,000 Washers $ 6,000 Pavilions (40 feet x 50 feet) $ 170,000 Tether Ball $ 1,500 Picnic Shelters (20 feet x 40 feet) $ 440,000 Game Tables $ 20,000 Trailhead $ 30,000 Playground $ 175,000 Orchard Grass Paver Parking Lot $ 650,000 Multi-Purpose Fields $ 300,000 Outdoor Amphitheater $ 150,000 Site Furnishings $ 545,000 Volleyball $ 150,000 Subtotal 21,421,500

108 | 6-Implementation Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Table 10: Proposed Landscape Improvements Lafitte Greenway Full-Build Out Vision

Item Preliminary cost Alternative improvements Preliminary cost Trees $ 550,000 Orleans Relief Canal Water Feature $25,000,000+ (Approx. 98,900 square feet) Seeded Lawn $ 388,000 Open Frenchman’s Canal (3 miles, 16 feet $15,000,000+ Subtotal $ 938,000 wide, 4 feet deep)

Total Improvements $27,025,500

Contractor Costs $ 3,393,500 Contingency (15%)* $ 4,053,900

Grand Total $34,472,900

*Note: Percent of contingency will decrease as level of project design, engineering, and documentation increases.

**Note: There is a potential for costs, or portions of costs, to be donated or funded under separate grants.

6-Implementation | 109 Greenway Plan Master Opinion of Probable Costs for Initial Improvements

Initial Improvements Estimate Table 11: Cost Estimate Currently, $6.5 million have been allocated included within this cost estimate. For example, Item Preliminary cost to the construction of the Greenway and a skate park is currently being explored as a Erosion Control and Site Protection $ 110,500 determine the elements that can be built. potential donation to be installed permanently Site Clearing $1,438,200 The cost estimate to the right shows those in the Greenway. The costs estimates provide Environmental Mitigation $2,143,000 improvements that fall within the budget, a basis of discussion and a starting point for Site Grading (Grading, Lawn Inlets) $ 839,500 including a 12-foot-wide concrete trail, from obtaining additional funding to realize the Basin Street to N. Alexander Street. The potential of the Lafitte Greenway Master Plan. Paved Bike Trail- Pervious Concrete $1,072,000 decision to end the Greenway at N. Alexander Concrete Sidewalk $ 558,000 Street is due to ownership rights of the N.O. Seeded Lawn $ 339,000 Terminal Company and City-owned land Subtotal $6,500,200 and the importance of the connection to City Park. Please refer to the Lafitte Corridor General Conditions $ 734,500 20 Existing Conditions Report for information Contingency (15%)* $1,085,500 regarding the survey and title research. The budget accounts for no demolition of existing Grand Total $8,320,200 structures, and areas outside of these structures are proposed to be graded and seeded, allowing for flexible open space and recreation. *Note: Percent of contingency will decrease as level of project The opportunity for donations or other funding design, engineering, and documentation increases. opportunities should be explored to include elements of the Greenway vision that are not

20 Design Workshop. Lafitte Corridor Existing Conditions Report. City of New Orleans, November 2011. .

110 | 6-Implementation Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Lafitte Greenway $6.5 million option

Asphalt Trail Seeded Lawn

6-Implementation | 111 Greenway Plan Master Building Partnerships

Partners Greenway Elements Skate park Football and Basketball Vertical Gardens

To achieve the construction, operations and Signage and Arts The Rob Dyrek Foundation, which funded Other Corridor-wide partnerships could include Between Carrollton Avenue and Bayou St. maintenance of the Lafitte Greenway will the construction of a skate park in Shreveport, professional football teams, who may agree to John, partnership opportunities might be built require a variety of funding sources and Other construction possibilities include non- might be interested in New Orleans. In fund the construction of the Lafitte Charger with a local big-box store. The foundation of partnerships. The following is a description of profits such as Arts Council, who might work to addition, there is some indication that there Field or the Warren Easton Eagles field (also the local big-box store would logically have an the types of partnerships that may be possible. secure Arts Funding for the Greenway. may be commercial interest in a skate park used by the Rhinos). Similarly, the professional interest in a building project such as this. The concession along the Greenway. basketball teams may have an interest in funding current focus of the foundation is to provide Between City Park Avenue and Canal Signals and Crossings the construction of the basketball courts within support for veterans. Perhaps a fitness course Boulevard, perhaps there is a partnership Volleyball the plan. specifically designed for the disabled but usable possibility with the police training facility Throughout the Greenway and Corridor, Safe by all could be the focus of the local big-box which may desire a parcourse (fitness trail) Routes to School funding should be pursued The Mid City Volleyball Association has a great Play Equipment store’s efforts. Such a course would also extend or other fitness facility along this section of with the Environmental Protection Agency. interest in developing the volleyball complex the populations served by the Greenway. the Greenway. A conversation with the local Such funding might cover the cost of pedestrian and may be ready to provide labor and some National non-profit playground planners, who Alternatively, Living Wall systems on the blank college would also be in order as there may be signals, crosswalks and other pedestrian funding. There is also some indication that are building playgrounds elsewhere in the walls of local businesses might both beautify educational programs for the college that could improvements. there may be commercial interest in a volleyball city, may have an interest in constructing the the Greenway and perhaps provide outdoor utilize this space. concession in the Greenway. There may, playgrounds provided in the master plan. display for their garden shops and even herb and however, be liquor law questions to resolve for vegetable sales. The Environmental Protection Throughout the Corridor, it may be possible Contemplative Space these types of operations. There may be other corporate interests who Agency has a vertical garden grant program that to develop license agreements with private would underwrite or donate equipment aims to transform overburdened environmental property owners, such as restaurants that might The local Buddhist organizations have expressed Sports Fields (playground equipment, site furniture, green areas into vibrant and sustainable places and may be able to obtain licenses for deck space (not interest in potentially partnering on design walls, etc.) in order to be associated with be able to assist with a vertical garden element parking or building encroachments) for dining implementation of the contemplative space. The Orleans Parish School Board, parents and the project. However, for such efforts to be in this area. terraces in exchange for funding or maintaining other supporters of Warren Easton Charter successful there must be a major public relations a segment of the Greenway. The rental of patio Community Gardens High School might come together to help strategy to ensure adequate publicity for the space rather than ground leases for restaurant implement the sports field improvements along companies who contribute in this way. buildings within the Greenway may be just It is conceivable that these narrow areas the section of the Greenway near the high as effective in generating revenue for the between buildings could be utilized for school. Warren Easton Charter High School, Plantings and Materials Greenway without filling the open space with community gardens (although there are the oldest public school in New Orleans, has structures. better, larger locations as one moves closer to no outdoor recreational facilities. The closest A local non-profit organization has been Basin Street). New Orleans has a number of place for the band and sports teams to practice provided with a preliminary plant list for the Another potential partner could be a local big community gardening initiatives that would be is Easton Park six blocks from the school. The project and conversations were held about the box foundation to fund a parcourse (fitness trail) coordinated and developed as part of the Lafitte Greenway is two blocks closer and has adequate donation of trees to the project. along the Greenway. Greenway effort. The local community garden dimension to accommodate many of their organizations should be brought together to desperately needed facilities. The Louisiana Urban Forestry Council and the craft an overall implementation strategy for the Society for Louisiana Iris has volunteered to community gardens within the Greenway. The donate all of the irises needed for the project. market being developed by the Broad Street Nursery groups and fishermen might contribute Connection should have a logical interest in construction materials. developing the community gardens near its operations. In addition, there have been requests The area over the Orleans Relief Canal has to use a portion of the Greenway as a native also been suggested as an area for greenhouse plant nursery, which could be the focus of a construction and aquaculture. community garden. The organizations could take the lead in securing funding for these elements of the Greenway.

112 | 6-Implementation Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Additional Partners create additional auto and pedestrian conflicts, is hospitals may be willing to participate in the Environmental Metrics Monitoring not recommended, some commercial use of this development of the Greenway in some fashion. Bayou St. John space in exchange for benefits to the Greenway There are also research partnerships which may be in order. These would be analogues to National Park Service should be developed to monitor the long-term At Bayou St. John, there is great potential food carts in a pedestrian mall (or the artists and success of the Greenway. Butterfly experts to partner with both the U.S. Postal Service other vendors in the French Quarter). The City It is conceivable that The National Park Service and advocates should be approached about and the Louisiana Department of Wildlife should consider the execution of Community Jazz National Historic Park could provide conducting an annual butterfly count within and Fisheries. The Department of Wildlife Benefits Agreements with developers adjacent to interpretive signage for the Greenway. Given the Greenway. In a similar way the local birding and Fisheries has an interest in improving or in close proximity of the Greenway. the importance of Tremé and the surrounding community should be encouraged to conduct fisheries habitat and water quality within the neighborhoods to the creation and evolution of an annual bird count in the Greenway and Bayou. In so doing, the stormwater benefits, Local Carnival Groups Jazz and other forms of music in America this Corridor. Annual water quality monitoring recreational and contemplative space within the would be a natural partnership. in Bayou St. John by the Louisiana Fish and Greenway can also be realized. The Department Moving East of Broad to the French Quarter, a Wildlife Department could help to gauge the should also have ideas about federal and other local carnival group has expressed an interest in Non Profits effectiveness of stormwater management systems grant funding to fisheries and water quality leasing a portion of the Greenway for a parking within the Lafitte Greenway and Corridor. The improvements in Bayou St. John. As the plan lot. While the construction of a surface parking The Trust for Public Land, which is making Center for Disease Control should have a great envisions the construction of wetlands which lot within the Greenway is not recommended, improvements at Markey Park, may have an interest in monitoring and measuring the public would greatly benefit fisheries within the the local carnival group might help fund the interest here as well. health benefits from the construction of the Bayou, fishing groups or even commercial construction of the grass block parking lot in the Corridor. The Rails to Trails Conservancy may operators may take an interest in this portion pecan grove in that portion of the Greenway. Coordination with non-profit friends also have research interest in the Greenway, as of the plan. With the proposed plan there is Properly constructed and managed, this parking groups who have an interest in the physical does the Tulane School of Public Health. great potential for a canoe or boat livery which may be available by lease for special events and improvement of the Corridor and connecting could provide an entrepreneurial opportunity open to the general public at other times. between public facilities and other open spaces and employment for local youth. Amphitheater within the Corridor should be considered to rental charges from Bayou Boogaloo and other Housing Partners avoid working at cross purposes and to avoid concerts could also generate some revenue. duplicate requests for donations. Providence Housing has a lease on the land It is not inconceivable that the Greenway could adjacent to Sojourner Truth. They intend to Equestrian be established as a wetlands bank for the parish, build recreational facilities for their residents. where developers who are removing wetlands The extent of their planned improvements is The Carondelet Walk and/or Lafitte Street as part of their construction in other parts of the unknown. However, they have expressed an and St. Louis Street could serve as a venue for parish contribute to the funding of stormwater interest in a coordinated effort with the Lafitte carriage tours with narrators describing the and other wetland improvements within the Greenway Master Plan. history and architecture of the surrounding Greenway. Some discussions have been held neighborhoods, the ecology of Bayou St. John, about the potential of the Greenway as a Similarly, it is anticipated that local developers and the history of the . There location for carbon credits as well. Finally, cable may wish to partner on the construction of may be partnering potential with the various and telecommunications operators may have recreational facilities adjacent to their project. carriage operators and companies. It is possible some interest in the Greenway as a corridor for The current plan for Iberville does not contain that an entrepreneur would be interested in an their fiber and may be willing to pay for the use significant recreational facilities, making the equestrian concession within the Greenway, and of the property in this manner. Greenway a logical location of the needed riders could go from Basin Street all the way improvements for these residents. to Lake Pontchartrain (along or through City Corridor Businesses Park). LSU/ VA Medical Hospitals Between City Park Avenue and Carrollton Avenue other opportunities exist. Companies The construction of the LSU and VA Medical along the Greenway might receive a license Hospitals just blocks from the Greenway offer for outdoor display space for bicycles and other other potential partners, particularly if housing sports equipment for use in the Greenway in is incorporated into the long-term development exchange for funding or maintaining a segment of these sites. In addition, the Greenway of the Greenway. While the crossing of the will be a major recreational venue for their Greenway by a new driveway, which would employees. It would seem, therefore, that these

6-Implementation | 113 Greenway Plan Master Identifying Funding

There are six basic options that present and a sufficient budget. Corporate sponsorships can also be a revenue source for the Lafitte achievable rent) criteria. An alternate land themselves and have historically been used to are another potential source of similar funds. Greenway. use that might generate meaningful land lease find park operations and development in the revenue is parking, although the incremental United States: To explore the viability of this funding Finally, park concessions are a viable source of demand for parking is not immediately approach or to gauge the likely contribution of revenue for the Lafitte Greenway and should be apparent. 1.. Direct City Funding (General Fund or Other fund raising, grants and corporate philanthropy, explored in the park design and construction. Revenues), a feasibility study by a qualified development While it is not expected that activity levels Tax Increment Financing 2. Philanthropic Support/Grants, professional needs to be undertaken. It stands would generate extensive food or beverage 3. Revenue Generated by Fee-Based Activities to reason however, that the opportunity may vending, there may be an opportunity to create Tax increment financing (TIF) has not and Concessions, exist for a non-profit organization to generate one or two points of sale that could contribute a historically been a popular means of funding 4. Revenue Generated by Real Estate a meaningful revenue stream to be applied to ground lease payment towards park operations, park operations or construction, in large Development, ongoing park operations. potentially on the order of magnitude of measure because the actual value or revenue 5. TIF Revenues, and $10,000 to $15,000 per point of sale. Under this increment the park actually generates is difficult 6. Park Improvement District. Revenues Generated by approach, operators would build and operate to forecast. There may be an opportunity to Fee-Base Activities and their own structures, subject to City approval, create a TIF structure to support the Lafitte There is no silver bullet financing solution but, not taxing the construction budget any further. Greenway, although key provisions in the City’s through a combination of approaches and Concessions Tax Increment Financing Manual suggest that efforts, a stream of revenue suitable to cover Funds Generated by Real this approach may not be fiscally feasible. expected operating costs can be generated. Another funding approach that is gaining Estate Development broader use in parks across the country is One potential TIF approach would be to create derivation of fee revenue from park activity City General Fund Revenues An increasingly popular approach to park a Tax Increment District designed to capture participants and by awarding of concessions in incremental sales tax activity generated by the park area. maintenance funding is setting aside a portion Park operations in the United States have of publicly owned property for real estate new retail activity in the Corridor. While one historically been funded out of City General development under a land lease regime, with of the results of the Greenway’s development Fund monies or other funds available within The most straight-forward element of this will be increased commercial vibrancy and approach, although potentially also the most the resulting lease payment dedicated to park city government. Like most other major cities maintenance costs. the redevelopment or new development of in the United States, New Orleans is suffering sociologically objectionable, is the assessment attractive retail spaces, it is highly unlikely that from current fiscal deficits making funding of recreational fees to park users. For instance, the construction of the Greenway will result baseball fields or basketball courts might be It appears that the most viable use to be of its current obligations extremely difficult, considered for this approach is rental apartment in a meaningful net increase in retail sales let alone allowing for additional operating made available subject to a fee, say $25 per for the City overall. Because the sales tax is hour, and more expensive amenities such as development. RCLCO conducted a preliminary costs. It has been assumed for this purpose of analysis to estimate how much land might need collected at the City level, increment generated this analysis that all other avenues of location skate parks would be available at a per-person at retail establishments in the Corridor is likely use rate. The challenge with this approach, of to be set aside to generate the funds required funding support for the park must be explored to cover park operations. RCLCO’s rough to consist of taxes that would be collected to account for this fiscal condition. course, is that relatively few hard amenities are elsewhere in the city if it were not built, and likely to be included in early phases of the park, initial analysis suggests that market-rate rental apartment development might generate as much thus cannot be considered an increment. This funding option would be best for both and such fees may well limit park use, thereby compromising the park’s social mission. as $35,000-$40,000 per acre in ground rent operations and capital projects. payment, assuming that the City would agree to The more promising approach might be a a 100-year land lease. property tax TIF, in which the resulting tax Revenue might also be generated through revenue from incremental property value that Philanthropic Support/Grants park site rental, which might include anything The key challenge with this approach is that would accrue to property along and as a result from picnic areas to farmers markets to places the Greenway would be dedicated to its ongoing Fund raising is an essential source of funds for for larger-scale gatherings. While it is not making the opportunity construction feasible most large urban parks today. A recent survey would require roughly four (4) to five (5) acres maintenance and operations. There is good likely that construction of large-scale indoor case study evidence to suggest that the creation of major urban parks demonstrated that fund facilities would be financially feasible given the in a rectangular format, enough to support raising typically generates between 20 percent roughly 200 units in a mid-rise wood frame of the Greenway may well add an average of current construction budget, there may be some five percent to the value of both residential and 40 percent, roughly, of operating budgets. revenues to be derived from open air events, construction (40 – 50 dwelling units per acre Typically, raising significant funds through this in a four-story building). The park dimensions and commercial property in the district. although it is estimated for the purpose of this Unfortunately, the TIF regulations stipulate that method relies on either the existence of an angel analysis to be a small potential stream of funds. may simply not allow this. Further exploration donor or a sophisticated professional development of this approach would also require confirming all proposals must demonstrate an increment not Sales of permits for smaller-scale food vendors, relative to the current level of assessment and program that includes a dedicated, capable staff such as food trucks and snow cone stands, developer interest in the opportunity and exploration of accepted underwriting (the tax generation in the district but relative to the pre-Katrina levels.

