3Rd Quarter of 2017
Total Page:16
File Type:pdf, Size:1020Kb
Highlights Of Accomplishment Report 3rd Quarter of 2017 Prepared by: Corporate Planning and Management Staff Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1 TRAFFIC ENFORCEMENT Income from Traffic Fines Traffic Direction & Control; Metro Manila Traffic Ticketing System 60-Kph Speed Limit Enforcement Bus Management and Dispatch System South West Integrated Provincial Transport System (SWIPTS) EDSA Bicycle-Sharing Scheme Towing and Impounding Anti-Jaywalking Operations Anti-Illegal Parking Operations Enforcement of the Yellow Lane and Closed-Door Policy Anti-Colorum and Out-of-Line Operations Operation of the TVR Redemption Facility Personnel Inspection and Monitoring Road Emergency Operations (Emergency Response and Roadside Clearing) Unified Vehicular Volume Reduction Program (UVVRP) TRAFFIC ENGINEERING Upgrading of Traffic Signal System Design and Construction of Pedestrian Footbridges Application of Thermoplastic and Traffic Cold Paint Pavement Markings Fabrication & Manufacturing/ Maintenance of Traffic Road Signs/ Facilities Installation of Traffic Facilities and Road Signs Maintenance of Traffic Road Signs and Facilities Traffic Signal Operation & Maintenance Street Lighting Maintenance Other Special Projects TRAFFIC EDUCATION Institute of Traffic Management OTHER TRAFFIC IMPROVEMENT-RELATED SPECIAL PROJECTS/ MEASURES METROBASE FLOOD CONTROL & SEWERAGE MANAGEMENT OFFICE (FCSMO) ……………….. 16 SOLID WASTE MANAGEMENT OFFICE ……………….. 19 HEALTH, PUBLIC SAFETY & ENVIRONMENTAL PROTECTION OFFICE (HPSEPO) ……………….. 22 Enforcement of MMDA Regulation No. 96-009 or Anti-littering Law Enforcement of RA 9211 or the Tobacco Regulation Act/ No Smoking in Public Places/ MMDA-Bloomberg Project Public Safety Programs Anti-Smoke Belching Operations Metro Parkway Clearing Group OFFICE OF THE ASSISTANT GENERAL MANAGER FOR PLANNING (OAGMP) ……………….. 33 Regional Development Council (RDC) NCR Development Planning Land Use Planning and Zoning Shelter Services Other Activities METROPOLITAN SOCIAL SERVICE OFFICE ……………….. 37 SIDEWALK CLEARING OPERATIONS ……………….. 38 GROUP (SCOG) COUNCIL SECRETARIAT ……………….. 40 MANAGEMENT AND INFORMATION ……………….. 42 SYSTEM STAFF PUBLIC AFFAIRS STAFF—PUBLIC ……………….. 43 INFORMATION CENTER Public Concerns and Responses Management Unit Design and Layout TRAFFIC ADJUDICATION DIVISION ……………….. 45 CORPORATE PLANNING AND ……………….. 46 MANAGEMENT STAFF TASK FORCE BAKLAS BILLBOARD ……………….. 48 FINANCE SERVICE ……………….. 49 Accounting Division Budget Division Internal Audit Unit ADMINISTRATIVE SERVICE ……………….. 53 Personnel Benefits Division Payroll Group Medical and Dental Clinics Personnel Transaction Division General Administrative Service Division Transport Division Staff Development Division Supply and Property Division Records Division MMDA SPECIAL PROJECTS ……………….. 64 Children’s Road Safety Park Metro Manila Crisis Monitoring and Management Center TRAFFIC DISCIPLINE OFFICE INCOME FROM TRAFFIC FINES The MMDA earned a total of P32.088M from traffic fines during the 3rd Quarter of 2017. Compared to the same period last year, income from the same source was recorded at P24.412M, or an increase of P7.676M (31.44%). PROGRAM/PROJECT/ACTIVITY 3rd Quarter 2017 3rd Quarter 2016 INCOME FROM TRAFFIC FINES P32.088M P24.412M TRAFFIC ENFORCEMENT TRAFFIC DIRECTION AND CONTROL; METRO MANILA TRAFFIC TICKETING SYSTEM A total of 2,205 traffic constables were deployed in Metro Manila as of September 30, 2017, of which 826 were active UOVR holders, who made a total of 107,876 apprehensions that comprise 269.7% of the 40,000 target output for the quarter. Target Output 3rd Quarter 3rd Quarter PROGRAM/PROJECT/ACTIVITY 2017 2017 2016 No. of Traffic Constables (TCs) 100% 2,205 2,361 deployed deployment of TCs No. of active UOVR holders - 826 935 Total no. of apprehensions 40,000/ qtr. 107,876 62,086 (269.7%) 1| P a g e 60-KPH SPEED LIMIT ENFORCEMENT A 60-km. speed limit has been in force along Commonwealth Ave. since 2011 to stem the high incidence of road accidents on this major road. Macapagal Ave. Commonwealth Ave. Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Commonwealth Ave. Speed Limit 100%/ qtr. 414 85 Enforcement (100%) Macapagal Ave. Speed Limit 381 31 Enforcement (100%) Total 795 116 Bus Management & Dispatch System (BMDS) This scheme controls bus dispatch in the 4 major BMDS terminals in Baclaran, Alabang, Fairview and Malabon and in 10 satellite stations to improve city bus operation particularly along EDSA. PROGRAM/ PROJECT/ ACTIVITY Target Output 3rd Quarter 3rd Quarter 2017 2017 2016 Total bus trips recorded 478,400/ qtr. 546,326 552,194 Average daily bus dispatch recorded 5,200 ave. 5,940 5,998 daily bus trips (114%) City bus drivers registered via fingerprint 150 323 413 scanners (215.33%) No. of drivers’ records being maintained/ up- 11,219 9,926 dated in the PUB Drivers Databank - No. of BMDS-related apprehensions made 25 711 720 (2,844%) 2| P a g e SOUTHWEST INTEGRATED PROVINCIAL TRANSPORT SYSTEM (SWIPTS) The MMDA SWIPTS Terminal was launched on August 6, 2013 to serve as a temporary terminal for Cavite and Batangas-bound provincial buses until the completion of a permanent South West ITS (Integrated Transport System) Terminal. The terminal’s location was transferred from Coastal Mall in Paranaque City to HK Plaza along Roxas Blvd. -EDSA on May 5, 2017. 