3Rd Quarter of 2017

Total Page:16

File Type:pdf, Size:1020Kb

3Rd Quarter of 2017 Highlights Of Accomplishment Report 3rd Quarter of 2017 Prepared by: Corporate Planning and Management Staff Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1 TRAFFIC ENFORCEMENT Income from Traffic Fines Traffic Direction & Control; Metro Manila Traffic Ticketing System 60-Kph Speed Limit Enforcement Bus Management and Dispatch System South West Integrated Provincial Transport System (SWIPTS) EDSA Bicycle-Sharing Scheme Towing and Impounding Anti-Jaywalking Operations Anti-Illegal Parking Operations Enforcement of the Yellow Lane and Closed-Door Policy Anti-Colorum and Out-of-Line Operations Operation of the TVR Redemption Facility Personnel Inspection and Monitoring Road Emergency Operations (Emergency Response and Roadside Clearing) Unified Vehicular Volume Reduction Program (UVVRP) TRAFFIC ENGINEERING Upgrading of Traffic Signal System Design and Construction of Pedestrian Footbridges Application of Thermoplastic and Traffic Cold Paint Pavement Markings Fabrication & Manufacturing/ Maintenance of Traffic Road Signs/ Facilities Installation of Traffic Facilities and Road Signs Maintenance of Traffic Road Signs and Facilities Traffic Signal Operation & Maintenance Street Lighting Maintenance Other Special Projects TRAFFIC EDUCATION Institute of Traffic Management OTHER TRAFFIC IMPROVEMENT-RELATED SPECIAL PROJECTS/ MEASURES METROBASE FLOOD CONTROL & SEWERAGE MANAGEMENT OFFICE (FCSMO) ……………….. 16 SOLID WASTE MANAGEMENT OFFICE ……………….. 19 HEALTH, PUBLIC SAFETY & ENVIRONMENTAL PROTECTION OFFICE (HPSEPO) ……………….. 22 Enforcement of MMDA Regulation No. 96-009 or Anti-littering Law Enforcement of RA 9211 or the Tobacco Regulation Act/ No Smoking in Public Places/ MMDA-Bloomberg Project Public Safety Programs Anti-Smoke Belching Operations Metro Parkway Clearing Group OFFICE OF THE ASSISTANT GENERAL MANAGER FOR PLANNING (OAGMP) ……………….. 33 Regional Development Council (RDC) NCR Development Planning Land Use Planning and Zoning Shelter Services Other Activities METROPOLITAN SOCIAL SERVICE OFFICE ……………….. 37 SIDEWALK CLEARING OPERATIONS ……………….. 38 GROUP (SCOG) COUNCIL SECRETARIAT ……………….. 40 MANAGEMENT AND INFORMATION ……………….. 42 SYSTEM STAFF PUBLIC AFFAIRS STAFF—PUBLIC ……………….. 43 INFORMATION CENTER Public Concerns and Responses Management Unit Design and Layout TRAFFIC ADJUDICATION DIVISION ……………….. 45 CORPORATE PLANNING AND ……………….. 46 MANAGEMENT STAFF TASK FORCE BAKLAS BILLBOARD ……………….. 48 FINANCE SERVICE ……………….. 49 Accounting Division Budget Division Internal Audit Unit ADMINISTRATIVE SERVICE ……………….. 53 Personnel Benefits Division Payroll Group Medical and Dental Clinics Personnel Transaction Division General Administrative Service Division Transport Division Staff Development Division Supply and Property Division Records Division MMDA SPECIAL PROJECTS ……………….. 64 Children’s Road Safety Park Metro Manila Crisis Monitoring and Management Center TRAFFIC DISCIPLINE OFFICE INCOME FROM TRAFFIC FINES The MMDA earned a total of P32.088M from traffic fines during the 3rd Quarter of 2017. Compared to the same period last year, income from the same source was recorded at P24.412M, or an increase of P7.676M (31.44%). PROGRAM/PROJECT/ACTIVITY 3rd Quarter 2017 3rd Quarter 2016 INCOME FROM TRAFFIC FINES P32.088M P24.412M TRAFFIC ENFORCEMENT TRAFFIC DIRECTION AND CONTROL; METRO MANILA TRAFFIC TICKETING SYSTEM A total of 2,205 traffic constables were deployed in Metro Manila as of September 30, 2017, of which 826 were active UOVR holders, who made a total of 107,876 apprehensions that comprise 269.7% of the 40,000 target output for the quarter. Target Output 3rd Quarter 3rd Quarter PROGRAM/PROJECT/ACTIVITY 2017 2017 2016 No. of Traffic Constables (TCs) 100% 2,205 2,361 deployed deployment of TCs No. of active UOVR holders - 826 935 Total no. of apprehensions 40,000/ qtr. 107,876 62,086 (269.7%) 1| P a g e 60-KPH SPEED LIMIT ENFORCEMENT A 60-km. speed limit has been in force along Commonwealth Ave. since 2011 to stem the high incidence of road accidents on this major road. Macapagal Ave. Commonwealth Ave. Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Commonwealth Ave. Speed Limit 100%/ qtr. 414 85 Enforcement (100%) Macapagal Ave. Speed Limit 381 31 Enforcement (100%) Total 795 116 Bus Management & Dispatch System (BMDS) This scheme controls bus dispatch in the 4 major BMDS terminals in Baclaran, Alabang, Fairview and Malabon and in 10 satellite stations to improve city bus operation particularly along EDSA. PROGRAM/ PROJECT/ ACTIVITY Target Output 3rd Quarter 3rd Quarter 2017 2017 2016 Total bus trips recorded 478,400/ qtr. 546,326 552,194 Average daily bus dispatch recorded 5,200 ave. 5,940 5,998 daily bus trips (114%) City bus drivers registered via fingerprint 150 323 413 scanners (215.33%) No. of drivers’ records being maintained/ up- 11,219 9,926 dated in the PUB Drivers Databank - No. of BMDS-related apprehensions made 25 711 720 (2,844%) 2| P a g e SOUTHWEST INTEGRATED PROVINCIAL TRANSPORT SYSTEM (SWIPTS) The MMDA SWIPTS Terminal was launched on August 6, 2013 to serve as a temporary terminal for Cavite and Batangas-bound provincial buses until the completion of a permanent South West ITS (Integrated Transport System) Terminal. The terminal’s location was transferred from Coastal Mall in Paranaque City to HK Plaza along Roxas Blvd. -EDSA on May 5, 2017. 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY Target Output 2017 2017 2016 Total no. of bus trips recorded/ dis- 13,020/ qtr. 18,656 24,726 patched (143.28%) EDSA BICYCLE-SHARING SCHEME As of September 2017, bicycle-sharing was stopped as all bike lanes are set for rehabilitation. With the remaining 27 repaired bicycles during the quarter, 71 bike users still benefitted from this project. Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Comparative No. of Bike Borrowings 200/ qtr. 71 841 (35.5%) Towing and Impounding Illegally parked, out-of-line and colorum vehicles are subject to towing and impounding. Ultra in Pasig City and Tumana in Marikina City are the two impounding areas that the MMDA maintains. 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY Target Output 2017 2017 2016 Impounded 100% of stalled vehicles 7,241 5,667 Released 6,335 5,279 3| P a g e ANTI-JAYWALKING OPERATIONS Five groups of the Anti-Jaywalking Unit (AJU) conducted operations along EDSA-Quezon Ave., EDSA-Taft Ave. (Pasay City), EDSA-Ortigas, EDSA-Ayala, and EDSA (roving team). The following chart shows the total apprehensions made by the teams during 3rd quarter 2017, with comparative figures during the same period in 2016: Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Settled/ Paid fine 1,227 551 Unsettled 6,773 2,711 Rendered community service 116 Total 8,116 3,262 1,400/ qtr. (579.7%) ANTI-ILLEGAL PARKING OPERATIONS The Anti-Illegal Parking Operations (AIPO) unit was created under Office Order No. 44, s. 2016 and replaced the former Parking Enforcement Team which was dissolved per Office Order No. 86, s. 2016. AIPO reported the following accomplishments for 3rd Quarter 2017, with comparative figures for the same period in 2016: Target Output PROGRAM/ PROJECT/ ACTIVITY 3rd Quarter 2017 3rd Quarter 2016 2017 Towed vehicles (unattended) 1,448 2,416 3,960 Issued UOVR tickets (Illegal apprehensions 6,208 1,670 Parking) per quarter Total 7,656 (193.33%) 4| P a g e ENFORCEMENT OF THE YELLOW LANE RULE & CLOSED-DOOR POLICY The Yellow Lane Rule restricts buses and PUJs in their designated yellow lanes while the Closed Door