114 | 6-Implementation Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway Master Plan Greenway Plan Master

Park Improvement District Conclusions

The final source of revenue, a park This discussion suggests that there is no single improvement district (PID), is similar to solution to funding capital and operational a business improvement district (BID) in projects. It is the team’s opinion that the which both residents and businesses within combination of several approaches may be most the Greenway Corridor would pay an annual effective in generating the appropriate level of assessment, most likely appearing on their revenue. Specifically, the consultants counsel: annual property tax bill. Again, this might be acceptable to local home and business owners 1. Increasing focus on the philanthropic and/ because the park would, one expects, add as or corporate sponsorship model – there may be much as five percent to the value of their real grant money available to explore professional estate. The consultant team’s analysis suggests development expertise to achieve this. that as little as $50 per year per property owner may be sufficient to support ongoing park 2. Actively planning for an exploration of operations. concession opportunities in the Greenway, which may provide additional funding and Such a PID would not require its own staff or be increase its use. responsible for executing the park maintenance internally but could be administered through an 3. Exploring the feasibility of a PID which existing business improvement district or even could yield high fiscal potential and the net through the Friends of the Lafitte Greenway, economic impact which is no different from a subject to review of their governance structures. BID (both are taxes on the incremental value of homeowner/business owner property). The challenge with this approach is that creation of such a PID would require consent of a majority of residential and commercial property owners in the district and ultimately passage of enabling legislation by City Council (this guidance is subject to input from legal counsel). Whether or not this would be politically feasible at this point in the process is subject to debate.

6-Implementation | 115 Greenway Plan Master Operations and Maintenance

The details of operations and maintenance of Funding of Operations and Maintenance Endowment the Greenway is discussed the Lafitte Greenway 21 Maintenance Maintenance Strategy Report for the City of A maintenance endowment could be created New Orleans. The optimal funding scenario is for the City to ensure the sustainability of the Greenway. of New Orleans to include the annual cost of The maintenance endowment should be This report includes the maintenance costs developed to the level of creating an annual and potential funding and managing partner maintaining the Lafitte Greenway in the annual General Fund budget. A reliable source of interest amount of $166,000 to cover the associated with full build-out of the plan, which operational and maintenance costs in 2011 includes the following program amenities: annual revenue needs to be identified in order to properly operate and maintain the Lafitte figures. This figure as well as the annual expenditure can fluctuate based on the fund • 3.1 miles of 12’ hard surface trails Greenway without it being subject to fluctuating budget constraints. amount and/or the interest rate (which will • 3.1 miles of 3’ soft surface trails vary based on the type and length of investment • Two playgrounds and interest rate at the time of investment). • Sprayground The New Orleans Recreation Development Foundation (NORD Foundation), an existing The Greenway maintenance subsidy can also • Two lighted tennis courts consist of an annual fund-raising drive to be • Three and a half lighted basketball courts non-profit foundation, can actively raise funds dedicated to the Lafitte Greenway operations able to expend the subsidy needed each year to • One dog park cover the cost of the operation of the Lafitte • Two skateparks and maintenance and would be an avenue to channel donated funds to the Department of Greenway. Contributions to this endowment are • Three skate dots along trail anticipated to be eligible for tax deduction. • 12 fitness stations along trail Parks and Parkways to pay for the Greenway • Three large pavilions maintenance. • 13 small picnic shelters • One amphitheater It could be most beneficial if another non-profit • One stage organization took on the task of fund-raising to • One lighted football/soccer field assist the NORD Foundation. The possibility • Three lighted softball/baseball fields of hiring of an executive director who then • Three large multipurpose lawn areas would be tasked to raise their own funds should • Six sand volleyball courts be considered. The composition of the non- • Three small multipurpose lawns profit organization would also need to include • Three community gardens individuals with strong management and fund- • One orchard raising skills. • One contemplating space • One water feature/fountain The NORD Foundation with some dedicated • Nine bocce ball courts fund-raising assistance from the non-profit • Nine horse shoe pits organization can raise the funds necessary to • Six washers/shuffleboard courts operate and maintain the Greenway on an • 18 BBQ grills annual basis. These funds can be earmarked • 14 chess/checkers tables and dedicated to the Department of Parks and • Three tetherball courts Parkways strictly for the purpose of maintaining • Mowing of 24.5 - 62.5 acres (depending on the Lafitte Greenway. stage of build out) • Irrigation of four acres is for lighted Ideally, a Lafitte Greenway Endowment multipurpose lawn areas for sports Fund should be established at a level that the annual interest is enough to cover the annual The total operations and maintenance cost based maintenance costs for the Greenway and fund upon this program is $166,000. raising each year to cover these costs.

21 Design Workshop. Lafitte Greenway Management Strategy Report. City of New Orleans, March 2012 .

116 | 6-Implementation Lafitte Greenway Master Plan | New Orleans, Louisiana CHAPTER TITLE SUBTITLE 7 WORKS REFERENCED

Community Participation Bibliography

The Works Referenced Chapter captures the extensive public outreach that has been part of the Greenway and Corridor planning processes and provides documentation of the breadth of documents that have been consulted during the creations of these plans. Works Referenced | 117 g reenway m Community Participation

Advisory Group Meetings • Planning Advisory Group – Technical. Community Participation • Disaster – CDBG Program. July 2011, • The Urban Conservancy. June 2011, July Presentation with Design Workshop. City August 2011, October 2011, November 2011. aster p aster and Outreach The Planning Advisory Group - Community is of New Orleans, LA., 28 July 2011. 2011, January 2012, March 2012. • New Orleans Business Alliance. July 2011. made up of community members with a specific • Planning Advisory Group – Community. • Mayor’s Office of Neighborhood • National Park Service. July 2011. Presentation with Design Workshop. City In addition to the Planning Advisory Engagement. July 2011. • Greater New Orleans Foundation. July

lan interest in the direction of the Greenway and of New Orleans, LA., 28 July 2011. Group meetings, extensive outreach into • Department of Public Works. June 2011, 2011. Corridor. The core of this group is the Lafitte the community has resulted in hundreds of Greenway Steering Advisory Committee and • Workshop 1. Five Day Charrette with October 2011, November 2011, March • Arts Council of New Orleans. July 2011. Design Workshop Team. City of New meetings and participants being involved in the 2012. • New City. June 2011, January 2011. members from Friends of Lafitte Corridor and Greenway and Corridor planning process. met in May, June, July, October and November Orleans, LA., 15 August – 20 August 2011. • Department of Parks and Parkways. June • Broad Street Connections. July 2011. 2011 as well as January 2012. • Planning Advisory Group – Technical. 2011, October 2011, March 2012. • Regional Planning Commission. July 2011. Presentation with Design Workshop. City Neighborhood and Community • Office of Environmental Affairs. June 2011. • Bike Easy. November 2011. Organizations The Planning Advisory Committee - Technical of New Orleans, LA., 19 October 2011. • New Orleans Recreation Development • Play NOLA. June 2011. • City of New Orleans Design Advisory Commission. June 2011, October 2011. • Market Umbrella. June 2011. is made up of representatives from the following The following neighborhood and community City departments and met in May, June, July, Committee (DAC). Presentation with • Department of Property Management. July • Saint Peter Claver Catholic Church. June Design Workshop. City of New Orleans, organizations were interviewed during this 2011. 2011. October and November 2011 as well as January process: and October 2012: LA., 20 October 2011. • New Orleans Police Department – Policy • Dryades YMCA. July 2011. • Planning Advisory Group – Community. • Friends of Lafitte Corridor. June - July and Planning Office. August 2011. • Warren Easton Charter High School. • Deputy Mayor of Facilities, Infrastructure 2011. and Community Development Presentation with Design Workshop. City • JOB 1. July 2011. October 2011. of New Orleans, LA., 20 October 2011. • Historic Faubourg Tremé Association. June • New Orleans Business Alliance. July 2011. • Sterling Farms. October 2011. • Capital Projects Administration (CPA) 2011. • Department of Public Works (DPW) • Planning Advisory Group – Technical. • New Orleans City Planning Commission. • Global Green. October 2011. Presentation with Design Workshop. City • Mid-City Neighborhood Association. June October 2011, November 2011, January • The Green Project. November 2011. • Department of Property Management – 2011. Real Estate and Records of New Orleans, LA., 17 November 2011. 2012. • Foundation for Louisiana. November 2011. • Planning Advisory Group – Community. • Esplanade Ridge / Tremé Civic • District A. June • Make it Right Foundation. November 2011, • Department of Law Association. July 2011. • Disaster-CBDG Program Management Presentation with Design Workshop. City 2011. January 2011. of New Orleans, LA., 17 November 2011. • Iberville Residents Council. June 2011. • New Orleans Department of Economic • New Orleans Preservation Center. • Office of Community Development – • Lafitte Residents Council. June 2011. Housing • Workshop 2 – Presentation with Design Development. August 2011. November 2011. Workshop. City of New Orleans, LA., 16 • Friends of Armstrong Park. June 2011. • New Orleans Business Retention and • Historic New Orleans Collection. January • Department of Parks and Parkways • Faubourg St. John Neighborhood • New Orleans Recreation Development November – 17 November 2011. Expansion. July 2011. 2012. • Planning Advisory Group – Technical. Association. July 2011. • University of New Orleans Ornithologist. Commission • Lakeview Neighborhood Association. June • New Orleans Police Department Presentation with Design Workshop. City Organizations January 2012. of New Orleans, LA., 10 January 2012. 2011. • Louisiana Department of Fish and Game. • Sewerage and Water Board of New Orleans • Tremé Center. November 2011, January • Office of Environmental Affairs • Planning Advisory Group – Community. The following organizations with a critical or June 2011, October 2011, November 2011. Presentation with Design Workshop. City 2011. relative interest in the project were interviewed • Mid-City Volleyball Group. August 2011, • Office of Communications • Zulu Social Aid & Pleasure Club. June 2011. • New Orleans, Health Commissioner of New Orleans, LA., 12 January 2012. during this process: November 2011, January 2012. • City Planning Commission – Technical. • Downtown Neighborhood Improvement • Sewerage and Water Board. June 2011, • Bayou Trees. January 2012. • CNO Director of Blight Policy and Association. June 2011. Neighborhood Remediation Meeting with Design Workshop. City of October 2011. • HRI Properties. January 2012. New Orleans, LA., 11 October 2012. • City Park Improvement Association. July • Urban Forestry Council. June 2011. • Blight Policy City Departments and Officials • Director of Place-Based Planning • Steering Advisory Committee – Technical. 2011. • Providence Housing. March 2012. Meeting with Design Workshop. City of • Audubon Institute. July 2011. • Holly Grove Farmers Market. March 2012. The following City departments and officials Meeting Citations New Orleans, LA., 11 October 2012. • Regional Transit Authority. June 2011. • Environs – Technical. Meeting with Design were consulted during this process: • Housing Authority of New Orleans. June • Deputy Mayor of Facilities, Infrastructure • Planning Advisory Group – Technical. Workshop. City of New Orleans, LA., 10 2011. October 2012. and Community Development. July 2011, • Neighborland. June 2011. Presentation with Design Workshop. City October 2011, November 2011, January of New Orleans, LA., 10 May 2011. • Parks and Parkways – Technical. Meeting • Covenant House. July 2011. with Design Workshop. City of New 2012, March 2012. • Lafitte Greenway Steering Advisory • Planning Advisory Group – Community. • Mayor’s Office of Communications. June Presentation with Design Workshop. City Orleans, LA., 10 October 2012. Committee. June 2011, October 2011, 2011, July 2011, August 2011. November 2011. of New Orleans, LA., 11 May 2011. • City Planning Commission. July 2011, • Planning Advisory Group – Technical. • Trust for Public Land. June 2011, November October 2011, November 2011, January 2011, January 2011. Presentation with Design Workshop. City 2012, March 2012, October 2012. of New Orleans, LA., 10 June 2011. • Waggoner Ball Architects. June 2011. • Parkway Partners. June 2011.