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY Target Output 2017 2017 2016 Total no. of bus trips recorded/ dis- 13,020/ qtr. 18,656 24,726 patched (143.28%) EDSA BICYCLE-SHARING SCHEME As of September 2017, bicycle-sharing was stopped as all bike lanes are set for rehabilitation. With the remaining 27 repaired bicycles during the quarter, 71 bike users still benefitted from this project. Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Comparative No. of Bike Borrowings 200/ qtr. 71 841 (35.5%) Towing and Impounding Illegally parked, out-of-line and colorum vehicles are subject to towing and impounding. Ultra in Pasig City and Tumana in Marikina City are the two impounding areas that the MMDA maintains. 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY Target Output 2017 2017 2016 Impounded 100% of stalled vehicles 7,241 5,667 Released 6,335 5,279 3| P a g e ANTI-JAYWALKING OPERATIONS Five groups of the Anti-Jaywalking Unit (AJU) conducted operations along EDSA-Quezon Ave., EDSA-Taft Ave. (Pasay City), EDSA-Ortigas, EDSA-Ayala, and EDSA (roving team). The following chart shows the total apprehensions made by the teams during 3rd quarter 2017, with comparative figures during the same period in 2016: Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Settled/ Paid fine 1,227 551 Unsettled 6,773 2,711 Rendered community service 116 Total 8,116 3,262 1,400/ qtr. (579.7%) ANTI-ILLEGAL PARKING OPERATIONS The Anti-Illegal Parking Operations (AIPO) unit was created under Office Order No. 44, s. 2016 and replaced the former Parking Enforcement Team which was dissolved per Office Order No. 86, s. 2016. AIPO reported the following accomplishments for 3rd Quarter 2017, with comparative figures for the same period in 2016: Target Output PROGRAM/ PROJECT/ ACTIVITY 3rd Quarter 2017 3rd Quarter 2016 2017 Towed vehicles (unattended) 1,448 2,416 3,960 Issued UOVR tickets (Illegal apprehensions 6,208 1,670 Parking) per quarter Total 7,656 (193.33%) 4| P a g e ENFORCEMENT OF THE YELLOW LANE RULE & CLOSED-DOOR POLICY The Yellow Lane Rule restricts buses and PUJs in their designated yellow lanes while the Closed Door Policy requires them to maintain closed doors while on the move. These rules are strictly implemented to help improve traffic flow and promote passenger safety. PROGRAM/ PROJECT/ Target Output 2017 3rd Quarter 2017 3rd Quarter 2016 ACTIVITY Yellow Lane Rule 100% per quarter 2,438 2,016 (100%) Closed-Door Policy 1,213 432 (100%) ANTI-COLORUM & OUT-OF-LINE OPERATIONS Public utility vehicles without LTFRB franchise and those operating outside their authorized routes contribute to traffic congestion and unduly compete with legal transport operators. PROGRAM/ PROJECT/ Target Output 2017 3rd Quarter 2017 3rd Quarter 2016 ACTIVITY Anti-Colorum Operations 100% apprehension 267 123 of violators Out-of-Line Operations 264 103 5| P a g e OPERATION OF THE TVR REDEMPTION FACILITY The TVR Redemption Facility accomplished the following comparative figures during the 3rd quarter of years 2017 and 2016: Target Output 3rd Quarter 3rd Quarter PROGRAM/ PROJECT/ ACTIVITY 2017 2017 2016 Traffic clearance applications 10,890/ qtr. 19,349 18,738 processed 21,780/ sem (177.67%) Traffic clearances released - 18,705 18,524 (96.67% of processed) Applications received/ processed for 100/ qtr. 389 253 release of impounded vehicles 200/ sem. (389%) Impounded vehicles released after - 361 254 penalty payment/ with resolution (92.8% of from the Traffic Adjudication Div. processed) Bank payments downloaded and 15,000/ qtr. 31,543 20,742 uploaded to MRRES database 30,000/ sem (210%) Confiscated drivers licenses and 1,075/ qtr. 1,103 1,606 motor vehicle plates received (102.6%) Confiscated drivers licenses & 820 1,353 vehicle plates processed and (74.34% of released to owners received) 6| P a g e Monitoring of Field Personnel The TDO Personnel Inspection & Monitoring Group (PIMG) conducts inspection and monitoring of traffic/ field personnel assigned at the different traffic enforcement units and metes disciplinary action as warranted. Chart below shows comparative accomplishments