Policy requires them to maintain closed doors while on the move. These rules are strictly implemented to help improve traffic flow and promote passenger safety. PROGRAM/ PROJECT/ Target Output 2017 3rd Quarter 2017 3rd Quarter 2016 ACTIVITY Yellow Lane Rule 100% per quarter 2,438 2,016 (100%) Closed-Door Policy 1,213 432 (100%) ANTI-COLORUM & OUT-OF-LINE OPERATIONS Public utility vehicles without LTFRB franchise and those operating outside their authorized routes contribute to traffic congestion and unduly compete with legal transport operators. PROGRAM/ PROJECT/ Target Output 2017 3rd Quarter 2017 3rd Quarter 2016 ACTIVITY Anti-Colorum Operations 100% apprehension 267 123 of violators Out-of-Line Operations 264 103 5| P a g e OPERATION OF THE TVR REDEMPTION FACILITY The TVR Redemption Facility accomplished the following comparative figures during the 3rd quarter of years 2017 and 2016: Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Traffic clearance applications 10,890/ qtr. 19,349 18,738 processed 21,780/ sem (177.67%) Traffic clearances released - 18,705 18,524 (96.67% of processed) Applications received/ processed for 100/ qtr. 389 253 release of impounded vehicles 200/ sem. (389%) Impounded vehicles released after - 361 254 penalty payment/ with resolution (92.8% of from the Traffic Adjudication Div. processed) Bank payments downloaded and 15,000/ qtr. 31,543 20,742 uploaded to MRRES database 30,000/ sem (210%) Confiscated drivers licenses and 1,075/ qtr. 1,103 1,606 motor vehicle plates received (102.6%) Confiscated drivers licenses & 820 1,353 vehicle plates processed and (74.34% of released to owners received) 6| P a g e Monitoring of Field Personnel The TDO Personnel Inspection & Monitoring Group (PIMG) conducts inspection and monitoring of traffic/ field personnel assigned at the different traffic enforcement units and metes disciplinary action as warranted. Chart below shows comparative accomplishments
Recommended publications
  • This Directory Is As of August 04, 2016 METRO MANILA PICK-UP CHANNEL PROVINCE AREA/CITY ADDRESS PALAWAN PAWNSHOP METRO MANILA MANILA 1738 D JUAN ST
    METRO MANILA PICK-UP CHANNEL PROVINCE AREA/CITY ADDRESS PALAWAN PAWNSHOP METRO MANILA CALOOCAN CITY UNIT B-5 A. MABINI STREET, CALOOCAN CITY LANDMARK: WITHIN SANGANDAAN PLAZA, A. MABINI PALAWAN PAWNSHOP METRO MANILA CALOOCAN CITY 368 EDSA, CALOOCAN CITY LANDMARK: FRONT OF MCU (MANILA CENTRAL UNIVERSITY) PALAWAN PAWNSHOP METRO MANILA CALOOCAN CITY STALL #1, MARIETTA ARCADE, 1107 GE. SAN MIGUEL ST., SANGANDAAN, CALOOCAN LANDMARK: NEAR UNIVERSITY OF CALOOCAN RD PAWNSHOP METRO MANILA CALOOCAN CITY 149-D AVE., GRACE PARK, CALOOCAN CITY RD PAWNSHOP METRO MANILA CALOOCAN CITY A1 LTL BLDG. CAMARIN RD. COR. SIKATUNA AVE. URDEJA V CARD BANK METRO MANILA LAS PIÑAS CITY BRGY E. ALDANA REAL ST. LAS PIÑAS CITY PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY 407 ALABANG-ZAPOTE RD., TALON 1, LAS PINAS LANDMARK: FRONT OF MOONWALK MARKET PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY 487 ALMANZA GREGORIO AVENUE, LAS PIÑAS CITY LANDMARK: NEAR SM SOUTH MALL PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY 325 DE GUZMAN COMPOUND, REAL ST. PULANG LUPA 1, LASPINAS CITY LANDMARK: NEAR SHELL STATION PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY UNIT H, ZAPOTE-ALABANG RD, PAMPLONA, LAS PIÑAS LANDMARK: NEAR ZAPOTE FLYOVER PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY BLK 2 LOT 12 CAA ROAD, AGUILAR AVE., PULANG LUPA DOS, LAS PINAS CITY LANDMARK: IN FRONT OF MARY QUEEN OF APOSTLES PARISH PALAWAN PAWNSHOP METRO MANILA LAS PIÑAS CITY 400 REAL ST., TALON, LAS PINAS CITY LANDMARK : NEAR PUREGOLD MOONWALK RD PAWNSHOP METRO MANILA LAS PIÑAS CITY BLDG. B, CTC COMM. REAL ST. RD PAWNSHOP METRO MANILA LAS PIÑAS CITY 400 REAL ST.