118 | 7-Works Referenced Lafitte Corridor Connection | New Orleans, Louisiana g Bibliography reenway m

ASHTO. AASHTO Guidance for the Planning, City of New Orleans, Louisiana. “Bid Tab City of New Orleans, Louisiana. “Mayor City of New Orleans, Louisiana. Street Google Earth. Aerial Map. 2011. Design and Operations of Bicycle Facilities. Berkley Drive Reconstruction.” New Landrieu Outlines Committed Projects.” Lighting Handbook: Design Guidelines for

Harlem BID. (March 2012). Transportation Officials, February 2010. Works, 2010. en/sitecore/content/Root/PRESS/ Revision 1.08. 19 March 2004. City-Of-New-Orleans/All-Articles/ Institute of Electrical and Electronics Engineers, Access Board. “ADA Accessibility Guidelines.” City of New Orleans, Louisiana. “Bid Tab City of New Orleans, Louisiana. lan MAYOR-LANDRIEU-OUTLINES- Inc. (IEEE-SA). “National Electric Safety 2002. Code 2012 Edition.” 1 August 2011. adaag/html/adaag.htm> (November 2011). New Orleans Department of Public Works, Century. 2004. (August 2010). 2010. International Code Council. “2012 Arts Council of New Orleans. “Cultural Delgado Community College. “History.” City of New Orleans, Louisiana. “City Council International Building Code, 5th Edition” Products Districts.” 2012. (March 2012). ITE Parking Generation. Fourth Edition City Planning Commission, 14 February story=20081006120911119rmlc110308> Orleans: New Orleans Department of and Handbook of Landscape Architectural 2012. Design Workshop. Lafitte Corridor Existing (October 2012). Public Works, 2010. Construction. 1989. Conditions Report. November 2011 . 2011. (12 January 2012). 2012 < http://library.municode.com/index. Design Workshop. Lafitte Greenway Bayou Land RC&D: Alton James USDA‐NRCS City of New Orleans, Louisiana. “Bid Tab aspx?clientId=16306> (March 14, 2012). Master Plan. March 2012 . No 24485: Lafitte Corridor Zoning.” Mayor Public Health Institute: Jennifer Ruley, Public Works, 2008. Lake, Douglas, PhD. “Lafitte Corridor Council Series. 15 July 2011. Design Workshop. Lafitte Greenway Management P.E. (Lead Technical Advisor in residence at Enhancement Project Tree Survey” City of New Orleans, Louisiana. “Bid Tab Strategy Report. March 2012 . Architecture Baton Rouge, LA. July 2011. Consultants. Stormwater BMP Guidance Tool: Series. 27 December 2011. Public Works, 2010. A Stormwater Best Management Practices Guide DOTD. “Standard Plans and Special Details.” Liberty Bank. “Funding for Gentilly.” March 2012. Recreation, and Open Space Element.”Plan 2010. Century. 1999. standardplans/home.aspx> (March 2012). for the 21st Century. 2002. Lindsey, Patrick and Greg Lindsey, “Using Bio District New Orleans. “Economic Impact City of New Orleans, Louisiana. Department DOTD. “Standard Specifications for Roads Pedestrian Count Models to Estimate City of New Orleans, Louisiana. Plan for the 21st Study,” October 29, 2010. Analysis & Policy (2004): 34:1. 2010. economic-impact-study/> (13 March 2012). (March 2012). City of New Orleans, Louisiana. Department of Lindsey, “Counting Pedestrians and Cyclists City of New Orleans, Louisiana. Tax Incremental Broad Community Connections. Public Works General Specifications for Street Federal Highway Administration. Manual on Multiuse Trails and Other Facilities Financing Manual. New Orleans: Draft 22 “Programs and Projects.” (January 2012). City of New Orleans, Louisiana. “The New Transportation, 2009. Comprehensive Zoning Ordinance 4.0. Louisiana Bucket Brigade. “New Orleans Earth Orleans Comprehensive Code of Local Call for Service. “Crime Statistics for Study New Orleans: City of New Orleans City Friends of Lafitte Corridor. Lafitte Greenway: Day Festival and Green Business Expo.” Ordinance. Municipal Code Corporation.” Area.” November 2011. Planning Commission, 01 August 2011. Sustainable Water Design. New Orleans: (March 2012). Carmel Clay Parks & Recreation. “Monon City of New Orleans, Louisiana. “Lafitte index.aspx?clientId=10040> (14 March Greenway Trail Guide,” 1 January 2011. Greenway Corridor Phase I Findings/ 2012). Friends of Lafitte Corridor and Brown+Danos Louisiana Department of Health and Hospitals. Activities.” New Orleans, LA, Office of Plan: A Vision for the Lafitte Corridor. New Edition.” State of Louisiana, 2000. for Proposals RFP No. 500C-00910 (13 March 2012). Community Development, 23 November Orleans: Greater New Orleans Foundation, Professional Agreement to Complete the 2009. 2007. Louisiana Department of Transportation and City of New Orleans, Louisiana. “Bid Tab Lafitte Greenway Corridor Revitalization Development. “A Guide to Constructing, Alcee Fortier Streetscape.” New Orleans: City of New Orleans, Louisiana. “Land Use Plan and Greenway/Trail Design.” 23 Friends of Lafitte Corridor. “Tree Inventory.” Operating, and Maintaining Highway New Orleans Department of Public Works, Element.” Plan for the 21st Century. 1999. March 2010. (August 2011). 10 January 2006.

7-Works Referenced | 119 g reenway m

documents/Lighting_Guide_rev_200601. and the Community Support Organization http://www.nola.gov/RESIDENTS/ Ruley, Jennifer. A Powerpoint Presentation: U.S. Bureau of the Census. “2000 Census of pdf> (November 2011). (CSO). Unified New Orleans Plan: District HDLC/Guidelines/Guidelines/> (14 The Highline New York City. Photos by J. Population and Housing and ESRI forecasts aster p aster 4. New Orleans: New Orleans Community December 2011). Ruley. October for 2010 and 2015,” ESRI, July 2011. Louisiana Department of Transportation and Support Foundation, 2007. 2009. Development. “Construction Contract Purpura, Paul. “Both Algiers bike path phases U.S. Department of Transportation Federal

lan Administration Manual.” May 2011 New Encyclopedic Atlas and Gazetteer of the can be bult at once.” 06 December 2011. Safe Routes to School. “Steps to Creating a Safe Highway Administration. 2009 Manual < http://onlinemanuals.txdot.gov/ World. “Historic Maps.” (June 2011). (November ssf/2011/12/both_algiers_bike_path_ (January 2011). index.cfm> (18 August 2011). 2, 2012 Edition, May 2012. (May 2012). Development. “Consultant Contract Plaquemines, St. Bernard and St. Tammany Memorandum to: Rebecca Leonard and Hydraulic Analyses for Hagan Street Drainage. Services Manual, Title 48, RS Parishes.” September 2006. Design Workshop “Outline of Existing and New Orleans: June 2004. U.S. Environmental Protection Agency. “Heat 48:294-Contract Types.” 2011. Proposed Efforts to Promote Revitalization Island Mitigation: Trees and Vegetation,” New Orleans Regional Planning Commission. Sewerage and Water Board of New Orleans. of the Lafitte Corridor and Encourage March 6, 2012, (14 March & Development. “Materials Sampling org/resources/water/AGO-national- System as Constructed To Date.” 1992. 2010. 2012). Manual.” Smart Mobility Inc. and Waggonner & Ball highways/construction/lab/msm/metric/ (November 2011). Rails-to-Trails Conservancy (RTC). U.S. Environmental Protection Agency. Architects. Restoring Claiborne Avenue introduction.shtml> (November 2011). Memorandum to: Rebecca Leonard and “Forestry Practices that Sequester or New Orleans Regional Planning Commission. Alternatives for the Future of Claiborne Avenue. Design Workshop “RTC’s pedestrian and Preserve Carbon.” 20 June 2010. < http:// LUFC. “About Louisiana Urban Forestry “GIS Data: Buildings, Parks, Average Daily New Orleans: 15 July 2010. bicycling conditions analysis along the www.epa.gov/sequestration/forestry.html> Council.” 2011. (21 October 2011). U.S. Environmental Protection Agency. Louisiana Public Health Institute, City of Rails-to-Trails Conservancy (RTC). Times-Picayune Staff. “Mid-City Market has “National Environmental Policy Mertes, James D. and James Hall. Park New Orleans Department of Public Works Memorandum to: Rebecca Leonard and signed tenants, plans to break ground in Act (NEPA)” 1 January 1970. Recreation, Open Space and Greenway and the University of New Orleans Center Design Workshop “Lafitte Corridor January.” 11 October 2011. (May 20, 2011). Association, 1995. Momentum: New Orleans 2010 Campaign October 2010. mid-city_market_has_inked_tena.html> for Active Transportation Case Statement.” U.S. Environmental Protection Agency. “What Mid-City. “Mid-City Bayou Boogaloo.” 2009. (November 2011). June 2008. Rails-to-Trails Conservancy (RTC). is Green Infrastructure?” 6 March 2012. Memorandum to: Rebecca Leonard and Tulane Community Health Clinic. (January 2012). greeninfrastructure/gi_what.cfm> (March Louisiana Public Health Institute, Bike Moran, Kate. “$20 Million Gift Planned for examples,. 06 October 2010. 14, 2012). Easy. “New Orleans Bike Map.” 2012. Urban Design Associates. Tremé/Lafitte and Gentilly.” New Orleans Times-Picayune, 21 Rails-to-Trails Conservancy (RTC). Tulane/Gravier Homebuilding Plan. New Washington DC BID. Memorandum to: Rebecca Leonard and Orleans: December 2007. org> (March 2012). (October 2012). Moran, Kate. “LSU and VA to build joint Design Workshop “Executive Summary of Urban Design Associates. Tremé/Lafitte and Zerinque, Jared, “Wildlife Use of a Proposed medical campus in downtown New Phoenix BID. (March 2012). Rails-to-Trails Conservancy (RTC). “The news/index.ssf/2008/11/lsuva_shared_ Urban Design Associates. Louisiana Speaks: Platte, Keith. “A Policy on Geometric Design Lafitte Corridor and Rails-to-Trails hospital_site_is.html> (November 2011). Pattern Book. Louisiana Recovery Authority of Highways and Streets (The Green Book), Conservancy’s Urban Pathways Initiative: and the LRA Support Foundation, 2006. Mowbray, Rebecca. “Charity Hospital Floated 6th Edition.” American Association of State An Emerging Opportunity to Connect as Gome for City Hall.” 26 October 2009. Highway and Transportation Officials, Neighborhoods to Healthy Living.” 53. Urban, James. Up By Roots: Healthy Soils and (November 2011). Standards for Landscape Architecture. (New 31 October 2010. (November Guidelines (ADA and ABA Guidelines). July Code, 2009.” 20 July 2010. New Orleans 2011). 2004. Rev. 2010. Preservation Design Partnership. “City of Community Support Foundation (NOCSF) New Orleans: Historic District Landmark Commission Guidelines.” May 2011. < 120 | 7-Works Referenced Lafitte Corridor Connection | New Orleans, Louisiana g reenway m aster p aster lan

This page intentionally left blank.

7-Works Referenced | 121 g reenway m aster p aster lan

This page intentionally left blank.

122 | 7-Works Referenced Lafitte Corridor Connection | New Orleans, Louisiana 8 APPENDIX

Regional Bike and Pedestrian Plan Nola Cycle Bike Map Greenway Plant List Greenway Tree Planting Concept Diagram

The Appendix includes the regional bike plan and the Greenway plant list.

The purpose of this section is to show the existing bike routes that connect to the Greenway and to provide additional information regarding the recommended Greenway plant materials and the concept for the Greenway tree planting.

8-Appendix | 123 1110 speeds, and poor design were some of the factors that network. Much work remains ahead of us to achieve were present in these areas. In addition to the physical

Greenway Plan Master these goals. factors, empirical data on crashes recorded at these lo- New Orleans Metropolitan Bicycle and Pedestriancations was Plan also factored into these ratings. Figure 48 shows the color-coded routes in the central area of the J/S. C R New Orleans metropolitan area. One of the most diffi cult trips for a cyclist in the New Orleans metropolitan area is traveling north/south be-mended width, future plans should probably decrease 1333 Figure 48 1226 Beauregard Ave. between Lakeshore Dr. and Regional Bike Routes tween the Mississippi River and Lake Pontchartrain.Figurethe 56parking lane by a foot to provide the slight extraRobert E. Lee Blvd. Figure 59 Central New Orleans Routes North/south routes in Jeff erson ParishWisner are particularly Corridorwidth thatNorth would make this section optimal. In addi- Esplanade Corridor This segment is on an existing neighborhood roadway. problematic because of numerous large-scale east/westtion, traffi c volume is relatively low and debris is not The bike routes shown on this page are from transportation corridors, railroad tracks, and drainageoft en a problem. Two other improvements could helpThe lanes are wide and have a gentle curve. Traffi c vol- canals that criss-cross the area. The route along the Jef-to improve this section: 1) signage to mark the route asumes are low and debris does not seem to be a major the 2005 New Orleans Metropolitan Bicycle ferson/St. Charles Parish line is a particularly diffi culta bicycle route and 2) reduced speed limit to 25 milesproblem. Signage is needed to mark the route as a bi- New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 one for cyclists. From 1999 to the  rst quarter of 2003,per hour to make the route more conducive to a sharedcycle route. A major RTA bus stop exists at the corner of and Pedestrian Plan. They are depicted here in 11 43 bike crashes were recorded along this route . Figurestra ffi c environment. In addition, the intersection ofWisner and Robert E. Lee boulevards. The University of order to provide an understanding for how the 49, 50, and 51 show the overall cycling conditions in thisEsplanade Avenue and Claiborne Avenue poses someNew Orleans is less than a mile away to the east and is a corridor. problems. Traffi c turning onto Claiborne Avenue oft enmajor destination in the area. Greenway fits into the regional bicycle network. does not habitually yield to bicycles crossing Esplanade Moving from north to south, the route begins at the LakeAvenue. A combination of increased enforcement, im-Robert E. Lee Blvd. to Zachary Taylor Dr. on Wisner Pontchartrain path. The shared use path along the Jef-proved signage, and/or a change in the light cycle forBlvd. ferson/St. Charles parish line begins as a smooth pavedturning vehicles should be considered for this intersec- path at the lake. The east/west portion of the shared usetion. Wisner Boulevard with its high speed (40 mph) and path running parallel to the lake in this area, however, is overgrown, cracked shoulders can be a diffi cult stretch extremely rough because of its placement directly adja-North Claiborne Ave. to Wisner Blvd. for cyclists. While skill level A (expert) and B (experi- cent to the lake. Weather and time have taken their toll enced adult) cyclists will use this stretch even at high On this segment of Esplanade Avenue (1.6 miles), thetra ffi c times, the general condition of this stretch makes on this portion of the path. This section of the path streetis is in fair to poor condition with very rough pave- it undesirable for wider use. Plans currently call for a currently scheduled to be replaced within the next sev-ment as well as some potholes. This segment currently separated bike lane to be placed along the bayou side eral years. has two moving car lanes and one parking lane with a total width of 26’ 4”. The left moving lane is 10’ wide.of the roadway and wider shoulders to be added to the The route along the parish line heads south to West Es-This leaves 16’ 4” for the right moving lane as well asroadway itself. These changes could help improve the planade along the smooth paved path. While the pavedthe parking lane. When there are cars parked alongcondition for cyclists. Care should, however, be taken portion of the path continues past West Esplanade ap- at intersections along this route. The high speeds of cars This classi cation scheme should be used to help direct this segment of Esplanade Avenue, there is simply not proximately another three-quarters of a mile, there is no turning off the route could be a major safety problem. the att ention of area traffi c engineers and planners to enough room for two cars to drive side-by-side safely. street outlet at the end of the path. Cyclists must turn Roadway treatments, signage, or possibly lower speed potential problem areas in the current bicycle network. When a bicycle is included into this narrow space, the at West Esplanade onto the shared usehistoric road system Bayou to St. John area. While the route primarily While area bicyclists have already been utilizing these situation can become dangerous. All 10 recorded bikelimits should be considered through this area to under- bicyclists. Bicyclists are in danger of being hit by carscontinue. Cyclists travel approximatelyserves a quarter bicycle mile commuters, it can also12 25be enhanced to 1229