    [Show full text]
  • 2020 Sustainability Report Contents About the Report
    Enabling Infrastructure Development for National Progress 2020 Sustainability Report Contents About the Report This is the fifth sustainability report of Metro Pacific Investments Corporation (MPIC, the Company or the Parent Company) containing information about our economic, environmental, social, and governance (ESG or Sustainability) impacts for the year ending December 2020. This report should be read in conjunction with our SEC Part 1: Form 17A and our 2020 Information Statement. In line with our commitment to transparency and accountability, we have prepared this report in accordance with the Contributing to National Progress and 1 Sustainability Accounting Standards Board (SASB) Industry Standards, United Nations Improving the Quality of Life of Filipinos Global Compact Index (UNGC), and Global Reporting Initiative (GRI) Standards: Core Option. DNV has provided an independent assurance statement for our sustainability or non-financial disclosures. We welcome feedback on this report and any matter concerning the sustainability performance of our business. Part 2: Please contact us at: Our Sustainability Pillars 25 Metro Pacific Investments Corporation Investor Relations 10/F MGO Building, Legaspi corner Dela Rosa Streets, Makati City, 0721, Philippines +63 2 8888 0888 [email protected] Annex The 2020 Sustainability Report was published on 80 April 5, 2021 and is also available for download from the corporate website. Part 1: Contributing to National Progress and Improving the Quality of Life of Filipinos Part 2: Our Sustainability
    [Show full text]
  • ACCREDITED DENTISTS August 2018
    Where beautiful smiles begin www.elitegroup.com.ph ACCREDITED DENTISTS www.elitegroup.com.ph August 2018 TABLE OF CONTENTS Area Page No. Area Page No. Area Page No. NCR – METRO MANILA 3 REGION 2 - CAGAYAN VALLEY 12 REGION 7 - CENTRAL VISAYAS 19 Caloocan City 3 Cagayan 12 Bohol 19 Las Piñas City 3 Isabela 12 Cebu 19 Makati City 3 Nueva Vizcaya 12 Malabon 4 REGION 8 - EASTERN VISAYAS 20 Mandaluyong 4 REGION 3 - CENTRAL LUZON 12 Leyte 20 Manila 5 Aurora 12 Northern Samar 20 Binondo 5 Bataan 12 Samar 20 Sta. Cruz 5 Bulacan 12 Marikina City 5 Nueva Ecija 13 REGION 9 - ZAMBOANGA PENINSULA 20 Muntinlupa City 6 Pampanga 13 Zamboanga del Sur 20 Navotas City 6 Tarlac 14 Parañaque 6 Zambales 14 REGION 10 - NORTHERN MINDANAO 21 Pasay City 7 Bukidnon 21 Pasig City 7 REGION 4A - CALABARZON 14 Lanao del Norte 21 Ortigas Center 7 Batangas 14 Misamis Occidental 21 The Medical Center 8 Cavite 15 Misamis Oriental 21 Pateros 8 Laguna 16 Quezon City 8 Quezon 17 REGION 11 - DAVAO REGION 21 Cubao 10 Rizal 17 Davao del Sur 21 Libis 10 Davao del Norte 22 Novaliches 10 REGION 4B – MIMAROPA 18 St. Lukes Medical Center 10 Occidental Mindoro 18 REGION 12 – SOCCSKSARGEN 22 San Juan 10 Oriental Mindoro 18 North Cotabato 22 Taguig 10 Palawan 18 South Cotabato 22 Valenzuela 11 Sultan Kudarat 22 REGION 5 - BICOL REGION 18 CAR – Albay 18 REGION 13 – CARAGA 22 CORDILLERA ADMINISTRATIVE REGION 11 Camarines Sur 19 Agusan del Norte 22 Benguet 11 Masbate 19 Agusan del Sur 22 REGION 1 - ILOCOS REGION 11 REGION 6 - WESTERN VISAYAS 19 ARMM 22 Ilocos Norte 11 Aklan 19 Maguindanao 22 La Union 11 Capiz 19 Pangasinan 11 Iloilo City 19 Negros Occidental 19 Page | 2 ACCREDITED DENTISTS www.elitegroup.com.ph August 2018 National Capital Region Location: opposite MCU Hospital; located at Access Computer DR.