New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 score that this roadway is in a park and not a high-speed routes, prudentmaking care left should turns asbe theytaken cross when the a ttneutral empting ground. In Figurecrashes 57 along the Esplanade Avenue corridor from 1999 Figure 54 to the east along West Esplanade. This sectionserve as can a corridor have for recreation and for tourism. to utilize addition,these routes the forpath bicycle is oft en travel. clutt ered Many with of brokenthe glass to the  rst quarter of 2003 occurred in this stretch. Spe-traffi c corridor. Jeff erson/Orleans Corridor North a fair amount of traffi c and limitedWisner width. CyclistsCorridor are Mid-City on-street routesand other are currentlydebris. suitable only for the more ci cally, all 10 bike crashes occurred between N. Galvez advised to exercise caution. Wisner Corridor advanced riders with good traffi c reading skills. Even and N. Broad streets. Signals at major intersections such as Harrison, Filmore for these riders,Several major steps sectionscould be of taken the routesto improve may this be ac-route. Strip- The Wisner Corridor is broken into four logical seg- and Mirabeau avenues may need to be redesigned for This stretch of road would be a perfect candidate for ceptable onlying theduring path o clearlyff -hour, across low tratheffi road, c intervals. providing The appropri- ments. These include a segment on Beauregard Avenue both the proposed bicycle path and a future bike lane or

122511 a bicycle lane. AASHTO (1999) recommends that bikeNew Orleans Metropolitan Bicycle and Pedestrian Plan 2005 Figure 54 New Orleansate signage,metropolitan and improved area is only signals at the at  majorrst phase intersections The number of crashes for the routes includesbetween all recorded Lakeshore crash- Drive and Robert E. Lee Boulevard, wide curb lane on the street. The bicycle plans for this

lanes between the parking area New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 and road lane have a of creatingare a fully all possible functioning, measures effi cient, that and have safe been bicycle suggested toes within 1/10 of a mile of the corridors. Thisa distance planned picks separated up path on Wisner Boulevard between area should be coordinated with the city of New Orleans Jeff erson/Orleans Corridor North crashes immediately adjacent to the routes. minimum width of 5 feet with a 6 inch solid line sepa- make these intersections less hazardous. New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 Department of Public Works citywide signal project to Robert E. Leerating Boulevard road tra andffi c andZachary a 4 inch Taylor solid Drive, line separating a the adequately plan for proper signal locations. segment goingbike through lane from City the Park parking beginning lane (p. at 22).Wisner If one moving It may, however, be more appropriate to concentrate Boulevard andlane ending was removed at the intersection along Esplanade of Moss Avenue, Street the dimen- scarce resources on improving the on-road, shared use and Carrolltonsions Avenue, of this andsegment a segment from curb on toMoss neutral Street ground couldZachary Taylor Drive to the Intersection at Moss and portion of the route. The street in this segment is in good from Carrollton Avenue to an ending point at the Jeff Carrollton New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 be: a parking lane of 8 feet, a bicycle lane of 5 feet 10 condition and has a fairly wide curb lane. Many experi- Davis Parkway Path at Iberville Street. Esplanade Avenue between Royal and Bourbon streets enced cyclists use the on-street facilities because of the This segment consists of a tour through City Park in or- many present problems with the path system. In addi- der to avoid the dangers of the narrow bridge lanes that tion, bicycle path design recommendations speci cally cross the Interstate and the increasing traffi c south of warn against median or neutral ground paths with mul- tiple crossings. The Jeff erson Davis path, unfortunately, is exactly what current design guidelines recommend against. As was stated previously, of the 18 recorded bike crashes along this route from 1999 to the  rst quar- ter of 2003, 14 were recorded along the Jeff erson Davis Parkway stretch of the route. Figure 55

Because of the width of the street, there is a possibility of Jeff erson/Orleans Corridor South Jeff erson Davis Parkway between Tulane Ave. and striping the area with bike lanes. In addition to this pos- Earhart Blvd. it is, in general, a fairly good route to siblemove improvement, north/south the consistent placing of stop signs on the roadways traversing the neutral ground should As in the previous segment, there are many unsigned in Orleans Parish. There were 18 recorded crashes along Figure 58 1331 this route from 1999 to the  rst quarterFigurebe of considered. 2003. 55 Of Manythese of the intersections between Jeff er- and uncontrolled intersections between the neutral ground path and city streets. Many of the same recom- crashes, all but fourJe occurredff erson/Orleans along theson JeDavis Corridorff erson Parkway Davis South and neighborhoods are completely Wisner Corridor South (Nashille Area) uncontrolled: there are no stop signs for either direc- mendations apply to this segment as well. Parkway portion of the route. tion. Stop signs could be placed to decrease the speed While the new Alberton’s temporarily increased traffi c it is, in general, a fairly good route to move north/south of cars that are leaving the neutral ground crossing di- in this area, its recent closing has alleviated potential in Orleans Parish. There were 18 recorded crashes along The route is divided into two basic rectlysections: into thethe path Wis- of approaching cyclists. traffi c con icts in this area for now. If a new tenant is this route from 1999 to the  rst quarter of 2003. Of these ner Avenue/Jeff erson Davis Parkway section and the found for this spot, consideration should be given to New Orleans Metropolitan Bicycle and Pedestrian Plan 2005 crashes, all but four occurred along the Jeff erson Davis Uptown/Nashville Avenue section (FiguresThe street 56, has 57, a andhigh traffi c volume during rush hour. eliminating on-street parking on the block of Jeff erson Parkway portion of the route. 58). The Wisner Boulevard section joinsThere Uptown is well-enforced bicycle School Zone between Canal and Davis Parkway next to the site. This would greatly en- traffi c to Mid-City and the Lakefront Tulanevia relatively Avenue low-that slows the traffi c to 20 mph. There hance visibility of bicyclists to motorists. The route is divided into two basic sections: the Wis- volume streets. This route is also a criticalare two link day for care stu- facilities on the lakeside of this seg- ment that have a large number of cars pulling over for Both the protected pedestrian path and the curb lanes of ner Avenue/Jeff erson Davis Parkway section and the dents and employees of the University of New Orleans, quick stops, sometimes unpredictably. the bridge are perpetually covered in broken glass. Reg- Uptown/Nashville Avenue section (Figures 56, 57, and Southern University of New Orleans, and John F. Ken- ular sweeping of both the on-street edge of the bridge 58). The Wisner Boulevard section joins Uptown bicycle nedy High School. Other points of interest or employ- and the center path should be undertaken. traffi c to Mid-City and the Lakefront via relatively low- ment centers near the route are the Agriculture Research volume streets. This route is also a critical link for stu- Center at Robert E. Lee and Wisner boulevards, the dents and employees of the University of New Orleans, many amenities of City Park, the Fairgrounds, the New Jeff erson Davis intersection with Earhart and Southern University of New Orleans, and John F. Ken- Orleans Museum of Art, and the Pitot House. The route Washington Avenue nedy High School. Other points of interest or employ- also provides an opportunity to peddle along the scenic, ment centers near the route are the Agriculture Research Center at Robert E. Lee and Wisner boulevards, the many amenities of City Park, the Fairgrounds, the New Orleans Museum of Art, and the Pitot House. The route also provides an opportunity to peddle along the scenic,

124 | 8-Appendix Nashville between Claiborne and Willow during a traffi c times. Consideration should be givenLafitte to Greenway Master Plan | New Orleans, Louisiana placing a bike lane on Nashville Avenue to improve the Nashville Avenue in this segment has no neutral ground situation. and two travel lanes. It has a narrow curb lane. School buses, service vehicles, and school drop-off s make use of Nashville between Willow and St. Charles the curbside space. This creates a diffi cult and danger- ous situation for cyclists during the heavily traffi cked The pavement is slightly bett er in this segment. The curb aft ernoon and morning rushes. This section is particu- lane is about 16 feet. On-street parking signi cantly re- larly important because it provides a linkage for Tulane/ duces the area for cyclists, however. With the relatively Loyola university students (as well as Ursuline and Mc- high volume of traffi c on this segment, the small cycling Main students) to campuses along Willow Street. area makes this stretch fairly diffi cult to traverse. Once again, a bike lane could signi cantly improve condi- In addition, this segment has extremely poor pavement tions. condition. It has a dangerous pavement change/crack Nashville between St. Charles and Tchoupitoulas that is parallel to the  ow of traffi c and in an area where On the riverside of St. Charles Avenue, Nashville Av- bicycles travel. The street bulges--it has a signi cant enue has newly redone pavement and a wide curb lane slope between the centerline and curb. All of these fac- (about 22 feet) including on street parking. Aft er a few tors make this section extraordinarily diffi cult to traverse blocks, at Hurst Street, the road narrows 3 feet to about LA

DY S EVEN LA NO BA GR T FI CA CO S RT RUN CT TH NCHL MB RRING IL AY O HG MB NI MP UA ZE AKS ER ST AT RE N RD E EY ME EL LE E TO ST R RD ST AD AVA Y DR ONRA AN CURRA MD N CT BY HA D DR E IR SY B 10 S LO AL DR N LV I- WE SBR MM AV N E D D BU Greenway m PO E WY BRAE E TR SH A ES RD AST BR OU LLA VA IT VER RE OW API S AW A LL RD RD R HI E HUBRICK SEVEN ST NNEIL OR NDERKL GH VE WI RD RD D OV CK VAR A KI DF RD WI ER A R GA W DE IL A ER VE VE A NCHEST EVY MA EY VE L BU VE TE GU RRO D ST VI D AVE T OOR D RDL AV AV HA R SE R NE N ST R OO SSM YA R DR LO T KE D CHA S E E O New Orleans Bike Map LL DA A T FL OGE UIS PR BU BI ST T ER NKINS STS AF AV VE WE R R E DI VAI NIEL AV D 10 P LLA R TO LD I- BE E ARK GE E A IE N VER NF IM RD NSON SDA D AI D CT DR T A R PL DR RT AV LV LAKE R E N RD DR E EX GE M D T ED XI HARDY S T RIPESDRUM OOR D E NO B CURRA D T FO WO AD N S ZE ND STTR EB R UCER ST R A L ND RD RE L S MA RL XCRO ASI D IGU NO P PR MO WA P C STAR OU OD BT MP T CHA RE OGW LO HARDY IN S Y BERDEEN CL R ER S KE TA STRUM IM ID A TE NROCK D LV MU T O R BI YO BO BU DF T BE ONRA DE FT L AR B DE NSINGT WI ME RP ST ROSE E SA RF ST STAR NE D UNKER HI W OOD DR NSON C RK ST NDY RD WR D VD IS LL D DR IDGE 10 ER BL ON LE I- ORD R IL ED IGH H ET TO ON D LW FI P RIPES D R CRO M R LE WA S ST EA D W T S EL ARK ON AT New Orleans Bike Map C WN RD DR ND ST DA R DR BL ROY A T R ESTHA Y N CI S T CR R D T ER MA ST DS RD S T T VD LY VD ST WD B C RL STAR LE LL D R BL ES CE R D BL D ER ES MO VI LV VE L RT TO OD D HI LI J YNE R WA WO R CE R VD R HE ER RD EY SC OHNS HA R SER VI D WO WA T PO NCO TM T EAST S ST MA VEN N ON D IN D RE R N RD 10 PL LN LS D N I- S WI N RD B SER LE RNL W NL IE EBEL KE MI OD R ID T LN

SH ON 10 AZ VY Plan aster OR RT KU Y I NE L FE LV OOD L I- N Y R NCEST VI LA LL EY R O R OW R LAKESHORE DR LN AT CURRA NEW ORLEANS EAST D ON D A WA EL D D DW TA OD C ER SW T T SUNRISE DR Y D OD LAKE PONTCHARTRAIN S T CI RE TA NT VERN LL RE DR S S D S DOWNMAN RD S RD D T RA WO ST LY T NDY P WO UNNA T T NO S EXI AD OD C IF ST T S DPOI T RY LE ETT ST R LEON C SIMON DRHA TO WI ER HAMM AL S T L MI T T ER S WD JOE BROWN ID WO RD NT B S COVE CRO N R RBOR WN A E ST T RRY RK OOD C LV ME In addition to the bike routes shown on the E PARK EVEE MI L ON D BAM L ME ST COVE MB AKE PA R IM D BA L N LN SE S RKW ON C S T AD DORCHEST LI OOD D EL LE EABR MORRISON RD PA WY D R D EXI EBUR PK C ND P A S RDW S ER TT AK UNIVERSITY OF IN D OW HA YSI O WD KE ST ERB R LA IRCL N DR CRO DWYER RD MU EAU LE LAKE FOREST BLVD MA FO T TO S NEW ORLEANS DR ROBI T IOLE MP E FR PA OOK AT BANK AN R DR OR SH L HA BO VIE J previous page, the New Orleans Bike Map is R S T U G R I- NORG NNA D SI EAST CAMPUS 10 AR S ID ER T NO R T IA AT E E S UNIVERSITY OF UL S IDGE ONRA EAKW K D O BR HO E NDERS R RK S R F A LE LA BR D ER C L R M NHO CHR R MP PA P HNDR T CT NI YER BR T NEW ORLEANS D IE IN T CORINN AN S IO RK S T TT DW E D SW ST T WR DEER S RD L S MORRISON E RONE SA AR TU WO W TE LL GH KI E PA LD XI DR E T WE EA CO MA ADAM LA N IGH INGH OR FL ST SI R RN S E TH OOD T CT YSL UNN S LA CHRI N AW ADAM DR T CK D ST CORONADO D E SE T DORI IGH IO AY OD IL T J LA MP RD RD NE NT O WA NI ST S LN LF ERRA OD D DHURS TH ORIT TI SC Y DORO L GOOD D J ST VI CORO CA SOUTHERN SA S T VERNE CA S N T OR BE OR D T KW AV ANKF MB UL SA WO HA A intended to provide additional information FR ST D OR DR P W RE R AR D D ER LO RREND HINDL AL AM RVIC FO ST AM T PE E DR RE CA DR SW UNIVERSITY RDENASD DR E EAG OO NT NDAL S T HO GIL R RT JAY E B AN S RI MO BE CA A RW MA UCK D R R W RT RD S PE R AM R FA DW ST ET HERM IA RL S HYST ST SE CH R M T CT S RL ED T AY ST AKESHO ST LER D CT ONRA C LE D W R AD L RB RT D ESTL LL CT IE S Y H DR N RO WA T DE N LD S IA DR ST IT RK KER VA T YO RE LN CA ADRE A N W S LU TO ZINNI O R DONNA PA NE R Z ST LE DR SO O W Y OOD LN R RDR CONGRESS T EY HA CI WO TOPAZ LN LARK ST A N C SIM N ST ER ST VE T L WE O R DR PA LLA E DR CROWDER BLVD GA CHA CA IO DR SPA RL TR L D LL T MP S R T 10 R JADE T S D N DR EXICO ES W D T L H ST LN M PA AKE Y A CURI IS WA AL CE D INSETTI I- ROAD CRYSTAL ST PO RM VD GA RUS D PA about bike routes in New Orleans. They S ND ST OD S AN R I D YST LL N BR O SPA BL DR CHA IN MM R OR LO GA HA D CR EA T US ST PA R S IN D SP N ES R ST RL JEW EN L IN DE N RISE EL NI OL ST S WR E PI D T LA AM PRATT DR GE D BO B R ST DR I R LS T NVIE IE OR LLI NDO AR TE ST S DSS UL DWYER RD WA L ANKF E PE BA B UNDY R FR CA MA A NI FR B LO ST LA RL R HE R T OND ST HAD DR L R ST AR HA RA T MM KN WK ST LV NI HA T RSS S S IN MA R DR T SH ON TS OR OP ASI GU RK CANST AL RY YO T DR W BA ME A IN NG S NE ANKL DR S NCE T ENE RK D RO IB B TA EG N BE AVE D E TH NA IGH RI NIUM T LAKE MA S T VERNE VE DRID S D F R MA E LA HA FL BE B LL IS CCICHST S WI

DR LA DR LO FELL DOVE D are also depicted here in order to provide an TU LA ST Y N ROSE RQ RE T T HI T OR R UR DR AM UO TU DR ST DODT RI I LV AN EM SE S LO HW INDUSTRIAL CANAL AK GR LI CR ER ST T CA S YDEL D AL NG P T ES LS D ST ST ENNA R DR UE D R LN VI IN FA ST TU T S IN C EUR W T T PONTCHARTRAIN V ROBER D T L NT EM T HERM DR T T E ER RS S CH LEE T AL TO S E KERSO BL IA A ME DR D ST ON VD AN ME AV RHODES IOL BU YE CT D E OW F N HAMM ROBERT E LEE BLVD ST R LI T LA O BL N S VE D Y G S PARK DR H VE AV BA CHE W SSBUR MO E S YER AVE PR A LY OL AN URBANK DR S P R E ST B CONRAD NDYRD DRID DW LI MA A T P ST VD ST PLAQ S HI FO A D UE T RM Z DE VE D MINE S E GE T AST MA BYL T ST NHUBERD ST ST FR A ST VE WI S HI TI NT NDE ST WI AT WI WI AT T ST R NT WA understanding for how the Greenway fits into CONRAD BURBANK DR E AN T ME VI NDR S LAKEFRONT TRAIL ST GR EA A NT HA AL ST AV S SH Y PL S HI MA N DR RE LLY AXE T I CA AT EM M A IL CK NDEVI SS LLI

NG P E E LT WA LD NNES LY AV WE R LIVE OAK ST LKER E AVE SS ONS ENTI NCISDR ST T SS ENTI GR G S AM FR RRINGT ENTI PR ST R DR TE DR WA PR PR AL RA URBL T T GIL ESSBUR YNES L MC

VE J ST STA LKER PR ME S FFO ON D RD PL CHA IN WA D S FI ON

D DR E S

AV T OD T AI S AT ESTI DA E R

E IN BRAL DA RNER DR

A CA A V KE ED RRACE AND IM R EL Y ER BA CH A VE R ST RDR OD

VE S HI COY W AT RON IA D AV S CARTIER AVE T Y D PENCER E B AVE AV VD LL IE AV RBY

VE E AV LE ST T A Z LE GR

TH T AR OR NI A NDE S RNARD DEN DR S DDR ME NST NCRO IC ST A Y NI T DR IA AM DR R RA R

SK T LS MU C N DR LV LV S A E VD TU

AV W IA M NACO S SS E TH ST RANSOM MO the regional bicycle network. ENTI E ST MI UR HW AVE T MO T PR CONGRESS S S SETT PLAR 40T PO UT T OA E H ST DE A DY D S GH AM ON D

NO ON IN D AN PE ER

AR S OD NT B T OIS D S ST ER J

N BL YVI EA ME BL DR LV E BERL F SI T ST RDE EU IN ST L D OURDA T A

PI VE S

R LD CHE MI

URON A IE DE G B

LO T CHA RF T CKASA T OP

EL AI KESH S T D WA 39 INI C IN TH ST TH CH OD UX A BR PA KS S T T VD C PI TK ST CA

T VE SI SY

H FT S

SPER OC LV HRA DRE EW OR FL PH MIT HE GA AV PO

LY ST SE R R DES DRST AV PI ET SI LA ST D AB RA TR ME R AR L UL LY B WI D IL AR

CHI T ST NT D S AI ERPL GE HRA IT ARD HE D CHA PR NT FILMORE MIT ES MB 38 RE D OL TH ST PEL E LO E F D OR LE ELYSIAN FIELDS AVE S A ST E T Y F GENTILLY GA IN R T R ST S MI NN W ESPL NDR E LD T ANADE PA HORNUF AV LO N RD IE VER E N RF E CI T MI S NT WA CENT AT DR R I WU ES ST AV HAIG S CR E LLY AV 37 ST TH RDINAND DR LOUISA DR ST D DL W ESPLANADE LL R EM RKW CHAR BO AV E ME S DD SNER TT BE R A L WI T DR HONY

E E R R X AV E T WI EU IE MARCONI DR HRA S DR OT D MIT BE VD PR DR WA NT WI E PRESS DR MO TE LD TR LE RA O FE KE R DR B CHE T LT STNUT IT R KE FILMORE AVE AY S DR HANST T BL CH VE A AURE OV IS RRACE VE N ST R T PO Y ASTER PO AI ROBI LI OP MON S RT NE AL NT EO OND NDAL EX OURNE S GR L US S D A LB BA T ME RNARD A RDR CIAN VENUE DR DR D R CL AR ID AV A E LI UDIUS ST LAC ST VE ST AVE DR A OL A A UR ER LM EG

LV GE EN DE ASTER PO R SE RD MA AN RT NA MON GA CCICHS SE ENUE EOUS S SELMA ST E AL T ENCE ST GA B E AV SM IDGE ANN R IR IT EAD Y IT TM VE NT H ST BR NT DR M L E GU LLE UT CA AV EVI MI A T S RIGN LA

S UR A VE RE D ST VE AN E ASTERN A DR MA O ST CITY PARK HA T RD VE VE PA NT ME AV MU ST ON S TA ON DR

CO ON D LE AR VE A CE MA NARY R H DR ST TIMO D ME AV AI FA T E NNE AV F F A A A T ER R VI NUSS RI D LA T T P F IK IT IN E OR NE S NDEVI CHE D UOIS R RDEN DR E E T S R TS ME LL SI TL AV YE E NE ON D FR RO Y S LT O T ST E S AR L R AV ST T CH SPA D PKW D CHE

VE GO TE ON ST D

C RDINAND D CH PH NA MA SM VD ST AV T LE G S GA UZ EER LA S E BE 30 AR TH V NE S P ROSA E A S HO T T R CH S ST NDREW IR LT DE ST RSS AR PEMIRABEAU AVE M AVI Y BR NCH T S G AG BL A SE G T L

IN ST ST RRINGT OS RJ IN EL VE HIS DIAZ AV 28 LL TH FO T T SI ST L

OL BER ST RL US S EL LE AKE RUT S T A L B S NBRAUGH CT PINE S EPHEN T L ORIE AI E EXI PH L M D RE P R E G D WA N MP HA N PA ST SPER RRISON UIS XI KI ME T AVE UISVIL T NA T A MA KSBUR IT RR 26 VERL TH S BR NE T ST RA AG FERONIA KE IA G Y WN ST VEL ST TO

OIS T CANAL TRAIL COL C T DO A S

OT UGERS LO ANS HE LO ME RN

L CA VE R VD CA NST

BE CA LL KW S NE VI L ST T UR HW UROS OC S RD ST R RSHA A E AL A MB D MO E

LE LO NAST D ER BL L E N XI T HE NT R T WI S R ST

WISNERTRAIL TE Y GE MP VE TH IS LN LY BR SU ME DR J TH E AV 22 ND ST MA F IL OURD W WE A NA S OR Y CHE VE 17 CIS ST LN POMONA ST T A OR LE TI Y

W ARD ST POMONA S DUMAINE ST 20TH S VD LOMB T HW RA T T BL D GENT LO VE DE L LL OWENS DR ASTER ER MI GENTILLY BLVD MI US FO WALNUT LOYSI ENTEUR OL UISA MON CA A A M ST NE ST EF AL DU INGT AN 18TH ST PARIS AVE CH T S

UR APW IS WA FR E EXI URO ENCH YBI P RI E NG ST EXI OL PL R METAIRIE D ST RA A LL 16TH NEW BASIN CANAL TRAIL N ST ST NURS S VA LI T AR T AS AV S D MANDO STERIA CAHONT UISA T FL ON WA ACE WI PO D ESSI L LO VE YNE TERANS MEM L N LV ORIA L BLVD LAKEVIEW IR ST TR 14TH ST INE ST T EE ST ST GERM RRINGT NORM DAS ST JASM HIAWATHA AIN A PI ST AV LO XI DE B PE DR IS GERM E D E AI VE N AL 12 ST S A ST R EANS TH ST DR RBEN AL T S VE IN E E EL MA R H ST SI RM VE ST TE VA

AV A LO VE T E HIRE P AN VE ON D W RE S A 10 D R AV AB TH ST A ASTER

RDEN DR A ORL GNOL R LK R FR

TU N DR PO MA LS AV AL DA A N PO LK ST I — NEW ORLEANS — DE S CL KASA CA NN MOST MON ST RA HE T OIS NES O S ST C ST Y TE R L PO NA DILLARD FA UI ANCE HAIG S G IO LK SE WI JON HA S T RNEY ST VI YER PI ST VEY L ON N AL SPER AW ST EM R CL CHI L A R PARI DI BO ED S AV VE B IRMONT E ST ER LY UNIVERSITY TOULOUSE SH IA N ST GIL ST ST AR AG TO F OR ON ST BERNARD AVECA HE KL D UCHANANST D R VENDER HE ER AT LA LL A URO D MO HA RA S CA RNEY DI B ERDI A ST VE AL R MO IS ST VE AC NA W VI R OA NE S BROOKS BR LV OVER NA T ST T E CL VER OOKS FOY ST ACACIA ST N I 10 ST NE NT SER AST S A D VICE RD H D VA NURS L CANAL BLVD

SE W KEN S AVA D NT ST AL T BE ST ILWO IA I-10 RTH ST D ACAC NANDS S GE R I 10 SERVICE VD T R IS ST R RD T EN KENILW MILTON S NA W ST D D R ORTH FR D T ST MYRTLE S ST P EST R VD HOLL CA KENILW T MP ASTER YG NA ED S Y ROVE ST L BLVD I-610 W ORTH ST ST DENIS L SERE ST BL H DR EXI K S Y T IMPE R DER ST IN ND BL RIAL EL ZACHARY TAYLOR DR D A HES IT OID S R T T S AL GG KENILWORTH ST D NNE T HI SIDNEY E T RE S ST SERE S ENIE ST MON T FR GE PKW CA FLORID LA SA ONRA W H VD SM A BL DER ST RDEN DR VD T BL E ST RE S IA S NA E AL L SE AVA IN D EL L FL GG ORID T TTE BE VE HI D PKW L LEMON ST A BLVD ENIERE S ST ST 10 HL TTY P FR VI VE PA GA AV LA P PL EASURE PL RA R P ST LM I-61 I- ST A WE E 0 E ARKER VI N DR E D CA BAY PL N DR ST NA A DA EASURE Y YNE R A MO AR LE ST DE VE ST Y D VE IT HO DA R S AN PL ME NBRAUGH CT DILLARD ST R ST RY PA PA BBI VE HUM WN

AV LY ER S DA ST GI T A S VE T A RI TY MU E W AVE S NI A T MA EAD OR AW AD TS A ORID EA M FL HU ERS HORNE PL T NA N RK P S R PE KE AC LA

VE A MA BS T M ER EXI T IN TS ME PA T ST IA VE FI Y LN NE NAND VERL KL R BE SPA OCH SI S RA DSS A IO PO PH RE D NT LSU SCHOOL SE S IA AL T OP AKE ADEM WT PETER BA ST OO ST A T S E OC FI EST T ONS OD RK P NE BIG BE EL LL CH MI S T T L C AI FR ST BE L VE ROSA T KW OA OF DENTISTRY A LL AL ST OR RCIA OS ST HI SEVE FREY PL FIT AN ST

T DAL NE ST ALLEN L S HA BE IN WY BR GO S ST ST A WI ROSE LAKE ERDI LL T GOLF DR S OIS VD URO ROSE WO ES ST DEN PL ENCH AV T IT ST Y WI T

SPER

N ST S L L ST ORLEANS NEW PH E A EASURE HOM IS E ST MA TR F ET T Y BE NAVA LT TRAIL S RE P RRE S E OL T CIAN W S T ET DESAIX BLVD AVE E T

HE EASURE HE TR DR PO ST AR M RU N BL BR RE T V LI OU UISA IOL SI ET UNDANCE C ST LOUQ UNDANCE S PI UE P AB URE ST NCER L AL LT OP LN ME T AGRICU YU ESS

K E FE CL LO AB U PUBL TURE S D DR L AB DE MO IUM FRIEDRICHS AGRICUL UNDANCE S R PI MI VO TR NK S IS XEL P T IN S STAD AVE T TRAFALGA NST CODIFER BL IE LI R ST PR SP VD SE GE IR K Y ST L T A TA PL DELGADO RANT INDUSTR TUTION P ME P DE GREE DERBY PL TI NW LE IC CONS AVE OOD ORGE R DR IN

ME M CO IDGE DR IS Y Y ST DUST UL BIKE MAP COMMUNITY OR TR FR CT CA S R VI IN INDUS S E RY D A AV WEIBLEN PL BELFOR ST E FLORID ST ELLI COLLEGE T AVE T

S D PKW HY ST Y IDGE ACINTH S E ST T SP T DE URS

AKR AV IGL T VE RE S LS S EA A IA IE OU N DUE TAIR R ME RNHA PO YF PL S KR EAL R IO

AI ID O R DRENEW ORLEANS FL ERS IC ORID NARCISSUS ST DR OR NE S RE DSS MO E T ST LA FA HOPE NST USSA A LI FL NT NE AV R MUSEUM OF ART EI K ST ORID S A LAW E OA AVENUE ESS T NCO PL PUBL A AY LL T A CA