    [Show full text]
  • Philippines Metro Manila LRT Line 1 Capacity Expansion Project External Evaluator: Atsushi Fujino (KRI International Corp.) Field Survey: September 2004 1
    Philippines Metro Manila LRT Line 1 Capacity Expansion Project External Evaluator: Atsushi Fujino (KRI International Corp.) Field Survey: September 2004 1. Project Profile and Japan’s ODA Loan Baguio Manila Project site Cebu City Philippines Davao Project site location map One of the newly-procured carriages 1.1 Background The LRT (Light Rail Transit) Line 1 (14.5km) was financed by a loan from the Belgian government and began its operation in 1985. It was the first mass transportation constructed in the Philippine’s and runs north to south through Metropolitan Manila (17 municipalities, covering an area of 636km2, population 9.93 million; Tokyo’s 23 wards cover an area of 621km2, population 8.41 million). In 1994, LRT Line 1 carried approximately 403,000 passengers per day (the Toei Mita Line has around 500,000 passengesr per day) and had become a firmly established means of transportation for citizens in the area. However, increases in the number of passengers meant that the capacity with the existing two-car trains reached the limitation. Since 1990, passengers were often forced to be left off during the morning rush hour and the trains were delayed on a daily basis. Meanwhile, economic growth in the 1990s led to a surge in the number of vehicles and the resultant congestion on roads in Metro Manila generated economic losses and air pollution. Under such circumstances, there were calls for the immediate provision of a safe, comfortable, inexpensive and punctual mass transport system. 1.2 Objectives The project’s objective was to expand the transport capacity of Metro Manila Light Rail Transit (LRT) Line 1 and to improve passengers’ comfort by procuring new rolling stock cars and by improving existing facilities, and thereby alleviates congestion on the roads and improves in the urban environment.
    [Show full text]
  • 2019 Sustainability Report
    Empowering Sustainable Communities 2019 SUSTAINABILITY REPORT About this Report Leadership Message Company Profile Key Metrics Mission, Vision and Values Core Assets Contributions to Nation Building Part One: Governance Part Two: Sustainability Impacts Part Three: ESG Reporting Methodology Annex Contents About this Report 1 About this Report This is the fourth sustainability report for Metro We welcome feedback on this report and any matter 2 Leadership Message Pacific Investments Corporation (“MPIC”, “the concerning the sustainability performance of our 8 Company Profile / Key Metrics / Mission, Vision and Values Company” or “the Parent Company”) containing business. Please contact us at: information about our environmental, social and 9 Core Assets – Simplified Ownership Structure governance (“ESG” or “Sustainability”) impacts for Metro Pacific Investments Corporation 10 Contributions to Nation-Building the year ending December 2019. Investor Relations 14 Part One : Governance 10/F MGO Building, Legaspi corner Dela Rosa Streets, 15 Value Creation This report should be read in conjunction with Makati City, 0721, Philippines 19 Responsibility for ESG our SEC Form 17A and our 2019 Information +63 2 8888 0888 21 Economic Performance Statement. In line with our commitment to [email protected] 24 Investment Selection and Portfolio Management transparency and accountability, we have prepared this report in accordance with the Global 26 MPIC and the Sustainable Development Goals Reporting Initiative (“GRI”) Standards: Core 29 Part Two : Sustainability Impacts Option. DNV GL has provided an independent 30 Boundary of ESG Performance assurance statement for our sustainability / 31 Operational Efficiency non-financial disclosures. 49 Service Excellence 60 Engaged Employees and Safe Workplaces The 2018 Sustainability Report was published on 27 May 2019 and is also available for download from the 75 Social Responsibility corporate website.