GNOL AV VE CONNERD L CHART P RE D ST E BO W W W RDE Y LA ST E AUX BE OOD D ST T W CI T S TY T PR A PAR ST T TU RGENOIS K A AI DO OOD D AV SY N ST E FAIRGROUNDS OR OOD DR D ST MA S ST LA FL IR T GINIA LLE AV LA ORID LL PA U LN R A W SSA W EW NE LL OOD D R A DA IC HLIA S A RE ST ON P ST ST OA T AV N T PL FA PI DA E A D ST ST LE ST YW VI UGERS VI T ST MOSS ST C RA S S NST BE BR COMUS CT d DG VE Y Y RN AU DR TTE YM A LL A CT T ANS GREN N T PEACE ON AD A IN NA NN S DUPRE S R ENW E ST RI OD ST IN B URA FORTIN PH MP N D ON S ROSE OL VE T AU DO D LEGEND NGST N W RGENOI M R ERSO HO ss LE MA ND DR GENTILLY BLVD RT PL BR N ST ST R T R GL VE NDER ST MAURE OR OR AL T T PAS ST AV 10 CIAN VI THEA N DA S WO L N LV A ST ce ST I- HE Y EL FF A N A T ST S S T M OCH LA RO PO T LI LI A NDEVI HE ANTH BI NCE DE LEON BAD ST BERNARD N MIRO ST ROEL RK TZ T S T E CT CHE D ENVI EX NNE ONRA Ac D YSI N BERNADO FR BL JE R UL R NT S E IE TO MA L NA AV IT S IR GRAND RTE ll FE RY AT TA IE E T Z PA AL BE N DE fi ST HE ME UL PA W N ST T I D S N GALVEZ ST PA P BERVI LL SO ENCH TO LA VE IO N UT HONY AV LA AN LM E NT W T T TTE R A OU 10 I S ST S nd MA I- T E O S ON S ST JOHN T NCE S FLORIDA AVE LN LL NCENT I- T FT IGN Bike Lanes OR 10 CANAL ST AV T ON S SE A IA EL LE ZA E EG AV La ST F T LOUISA ST N R LL BE RDI S D PA ST UM VI N E T HNSON S MI N LL E N JO DO E TA RO TE ST S GE GA A S RGENOIS d E N BROAD ST IE ED N LS LO M HENNESSEY T S ST FR AN LA D S ME NT S Y T W T ST CONT T S VE S ST PIETY ST ZA T IN N T S ST Ol OT T LD T O R WI T Dedicated street lane for bicycles. BURG MO ST ST LI T UR ST EU AVENUE RDE IE N GALVEZ ST S BAYOU RD N PR EG N ST PA E NST QUI SO L MO IRIE R O APEYR I S S CK S LO D H ST E ST PH SS MA GA NC T T IN T TA RI ST YO AV ST D PRIEUR A R MB SO AV ST N PR N J DR ST T MAN OHNS N S NO H S TE BATH RTHLIN E A D T BAYOU LA OU N RO ST. ROCH IEUR ST RO E AT MO OR N E FI ST EAT BERNAD T T N GA OL ON S CHE ME ST BA TE T ST G BA P PI VI I S HARPE D RO T LA ST S TE SE T BL DUPRE S RSS AC OOD D S N ST BERNARD AVE AV W Shared Lanes D T ST OT GA T RRACKS ST S E ON S T OL CIAN N S ST DA NT ST ROCH AVE RO ST ST YM ST N CO ST ST N T ST N CARROLLTON AVEEZ S DERBIGNY AR MA N DO EW ST S SC HA N LI N PR OL NA Y ST. JOHN TO ST IGN RGENOIS RIDGE O S CRE LU ST IE SSAU PA ROEL ON S T OL RA N RT UR S REKO N TS T T N YNES MI Fl T S PEZ T N MB FE DERBIGNY T RO or E P ST NICA FF id DG LT RENDON S AVE a Vehicles and bicycles share the marked lanes. D ST LM EAR ED ONDE S ST I- BORNE MU ST T T Av R MU CO AI S MA N URS US N CL SU S e MI N LO S RE RI L S P 10 O S ST T IT PA S N LC N ST N RO S d EACH GO CL SL GA W APL S N S BA S T T RK T T RT LV CI Z HA MO SI AI LM E T UL N ST BO EZ IL R T R DI T EXANDER SA ST RTSO ST S M ST VERNO RRACKS ST BE RNE JAPO TA S AN S N RO T T S DE YO IN C AIRL ONRA PA T N INE DR CE ET XO LO N E KE A ST ss ST AL HENNESSE IS ESPLANADE AVE PO NAND S VE TO EU ES VA ST ST S NT ST IT ST TO N ST S GA RL NE ce S T SO CL UGERS L AND A RD NO AVE ERE ST I ST Off-Street Trails T UL T N R NI EREC N VILL AL BR S S ERCE EVEL TO OOD S Ac L WH S ST. CLAUDE ON S AIRLINE T LO ARK TTE CHOC A HWY OT GE ERDI JU ND AI PI UL CH ABO DU Mu ST MP N FL RL A T N CONGRESS OR IN R A ST T ST VI T ON S S N F NT st D RD IN ST SC PA A CL OU ORLEANS AVE OL S UHAR LL N IN an Be E ND S T BAY URQ ERE PR AL HW ST T NNESSEE S S g nj LM N PETER S CL IE am Trail completely separate from vehicle traffic. ST Y S SE LS ST ST AI UR ST GORDON T Dr ST DI BA BA T L ST ST ST URQ BO BE in D AV T T RNE XO YR DUM S ST LL T S RA PEZ OUIS ST A P OU R IS ST UHAR N TE t NG K HE UDIN ST N E MARA W RO BR MP T P KS NN S T N T BE IDGE N ST A RENDON ST O S S HI ST S N VI EACH ME VE RT TA RO T OA S ED ST LO S S AI LI A ST SO MA VE Dr RAMP LI ST ST N CEDO S LA T ST CLAUDE MA N N LOWERN NINTH EA ME RHAR TO S T BLVD CO N T T NE P D SO L RA ST CL ST A y eal RY E IN T ST IS T R ST E AI FI BO RS VE YO ST ST C S E O S D ST Y S RNE ST t BURG UR TTE ST RT S LA T EPENDENCE r LI TO SAL UDE IE IN LO ST ne UROS Bicycle Connector Routes ER E T CE HOLLYGROVE T ST AV Rd GA NE P D T E NDRY S T N T N AV AV FO T r IT AV BE ST E Y LE MA LL ST A Co s CH N T LLE HA UL WARD ST I RE S IN S PEL T PKW S E R HO N se D ri T H ST S T T CL Mi VE ST T ST GIC MA S PA WH RO VE AI rl nk S EL SI ND BO AURI D ST IS O GA PA NNE TU St S ERE S RNE t Ro Pa A MI T MC RT A r Useful on-street connections. N UCK SPA N LM N IT D T e T E FO T ST UR S RO RO A CHE S Ka B ST CH ON S VE GR T VE n ear AV ST MAZANT ST LA M S r ARK EX LL DE NICA BE N RT N D S E AV L IE N S RA BO Oc E LT GL RSHEY AI OIS ST BA T Av r T O S VI MP NT RDI S SO ba RO IE T OUIS TTE T SSEP N ck el D T RL N CL DUM T AR ST ST r ll Dr ot IN S AV E PO OL ST ST R S IN AV MI EA S T PR EANS N UPHINE S T S te t D KBAR AV F S RGENOIS DA UT ST MA AR e r ar IN ST S e YG IG S N T S KE ONDE ZA N co IK N N ESS LE APO VI de W I MARIGNY S C E S ORL ST KE IA LL E S Ll HA VE GE YO ST I S AI EM GO J Es am NRIE E URDAN ERE Sa LL LI T LI hn ug Ch ST TO EXI S RSON D DO T T LA Av Ay a B TZ ST OR PEZ E A NE BA RL EG ET SL CH T ll Dr enj al DA T ST y er Ct T T ST RENDON S TR VERNO PR BU Ch Ferry Routes me DE E LL N NT S NN S HE S AN e St Sc Re am HO COL T CEDO GA IT Y S RRACKS ST EREC RG JO nt in Co tt SH XAVIER LO BYWATER UND exan Dr ch s in e BE DUB S T T d S DUPRE ST NT DE UR NUE hl ill D TO FFE TO T OU Y a Ma S Ba S AL RO ST Al t ve HO S T EG UHAR E Ce n Dr nd Dr ck API UNIVERSITY WH VE S Ge Dr Ha L R LE OL JE SAL N DA T Me Su pl ST MI B R NI S CL UPHINE S rri ne la d A ml ev S D ST A MO ST cc e e WA S S TU ASI ST CLAUDE AVE AV t D r et ee SSA ST T UCKY Bicycles freeDr to ride on these routes. ST NROE S EANDER CARRO S N ARMSTRONG RAND CT ICOU S es P R IR DI LA ST MA Ea r od Wa oo ne OX VI T RD JANE T CH TUR ST RO T s Pe qu D l d W MI S ST XO OA OI N EX URS DECA RA sy St ky li AVE N NE UR ST ST YA IS x Ag G S MO S RNE PARK S L NT S ST TR S ni al JE ST OL ST STER T Pr My rw ri FF KN A OR E N ST A AVE VE HNSON S CHARTRES ST t Wo P cu ERSO T PPL T VE BR EN IE N UL ST F ospe ri ge lt T T Ct rt Am ur N HW ST PE BO IT LS N PETERS SI d mi te YN MONTICELLO AVE IN S LA JO KE le No e Y VE SH RDIDO S IN ri W pe an ou St ST DRE JEFFERSON DAVIS PKWY TRAIL T PR MA AI AR S L ty n lv D it r E DI N ES N S r Do At Dr KL A RL UNDY P RA ly ST MA XEL XO S N T MP t B Im Ev re T MID-CITY RO CL TREMÉ Br r Bicycle Friendly AreasLaf us IS DORG MP AVE KT AR itt ro D T N ST T CANAL ST ST T ve any ey Prince T d S RS WE D GR N N ST BURG ST VENUE Dr it r OO RONNE NDE S D IR T S URG an R VEZ RA A A P an AP P AV L B N ST UNDY l Ca wl s R VE E LO ROCHEB O er Fair Dr FI IE N S la fax Dr BR T MB RICO L ZAT L T Je T CT R S 3RD ST r Dr ss A G ST T BO NCH M DA Ro Areas with many cyclists and slower traffic. AV VE ST T SL d S E IDGE CA GA E UPHINE S T abr Dr ST N YA D adg s ce Ch S S FRENCH nge lv A e N ST AY W CA I S T UR S B Pa Cr al ON S T RN ST ASS T CRO TO FR AVE TO S al Dr me EU IS RO DE T A Pa tr eo ng no r RDING S RRY ES ST NE S CHUS S S DD P B ic Ac tt KI LT ASH LLI me ci S ia le r e L T FE P NT ST UL BO RO N abl Al S D Ki Ba S PI DW O HRO O S RA YA L RY S la pa Ju D MI ER ERP EZ N L t Cla P er t r ck L COOL HA BA RIAL DA CL MA PE T OU ST e ca D JU T TO l Do aux la AT ST C ud ev IN S OA QUARTER FFI LE Dr D Dr W HA INGT SI LV MA e i RI S AI BE UDUBO O ST S MIR SO ST ST N ST SE e r er Vi ee VER LE NE S OV R Av mm rr r R BO BL A TH ST PO N e De nde gr rt WALMSLEY AVE BR S SI CH DE Ra Dr ue E d R VE FO LF ON S E ST AR CA er te D AL NT GA TU TR HOLY CROSS mp Se M fi S La RN DU ST TE T e Co el t w St AST S T BA ES St rp Pa Va d Ro pi T NT IA ON ERE EM ST ar or Ma NDUST RO N CH EX DOUG t S Cla as ve rc Dr han NE S S D ST ST BI CA lo I S E Bu Av ct P r a gi t ST AI DA T LL VENUE rg t ud D Dr S Ju W st S R ST TR ENVI LA A l Ma ra YG SY AV NE N S und e r L RO N RT A OA OHNS ROBERT ST A e te EN T CL UR S VI ST DE ll Av W g S LL AS E EBL J y Do Li nol S CA LS S VE IO S W S St r t e on Oz t N BR S IE VA S S PL T LL Da vi De be ia E er DUBO T BR L rt W D ra D Vi ON S MA ON ST up Pa HO MO PL EA T LI E PATTERS hi D S Ju r ux r rt si T S PR PA K AR P ne co d S ue OA LA I ST J DOUGL ve ge d W S ONID AU C BERVI T AHNCKE er ri No S t U DR St rry is Ge t vo PA RE S RO EL TY sh Pe Ph lv FA BO DELA A T I- T RONDE S T nt ni LE MP AS Fr S re ilip D PL 10 YET T BI D Co e La PO RAL OGD NO S T S VER Te z e C B St Pi J COHN MA ST ENVENUE t B Dr W COMMON ST LL ST Ro au St lo t er PE EANNE T E D ST RA ST T Ce r ne Oa re NE LA T VE TE O S RGAN S DRY ya rk E Du S ONR E E Ch y er SPONSORED BY:l Dr Av k S ST VERSI l be Li NA S T PE T St T ba t T S W T S S EA S AV ST LICAN AVE ar it re be ST OA MO R ST tr na Pa rr GE ED S T RONDE S DO S es S m Se e r W Ce ra y ST AV Ln T AM E S T Le le ux St ST PA RHART UNIGRAVIER ST S un rv Jo EN PE ON LA rd st S UF CK Do t TT TTE BR OI SE Ma ha ic D se in t MO RDIDO S Y W r E S P ERET DE ug ph e T E EL RN la Rd Hwy in e So St AYE ER E S TE MISSISSIPPI RIVER D in VD NCENNES PL T ALIX ST s t A D BI BA VE EN T PETERS FR GUIN S Bi mm r r en lid e E GL WI ST B UN OE en St lle E RENDONT S Rd el St LE FR NE Ge T T BO VE ve ham E ta BL VI S LV LASALLE ST T IO N S r ck y le ST ET LL T I S N BO TH S Ce ni URDE E nu S S S N B GN n EA T Co p e D A AI IT t AQUARIUM NDEE ST et Z ST e le ST B T er uga q St OW T S P St li st PL T ont t D Pa r ri E SP NT PO UN LL S r ke in ES EL LE NROE S RN S CL SUPERDOME FERRY IC IZA ST al nt 8t S e MISSISSIPPI RIVER TRAIL DORG ER E OF THE S WA Bi Dr St UM S PEZ T T HE SANCTU ba r h D Jo RUCE ST CANAL ST / ALGIERS WH AR en NT TO T S Y DR r St be Pa Ma r FE LL S AT WD Y VA St t ve W se MO T S DA Ce y ne Dr NT nu ph S HI LO O S AMERICAS VE tte D ne Pr ST ST S TH HO VE NN S PO ST St e D os in D r DA HE CEDO D ST EVEL S St He or n Dr e e T GR CKORY W DUPRE S E DIXON DR YD INA ST nt ra pe Dr OA SAI ES S SO AL T EXI R ER z te eel St el OA AS LA n ib to e r WA RRE D ck me t St ST S AV VE PE DINE S e R R IA ST ST OL d lla Dr Av W EE D E DRAS PL DR Cr ch K SAL BR S de ra rn r nd iv S YM al ch St YO RD A ve y S Pl ne AT co e Dr ST OUN D MC S T N PO Y PI R ma Cla A St ST T T Pi N ST BA LV VE K S NEW ORLEANS T N A Ga vi Ly er BI EN OPELOUSAS AVE GUAD CI an A Co ho au st or y de T ST NA TH RN NT A ALCANA er ss tto W e mi L ST Ch O S T R Ay r GA JUL FE CBD S RCH ST B S VE W T on St ut LH MA VE Iv T PO rn r q e t St IE E tte Pl co J S ROCHEBL T CH ONRAARENAIA rg re s ck vd ac Dr co ST S MIR ST ST nes D ea t D YO BO A S S S r Ci S t BER n T ON CA RK S T EE He er Hi Bl lm pl Da OL S RO GI LL ST be ng E La Ba er BROADMOOR T IDE AV J T EZ T AI RO SL E me e Ca Jo tt en tta De Dr SLIDELL D S pt ST S D ST in tt d ne n is r OR AVE LO LV ST RA d al ro Pa La ld HE te STREET OK C N Co li se n LL BANNO Pa S mb S CARROLLTON AVE T ROCHEBL na or lle St S DE CL MP Pe Ol D TO ON S R li t re GA MI me e SH R ST FI We ade Dr E NA UISIAN Ch UDUB S ER ST HOME ib la Go ST S O te Ro el S HOME al Dr ckso ZI T A R ST lle ig eu LA ST rs EVI VD i AT CI i Av Ka

T LE S De t EL MP AT I S OHNS UR JUL S Ch s Dr De ST FU nd NT CONV S PO TO J O S LOYOLA AVE IA Br Ch n Cla Ja RT S HO IE S LUNA ST t ev W e qu S S CHAIS LL S T BL E DANO LL PA bb

LE ST UNION PASSENGER St Giro Ly E ER E BU FR R VENDOME PL PR T WA NE CONS al W so St ON ST MA LT WTON TE B PO ST LL T LE RCE ST ATION nd es on A S AM O S S N Ac er Gi r d vi MIR A me de ERET D S BE di RT RT TERMINAL RD na ean St ff St S T OCTAVIA ST A nt ONS TE ze t RRI A DI d rd K D AD ON AN r IN LUT RT A ST ce

HE NDRE A EN Hwy r n PET ROBE VE ST Bu ER T AW tte Ma Dr S S VE ST MAGAZINE ST BR DIANA ST Fa r lle t

LVEZ E Y DIAN R t Mo UDUB GA CHEST A ST D Ci lo S S J MME S ss

O S ME e IN SEPH O VE T ll a CARROLLTON A A T

T S D d r T rd T ST N Rd S HER KI HL e ST t OO DELGADO ne PKW HO t S S T In rc HA T T IONC A R tt

VE D PH S W F ON S UNE y te rro CO R li or D OHNS TH DE A T ee S Y M ST WE S J TE V RMAS S ya DISCLAIMER: This map was published to increaserm bicycle and pedestrian usage on the streets of New Orleans. or T T p Fe ST MP WAREHOUSE COMMUNITY UT d ff T io ct AL N er oda Ma R APL DERBIGN IL ST PO oncit EL R NG KL S me St ef ne E N er T Ca tta ve S Rd PSI IA S T una O P SO Y IP LAMA NCE N et l Dr m zz Vi T NT RQ RR al B S UE ST COLLEGE Users of this map should be aware that potential hazards andCo obstructions may existlo o on Athe routes shown and rn Dr IN E mi Z SO E ST DE S N PO YN NA S PR MA CHORE LN D ri LV CH EX S BE IE J S T ENTE T n

UR RO mb N S TA ky Fa ri ST ST E r Ra T em T s

VER EN Ch ds ou ST TE co RL D NE S URL EO t P DISTRICT CHA Cu T OW CL Z this map does not guarantee safe cycling conditions or reflect road conditions including pavement conditions, ST T L AV T ST BO L B LANDRY AVE T TI ca DE LO ORE T P l PO r

E ST Lu ST AVE C E LL M

RI IO S ZI oy Pl Y DR LO ST SO AV t De E N CRAT MI tl A ES LT WE S S ST T S ez r r WI A OD A T ER ST O S FL Ll D Pe ST RD ST UISIAN MAJESTIC PL VD traffic volume, or speed. The user of this map is responsible for evaluating road and trail conditions in accordance IL T D T ST RAH Re S T S LE AR NE S T R ST L GE AR AT GA V er el ERNEST N. MORIAL UX LN D O S S CAMP ST Na is LO RD ST LE WI de s S MA ta P OR E ER BL PI IA O S NDERS W LL CL PT LV IN with the cyclist’s individual levels of experience, skill, tolerance for cycling in traffic, weather, time of day, Pl EAR Y LE BL OLEMY ST P Dr re nd ON Ca ST AV CA CA AL m r et CONVENTION CENTER A an NE HI SA ND RD MA D N t HUS R T LLI BLV NUM sa te ri r CL AL RK T PA LL al yn Ly HR C r T LLI I B VD NDE D D li T MN C TULANE A GNOL O A LN obstacles, road condition and other factors when evaluating or selecting a route. StTheW Regional Planning L AR S VA PE T al S t R PL FL Dr D CUCUL A BERTY S ER ST lv ack Mo vo Ci NCE S RA O WRE ST S A LU LI FE AT LA R ta Ma Dr MO AV MA LA LI ST T Ch S ST PE LAWRENCE ST AW rj re rd S Pe BE LV a ST O S INBOUND S A A CCC CO VE RO t SA D L ca UNIVERSITY S BARONNE ST T SU HORACE Commission, University of New Orleans andni Bike Easy disclaims any responsibility for errors,au omissions or e EE BO T NUNE Me a VD OGA LI D S E ST S rd d ARD be L B L az st ni N CHL t S DR R CI HL MA P CA RDI GR ST P AT NROES AS BLVD Bo d ega r on OK BL CA Dr R PERSH R ST Pl ro IZ inaccuracies in this map and in no event shall these parties be liable for any damages or loss of any kind related ga INGIE R r co EETE MO TY TA BR RI URL L EU Y Dr Am n al SI CE RA R B LN D CL MARDI GRAS BLVD TRAIL UT r re ey CHASE ER SAR EAD ST S TER TI Ve AR M TTI La P A D au MA AR ME EL A CL HOLIDAY PL NNEEL T IC D to the data and information contained on this map. S Z S URA ca Dr GNOL ST LLAN LE d Ch T PO LP GE A au tta hr MA PA pe MCALISTER DR E um d E CH OM RRAGUT NE OM PH PE T DA SO ST Be VE S EN LE CENTRAL ST ON IA Dr LY ESTEAD R ST IR ni se Pe ROBER S TO E MAGE B ou Ma pe BEHRMAN LLAN OP Be RD T ST ST S EES l T MA A MN S t R mp IL TE FA r W Ly a GE Y lin IN ss WC TS R T L mi n D PSI CKS PL R RI ME Gr Co D E Ro nd vi DO DR LE IP IA SH W ON CHORE MEMORIAL PARK DE CT DATA CITATION: Completed bicycle facilities data by Regional Planning Commission and Louisiana Public Health vd Vo N ST DUB ER AM TR bi r lu la el Mu G ER ER ce S S IC EEPL MI NE R E T ST S US ST a d C ta Dr TSON ST T HOM MAGELLAN Dr Bl LA DANO ST T CT MA ST A P t CITY HO NICAN AU L S ROBER 3 MBUS S d r ST T LU Institute, 2012. Connector routes andAc bicycle friendly areas by Bike Easy, 2012. Map data prepared by the o CA CO LM ST RD ST PKW EE A COPE ST Ri Oc AT 2 VE URADA RNIC NARD ST A GN US ST EU LN T W ve ke J T E D AUDO EST ND ST NDRE TER MC DONOUGH MMES S an Dr T AI SE RDI r iser ss R an E E IV EN PE LOYOLAPA NNY D Regional Planning Commission under RPC Task UPWP A2.12. T Rd rl DI NDERSON S TR T VE T LA S LL ST W BR ST HE Co t B is llo s ND P S WA NI ce H R ST WALL Ka PL BLV S S D PR JO A ve le MI ON Z T J S DR UNIVERSITY A URS S ANNUNCIATION ST er T G WA DA lm LE ET EES LL SAL ACKSO BE BLVD na Ga Dr LA T W RA T PR T CA Ac Ri ar PI L MA ST SEPH CE S US S T Y ST IC VER r e R MO ER NDEE ST l ST rd AM S RA TT T VE GE Pa LM FO MP T NN R LI YT ST W ST AYE S HRM Hwy NDEL NCE Ch ST NE D T DRY D A RRICOXS T RI nn S A S UE LE N ASH T Oi AN BERTY L Y ST HE CH S LI UF S RA l ri MI RO VA TT N OU T UCHER ST CA ta T P ST EVY TH GE IN TA RUP ER L L E N IR d MA bi IA RI CA OR BL C EST ME M et AY PL 1S JO LA AN AN CT Co LA EYER S LN E ST T AV OE E HA INGT EX R 6T GE ET Ri Rd W LN COPE ve NE S GN T LA AVE LO T ST T VD SH E r Rd Mo Ch YO M RI DI T B E er g RSON LO B NST E CHARD ST T CO DW S A RN A ION H ST AUDUBON PERRY AV d ST NCO AL STER ICUS S VE r S AR L IN in RA CONE DR T UISIAN SO VE D ON CONS sh ST WA R LE S

AVE DA FE T VE CT OA S EST SPAS CK S PARK IA ON T r D GRI N ST MA ND PKW T BE NNEEL ATOGA Y EA K Rd Fi ck SAR RK SH NT PATTERSON AVE ON LV NJ S 4TH T ss L IN lo ET ST W A N LL T g D BR S AM S ST S ST ISBE S IC GA IGA d ru BE T CK LL T D AT B T BE JEF TA VE ER LE IN S R ce ar IN RY T V in ST T FFI T S T LL HURS S J AST ERIE ST EST N ARD ne S IN DR ss DANNEEL S ACKSO JE S L VE C T LV YL A Ac S

EAKE NUT URM UDUB ON S S B VA ce hy d Pi T VE NA cess R L PE T ST SA ST f e Ac L AV ER AW and Leve N A Di CO Ac A ST FF EST GA RE B D TI ST AM T T NCER ST rp OR LOWER EX A NDRA ES AD A URB L ar RF UPTOWN DRYAD PL L A DR ST W WA SI IE NIST E PH N ST AKS SE ERSO ANSO AM GE L RIDGE DR Mu LD EL EL ON WA D rry N PET T Wh S COBB SEY PA O AL PI S IL E AZ NE PR R RA ST TT DE CONE EST NCE T AV IZ L BAN E MO E AN S LA ON S RA SON ST Fe BARONNE ST TO IGIOUS S T IA IP XPO S WA ON S GARDEN AKS Y LM ST W L T L HOLIDAY DR AUDUBON AV PR ST S E LA AR BASH NE CT E S T DE GAU L IS R AV SE YT ST DE HA NST NE NROEST VER A T FR ORE RCEDES O A AN T T P BBEY T CHAI RE Y RY S D A ALGIERS PL DR T LI RR GE IA GARDEN BR PARK T RI VI S ST FL LL OU ER NDRE HA T ANKL VIRGIL RA DR Y E ME T S E N AV S KABEL DR

ES DISTRICT NE EY HARL DR HERSCHEL ON TA ST C HA ID S ST T MI TE MA ST

T GH ST R SE PL NORL FINL TRAIL IT ST AND PL PER VI ST ME WA XEN S CONS AS Y T T MA RM OC ST RR A TT ST W LT MS ND S OC IN PI DISTRICT E URO LO S T EASA ST AV BO S IN IO IN MO T T MA ROMA E UP S CUP ON S A T TT Y NBUR PI FO ST WH BR HOM AU EA ST NSAS ST IN HY T LA LL RA HUDS T T UISIAN ON CT IGH T OUN A ANIA S T T PKW RIAL MACARTHUR S BLVD S ON O RD PRYT SE TO ST RENGOST UCHER ST S N EUF E ETON ST T DA KA S E T 8TH ST VE T NASHVILLE AVE TA S MA VA Y T OOK WY OX N PL OR LH NT SO T C GA LD AV COOK S AH G S PR IN CHALMETTE ER OCONNOR Y P FO SAD FERRY LM RRIER ST I S EA ST PE AN ST UREL ID N RD P ROUS ER NT NK EXPW ARK AUDUBON ABEL LE S R E CA S ST SE EBO RA T LA SE VA A APA AT L PA T UX S COLISEUM ST TO T LON ST T L A SO IN LA E BA ST OXFORD PL LOWER ALGIERS ZOO NCE S INOP AR E EST ST T AV DR 9TH DR EBST T S ST NK EXP ST HE T T LF N NORE S NINE RU AV STNU AU E S SSA CHE RIVERVIEW DR W T E AL 7T ER ST ST EST DIAN RHODES AVE S EPL DR RT S K E BA T T RE VE O GRETNA ER IN R AT S W ST T EO LE STER WR A IN T H AKS S

T LL AT T CAMP ST ST GE S S Y DOVE E ST EE R PL T ST T ST EL S EST O NE E LTON S SEPH MI T AY S NI L ESTCHE T DUF T IGHT PAT ST L T YD ST DURHA DR W EL S T ST TI BKE AV LD ROBE A ST M DR TO S W BA UDAIS L R IL S JO ST EY LI CL LE NEIL AVE ST N ST SHVI H MW SO T VA D PL T DR S BO FR VER ER P LY RT ER IRISH CHANNELTZ LI PO 5T NDER D ST ON I

1S PL PPEW TE RT MISSISSIPPI RIVER TRAIL MS AM DR A OOD P RI NA T VER ST RI HUNT RD NCE IE SUTTON EL ON P CA TA L MBRIDGE R N CT CHI VE LE NRY CONS IA ON BE RRIN ST ST S KENS PE DONA VA RR AR D ST RI N HA P ST TRUMP ST BERKLEY DR FI S LN EL HO TRUM ABI T R N AI BO VA PO C DRIAN S AR CHARD ST ST LL

ECAST S EXAS HE ARK TT ST MA IA TT A T Y Data Source: Completed bicycle facilities data by E NE S WI NS LL DI TO R T YO BL NCAST EST ST VER T CCHUS D T PI T S VE L S LL A WI LAUREL ST UM CHILO S HECTOR R RA LA LL Y CHILO ST T PKW AD MA SE NKIN S D DR HR T T ON S LA S T S P KI NGST T MA E PR D VO DR MI ON CT ANK BA

E BE OW PF ON C ST R NNE AR D ST GR G S TE E S NE BE LE YTHE T YS ST T LL R RUX ON LD TO CT TH LAS IS N ST N CT 2N SSEX NT FR D E AM

SET OU E Y IS B PA D TT BO L EEN D IS BE BL D TCHOUPIT ST HI FAIRFAX PL IE L R L LV WESTBANK EXPRESSWAY TRAIL AP W R TA BR H LA E RD S P LA R RK E RA KE Regional Planning Commission and Louisiana Public GN RA OU

S ST AV AD R CI ABAUVE 3 R EPHENS LE ANNUNCIATION ST ST ST E VER FR T AY EN 6T LP I HU D O CHE ON D NE H A I AST ST FA T IN SH T ME T MI S PPL LL AN HE D E ST T ST 7T ST R NICHO FRON EY DUP IM YM CO BRUNSW R S NE YET AS S YE DE OL T M H O S E ICK CT