    [Show full text]
  • Project Information Memorandum 1 / 55
    PROJECT INFORMATION MEMORANDUM 1 / 55 Republic of the Philippines Department of Transportation and Communications & Light Rail Transit Authority PPP for the Automatic Fare Collection System Project for LRT Lines 1& 2 and MRT 3 PROJECT INFORMATION MEMORANDUM PROJECT INFORMATION MEMORANDUM 2 / 55 Disclaimer This Information Memorandum has been prepared by the Department of Transportation and Communications (DOTC) and the Light Rail Transit Authority (LRTA). All information in this Information Memorandum is qualified by the terms and conditions of the Instructions to Prospective Bidders. All information in this Information Memorandum shall also be qualified by the terms and conditions of the Instructions to Bidders to be released to Pre-Qualified Bidders, and the Concession Agreement and its Annexes, including the Minimum Performance Standards and Specifications and its Annexes. Drafts of the Concession Agreement and its Annexes, including the Minimum Performance Standards and Specifications and its Annexes, will be made available to Pre-Qualified Bidders. In case of any conflict between the information and terms in this Information Memorandum and the Instructions to Prospective Bidders and Instructions to Bidders, the information and terms in the Instructions to Prospective Bidders and Instructions to Bidders shall prevail. This Information Memorandum does not purport to be all-inclusive or to contain all of the information that a prospective participant may consider material or desirable in making its decision to participate in the tender. No representation or warranty, expressed or implied, is made, or responsibility of any kind is or will be accepted by the DOTC, LRTA, or the Government of the Philippines (GOP) or any of its agencies, with respect to the accuracy and completeness of this preliminary information.
    [Show full text]
  • Dental Network
    Where beautiful smiles begin www.elitegroup.com.ph ACCREDITED DENTISTS www.elitegroup.com.ph October 2020 flambarte TABLE OF CONTENTS Area Page No. Area Page No. Area Page No. NCR – METRO MANILA 3 REGION 2 - CAGAYAN VALLEY 12 REGION 7 - CENTRAL VISAYAS 20 Caloocan City 3 Cagayan 12 Bohol 20 Las Piñas City 3 Isabela 12 Cebu 20 Makati City 3 Nueva Vizcaya 12 Malabon 4 REGION 8 - EASTERN VISAYAS 21 Mandaluyong 4 REGION 3 - CENTRAL LUZON 12 Leyte 21 Manila 5 Aurora 12 Samar 21 Binondo 5 Bataan 12 Sta. Cruz 5 Bulacan 12 REGION 9 - ZAMBOANGA PENINSULA 21 Marikina City 6 Nueva Ecija 13 Zamboanga del Sur 21 Muntinlupa City 6 Pampanga 13 Parañaque 6 Tarlac 14 REGION 10 - NORTHERN MINDANAO 21 Pasay City 7 Zambales 14 Bukidnon 21 Pasig City 7 Lanao del Norte 21 Ortigas Center 8 REGION 4A - CALABARZON 14 Misamis Occidental 21 The Medical Center 8 Batangas 14 Misamis Oriental 21 Pateros 8 Cavite 15 Quezon City 8 Laguna 16 REGION 11 - DAVAO REGION 22 Cubao 10 Quezon 17 Davao del Sur 22 Libis 10 Rizal 18 Davao del Norte 22 Novaliches 10 San Juan 11 REGION 4B – MIMAROPA 19 REGION 12 – SOCCSKSARGEN 22 Taguig 11 Occidental Mindoro 19 North Cotabato 22 Valenzuela 11 Oriental Mindoro 19 South Cotabato 22 Palawan 19 Sultan Kudarat 22 CAR – CORDILLERA ADMINISTRATIVE REGION 11 REGION 5 - BICOL REGION 19 REGION 13 – CARAGA 23 Benguet 11 Albay 19 Agusan del Norte 23 Camarines Sur 19 Agusan del Sur 23 REGION 1 - ILOCOS REGION 11 Masbate 19 Ilocos Norte 11 La Union 11 REGION 6 - WESTERN VISAYAS 19 Pangasinan 11 Aklan 19 Capiz 19 Iloilo City 20 Negros Occidental 20 Page | 2 ACCREDITED DENTISTS www.elitegroup.com.ph October 2020 National Capital Region DR.