1S URO A AD HO E SO UL ST E

Y NDRE BERS LE T TKW P 8T IGH ET PL E RY A WT T CO HEN H LL RENE ST FFEE PL DR ARENCE ST T N A MAUM CL L TE FRIEDRICHS LM RU RUE US FRIEDRICHS HRM AVE W 9T N PL PA D R REE NNOX BL RU D S E RU OW RUE ONG ON RU E Health Institute, 2012. Connector routes and bicycle WR CA EYER S VE BL ES GE RLISLE CT PE R ST D ONY R ST T HAWKINS ST TE BE ST Y DE A NE S T RUE RU ST S O B LLE Y LN RU WAREHOUSE RD RR R ST AV T SSO LV RA STRATFORD PL FE EEN PI A DO RBIGNY S TH WY OUR LADY OF NEHURS S GE 11 SU EN AVE E KASS ST Y D ON L ND HW DR T BL DE GAUL HL B RMINAL LH ENGL GL TE RUB PKW HOLY CROSS WARWICK CT NNI ISH TURN PW CT TA CR M LA LA PA BR UEBONNE VD IS T L E T friendly areas by Bike Easy. 2012. Map data prepared ON NK EXP T BRECHTEL DR H S RI ST COLLEGE JE OD MISSISSIPPI RIVER KAT FAIRWAY T GR AN DR OAKS DR UISIAN SA IL OW T BA URN PK Y T A C NE TH ST PARK ET DE S RANDALON S LE WO 12 HE Miles EA LO GU DI EF T EST N HAMILT UM BERRY S VENUE WT E ON RD D T D N MA TH HT MAPLE LEAF D W R R S DR FA PL A D D PF R WY BA 10 GL AS DR LI LK C LF VE ER AV CHA RM B T AV

T R PI R NH ON OM WOOD T 17 NDA LV WY GA CA LV INGT P ST A N LA E

RK D EA VENUE D WI D ND BR VENUE Y by the Regional Planning Commission under RPC D O AY L E TH D ID 0 0.5 1 2 PO A FA GE A B H PO AT R S LD LI AT AK N RDE LM LL ON P S DS S T S T AK LV D C AL VENUE T URN D IRMONT OL S DE NE T S EL

R T EN AV A TA ER OW T VE IN NA TU AN FI T S L T R ST E TH T VER IT E TE AZ C RI G IV RE TTE MA R A N DR T N BL 15 S H FI BES GL DR AKEW T D ET NT CT RI DUPO N LY LN RD TU VER E S T T R L

4T NK I RI K IS A WH ST R OD 5T AV S TH S FR HRM LL D CE Task UPWP A2.12. H K T IE R BA BER DRIC H VE VD 12 E GR A DE IS D S ERFI IS NNOX B ST ST TH WA DR EL ST EL ST OA S L COO D RD ST T PER RD OY GL H T E H DR OA D J S EST 16 TH BE LL 4T WO LD T 8T LI R LE W 17 NDA CT WI GO HO TU EN

IN 8-Appendix | 125 Greenway m Greenway Tree Planting Concept Diagram Tree Planting Concept aster Plan Plan aster Diagram

The Tree Planting Concept Diagram is intended to explain the methodology of selecting specific tree species for different streets. The Greenway crosses the bottomland hardwood forest and natural levee ecosystems. Tree species that naturally occur in these ecosystems were selected based on this concept. The tree species can be switched to different streets but should not stray from this list because it has been approved by Parks and Parkways.

ORLEANS AVENUE ORLEANS AVENUE E C O S Y S T E M T Y P O L O G I E S & P L A N T I N G C O N C E P T ORLEANS AVENUE

Winged Elm, 50’ canopy; 50’OC SAINT PETER STREET Hop Hornbeam

bottomland hardwood bottomland hardwood natural levee 15’ canopy; 15’OC natural. levee natural levee natural levee Nutall Oak . T S 40’ canopy; 40’OC E S T ON 164 T S 182

Bigleaf Magnolia VILLE R 193 E R LAFITTE HOUSING PROJECT N. American Elm 25’ canopy; 25’OC O B ORLE R A NS Shumard Oak 40’ canopy; 40’OC N . A V E N U E LAFITTE HOUSING PROJECT L A F I T T E BA Sweetbay Magnolia 40’ canopy; 40’OC SIN Swamp Red Maple 25’ canopy; 25’OC

30’ canopy; 30’OC LAFITTE HOUSING PROJECT J Sweet Gum Black Gum 25’ canopy; 25’OC STREET ITTE LAF I 30’ canopy; 30’OC F Southern Live Oak Winged Elm, Nutall Oak Hop Hornbeam Bigleaf Magnolia American Elm Shumard Oak Sweetbay Magnolia Swamp Red Maple Sweet Gum Historic Trees Existing Tuliptree Hackberry Green Ash Sycamore Swamp Red Maple Tupelo Gum Bald cypress Tupelo Gum Swamp Red Maple Sycamore Hackberry Tuliptree Green Ash 70’ canopy; 55’OC 50’ canopy; 50’OC 40’ canopy; 40’OC 15’ canopy; 15’OC 40’ canopy; 40’OC 40’ canopy; 40’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 40’ canopy; 40’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 40’ canopy; 40’OC TOULOUSE STREET 326 TOULOUSE STREET

TOULOUSE STREET . . TOULOUSE STREET TOULOUSE STREET TOULOUSE STREET TOULOUSE STREET EET S T

AV E STR . TTE LAFI E . S T 336 S T .

E NU E BR OAD R 360 HI TE 10

O S T 458 . W Y

VILLE R are 119-A . N . Squ

A S T DU P T

369

. AV E

N . W N. S

Square 183-A

H A . N.O.T.C.-1 T E N . I T

S T A F G D O L E 393 I GAYO S 526

E

H N.O.T.C.-3 N

C 402 I S R N. E Square 162-A T

EZ S T 418 A O N A L

540 500 483 A 527 R 427 S O T B T E

509 O P T I .C.-2 F N.O.T A I 474 ENDON L A S 575 T L E T

593 R 608 584 L N . M A

E R 602 554 L 448 T 617 563 L R N . O N. C I N T

R

T V R M S

T . I A A

E R R

T

C N M G E TT E

. O U R I . P Y N N . RC E C H T N C HU S A I E M E bottomland T A S I T C F I Y S E I E A

CK L S V A N P I S P S I

A N.

N. M NAD O K RK N OI S N .

R Y M A HO N CLAYTON ERA A TR I E R NN E OM O

A L A S G E B A LE XAN D P

P OR TE Z

B

S 457 C O L

TELE

Y C H E O L A

N . AN T

N . T N.

N . S P N. I N .

623 N . 624 N .

C N . N . DAVID N . mix

C N J OH S T . A OU E B AY I T T N L A F ST. LOUIS S T. L O U I S S T R E E T A ST. LOUIS STREET ST. LOUIS STREET L B T E L L A F I T V D ...... T . S T S S T

S T S T

S T

I S T E S S T O O N R A N IGN Y I R NO I ON T LA V B M IE U

R O M T G E R OHN S N. R HE B N . J P D E

539 N . N . N . O C N .

601 DO R

562 R

528 529 482 583 555 N . 609 594 576 508 501 616 475 335 N . 624 456 361 368 394 401 419 449 426 DAVI S

N

CONTI STREET CONTI STREET CONTI STREET CONTI STREET ON DAVI S CONTI STREET CONTI STREET CONTI STREET O S S C O N T I E FF R E FF R J J N . N . American Holly; 25’canopy; plant 50’ OC Flowering Dogwood; 15’ canopy; plant 30’ OC *Coastal Prairie understory *Coastal Prairie understory Coastal Prairie Coastal Prairie Recommended planting of Red Bay; 15’ diameter; planted in pairs Coastal Prairie Deciduous Holly; 15’ diameter, 15’ OC *Run from Broad to Claiborne *Runs from to end of Greenway Flowering Dogwoode15’ Canopy planted where applicable Redbay 15’ Canopy planted where applicable River Birch on private property 10’ OC w/ 20’ break between pairs *Runs from Je Davis to Broad *Coastal Prairie Understory *Runs from Je Davis to Broad *Coastal prairie understory *Runs from Je Davis to Broad *Runs from Je Davis to Broad

126 | 8-Appendix Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway m aster Plan Plan aster

ORLEANS AVENUE ORLEANS AVENUE E C O S Y S T E M T Y P O L O G I E S & P L A N T I N G C O N C E P T ORLEANS AVENUE

Winged Elm, 50’ canopy; 50’OC SAINT PETER STREET Hop Hornbeam

bottomland hardwood bottomland hardwood natural levee 15’ canopy; 15’OC natural. levee natural levee natural levee Nutall Oak . T S 40’ canopy; 40’OC E S T ON 164 T S 182

Bigleaf Magnolia VILLE R 193 E R LAFITTE HOUSING PROJECT N. American Elm 25’ canopy; 25’OC O B ORLE R A NS Shumard Oak 40’ canopy; 40’OC N . A V E N U E LAFITTE HOUSING PROJECT L A F I T T E BA Sweetbay Magnolia 40’ canopy; 40’OC SIN Swamp Red Maple 25’ canopy; 25’OC

30’ canopy; 30’OC LAFITTE HOUSING PROJECT J Sweet Gum Black Gum 25’ canopy; 25’OC STREET ITTE LAF I 30’ canopy; 30’OC F Southern Live Oak Winged Elm, Nutall Oak Hop Hornbeam Bigleaf Magnolia American Elm Shumard Oak Sweetbay Magnolia Swamp Red Maple Sweet Gum Historic Trees Existing Tuliptree Hackberry Green Ash Sycamore Swamp Red Maple Tupelo Gum Bald cypress Tupelo Gum Swamp Red Maple Sycamore Hackberry Tuliptree Green Ash 70’ canopy; 55’OC 50’ canopy; 50’OC 40’ canopy; 40’OC 15’ canopy; 15’OC 40’ canopy; 40’OC 40’ canopy; 40’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 30’ canopy; 30’OC 40’ canopy; 40’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 25’ canopy; 25’OC 25’ canopy; 25’OC 30’ canopy; 30’OC 40’ canopy; 40’OC TOULOUSE STREET 326 TOULOUSE STREET

TOULOUSE STREET . . TOULOUSE STREET TOULOUSE STREET TOULOUSE STREET TOULOUSE STREET EET S T

AV E STR . TTE LAFI E . S T 336 S T .

E NU E BR OAD R 360 HI TE 10

O S T 458 . W Y

VILLE R are 119-A . N . Squ

A S T DU P T

369

. AV E

N . W N. S

Square 183-A

H A . N.O.T.C.-1 T E N . I T

S T A F G D O L E 393 I GAYO S 526

E

H N.O.T.C.-3 N

C 402 I S R N. E Square 162-A T

EZ S T 418 A O N A L

540 500 483 A 527 R 427 S O T B T E

509 O P T I .C.-2 F N.O.T A I 474 ENDON L A S 575 T L E T

593 R 608 584 L N . M A

E R 602 554 L 448 T 617 563 L R N . O N. C I N T

R

T V R M S

T . I A A

E R R

T

C N M G E TT E

. O U R I . P Y N N . RC E C H T N C HU S A I E M E bottomland T A S I T C F I Y S E I E A

CK L S V A N P I S P S I

A N.

N. M NAD O K RK N OI S N .

R Y M A HO N CLAYTON ERA A TR I E R NN E OM O

A L A S G E B A LE XAN D P

P OR TE Z

B

S 457 C O L

TELE

Y C H E O L A

N . AN T

N . T N.

N . S P N. I N .

623 N . 624 N .

C N . N . DAVID N . mix

C N J OH S T . A OU E B AY I T T N L A F ST. LOUIS S T. L O U I S S T R E E T A ST. LOUIS STREET ST. LOUIS STREET L B T E L L A F I T V D ...... T . S T S S T

S T S T

S T

I S T E S S T O O N R A N IGN Y I R NO I ON T LA V B M IE U

R O M T G E R OHN S N. R HE B N . J P D E

539 N . N . N . O C N .

601 DO R

562 R

528 529 482 583 555 N . 609 594 576 508 501 616 475 335 N . 624 456 361 368 394 401 419 449 426 DAVI S

N

CONTI STREET CONTI STREET CONTI STREET CONTI STREET ON DAVI S CONTI STREET CONTI STREET CONTI STREET O S S C O N T I E FF R E FF R J J N . N . American Holly; 25’canopy; plant 50’ OC Flowering Dogwood; 15’ canopy; plant 30’ OC *Coastal Prairie understory *Coastal Prairie understory Coastal Prairie Coastal Prairie Recommended planting of Red Bay; 15’ diameter; planted in pairs Coastal Prairie Deciduous Holly; 15’ diameter, 15’ OC *Run from Broad to Claiborne *Runs from to end of Greenway Flowering Dogwoode15’ Canopy planted where applicable Redbay 15’ Canopy planted where applicable River Birch on private property 10’ OC w/ 20’ break between pairs *Runs from Je Davis to Broad *Coastal Prairie Understory *Runs from Je Davis to Broad *Coastal prairie understory *Runs from Je Davis to Broad *Runs from Je Davis to Broad

8-Appendix | 127 Greenway m Greenway Plant List

Natural Levee Bottomland Hardwood Coastal Prairie Marsh Swamp aster Plan Plan aster Trees Trees Low to Mid-Height Brush Level Trees

American Elm Bald Cypress Bee Balm Arrowwood Viburnum Bald Cypress Bigleaf Magnolia Black Gum Blazing Star Baccharis Black Gum Black Gum Green Ash Blue-eyed grass Button Bush Swamp Red Maple Hop Hornbeam Hackberry Buge Bluestem Service Berry Nutall Oak Swamp Red Maple Bushy Bluestem Low-Mid Level Shumard Oak Sycamore Coral Bean Grassy Southern Live Oak Tupelo Gum Covegrass Iris Swamp Red Maple Tuliptree Gulf Cordgrass Arrow Mallow Sweetbay Magnolia Indian Grass Bul l Tounge Swamp Lilly Crinum Sweet Gum Shrubs Iris Goldenrod Wild Azalea Winged Elm Little Bluestem Goldenrod Dahoon Holly Milkweeds Pickerelweed Shrubs Dwarf Palmetto Panic grass Rush Oakleaf hydrangea Prairie Cone Flower Sawgrass American Beautyberry Roughleaf Dogwood Prairie petunia Sedges Elderberry Serviceberry Purple Aster Showy Iris Hydrangea Silverbells Rush Spikegrass Red Buckeye Spicebush Sedge Umbrella Sedges Redbud Wax Myrtle Singlestem Surfpea Service Berry Witch Hazel Spiderworts Wax Myrtle Yaupon Spikerush Spurge Grass/groundcover Low Switch Grass Tickseed Big Blue Dwarf Palmetto White Top Sedge Coneflower Wood Fern Deepseed Eastern Gamma Grass Foxglove Goldenrod Indiangrass Inland Sea Oats Spiderwort Thorywort Yarrow

128 | 8-Appendix Lafitte Greenway Master Plan | New Orleans, Louisiana Greenway m aster Plan Plan aster

This page intentionally left blank.

8-Appendix | 129