    [Show full text]
  • Data Collection Survey on Drainage System in Metro Manila in the Republic of the Philippines
    DEPARTMENT OF PUBLIC JAPAN INTERNATIONAL WORKS AND HIGHWAYS COOPERATION AGENCY THE REPUBLIC OF THE PHILIPPINES DATA COLLECTION SURVEY ON DRAINAGE SYSTEM IN METRO MANILA IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT DECEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY CTI ENGINEERING INTERNATIONAL CO., LTD. CTI ENGINEERING CO., LTD NIPPON KOEI CO., LTD 1R1R1R CR(3)CR(3)CR(3) 151515-15---078078078078 DEPARTMENT OF PUBLIC JAPAN INTERNATIONAL WORKS AND HIGHWAYS COOPERATION AGENCY THE REPUBLIC OF THE PHILIPPINES DATA COLLECTION SURVEY ON DRAINAGE SYSTEM IN METRO MANILA IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT DECEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY CTI ENGINEERING INTERNATIONAL CO., LTD. CTI ENGINEERING CO., LTD NIPPON KOEI CO., LTD Exchange Rate used in the Report is: US$ 1.00 = PhP. 46.86 = JpY. 119.96 PhP 1.00 = JpY. 2.56 (October 1st, 2015) Acknowledgement In response to a request from the Government of the Republic of the Philippines, the Japan International Cooperation Agency (JICA) decided to conduct “Data Collection Survey on Drainage System in Metro Manila”. We are pleased to submit herewith the Final Report on the Survey for your kind consideration. On this occasion the Survey Team would like to express its sincere appreciation to JICA, the Advisory Committee which examined the Survey from specialist and technical point of view, and also to the Department of Public Works and Highways, particularly UPMO-Flood Control Management Cluster Director Patrick B. Gatan, Ms. Angelina C. Forcadilla, Ms. Leonie R. Mercado and Ms. Lydia C. Aguilar for the cooperation extended to the Team during the Survey. We sincerely hope that the results of the Survey will contribute to the solution and/or mitigation of flooding problems in Metro Manila and that the amicable relationship between our countries will further continue in the future.
    [Show full text]
  • Metro Manila Urban Transportation Integration Study
    No. Republic of the Philippines DOTC*MMDA*DPWH*NEDA*PNP-NCR*HUDCC*UP-NCTS*EMB Japan International Cooperation Agency (JICA) METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY FINAL REPORT SUMMARY March 1999 ALMEC CORPORATION PACIFIC CONSULTANTS INTERNATIONAL YACHIYO ENGINEERING CO.,LTD. mmutis SSF JR 99-036(1/16) EXCHANGE RATE USED 1 US$ = 40 PhP Republic of the Philippines DOTC*MMDA*DPWH*NEDA*PNP-NCR*HUDCC*UP-NCTS*EMB Japan International Cooperation Agency (JICA) METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY FINAL REPORT SUMMARY March 1999 ALMEC CORPORATION PACIFIC CONSULTANTS INTERNATIONAL YACHIYO ENGINEERING CO.,LTD. mmutis PREFACE In response to a request from the Government of the Republic of the Philippines, the Government of Japan decided to conduct a master plan study on Metro Manila Urban Transportation Integration Study(MMUTIS) and entrusted to study to the Japan International Cooperation Agency (JICA). JICA selected and dispatched a study team headed by Dr. Shizuo Iwata of ALMEC Corporation and consists of ALMEC Corporation, Pacific Consultants International and Yachiyo Engineering Co., LTD. to Philippine, there times between March 1996 to December 1999. In addition, JICA set up an advisory committee head by Dr.Shigeru Morichi, professor of University of Tokyo between March 1996 and February 1999,which examined the study from specialist and technical points of view. The team held discussions with the officials concerned of the Government of Philippines and conducted field surveys in the study area. Upon returning to Japan, the team conducted further studies and prepared this final report. I hope that this report will contribute to the promotion of this project and to the enhancement of friendly relationship between our two countries.
    [Show full text]
  • Peak Hour Ridership Modeling of LRT Line 1 Stations
    University of the Philippines Los Baños University Knowledge Digital Repository Undergraduate Theses Theses and Dissertations 10-2009 Peak hour ridership modeling of LRT line 1 stations Raymond Guadalupe Montes Follow this and additional works at: https://www.ukdr.uplb.edu.ph/etd-undergrad Recommended Citation Montes, Raymond Guadalupe, "Peak hour ridership modeling of LRT line 1 stations" (2009). Undergraduate Theses. 551. https://www.ukdr.uplb.edu.ph/etd-undergrad/551 PEAK HOUR RIDERSHIP MODELING OF LRT LINE 1 STATIONS RAYMOND GUADALUPE MONTES 2005-13961 SUBMITTED TO THE FACULTY OF THE COLLEGE OF ENGINEERING AND AGRO-INDUSTRIAL TECHNOLOGY UNIVERSITY OF THE PHILIPPINES LOS BAÑOS IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF SCIENCE IN CIVIL ENGINEERING OCTOBER 2009 TABLE OF CONTENTS Title Page i Acceptance Sheet ii About the Author iii Acknowledgement iv Table of Contents vi List of Tables viii List of Figures ix 1. INTRODUCTION 1 1.1 Background of the Study 1 1.2 Significance of the Study 3 1.3 Objectives of the Study 4 1.4 Scope and Limitations of the Study 4 1.5 Date and Place of the Study 5 2. REVIEW OF RELATED LITERATURE 6 2.1 Light Railway 6 2.2 Railway Stations 7 2.3 Degrees of Stations of integration 7 2.4 Ridership 8 2.5 Transportation Planning 10 2.6 Data Collection 11 2.7 Trip Generation 12 2.8 Tolerable Walking Distance 12 2.9 Multiple Linear Regression Analysis 13 2.10 Correlation Analysis 16 2.11 Linear Regression in Microsoft Excel 16 3.
    [Show full text]
  • Park N Ride Lawton Bus Schedule
    Park N Ride Lawton Bus Schedule Fusionism Norton sometimes snored his Jolson surlily and scribed so prudishly! Ximenes is unfeasible and morticed:dissipates which convivially Hagen as is extenuatory altern enough? Aldus rescinds dully and conks rawly. Arpeggiated and calico Wally South fort victoria as the lawton park n ride lawton chiles lane; misc support arm over boyfriend pants or cubao Of imprisonment at Camp Sumter Andersonville Camp Lawton Millen and Florence Prison. It can focus on. La caseta d woodbu. With them on your bus terminal along lawton park your bike rack when riding a greater percentage of the ride a jeepney passes through boyfriend bluejeans or someone to. Gray wolf peak period reflecting the lines of dark side to park n ride lawton bus schedule on christmas day holiday is filled with. Pdea just having locks available in fines or choose another option traders live in the huntington station and of the particular argument regarding spending far more. Alcohol always wear face covering to. Must wear a lot people like to operate saturday, laguna and we use the park n ride lawton bus schedule for posting and routes operate holiday weekends you off at the north edsa. With the latest updates via the discretion of deer lake south of which is illegal to carlos palanca st. Only familiar street, while we strive for accuracy but taking public schools and over the park n ride lawton bus schedule on the way to luneta park that enable cookies and water bottles and lunch at home! Hi angel, the City Colleges of Manila is near Manila city Hall.
    [Show full text]
  • Ex-Post Monitoring Report of Japanese ODA Loan Projects 2009 (Philippines)
    No. Ex-Post Monitoring Report of Japanese ODA Loan Projects 2009 (Philippines) October 2010 JAPAN INTERNATIONAL COOPERATION AGENCY PADECO Co., Ltd. EVD JR 10-65 Preface Ex-post evaluation of ODA projects has been in place since 1975 and since then the coverage of evaluation has expanded. Japan’s ODA charter revised in 2003 shows Japan’s commitment to ODA evaluation, clearly stating under the section “Enhancement of Evaluation” that in order to measure, analyze and objectively evaluate the outcome of ODA, external evaluations conducted by experts shall be enhanced. This volume shows the result of the ex-post monitoring for a Japanese ODA loan project that was completed seven years ago and was given ex-post evaluation five years ago. The ex-post monitoring was entrusted to external evaluators to review the projects’ effectiveness, impact, and sustainability, to follow up the recommendations made in the ex-post evaluation, and to make further recommendations for future sustainability. The lessons and recommendations drawn from these monitoring will be shared with JICA’s stakeholders in order to apply to the planning and implementation of similar projects in the future. Lastly, deep appreciation is given to those who have cooperated and supported the creation of this volume of evaluations. October 2010 Atsuo KURODA Vice President Japan International Cooperation Agency (JICA) Disclaimer This volume of evaluations shows the result of objective ex-post evaluations made by external evaluators. The views and recommendations herein do not necessarily reflect the official views and opinions of JICA. No part of this report may be copied or reprinted without the consent of JICA.
    [Show full text]